Loading...
HomeMy WebLinkAboutMOUNTAIN'S EDGE (FORMERLY 2430 OVERLAND TRAIL - RESIDENTIAL) - PDP - PDP160045 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT December 22, 2016 Mountain’s Edge Fort Collins, Colorado Prepared for: Lorson South Land Corp Jeff Mark 212 N. Wahsatch Avenue, Suite 301 Colorado Springs, CO 80903 719-635-3200 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 911-007  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for Mountain’s Edge Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed Mountain’s Edge development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Mountain’s Edge Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 1 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description ............................................................................................................... 4 B. Sub-Basin Description .................................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations .................................................................................................................................. 5 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 6 D. Hydrological Criteria .................................................................................................................... 6 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 6 G. Modifications of Criteria .............................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept .......................................................................................................................... 7 B. Water Quality Treatment ........................................................................................................... 12 C. Specific Details ........................................................................................................................... 12 V. CONCLUSIONS ...................................................................................................... 12 A. Compliance with Standards ........................................................................................................ 12 B. Drainage Concept ...................................................................................................................... 12 References ....................................................................................................................... 13 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (NOT INCLUDED WITH PDP) B.1 – Detention Ponds and Water Quality B.2 – Storm Sewers (NOT INCLUDED WITH PDP) B.3 – Inlets (NOT INCLUDED WITH PDP) APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX E – References Mountain’s Edge Preliminary Drainage Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 LIST OF TABLES: Table 1 - Historic Rational Basin Summary ............................................................................ 8 Table 2 - Proposed Rational Basin Summary .......................................................................... 9 Table 3 - Detention Pond Summary ..................................................................................... 10 Table 4 - Historic Stormwater Release and Allowable Developed Release.................................. 11 Table 5 - Proposed Stormwater Release ............................................................................... 11 MAP POCKET: HDR1 – Historic Drainage Exhibit DR1 - Drainage Exhibit Mountain’s Edge Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. A tract located in the southwest quarter of Section 21, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. Bounded to the north by private property, to the west by Overland Trail, to the east by the Brown Farm Subdivision, and to the south by Drake Road. 4. Significant offsite flows are directed into the site through Dixon Creek. Dixon Creek traverses the Mountain’s Edge site within the southern half. Additionally, two existing culverts cross Overland Trail. These culverts convey stormwater runoff from the property to the west. These off-site flows will be conveyed safely to ultimate outfall locations within the Mountain’s Edge site. 5. The Mountain’s Edge property has not been studied with the previous proposals or drainage studies. B. Description of Property 1. The site is approximately 19.67 acres. This acreage includes a portion of the adjacent Overland Trail Right of Way. Mountain’s Edge Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The existing site is generally comprised of vacant land with natural grasses and vegetation. A house, gravel drive, and out-structures exist on the site. Off-site basins include portions of adjacent Overland Trail. 3. The north half of the site is within the Canal Importation Basin. The northern 1/3 of the site slopes to the northern property line. A portion of the center of the site slopes to the east and overland flows across the existing single-family lots. The southern half of the site is located within the Spring Creek Basin and slopes south to the Dixon Creek drainage channel. 4. A report by Soilogic dated June 11, 2015 lists the soils for the area as consisting of silty/clayey sand, gravel, cobble and sandy lean clay ranging from 9 to 15 feet below the ground surface. A Web Soil Survey by the Natural Resources Conservation Service indicates soils are classified as Hydrologic Soil Group B and have a moderate infiltration rate. For this study, the soils were modeled as a Soil Group C with a slow infiltration rate to account for the soil variations within the soil borings. 5. The proposed project site plan is composed of 19 townhome buildings, 17 single-family lots, public local streets, sidewalk, private asphalt drives, and detention ponds. 6. This site will employ water quality features and runoff reduction facilities including rain gardens, minimization of directed connected areas of imperviousness, grass swales with infiltration section, grass buffers, and extended detention basins. Mountain’s Edge Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 7. No existing irrigation facilities are known at this time. 8. The project site has not been a part of any known previous drainage study. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Mountain’s Edge Preliminary Drainage Report 4 Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Mountain’s Edge project is located within two major drainage basins. The northern half of the site is located within the Canal Importation Basin. The southern half of the site is located within the Spring Creek Basin. B. Sub-Basin Description 1. Historically, the stormwater runoff and off-site flows within the northern half of the site generally flow in two directions. Stormwater runoff in the northern 1/3 of the site generally flows to the northern boundary and is collected within a swale along the access roadway on the adjacent property. Flows are conveyed to a City owned/maintained channel in the Brown’s Farm 3rd Subdivision. Stormwater within the remainder of the northern half of the site overland flows across the existing single- family lots along the eastern boundary of the site. 2. Historically, stormwater runoff within the southern half of the site overland flows to the Dixon Creek channel. Once collected in the channel it is conveyed under Drake Road and ultimately outfalling to Spring Creek. 3. The proposed plan will generally detain developed flows and release to the historical Mountain’s Edge Preliminary Drainage Report 5 outfall locations at the historical flow rates. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Mountain’s Edge project. B. Four Step Process The overall stormwater management strategy employed with the Mountain’s Edge project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Preserving natural areas south of the Dixon Creek. Minimizing site disturbance. Proposed smaller private streets will allow for greater open space in the center of the site. This approach allows for a lower percent imperviousness. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through rain gardens, grass-lined channels or grass buffers to provide additional infiltration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed rain gardens and extended detention basins. Water quality for areas not routed through the rain gardens will be provided within the extended detention basin volume. Step 3 – Stabilize Drainageways This property discharges detained stormwater to an existing drainage channel (Dixon Creek). The proposed release from this property is expected to require erosion control mats to stabilize the drainage way at the proposed pipe outfalls. Additionally, any proposed 4:1 grading will be required to be stabilized with erosion control blankets along the Dixon Creek. The majority of the Dixon Creek channel will remain undisturbed. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash receptacles within home will allow for the disposal of solid waste. Rain Gardens and extended detention basins to provide for water treatment prior to flows being released to existing drainageways and storm infrastructure. Mountain’s Edge Preliminary Drainage Report 6 Standard Operating Procedures (SOPs) for BMP maintenance of Rain Gardens, Detention ponds, and associated drainage infrastructure to remove sediment accumulation regularly. C. Development Criteria Reference and Constraints 1. The proposed site is a part of the Foothills Drainage Basin. This basin requires a 2- year historic stormwater release from the developed property. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Modified FAA Method calculations were utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the north and south. 2. All drainage facilities proposed with the Mountain’s Edge project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Mountain’s Edge project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. Mountain’s Edge Preliminary Drainage Report 7 G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Mountain’s Edge drainage design are to maintain the allowable storm runoffs as outlined within both the Spring Creek and Canal Importation Basin master plans, and to maintain the historic discharge locations. 2. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 3. Historic runoff from the Mountain’s Edge project site was evaluated. This evaluation provided the historic 2-yr and 100-yr peak runoff rates for the existing site and historic discharge locations. Basin HA Basin HA is generally the southern half of the property. Stormwater within this portion of the existing property generally flows via overland to Dixon Creek, from there it is conveyed to Spring Creek through existing drainage infrastructure. Basin HA is within the Spring Creek Basin. Basin HA was subdivided into 3 sub-basins to further aid in design. Basin HA1 contains the area of the site that will remain mostly undisturbed and pervious. This area includes Dixon Creek. Basin HA2 contains area north of Dixon Creek that will be developed with this project. Basin HA3 contains existing Overland Trail Right of Way proposed to be detained with this project. Basin HB Basin HB is generally the northern half of the property. Stormwater within this portion of the existing property generally flows via overland the existing single-family development or to a swale adjacent the existing access road, north of the property boundary. These stormwater flows are conveyed through existing drainage infrastructure to the detention ponds within the Brown’s Farm Subdivision. Basin HB is within the Canal Importation Basin. Basin HB was subdivided into 3 sub-basins to further aid in design. Basin HB1 contains the northern 1/3 of the property. This area generally drains to the northern property line and is collected in a swale along the off-site access road. From there, flows are conveyed to a City owned and maintained drainage easement through the Brown’s Farm Subdivision. Mountain’s Edge Preliminary Drainage Report 8 Basin HB2 contains existing Overland Trail Right of Way proposed to be detained with this project. Basin HB3 contains a portion of the property that generally flows via overland to the eastern boundary. Stormwater from this location historically flows through the adjacent single-family lots to Compass Court. Table 1 - Historic Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 4. The Mountain’s Edge project divided the site into six (6) major drainage basins, designated as Basins A, B, C, D, OS and UD. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 1. Basin A is subdivided into 3 sub-basins (A1-A3). Runoff from Basins A1-A3 is detained in Detention Pond 1. Stormwater runoff within Basin A2 is treated for water quality and LID in Rain Garden 1. Stormwater runoff from Basin A1 and A3 is treated for water quality within Detention Pond 1. LID treatment for Basin A3 is provided through grass buffers and grass swales. Basin B Basin B consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 2. Basin B is subdivided into 5 sub-basins (B1-B5). Runoff from Basins B1-B5 is detained in Detention Pond 2. Stormwater runoff for Basins B1-B5 will be treated for water quality within Detention Pond 2. Stormwater runoff from Basins B1, B2 and B5 is treated for LID with grass buffers and grass-lined swale with infiltration section. Off-site stormwater from an existing culvert under Overland Trail, within Basin B1, will be safely routed through Detention Pond 2 undetained. Basin C Basin C consists of proposed single-family attached buildings, sidewalk, roadways, landscape areas and Detention Pond 3. Basin C is subdivided into 2 sub-basins (C1- C2). Runoff from Basins C1-C2 is detained in Detention Pond 3. Stormwater runoff for Basins C1-C2 will be treated for water quality within Detention Pond 3. No LID treatment is planned for Basin C. Off-site stormwater from an existing culvert under Mountain’s Edge Preliminary Drainage Report 9 Basin D Basin D consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 4. Basin D is subdivided into 5 sub-basins (D1-D5). Runoff from Basins D1-D5 is detained in Detention Pond 4. Stormwater runoff for Basins D1-D5 will be treated for water quality and LID within Rain Garden 2. No additional water quality treatment is planned within Detention Pond 4. Basin OS Basin OS1 consists of open space and Dixon Creek. No detention is proposed for this basin as it is not being developed and generally will remain undisturbed. Some grading is proposed within this basin to accommodate Detention Pond 4. Basin UD Basin UD1 consists of proposed single-family lots, sidewalk, and roadways. Runoff from Basin UD1 will not be detained. Stormwater runoff for Basin UD1 generally will be conveyed through existing single-family lots. These existing single-family lots will generally function as grass buffers and thereby provide LID treatment. Table 2 - Proposed Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 1.74 0.63 0.79 7.4 5.7 2.77 13.25 2 A2 1.48 0.77 0.96 5.0 5.0 3.26 14.24 3 A3 2.23 0.44 0.55 9.7 8.9 2.20 10.00 4 B1 0.47 0.84 1.00 6.1 5.0 1.04 4.63 5 B2 0.57 0.55 0.69 6.2 5.4 0.84 3.93 6 B3 1.27 0.80 1.00 5.0 5.0 2.90 12.67 7 B4 0.23 0.60 0.75 6.5 5.0 0.35 1.70 8 B5 0.86 0.27 0.34 12.7 12.0 0.47 2.10 9 C1 0.36 0.63 0.79 5.0 5.0 0.65 2.84 10 C2 0.48 0.43 0.54 5.9 5.1 0.58 2.62 11 D1 0.33 0.85 1.00 5.9 5.0 0.76 3.24 11 D2 2.05 0.73 0.91 5.0 5.0 4.24 18.52 12 D3 0.98 0.72 0.90 6.3 5.0 1.89 8.79 13 D4 0.66 0.60 0.74 5.1 5.0 1.12 4.87 14 D5 1.38 0.36 0.45 9.9 9.2 1.11 4.93 15 UD1 0.49 0.36 0.45 11.9 10.5 0.37 1.67 16 OS1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 5. Four (4) detention ponds are proposed with the Mountain’s Edge development. These ponds will restrict all runoff from the site to historic 2-yr flowrate based on the master drainage basins, Spring Creek Basin and Canal Importation Basin. Mountain’s Edge Preliminary Drainage Report 10 Detention Pond 1 Detention Pond 1 detains developed runoff from Basin A. Detention Pond 1 has a total 3.34 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. Additionally, the emergency spill location is 1.58 feet below the lowest proposed top of foundation. Water Quality is proposed within the pond volume through an approved outlet structure. Detention Pond 2 Detention Pond 2 detains developed runoff from Basin B. All minimum opening elevations (MOEs) will need to be set at least 1 ft above the 100-yr WSEL with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Additionally, Pond 2 will be designed to pass off-site flow safely through the pond undetained. Detention Pond 3 Detention Pond 3 detains developed runoff from Basin C. Detention Pond 3 has a total 3.00 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 3 will be directed through an emergency spill weir designed with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Additionally, Pond 3 will be designed to pass off-site flow safely through the pond undetained. Detention Pond 4 Detention Pond 4 detains developed runoff from Basin D. Detention Pond 4 has a total 2.40 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 4 will be directed through an emergency spill weir designed with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Table 3 - Detention Pond Summary Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.19 5144.86 2,814 5142.63 0.60 2 0.50 5139.56 2,684 5137.73 2.30 3 0.15 5145.28 513 5143.14 0.20 4 1.17 5142.81 863 5137.48 0.80 Mountain’s Edge Preliminary Drainage Report 11 Total Stormwater Release from Site The total allowable 100-yr release from the site was evaluated based on historic Basins HA and HB. These basins correlate with the Spring Creek Basin and Canal Importation Basin, respectively. The allowable release for the Spring Creek Basin is a summation of the 100-yr historic runoff from Basin HA1 and the 2-yr historic runoff from Basins HA2 and HA3. The allowable release for the Canal Importation Basin is a summation of the 2-yr historic runoff from Basins HB1-HB3. Table 4 - Historic Stormwater Release and Allowable Developed Release Historic Stormwater Release Allowable Developed 100- yr Release (cfs) Pond/ Basin 2-yr Flow (cfs) 100-yr Flow (cfs) HA1 1.96 8.68 8.68 HA2 1.31 5.95 1.31 HA3 0.27 1.33 0.27 TOTAL BASIN HA 3.54 15.96 10.26 HB1 2.18 9.80 2.18 HB2 0.49 2.29 0.49 HB3 1.32 6.06 1.32 TOTAL BASIN HB 3.99 18.15 3.99 Total developed 100-yr release in to the Spring Creek Basin (Historic Basin HA) is a summation of the release rates from Ponds 1, 3, and 4, and the 100-yr flowrate for Basin OS1. Total developed 100-yr release in to the Canal Importation Basin (Historic Basin HB) is a summation of the release rate from Pond 2, and the 100-yr flowrate for Basin UD1. Table 5 - Proposed Stormwater Release Proposed Stormwater Release Pond/ Basin 100-yr Flow (cfs) Basin HA Pond 1 0.60 Pond 3 0.20 Pond 4 0.80 Basin OS1 8.68 Total Basin HA 10.28 Basin HB Pond 2 2.30 UD1 1.67 Total Basin HB 3.97 Mountain’s Edge Preliminary Drainage Report 12 The proposed ponds will effectively detain all developed flows from the property to the 2-year historic release for both the Spring Creek and Canal Importation Basins. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Water Quality Treatment 1. A combination of 12-hr Rain Gardens and 40-hr Extended Detention Basins will provide water quality for the site, including a portion of the Overland Trail right of way. 2. Water Quality within the Detention Ponds will be provided through approved outlet structures. C. Specific Details 1. Additional details to be provided with the FDP submittal. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Master Drainage Plan for the Spring Creek Basin and Canal Importation Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 74% total impervious areas as being treated through an LID treatment. Please see LID Exhibit located in the Appendix. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with the Fort Collins Master Drainage Plan and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration from the underground water quality chambers. This is currently unable to be calculated with available soils data. Mountain’s Edge Preliminary Drainage Report 13 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Preliminary Geotechnical Subsurface Exploration Report Proposed Single-Family Residential Development Herring Property – 2430 South Overland Trail, Fort Collins, Colorado, June 11, 2015, Soilogic, Inc. (Soilogic Project No. 15-1132). 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 1 of 4 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 488580 488640 488700 488760 488820 488880 488940 488580 488640 488700 488760 488820 488880 488940 40° 33' 24'' N 105° 8' 5'' W 40° 33' 24'' N 105° 7' 50'' W 40° 33' 8'' N 105° 8' 5'' W 40° 33' 8'' N 105° 7' 50'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,410 if printed on A portrait (8.5" x 11") sheet. Warning: Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 3 Altvan-Satanta loams, 0 to 3 percent slopes B 8.7 42.7% 4 Altvan-Satanta loams, 3 to 9 percent slopes B 11.6 57.3% Totals for Area of Interest 20.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 4 of 4 Mountain's Edge CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 20, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. HA1 4.07 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.075 0.25 0.25 0.31 0% Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 HA1 No 0.25 0.25 0.31 87 11.64% 6.5 6.5 6.1 681 0.94% 1.46 7.8 14.3 14.3 13.9 1 HA2 Yes 0.25 0.25 0.31 547 3.21% 25.2 25.2 23.4 583 0.96% 1.47 6.6 31.8 31.8 29.9 1 HA3 Yes 0.57 0.57 0.71 620 2.89% 17.4 17.4 12.8 583 0.96% 1.47 6.6 24.0 24.0 19.4 2 HB1 No 0.25 0.25 0.31 252 5.17% 14.6 14.6 13.5 590 0.94% 1.45 6.8 21.4 21.4 20.3 2 HB2 No 0.57 0.57 0.71 252 5.17% 9.1 9.1 6.7 590 0.94% 1.45 6.8 15.9 15.9 13.5 Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: 1 HA1 4.07 14 14 14 0.25 0.25 0.31 1.92 3.29 6.82 1.96 3.35 8.68 1 HA2 4.18 32 32 30 0.25 0.25 0.31 1.26 2.14 4.56 1.31 2.24 5.95 1 HA3 0.33 24 24 19 0.57 0.57 0.71 1.48 2.52 5.75 0.27 0.47 1.33 2 HB1 5.60 21 21 20 0.25 0.25 0.31 1.56 2.67 5.60 2.18 3.74 9.80 2 HB2 0.47 16 16 13 0.57 0.57 0.71 1.84 3.14 6.92 0.49 0.83 2.29 3 HB3 4.66 37 37 34 0.25 0.25 0.31 1.13 1.93 4.16 1.32 2.25 6.06 EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 20, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Runoff Mountain's Edge CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 20, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Single Family Lots 0.30 30% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Single-Family Lots (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: 1 A1 1.74 7 7 6 0.63 0.63 0.79 2.52 4.31 9.63 2.77 4.74 13.25 2 A2 1.48 5 5 5 0.77 0.77 0.96 2.85 4.87 9.95 3.26 5.58 14.24 3 A3 2.23 10 10 9 0.44 0.44 0.55 2.26 3.86 8.21 2.20 3.76 10.00 3 TOTAL BASIN A 5.46 8 8 7 0.59 0.59 0.74 2.40 4.10 8.80 7.73 13.21 35.43 4 B1 0.47 6 6 5 0.84 0.84 1.00 2.67 4.56 9.95 1.04 1.78 4.63 5 B2 0.57 6 6 5 0.55 0.55 0.69 2.67 4.56 9.95 0.84 1.44 3.93 6 B3 1.27 5 5 5 0.80 0.80 1.00 2.85 4.87 9.95 2.90 4.96 12.67 7 B4 0.23 7 7 5 0.60 0.60 0.75 2.60 4.44 9.95 0.35 0.61 1.70 8 B5 0.86 13 13 12 0.27 0.27 0.34 2.02 3.45 7.16 0.47 0.81 2.10 8 TOTAL BASIN B 3.40 11 11 10 0.62 0.62 0.77 2.13 3.63 7.88 4.47 7.61 20.64 9 C1 0.36 5 5 5 0.63 0.63 0.79 2.85 4.87 9.95 0.65 1.11 2.84 10 C2 0.48 6 6 5 0.43 0.43 0.54 2.76 4.72 9.95 0.58 0.99 2.62 10 TOTAL BASIN C 0.85 5 5 5 0.52 0.52 0.65 2.85 4.87 9.95 1.25 2.14 5.46 11 D1 0.33 6 6 5 0.85 0.85 1.00 2.76 4.72 9.95 0.76 1.30 3.24 11 D2 2.05 5 5 5 0.73 0.73 0.91 2.85 4.87 9.95 4.24 7.25 18.52 12 D3 0.98 6 6 5 0.72 0.72 0.90 2.67 4.56 9.95 1.89 3.22 8.79 13 D4 0.66 5 5 5 0.60 0.60 0.74 2.85 4.87 9.95 1.12 1.91 4.87 14 D5 1.38 10 10 9 0.36 0.36 0.45 2.26 3.86 8.03 1.11 1.89 4.93 14 TOTAL BASIN D 5.39 10 10 9 0.62 0.62 0.78 2.21 3.78 8.03 7.42 12.68 33.68 15 UD1 0.49 12 12 11 0.36 0.36 0.45 2.09 3.57 7.57 0.37 0.63 1.67 16 OS1 4.07 14 14 14 0.25 0.25 0.31 1.92 3.29 6.82 1.96 3.35 8.68 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION POND SIZING B.2 STORM SEWER (NOT INCLUDED) B.3 INLET (NOT INCLUDED) APPENDIX B.1 DETENTION PONDS AND WATER QUALITY Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 12/22/2016 Pond No.: 1 Pond 1 100-yr 0.74 WQCV 2814 ft3 Area (A)= 5.46 acres Quantity Detention 49207 ft3 Max Release Rate = 0.6 cfs Total Volume 52021 ft3 Total Volume 1.194 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 40.2 12061 180 11881 10 600 7.72 31.2 18715 360 18355 15 900 6.52 26.3 23709 540 23169 20 1200 5.60 22.6 27151 720 26431 25 1500 4.98 20.1 30182 900 29282 30 1800 4.52 18.3 32873 1080 31793 35 2100 4.08 16.5 34618 1260 33358 40 2400 3.74 15.1 36267 1440 34827 45 2700 3.46 14.0 37745 1620 36125 50 3000 3.23 13.1 39151 1800 37351 55 3300 3.03 12.2 40400 1980 38420 60 3600 2.86 11.6 41600 2160 39440 65 3900 2.72 11.0 42861 2340 40521 70 4200 2.59 10.5 43951 2520 41431 75 4500 2.48 10.0 45091 2700 42391 80 4800 2.38 9.6 46158 2880 43278 85 5100 2.29 9.3 47188 3060 44128 90 5400 2.21 8.9 48218 3240 44978 95 5700 2.13 8.6 49054 3420 45634 100 6000 2.06 8.3 49939 3600 46339 105 6300 2.00 8.1 50909 3780 47129 110 6600 1.94 7.8 51733 3960 47773 115 6900 1.89 7.6 52691 4140 48551 120 7200 1.84 7.4 53527 4320 49207 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 12/22/2016 10:48 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 12/22/2016 Pond No.: 1 Pond 1 WQCV 2814 ft3 5142.63 ft. Design Storm 100-yr Required Volume= 52021 ft3 5144.86 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,141.60 3 0.00 0 0 0 0 5,141.80 295 0.20 30 30 22 22 5,142.00 1249 0.20 154 184 143 165 5,142.20 2831 0.20 408 592 397 562 5,142.40 5014 0.20 784 1377 774 1337 5,142.60 7597 0.20 1261 2638 1252 2589 5,142.80 10388 0.20 1798 4436 1791 4380 5,143.00 13198 0.20 2359 6795 2353 6733 5,143.20 16023 0.20 2922 9717 2917 9650 5,143.40 18,846 0.20 3487 13204 3483 13133 5,143.60 21,585 0.20 4043 17247 4040 17173 5,143.80 24,006 0.20 4559 21806 4557 21730 5,144.00 26,125 0.20 5013 26819 5012 26742 5,144.20 27,950 0.20 5408 32226 5407 32149 5,144.40 29,486 0.20 5744 37970 5743 37892 5,144.60 30,754 0.20 6024 43994 6024 43915 5,144.80 31,626 0.20 6238 50232 6238 50153 5,145.00 32,455 0.20 6408 56640 6408 56561 5,145.20 33,379 0.20 6583 63224 6583 63144 5,145.40 34,415 0.20 6779 70003 6779 69923 5,145.60 35,573 0.20 6999 77002 6998 76922 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 12/22/201610:48 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\Stage_Storage POND 1 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.460 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 48.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.4800 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.201 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.091 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 1167 <-- CALCULATED Adjusted WQCV (cu-ft) = 2814 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.030 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.260 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 4/7 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE December 20, 2016 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 69.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.690 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.22 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 64,671 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,167 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 892 sq ft D) Actual Flat Surface Area AActual = 1247 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1847 sq ft F) Rain Garden Total Volume VT= 1,289 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 1,167 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 4/5 in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering December 20, 2016 Mountain's Edge - Rain Garden 1 Drake and Overland, Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden 1.xlsm, RG 12/20/2016, 3:19 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering December 20, 2016 Mountain's Edge - Rain Garden 1 Drake and Overland, Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Rain Garden 1.xlsm, RG 12/20/2016, 3:19 PM Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 12/22/2016 Pond No.: Pond 2 Pond 2 100-yr 0.77 WQCV 2684 ft3 Area (A)= 3.40 acres Quantity Detention 18868 ft3 Max Release Rate = 2.3 cfs Total Volume 21552 ft3 Total Volume 0.495 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 26.0 7815 690 7125 10 600 7.72 20.2 12127 1380 10747 15 900 6.52 17.1 15362 2070 13292 20 1200 5.60 14.7 17593 2760 14833 25 1500 4.98 13.0 19556 3450 16106 30 1800 4.52 11.8 21300 4140 17160 35 2100 4.08 10.7 22431 4830 17601 40 2400 3.74 9.8 23499 5520 17979 45 2700 3.46 9.1 24457 6210 18247 50 3000 3.23 8.5 25368 6900 18468 55 3300 3.03 7.9 26177 7590 18587 60 3600 2.86 7.5 26955 8280 18675 65 3900 2.72 7.1 27772 8970 18802 70 4200 2.59 6.8 28479 9660 18819 75 4500 2.48 6.5 29217 10350 18867 80 4800 2.38 6.2 29908 11040 18868 85 5100 2.29 6.0 30576 11730 18846 90 5400 2.21 5.8 31243 12420 18823 95 5700 2.13 5.6 31785 13110 18675 100 6000 2.06 5.4 32358 13800 18558 105 6300 2.00 5.2 32987 14490 18497 110 6600 1.94 5.1 33521 15180 18341 115 6900 1.89 4.9 34141 15870 18271 120 7200 1.84 4.8 34683 16560 18123 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 12/22/2016 10:49 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 12/22/2016 Pond No.: Pond 2 Pond 2 WQCV 2684 ft3 5137.73 ft. Design Storm 100-yr Required Volume= 21552 ft3 5139.56 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,136.80 35 0.00 0 0 0 0 5,137.00 720 0.20 75 75 61 61 5,137.20 2095 0.20 282 357 270 330 5,137.40 3752 0.20 585 942 577 907 5,137.60 5652 0.20 940 1882 934 1841 5,137.80 7358 0.20 1301 3183 1297 3138 5,138.00 8656 0.20 1601 4785 1600 4738 5,138.20 9573 0.20 1823 6607 1822 6560 5,138.40 10171 0.20 1974 8582 1974 8534 5,138.60 10550 0.20 2072 10654 2072 10606 5,138.80 10908 0.20 2146 12800 2146 12752 5,139.00 11270 0.20 2218 15017 2218 14970 5,139.20 11638 0.20 2291 17308 2291 17260 5,139.40 12019 0.20 2366 19674 2366 19626 5,139.60 12482 0.20 2450 22124 2450 22076 5,139.80 13045 0.20 2553 24677 2553 24628 5,140.00 13726 0.20 2677 27354 2677 27305 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 12/22/201610:50 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\Stage_Storage POND 2 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 3.400 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 54.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5400 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.217 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.062 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 2684 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.251 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 4/7 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE December 20, 2016 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 12/22/2016 Pond No.: Pond 3 Pond 3 100-yr 0.65 WQCV 513 ft3 Area (A)= 0.85 acres Quantity Detention 5880 ft3 Max Release Rate = 0.2 cfs Total Volume 6393 ft3 Total Volume 0.147 ac-ft Time Time Larimer County Area II 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 5.5 1649 60 1589 10 600 7.72 4.3 2559 120 2439 15 900 6.52 3.6 3242 180 3062 20 1200 5.60 3.1 3713 240 3473 25 1500 4.98 2.8 4127 300 3827 30 1800 4.52 2.5 4495 360 4135 35 2100 4.08 2.3 4734 420 4314 40 2400 3.74 2.1 4959 480 4479 45 2700 3.46 1.9 5161 540 4621 50 3000 3.23 1.8 5354 600 4754 55 3300 3.03 1.7 5524 660 4864 60 3600 2.86 1.6 5689 720 4969 65 3900 2.72 1.5 5861 780 5081 70 4200 2.59 1.4 6010 840 5170 75 4500 2.48 1.4 6166 900 5266 80 4800 2.38 1.3 6312 960 5352 85 5100 2.29 1.3 6453 1020 5433 90 5400 2.21 1.2 6594 1080 5514 95 5700 2.13 1.2 6708 1140 5568 100 6000 2.06 1.1 6829 1200 5629 105 6300 2.00 1.1 6962 1260 5702 110 6600 1.94 1.1 7074 1320 5754 115 6900 1.89 1.0 7205 1380 5825 120 7200 1.84 1.0 7320 1440 5880 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 12/22/2016 10:51 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 12/22/2016 Pond No.: Pond 3 Pond 3 WQCV 513 ft3 5143.14 ft. Design Storm 100-yr Required Volume= 6393 ft3 5145.28 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,142.00 9 0.00 0 0 0 0 5,142.20 73 0.20 8 8 7 7 5,142.40 199 0.20 27 35 26 33 5,142.60 389 0.20 59 94 58 91 5,142.80 640 0.20 103 197 102 193 5,143.00 955 0.20 160 357 158 352 5,143.20 1,336 0.20 229 586 228 580 5,143.40 1,746 0.20 308 894 307 887 5,143.60 1,900 0.20 365 1259 364 1251 5,143.80 2,062 0.20 396 1655 396 1647 5,144.00 2,266 0.20 433 2088 433 2080 5,144.20 2,522 0.20 479 2566 478 2559 5,144.40 2,828 0.20 535 3101 535 3093 5,144.60 3,185 0.20 601 3703 601 3694 5,144.80 3,592 0.20 678 4380 677 4371 5,145.00 4,049 0.20 764 5144 764 5135 5,145.20 4,569 0.20 862 6006 861 5996 5,145.40 5,182 0.20 975 6981 974 6971 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 12/22/201610:51 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\Stage_Storage POND 3 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 0.850 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 35.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.3500 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.166 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.012 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 513 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.140 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.051 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/4 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE December 20, 2016 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 12/22/2016 Pond No.: 4 Pond 4 100-yr 0.78 WQCV 863 ft3 Area (A)= 5.39 acres Quantity Detention 49937 ft3 Max Release Rate = 0.8 cfs Total Volume 50800 ft3 Total Volume 1.166 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 41.8 12550 240 12310 10 600 7.72 32.5 19474 480 18994 15 900 6.52 27.4 24670 720 23950 20 1200 5.60 23.5 28252 960 27292 25 1500 4.98 20.9 31405 1200 30205 30 1800 4.52 19.0 34205 1440 32765 35 2100 4.08 17.2 36022 1680 34342 40 2400 3.74 15.7 37737 1920 35817 45 2700 3.46 14.5 39276 2160 37116 50 3000 3.23 13.6 40739 2400 38339 55 3300 3.03 12.7 42038 2640 39398 60 3600 2.86 12.0 43286 2880 40406 65 3900 2.72 11.4 44598 3120 41478 70 4200 2.59 10.9 45733 3360 42373 75 4500 2.48 10.4 46919 3600 43319 80 4800 2.38 10.0 48029 3840 44189 85 5100 2.29 9.6 49101 4080 45021 90 5400 2.21 9.3 50173 4320 45853 95 5700 2.13 9.0 51043 4560 46483 100 6000 2.06 8.7 51964 4800 47164 105 6300 2.00 8.4 52973 5040 47933 110 6600 1.94 8.2 53831 5280 48551 115 6900 1.89 7.9 54827 5520 49307 120 7200 1.84 7.7 55697 5760 49937 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 12/22/2016 10:52 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 12/22/2016 Pond No.: 4 Pond 4 WQCV 863 ft3 5137.48 ft. Design Storm 100-yr Required Volume= 50800 ft3 5142.81 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,136.60 66 0.00 0 0 0 0 5,136.80 410 0.20 48 48 43 43 5,137.00 857 0.20 127 174 124 167 5,137.20 1333 0.20 219 393 217 384 5,137.40 1832 0.20 316 710 315 699 5,137.60 2,207 0.20 404 1114 403 1102 5,137.80 2,554 0.20 476 1590 476 1578 5,138.00 2,924 0.20 548 2138 547 2126 5,138.20 3,279 0.20 620 2758 620 2746 5,138.40 3,530 0.20 681 3439 681 3426 5,138.60 3,787 0.20 732 4171 732 4158 5,138.80 4,059 0.20 785 4955 784 4942 5,139.00 4,344 0.20 840 5795 840 5782 5,139.20 4,642 0.20 899 6694 898 6681 5,139.40 6,397 0.20 1104 7798 1099 7780 5,139.60 6,892 0.20 1329 9127 1329 9109 5,139.80 7,414 0.20 1431 10557 1430 10539 5,140.00 7,957 0.20 1537 12094 1537 12075 5,140.20 8,522 0.20 1648 13742 1648 13723 5,140.40 9,110 0.20 1763 15505 1763 15486 5,140.60 9,725 0.20 1884 17389 1883 17369 5,140.80 13,580 0.20 2331 19720 2320 19689 5,141.00 14,614 0.20 2819 22539 2819 22508 5,141.20 15,718 0.20 3033 25572 3032 25540 5,141.40 12,761 0.20 2848 28420 2843 28383 5,141.60 13,565 0.20 2633 31053 2632 31015 5,141.80 14,408 0.20 2797 33850 2797 33812 5,142.00 15,302 0.20 2971 36821 2970 36783 5,142.20 16,263 0.20 3156 39977 3156 39939 5,142.40 17,301 0.20 3356 43334 3356 43294 5,142.60 18,413 0.20 3571 46905 3571 46865 5,142.80 19,593 0.20 3801 50706 3800 50665 5,143.00 20,830 0.20 4042 54748 4042 54707 Design Point POND 4 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.390 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 55.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5500 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.220 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.099 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 3450 <-- CALCULATED Adjusted WQCV (cu-ft) = 863 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.085 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/3 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE December 20, 2016 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 55.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.550 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 234,756 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 3,450 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 18 in 12-INCH MAXIMUM B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 2582 sq ft D) Actual Flat Surface Area AActual = 1446 sq ft ACTUAL FLAT AREA < MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) ATop = 3365 sq ft F) Rain Garden Total Volume VT= 3,608 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 3,450 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1 1/3 in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering December 20, 2016 Mountain's Edge - Rain Garden 2 Drake and Overland, Fort Collins CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden Pond 4.xlsm, RG 12/20/2016, 3:13 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering December 20, 2016 Mountain's Edge - Rain Garden 2 Drake and Overland, Fort Collins CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Rain Garden Pond 4.xlsm, RG 12/20/2016, 3:13 PM APPENDIX B.2 STORM SEWERS APPENDIX B.3 INLETS APPENDIX C EROSION CONTROL REPORT Mountain’s Edge Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX D LID EXHIBIT Project: Mountain's Edge Calculations By: S. Thomas Date: December 22, 2016 L1 A2 64,671 69% 44,326 Rain Garden 1 A3 97,320 24% 23,327 Grass Buffer Total L1 161,991 42% 67,653 L2 B1 20,289 83% 16,939 B2 24,873 39% 9,698 B5 37,619 17% 6,570 Grass Buffer Total L2 82,781 40% 33,206 L3 C2 21,094 24% 5,009 Grass Buffer Total L3 21,094 24% 5,009 L4 D1 14,166 85% 12,078 D2 89,304 67% 60,073 D3 42,668 64% 27,423 D4 28,680 62% 17,666 D5 59,938 20% 12,240 Total L4 234,756 55% 129,480 L5 UD1 21,559 44% 9,544 Grass Buffer Total L5 21,559 44% 9,544 Total Treated 522,181 47% 244,892 A1 75,924 62% 47,069 B3 55,488 73% 40,496 B4 9,903 58% 5,779 C1 15,762 49% 7,723 Total Proposed Untreated 157,077 64% 101,066 HA3 14,166 45% 6,375 HB2 20,289 45% 9,130 Total Existing 34,455 45% 15,505 PROPOSED LID COMPUTATIONS LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment PROPOSED LID UNTREATED AREA PROPOSED LID TREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) Grass-Lined Swale w/ Infiltration Section Rain Garden 2 Project: Mountain's Edge Calculations By: S. Thomas Date: December 22, 2016 PROPOSED LID COMPUTATIONS 679,258 15,505 345,958 330,453 247,840 244,892 74% Rain Garden 1 Rain Garden 2 Total Contributing Area (sf) 64,671 234,756 Percent Impervious 69% 55% Total Volume Required (cf) 1,167 3,450 Total Volume Provided (cf) 1,167 3,450 RAIN GARDEN SUMMARY LID TREATMENT SUMMARY Total Site Area (sf) Total Existing Impervious Area (sf) Total Proposed Impervious Area (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures 75% Required Minimum Area to be Treated by LID measures (sf) Total Net Proposed Impervious Area (sf) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G AS APPENDIX E REFERENCES MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE G AS B M D T C F E S S H2O H2O H2O A1 A2 A3 B3 B1 B2 B4 B5 C1 C2 D1 D2 D3 D4 D5 UD1 OS1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 PRIVATE DRIVE A PRIVATE DRIVE B (S) PRIVATE DRIVE B (N) HILLOCK STREET PRIVATE DRIVE D OVERLAND TRAIL BLUEGRASS DRIVE PRIVATE DRIVE E DRAKE ROAD PROPOSED INLET PROPOSED STORM DRAIN PROPOSED INLETS PROPOSED STORM DRAIN REMOVE AND REPLACE EXISTING STORM DRAIN CONNECT TO EXISTING STORM DRAIN PROPOSED OUTLET STRUCTURE PROPOSED OUTLET STRUCTURE DETENTION POND 1 DETENTION POND 3 DETENTION POND 4 DETENTION POND 2 PRIVATE DRIVE C PROPOSED OUTLET STRUCTURE 8" SS 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 6" W 6" W S 6" W S S PROPOSED OUTLET STRUCTURE PROPOSED INLET PROPOSED INLET PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED CURB CUT RAIN GARDEN #1 RAIN GARDEN #2 POND 1 SPILL PATH POND 1 SPILL PATH DIXON CREEK Sheet MOUNTAIN'S EDGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com of 24 DR1 DRAINAGE PLAN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner 24 ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE"Preliminary Drainage Report for Mountains Edge" BY NORTHERN ENGINEERING, DATED December 22nd, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 1.74 0.63 0.79 7.4 5.7 2.77 13.25 2 A2 1.48 0.77 0.96 5.0 5.0 3.26 14.24 3 A3 2.23 0.44 0.55 9.7 8.9 2.20 10.00 4 B1 0.47 0.84 1.00 6.1 5.0 1.04 4.63 5 B2 0.57 0.55 0.69 6.2 5.4 0.84 3.93 6 B3 1.27 0.80 1.00 5.0 5.0 2.90 12.67 7 B4 0.23 0.60 0.75 6.5 5.0 0.35 1.70 8 B5 0.86 0.27 0.34 12.7 12.0 0.47 2.10 9 C1 0.36 0.63 0.79 5.0 5.0 0.65 2.84 10 C2 0.48 0.43 0.54 5.9 5.1 0.58 2.62 11 D1 0.33 0.85 1.00 5.9 5.0 0.76 3.24 11 D2 2.05 0.73 0.91 5.0 5.0 4.24 18.52 12 D3 0.98 0.72 0.90 6.3 5.0 1.89 8.79 13 D4 0.66 0.60 0.74 5.1 5.0 1.12 4.87 14 D5 1.38 0.36 0.45 9.9 9.2 1.11 4.93 15 UD1 0.49 0.36 0.45 11.9 10.5 0.37 1.67 16 OS1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.19 5144.86 2,814 5142.63 0.60 2 0.50 5139.56 2,684 5137.73 2.30 3 0.15 5145.28 513 5143.14 0.20 4 1.17 5142.81 863 5137.48 0.80 X X X X / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / GAS MM T W VAULT F.O. B M D T C F E S C ONTROL IRR S H2O H2O H2O 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W HA1 HA2 HB1 HB2 HA3 1 2 HB3 3 8" SS 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 6" W 6" W S 6" W S S OVERLAND TRAIL BLUEGRASS DRIVE DRAKE ROAD Sheet MOUNTAIN'S EDGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com of 23 HDR1 HISTORIC DRAINAGE EXHIBIT CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR MOUNTAIN'S EDGE" BY NORTHERN ENGINEERING, DATED DECEMBER 20TH, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 B M D T C F E S S H2O H2O H2O A1 A2 A3 B3 B1 B2 B4 B5 C1 C2 D1 D2 D3 D4 D5 UD1 OS1 PRIVATE DRIVE A PRIVATE DRIVE B (S) PRIVATE DRIVE B (N) HILLOCK STREET PRIVATE DRIVE D OVERLAND TRAIL BLUEGRASS DRIVE PRIVATE DRIVE E DRAKE ROAD PRIVATE DRIVE C 8" SS 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 6" W 6" W S 6" W S S DIXON CREEK RAIN GARDEN #1 RAIN GARDEN #2 GRASS SWALE WITH INFILTRATION SECTION DETENTION POND 1 DETENTION POND 3 DETENTION POND 4 DETENTION POND 2 GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER GRASS BUFFER L1 A2, A3 L2 B1, B2 L2 B5 L3 C2 L4 D1-D5 L5 UD1 Sheet MOUNTAIN'S EDGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com of 24 LID (LID) EXHIBIT LOW IMPACT DEVELOPMENT ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY DRAINAGE BASIN BUBBLE A LID BASIN BOUNDARY PROPOSED STORM SEWER LID TREATMENT MEASURE DRAINAGE BASIN BOUNDARY L1 A2, A3 LID BASIN BUBBLE LID BASIN DESIGNATION CONTRIBUTING DRAINAGE BASINS PROPOSED LID TREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment L1 A2 64,671 69% 44,326 Rain Garden 1 A3 97,320 24% 23,327 Grass Buffer Total L1 161,991 42% 67,653 L2 B1 20,289 83% 16,939 Grass-Lined Swale w/ B2 24,873 39% 9,698 Infiltration Section B5 37,619 17% 6,570 Grass Buffer Total L2 82,781 40% 33,206 L3 C2 21,094 24% 5,009 Grass Buffer Total L3 21,094 24% 5,009 L4 D1 14,166 85% 12,078 Rain Garden 2 D2 89,304 67% 60,073 D3 42,668 64% 27,423 D4 28,680 62% 17,666 D5 59,938 20% 12,240 Total L4 234,756 55% 129,480 L5 UD1 21,559 44% 9,544 Grass Buffer Total L5 21,559 44% 9,544 Total Treated 522,181 47% 244,892 PROPOSED LID UNTREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) A1 75,924 62% 47,069 B3 55,488 73% 40,496 B4 9,903 58% 5,779 C1 15,762 49% 7,723 Total Proposed Untreated 157,077 64% 101,066 HA3 14,166 45% 6,375 HB2 20,289 45% 9,130 Total Existing 34,455 45% 15,505 LID TREATMENT SUMMARY Total Site Area (sf) 679,258 Total Existing Impervious Area (sf) 15,505 Total Proposed Impervious Area (sf) 345,958 Total Net Proposed Impervious Area (sf) 330,453 75% Required Minimum Area to be Treated by LID measures (sf) 247,840 Total Treated Impervious Area (sf) 244,892 Percent Impervious Treated by LID measures 74% RAIN GARDEN SUMMARY Rain Garden 1 Rain Garden 2 Total Contributing Area (sf) 64,671 234,756 Percent Impervious 69% 55% Total Volume Required (cf) 1,167 3,450 Total Volume Provided (cf) 1,167 3,450 Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 12/22/201610:53 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\Stage_Storage December 20, 2016 Intensity, i10 (in/hr) C10 Q = C f ( C )( i )( A ) 12/20/2016 3:52 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Runoff 10-yr Tc (min) 100-yr Tc (min) 1 A1 No 0.63 0.63 0.79 61 2.34% 5.1 5.1 3.4 N/A N/A N/A 227 0.70% 1.67 2.3 7.4 7.4 5.7 2 A2 No 0.77 0.77 0.96 35 3.54% 2.4 2.4 1.0 N/A N/A N/A 249 0.80% 1.79 2.3 5.0 5.0 5.0 3 A3 No 0.44 0.44 0.55 69 7.35% 5.3 5.3 4.4 163 1.04% 1.53 1.8 264 0.68% 1.65 2.7 9.7 9.7 8.9 3 TOTAL BASIN A No 0.59 0.59 0.74 35 3.54% 3.7 3.7 2.6 163 1.04% 1.53 1.8 264 0.68% 1.65 2.7 8.1 8.1 7.1 4 B1 No 0.84 0.84 1.00 46 2.83% 2.4 2.4 0.9 N/A N/A N/A 358 0.63% 1.59 3.7 6.1 6.1 5.0 5 B2 No 0.55 0.55 0.69 47 10.83% 3.2 3.2 2.4 389 1.99% 2.11 3.1 N/A N/A N/A 6.2 6.2 5.4 6 B3 No 0.80 0.80 1.00 39 3.28% 2.4 2.4 0.8 N/A N/A N/A 349 1.45% 2.41 2.4 5.0 5.0 5.0 7 B4 No 0.60 0.60 0.75 60 2.62% 5.2 5.2 3.7 N/A N/A N/A 216 1.94% 2.79 1.3 6.5 6.5 5.0 8 B5 No 0.27 0.27 0.34 50 2.00% 8.7 8.7 8.0 311 2.41% 2.33 2.2 157 0.52% 1.44 1.8 12.7 12.7 12.0 8 TOTAL BASIN B No 0.62 0.62 0.77 46 2.83% 4.3 4.3 3.0 389 1.99% 2.11 3.1 358 0.63% 1.59 3.7 11.2 11.2 9.8 9 C1 No 0.63 0.63 0.79 35 5.14% 3.0 3.0 2.0 N/A N/A N/A 106 0.47% 1.37 1.3 5.0 5.0 5.0 10 C2 No 0.43 0.43 0.54 52 6.00% 4.9 4.9 4.1 132 2.46% 2.35 0.9 N/A N/A N/A 5.9 5.9 5.1 10 TOTAL BASIN C No 0.52 0.52 0.65 52 6.00% 4.3 4.3 3.4 132 2.46% 2.35 0.9 N/A N/A N/A 5.2 5.2 5.0 11 D1 No 0.85 0.85 1.00 42 2.64% 2.2 2.2 0.9 N/A N/A N/A 639 2.04% 2.86 3.7 5.9 5.9 5.0 11 D2 No 0.73 0.73 0.91 N/A N/A N/A N/A N/A N/A N/A 368 2.42% 3.11 2.0 5.0 5.0 5.0 12 D3 No 0.72 0.72 0.90 78 3.21% 4.2 4.2 2.2 217 1.43% 1.79 2.0 N/A N/A N/A 6.3 6.3 5.0 13 D4 No 0.60 0.60 0.74 18 2.94% 2.8 2.8 2.0 N/A N/A N/A 266 0.94% 1.94 2.3 5.1 5.1 5.0 14 D5 No 0.36 0.36 0.45 57 6.11% 5.7 5.7 5.0 487 1.71% 1.96 4.1 N/A N/A N/A 9.9 9.9 9.2 14 TOTAL BASIN D No 0.62 0.62 0.78 42 2.64% 4.2 4.2 2.8 247 1.23% 1.66 2.5 639 2.04% 2.86 3.7 10.4 10.4 9.0 15 UD1 No 0.36 0.36 0.45 165 3.33% 11.9 11.9 10.5 N/A N/A N/A N/A N/A N/A 11.9 11.9 10.5 16 OS1 No 0.25 0.25 0.31 87 11.64% 6.5 6.5 6.1 681 0.94% 1.46 7.8 N/A N/A N/A 14.3 14.3 13.9 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas Design Point Sub-Basin Overland Flow SwaleConcentration Flow Gutter/Pipe Flow Time of December 20, 2016 (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/20/2016 3:51 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Tc A1 1.74 0.41 0.25 0.55 0.25 Clayey | Average 2% to 7% 0.283 0.63 0.63 0.79 62% A2 1.48 0.22 0.34 0.00 0.54 Clayey | Average 2% to 7% 0.379 0.77 0.77 0.96 69% A3 2.23 0.00 0.11 0.00 0.48 Clayey | Average 2% to 7% 1.639 0.44 0.44 0.55 24% TOTAL BASIN A 5.46 0.64 0.70 0.55 1.27 Clayey | Average 2% to 7% 2.301 0.59 0.59 0.74 48% B1 0.47 0.37 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.075 0.84 0.84 1.00 83% B2 0.57 0.00 0.05 0.00 0.20 Clayey | Average 2% to 7% 0.324 0.55 0.55 0.69 39% B3 1.27 0.29 0.28 0.00 0.43 Clayey | Average 2% to 7% 0.273 0.80 0.80 1.00 73% B4 0.23 0.09 0.02 0.06 0.00 Clayey | Average 2% to 7% 0.055 0.60 0.60 0.75 58% B5 0.86 0.00 0.00 0.38 0.00 Clayey | Average 2% to 7% 0.487 0.27 0.27 0.34 17% TOTAL BASIN B 3.40 0.75 0.37 0.44 0.63 Clayey | Average 2% to 7% 1.213 0.62 0.62 0.77 54% C1 0.36 0.00 0.07 0.00 0.12 Clayey | Average 2% to 7% 0.165 0.63 0.63 0.79 49% C2 0.48 0.00 0.07 0.00 0.06 Clayey | Average 2% to 7% 0.356 0.43 0.43 0.54 24% TOTAL BASIN C 0.85 0.00 0.15 0.00 0.18 Clayey | Average 2% to 7% 0.521 0.52 0.52 0.65 35% D1 0.33 0.26 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.046 0.85 0.85 1.00 85% D2 2.05 0.47 0.68 0.23 0.23 Clayey | Average 2% to 7% 0.443 0.73 0.73 0.91 67% D3 0.98 0.35 0.15 0.00 0.16 Clayey | Average 2% to 7% 0.319 0.72 0.72 0.90 64% D4 0.66 0.14 0.10 0.30 0.07 Clayey | Average 2% to 7% 0.058 0.60 0.60 0.74 62% D5 1.38 0.00 0.04 0.27 0.15 Clayey | Average 2% to 7% 0.912 0.36 0.36 0.45 20% TOTAL BASIN D 5.39 1.22 0.99 0.80 0.60 Clayey | Average 2% to 7% 1.779 0.62 0.62 0.78 55% UD1 0.49 0.03 0.02 0.44 0.00 Clayey | Average 2% to 7% 0.010 0.36 0.36 0.45 44% OS1 4.07 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.075 0.25 0.25 0.31 0% TOTAL SITE 19.67 2.63 2.22 2.23 2.68 Clayey | Average 2% to 7% 9.899 0.52 0.52 0.66 40% Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/20/2016 3:50 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Composite C 3 HB3 Yes 0.25 0.25 0.31 541 0.98% 37.2 37.2 34.5 0 N/A N/A N/A 37.2 37.2 34.5 EXISTING TIME OF CONCENTRATION COMPUTATIONS S. Thomas December 20, 2016 Design Point Sub-Basin Overland Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Tc HA2 4.18 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.178 0.25 0.25 0.31 0% HA3 0.33 0.15 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.178 0.57 0.57 0.71 45% HB1 5.60 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 5.602 0.25 0.25 0.31 0% HB2 0.47 0.21 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.254 0.57 0.57 0.71 45% HB3 4.66 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.661 0.25 0.25 0.31 0% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/20/2016 3:47 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Composite C Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 2 of 4 Overland Trail, within Basin C1, will be safely routed through Detention Pond 3 undetained.