HomeMy WebLinkAboutPOUDRE RIVER WHITEWATER PARK (FORMERLY POUDRE RIVER DOWNTOWN PARK) - PDP - PDP160039 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision:
Project Name:
Project Type:
Project Number: Items for New Projects & Resubmittals Final Redlines
Date Received:
Review Round:
Planner:
Engineer:
# Label Sets Needed (1,2,3….): 3
Labels Received Y/N: Y
W RETURN ALL REDLINES
1 1 1 1 1 1 1 1 1 1 2 1
1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1
1 1 1
1 1 1 1
1 1 1 1 1 1
1 1 1
1 1 1 1 1
1 1 1 1
1 1 1
1 1 1 1 1 1
1 1 1
1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1
1 1 1
1 1 1 1 1 1 1
1 1 1
1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1
1 1 1 1 1
29 28 27 18 0 8 6 4 6 16 2 1 3 3 1 0 0 0 0 0 Revised: 1-29-2016
P P P P P P P P P P P P P P CD P P P P P
X X X X X X X X X X X
Lighting Plan
Plat
Building Elevations
Lighting Plan
Drainage Report
Turnaround Time: 3 weeks Comments Due: Dec. 28. 2016
Poudre River Whitewater Park (formerly Poudre River Downtown Park)
PDP
PDP160039
1
Total:
Format Required: (P)aper, Digital (CD)
Xcel Energy
Zoning
City Water Utilities Eng. (Stormwater)
City Erosion Control (SWMP Review)
Received:
County Assessor
CDOT
Ditch Co:
Railroad: BNSF
School District
Other:
Outside Agency Sanitation Dist:
Outside Agency Water District:
Street Oversizing
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water Conservation
Neighborhood Services
Park Planning
Pavement Management
Post Office
Poudre Fire Authority
Real Estate Planning
Economic Development
Environmental Planner
Forestry
GIS
Historic Preservation
CFC Light & Power
Item Waived(W); Deferred (D); or n/a
File: Project Planner
Building Inspection
Century Link
Comcast
Development Review Engineering
Drainage Report
Building Materials Exhibit
Easements (As Needed)
SWMP (Erosion Report)
Utility Plan
Site Plan
Landscape Plan
Plat
Building Elevations
Wetland Delineation
Ecological Study (ECS)
Hazmat Review
Soils Study- New/Update
Digital copy of all materials
L.U.C. Mod. Requests
T.I.A.(letter or full report)
Utility Plans
12.06.2016
Planning Objectives
Comment Response Letter
Site Plan
Landscape Plan
New projects: APO labels & list:
Rebecca Everette
Marc Ragasa