HomeMy WebLinkAboutBEEBE CHRISTIAN SCHOOL - PDP - PDP160022 - PLANS - UTILITY PLANSUTILITY PLANS FOR BEEBE
CHRISTIAN SCHOOL AND SEVENTH
DAY ADVENTIST CHURCH
DRAWING INDEX
SUPPLEMENTAL GENERAL NOTES
PROJECT CONTACTS:
LEGAL DESCRIPTION
VICINITY MAP
BUILDING DATA
SITE DATA
Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
E. DRAKE RD.
JOSEPH ALLEN DR.
S TIMBERLINE RD
COVER SHEET
CV-1.0
1
’
“ ”
–
’
’
’
’
JOSEPH ALLEN DR.
S. TIMBERLINE RD.
NANCY GRAY AVE.
INITIAL
EROSION
CONTROL PLAN
ER-1.0
2 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
SEEDING NOTE:
LEGEND
EROSION CONTROL NOTES
ACREAGE SUMMARY (IN ACRES)
EROSION DETAILS
JOSEPH ALLEN DR.
S. TIMBERLINE RD.
NANCY GRAY AVE.
SCHOOL/CHURCH
INTERIM
EROSION
CONTROL PLAN
ER-1.1
3 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
LEGEND
ACREAGE SUMMARY (IN ACRES)
SEEDING NOTE:
EROSION DETAILS
SEE EROSION CONTROL
NOTES ON ER-1.0
JOSEPH ALLEN DR.
S. TIMBERLINE RD.
NANCY GRAY AVE.
SCHOOL/CHURCH
FINAL EROSION
CONTROL PLAN
ER-1.2
4 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
LEGEND
EROSION DETAILS
ACREAGE SUMMARY (IN ACRES)
SEEDING NOTE:
SEE EROSION CONTROL
NOTES ON ER-1.0
EROSION
NOTES
ER-2.0
5 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
JOSEPH ALLEN DR.
S. TIMBERLINE RD.
NANCY GRAY AVE.
D
D
D
SCHOOL/CHRUCH
HORIZONTAL
CONTROL AND
PAVEMENT PLAN
C-1.0
6 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
LEGEND
Know what'sbelow.
Call before you dig.
R
JOSEPH ALLEN DR.
SCHOOL/CHURCH
NANCY GRAY AVE.
S. TIMBERLINE RD.
GRADING PLAN
C-2.0
7 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
GRADING NOTES
LEGEND
JOSEPH ALLEN DR.
SCHOOL/CHURCH
NANCY GRAY AVE.
S. TIMBERLINE RD.
BASIN 2
1.859 AC
BASIN 1
0.856 AC
BASIN OS7
1.240 AC
POLICE STATION BASIN
0.88 AC
TOTAL BASIN AREA
DRAINING TO POND
5.44 AC
DRAINAGE
PLAN
C-2.1
8 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
WATER QUALITY TREATMENT LEGEND
Minimum 8" Thick Layer of
CDOT No. 4 Aggregate
Minimum 4" Perforated
PVC Pipe (Optional
JOSEPH ALLEN DR.
S. TIMBERLINE RD.
NANCY GRAY AVE.
D
D
D
SCHOOL/CHRUCH
UTILITY AND
PAVEMENT
PLAN
C-3.0
9 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
LEGEND
Know what'sbelow.
Call before you dig.
R
GENERAL UTILITY NOTES WATER NOTES SANITARY SEWER NOTES
ADDITIONAL NOTES:
STREET & SW
DETAIL SHEET
C-4.0
10 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
WATER AND
SEWER DETAIL
SHEET
C-4.1
11 Of
PROJECT TITLE
REVISIONS
SHEET TITLE
SHEET INFORMATION
SEAL
DATE
PREPARED FOR
ENGINEERING R IDGE & CONSULTING T OP
5255 Ronald Reagan Blvd.,
Ste. 210
Johnstown, CO 80534
T (303) 322-6480
W ridgetopeng.com
CITY COMMENTS 11/28/2016
DRAWN BY:
CHECKED BY:
PROJECT NO.:
ROCHE
CONSTRUCTORS
BEEBE CHRISTIAN
SCHOOL AND
SEVENTH DAY
ADVENTIST CHURCH
361 71ST AVE.
GREELEY , CO
2103 NANCY GRAY AVE.
FORT COLLINS, CO
16-026-001
MRB
BSA/RSB
11
SUBMITTAL
PROJECT
DEVELOPMENT PLAN
10/31/2016
LOGO
Depending on Underlying
Soil Conditions)
12" Ponding Depth
Minimum 12" Thick Layer
of Bioretention Sand Media
(see Bioretention Sand
Media Specification below)
Minimum 6" Thick Layer of
Pea Gravel Diaphragm
Parking/Building
Water Surface
Minimum CDOT
No. 4 Aggregate
Above and Below
PVC Pipe
Undisturbed Soil
CONNECT UNDERDRAIN
TO OUTLET STRUCTURE
POND BASIN
0.608 AC
“ ”
GENERAL NOTES (AS ADOPTED FROM LARIMER COUNTY URBAN AREA STEET APPENDIX E)
BASIS OF BEARING
BENCHMARK DATA