Loading...
HomeMy WebLinkAboutBEEBE CHRISTIAN SCHOOL - PDP - PDP160022 - REPORTS - DRAINAGE REPORTDrainage Report for BeBee Christian School/Church 2103 Nancy Gray Avenue Fort Collins, CO 80525 Prepared by: Mike Beach, P.E. Project #:16‐026‐001 Dated: December 8, 2016 5255 Ronald Reagan Blvd, Suite 210 Johnstown, CO 80534 (303) 322-6480 EMAIL: mbeach@ridgetopeng.com 2 | Page Section Page 1. Project Engineer’s Certification ........................................................................................ 3 2. Project Location & Overview ............................................................................................ 4 3. Drainage Design Criteria ................................................................................................... 5 4. Hydraulic Calculations ....................................................................................................... 6 5. Facility Design .................................................................................................................... 7 6. Conclusion ......................................................................................................................... 8 7. References ......................................................................................................................... 8 Appendix A – Site Vicinity Map Appendix B – Flood Insurance Rate Map Appendix C – NRCS Soils Map Appendix D – Hydrologic Criteria Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO‐3 – Recommended Percentage Imperviousness Values Appendix E – Hydraulic Calculations Runoff Coefficients & Imperviousness Time of Concentration ‐ SF‐2 Rational Method Runoff Flows – SF‐3 (2‐Year Event) Rational Method Runoff Flows – SF‐3 (10‐Year Event) Rational Method Runoff Flows – SF‐3 (100‐Year Event) Detention Volume by Modified FAA Method Rain Garden Calculations (both Subbasins) LID Summary Drain Times Appendix F – Maps Drainage Plan/Subbasin Map Appendix G – References Table of Contents 3 | Page Section 1: PROJECT ENGINEER’S CERTIFICATION I hereby attest that this Final Drainage Report for the design of stormwater management facilities for BeBee Christian School on 2103 Nancy Gray Ave. was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the responsible parties thereof. __________________________ Mike Beach, P.E. Registered Professional Engineer State of Colorado No. 45088 4 | Page Section 2: Project Location & Overview Location The sites address is 2103 Nancy Gray Avenue, Fort Collins, CO; which is described as a portion of Outlot A, Spring Creek Farms North, City of Fort Collins, County of Larimer, State of Colorado. For Recording purposes: Part of the Southeast Quarter of Section 19, TP 7 N, R 68 W of the 6th PM. Located along the north side of Nancy Gray Ave. and east of South Timberline Road, the site is described as above and contains 3.326 acres of undeveloped vacant land. (See Appendix A – Site Vicinity Map) Existing Condition The existing site is covered by native vegetation and slopes predominately towards South Timberline Road at approximately 0.5% slope. Stormwater runoff collected into an existing stormwater detention pond along the eastern side of the site. Currently the detained water is released at 2.0 cfs via an existing outlet structure and conveyed via piping to “Storm 2” as delineated in previous storm reports. Storm 2 connects to Sidehill Filing 2 Storm system. The Sidehill report requires the outlet be contained to a 1.1 cfs release rate and it appears existing pond has not been updated since its original construction, therefore, as part of this project the pond is being redesigned to accommodate the slower release rate. Proposed Condition The intent of the development is to construct a new building of approximately 26,200 SF, asphalt concrete parking, curb and gutter, playground area containing grass and gravel material, and landscaping. It has been determined by the survey that the existing pond does not have sufficient detention capacity for this project. Existing pond size of 0.866 ac‐ft is will be slightly regraded along the west side to increase overall pond volume to meet the minimum required. Floodplain FEMA Floodplain mapping in this neighborhood is located on map‐panel 08069C1000F, Effective December 18, 2006, (Not Printed), however it appears the subject property is located in Zone X, which is outside the 100‐year floodplain. Flood Insurance Rate Map not available for printing. Existing Soils The Natural Resource Conservation Service mapped the historic soils on the site as part of the Nunn clay loam. The Hydrologic Class is Type ‘C’ Soils. (Appendix C – NRCS Soils Map) 5 | Page Section 3: Drainage Design Criteria Reference Manuals Storm drainage design criteria is defined in the City of Fort Collins “Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and Amendments, which references to the “Urban Drainage and Flood Control District” (UDFCD) and the “Urban Storm Drainage Criteria Manual” (USDCM), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual), are used and referenced in this report. Low Impact Development (LID) Requirements The proposed development is required to meet the City’s current Land Use Code, which includes: ‐ 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. ‐ 75% of all newly added or modified impervious area must be treated by LID techniques. Four Step Process The City of Fort Collins has adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM for selecting BMP’s in urban redevelopment areas. The goal of this process is to minimize adverse impacts on receiving waters. The following describe how each step of the process are incorporated in the proposed development: Step 1 – Employ Runoff Reduction Practices By selecting a site that is undeveloped that currently does not have water quality treatment, the impacts of the proposed development will be less due to the addition of the water quality capture volume included. The project proposes to install a rain garden with underdrains to aid in conveyance and infiltration opportunities which will reduce the effects of the added impervious area from the development of the site. Step 2 – Water Quality Capture Volume (WQCV) In order to reduce the sediment load and other pollutants leaving the site, it is important to provide WQCV to minimize the downstream impacts. This project proposes to provide rain garden prior to the stormwater entering the detention pond, both located on the site. These facilities are sized to release at or below the historic runoff rates. Step 3 – Stabilize Drainageways Since this site is in close proximity to Poudre River it is important to take this Step into consideration. By providing stormwater detention and water quality and lowering the historic runoff and providing a metered outflow the project impacts to the drainageway are essentially reduced. The majority of the drainageway leaving the site is already stabilized. 6 | Page Step 4 – Implement Site Specific and Other Source Control BMP’s The proposed project will contain the following BMP’s: Rain Garden: All runoff from the site will be directed into and through the proposed BMP facilities prior to leaving the site. Rain gardens utilize native plants that act as sponges to reduce the amount of stormwater runoff and absorb contaminants. Maintenance: In order for BMP’s to remain effective proper maintenance needs are required. Scheduled visual inspections and routine repair after larger storm events are critical in the maintenance and effectiveness of the installed BMP’s. The sites owner will be advised of these practices during installation in order to maximize the efficiency of the installed BMP’s. Section 4: Hydraulic Calculations Criteria Runoff criteria for the proposed sites was analyzed for the 2‐YR, 10‐YR, and 100‐YR storm events. The Rational Method is being used for the design of the proposed improvements. Rainfall Intensities used in the proposed design were determined as a function of the Time of Concertation for each subbasin. The values used were determined by the City of Fort Collins Rainfall Intensity/Duration/Frequency curve (Figure RA‐16 and Table RA‐7 (see Appendix D). Imperviousness Values from Table RO‐11 (Fort Collins Amendment to the USDCM) were used in determining the sites imperviousness. The overall proposed site improvements and landscaping equate to a total onsite proposed Imperviousness of 46%, while the total basin reaching the pond is 53%. Time of Concentration & Runoff Coefficient The onsite area was separated into three (3) subbasins with slopes varying between 0.5% to 1.5%. The calculated Time of Concentration (TC) for each subbasin are listed in Appendix E. See Basin Map in Appendix F for more information. WQCV The UD‐BMP_v3.03 (UDFCD) spreadsheet was used to calculated the required Rain Garden water quality capture volume. See Appendix E for design information. The existing detention pond design also included a volume allotted for the WQCV. Per the previous report by Stantec, a volume of 0.033 ac‐ft is required for WQCV and will be included in the total pond volume calculations. The previous pond design did not allow for an extended WQ drain time, so therefore a new orifice plate is being designed and included with this project. The revised pond will outlet the WQCV over a 12 hour period as allowed by the Manual. 7 | Page Detention The existing detention pond is already constructed and was designed by Stantec with an allowable release rate of 1.1 cfs. The design was also discussed in the “Interim Timberline Road Widening – Drake to Prospect” and “Spring Creek Farms North Filing No. 2”. See existing report information in Appendix G. The detention facility Drain Time Spreadsheet and Stage Storage relationship spreadsheet have been calculated and is included within Appendix E of this report. The calculated drain time for 99% of the inflow volume of the pond with the proposed project and off‐site area included is approximately 23 hours for the 100‐year event, which is below the maximum allowed drain time. Section 5: Facility Design The proposed improvements will increase the amount of impervious area; however, measures have been included in the design to minimize the amount of stormwater released from the site. Per previous design reports, specifically the Spring Creek Farms North, the outlet structure is designed to release at 1.1 cfs. The existing water quality plate in the existing pond will need to be replaced to meet current requirements and drain times. The plate will be designed with a single 1‐3/16” diameter orifice to release the WQCV at 0.045 cfs, and a single 2‐5/16” diameter orifice above the WQCV to release the 100‐year event at 1.1 cfs. Per our report, the predeveloped 2‐year event release rate is 2.44 cfs per for the entire 3.32‐acre site (see Appendix E for historic calcs). The runoff will sheet flow until a concentrated point and then be conveyed via trickle channel or gutters and then deposited into the water quality device and/or detention pond. The site was broken into three developed subbasins for water quality purposes; Subbasin 1.0 (0.856 acres), Subbasin 2.0 (1.859 acres), and Subbasin Pond (0.608 acres). OS‐7 and PS‐1 (as described below) was also modeled and included in the detention calculations. See Appendix E for breakdown of the different area types for each subbasin and Appendix F for the Subbasin Map. Subbasin 1.0 contains half of the proposed building and the parking and paved areas south of the building. The runoff will be conveyed to the east side of the building and outlet into a proposed rain garden. The rain garden will outlet to the modified detention pond. Subbasin 2.0 contains half of the building, the parking and paved areas to the west of the building, and the playground area. All areas drain to the north and east. Water Quality for this subbasin will be provided via a rain garden. The rain garden will outlet to the modified detention pond. Pond Basin is that area within the existing Drainage Easement on the east side of the site. The existing detention pond was already sized for a release of 1.1 cfs, however current regulations require slight modifications to the steel orifice plate to meet drain times. Currently it has one 8 | Page 3.5” diameter orifice plate that will be replaced with a new plate containing a single 1‐3/16” diameter orifice to release the WQCV at 0.045 cfs, and a single 2‐5/16” diameter orifice above the WQCV to release the 100‐year event at 1.1 cfs.. The existing pond was modeled with the proposed project and the 100‐year WSEL’s is indicated on the Drainage Plan in Appendix F. OS‐7 – This off‐site basin is the area of Nancy Gray and a portion of Timberline that drain to the existing detention pond. Full design calculations are included in order to determine the required detention volume is being provided within the existing pond. PS‐1 – This off‐site basin is the northeast portion of the Police Services site that drains to the existing type R in Nancy Gray that is conveyed to the existing detention pond on‐site. Since there is only one detention pond modeled with this report we have provided a summary of the proposed design below. See supporting calculations within the Appendix of this report. Area (ac) Sub 1.0 0.86 1.33 2.32 6.21 0.013 ‐ ‐ ‐ ‐ ‐ Sub 2.0 1.86 2.19 3.73 10.20 0.028 ‐ ‐ ‐ ‐ ‐ Pond 0.61 0.17 0.29 0.74 ‐ ‐ ‐ ‐ ‐ OS‐7 1.24 1.81 3.85 11.07 ‐ ‐ ‐ ‐ ‐ ‐ PS‐1 0.88 1.19 2.05 5.79 ‐ ‐ ‐ ‐ ‐ ‐ Total Site 3.32 3.28 5.63 14.48 ‐ ‐ ‐ ‐ ‐ ‐ Total Basin 5.44 5.77 10.02 25.62 0.045 0.033 1.168 1.031 1.213 1.1 Release Rate (cfs) 2‐Year Flow (cfs) 100‐Year Flow (cfs) WQCV (ac‐ft) 100‐Year Vol. (ac‐ft) Detention Req'd (ac‐ft) Tot. Volume Provided (ac‐ft) 10‐Year Flow (cfs) WQCV Req'd Section 6: Conclusions All computations that have been reviewed or completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volumes 1 &2. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention and water quality treatment of impervious areas by releasing the 100‐Year storm event at the required allowable release rate of 1.1 cfs, which is less than the Predeveloped 2‐Year runoff rates. The Water Quality design will benefit the site by reducing the initial discharge from the site and removal of any sediments or other pollutants generated by the developed site. As well, with the modified steel outlet plate, water quality is now being provided for the offsite basins that drain to the existing pond. 9 | Page Section 7: References  The Natural Resource Conservation Service Soil Survey for Larimer County and the WSS website.  FEMA FIRM map‐panel 08069C1000F Effective 12/18/2006. – Not Printed.  “City of Fort Collins Stormwater Criteria Manual” dated December 2011  Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual (UDFCD), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual).  Drainage Report: Police Services Building  Drainage Report – Spring Creek Farms North  Drainage Report – Timberline Road Widening  Drainage Report – Sidehill Filing 2 – Stormwater Pipe Reduction w Appendix A Site Vicinity Map Appendix B Flood Insurance Rate Map (Not available to Print) Appendix C NRCS Soils Map Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 1 of 4 4489690 4489710 4489730 4489750 4489770 4489790 4489810 4489690 4489710 4489730 4489750 4489770 4489790 4489810 496470 496490 496510 496530 496550 496570 496590 496610 496630 496650 496670 496470 496490 496510 496530 496550 496570 496590 496610 496630 496650 496670 40° 33' 32'' N 105° 2' 30'' W 40° 33' 32'' N 105° 2' 20'' W 40° 33' 28'' N 105° 2' 30'' W 40° 33' 28'' N 105° 2' 20'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 45 90 180 270 Feet 0 15 30 60 90 Meters Map Scale: 1:1,020 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 4.3 97.1% 74 Nunn clay loam, 1 to 3 percent slopes C 0.1 2.9% Totals for Area of Interest 4.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 4 of 4 Appendix D Hydrologic Criteria RAINFALL INTENSITY-DURATION-FREQUENCY CURVE 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 STORM DURATION (minutes) RAINFALL INTENSITY (inches/hour) 2-Year Storm 10-Year Storm 100-Year Storm Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. (11) Section 4.0 is amended to read as follows: 4.0 Intensity-Duration-Frequency Curves for Rational Method: The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 Appendix E Hydraulic Calculations Historic Runoff Coefficients & Percent Impervious Calculated By: RSB Project - BeBee Christian School Checked By: MRB Job Number: 16-026-001 Date: 10/28/2016 IMP% Soil Types: Nunn Clay Loam Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: C Table RO-3 (UDSDCM Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.10 0 Landscaping (steep) 0.20 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.02 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv EX-7 1.240 54014 0 32401 0 6280 15333 0.71 71 Off-Site EX-8 3.320 144619 0 0 0 2660 141959 0.12 2 Site EX-PS 0.880 38333 0 12268 0 7970 18095 0.55 52 Police Station Total Basin 5.44 236966 0 44669 0 16910 175387 0.32 26 Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year Historic TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 10/28/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti ) (tt) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. t t COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) EX-7 0.71 1.24 150 1.0 9.0 400 1 0.016 1.3 5.1 14.1 14.1 Off-Site EX-8 0.12 3.32 275 1.0 30.5 236 1 0.025 2.1 1.9 32.4 32.4 Site EX-PS 0.55 0.88 115 2.0 8.8 150 0.5 0.016 1.2 2.1 10.9 10.9 Police Station Total Basin 0.32 5.44 290 1.0 24.8 500 1 0.025 2.1 4.0 28.8 28.8 Basins EX-7, EX-8 & EX-PS References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: RSB Event: 2-Year Date: 10/28/2016 Historic Flow Rate Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) EX-7 0.71 1.24 0.71 14.1 1.95 1.714 Off-Site EX-8 0.12 3.32 0.12 32.4 1.35 0.518 Site EX-PS 0.55 0.88 0.55 10.9 2.35 1.135 Police Station Total Basin 0.32 5.44 0.32 28.8 1.40 2.444 Basins EX-7, EX-8 & EX-PS Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Runoff Coefficients & Percent Impervious Calculated By: RSB Project - BeBee Christian School Checked By: MRB Job Number: 16-026-001 Date: 10/28/2016 IMP% Soil Types: Nunn Clay Loam Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: C Table RO-3 (UDSDCM) Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.10 0 Landscaping (Average) 0.15 0 Landscaping (steep) 0.20 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.02 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv 1.0 0.856 37287 13497 6509 0 2967 14314 0.62 58 2.0 1.859 80978 12622 28242 0 5813 34301 0.59 56 Pond 0.608 26484 0 0 0 0 26484 0.10 0 Pond Basin OS-7 1.240 54014 0 32401 0 6280 15333 0.71 71 Directly to Pond PS-1 0.88 38333 0 12268 0 7970 18095 0.55 52 Police Station Total Site 3.32 144750 26119 34751 0 8780 75099 0.51 46 Basins 1, 2, & Pond Total Basin 5.44 237097 26119 79420 0 23030 108527 0.56 53 Basins 1, 2, Pond, OS-7, & PS-1 Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year & 10-Year TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 12/6/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.62 0.86 55 2.0 5.2 230 0.5 0.015 1.3 2.9 8.2 285 11.6 8.2 2.0 0.59 1.86 135 1.0 11.1 400 0.5 0.015 1.5 4.4 15.5 535 13.0 13.0 Pond 0.10 0.61 5 2.0 3.3 150 0.5 0.016 1.2 2.1 5.4 155 10.9 5.4 OS-7 0.74 1.24 60 2.0 4.2 400 1 0.016 2.0 3.3 7.5 460 12.6 7.5 PS-1 0.53 0.88 70 4.0 5.6 110 2 0.016 2.8 0.7 6.3 180 11.0 6.3 Total Site 0.51 3.32 140 2.0 10.4 510 0.5 0.016 1.4 6.1 16.5 650 13.6 13.6 Total Basin 0.56 5.44 160 2.0 10.2 620 0.5 0.016 1.4 7.4 17.6 780 14.3 14.3 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check STANDARD FORM SF-2 Event: 100-Year TIME OF CONCENTRATION Cf = 1.25 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 12/6/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASINS) tc DESIG: C AREA C*Cf LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.62 0.86 0.78 55 2.0 3.5 230 0.5 0.015 1.3 2.9 6.5 285 11.6 6.5 2.0 0.59 1.86 0.74 135 1.0 7.9 400 0.5 0.015 1.5 4.4 12.3 535 13.0 12.3 Pond 0.10 0.61 0.12 5 2.0 3.2 150 0.5 0.016 1.2 2.1 5.3 155 10.9 5.3 OS-7 0.74 1.24 0.92 60 2.0 2.1 400 1 0.016 2.0 3.3 5.4 460 12.6 5.4 PS-1 0.53 0.88 0.66 70 4.0 4.3 110 2 0.016 2.8 0.7 5.0 180 11.0 5.0 Total Site 0.51 3.32 0.64 140 2.0 8.1 510 0.5 0.016 1.4 6.1 14.2 650 13.6 13.6 Total Basin 0.56 5.44 0.70 160 2.0 7.6 620 0.5 0.016 1.4 7.4 14.9 780 14.3 14.3 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 2-Year Date: 12/6/2016 Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.62 0.86 0.62 8.2 2.50 1.33 2.0 0.59 1.86 0.59 13.0 2.00 2.19 Pond 0.10 0.61 0.10 5.4 2.75 0.17 OS-7 0.74 1.24 0.74 7.5 1.98 1.81 PS-1 0.53 0.88 0.53 6.3 2.55 1.19 Total Site 0.51 3.32 0.51 13.6 1.94 3.28 Total Basin 0.56 5.44 0.56 14.3 1.90 5.77 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 10-Year Date: 12/6/2016 Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.62 0.86 0.62 8.2 4.35 2.32 2.0 0.59 1.86 0.59 13.0 3.40 3.73 Pond 0.10 0.61 0.10 5.4 4.75 0.29 OS-7 0.74 1.24 0.74 7.5 4.21 3.85 PS-1 0.53 0.88 0.53 6.3 4.40 2.05 Total Site 0.51 3.32 0.51 13.6 3.33 5.63 Total Basin 0.56 5.44 0.56 14.3 3.30 10.02 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 100-Year Date: 12/6/2016 Cf = 1.25 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.62 0.86 0.78 6.5 9.30 6.21 2.0 0.59 1.86 0.74 12.3 7.44 10.20 Pond 0.10 0.61 0.12 5.3 9.75 0.74 OS-7 0.74 1.24 0.92 5.4 9.69 11.07 PS-1 0.53 0.88 0.66 5.0 9.95 5.79 Total Site 0.51 3.32 0.64 13.6 6.85 14.48 Total Basin 0.56 5.44 0.70 14.3 6.75 25.62 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 12/6/2016 BASIN: Total Basin (Basins 1, 2, Pond, OS-7, and PS-1) Equations: A trib. To pond = 5.440 acre QD = CiA C100 = 0.70 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 3.81 acre Vo =m*QPO*(60*T) QPO = 1.100 cfs S = Vi - Vo tc = 14.3 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 37.9 11367 1.00 330 11037 0.253 10 7.72 29.4 17639 1.00 660 16979 0.390 20 5.60 21.3 25590 0.86 1135 24455 0.561 30 4.52 17.2 30982 0.74 1465 29517 0.678 40 3.74 14.2 34181 0.68 1795 32385 0.743 50 3.23 12.3 36900 0.64 2112 34788 0.799 60 2.86 10.9 39207 0.62 2455 36752 0.844 70 2.62 10.0 41903 0.60 2772 39131 0.898 80 2.38 9.1 43503 0.59 3115 40387 0.927 90 2.22 8.5 45650 0.58 3445 42205 0.969 100 2.05 7.8 46838 0.57 3762 43076 0.989 110 1.93 7.3 48506 0.57 4138 44368 1.019 120 1.80 6.9 49352 0.56 4435 44916 1.031 130 1.60 6.1 47524 0.56 4805 42719 0.981 140 1.40 5.3 44782 0.55 5082 39700 0.911 150 1.20 4.6 41126 0.55 5445 35681 0.819 160 1.15 4.4 42040 0.54 5702 36338 0.834 170 1.10 4.2 42726 0.54 6059 36667 0.842 180 1.05 4.0 43183 0.54 6415 36768 0.844 Required Storage Volume: 44916 ft3 1.031 acre-ft Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 58.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.580 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 37,287 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 570.8 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 381 sq ft D) Actual Flat Surface Area AActual = 380 sq ft E) Area at Design Depth (Top Surface Area) ATop = 764 sq ft F) Rain Garden Total Volume VT= 572 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 0.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 406 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1.38 in Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering October 28, 2016 BeBee Christian School Basin 1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03_Basin 1, RG 10/28/2016, 9:25 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering October 28, 2016 BeBee Christian School Basin 1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03_Basin 1, RG 10/28/2016, 9:25 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 56.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.560 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 80,978 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 1,206.2 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 804 sq ft D) Actual Flat Surface Area AActual = 915 sq ft E) Area at Design Depth (Top Surface Area) ATop = 1510 sq ft F) Rain Garden Total Volume VT= 1,213 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 0.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 1,206 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 2.37 in Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering October 28, 2016 BeBee Christian School Basin 2 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03_Basin 2, RG 10/28/2016, 11:35 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering October 28, 2016 BeBee Christian School Basin 2 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03_Basin 2, RG 10/28/2016, 11:35 AM Orifice Calculations (Rain Garden Plates) BeBee School/Church 12/2/2016 d = diameter (inches) Q = flow (cfs) h = hydraulic head (ft) d = sqrt((36.88*Q)/(sqrt(h)) Water Quality Orifice (RG‐1) Q (cfs) = 0.013 h (ft) = 1 Diameter (sq‐in) Standard Size (diam) d = sqrt((36.88*0.045)/(sqrt(1.0)) = 0.69 15/16" Orifice Set invert of orifice at elevation 4944.0 Water Quality Orifice (RG‐2) Q (cfs) = 0.028 h (ft) = 1 (Total Pond height minus WQ depth) Diameter (sq‐in) Standard Size (diam) d = sqrt((36.88*1.100)/(sqrt(1.0)) = 1.02 1‐1/8" Orifice Set invert of orifice at elevation 4944.0 LID Table 100% On-Site Treatment by LID Requried New Impervious Area 69,460 sq. ft. Required Minimum Impervious Area to be Treated 69,460 sq. ft. Area Treated by Rain Garden (Basin 1) 22,793 sq. ft. Area Treated by Rain Garden (Basin 2) 46,667 sq. ft. Run-on Area 0 sq. ft. Impervious Area by LID Treatment 69,460 sq. ft. Actual % On-Site Treated by LID 100% 0% Porus Pavement Requried New Pavement Area 0 sq. ft. Required Minimum Area of Porus Pavement 0 sq. ft. Porus Pavement Area 0 sq. ft. Run-on Area (up to 3:1 allowed) 0 sq. ft. Total Porus Pavement Area 0 sq. ft. Actual % of Porus Pavement Provided #DIV/0! Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length‐to‐Width Ratio = 2.00 L:W 0.00 1 0.00 0.00 Watershed Area = 5.44 acres 0.60 40 0.60 0.05 Watershed Imperviousness = 52.0% percent 1.60 2,990 1.60 0.05 Percentage Hydrologic Soil Group A = 0.0% percent 2.60 6,291 2.60 1.10 Percentage Hydrologic Soil Group B = 0.0% percent 3.60 8,052 3.60 1.10 Percentage Hydrologic Soil Groups C/D = 100.0% percent 4.60 9,922 4.60 1.10 5.60 11,913 5.60 1.10 6.60 14,033 6.60 1.10 7.10 15,142 7.10 1.10 7.60 16,283 7.60 1.10 User Input: Detention Basin Characteristics WQCV Design Drain Time = 12.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year Two‐Hour Rainfall Depth = 0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume = 0.076 0.219 0.373 0.518 0.791 1.043 1.393 acre‐ft OPTIONAL Override Runoff Volume = acre‐ft Inflow Hydrograph Volume = 0.075 0.218 0.372 0.518 0.791 1.043 1.392 acre‐ft Time to Drain 97% of Inflow Volume = 12 12 13 13 14 14 16 hours Time to Drain 99% of Inflow Volume = 12 14 15 16 18 20 23 hours Maximum Ponding Depth = 1.86 2.62 3.40 4.09 5.19 6.05 7.11 ft Maximum Ponded Area = 0.088 0.145 0.177 0.205 0.254 0.295 0.348 acres Maximum Volume Stored = 0.055 0.143 0.269 0.401 0.652 0.889 1.228 acre‐ft Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Lot 18 ‐ Pond 1 2590 Midpoint Dr, Fort Collins Copy of Drain times Pond 1 ‐ RSB, Design Data 12/8/2016, 12:03 PM Doing_Clear_FoYes CountA= 1 0123 #N/A #N/A 0123 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 5 10 15 20 25 30 35 0.1 1 10 FLOW [cfs] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 8 0.1 1 10 100 PONDING DEPTH [ft] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV Copy of Drain times Pond 1 ‐ RSB, Design Data 12/8/2016, 12:03 PM PROPOSED DETENTION POND - STAGE/STORAGE Pond: 1.0 Location: Bebee - Proposed WQ & Detention Pond Calculated By: MRB Date: 12/8/2016 V = 1/3 d (A + B + sqrt(A*B)) V = Volume between Contours, ft^2 d = Depth between Contours, ft A = Surface Area of Contour, ft^2 4936.4 0 4937 40 0.000 0.000 4938 2990 0.026 0.026 WQCV = 4938.26 3521 0.019 0.045 0.000 4939 6291 0.082 0.128 0.082 4940 8052 0.164 0.292 0.246 4941 9922 0.206 0.498 0.452 4942 11913 0.250 0.748 0.703 4943 14033 0.297 1.046 1.000 100‐Year WSEL = 4943.5 15142 0.167 1.213 1.168 4944 16283 0.180 1.393 1.348 4944.5 17448 0.194 1.587 1.541 Required Detention Volume = 1.031 See "Detention Volume Calculations" this report Provided Detention = 1.168 Required WQCV = 0.033 See "WQCV" Page 11 from Stantec Report Provided WQCV = 0.045 Total Required Volume = 1.064 Total Volume Provided = 1.213 Stage (ft) Surface Area (ft^2) Incremental Storage (ac‐ft) Total Storage (ac‐ft) Detention Storage (ac‐ ft) Orifice Calculations (Detention/WQ Outlet) BeBee School/Church 12/2/2016 d = diameter (inches) Q = flow (cfs) h = hydraulic head (ft) d = sqrt((36.88*Q)/(sqrt(h)) Water Quality Orifice Q (cfs) = 0.045 h (ft) = 1.86 Diameter (sq‐in) Standard Size (diam) d = sqrt((36.88*0.045)/(sqrt(1.86)) = 1.10 1‐3/16" Orifice Set invert of orifice at elevation 4936.4 100 ‐ Year Detention Orifice Q (cfs) = 1.100 h (ft) = 5.24 (Total Pond height minus WQ depth) Diameter (sq‐in) Standard Size (diam) d = sqrt((36.88*1.100)/(sqrt(5.24)) = 4.21 2‐5/16" Orifice Set invert of orifice at elevation 4938.26 15 | Page Appendix F Maps JOSEPH ALLEN DR. SCHOOL/CHURCH NANCY GRAY AVE. S. TIMBERLINE RD. BASIN 2 1.859 AC BASIN 1 0.856 AC BASIN OS7 1.240 AC POLICE STATION BASIN 0.88 AC TOTAL BASIN AREA DRAINING TO POND 5.44 AC DRAINAGE PLAN C-2.1 8 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 10/31/2016 LOGO WATER QUALITY TREATMENT LEGEND Minimum 8" Thick Layer of CDOT No. 4 Aggregate Minimum 4" Perforated PVC Pipe (Optional 16 | Page Appendix G References This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-30-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Nov-30-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA Depending on Underlying Soil Conditions) 12" Ponding Depth Minimum 12" Thick Layer of Bioretention Sand Media (see Bioretention Sand Media Specification below) Minimum 6" Thick Layer of Pea Gravel Diaphragm Parking/Building Water Surface Minimum CDOT No. 4 Aggregate Above and Below PVC Pipe Undisturbed Soil CONNECT UNDERDRAIN TO OUTLET STRUCTURE POND BASIN 0.608 AC Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 2 of 4