HomeMy WebLinkAboutWORTHINGTON AVENUE RESIDENCES - PDP - PDP160023 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTS (18)DELICH Worthington Residences TIS, June 2016 ASSOCIATES The existing geometry at the Centre/Worthington intersection is shown in Figure 3. Recent peak hour traffic counts at the Centre/Worthington intersection are shown in Figure 4. Traffic counts at the Centre/Worthington intersection were obtained in May 2016. Raw traffic count data is provided in Appendix B. Using the volumes shown in Figure 4, the current peak hour operation at the Centre/Worthington intersection is shown in Table 1. Calculation forms for these analyses are provided in Appendix C. The Centre/Worthington intersection was analyzed using the unsignalized intersection techniques from the 2010 Highway Capacity Manual (2010 HCM). A description of level of service for unsignalized intersections from the 2010 Highway Capacity Manual is provided in Appendix C. Table 4-3 showing the Fort Collins Motor Vehicle LOS Standards (Intersections) is also provided in Appendix C. This site is in an area termed “employment district” (all other areas) on the Fort Collins Structure Plan. In areas termed “all other areas,” acceptable operation is considered to be at level of service E overall and level of service F for any approach leg at arterial/arterial and collector/collector stop sign controlled intersections. At collector/local stop sign controlled intersections, acceptable operation is considered to be at level of service D overall and level of service C for any approach leg. As can be seen in Table 1, the Centre/Worthington intersection is currently operating acceptably with existing control and geometry. Trip Generation, 9 th Edition, ITE was used to estimate the daily and peak hour trip generation for the Worthington Residences. From this reference, the equations for Townhome/Condominium (Code 230) were used to estimate the daily and peak hour trip generation as shown in Table 2. The trip generation resulted in 252 daily trip ends, 22 morning peak hour trip ends, and 25 afternoon peak hour trip ends. The trip distribution for the Worthington Residences site is shown in Figure 5. Figure 6 shows the site generated peak hour traffic. Background traffic projections for the short range (2021) future horizon were obtained by factoring the current traffic volumes by two percent per year. Figure 7 shows the short range (2021) background peak hour traffic at the Centre/Worthington intersection. The traffic volumes generated by the proposed Worthington Residences were added to the background traffic volumes to produce the total traffic volume forecasts for the short range (2021) future. Figure 8 shows the short range (2021) total peak hour traffic at the Centre/Worthington and Worthington/Site Access intersections. Figure 9 shows a schematic of the short range (2021) geometry. No geometric improvements to the public streets are required. Table 3 shows the short range (2021) background morning and afternoon peak hour operation at the Centre/Worthington intersection. The Centre/Worthington intersection will operate at acceptable levels of service during the peak hours. Calculation forms for these analyses are provided in Appendix D. Table 4 shows the short range (2021) total morning and afternoon peak hour operation at the Centre/Worthington and Worthington/Site Access intersections. The Centre/Worthington and Worthington/Site Access intersections will operate at acceptable levels of service during the peak hours. Calculation forms for these analyses are provided in Appendix E. DELICH Worthington Residences TIS, June 2016 ASSOCIATES The Worthington Residences site is in an area within which the City requires pedestrian and bicycle level of service evaluations. Appendix F shows a map of the area that is within 1320 feet of the Worthington Residences site. The Worthington Residences site is located within an area termed as “all other areas,” which sets the pedestrian level of service threshold at LOS C for all measured categories. There are six destination areas within 1320 feet of the proposed Worthington Residences: 1) the residential neighborhood to the northwest, 2) the residential neighborhood to the northeast, 3) the commercial area to the southeast, 4) the commercial area to the south, 5) the residential uses to the west, and 6) the commercial area to the southwest. Appendix F contains a Pedestrian LOS Worksheet. Sidewalks exist along all streets within these areas. Appendix F shows a map of the area that is within 1320 feet of the Worthington Residences site. Based upon Fort Collins bicycle LOS criteria, there is one destination area within 1320 feet of the Worthington Residences site: 1) the commercial area to the south of the site. There are bike lanes on Centre Avenue and Worthington Avenue, south of Centre Avenue. Appendix F contains a Bicycle LOS Worksheet. It is concluded that the bicycle LOS criteria will be met. Currently, this area is served by Transfort Routes 7 and 19, which run along Shields Street, and Transfort Horn Route, which runs along Centre Avenue to the CSU Campus. The transit service is acceptable. It is concluded that the Centre/Worthington and Worthington/Site Access intersections will operate acceptably with the existing geometry and control. No further transportation analyses are required at this time. Spring Creek Trail Mason Trail Drake Prospect Shields Centre Worthington Research SCALE: 1"=1000' SITE LOCATION Figure 1 DELICH ASSOCIATES Worthington Residences TIS, June 2016 SCALE: 1"=100' SITE PLAN Figure 2 DELICH ASSOCIATES Worthington Residences TIS, June 2016 EXISTING INTERSECTION GEOMETRY Figure 3 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Worthington - Denotes Lane AM/PM RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Worthington 7/2 380/194 34/49 5/2 87/335 26/85 2/11 4/13 4/7 89/32 11/5 28/31 DELICH Worthington Residences TIS, June 2016 ASSOCIATES TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Centre/Worthington (stop sign) NB LT/T/RT C C SB LT/T/RT B C EB LT A A WB LT A A OVERALL A A TABLE 2 Trip Generation for Worthington Residences Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 230 Townhome/ Condominium 34 D.U. EQ 252 EQ 4 EQ 18 EQ 17 EQ 8 Centre Worthington Research 25% 35% 40% SCALE: 1"=300' TRIP DISTRIBUTION Figure 5 DELICH ASSOCIATES Worthington Residences TIS, June 2016 AM/PM SITE GENERATED PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Site Access Worthington Worthington 1/4 1/6 6/3 7/3 5/2 2/7 NOM 18/8 4/17 NOM AM/PM SHORT RANGE (2021) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Worthington 7/2 420/214 37/54 5/2 96/370 29/94 2/11 4/13 4/7 98/35 11/5 31/34 AM/PM SHORT RANGE (2021) TOTAL PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Site Access Worthington Worthington 8/6 420/214 37/54 6/8 96/370 29/94 8/14 11/16 9/9 98/35 13/12 31/34 NOM 18/8 4/17 22/8 NOM 9/30 SHORT RANGE (2021) GEOMETRY Figure 9 DELICH ASSOCIATES Worthington Residences TIS, June 2016 Centre Site Access Worthington Worthington - Denotes Lane DELICH Worthington Residences TIS, June 2016 ASSOCIATES TABLE 3 Short Range (2021) Background Peak Hour Operation Intersection Movement Level of Service AM PM Centre/Worthington (stop sign) NB LT/T/RT C C SB LT/T/RT B C EB LT A A WB LT A A OVERALL A A TABLE 4 Short Range (2021) Total Peak Hour Operation Intersection Movement Level of Service AM PM Centre/Worthington (stop sign) NB LT/T/RT C C SB LT/T/RT C C EB LT A A WB LT A A OVERALL A A Worthington/Site Access (stop sign) WB LT/RT A A SB LT/T A A OVERALL A A APPENDIX A APPENDIX B DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970) 669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 5/5/2016 Observer: Vickie Day: Thursday Jurisdiction: Fort Collins R = right turn Intersection: Centre/Worthington S = straight L = left turn Time Northbound: Worthington Southbound: Worthington Total Eastbound: Centre Westbound: Centre Total Total Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All 7:30 3 3 23 29 0 0 0 0 29 1 97 9 107 3 25 0 28 135 164 7:45 12 3 29 44 1 1 2 4 48 3 121 11 135 9 26 0 35 170 218 8:00 9 3 18 30 0 1 1 2 32 3 88 6 97 10 16 1 27 124 156 8:15 4 2 19 25 1 2 1 4 29 0 74 8 82 4 20 4 28 110 139 7:30-8:30 28 11 89 128 2 4 4 10 138 7 380 34 421 26 87 5 118 539 677 PHF 0.58 0.92 0.77 0.73 0.5 0.5 0.5 0.63 0.58 0.79 0.77 0.78 0.65 0.84 0.31 0.84 0.78 4:30 6 2 11 19 3 4 3 10 29 1 53 12 66 17 75 1 93 159 188 4:45 6 1 5 12 1 5 1 7 19 1 44 11 56 17 69 0 86 142 161 5:00 12 2 6 20 3 3 3 9 29 0 36 16 52 28 100 0 128 180 209 5:15 7 0 10 17 4 1 0 5 22 0 61 10 71 23 91 1 115 186 208 4:30-5:30 31 5 32 68 11 13 7 31 99 2 194 49 245 85 335 2 422 667 766 PHF 0.65 0.63 0.73 0.85 0.69 0.65 0.58 0.78 0.5 0.8 0.77 0.86 0.76 0.84 0.5 0.82 0.92 APPENDIX C HCM 2010 TWSC Recent AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 3.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 7 380 34 26 87 5 28 11 89 2 4 4 Future Vol, veh/h 7 380 34 26 87 5 28 11 89 2 4 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 8 447 40 31 102 6 33 13 105 2 5 5 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 108 0 0 487 0 0 655 653 467 708 670 105 Stage 1 - - - - - - 484 484 - 166 166 - Stage 2 - - - - - - 171 169 - 542 504 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1483 - - 1076 - - 379 387 596 350 378 949 Stage 1 - - - - - - 564 552 - 836 761 - Stage 2 - - - - - - 831 759 - 525 541 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1483 - - 1076 - - 364 374 596 274 365 949 Mov Cap-2 Maneuver - - - - - - 364 374 - 274 365 - Stage 1 - - - - - - 561 549 - 831 739 - Stage 2 - - - - - - 798 737 - 420 538 - Approach EB WB NB SB HCM Control Delay, s 0.1 1.9 15.2 13.3 HCM LOS C B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 501 1483 - - 1076 - - 445 HCM Lane V/C Ratio 0.301 0.006 - - 0.028 - - 0.026 HCM Control Delay (s) 15.2 7.4 - - 8.4 - - 13.3 HCM Lane LOS C A - - A - - B HCM 95th %tile Q(veh) 1.3 0 - - 0.1 - - 0.1 Lanes and Geometrics Recent AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.988 0.992 0.906 0.944 Flt Protected 0.950 0.950 0.989 0.992 Satd. Flow (prot) 1770 1840 0 1770 1848 0 0 1669 0 0 1744 0 Flt Permitted 0.950 0.950 0.989 0.992 Satd. Flow (perm) 1770 1840 0 1770 1848 0 0 1669 0 0 1744 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 200 Travel Time (s) 6.2 6.6 4.7 4.5 Intersection Summary Area Type: Other HCM 2010 TWSC Recent PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 3.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 2 194 49 85 335 2 31 5 32 11 13 7 Future Vol, veh/h 2 194 49 85 335 2 31 5 32 11 13 7 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 211 53 92 364 2 34 5 35 12 14 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 366 0 0 264 0 0 803 793 237 812 818 365 Stage 1 - - - - - - 242 242 - 550 550 - Stage 2 - - - - - - 561 551 - 262 268 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1193 - - 1300 - - 302 321 802 298 311 680 Stage 1 - - - - - - 762 705 - 519 516 - Stage 2 - - - - - - 512 515 - 743 687 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1193 - - 1300 - - 272 298 802 266 289 680 Mov Cap-2 Maneuver - - - - - - 272 298 - 266 289 - Stage 1 - - - - - - 761 704 - 518 479 - Stage 2 - - - - - - 457 479 - 704 686 - Approach EB WB NB SB HCM Control Delay, s 0.1 1.6 16.1 17.5 HCM LOS C C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 398 1193 - - 1300 - - 321 HCM Lane V/C Ratio 0.186 0.002 - - 0.071 - - 0.105 HCM Control Delay (s) 16.1 8 - - 8 - - 17.5 HCM Lane LOS C A - - A - - C HCM 95th %tile Q(veh) 0.7 0 - - 0.2 - - 0.3 Lanes and Geometrics Recent PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.970 0.999 0.936 0.968 Flt Protected 0.950 0.950 0.978 0.983 Satd. Flow (prot) 1770 1807 0 1770 1861 0 0 1705 0 0 1772 0 Flt Permitted 0.950 0.950 0.978 0.983 Satd. Flow (perm) 1770 1807 0 1770 1861 0 0 1705 0 0 1772 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 200 Travel Time (s) 6.2 6.6 4.7 4.5 Intersection Summary Area Type: Other APPENDIX D HCM 2010 TWSC Short Bkgrd AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 3.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 7 420 37 29 96 5 31 11 98 2 4 4 Future Vol, veh/h 7 420 37 29 96 5 31 11 98 2 4 4 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 8 494 44 34 113 6 36 13 115 2 5 5 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 119 0 0 538 0 0 721 719 516 780 738 116 Stage 1 - - - - - - 532 532 - 184 184 - Stage 2 - - - - - - 189 187 - 596 554 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1469 - - 1030 - - 343 354 559 313 346 936 Stage 1 - - - - - - 531 526 - 818 747 - Stage 2 - - - - - - 813 745 - 490 514 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1469 - - 1030 - - 328 340 559 234 333 936 Mov Cap-2 Maneuver - - - - - - 328 340 - 234 333 - Stage 1 - - - - - - 528 523 - 814 722 - Stage 2 - - - - - - 777 720 - 377 511 - Approach EB WB NB SB HCM Control Delay, s 0.1 1.9 17 14.2 HCM LOS C B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 463 1469 - - 1030 - - 403 HCM Lane V/C Ratio 0.356 0.006 - - 0.033 - - 0.029 HCM Control Delay (s) 17 7.5 - - 8.6 - - 14.2 HCM Lane LOS C A - - A - - B HCM 95th %tile Q(veh) 1.6 0 - - 0.1 - - 0.1 Lanes and Geometrics Short Bkgrd AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.988 0.992 0.905 0.944 Flt Protected 0.950 0.950 0.989 0.992 Satd. Flow (prot) 1770 1840 0 1770 1848 0 0 1667 0 0 1744 0 Flt Permitted 0.950 0.950 0.989 0.992 Satd. Flow (perm) 1770 1840 0 1770 1848 0 0 1667 0 0 1744 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 200 Travel Time (s) 6.2 6.6 4.7 4.5 Intersection Summary Area Type: Other HCM 2010 TWSC Short Bkgrd PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 3.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 2 214 54 94 370 2 34 5 35 11 13 7 Future Vol, veh/h 2 214 54 94 370 2 34 5 35 11 13 7 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 2 233 59 102 402 2 37 5 38 12 14 8 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 404 0 0 291 0 0 884 875 262 896 904 403 Stage 1 - - - - - - 266 266 - 608 608 - Stage 2 - - - - - - 618 609 - 288 296 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1155 - - 1271 - - 266 288 777 261 277 647 Stage 1 - - - - - - 739 689 - 483 486 - Stage 2 - - - - - - 477 485 - 720 668 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1155 - - 1271 - - 236 264 777 229 254 647 Mov Cap-2 Maneuver - - - - - - 236 264 - 229 254 - Stage 1 - - - - - - 738 688 - 482 447 - Stage 2 - - - - - - 420 446 - 678 667 - Approach EB WB NB SB HCM Control Delay, s 0.1 1.6 18 19.5 HCM LOS C C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 356 1155 - - 1271 - - 282 HCM Lane V/C Ratio 0.226 0.002 - - 0.08 - - 0.119 HCM Control Delay (s) 18 8.1 - - 8.1 - - 19.5 HCM Lane LOS C A - - A - - C HCM 95th %tile Q(veh) 0.9 0 - - 0.3 - - 0.4 Lanes and Geometrics Short Bkgrd PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.970 0.999 0.936 0.968 Flt Protected 0.950 0.950 0.977 0.983 Satd. Flow (prot) 1770 1807 0 1770 1861 0 0 1703 0 0 1772 0 Flt Permitted 0.950 0.950 0.977 0.983 Satd. Flow (perm) 1770 1807 0 1770 1861 0 0 1703 0 0 1772 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 200 Travel Time (s) 6.2 6.6 4.7 4.5 Intersection Summary Area Type: Other APPENDIX E HCM 2010 TWSC Short Total AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 4 Intersection Int Delay, s/veh 4.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 8 420 37 29 96 6 31 13 98 8 11 9 Future Vol, veh/h 8 420 37 29 96 6 31 13 98 8 11 9 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 9 494 44 34 113 7 36 15 115 9 13 11 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 120 0 0 538 0 0 731 723 516 785 741 116 Stage 1 - - - - - - 535 535 - 185 185 - Stage 2 - - - - - - 196 188 - 600 556 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1468 - - 1030 - - 337 352 559 310 344 936 Stage 1 - - - - - - 529 524 - 817 747 - Stage 2 - - - - - - 806 745 - 488 513 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1468 - - 1030 - - 314 338 559 231 331 936 Mov Cap-2 Maneuver - - - - - - 314 338 - 231 331 - Stage 1 - - - - - - 526 521 - 812 722 - Stage 2 - - - - - - 757 720 - 374 510 - Approach EB WB NB SB HCM Control Delay, s 0.1 1.9 17.5 16 HCM LOS C C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 454 1468 - - 1030 - - 361 HCM Lane V/C Ratio 0.368 0.006 - - 0.033 - - 0.091 HCM Control Delay (s) 17.5 7.5 - - 8.6 - - 16 HCM Lane LOS C A - - A - - C HCM 95th %tile Q(veh) 1.7 0 - - 0.1 - - 0.3 Lanes and Geometrics Short Total AM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.988 0.991 0.906 0.955 Flt Protected 0.950 0.950 0.989 0.987 Satd. Flow (prot) 1770 1840 0 1770 1846 0 0 1669 0 0 1756 0 Flt Permitted 0.950 0.950 0.989 0.987 Satd. Flow (perm) 1770 1840 0 1770 1846 0 0 1669 0 0 1756 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 328 Travel Time (s) 6.2 6.6 4.7 7.5 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 4 Intersection Int Delay, s/veh 3.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Traffic Vol, veh/h 6 214 54 94 370 8 34 12 35 14 16 9 Future Vol, veh/h 6 214 54 94 370 8 34 12 35 14 16 9 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 7 233 59 102 402 9 37 13 38 15 17 10 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 411 0 0 291 0 0 899 890 262 912 915 407 Stage 1 - - - - - - 275 275 - 611 611 - Stage 2 - - - - - - 624 615 - 301 304 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1148 - - 1271 - - 260 282 777 255 273 644 Stage 1 - - - - - - 731 683 - 481 484 - Stage 2 - - - - - - 473 482 - 708 663 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 1148 - - 1271 - - 227 258 777 218 250 644 Mov Cap-2 Maneuver - - - - - - 227 258 - 218 250 - Stage 1 - - - - - - 727 679 - 478 445 - Stage 2 - - - - - - 412 443 - 656 659 - Approach EB WB NB SB HCM Control Delay, s 0.2 1.6 19.5 20.5 HCM LOS C C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 336 1148 - - 1271 - - 274 HCM Lane V/C Ratio 0.262 0.006 - - 0.08 - - 0.155 HCM Control Delay (s) 19.5 8.2 - - 8.1 - - 20.5 HCM Lane LOS C A - - A - - C HCM 95th %tile Q(veh) 1 0 - - 0.3 - - 0.5 Lanes and Geometrics Short Total PM 3: Worthington & Centre Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12 Grade (%) 0% 0% 0% 0% Storage Length (ft) 150 0 150 0 0 0 0 0 Storage Lanes 1 0 1 0 0 0 0 0 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.970 0.997 0.942 0.968 Flt Protected 0.950 0.950 0.979 0.982 Satd. Flow (prot) 1770 1807 0 1770 1857 0 0 1718 0 0 1771 0 Flt Permitted 0.950 0.950 0.979 0.982 Satd. Flow (perm) 1770 1807 0 1770 1857 0 0 1718 0 0 1771 0 Link Speed (mph) 35 35 30 30 Link Distance (ft) 316 339 206 328 Travel Time (s) 6.2 6.6 4.7 7.5 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total AM 2: Worthington & Site Access Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 3 Movement NBT NBR SBL SBT SWL SWR Traffic Vol, veh/h 22 4 0 9 18 0 Future Vol, veh/h 22 4 0 9 18 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 26 5 0 11 21 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 31 0 39 28 Stage 1 - - - - 28 - Stage 2 - - - - 11 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1582 - 973 1047 Stage 1 - - - - 995 - Stage 2 - - - - 1012 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1582 - 973 1047 Mov Cap-2 Maneuver - - - - 973 - Stage 1 - - - - 995 - Stage 2 - - - - 1012 - Approach NB SB SW HCM Control Delay, s 0 0 8.8 HCM LOS A Minor Lane/Major Mvmt NBT NBR SBL SBTSWLn1 Capacity (veh/h) - - 1582 - 973 HCM Lane V/C Ratio ---- 0.022 HCM Control Delay (s) - - 0 - 8.8 HCM Lane LOS - - A - A HCM 95th %tile Q(veh) - - 0 - 0.1 Lanes and Geometrics Short Total AM 2: Worthington & Site Access Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group NBT NBR SBL SBT SWL SWR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.978 Flt Protected 0.950 Satd. Flow (prot) 1822 0 0 1863 1770 0 Flt Permitted 0.950 Satd. Flow (perm) 1822 0 0 1863 1770 0 Link Speed (mph) 30 30 30 Link Distance (ft) 328 421 176 Travel Time (s) 7.5 9.6 4.0 Intersection Summary Area Type: Other HCM 2010 TWSC Short Total PM 2: Worthington & Site Access Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 2 Intersection Int Delay, s/veh 1.1 Movement NBT NBR SBL SBT SWL SWR Traffic Vol, veh/h 8 17 0 30 8 0 Future Vol, veh/h 8 17 0 30 8 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 85 85 85 85 85 85 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 9 20 0 35 9 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 29 0 54 19 Stage 1 - - - - 19 - Stage 2 - - - - 35 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1584 - 954 1059 Stage 1 - - - - 1004 - Stage 2 - - - - 987 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1584 - 954 1059 Mov Cap-2 Maneuver - - - - 954 - Stage 1 - - - - 1004 - Stage 2 - - - - 987 - Approach NB SB SW HCM Control Delay, s 0 0 8.8 HCM LOS A Minor Lane/Major Mvmt NBT NBR SBL SBTSWLn1 Capacity (veh/h) - - 1584 - 954 HCM Lane V/C Ratio ---- 0.01 HCM Control Delay (s) - - 0 - 8.8 HCM Lane LOS - - A - A HCM 95th %tile Q(veh) - - 0 - 0 Lanes and Geometrics Short Total PM 2: Worthington & Site Access Worthington Residences 5/24/2016 Synchro 9 Light Report Delich Associates Page 1 Lane Group NBT NBR SBL SBT SWL SWR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Width (ft) 12 12 12 12 12 12 Grade (%) 0% 0% 0% Storage Length (ft) 0 0 0 0 Storage Lanes 0 0 1 0 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Ped Bike Factor Frt 0.907 Flt Protected 0.950 Satd. Flow (prot) 1690 0 0 1863 1770 0 Flt Permitted 0.950 Satd. Flow (perm) 1690 0 0 1863 1770 0 Link Speed (mph) 30 30 30 Link Distance (ft) 328 421 176 Travel Time (s) 7.5 9.6 4.0 Intersection Summary Area Type: Other APPENDIX F Spring Creek Trail Drake Shields Centre Worthington Research SCALE: 1"=600' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Worthington Residences TIS, May 2016 Pedestrian LOS Worksheet Project Location Classification: All Other Areas Description of Applicable Destination Area Within 1320’ Destination Area Classification Level of Service (minimum based on project location classification) Directness Continuity Street Crossings Visual Interest & Amenities Security Neighborhood to the northwest of the site Residential Minimum C C C C C 1 Actual C C B B B Proposed C C B B B Neighborhood to the northeast of the site Residential Minimum C C C C C 2 Actual B B A B B Proposed B B A B B Commercial uses to the southeast of the site Commercial Minimum C C C C C 3 Actual A B B B B Proposed A B B B B Commercial uses to the southeast of the site Commercial Minimum C C C C C 4 Actual A B B B B Proposed A B B B B Residential uses to the west of the site Residential Minimum C C C C C 5 Actual A C A B B Proposed A C A B B Commercial uses to the southwest of the site Commercial Minimum C C C C C 6 Actual A C B B B Proposed A C B B B Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Minimum 10 Actual Proposed Spring Creek Trail Drake Shields Centre Worthington Research SCALE: 1"=600' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Worthington Residences TIS, May 2016 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification Commercial area to the 1 south of the site Commercial C A A 2 3 4