Loading...
HomeMy WebLinkAboutTHE STEAD (255 S. TAFT HILL RD.) - PDP/FDP - FDP150026 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSLAPORTE AVE PROJECT SITE W MULBERRY ST S TAFT HILL RD CITY PARK W PROSPECT RD CS1 COVER SHEET D. Weber D. Weber N/A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com APPLICANT CONTACT INFORMATION PROJECT TEAM: Shane Roberts 255 South Taft Hill Road Fort Collins, CO 80521 GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-- Doug Martine (970) 224-6152 CABLE------------- Comcast----------------------------------- Don Kapperman (970) 567-0245 TELECOM.--------CenturyLink------------------------------- William Johnson (970) 490-7501 WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 221-6700 FIBER OPTICS-- Colorado State University------------ Kurt Davis (970) 491-0187 CS2 CONSTRUCTION NOTES GENERAL AND D. Weber D. Weber N/A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado S H Y D WV TH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W E G CTV REC. NO. 99024292 TENTH GREEN, FIRST FILING 9 7 8 10 11 12 (7) TREES TO BE REMOVED BUILDING BUILDING BUILDING GROVE OF TREES 8" CONC WALL 6" CONC BOX FL=5077.42 (E) FL=5077.29(W) S H Y D WV X X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W E G CTV REC. NO. 99024292 TENTH GREEN, FIRST FILING 9 7 8 10 11 12 CO CO CO SOUTH TAFT HILL ROAD 20' DIA. GUEST YURTS NEW RESIDENCE PATIO 3-CAR GARAGE BARN PATIO GARDEN GARDEN GARDEN GARDEN 12" PVC APPROX. LOCATION OF 6" WATERLINE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X REC. NO. 99024292 9 7 8 10 SOUTH TAFT HILL ROAD NEW RESIDENCE FFE=5080.25 3-CAR GARAGE FFE=5075.5 BARN FFE=5076.25 1.6% 2.4% 3.0% 2.7% 2.5% 2.9% 2.2% 1.0% 1.0% 25.0% 0.7% 1.9% 2.0% 78.55 77.45 D1 CONSTRUCTION DETAILS D. Weber D. Weber N/A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com Lip FL Back of curb Right of Way Line 1:50 (max.) NOTE: 1. Concrete driveway shall be provided to the property line. 2. 0" Curb Height, See Section A-A 3. Full Curb and Gutter, See Standard Drawing 701. X W X 1:12 (max.) SECTION A-A X = Curb Transition Length, Varies* W = Driveway Width (See Drawing Series 707) T = Concrete Thickness - 6" Residential, 8" Commercial. A A D2 EROSION CONTROL DETAILS D. Weber D. Weber N/A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com APPROVED: DATE: DETAIL DRAWN BY: FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 SILT FENCE 12/27/00 D-28 NBJ FILTER FABRIC ATTACH SECURELY TO POST COMPACTED BACK FILL APPROXIMATELY 4 IN. X 4 IN. TRENCH 10 IN. MIN. STEEL OR WOOD POST RUNOFF SECTION VIEW 1. THE MAXIMUM TRIBUTARY AREA IS LIMITED TO 0.25 ACRES PER 100 FEET OF FENCE. 2. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN ONE HALF THE HEIGHT OF THE FENCE HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. GENERAL NOTES: BACK FILLED TRENCH STEEL OR WOOD POST FILTER FABRIC VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE. A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT. VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (i.e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x4'S, PIPES, DIRT, GRAVEL OR ASPHALT, SHALL BE PLACED IN GUTTER TO FACILITATE MOUNTING CURB; HOWEVER, CURB MAY BE CUT DOWN TO A HEIGHT OF 2" OR HIGHER FOR EASIER ACCESS AND REPLACED AT PROJECT COMPLETION. OTHER ACCESS DEVICES MAY BE USED AS ACCEPTED BY THE CITY. 3" - 6" ROCK CURB CUT 50' MIN. 2" MIN. 6" MIN. 6" MIN. ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY INSPECTOR. IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING A WASHWATER SEDIMENT TRAP. 5. 6. IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY. ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE. ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES. 4. 5. VTC SLOPE TYPE H TYPE M TABLE I CLASSIFICATION AND GRADATION OF ORDINARY RIPRAP RIPRAP DESIGNATION % SMALLER THAN GIVEN SIZE BY WEIGHT INTERMEDIATE ROCK DIMENSIONS (INCHES) d 50 (INCHES)* TYPE VH 50 * d = MEAN PARTICAL SIZE (INTERMEDIATE DIMENSION) BY WEIGHT. 35-50 2-10 50-70 70-100 12 4 18 21 12 24 18 50-70 24 35-50 2-10 50-70 2-10 70-100 35-50 24 9 33 6 42 18 70-100 30 TABLE II GRADATION FOR GRANULAR BEDDING U.S. STANDARD TYPE I CDOT SECT. 703.01 TYPE II CDOT SECT. 703.09 CLASS A SIEVE SIZE 3 INCHES 1 1/2 INCHES 3/4 INCHES 3/8 INCHES #4 #16 #50 #100 #200 PERCENT WEIGHT BY PASSING SQUARE-MESH SIEVES -- -- -- 100 95-100 45-80 10-30 2-10 0-2 90-100 -- 20-90 -- 0-20 -- -- -- 0-3 M (d = 12 IN.) H (d = 18 IN.) VH (d = 24 TABLE III THICKNESS REQUIREMENTS FOR GRANULAR BEDDING U.S. STANDARD SIEVE SIZE FINE-TYPE GRAINED I PERCENT TYPE SOILS* WEIGHT II BY PASSING SQUARE-MESH SIEVES COURSE-GRAINED SOILS** 4 6 6 6 8 8 50 50 50 TYPE II \A1;2'\\A1;SEE TABLE A1;50 2*d III \A1;SEE TABLE III STABILIZATION TOPSOIL FLARED END SECTION (TYP.) GRANULAR BEDDING STABILIZATION TOPSOIL TYPE II BEDDING TYPE I BEDDING GRANULAR BEDDING CONCRETE CUTOFF WALL SOIL RIPRAP AT PIPE OUTLET {WITH CUTOFF WALL} SOIL RIPRAP AT PIPE OUTLET {WITHOUT CUTOFF WALL} * MAY SUBSTITUTE ONE 12-INCH LAYER OF TYPE II BEDDING. THE SUBSTITUTE OF ONE LAYER OF TYPE II BEDDING SHALL NOT BE PERMITTED AT DROP STRUCTURES. THE USE OF A COMBINATION OF FILTER FABRIC AND TYPE II BEDDING AT DROP STRUCTURES IS ACCEPTABLE. ** FIFTY PERCENT OR MORE BY WEIGHT RETAINED ON THE #40 SIEVE. \A1;12" MIN. COMPACT BACKFILL TO 95% STANDARD PROCTOR STAPLES FABRIC SOIL STAPLES FABRIC STABILIZATION TOPSOIL {\LFILTER FABRIC PLACEMENT AND LAP DETAIL} {\LLAP DETAIL} MIX UNIFORMLY 65% ORDINARY RIPRAP WITH 35% STABILIZATION TOPSOIL PRIOR TO PLACEMENT. STABILIZATION TOPSOIL SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT. PLACE STONE-SOIL MIX TO RESULT IN SECURELY INTERLOCKED ROCK AT THE DESIGN THICKNESS AND GRADE. PLACE TWO LIFTS (MINIMUM) WITH LARGER ROCK ON TOP. ROCK VOIDS TO BE COMPLETELY FILLED TO FORM A HOMOGENEOUS MASS FOR THE FORMATION OF A ROOT MAT INTERTWINED WITH THE RIPRAP. STABILIZATION SOIL IS TO FILL RIPRAP VOIDS, NOT DISPLACE RIPRAP. COMPACT AND LEVEL TO ELIMINATE ALL VOIDS AND ROCKS PROJECTING ABOVE DESIGN RIPRAP TOP GRADE. FINISHED GRADE (PER CIVIL GRADING PLANS) DESIGN RIPRAP GRADE PLACEMENT OF ROCK IN TOP LAYER WILL REQUIRE DISTURBANCE OF FIRST LAYER SOIL IS NOT TO BE PERCHED. STABILIZATION SOIL FILLS ALL VOIDS FROM FINISHED SURFACE TO SUBGRADE. \A1;D50% D MAXIMUM THICKNESS OF FIRST LIFT PLACEMENT OF TOP LIFT WILL \A1;D REQUIRE ADJUSTMENT OF FIRST LIFT 4" MIN 6" MAX 5" TYP MEASUREMENT ON SLOPE PERPENDICULAR TO SLOPE SEE TABLES II AND III BELOW. 1.GENERAL PLACEMENT TECHNIQUES SHOULD RESULT IN LARGER ROCK AT THE SURFACE WITH ROCK SECURELY INTERLOCKED AT THE DESIGN THICKNESS AND GRADE. COMPACTION AND LEVELING SHOULD RESULT IN MINIMAL VOIDS AND PROJECTIONS ABOVE GRADE. 2.FINAL SOIL RIPRAP TO BE COMPACTED BY FULL LOADING OF BACKHOE BUCKET. ANY SOFT, YIELDING OR PACKETS OF SMALL ROCK SHALL BE REWORKED. PLACE STABILIZATION TOPSOIL 4 TO 6 INCHES THICK OVER ROCK. NO MORE THAN 25 PERCENT OF ORDINARY RIPRAP ROCK SHALL REMAIN EXPOSED. COORDINATE ROCK PLACEMENT TO PROVIDE TREE OR SHRUB PLANTING PITS AS INDICATED ON LANDSCAPE PLANS, AS APPLICABLE. COORDINATE SCOPE OF WORK AND RESPONSIBILITIES WITH OWNER AND LANDSCAPE CONTRACTOR. 3.PROVIDE CRIMP OR TACKIFY MULCH, HYDROMULCH, AND OR TURF REINFORCEMENT MAT (TRM) / EROSION CONTROL BLANKET ALONG WITH PLANTING, PER APPROVED LANDSCAPE PLANS, TO ENSURE VEGETATION BECOMES ESTABLISHED AND SEED DOES NOT WASH AWAY. 4.PREPARE COMPACTED SUBGRADE PER GEOTECHNICAL ENGINEERING RECOMMENDATIONS, OR PLACE ON UNDISTURBED SUBGRADE. {\LTYPICAL SOIL RIPRAP PLACEMENT} FILTER FABRIC MAY BE USED IN COMBINATION WITH TYPE II BEDDING AT DROP STRUCTURES AS AN ALTERNATIVE TO A TWO LAYER FILTER. FILTER FABRIC SHALL CONFORM TO CDOT SPECIFICATIONS FOR CHANNEL APPLICATIONS REFER TO THE MAJOR DRAINAGE CHAPTER OF THE URBAN STORM DRAINAGE CRITERIA MANUAL, VOLUME 1, FOR RIPRAP SIZING. FOR CULVERT/STORM SEWER OUTLET APPLICATIONS REFER TO THE HYDRAULIC STRUCTURES CHAPTER OF THE URBAN STORM DRAINAGE CRITERIA MANUAL, VOLUME 2, FOR RIPRAP SIZE, RIPRAP DEPTH, BASIN LENGTH, AND BASIN WIDTH. COORDINATE THE COLOR OF ALL EXPOSED RIPRAP WITH THE OWNER AND PROJECT LANDSCAPE ARCHITECT. NO MORE THAN 25% OF ORDINARY RIPRAP ROCK SHALL REMAIN EXPOSED. FINISHED GRADE DEPICTED ABOVE SHALL BE FINISHED GRADE SPECIFIED ON GRADING PLANS. {GENERAL NOTES:} 1. 2. 3. 4. {\LPLACEMENT NOTES:} {FILTER FABRIC NOTES:} 1. 2. RP OPTIONAL UNDERDRAIN SOIL RIPRAP SEE NOTE 4 BELOW. SLOPE VARIES (SEE PLANS) 50 \A1;2*d SOIL RIPRAP \A1;4" TO 6" SOIL RIPRAP SOIL RIPRAP (ROCK-SOIL MIX) GRANULAR BEDDING TOPSOIL SLOPE Location Pipe Diameter (Inches) Ordinary Riprap Type Riprap Length (ft) Riprap Width (ft) Riprap Depth (ft) Culvert 8 Type M 2.0 2.0 2.0 CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE. VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE. WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. LOCATION OF CONCRETE WASHOUT AREA ON SHEET EC1 IS CONCEPTUAL ONLY. FINAL LOCATION TO BE DETERMINED IN THE FIELD AT CONTRACTOR'S DISCRETION. {NOTES: }1. 2. 3. 4. 5. 6. 7. 3H:1V OR FLATTER SIDE SLOPES \A1;12" MIN 8'x 8' MIN OR AS REQUIRED TO CONTAIN WASTE CONCRETE \A1;12" \A1;2'-0" MIN. COMPACTED EMBANKMENT MATERIAL, TYP. BERM AROUND PERIMETER GROUND SURFACE SIGN TO INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA CWA PERSPECTIVE Flowline Back of Walk N.T.S. LARIMER COUNTY DRAWINGS CONSTRUCTION REVISION NO: 1 706.DRAWING 2 STREET STANDARDS URBAN AREA DATE: 02/17/15 STANDARD DRIVEWAY APPROACH ATTACHED WALK (TYPE II) Varies * Driveway Width Varies * W = Width Refer to Chapter 25 for minimum removal dimensions. Walk T ROW Varies NOT TO SCALE Attached Sidewalk Property Line Retaining Curb (Optional), 1" per ft. 1/4" per ft. See Drawing 1603 (TYP) 6" \A1;6" Attached Attached 1:12 (max.) 1:12 (max.) * Ramp length not to exceed 15'-0", slope must be uniform. See Note 3 See Note 2 See Note 3 See Note 2 1" per ft. 1:50 (max.) 1/4" per ft. 1:12 (max.) 1 2" min - 2" max T 2" Expansion Joint if driveway continues as concrete All residential water service shall be installed in the center of the lot All water and sanitary sewer service shall have a minimum of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit. No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet Use type K copper for the service from the corporation stop to a minimum of 5 feet up to and including the curb stop. The owner is responsible for service from the The City is responsible for maintaining the water main, corporation stop, and service piping Locate curb box and meter pit according to the approved utility drawings. Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC, unless otherwise approved by the Utility. horizontal separation of ten feet. No couplings allowed between curb stop and meter setting. curb stop, including the outlet coupling to the building. construction or use a tapping saddle. in which case, use a tapping saddle. GENERAL NOTES 9. 8. 4. 6. 7. 5. WATER MAIN 3. 2. 1. IN FACE OF CURB CUT 4 INCH CROSS CORPORATION STOP FOR PAVEMENT CURB STOP CURB BOX 66 INCH MAX. 54 INCH MIN. CURB, GUTTER AND SIDEWALK DISTANCE VARIES 1 FT. PROPERTY OR EASEMENT LINE GRADE FINAL LANDSCAPED REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 TYPICAL WATER SERVICE 11 4/12/11 1 1/2 INCH OR GREATER CORPORATION STOP FOR 3/4 AND 1 INCH SERVICES SERVICES 1 INCH SERVICES PLAN VIEW CROSS VIEW 45 ELBOW SERVICE WYE 8 IN. PVC SEWER PIPE COMPACTED GRANULAR MATERIAL AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR LEAN CONCRETE PVC SEWER PIPE NOTE: WYE CONNECTION NOT ALLOWED ON VCP LEAN CONCRETE o 20 MIN. o 45 MAX. o TRENCH UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR 4 IN. X 4 IN. MARKER AIR-TIGHT PLUG DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL SERVICE WYE DETAIL WW-9 NBJ 4/11/11 W/ SEWER STAMPED ON LID VALVE BOX \A1;6" MIN \A1;WATER TIGHT SCREW CAP \A1;4" HARD ASPHALT SURFACE OR OTHER FLOW DIRECTION DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL TRAFFIC RATED CLEANOUT WW-15 NBJ 4/11/11 02/17/15 STANDARD SIDEWALK URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1601 DRAWING DATE: 4 Driveway Driveway Sidewalk SECTION A-A Detached Sidewalk Attached Sidewalk Detached Attached All Sidewalk Thickness Shall Be 6" minimum. Sidewalk NOTE: 1. Sidewalk grade shall remain consistent across driveway 2. For driveway design requirements, see CONST. DWG. Series 706 & 707 3. This detail applies to Residential & Commercial driveways. 6" 2'-0" 6'-0" T.C. F.L. Lip 1/2" Expansion Joint Material 1/2" Expansion Joint Material 8" Commercial 6" Residential A A Sidewalk Min. NOT TO SCALE NOTES: 1. THE SIGN PLATE SHALL BE A MINIMUM OF 12"X18" WITH A THICKNESS OF .080 ALUMINUM CONSTRUCTION. 2. THE SIGN FACE SHALL HAVE A WHITE REFLECTIVE BACKGROUND WITH A RED LEGEND. USE THE STANDARD 3M SCOTCHLITE SIGN FACE NUMBER R7-32 OR EQUIVALENT, WITH RED LETTERING AS SHOWN ABOVE. 3. ARROWS MAY BE NEEDED (LEFT, RIGHT OR DOUBLE), TO DESIGNATE BEGIN AND END OF NO PARKING AREA. CONSTRUCTION FIRE ACCESS ROAD SIGNS LARIMER COUNTY STREET URBAN STANDARDS AREA DRAWINGS 1418 DRAWING REVISION DATE: 04/NO: 01/07 2 FIRE LANE NO PARKING BY ORDER OF THE FIRE MARSHAL STANDARD FIRE LANE SIGN DETAIL UNIVERSAL FIRE LANE SIGN DETAIL 18" 2" 1 1/2" 3/4" 12" 12" FIRE LANE COLOR SCHEDULE BACKGROUND "P" RED WHITE BLACK LEGEND, CIRCLE DIAGONAL, BORDER, "ARROW", "FIRE LANE" (FORT COLLINS ONLY) 78.55 76.75 77.41 75.99 76.00 78.55 78.55 76.34 76.25 78.16 77.32 76.27 75.75 75.57 75.48 75.33 74.75 74.67 75.48 77.07 76.11 75.35 75.29 75.62 75.32 73.80 73.64 75.00 74.49 73.73 73.56 74.34 73.86 75.44 75.61 74.47 76.09 74.61 74.55 76.11 75.09 74.85 (79.28) (80.93) (74.84) (74.32) (76.06) (74.32) 75.51 75.00 RETENTION POND BOTTOM=5070.25 VTC SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF RP POND OVERFLOW WEIR G1 GRADING PLAN D. Weber D. Weber 1" = 20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner NORTH LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL PROJECT ELEVATIONS ARE ON THE VERTICAL DATUM NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4. ALL CURB SPOTS ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. GENERAL NOTES: 2.0% (47.45) EXISTING SPOT ELEVATION EXISTING LOT LINE EASEMENT LINE ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 NOTE: ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR. TEMPORARY BMP'S INLET PROTECTION IP VEHICLE TRACKING CONTROL PAD VTC SILT FENCE SF SF RIPRAP RP 1.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES. 2.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED. 4.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE STABILIZATION. 5.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY STABILIZED. 6.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR DOWNSPOUT CONNECTIONS, TO THE STORM DRAIN SYSTEM, UNTIL CONNECTION IS ESTABLISHED WITH DOWNSPOUT. 7.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 8.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS, TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE. 9.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY TO INSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION. AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS. 10.CONTRACTOR SHALL IMPLEMENT APPROPRIATE PERIMETER PROTECTION FOR AREAS DIRECTING DRAINAGE OFFSITE. PERIMETER PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN SEDIMENT CONTROL LOGS OR SILT FENCE FOR BARE SOIL, SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.) 11.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. 12.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND CONSTRUCTION TOILETS SHALL BE STAKED DOWN. 13.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE CITY'S CONSTRUCTION INSPECTORS BY CEASING OPERATIONS WHEN WINDS ARE OF SUFFICIENT VELOCITY TO CREATE BLOWING DUST WHICH, IN THE INSPECTOR'S OPINION, IS HAZARDOUS TO THE PUBLIC HEALTH AND WELFARE. 14.WHERE SEASONAL CONSTRAINTS (E.G., DURING SUMMER AND WINTER MONTHS) INHIBIT PERMANENT SEEDING OPERATIONS, DISTURBED AREAS WILL BE TREATED WITH MULCH AND MULCH TACKIFIER OR OTHER MATERIALS APPROVED BY EROSION CONTROL STAFF TO PREVENT EROSION. 15.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING, REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS. EROSION CONTROL NOTES: 20' TYPE-II DRIVEWAY APPROACH 32.5' 10' INV=5065.36 1" WATER SERVICE TRAFFIC RATED CLEANOUT INV=5066.96 TRAFFIC RATED CLEANOUT 22.5° BEND AND INV=5068.56 TRAFFIC RATED CLEANOUT INV=5070.16 CURB STOP FIRE ACCESS EASEMENT SIDEWALK CHASE SIDEWALK CHASE SIDEWALK CHASE 8" STORM CULVERT @ 1.0% 8" FES INV=5073.80 8" FES INV=5073.64 STAIRS STAIRS STAIRS PORCH INV=5071.61 FLOWLINE CONCRETE APRON RETENTION POND 27.5' ROW DEDICATION 15' UTIL EASEMENT DEDICATION 4" SANITARY SEWER SERVICE "FIRE LANE" SIGN FIRE HYDRANT DISTANCE L= 460' PV1 UTILITY PLAN PAVING AND D. Weber D. Weber 1" = 30' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 LEGEND: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. PAVEMENT MARKINGS AND SIGNAGE SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL. 3. PAVEMENT SECTIONS TO BE DESIGNED BY A LICENSED GEOTECHNICAL ENGINEER. 4. REFER TO SITE AND LANDSCAPE PLANS FOR PAVERS, DECORATIVE PAVING, SCORING, ETC. 5. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 6. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 7. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 8. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS AND SERVICES. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10. CONTRACTOR SHALL COORDINATE ANY NECESSARY DRY UTILITY LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS. 11. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 12. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 13. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC LINES AND METERS WITH ARCHITECT AND UTILITY PROVIDERS. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner EXISTING EASEMENTS CONCRETE FLATWORK PROPOSED CURB & GUTTER ASPHALT PAVING GRAVEL FLAGSTONE PAVERS EXISTING WATER MAIN W EXISTING SANITARY SEWER SS PROPOSED STORM SEWER EXISTING FIRE HYDRANT H Y D G CTV EXISTING ELECTRIC E EXISTING TV EXISTING GAS PROPOSED WATER SERVICE PROPOSED SANITARY SEWER SERVICE PROPOSED TRAFFIC RATED CLEANOUT CO PIPE FL=5078.62 6" CONC WALL CONC PAD PIPE FL=5079.70 APPROXIMATE LOCATION OF ACTIVE IRRIGATION PIPE PIPE FL=5079.40 PIPE FL=5078.27 PIPE FL=5078.63 PARCEL 1 TREE DRIP LINE 12" PVC APPROX. LOCATION OF 6" WATERLINE EASEMENT PER REC. NO. 20140054843 AGREEMENT EXHIBIT A TEST HOLE BEGIN FENCE REMOVAL END FENCE REMOVAL FENCE TO REMAIN BEGIN FENCE REMOVAL FENCE TO REMAIN END FENCE REMOVAL BEGIN FENCE REMOVAL END FENCE REMOVAL REMOVE RIBBON CURB SOUTH TAFT HILL ROAD 30' PUBLIC ROW REMOVE CONC PAD APPROX. LIMIT OF REMOVALS REMOVE SIDEWALK REMOVE CONCRETE SAWCUT SAWCUT SAWCUT FIRE HYDRANT EX1 AND DEMOLITION PLAN EXISTING CONDITIONS D. Weber D. Weber 1" = 30' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 07/22/15 PROJECT: 1130-001 Sheet Of 7 Sheets FENSKE-ROBERTS RESIDENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET XX/XX/XX 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R NORTH EXISTING ELECTRIC E LEGEND: G EXISTING CABLE TV CTV EXISTING GAS NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 5. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 6. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 7. REFER TO LANDSCAPE PLANS FOR TREE PROTECTION AND MITIGATION. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. 9. CONTRACTOR SHALL COORDINATE ANY NECESSARY DRY UTILITY LOWERING (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDER(S). EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING FIRE HYDRANT EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 H Y D EXISTING LOT LINE APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL EXISTING TREES (TO REMAIN) EXISTING TREES (TO BE REMOVED) City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner SAWCUT LINE ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 UTILITY PLAN APPROVAL Environmental Planner A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the "Final Drainage and Erosion Control Report for Fenske-Roberts Residence" dated July 22, 2015 by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by t he construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT BENCHMARK: City of Fort Collins Benchmark 25-97 At the Southwest corner Mulberry St. and Whedbee St., on a concrete traffic signal base. NAVD88=5071.25 COORDINATE CONTROLS: CP-NE Northing=129918.03 Easting=183933.06 Elev=5077.54 CP-SW Northing=129755.47 Easting=183791.50 Elev=5075.97 BASIS OF BEARING Basis of bearing is the East line of the Southeast 1 4 of Section 9 as bearing North 00°43'41" East (assumed bearing). 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: a. N/A CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the "Final Drainage and Erosion Control Report for Fenske-Roberts Residence" dated July 22, 2015 by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. JULY 2015 SHEET INDEX UTILITY PLANS FOR A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FENSKE-ROBERTS RESIDENCE PHONE NUMBER Nick Haws, PE, LEED AP Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Erik Smith, PLS Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT *The underground utility locates provided by SiteWise, LLC are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. VICINITY MAP NORTH 1"=1500' I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT BENCHMARK: City of Fort Collins Benchmark 25-97 At the Southwest corner Mulberry St. and Whedbee St., on a concrete traffic signal base. NAVD88=5071.25 COORDINATE CONTROLS: CP-NE Northing=129918.03 Easting=183933.06 Elev=5077.54 CP-SW Northing=129755.47 Easting=183791.50 Elev=5075.97 BASIS OF BEARING Basis of bearing is the East line of the Southeast 1 4 of Section 9 as bearing North 00°43'41" East (assumed bearing). Northern Engineering Services, Inc. Project No. 1130-001 Date: April 8, 2015 ORIGINAL FIELD SURVEY BY: CDS Engineering Corporation "GEOTECHNICAL INVESTIGATION FOR PARCEL NUMBER 97094-04-013 IN SECTION 9, T. 7 N., R. 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO FOR SHANE ROBERTS" Project No. 14-7114 Date: October 29, 2014 PROJECT BENCHMARKS: CS1 CS2 E N G I N E E R I N G N O R T H E RN E N G I N E E R I N G N O R T H E RN COVER SHEET GENERAL & CONSTRUCTION NOTES EX1 EXISTING CONDITIONS & DEMOLITION PLAN PV1 PAVING AND UTILITY PLAN G1 GRADING & EROSION CONTROL PLAN D1 CONSTRUCTION DETAILS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner Stephanie Van Dyken Ripley Design, Inc. 419 Canyon Avenue, Suite 200 Fort Collins, Colorado 80521 (970) 224-5828 SITE ENGINEER SURVEYOR VAUGHT FRYE LARSON architects ■ land planning ■ landscape architecture ■ ■ urban design ■ entitlement ■ ARCHITECT Taylor Meyer Vaught Frye Larson Architects 419 Canyon Avenue, Suite 200 Fort Collins, Colorado 80521 (970) 224-1191 D2 EROSION CONTROL DETAILS