Loading...
HomeMy WebLinkAboutTHE STEAD (255 S. TAFT HILL RD.) - PDP/FDP - FDP150026 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTJuly 22, 2015 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR Fenske-Roberts Residence Fort Collins, Colorado Prepared for: Shane Roberts Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1130-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. July 22, 2015 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for FENSKE-ROBERTS RESIDENCE Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Fenske-Roberts Residence. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Danny Weber Nicholas W. Haws, PE Project Engineer Project Manager Fenske-Roberts Residence Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 4 A. Location ............................................................................................................................................. 4 B. Description of Property ..................................................................................................................... 4 C. Floodplain.......................................................................................................................................... 6 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 7 A. Major Basin Description .................................................................................................................... 7 B. Sub-Basin Description ....................................................................................................................... 7 III. DRAINAGE DESIGN CRITERIA ................................................................................... 8 A. Regulations........................................................................................................................................ 8 B. Four Step Process .............................................................................................................................. 8 C. Development Criteria Reference and Constraints ............................................................................ 8 D. Hydrological Criteria ......................................................................................................................... 9 E. Hydraulic Criteria .............................................................................................................................. 9 F. Modifications of Criteria ................................................................................................................... 9 IV. DRAINAGE FACILITY DESIGN .................................................................................... 9 A. General Concept ............................................................................................................................... 9 B. Specific Details ................................................................................................................................ 10 V. CONCLUSIONS ...................................................................................................... 11 A. Compliance with Standards ............................................................................................................ 11 B. Drainage Concept ............................................................................................................................ 11 REFERENCES .................................................................................................................. 11 EROSION CONTROL REPORT ............................................................................................ 16 APPENDICES: APPENDIX A - Hydrologic Computations APPENDIX B - Hydraulic Computations B.1 - Detention Facilities APPENDIX C - Erosion Control Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 5 Figure 2 – Proposed Site Plan ............................................................................................... 6 Figure 3 – Existing Floodplains ............................................................................................. 7 MAP POCKET: Developed Drainage Exhibit Fenske-Roberts Residence Final Drainage Report I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in Section 9, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located north of the intersection of South Taft Hill Road and West Mulberry Street, and is a flag lot extending to South Taft Hill Road. 4. The project site lies within the Canal Importation Drainage Basin. 5. This is an infill, flag-shaped lot, surrounded entirely by existing development. 6. The project site received no offsite flows from the surrounding areas. B. Description of Property 1. The development area is roughly 0.68 net acres. Fenske-Roberts Residence Final Drainage Report Figure 1 – Aerial Photograph 2. The subject property is currently undeveloped, with the majority of the site covered with native grasses while the leg portion of the flag lot is mostly covered with gravel. Existing ground slopes are mild to moderate (i.e., ±1 - 4%) through the interior of the property. General topography slopes from northwest to southeast. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Nunn Clay Loam, which falls into Hydrologic Soil Group C. 4. The proposed project site plan is composed of the development of a single-family residential unit, garage, barn, and guest yurts. Associated site work including patios, walkways, gardens, and utility services lines will be constructed with the development. Onsite water quality treatment is proposed and is discussed in Section IV, below. PROJECT SITE Fenske-Roberts Residence Final Drainage Report Figure 2– Proposed Site Plan 5. There is a private irrigation ditch in the northwest corner of the site that will not be disturbed by this development. 6. The proposed land use is a single-family residential unit in the Low Density Mixed-Use Neighborhood District (L-M-N). C. Floodplain 7. The project site is not encroached by either a Fort Collins Flood Plain Map of a FEMA Flood Plain Map (Map #08069C0978G). Fenske-Roberts Residence Final Drainage Report Figure 3 –Area Floodplain Mapping II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The project site lies within the Canal Importation Drainage Basin. Detention is required between the developed 100-year inflow rate and 2-year historic release rate. However, due to the site constraints of the flag-shaped, infill development and the feasible of a detention pond outfall location, an on-site retention pond is proposed, as suggested as an alternative by City Staff. Additionally, the leg portion of the flag lot cannot be graded to be retained on-site but sees very little to no increase in runoff caused by the development. B. Sub-Basin Description 1. The subject property historically drains overland from northwest to southeast. Runoff from the majority of the site has historically collected at a point near the southeast corner of the site where it drains onto the adjacent property, then into the South Taft Hill Road Right-Of-Way, and ultimately onto West Mulberry Street. 2. A summary of the historic runoff rates for each basin is tabularized on the Drainage Exhibit in the Map Pocket at the end of this report. Project Site Fenske-Roberts Residence Final Drainage Report III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated using a retention pond. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality treatment, where none previously existed, sediment with erosion potential is removed from downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: The proposed development will provide LID and water quality treatment; thus, eliminating sources of potential pollution previously left exposed to weathering and runoff processes. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the Fenske-Roberts Residence Final Drainage Report proposed drainage system including: Existing elevations along the property lines will generally be maintained. As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RA-7 and RA-8 of the FCSCM. Please see Appendix A. 3. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. The Rational Formula-based FAA procedure has been employed to compute the required storage volume of the retention pond. 3. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. Please see Appendix B. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. Onsite water quality treatment will be provided, as well as other LID features, which are discussed further below. 3. Drainage patterns anticipated for drainage basins shown in the Drainage Exhibit are described below. Fenske-Roberts Residence Final Drainage Report Basin W Basins W will drain via overland flow to the retention pond located at the southeast corner of the site. This basin was considered as the gross area of improved surfaces as to properly size the retention pond and not retain the historic flows from the entire watershed basin. A series of drainage swales will pass the runoff through two vegetated swales prior to entering the pond. More specific information regarding the retention pond is included below. Please see further discussion of water quality and LID features in Section IV.B, below. Basin E Basin E will sheet drain to the southeast before entering the South Taft Hill Road Right-Of-Way. Due to the constraints of the surrounding existing developments, little to no re-grading of this area can be performed and, therefore, cannot be detained or retained. B. Specific Details 1. The retention pond has been sized to retain the volume of two times the 100- yr, 2-hour event plus 1’ of freeboard with an effective High Water Service Elevation of 5073.55. An overflow weir will be located along the east side at the natural low point, discharging away from any structures. A summary of the developed runoff information is tabularized on the Drainage Exhibit included in the Map Pocket at the end of this report. 2. The following table summarizes LID features and overall percentage of the basin being treated by the proposed LID features. Table 2 – LID Summary Basin Basin Area Portion of Basin Captured (sq.ft.) Treatment Type W 13336 13336 Retention Pond E 5474 0 None Total 18810 13336 Total Percentage Treated: 70.90% 3. Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and must be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss Fenske-Roberts Residence Final Drainage Report due to sedimentation, corrective actions taken, etc.). 4. Proper maintenance of the drainage facilities designed with the proposed development is a critical component of their ongoing performance and effectiveness. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Canal Importation Drainage Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and water quality mitigation features. 2. The drainage concept for the proposed development is consistent with requirements for the Canal Importation Drainage Basin. REFERENCES 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008 APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Fenske-Roberts Residence Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0.. 95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. W-Hist 13,336 0.31 0.00 0.00 0.00 0.00 0.00 0.31 0.25 0.25 0.31 0.0 E-Hist 5,474 0.13 0.00 0.01 0.00 0.04 0.00 0.08 0.38 0.38 0.47 18.7 Total 18,810 0.43 0.00 0.01 0.00 0.04 0.00 0.38 0.29 0.29 0.36 5.4 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: Fenske-Roberts Residence Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, Rational Method Equation: Project: Fenske-Roberts Residence Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: W W-Hist 0.31 15.5 15.5 14.3 0.25 0.25 0.31 1.87 3.19 6.71 0.14 0.24 0.64 E E-Hist 0.13 6.0 6.0 5.3 0.38 0.38 0.47 2.67 4.56 9.95 0.13 0.22 0.59 EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D. Weber July 22, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Existing.xlsx\Direct-Runoff CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Fenske-Roberts Residence Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: D. Weber Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.50 . 40 Roofs …….…….………………..……………….…………………………………………….0.. 95 90 Concrete Pavers…………………………...………………..…………………………………………….0.40 . 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Concrete Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. W 13,336 0.31 0.00 0.01 0.13 0.11 0.05 0.01 0.67 0.67 0.84 57.4 E 5,474 0.13 0.00 0.00 0.00 0.11 0.00 0.01 0.48 0.48 0.60 36.4 Total 18,810 0.43 0.00 0.01 0.13 0.22 0.05 0.02 0.62 0.62 0.77 51.3 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: Fenske-Roberts Residence Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, Rational Method Equation: Project: Fenske-Roberts Residence Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: W W 0.31 10.8 10.8 10.1 0.67 0.67 0.84 2.17 3.71 7.72 0.45 0.76 1.98 E E 0.13 6.0 6.0 5.3 0.48 0.48 0.60 2.67 4.56 9.95 0.16 0.27 0.75 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) D. Weber July 22, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Proposed.xlsx\Direct-Runoff APPENDIX B HYDRAULIC COMPUTATIONS APPENDIX B.1 DETENTION FACILITIES D. Weber Pond No : Retention W 100-yr 0.84 Area (A)= 0.31 acres 6811 ft 3 Max Release Rate = 0.00 cfs 0.16 ac-ft Time Time 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.950 2.56 767 0.0 767.3 10 600 7.720 1.98 1191 0.0 1190.6 15 900 6.520 1.68 1508 0.0 1508.3 20 1200 5.600 1.44 1727 0.0 1727.3 25 1500 4.980 1.28 1920 0.0 1920.1 30 1800 4.520 1.16 2091 0.0 2091.3 35 2100 4.080 1.05 2202 0.0 2202.3 40 2400 3.740 0.96 2307 0.0 2307.2 45 2700 3.460 0.89 2401 0.0 2401.3 50 3000 3.230 0.83 2491 0.0 2490.7 55 3300 3.030 0.78 2570 0.0 2570.1 60 3600 2.860 0.74 2646 0.0 2646.5 65 3900 2.720 0.70 2727 0.0 2726.7 70 4200 2.590 0.67 2796 0.0 2796.1 75 4500 2.480 0.64 2869 0.0 2868.6 80 4800 2.380 0.61 2936 0.0 2936.4 85 5100 2.290 0.59 3002 0.0 3002.0 90 5400 2.210 0.57 3068 0.0 3067.5 95 5700 2.130 0.55 3121 0.0 3120.7 100 6000 2.060 0.53 3177 0.0 3177.0 105 6300 2.000 0.51 3239 0.0 3238.7 110 6600 1.940 0.50 3291 0.0 3291.1 115 6900 1.890 0.49 3352 0.0 3352.1 120 7200 1.840 0.47 3405 0.0 3405.3 Fort Collins, CO Input Variables Results Calculations By: Required Retention Volume (2xDetention Vol) RETENTION POND CALCULATION; FAA METHOD Project Number : 1130-001 Date : July 22, 2015 APPENDIX C EROSION CONTROL REPORT Fenske-Roberts Residence EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or wattles along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. To ensure stormwater quality is achieved long after the construction of the project, one permanent Stormwater Quality BMP is included within the design. Located at the southeast corner of the project site, a Retention Pond is being proposed. This measure will treat all of the runoff draining through the property prior to reaching the historic outfall. The Final Public Improvement Construction Plan contains a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W G E CTV REC. NO. 99024292 TENTH GREEN, FIRST FILING 9 7 8 10 11 12 W E W 20' DIA. GUEST YURTS NEW RESIDENCE PATIO 3-CAR GARAGE BARN GARDEN GARDEN GARDEN GARDEN RETENTION POND PATIO PORCH These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com DR1 LEGEND: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R NORTH # # 1.45 ac FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION EXISTING RUNOFF SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) W W-Hist 0.31 0.25 0.25 0.31 15.5 15.5 14.3 0.14 0.24 0.64 E E-Hist 0.13 0.38 0.38 0.47 6.0 6.0 5.3 0.13 0.22 0.59 DEVELOPED RUNOFF SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) W W 0.31 0.67 0.67 0.84 10.8 10.8 10.1 0.45 0.76 1.98 E E 0.13 0.48 0.48 0.60 6.0 6.0 5.3 0.16 0.27 0.75 Design Point Design Storm Developed "C" = Project Location : V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) W W No 0.25 0.25 0.31 90 3.0 10.5 10.5 9.7 0 0.0 0.00 N/A 50 2.0 2.12 0.4 10.8 10.8 10.1 E E No 0.50 0.50 0.63 26 5.0 3.3 3.3 2.6 0 0.0 0.00 N/A 216 0.8 1.34 2.7 6.0 6.0 5.3 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow D. Weber July 22, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti − = D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Proposed.xlsx\Tc-2-yr_&_100-yr 10-year Cf = 1.00 July 22, 2015 D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Proposed.xlsx\C-Values V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) W W-Hist No 0.25 0.25 0.31 150 2.0 15.5 15.5 14.3 0 0.0 0.00 N/A 0 0.0 0.00 N/A 15.5 15.5 14.3 E E-Hist No 0.50 0.50 0.63 26 5.0 3.3 3.3 2.6 0 0.0 0.00 N/A 216 0.8 1.34 2.7 6.0 6.0 5.3 EXISTING TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow D. Weber July 22, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti − = D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Existing.xlsx\Tc-2-yr_&_100-yr 10-year Cf = 1.00 July 22, 2015 D:\Projects\1130-001\Drainage\Hydrology\1130-001_Rational-Calcs_Existing.xlsx\C-Values