March 29, 2013
Jason S. Messaros
BHA Design Inc.
1603 Oakridge Dr.
Fort Collins, CO 80525
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
03/27/2013: For the note that says "improvements as needed by phase", it would help to have
more clarification, such as: Site improvements shown indicate completion of all phases, and
shall be installed by phase as indicated in the phasing plan. Also, please label the parking
garage on the site plan and indicate the phase in which it will be constructed.
Comment Number: 11 Comment Originated: 03/27/2013
03/27/2013: Please dimension the MOB to Lady Moon, and fix the dimension for the main
building to Cinquefoil.
Comment Number: 12 Comment Originated: 03/27/2013
03/27/2013: Please add the number of parking spaces proposed for the parking deck, the
number of levels (one), so that it's clear how the parking sum is 908 spaces. Label the parking
deck on the site plan and indicate its construction phase.
Comment Number: 13 Comment Originated: 03/27/2013
03/27/2013: An alternative compliance request will be needed for the proposed parking
quantity.
Comment Number: 14 Comment Originated: 03/27/2013
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Jason Holland, at 970-224-6126
or jholland@fcgov.com.
RE: Banner Health Medical Campus, PDP130003, Round Number 2
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
03/26/2013: This Letter of Intent will need to be recieved prior to public hearing. 02/13/2013:
C400 - Provide easements for drainage and the detention pond on the offside portion to the
east.
Comment Number: 11 Comment Originated: 02/13/2013
03/26/2013: Per conversations with Northern Engineering the grading will revised with the
addition of inlets to ensure less than 750 sq. feet is released from the private drives. A design
concept was discussed with Engineering Staff and should be adequate. 02/13/2013: C401 -
Numberous Driveways appear to have greater than 750 sq. ft. of runoff draining out of them.
Please revise the grading or provide additional improvements to keep runoff to less than 750
sq. ft.
Comment Number: 13 Comment Originated: 02/13/2013
03/13/2013: To clarify; the understanding is that the Right turn lane from Harmony onto Lady
Moon Dr. will be constructed in Phase 1 and the Right turn lane from onto Cinquefoil Lane will
be in Phase 2. This should be denoted on the site plan phasing plan for hearing. 02/13/2013:
C504 - Plans show a right turn lane being proposed onto Cinquefoil from Harmony but the
Harmory Road improvement and grading plans do not appear to show this design.
Comment Number: 20 Comment Originated: 02/13/2013
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
03/22/2013: Thank you for adding this note. If you would like, the note could be amended to
indicate that if a pre-construction survey indicates no nests are presents, then the trees could
be removed inside of the nesting season.
02/11/2013: An Ecological Characterization Study (ECS) was submitted to the City in December
2012 for this project. The ECS finds that the only development-related timing issue is that tree
removal must occur outside of the songbird nesting season (April 1-July 31). A note to this
effect should be added to the landscape and tree mitigation plans. This issue can be resolved
at the time of final plan submittal, should the PDP be approved.
Comment Number: 1 Comment Originated: 02/11/2013
03/22/2013: Staff inspections regarding the landscaping bond will assess if these wetland
seeds are working. A plan for weed management while the seeds are establishing should be
submitted. This can be discussed further at final.
02/11/2013: The landscape plan indicates several areas to be treated with a wetland seed mix.
Based on staff experience, wetland plugs should be installed instead of a seed mix to increase
plant success and reduce weed management needs. This can be resolved at time of final plan
submittal.
Comment Number: 2 Comment Originated: 02/11/2013
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
02/13/2013: Provide tree numbers and percentages on final landscape plan. Select street trees
from the City street tree list.
Comment Number: 1 Comment Originated: 02/13/2013
02/13/2013: Please upsize trees in the numbers indicated on the tree mitigation plan. Upsized
trees to be 3.0 inch caliper shade trees 2.5 inch caliper ornamental trees and 8 foot height
evergreen trees.
Comment Number: 2 Comment Originated: 02/13/2013
02/13/2013: Explore options to save existing trees. Existing trees should be retained to the
extent reasonably feasible. Please clearly show existing trees to retain on the landscape plan.
Comment Number: 3 Comment Originated: 02/13/2013
02/13/2013: Plant note 8.3 should add that tree separations are 10 feet between water and
sewer mains and 6 feet between water and sewer service lines.
Comment Number: 4 Comment Originated: 02/13/2013
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
03/26/2013: Reminder
02/13/2013: Letter of intents are needed for the required off-site drainage easements before a
public hearing. These would include a drainage easement for the regional pond and all storm
sewers that are located off-site.
Comment Number: 1 Comment Originated: 02/13/2013
03/26/2013: Reminder
02/13/2013: Stormwater is ready for a public hearing with comment 1 and 4 resolved.
Comment Number: 2 Comment Originated: 02/13/2013
02/13/2013: The City encourages this Development to include more LID practices in the
drainage design. This could include bio-retention, porous pavers, etc.
Comment Number: 3 Comment Originated: 02/13/2013
03/26/2013: Reminder
02/13/2013: Approval by the Fossil Creek Reservoir Inlet Ditch owners is required for the
outfall into their ditch. The location and release has been previoulsy approved, but not the
construction details or specifics of the design.
Comment Number: 4 Comment Originated: 02/13/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
03/27/2013: No comments.
Comment Number: 35 Comment Originated: 03/27/2013
Topic: Construction Drawings
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
03/27/2013: This has been added, but the elevation is missing.
02/12/2013: Please add a second benchmark to sheet C000 & C001.
Comment Number: 8 Comment Originated: 02/12/2013
03/27/2013: There are still line over text issues on sheet C200.
02/12/2013: There are line over text issues on sheets C200, C201, C300, C301, C302, C401,
C500, C501, C502, C503, C504, C505 & C600.
Comment Number: 10 Comment Originated: 02/12/2013
03/27/2013: There is text over top of text(duplicate) on sheet C200 & C201.
Comment Number: 37 Comment Originated: 03/27/2013
Topic: Landscape Plans
03/27/2013: No comments.
Comment Number: 34 Comment Originated: 03/27/2013
Topic: Lighting Plan
03/27/2013: No comments.
Comment Number: 36 Comment Originated: 03/27/2013
Topic: Plat
02/12/2013: The boundary and legal description close.
Comment Number: 14 Comment Originated: 02/12/2013
03/26/2013: These numbers need to be added prior to filing.
02/12/2013: There are easements and rights of way shown as dedicated by seperate
document, that will need the recording information added. See redlines.
Comment Number: 17 Comment Originated: 02/12/2013
03/27/2013: There is no need from the City's standpoint to vacate the 20' Easement (Rec.
2002020071) at the south end of the property, since the new R.O.W. of Le Fever Drive
encompasses the easement area. If the developer wishes to pursue vacation, the vacation
must be by separate document.
Comment Number: 38 Comment Originated: 03/27/2013
Topic: Site Plan
03/27/2013: There are text over text issues on sheet 5.
Comment Number: 33 Comment Originated: 03/27/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
03/26/2013: What size truck can make the Wb Right-out turn at the Lady Moon and Ri/Ro
access without running over the curbs?
Comment Number: 10 Comment Originated: 03/26/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
03/26/2013: Please provide signing and striping plans.
Comment Number: 11 Comment Originated: 03/26/2013
Topic: General
03/26/2013: Discussions with the applicants TE clarified the dual turn lane issue. City accepts
the discussion. The Long Range Geometry Figures need to be revised to present the lane
expectations accurately. City feels the dual Sb receiving lanes on Lady Moon would extend
beyond Banner Healths northern Ri/Ro access before beginning the lane merge to a single
south bound lane.
02/12/2013: TIS indicates the need for dual north bound left turn lanes on Lady Moon at
Harmony in the Long Term future. TIS also indiactes dual west bound left turn lanes on Harmony
at Lady Moon which would require a second south bound lane on Lady Moon south of
Harmony. City will need to discuss those future additional lane possibilities and how we will
plan for those improvements. There is the possibility Lady Moon may need more right of way
from this development to help in providing for those future lanes. Traffic will provide further
comments on the topic as the City discusses the issue.
Comment Number: 5 Comment Originated: 02/12/2013
03/26/2013: Per discussions with the applicant and City staff an exclusive right turn lane at Lady
Moon and Harmony is to be built with this project. The TIS needs to be revised (Figures and
analysis) to reflect this short term geometry.
02/14/2013: City discussed need of right turn lanes on Harmony at Lady Moon and at
Cinquefoil. The City has concerns with turns being made from the high speed travel lanes. This
concern is even greater at Cinquefoil as the smaller amount of right turning traffic may be less
expected by advancing Eb motorists. The City is requesting rural design east bound right turn
lanes at both intersections.
Comment Number: 7 Comment Originated: 02/14/2013
Topic: Landscape Plans
03/26/2013: Traffic has a little sight distance concerns at the north Ri/Ro access onto Lady
Moon and the Wb Timberwood access back to the north thru the median landscaping. Please
review both locations for meeting intersection sight distance per AASHTO design requirements.
Any easements possibly needed should be included on other appropriate plans such as the
Utility Plans, Plat and Site Plans.
Comment Number: 8 Comment Originated: 03/26/2013
03/26/2013: Please include in the Landscaping Notes that all landscaping in the City
right-of-way shall meet traffic and transportation policies in LCUASS and the City Codes
regarding sight distance and minimum canopy height.
Comment Number: 9 Comment Originated: 03/26/2013
Topic: Traffic Impact Study
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Traffic Impact Study
03/26/2013: Traffic staff accepts the applicants discussion on the dual lefts and receiving lanes,
but no discussion or TIS revisions were provided for perceived Trip Generation Table
discrepancies. The Trip Generation Table part of the comment is continued.
02/12/2013: The TIS had a few errors or discrepancies internally and seemingly between what
the applicant is providing staff. One of the internal errors is in the Trip Generation table. Another
is the Harmony and Lady Moon long term analysis shows dual north bound left turn lanes in the
analysis but only a single left turn in Figure 14. Figure 14 shows dual west bound left turn lanes
but only a single south bound receiving lane on Lady Moon (analysis at LM and RT Access and
also at Rock Creek shows only a single Sb lane on Lady Moon in its analysis). Figure 13
indicates Cinquefoil extending to LeFever in the short term, but the applicant seems to be
stating they only want to extend Cinquefoil to their Emergency Center access in Phase 1.
These errors or inconsistencies drive the need to request the TIS be revised.
Comment Number: 2 Comment Originated: 02/12/2013
03/26/2013: The reply didn't tie the past and present together. The 2007 ODP Trip Gen Table 2
provides considerable AWDTE and peak hour volumes from Parcels K, M, N, O but Figures 5,
6 and 7 distribute a smaller amount of traffic to/from those east parcels, and only at the Rock
Creek intersection. The Banner Health TIS provides additional Cinquefoil intersections
(LeFever, Precision, ER access) with their own AM/PM peak volumes, plus the Rock Creek
AM/PM Peak volumes were adjusted somewhat. But there isn't any discussion in the body of
the TIS to understand the thoughts and determinations evolving from the ODP study to the
Banner Health study. It's difficult to use Figure 6 in the Banner Health study to understand how
traffic was ultimately distributed at the Cinquefoil intersections and at the Lady Moon &
Cinquefoil intersection. Please provide further information to illuminate how background traffic
volumes to/from the Parcels east of Cinquefoil were distributed from the 2007 ODP study to the
Banner Health study. Please include addtional distribution percentages at each of the
Cinquefoil intersections and the Lady Moon & Cinquefoil intersection with discussion on how
they were determined. Please include assumptions or other thoughts used in the work evolving
the ODP review to the Banner Health review regarding the eastern parcels traffic. This is being
requested only as the ODP indicates light traffic from the east parcels via the Rock Creek
intersection. The Banner Health study has more intersections receiving traffic from the east
parcels and the City feels the TIS needs to provide more discussion of that evolution of the
background traffic from the past and present study's.
02/12/2013: Please provide more discussion of what went into the Background growth
volumes (unexpected volumes at Lady Moon and Harmony, especially the north bound
volumes, and on LeFever.) Numbers are larger than expected. Traffic assumes other
undeveloped land and current proposed developments were included as well as general
growth but Traffic would like more information about what made up the background growth in the
Long Term.
Comment Number: 3 Comment Originated: 02/12/2013
03/27/2013: Please revise the TIS to reflect the current desicions, roadway geometries and as
provided in the other submitted comments.
Comment Number: 12 Comment Originated: 03/27/2013
Department: Transportation Planning
Contact: Emma McArdle, 970-224-6197, emcardle@fcgov.com
Topic: General
02/12/2013: Thank you for depicting the bus stops on the plans as I requested in Conceptual
Review. This meets the LUC requirements for transit facilities for this site.
Comment Number: 1 Comment Originated: 02/12/2013
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
03/26/2013: While this main is now shown on the Ex Conditions/Demo plan, I'm concerned that
the utility contractor will not see it there. Can it also be noted on the utility plan?
02/12/2013: There is another 12" water main stubbed to the east of Lady Moon north of
Timberwood. This main needs to be shown on the plans with the necessary notes for the
abandonment.
Comment Number: 1 Comment Originated: 02/12/2013
03/26/2013: (See comment 1.)
02/12/2013: Utility maps show a 3/4" water service stubbed north of the main in Le Fever and
east of Lady Moon. This needs to be located and shown on the plans.
Comment Number: 3 Comment Originated: 02/12/2013
02/12/2013: At final, include plan and profile drawings of the 12" water main.
Comment Number: 4 Comment Originated: 02/12/2013
02/13/2013: Will the water main construction be phased?
Comment Number: 5 Comment Originated: 02/13/2013
03/26/2013: Is the existing 3" FCLWD water main still in service? Is there a FCLWD main in
Cinquefoil? Will either of these remain in service?
Comment Number: 6 Comment Originated: 03/26/2013
03/26/2013: Please schedule a meeting to discuss options for service to the future building at
the northeast corner of Lady Moon and Le Fever.
Comment Number: 7 Comment Originated: 03/26/2013
03/26/2013: Provide 10 feet of separation between the water main and the existing electric in
Cinquefoil and maintain the 10 foot separation with the sanitary sewer.
Comment Number: 8 Comment Originated: 03/26/2013
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
03/26/2013: It is unclear if the walk-in access is separate from the main service gate as
required. Applicant clearified it is meeting the standard.
01/28/2013: LUC 3.2.5 Trash and recycling enclosure are required to be designed with walk-in
access without having to open the main service gate and located on concrete pad at least 20ft
from a public sidewalk. The proposed enclosures for both the hospital and MOB have not
included walk-in access and will need to be revised. Also please label the concrete pad area
and the dimensions of the enclosures.
During phase 1 there needs to be a walking path from the main hospital to the trash and
recycling enclosures.
Comment Number: 3 Comment Originated: 01/28/2013
01/28/2013: We will need to see detail of the fence being used to screen the loading area.
Comment Number: 4 Comment Originated: 01/28/2013
03/26/2013: What is covering the Medical Office Building bicycle parking that is labeled
covered?
01/30/2013: On the site plan please show the drip line of the structures that is being used to
meet the required covered parking requirements.
Comment Number: 5 Comment Originated: 01/30/2013
01/30/2013: The area in the 1st Phase that is minimal interim site improvements will need to be
restricted from vehicle use. Please provide details on how this will be accomplished.
03/26/2013: Applicant responded that this road is also for security. We will need to know more
information (such as but not limited to what type of security vehicles, daily or hourly patrol...) to
determine the appropriate surfacing
Also the Temporary Emergency Access easement will need to restrict vehicles from using it
other than times of Emergency, possible break away chains. If the applicant desires other
vehicles to travel on it then it will need to be asphalt or concrete.
Comment Number: 7 Comment Originated: 01/30/2013
03/26/2013: The Loading/unloading Platform requires a minimum average of 5 foot candles.
02/05/2013: LUC 3.2.4 There are some parking areas (North Parking, South Parking and
Southwest Parking) that the averages are not meeting the Minimum foot-candle requirements of
1. Please revise plans so that averages meet the Minimum Foot-candle level of 1.
Comment Number: 8 Comment Originated: 02/05/2013
02/05/2013: LUC 3.5.1(I) All mechanical/utility equipment (vents, flues, meters, HVAC...etc)
shall be screened. Plans need to indicate locations of such equipment and include notes on
how it is screened/painted.
Comment Number: 11 Comment Originated: 02/05/2013
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
03/26/2013: Please provide additional details to the parking table such as bed count, number
of staff on the largest shift and details on phases.
Comment Number: 13 Comment Originated: 03/27/2013