Loading...
HomeMy WebLinkAboutUS BANK FIRST SUBDIVISION REPLAT - PDP - PDP140017 - CORRESPONDENCE -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview November 03, 2014 Ken Merritt JR Engineering 2900 S. College, Ste 3D Fort Collins, CO 80525 Comment Summary: Department: Planning Services Contact: Clay Frickey, 970.224.6045, cfrickey@fcgov.com Topic: General 10/21/2014: The area being added to Lot 1 from this replat has no associated land use proposed. If you want to develop this piece of land in the future, you would need to go through a PDP. You can add a simple concept plan to your submittal for this replat and that will allow you to develop the empty space on Lot 1 through an amendment as opposed to a PDP. Comment Number: 1 Comment Originated: 10/21/2014 10/21/2014: Please add a label for Lot 2 above the acreage and square footage. Comment Number: 2 Comment Originated: 10/21/2014 10/21/2014: 3.2.2(J) - Parking areas shall be setback 5 feet from a lot line. The parking lot on the south end of the site abutting the lot line does not meet this standard. Two options you have to meet the standard are moving the lot line back 5 feet or eliminating two parking spots and landscaping the south end of the parking lot. Comment Number: 3 Comment Originated: 10/21/2014 10/21/2014: 3.2.1(E)5 - The parking lot abutting the lot line does not contain any interior landscaping. The Land Use Code requires 6 percent of the parking lot to be dedicated to landscaped areas. You can landscape the boundary of the parking lot or add a landscaped island to the interior of the parking lot to meet this standard. You can find the standards for landscaped islands in section 3.2.1(E)(5)(c) of the Land Use Code. Comment Number: 4 Comment Originated: 10/21/2014 Department: Engineering Development Review Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970.224.6045 or cfrickey@fcgov.com. RE: US Bank First Subdivision Replat, PDP140017, Round Number 1 Page 1 of 4 Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Topic: General 10/21/2014: The City will be entering into a development agreement to ensure that the public improvements along John F Kennedy Parkway will be completed. This includes identifying the responsibility to construct the section that will be added to the Lot 1 First National Bank PUD 1st site with this replat. There is a desire to complete the sidewalk connection along John F Kennedy Parkway to Horsetooth road and if the City constructs the improvements after the right of way has been dedicated, a reimbursement will be due. Comment Number: 3 Comment Originated: 10/21/2014 Topic: Plat 10/21/2014: Right of way will need to be dedicated to the north of John F Kennedy Parkway for the Lot 3, Observatory Heights property. Right of way to be dedicated will need to total 16' from the curb face (10' parkway and 6' detached sidewalk). See redlines. Comment Number: 1 Comment Originated: 10/21/2014 10/21/2014: 7.5' of right of way will need to be dedicated along the property frontage on Horsetooth Road. According to the City of Fort Collins Master Street Plan, Horsetooth Road is classified as a 4 lane arterial with a total right of way width of 115'. The existing plat currently shows an 8' utility easment. To clean up the plat, we recommend dedicating the 8' of right of way. Comment Number: 2 Comment Originated: 10/21/2014 Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 10/17/2014: No comments. Comment Number: 1 Comment Originated: 10/17/2014 Department: Light And Power Contact: Jim Spaulding, 970-416-2772, jspaulding@fcgov.com Topic: General 10/21/2014: No comments. Comment Number: 1 Comment Originated: 10/21/2014 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 10/28/2014: Poudre Fire Authority has no comments relative to the replat however further comments may be needed as such time the property is developed. Comment Number: 1 Comment Originated: 10/28/2014 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Page 2 of 4 10/21/2014: No Comment from Erosion Control. This revision does not significantly affect the current erosion control materials. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 10/21/2014 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 10/21/2014: No comments on the replat. Comment Number: 2 Comment Originated: 10/21/2014 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Plat 10/20/2014: Please change the title and correct the sub-title as masked. See redlines. Comment Number: 2 Comment Originated: 10/20/2014 10/20/2014: Please make sure that the Plat language is the most current. Comment Number: 3 Comment Originated: 10/20/2014 10/20/2014: Please add a Basis Of Bearings statement that is separate from the legal description. Comment Number: 4 Comment Originated: 10/20/2014 10/20/2014: Please set a monument at the point of beginning. See redlines. Comment Number: 5 Comment Originated: 10/20/2014 10/20/2014: Please correct the Notary Public signature block as shown. See redlines. Comment Number: 6 Comment Originated: 10/20/2014 10/20/2014: Are there any Lienholders for this property? If so, please add a signature block. If not, please add a note stating there are none. Comment Number: 7 Comment Originated: 10/20/2014 10/20/2014: Please add notes/statements as shown on sheet 1. See redlines. Comment Number: 8 Comment Originated: 10/20/2014 10/21/2014: Please add distances & curve data as marked. See redlines. Comment Number: 9 Comment Originated: 10/21/2014 10/21/2014: Please add sources of right of way dedications. Comment Number: 10 Comment Originated: 10/21/2014 10/21/2014: Please change the marked bearings to follow the legal description. See redlines. Comment Number: 11 Comment Originated: 10/21/2014 10/21/2014: Additional right of way will be needed along Horsetooth Road & JFK Parkway. See redlines. Comment Number: 12 Comment Originated: 10/21/2014 10/21/2014: Please add a symbol key/legend on sheet 2. See redlines. Comment Number: 13 Comment Originated: 10/21/2014 10/21/2014: Please label the lots as shown. See redlines. Comment Number: 14 Comment Originated: 10/21/2014 Page 3 of 4 10/21/2014: Please change the lot line between Lots 1 & 2 and the new right of way lines to solid/continuous linetype. See redlines. Comment Number: 15 Comment Originated: 10/21/2014 10/22/2014: All easements must be clearly labeled and locatable. See redlines. Comment Number: 16 Comment Originated: 10/22/2014 10/22/2014: Please check the distance (220.25') along JFK Parkway. See redlines. Comment Number: 17 Comment Originated: 10/22/2014 10/22/2014: Please remove "(TYP.)" from the monument descriptions. See redlines. Comment Number: 18 Comment Originated: 10/22/2014 Topic: Site Plan 10/22/2014: Please change the title and correct the sub-title as masked. See redlines. Comment Number: 19 Comment Originated: 10/22/2014 10/22/2014: There are line over text issues. See redlines. Comment Number: 20 Comment Originated: 10/22/2014 Page 4 of 4