HomeMy WebLinkAboutCENTRE FOR ADVANCED TECHNOLOGY 23RD, LOT 2 OFFICE BUILDING - PDP/FDP - FDP150007 - REPORTS - APPLICANT COMMUNICATIONSUN SHADE
METAL PANEL SIDING
UTILITY BRICK
METAL ROOF
METAL PANEL SIDING
ALUMINUM FRAMED
GLAZING
UTILITY BRICK
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
37' - 1" FIRE DEPARTMENT ACCESS
PRE-CAST CONCRETE
WALL CAPS AT DECKS
PRE-FINISHED SHEET
METAL FLASHING
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
42' - 4" GRADE PLANE
SECOND FLOOR
113' - 4"
THIRD FLOOR
128' - 0"
FIRST FLOOR
100' - 0"
SUN SHADE
STANDARD BRICK
UTILITY BRICK
METAL ROOF
METAL PANEL SIDING
MECHANICAL SCREEN
ALUMINUM FRAMED
GLAZING
ALUMINUM FRAMED
SPANDREL GLAZING
gradeplane grade plane
107' - 1 27/32"
BUILDING SIGN/ADDRESS
LOCATION
PRE-CAST CONCRETE BASE
SECOND FLOOR
113' - 4"
THIRD FLOOR
128' - 0"
FIRST FLOOR
100' - 0"
SUN SHADE
STANDARD BRICK
METAL PANEL SIDING MECHANICAL SCREEN
UTILITY BRICK
METAL PANEL SIDING
ALUMINUM FRAMED
GLAZING
ALUMINUM FRAMED
SPANDREL GLAZING
COVERED BICYCLE
PARKING
TRASH/RECYCLING
ENCLOSURE
TRANSFORMER
SPLIT FACE MASONRY
RETAINING WALLS
SPLIT FACE MASONRY
SECOND FLOOR
113' - 4"
THIRD FLOOR
128' - 0"
FIRST FLOOR
100' - 0"
SUN SHADE
STANDARD
BRICK
UTILITY BRICK
METAL ROOF
METAL PANEL SIDING
MECHANICAL SCREEN
ALUMINUM FRAMED
GLAZING
UTILITY BRICK
METAL ROOF
ALUMINUM FRAMED
GLAZING
STANDARD BRICK
ALUMINUM FRAMED
GLAZING
POWER AND GAS METERS,
PAINT TO MATCH ADJACENT
BUILDING SURFACE
gradeplane grade plane
107' - 1 27/32"
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
37' - 1" FIRE DEPARTMENT ACCESS
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
41' - 10" GRADE PLANE
SECOND FLOOR
113' - 4"
THIRD FLOOR
128' - 0"
FIRST FLOOR
100' - 0"
METAL ROOF
METAL PANEL SIDING
ALUMINUM FRAMED
GLAZING
UTILITY BRICK
ALUMINUM FRAMED
GLAZING
STANDARD BRICK
SPLIT FACE MASONRY
RETAINING WALLS
ALUMINUM FRAMED
SPANDREL GLAZING
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
48' - 7 1/2" FIRE DEPARTMENT ACCESS
gradeplane grade plane
107' - 1 27/32"
BUILDING SIGN/ADDRESS
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
40' - 0" GRADE PLANE
UTILITY BRICK ON CMU WALL.
MATCH BRICK ON BUILDING
PRE-FINISHED SHEET METAL
FLASHING. MATCH PROFILE AND
401 West Mountain Avenue, Suite 100 Fort Collins, CO 80521
ph: 970.224.1191 www.theartofconstruction.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARCHITECTS, INC. 2011.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
CHECKED BY:
DRAWN BY:
COPYRIGHT:
Issued
No. Description Date
1 02-25-2015
Revisions
PDP SUBMITTAL
2
3
4
5
6
7
8
9
10
No. Description Date
3
2
1
VAUGHT FRYE LARSON architects
RJH
RJH
PDP RE-SUBMITTAL 04-22-2015
4/22/2015 1:41:26 PM
A3
PERSPECTIVE VIEWS
LOT 2, CENTER
for ADVANCED
TECHNOLOGY,
23rd FILING
FORT COLLINS, COLORADO
SCHEMATIC DESIGN
2014-122
Author
COLOR ON BUILDING
PAINTED STEEL GATE
SPLIT FACE CMU RETAINING WALLS
PREFINISHED STANDING SEAM METAL
ROOF ON PAINTED STEEL FRAME. MATCH
COLOR AND PROFILE ON BUILDING.
6' - 0"
BIKE RACK MODEL PER
LANDSCAPE DRAWINGS
SPLIT FACE CMU STAIR WALLS
PAINTED STEEL PIPE HANDRAILS
CAST-IN-PLACE CONCRETE STAIRS
23' - 0"
18' - 10"
10' - 1"
RECYCLING BIN AREA
UTILITY BRICK ON CMU WALL.
MATCH BRICK ON BUILDING
PRE-FINISHED SHEET METAL
FLASHING. MATCH PROFILE
AND COLOR ON BUILDING
SPLIT FACE CMU
RETAINING WALLS
PREFINISHED STANDING SEAM
METAL ROOF ON PAINTED
STEEL FRAME. MATCH COLOR
AND PROFILE ON BUILDING.
BIKE RACK PER
LANDSCAPE DRAWINGS
36" WIDE ACCESS DOOR
3"
12"
10' - 2"
6' - 11"
13' - 1 1/2"
UTILITY BRICK ON CMU WALL.
MATCH BRICK ON BUILDING
PRE-FINISHED SHEET METAL
FLASHING. MATCH PROFILE
AND COLOR ON BUILDING
SPLIT FACE CMU RETAINING WALLS
PREFINISHED STANDING SEAM METAL
ROOF ON PAINTED STEEL FRAME. MATCH
COLOR AND PROFILE ON BUILDING.
SPLIT FACE CMU STAIR WALLS
10' - 0"
EXTERIOR FINISHES & COLOR SELECTION STRATEGY
BOLD, UNIFORM TO SLIGHTLY
VARIEGATED COLOR SELECTED FROM
THE BRICK MANUFACTURER'S "RED"
PALETTE
MUTED AND VARIEGATED COLOR
SELECTED FROM THE BRICK
MANUFACTURER'S "GRAY/BUFF" PALETTE
LIGHT & WARM UNIFORM COLOR
SELCTED TO COMPLIMENT BOTH THE
UTILITY BRICK AND STANDARD BRICK
COLORS
NEUTRAL COLOR OF A MEDIUM TO
MEDIUM-DARK VALUE. ROOF MATERIAL
REQUIRED TO MEET LEED STANDARDS
FOR REFLECTIVE ROOFING.
GRAY TINTED. SOLARBAN COATING ON
SOUTH FACING GLAZING
COOL, MEDIUM GRAY BACK-PAINTED
GLASS
GENERAL NOTE:
ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF.
UTILITY BRICK
STANDARD BRICK
PRECAST WALL BASE
PRECAST WINDOW HEADS & SILLS
PRECAST WALL CAPS AT DECKS
METAL PANELS
METAL ROOF
PREFINISHED SHEET METAL
FLASHING
ALUMINUM FRAMES
EXPOSED STEEL FRAMING
VISION GLAZING
SPANDREL GLAZING
401 West Mountain Avenue, Suite 100 Fort Collins, CO 80521
ph: 970.224.1191 www.theartofconstruction.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARCHITECTS, INC. 2011.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
CHECKED BY:
DRAWN BY:
COPYRIGHT:
Issued
No. Description Date
1 02-25-2015
Revisions
PDP SUBMITTAL
2
3
4
5
6
7
8
9
10
No. Description Date
3
2
1
VAUGHT FRYE LARSON architects
RJH
RJH
PDP RE-SUBMITTAL 04-22-2015
4/22/2015 1:41:26 PM
A2
EXTERIOR
ELEVATIONS
LOT 2, CENTER
for ADVANCED
TECHNOLOGY,
23rd FILING
FORT COLLINS, COLORADO
SCHEMATIC DESIGN
2014-122
Author
2 1/8" = 1'-0"
EAST ELEVATION
1 1/8" = 1'-0"
NORTH ELEVATION
4 1/4" = 1'-0"
TRASH & BIKE ENCLOSURES - FRONT ELEVATION
3 1/4" = 1'-0"
TRASH & BIKE ENCLOSURES - LEFT ELEVATION
5 1/4" = 1'-0"
TRASH & BIKE ENCLOSURES - RIGHT ELEVATION
RETAINING WALLS
METAL ROOF
SUN SHADE
STANDARD BRICK
UTILITY BRICK
METAL ROOF
SUN SHADE
gradeplane grade plane
107' - 1 27/32"
METAL ROOF
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
39' - 2 1/2" FIRE DEPARTMENT ACCESS
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
49' - 2" FIRE DEPARTMENT ACCESS
TO HIGHEST ROOF ON THIS SIDE OF BUILDING
38' - 10 1/2" GRADE PLANE
GROUND ANCHORING MASS
• ENGAGES THE GROUND
• LARGER MASONRY UNITS GIVE LARGER SCALE
• LITTLE OR NO MASONRY DETAIL AND LESS
BRICK COLOR VARIATION
• ORIENTED HOIZONTALLY WITH PROPORTIONS
RANGING FROM 1:1 to 1:2
PREDOMINATE BUILDING MASS
• SITS ON PRECAST CONCRETE BASE
• SMALLER MASONRY UNITS
• MORE MASONRY RELIEF DETAIL WORK AND
COLOR VARIATION
• ORIENTED HOIZONTALLY WITH PROPORTIONS
RANGING FROM 1:1 to 1:2
VERTICAL ACCENT MASS
• ENGAGES THE GROUND AND THE SKY
• METAL PANELS OR LARGER MASONRY
UNITS
• MAJOR FUNCTION IS TO DIVIDE LONGER
HOIZONTAL MASSES
• ORIENTED VERTICALLY WITH PROPORTIONS
RANGING FROM 2:1 to 4:1
HORIZONTAL ACCENT MASS
• STANDING SEAM METAL ROOFS AND METAL
SOFFIT PANELS
• MAJOR FUNCTION IS TO CONNECT VERTICAL
AND HORIZONTAL MASSES TO EACH OTHER
• ORIENTED HORIZONTALLY WITH LONG,
SLENDER PROPORTIONS
MASSING DIAGRAM
EXTERIOR FINISHES & COLOR SELECTION STRATEGY
BOLD, UNIFORM TO SLIGHTLY
VARIEGATED COLOR SELECTED FROM
THE BRICK MANUFACTURER'S "RED"
PALETTE
MUTED AND VARIEGATED COLOR
SELECTED FROM THE BRICK
MANUFACTURER'S "GRAY/BUFF" PALETTE
LIGHT & WARM UNIFORM COLOR
SELCTED TO COMPLIMENT BOTH THE
UTILITY BRICK AND STANDARD BRICK
COLORS
NEUTRAL COLOR OF A MEDIUM TO
MEDIUM-DARK VALUE. ROOF MATERIAL
REQUIRED TO MEET LEED STANDARDS
FOR REFLECTIVE ROOFING.
GRAY TINTED. SOLARBAN COATING ON
SOUTH FACING GLAZING
COOL, MEDIUM GRAY BACK-PAINTED
GLASS
GENERAL NOTE:
ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF.
UTILITY BRICK
STANDARD BRICK
PRECAST WALL BASE
PRECAST WINDOW HEADS & SILLS
PRECAST WALL CAPS AT DECKS
METAL PANELS
METAL ROOF
PREFINISHED SHEET METAL
FLASHING
ALUMINUM FRAMES
EXPOSED STEEL FRAMING
VISION GLAZING
SPANDREL GLAZING
401 West Mountain Avenue, Suite 100 Fort Collins, CO 80521
ph: 970.224.1191 www.theartofconstruction.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARCHITECTS, INC. 2011.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
CHECKED BY:
DRAWN BY:
COPYRIGHT:
Issued
No. Description Date
1 02-25-2015
Revisions
PDP SUBMITTAL
2
3
4
5
6
7
8
9
10
No. Description Date
3
2
1
VAUGHT FRYE LARSON architects
RJH
RJH
PDP RE-SUBMITTAL 04-22-2015
4/22/2015 1:41:07 PM
A1
EXTERIOR
ELEVATIONS
LOT 2, CENTER
for ADVANCED
TECHNOLOGY,
23rd FILING
FORT COLLINS, COLORADO
SCHEMATIC DESIGN
2014-122
1 1/8" = 1'-0"
SOUTH ELEVATION
2 1/8" = 1'-0"
WEST ELEVATION