Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutFORT COLLINS HOTEL (DOWNTOWN HOTEL) - FDP - FDP150033 - REPORTS - TRAFFIC STUDYFORT COLLINS CBD HOTEL
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
MARCH 2015
REVISED AUGUST 2015
Prepared for:
McWhinney
2725 Rocky Mountain Avenue, Suite 200
Loveland, CO 80538
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
..-_,,/;//.1 __
Project #1502
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 7
Pedestrians Facilities ...................................................................................................... 7
Bicycle Facilities .............................................................................................................. 7
Transit Facilities .............................................................................................................. 7
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Background Traffic Projections ..................................................................................... 10
Trip Assignment ............................................................................................................ 15
Signal Warrants ............................................................................................................. 15
Geometry ...................................................................................................................... 15
Operation Analysis ........................................................................................................ 22
Pedestrian Level of Service ........................................................................................... 33
Bicycle Level of Service ................................................................................................ 33
Transit Level of Service ................................................................................................. 33
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 38
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2020) Background Peak Hour Operation .......................................... 25
4. Long Range (2035) Background Peak Hour Operation ........................................... 27
5. Short Range (2020) Total Peak Hour Operation With
Roundabout Control at Mountain/Mathews-Walnut-Chestnut Intersection .............. 29
6. Short Range (2020) Total Peak Hour Operation With
RT-in/RT-out Control at Mountain–Walnut/Chestnut Intersection ........................... 31
7. Long Range (2035) Total Peak Hour Operation With
Roundabout Control at Mountain/Mathews-Walnut-Chestnut Intersection .............. 34
8. Long Range (2035) Total Peak Hour Operation With
RT-in/RT-out Control at Mountain–Walnut/Chestnut Intersection ........................... 36
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Site Plan .................................................................................................................. 11
5. Trip Distribution ....................................................................................................... 12
6. Short Range (2020) Background Peak Hour Traffic ................................................ 13
7. Long Range (2035) Background Peak Hour Traffic................................................. 14
8. Site Generated Peak Hour Traffic With Roundabout at Walnut Street .................... 16
9. Site Generated Peak Hour Traffic With RT-in/RT-out at Walnut Street ................... 17
10. Short Range (2020) Total Peak Hour Traffic With Roundabout at Walnut Street .... 18
11. Short Range (2020) Total Peak Hour Traffic With RT-in/RT-out at Walnut Street ... 19
12. Long Range (2035) Total Peak Hour Traffic With Roundabout at Walnut Street .... 20
13. Long Range (2035) Total Peak Hour Traffic With RT-in/RT-out at Walnut Street ... 21
14. Short Range (2020) and Long Range (2035) Geometry
With Roundabout at Walnut Street ......................................................................... 23
15. Short Range (2020) and Long Range (2035) Geometry
With RT-in/RT-out at Walnut Street ........................................................................ 24
APPENDICES
A. Base Assumptions Packet
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2020) Background Peak Hour Operation
E. Long Range (2035) Background Peak Hour Operation
F. Short Range (2020) Total Peak Hour Operation with Roundabout at Walnut Street
G. Short Range (2020) Total Peak Hour Operation with RT-in/RT-out at Walnut Street
H. Long Range (2035) Total Peak Hour Operation with Roundabout at Walnut Street
I. Long Range (2035) Total Peak Hour Operation with RT-in/RT-out at Walnut Street
J. Pedestrian/Bicycle Level of Service
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Fort Collins CBD Hotel. The Fort Collins
CBD Hotel site is located in the western quadrant of the Jefferson/Chestnut intersection in
Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (McWhinney) and the Fort Collins Traffic Engineering staff. This study generally
conforms to the format set forth in the Fort Collins transportation impact study guidelines
contained in the “Larimer County Urban Area Street Standards” (LCUASS). Appendix A
contains the Transportation Impact Study Base Assumptions form and related
attachments for the Fort Collins CBD Hotel. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine morning and afternoon peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
This TIS is a revision of the “Fort Collins CBD Hotel Transportation Impact
Study,” dated March 2015. The revised TIS addresses City staff comments.
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Fort Collins CBD Hotel site is shown in Figure 1. It is important
that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial. Land adjacent to the site is flat
(<2% grade) from a traffic operations perspective. The site is in the Fort Collins Central
Business District (CBD).
Roads
The primary streets near the Fort Collins CBD Hotel site are College Avenue,
Mountain Avenue, Jefferson Street, Linden Street, Walnut Street, and Chestnut Street.
The existing geometry at the College/Mountain, Mountain/Mathews-Walnut, Jefferson-
Riverside/Mountain-Lincoln, Jefferson/Linden, and Jefferson/Chestnut-Driveway
intersections is shown in Figure 2.
College Avenue is to the west of the Fort Collins CBD Hotel site. College
Avenue is a north-south street designated as a four-lane arterial street on the Fort
Collins Master Street Plan. College Avenue is also US287 (CDOT), categorized as a
NRC highway in this area. Currently, College Avenue has a four-lane cross section. At
the College/Mountain intersection, College Avenue has two through lanes in each
direction. Northbound left turns to westbound Mountain Avenue are prohibited. The
College/Mountain intersection has signal control. The existing speed limit in this area is
25 mph.
Mountain Avenue is to the south of the Fort Collins CBD Hotel site. Mountain
Avenue is an east-west street designated as a four-lane arterial street on the Fort
Collins Master Street Plan. Currently, Mountain Avenue has a four-lane cross section in
this area. The existing speed limit in this area is 25 mph. At the College/Mountain
intersection, Mountain Avenue has eastbound and westbound left-turn lanes and two
through lanes in each direction. At the Mountain/Mathews-Walnut intersection,
Mountain Avenue has eastbound and westbound left-turn lanes and two through lanes
in each direction. At the Jefferson-Riverside/Mountain-Lincoln intersection, Mountain
Avenue-Lincoln Avenue has eastbound and westbound left-turn lanes, one eastbound
through lane, two westbound through lanes, and an eastbound right-turn lane. The
Mountain/Mathews-Walnut and Jefferson-Riverside/Mountain-Lincoln intersections are
signalized.
Jefferson Street is to the northeast of (adjacent to) the Fort Collins CBD Hotel
site. Jefferson Street is a diagonal street running northwest-southeast. It is designated
as a four-lane arterial street on the Fort Collins Master Street Plan. Jefferson Street is
Mountain
Laporte
College
Remington
Mathews
Linden
Chestnut
Pine
Jefferson Riverside
Lincoln
Walnut
Maple
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 3
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 4
Mountain
College
Lincoln
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
- Denotes Lane
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 5
also SH14 (CDOT), categorized as a NRB highway in this area. Currently, Jefferson
Street has a four-lane cross section. There is no center median lane on Jefferson
Street. The existing speed limit in this area is 30 mph. At the Jefferson-Riverside/
Mountain-Lincoln intersection, Jefferson Street-Riverside Avenue has northbound and
southbound left-turn lanes and two through lanes in each direction. At the
Jefferson/Chestnut-Driveway intersection, Jefferson Street has two through lanes in
each direction. The Jefferson/Chestnut-Driveway intersection has stop sign control on
Chestnut Street. At the Jefferson/Linden intersection, Jefferson Street has northbound
and southbound left-turn lanes and two through lanes in each direction. The
Jefferson/Linden intersection is signalized.
Linden Street is to the northwest of the Fort Collins CBD Hotel site. Linden
Street is a diagonal street running northeast-southwest. North of Jefferson Street,
Linden Street is designated as a two-lane collector street on the Fort Collins Master
Street Plan. Currently, Linden Street has a two-lane cross section. The existing speed
limit in this area is 30 mph. At the Jefferson/Linden intersection, Linden Street has all
eastbound movements combined in a single lane. It also has a westbound left-turn
lane, one westbound through lane, and a westbound right-turn lane.
Walnut Street is to the southwest of (adjacent to) the Fort Collins CBD Hotel site.
Walnut Street is a diagonal street running northwest-southeast. Walnut Street is
designated as a two-lane collector street on the Fort Collins Master Street Plan.
Currently, Walnut Street has a two-lane cross section. There is no posted speed on
Walnut Street. At the Mountain/Mathews-Walnut intersection, Walnut Street has a
southbound left-turn lane and one southbound through lane. Mathews Street has all
northbound movements combined in a single lane.
Chestnut Street is to the southeast of (adjacent to) the Fort Collins CBD Hotel
site. Chestnut Street is a diagonal street running northeast-southwest. Chestnut Street
is designated as a local street on the Fort Collins Master Street Plan. Currently,
Chestnut Street has a two-lane cross section. Chestnut Street currently terminates just
east of Mountain Avenue-Walnut Street. At the Jefferson/Chestnut-Driveway
intersection, Chestnut Street has all eastbound movements combined in a single lane.
Existing Traffic
Figure 3 shows recent morning and afternoon peak hour traffic counts at the
College/Mountain, Mountain/Mathews-Walnut, Jefferson-Riverside/Mountain-Lincoln,
Jefferson/Linden, and Jefferson/Chestnut-Driveway intersections. Recent morning and
afternoon count data at the College/Mountain intersection was obtained in March 2014.
Recent peak hour count data at the Mountain/Mathews-Walnut intersection was
obtained in June 2014. Recent peak hour count data at the Jefferson-Riverside/
Mountain-Lincoln intersection was obtained in June 2013. Recent peak hour count
data at the Jefferson/Linden intersection was obtained in July 2014. Recent peak hour
count data at the Jefferson/Chestnut-Driveway intersection was obtained in January
2015. Raw count data is provided in Appendix B.
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 6
474/737
61/86
32/118
520/758
22/18
28/43
124/198
54/69
27/66
201/271
36/96
5/12
18/41
9/42
25/65
166/290
15/19
57/61
217/316
21/51
3/3
0/0
7/19
2/1
0/0
5/1
1/0
374/471
8/7
3/1
467/504
5/4
Mountain
College
Lincoln
7/29
19/43
20/65
23/50
29/58
40/116
19/18
384/437
8/24
57/75
419/444
21/30
21/32
135/202
121/265
33/55
138/228
41/62
42/39
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 7
Existing Operation
Using the volumes shown in Figure 3, the College/Mountain, Mountain/Mathews-
Walnut, Jefferson-Riverside/Mountain-Lincoln, Jefferson/Linden, and Jefferson/
Chestnut-Driveway intersections were evaluated and the morning and afternoon peak
hour operation is displayed in Table 1. At the diagonal intersections, Jefferson Street
and Riverside Avenue are considered to be north-south streets. Calculation forms are
provided in Appendix C. Currently, the key intersections operate at acceptable levels of
service using existing geometry and control. The intersections were evaluated using
techniques provided in the 2010 Highway Capacity Manual (2010HCM). A description of
level of service for signalized and unsignalized intersections from the 2010 Highway
Capacity Manual is provided in Appendix C. Table 4-3 (revised per staff comments
regarding type of intersection) showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) is also provided in Appendix C. This area of Fort Collins is considered to
be the Central Business District (CBD). Therefore, according to Table 4-3, the CBD is
considered to be a “Mixed Use District.” In areas termed “Mixed Use District,”
acceptable operation at signalized intersections during the peak hours is defined as
level of service E or better for the overall intersection, and level of service E or better for
any leg or movement. The level of service threshold for arterial/arterial and
arterial/collector or local stop sign controlled intersections is level of service F or better
for any approach leg. The level of service threshold for a collector/local stop sign
controlled intersection is level of service C or better for any approach leg.
Pedestrian Facilities
There are sidewalks along both sides of all the streets in the Fort Collins CBD.
Bicycle Facilities
Bicycle lanes do not exist on most of streets in the Fort Collins CBD.
Transit Facilities
Currently, this area of the Fort Collins CBD is served by Transfort routes 5 and
14. Routes 1, 8, 18, 81, and Flex run along this section of College Avenue. The
Downtown Transit Center is to the west of the Fort Collins CBD Hotel site.
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut
(signal)
EB LT A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T/RT B A
WB APPROACH B A
NB LT/T/RT B B
SB LT B C
SB T/RT B B
SB APPROACH B C
OVERALL A A
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT A B
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 9
Continued from previous page
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Jefferson/Chestnut-Driveway
(stop sign)
EB LT/T/RT B B
WB LT/T/RT C C
NB LT/T A A
SB LT/T A A
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT A C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Fort Collins CBD Hotel is a proposed commercial development. Figure 4
shows the site plan of the Fort Collins CBD Hotel site. Access to the site will be via
Chestnut Street. The short range analysis (Year 2020) includes development of the
Fort Collins CBD Hotel and an appropriate increase in background traffic, due to normal
growth, and other approved developments in the area. The long range future is
considered to be 2035. There are two plans for extending Chestnut Street to the
Mountain/Mathews-Walnut intersection. The first one has a right-turn ingress only from
Mountain Avenue to Chestnut Street and a right-turn egress only from Chestnut Street
to Walnut Street. The second design is a five-legged roundabout that will replace the
existing signal at the Mountain/Mathews-Walnut intersection at the request of the City.
This study will analyze both scenarios.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9
th
Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at this site. Table 2 shows the weekday daily,
morning, and afternoon peak hour trip generation for the Fort Collins CBD Hotel. At full
development, the Fort Collins CBD Hotel will generate the following traffic: 1,194
weekday vehicle trip ends, 93 morning peak hour vehicle trip ends, and 105 afternoon
peak hour vehicle trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
310 Hotel 175 Rooms EQ 1194 0.31 54 0.22 39 0.31 54 0.29 51
Trip Distribution
Directional distribution of the generated trips was determined for the Fort Collins
CBD Hotel site. Figure 5 shows the vehicle trip distribution used for the Fort Collins CBD
Hotel site. The trip distribution was discussed and agreed to in the scoping exercise.
Background Traffic Projections
Figures 6 and 7 show the short range (2020) and long range (2035) background
morning and afternoon peak hour vehicle traffic projections at the key intersections,
respectively. Short range (2020) and long range (2035) background traffic forecasts
were developed by factoring the existing traffic by one percent per year. It is important
Mountain
Laporte
College
Remington
Mathews
Linden
Chestnut
Pine
Jefferson Riverside
Lincoln
Walnut
Maple
SITE
25%
Nominal
20% 30%
5%
15%
5%
SCALE: 1"=400'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 12
Mountain
Laporte
College
Remington
Mathews
Linden
Chestnut
Pine
Jefferson Riverside
Lincoln
Walnut
Maple
SITE
25%
Nominal
20% 30%
5%
15%
5%
SCALE: 1"=400'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, February 2015
Page 12
AM/PM
SHORT RANGE (2020) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 13
498/775
64/90
34/124
547/797
23/19
29/45
130/208
57/73
28/69
211/285
38/101
5/13
19/43
9/44
26/68
174/305
16/20
60/64
228/332
22/54
7/20
7/2
393/495
8/7
4/1
496/534
Mountain
College
Lincoln
7/30
20/45
21/68
24/53
30/61
42/122
20/19
404/459
8/25
60/79
440/467
22/32
22/34
142/212
127/279
35/58
145/240
43/65
44/41
423/541
15/59
29/38
511/488
243/201
LONG RANGE (2035) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 14
580/900
75/105
40/145
635/925
30/25
35/55
150/240
65/85
35/80
245/330
45/115
10/15
20/50
10/50
30/80
205/355
20/25
70/75
265/385
25/60
Mountain
College
Lincoln
10/35
25/50
25/80
30/60
35/70
50/140
25/25
470/535
10/30
70/90
510/540
25/35
25/40
165/245
145/325
40/65
170/280
50/75
50/50
490/630
20/70
35/45
595/565
280/235
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
90/160
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 15
to note that there are approved design plans for Jefferson Street, north of Mountain
Avenue, which will impact the number of lanes and the allowed turning movements.
These plans introduce a raised median in Jefferson Street. There will be one
eastbound through lane west of Chestnut Street, with parallel parking allowed on the
west side of Jefferson Street. The background traffic forecasts and total traffic forecasts
reflect these design plans.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 5, Figure 8 shows the assignment
of the site generated peak hour traffic with roundabout control at the Mountain/
Mathews-Walnut-Chestnut intersection. Figure 9 shows the assignment of the site
generated peak hour traffic with the existing signal control at the Mountain/Mathews-
Walnut intersection and right-in/right-out at the Mountain-Walnut/Chestnut intersection.
The traffic assignment in Figure 9 depicts making legal movements at all intersections.
The right-in from westbound Mountain Avenue and the right-out to northbound Walnut
Street may be violated. In order to avoid circuitous travel, entering traffic from the south
and west may attempt to enter Chestnut Street from eastbound Mountain Avenue. In
addition, exiting traffic to the south and west may attempt to turn south on Walnut Street
to reach the signal at the Mountain/Mathews-Walnut intersection. Roundabout control
at the Mountain/Mathews-Walnut intersection will eliminate these potential movements
and provide safe, efficient access to the hotel. The site generated vehicle traffic was
combined with the background traffic to determine the total forecasted vehicle traffic at
the key intersections. Figures 10 and 11 show the short range (2020) total peak hour
traffic at the key intersections with roundabout control and right-in/right-out control at
Walnut Street, respectively. Figures 12 and 13 show the long range (2035) total peak
hour traffic at the key intersections with roundabout control and right-in/right-out control
at Walnut Street, respectively.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). The only
stop sign controlled key intersection in the analysis area is the Jefferson/Chestnut-
Driveway intersection. This intersection will be limited to right-in/right-out movements in
the future, as shown in the Jefferson Street Roadway Plans provided by the City.
Geometry
College Avenue and Jefferson Street were evaluated using the State Highway
Access Code (SHAC). All other streets were evaluated using criteria in LCUASS. At the
respective posted speeds, the threshold for requiring a left-turn deceleration lane is greater
AM/PM
SITE GENERATED PEAK HOUR TRAFFIC
WITH ROUNDABOUT AT WALNUT STREET Figure 8
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 16
13/13
14/14
Mountain
College
Lincoln
3/3
11/11
8/8
1/2
2/3
16/16
Linden
Jefferson
Walnut
Riverside
3/3
10/13
Mathews
Chestnut
3/3
13/13
24/24
14/18
NOM
10/13
12/15
10/13
4/6
10/12
NOM
2/2
2/2
3/5
AM/PM
SITE GENERATED PEAK HOUR TRAFFIC
WITH RT-IN/RT-OUT AT WALNUT STREET Figure 9
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 17
6/6
7/7
10/13
7/7
24/24
17/23
30/30
Mountain
College
Lincoln
2/2
16/16
3/3
11/11
8/8
5/8
12/15
16/16
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
9/9
9/9
20/26
22/28
AM/PM
SHORT RANGE (2020) TOTAL
PEAK HOUR TRAFFIC WITH
ROUNDABOUT AT WALNUT STREET Figure 10
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 18
498/775
77/103
34/124
547/797
23/19
29/45
130/208
57/73
28/69
211/285
48/114
Mountain
College
Lincoln
7/30
22/47
21/68
24/53
30/61
45/125
20/19
415/470
8/25
60/79
440/467
22/32
22/34
146/218
137/291
35/58
153/248
43/65
45/43
425/544
15/59
29/38
511/488
259/217
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
22/45
41/53
79/137
3/3
16/20
174/305
13/13
26/68
AM/PM
SHORT RANGE (2020) TOTAL
PEAK HOUR TRAFFIC WITH
RT-IN/RT-OUT AT WALNUT STREET Figure 11
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 19
504/781
71/97
34/124
557/810
23/19
29/45
130/208
57/73
28/69
211/285
38/101
5/13
19/43
9/44
33/75
174/305
16/20
60/64
228/332
22/54
24/43
7/2
393/495
38/37
4/1
496/534
Mountain
College
Lincoln
7/30
22/47
37/84
24/53
30/61
45/125
20/19
415/470
8/25
60/79
440/467
22/32
22/34
142/212
127/279
35/58
153/248
43/65
49/49
435/556
15/59
29/38
511/488
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC WITH
ROUNDABOUT AT WALNUT STREET Figure 12
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 20
Mountain
College
Lincoln
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
25/50
50/60
90/160
5/5
20/25
205/355
15/15
30/80
10/15
20/50
NOM
10/50
25/60
265/385
70/75
25/25
15/20
NOM
10/15
15/15
AM/PM
Rounded to Nearest
5 Vehicles
585/905
90/120
40/145
645/940
30/25
35/55
150/240
65/85
35/80
245/330
55/130
40/65
180/290
50/75
50/50
495/635
25/40
170/250
155/340
20/70
35/45
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC WITH
RT-IN/RT-OUT AT WALNUT STREET Figure 13
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 21
10/15
20/50
10/50
40/90
205/355
20/25
70/75
265/385
25/60
Mountain
College
Lincoln
Linden
Jefferson
Walnut
Riverside
Mathews
25/30
25/25
Chestnut
90/160
50/60
25/50
585/905
85/115
40/145
645/940
30/25
35/55
150/240
65/85
35/80
245/330
45/115
40/65
180/290
50/75
55/60
500/645
25/40
165/245
145/325
20/70
35/45
595/565
295/250
10/35
30/55
40/95
30/60
35/70
55/145
25/25
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 22
than 25 vehicles per hour and the threshold for requiring a right-turn deceleration lane is
greater than 50 vehicles per hour. The short range (2020) and long range (2035)
geometry with roundabout control at Walnut Street is shown in Figure 14. The short range
(2020) and long range (2035) geometry with right-in/right-out at Walnut Street is shown in
Figure 15. As mentioned earlier, the Jefferson/Chestnut-Driveway intersection will be
limited to right-in/right-out movements in the future. While existing and forecasted traffic
indicates the need for a northbound right-turn lane at the Jefferson/Lincoln intersection
and a southbound right-turn lane at the Jefferson-Riverside/Mountain-Lincoln
intersection, it is assumed they were purposefully not included in the design plans.
Existing and forecasted traffic indicates the need for northbound and southbound right-
turn lanes at the College/Mountain intersection. Given its location in the central
business district, it is doubtful that these lanes would be implemented.
Operation Analysis
Operation analyses were performed at the key intersections. The operation
analyses were conducted for the short range analysis, reflecting a year 2020 condition,
and for the long range analysis, reflecting a year 2035 condition.
Using the short range (2020) background morning and afternoon peak hour
traffic volumes, the key intersections operate as indicated in Table 3. The short range
(2020) operation analyses were conducted with the existing control and geometry at all
intersections (except for the Jefferson/Chestnut-Driveway intersection). Calculation
forms for these analyses are provided in Appendix D. All of the key intersections
operate acceptably.
Using the long range (2035) background morning and afternoon peak hour traffic
volumes, the key intersections operate as indicated in Table 4. Calculation forms for
these analyses are provided in Appendix E. The long range (2035) operation analyses
were conducted with the existing control and geometry at all intersections (except for
the Jefferson/Chestnut-Driveway intersection). All of the key intersections operate
acceptably.
Using the traffic volumes shown in Figure 10, the key intersections operate in the
short range (2020) total condition with roundabout control at Walnut Street as indicated
in Table 5. Calculation forms for these analyses are provided in Appendix F. The key
intersections will meet the Fort Collins operational criteria with the geometry shown in
Figure 14.
Using the traffic volumes shown in Figure 11, the key intersections operate in the
short range (2020) total condition with right-in/right-out at Walnut Street as indicated in
Table 6. Calculation forms for these analyses are provided in Appendix G. The key
intersections will meet the Fort Collins operational criteria with the geometry shown in
Figure 15.
SHORT RANGE (2020) AND LONG
RANGE (2035) GEOMETRY WITH
ROUNDABOUT AT WALNUT STREET Figure 14
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 23
Mountain
College
Lincoln
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
- Denotes Lane
SHORT RANGE (2020) AND LONG
RANGE (2035) GEOMETRY WITH
RT-IN/RT-OUT AT WALNUT STREET Figure 15
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Page 24
Mountain
College
Lincoln
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
- Denotes Lane
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 25
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut
(signal)
EB LT A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T/RT B A
WB APPROACH B A
NB LT/T/RT B B
SB LT B C
SB T/RT B B
SB APPROACH B C
OVERALL A A
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B B
NB T/RT A A
NB APPROACH A B
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 26
Continued from previous page
TABLE 3
Short Range (2020) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT A A
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 27
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut
(signal)
EB LT A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T/RT B A
WB APPROACH B A
NB LT/T/RT B C
SB LT B C
SB T/RT B C
SB APPROACH B C
OVERALL A A
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B C
NB T/RT A A
NB APPROACH A B
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 28
Continued from previous page
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT C C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 29
TABLE 5
Short Range (2020) Total Peak Hour Operation With Roundabout
Control at Mountain/Mathews-Walnut-Chestnut Intersection
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut-
Chestnut
(roundabout)
EB A B
WB A B
NB A A
SB A B
OVERALL A B
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B B
NB T/RT A A
NB APPROACH A B
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 30
Continued from previous page
TABLE 5
Short Range (2020) Total Peak Hour Operation With Roundabout
Control at Mountain/Mathews-Walnut-Chestnut Intersection
Intersection Movement Level of Service
AM PM
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT A C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 31
TABLE 6
Short Range (2020) Total Peak Hour Operation With RT-in/RT-out
Control at Mountain-Walnut/Chestnut Intersection
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut
(signal)
EB LT A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T/RT B A
WB APPROACH B A
NB LT/T/RT B B
SB LT B C
SB T/RT B B
SB APPROACH B C
OVERALL A A
Mountain-Walnut/Chestnut
(RT-in/RT-out) WB RT out A A
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 32
Continued from previous page
TABLE 6
Short Range (2020) Total Peak Hour Operation With RT-in/RT-out
Control at Mountain-Walnut/Chestnut Intersection
Intersection Movement Level of Service
AM PM
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B B
NB T/RT A A
NB APPROACH A B
SB LT A A
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT A C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 33
Using the traffic volumes shown in Figure 12, the key intersections operate in the
long range (2035) total condition with roundabout control at Walnut Street as indicated
in Table 7. Calculation forms for these analyses are provided in Appendix H. The key
intersections will meet the Fort Collins operational criteria with the geometry shown in
Figure 14.
Using the traffic volumes shown in Figure 13, the key intersections operate in the
long range (2035) total condition with right-in/right-out at Walnut Street as indicated in
Table 8. Calculation forms for these analyses are provided in Appendix I. The key
intersections will meet the Fort Collins operational criteria with the geometry shown in
Figure 15.
Both plans (roundabout at the Mountain/Walnut-Mathews intersection and signal
at the Mountain/Walnut-Mathews intersection with right-in/right-out access to/from the
site [Chestnut]) meet the Fort Collins operational criteria. The calculated delay and
level of service are not significantly different with regard to the two plans connecting
Chestnut Street to Mountain Avenue and Walnut Street. The roundabout will have a
single circulating lane with an inscribed circle diameter of 100-130 feet. With the
existing signal at the Mountain/Walnut-Mathews intersection, there will be circuitous
travel for some of the site generated traffic. The decision with regard to this intersection
will be the subject of conversations between the developer and the City of Fort Collins.
Pedestrian Level of Service
Appendix J shows a map of the area that is within 1320 feet of the Fort Collins
CBD Hotel site. The Fort Collins CBD Hotel site is located within an area termed as a
“pedestrian district,” which sets the level of service threshold at LOS A & B for all
measured factors. There are five destination areas within 1320 feet of the proposed
The Fort Collins CBD Hotel: 1) the commercial area north of the site; 2) the commercial
area adjacent to the site; 3) the commercial area west of the site; 4) the commercial
area south of the site; and 5) the residential area southwest of the site. There are
sidewalks along both sides of all the streets in the Fort Collins CBD. Appendix J
contains the Pedestrian LOS Worksheet.
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there are no destination areas
within 1320 feet of the Fort Collins CBD Hotel.
Transit Level of Service
Currently, this area of the Fort Collins CBD is served by Transfort routes 5 and
14. Routes 1, 8, 18, 81, and Flex run along this section of College Avenue. The
Downtown Transit Center is to the west of the Fort Collins CBD Hotel site.
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 34
TABLE 7
Long Range (2035) Total Peak Hour Operation With Roundabout
Control at Mountain/Mathews-Walnut-Chestnut Intersection
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut-
Chestnut
(roundabout)
EB A B
WB A B
NB A A
SB A B
OVERALL A B
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B C
NB T/RT A A
NB APPROACH A B
SB LT A B
SB T/RT A A
SB APPROACH A B
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 35
Continued from previous page
TABLE 7
Long Range (2035) Total Peak Hour Operation With Roundabout
Control at Mountain/Mathews-Walnut-Chestnut Intersection
Intersection Movement Level of Service
AM PM
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT C C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 36
TABLE 8
Long Range (2035) Total Peak Hour Operation With RT-in/RT-out
Control at Mountain-Walnut/Chestnut Intersection
Intersection Movement Level of Service
AM PM
College/Mountain
(signal)
EB LT C C
EB T/RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
NB T/RT B B
SB LT/T A A
SB T/RT A A
SB APPROACH A A
OVERALL B B
Mountain/Mathews-Walnut
(signal)
EB LT A A
EB T/RT A A
EB APPROACH A A
WB LT A A
WB T/RT B A
WB APPROACH B A
NB LT/T/RT B C
SB LT B C
SB T/RT B C
SB APPROACH B C
OVERALL A A
Mountain-Walnut/Chestnut
(RT-in/RT-out) WB RT out A A
Continued on next page
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 37
Continued from previous page
TABLE 8
Long Range (2035) Total Peak Hour Operation With RT-in/RT-out
Control at Mountain-Walnut/Chestnut Intersection
Intersection Movement Level of Service
AM PM
Jefferson-Riverside/Mountain-
Lincoln
(signal)
NB LT B C
NB T/RT A A
NB APPROACH A B
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT C C
EB T C C
EB RT C C
EB APPROACH C C
WB LT C C
WB T/RT C C
WB APPROACH C C
OVERALL B B
Jefferson/Chestnut-Driveway
(RT-in/RT-out)
EB RT B B
WB RT B B
Jefferson/Linden
(signal)
NB LT A A
NB T/RT A A
NB APPROACH A A
SB LT A B
SB T/RT A A
SB APPROACH A A
EB LT/T/RT C C
WB LT C C
WB T C C
WB RT C C
WB APPROACH C C
OVERALL A B
DELICH Fort Collins CBD Hotel TIS, March 2015
ASSOCIATES Page 38
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Fort Collins CBD Hotel development on the
short range (2020) and long range (2035) street system in the vicinity of the proposed
development. As a result of this analysis, the following is concluded:
• The development of the Fort Collins CBD Hotel site is feasible from a traffic
engineering standpoint. At full development, the Fort Collins CBD Hotel will
generate the following traffic: 1,194 weekday vehicle trip ends, 93 morning peak
hour vehicle trip ends, and 105 afternoon peak hour vehicle trip ends.
• Currently, the College/Mountain, Mountain/Mathews-Walnut, Jefferson-
Riverside/Mountain-Lincoln, Jefferson/Linden, and Jefferson/Chestnut-Driveway
intersections operate at acceptable levels of service with existing control and
geometry.
• The only stop sign controlled intersection in the analysis area is the Jefferson/
Chestnut-Driveway intersection. This intersection will be limited to right-in/right-out
movements in the future, based upon approved design plans for Jefferson Street.
• The short range (2020) and long range (2035) geometry with roundabout control
and with right-in/right-out at Walnut Street is shown in Figures 14 and 15,
respectively. An eastbound right-turn lane will not be required at the
Jefferson/Chestnut intersection based upon CDOT auxiliary lane criteria. The
geometry at the Jefferson/Linden intersection is the geometry reflected in the
approved design plans. Given its location in the central business district, it is
doubtful that the College/Mountain intersection will be modified.
• In the short range (2020) and long range (2035) futures, given development of
the Fort Collins CBD Hotel and an increase in background traffic, the key
intersections operate acceptably during the peak hours. The Mountain/
Mathews-Walnut-Chestnut intersection will operate acceptably with a roundabout
or with a right-in/right-out at Chestnut Street.
• Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines.
APPENDIX A
----------------Ch$-' {)t!';:r - 4 - Attachments
Attachment A
Transportation Impact Study
Base Assumptions
Project Inforrnatiun j
1
I Project Name F6RT COlt- (IVS CBD ~-rGL
Project Location NE COV Ai)£ A-AJ'l'" tJr ,vtBt J'1IITI1 (j1.l7~I4l.NlJ7 luxa« &G'C:Tr o-,u
TIS Assumptions r
1 Type of Study Full: ~V(~_ ! Intermediate: ~ ~.
j Study Area Boundaries North: L f;!J OG'~) ISouth: I-Ac>wJ rA. o-.J
I ! Study Years East: Short Range: JGFF~I(ZOZ6 S6.v TWest; jLong Range: WAweJ/.- ~ .4A-'r.tI6r.ub I
I future Traffic Growth Rate l.or?/feAf-1 1
I 1,
1 I t
j Study Intersections I. All access drives
5, J1\~"/ c:o \\Q.,,, ~ I
I I L'UOOlJrAwItJAoll/'T"- U~-nlt:1fl,q6··...J~:Jf.v'::r->""'- f L~\"'~'"'
13~J)(')o~TIt.,l}/~~J!>J!1P~J.e )PP-RfM
4'~~~FGeS&vAC~s~NVI8.
- Time Trip Generation Period for Study Rates ?AlyF7lJO-1.:;t2- l CJ:T&OQ:·7Al"1Pl\ll: "~C~f.4:00-{)~ ;:b') I Sat Noon: No
Trip Adjustment factors Passby: AI/A I Market: Captive AfA
o
I 1Overall Trip Distribution
Mode Split Assumptions AJ/A
SEE AIT ACHED SKETCH I
Pagl!P 4-34
1502 13At:: 1
l.arim ••r County litb;:)n Ar(>,..Str ••••t Standard ••- I'!op<>;>,lodand R=n ••cted April 1:. 41)01
Mopled by Larimer County., City of Lov~13nd.Cily of fort Collins
0oo0 .-I 0
M
JEFFERSON STREE
12 LOT 1
I ! ~'-.--- ---.
L -~---
o
EET '<OW)
WAI NUT S I REET
(J) f -
Trip Generation
AWDTE AM Peak Hour PM Peak Hour
Code Use Size
Rate Trips Rate In Rate Out
Rate In Rate Out
" 7tQ eQ Hq4- 0.31 5'4
0.22 39 0.31 5"4 1).29 51
,3){) WC>TGL- R.aJM~
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3/5/2014 Observer: City of Fort Collins
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Mountain
S = straight
L = left turn
Time Northbound: College Southbound: College Total Eastbound: Mountain Westbound: Mountain Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 111 15 126 8 119 6 133 259 9 34 22 65 3 50 4 57 122 381
7:45 0 115 15 130 7 126 11 144 274 5 32 11 48 11 58 6 75 123 397
8:00 0 131 16 147 2 154 10 166 313 6 32 9 47 11 61 8 80 127 440
8:15 0 117 15 132 5 121 5 131 263 8 26 12 46 11 32 9 52 98 361
7:30-8:30 0 474 61 535 22 520 32 574 1109 28 124 54 206 36 201 27 264 470 1579
PHF n/a 0.9 0.95 0.91 0.69 0.84 0.73 0.86 0.78 0.91 0.61 0.79 0.82 0.82 0.75 0.83 0.9
4:30 0 180 21 201 3 158 19 180 381 11 59 16 86 26 66 18 110 196 577
4:45 0 166 21 187 9 188 26 223 410 9 50 13 72 21 56 21 98 170 580
5:00 0 169 20 189 2 230 32 264 453 10 49 18 77 26 77 8 111 188 641
5:15 0 222 24 246 4 182 41 227 473 13 40 22 75 23 72 19 114 189 662
4:30-5:30 0 737 86 823 18 758 118 894 1717 43 198 69 310 96 271 66 433 743 2460
PHF n/a 0.83 0.9 0.84 0.5 0.82 0.72 0.85 0.83 0.84 0.78 0.9 0.92 0.88 0.79 0.95 0.93
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/5/2014 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Mountain/Matthews-Walnut
S = straight
L = left turn
Time Northbound: Matthews Southbound: Walnut Total Eastbound: Mountain Westbound: Mountain Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 2 3 5 20 6 3 29 34 4 39 5 48 2 43 10 55 103 137
7:45 3 8 2 13 20 9 6 35 48 6 44 5 55 6 70 16 92 147 195
8:00 2 5 3 10 17 13 6 36 46 7 49 5 61 5 52 18 75 136 182
8:15 0 3 1 4 18 11 6 35 39 8 34 0 42 8 52 13 73 115 154
7:30-8:30 5 18 9 32 75 39 21 135 167 25 166 15 206 21 217 57 295 501 668
PHF 0.42 0.56 0.75 0.62 0.94 0.75 0.88 0.94 0.78 0.85 0.75 0.84 0.66 0.78 0.79 0.8 0.86
4:30 0 6 11 17 36 11 13 60 77 14 65 2 81 16 67 13 96 177 254
4:45 7 5 6 18 28 15 8 51 69 16 63 6 85 16 72 12 100 185 254
5:00 1 17 14 32 38 11 9 58 90 15 84 4 103 9 89 22 120 223 313
5:15 4 13 11 28 28 12 13 53 81 20 78 7 105 10 90 14 114 219 300
4:30-5:30 12 41 42 95 130 49 43 222 317 65 290 19 374 51 318 61 430 804 1121
PHF 0.43 0.6 0.75 0.74 0.86 0.82 0.83 0.93 0.81 0.86 0.68 0.89 0.8 0.88 0.69 0.9 0.9
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 6/20/2013 Observer: City of Fort Collins
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Jefferson-Riverside/Mountain-Lincoln
S = straight
L = left turn
Time Northbound: Riverside Southbound: Jefferson Total Eastbound: Mountain Westbound: Lincoln Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 49 104 7 160 8 105 2 115 275 4 31 19 54 8 26 9 43 97 372
7:45 64 130 7 201 13 123 3 139 340 5 47 40 92 12 42 5 59 151 491
8:00 60 128 7 195 12 86 3 101 296 5 35 31 71 11 40 9 60 131 427
8:15 58 124 7 189 9 88 6 103 292 7 22 31 60 10 30 10 50 110 402
7:30-8:30 231 486 28 745 42 402 14 458 1203 21 135 121 277 41 138 33 212 489 1692
PHF 0.9 0.93 1 0.93 0.81 0.82 0.58 0.82 0.75 0.72 0.76 0.75 0.85 0.82 0.83 0.88 0.86
4:30 36 112 11 159 11 131 18 160 319 7 38 59 104 15 57 13 85 189 508
4:45 43 127 8 178 11 124 12 147 325 6 51 54 111 12 49 9 70 181 506
5:00 48 120 8 176 8 145 9 162 338 10 57 83 150 17 59 20 96 246 584
5:15 64 105 9 178 9 115 17 141 319 9 56 69 134 18 63 13 94 228 547
4:30-5:30 191 464 36 691 39 515 56 610 1301 32 202 265 499 62 228 55 345 844 2145
PHF 0.75 0.91 0.82 0.97 0.89 0.89 0.78 0.94 0.8 0.89 0.8 0.83 0.86 0.9 0.69 0.9 0.92
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 1/22/2015 Observer: Sue
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Jefferson/Chestnut-Driveway
S = straight
L = left turn
Time Northbound: Jefferson Southbound: Jefferson Total Eastbound: Chestnut Westbound: Driveway Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 1 103 0 104 1 97 2 100 204 0 0 0 0 0 0 0 0 0 204
7:45 1 135 2 138 0 96 1 97 235 1 0 3 4 2 0 0 2 6 241
8:00 1 124 2 127 0 66 3 69 196 1 0 3 4 2 0 2 4 8 204
8:15 0 105 1 106 0 115 2 117 223 1 0 1 2 1 0 0 1 3 226
7:30-8:30 3 467 5 475 1 374 8 383 858 3 0 7 10 5 0 2 7 17 875
PHF 0.75 0.86 0.63 0.86 0.25 0.81 0.67 0.82 0.75 n/a 0.58 0.63 0.63 n/a 0.25 0.44 0.91
4:30 1 113 0 114 0 114 0 114 228 0 0 6 6 1 0 0 1 7 235
4:45 0 119 3 122 0 69 0 69 191 0 0 4 4 0 0 0 0 4 195
5:00 0 145 1 146 0 151 3 154 300 2 0 4 6 0 0 1 1 7 307
5:15 0 127 0 127 0 137 4 141 268 1 0 5 6 0 0 0 0 6 274
4:30-5:30 1 504 4 509 0 471 7 478 987 3 0 19 22 1 0 1 2 24 1011
PHF 0.25 0.87 0.33 0.87 n/a 0.78 0.44 0.78 0.38 n/a 0.79 0.92 0.25 n/a 0.25 0.5 0.82
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 7/16/2014 Observer: City of Fort Collins
Day: Wednesday Jurisdiction: Fort Collins
R = right turn Intersection: Jefferson/Linden
S = straight
L = left turn
Time Northbound: Jefferson Southbound: Jefferson Total Eastbound: Linden Westbound: Linden Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 5 99 9 113 5 93 3 101 214 0 3 9 12 9 6 4 19 31 245
7:45 7 100 6 113 3 102 1 106 219 0 5 4 9 8 5 6 19 28 247
8:00 5 106 23 134 4 96 3 103 237 2 6 6 14 12 7 8 27 41 278
8:15 4 114 19 137 7 93 1 101 238 5 5 1 11 11 11 5 27 38 276
7:30-8:30 21 419 57 497 19 384 8 411 908 7 19 20 46 40 29 23 92 138 1046
PHF 0.75 0.92 0.62 0.91 0.68 0.94 0.67 0.97 0.35 0.79 0.56 0.82 0.83 0.66 0.72 0.85 0.94
4:30 6 72 16 94 3 113 5 121 215 8 6 15 29 29 14 8 51 80 295
4:45 5 120 20 145 3 111 2 116 261 6 10 15 31 25 14 12 51 82 343
5:00 4 102 16 122 6 105 10 121 243 7 11 16 34 29 17 21 67 101 344
5:15 15 150 23 188 6 108 7 121 309 8 16 19 43 33 13 9 55 98 407
4:30-5:30 30 444 75 549 18 437 24 479 1028 29 43 65 137 116 58 50 224 361 1389
PHF 0.5 0.74 0.82 0.73 0.75 0.97 0.6 0.99 0.91 0.67 0.86 0.8 0.88 0.85 0.6 0.84 0.85
APPENDIX C
HCM 2010 Signalized Intersection Summary Recent AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 28 124 54 36 201 27 0 474 61 22 520 32
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 31 138 60 40 223 30 0 527 68 24 578 36
Adj No. of Lanes 120120020020
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222022222
Cap, veh/h 349 694 286 373 897 119 0 1610 207 82 1625 100
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 999 2179 896 1049 2815 373 0 2914 364 60 2857 175
Grp Volume(v), veh/h 31 99 99 40 125 128 0 296 299 331 0 307
Grp Sat Flow(s),veh/h/ln 999 1593 1482 1049 1593 1596 0 1593 1601 1600 0 1492
Q Serve(g_s), s 1.9 3.6 3.9 2.3 4.6 4.8 0.0 7.9 7.9 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.7 3.6 3.9 6.2 4.6 4.8 0.0 7.9 7.9 0.0 0.0 0.0
Prop In Lane 1.00 0.60 1.00 0.23 0.00 0.23 0.07 0.12
Lane Grp Cap(c), veh/h 349 508 473 373 508 509 0 906 911 958 0 849
V/C Ratio(X) 0.09 0.19 0.21 0.11 0.25 0.25 0.00 0.33 0.33 0.35 0.00 0.36
Avail Cap(c_a), veh/h 349 508 473 373 508 509 0 906 911 958 0 849
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 22.7 19.8 19.9 22.2 20.1 20.2 0.0 9.1 9.1 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.9 1.0 0.6 1.2 1.2 0.0 1.0 1.0 1.0 0.0 1.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 1.7 1.7 0.7 2.2 2.3 0.0 3.7 3.7 0.3 0.0 0.3
LnGrp Delay(d),s/veh 23.2 20.6 20.9 22.7 21.3 21.4 0.0 10.1 10.1 1.0 0.0 1.2
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 229 293 595 638
Approach Delay, s/veh 21.1 21.5 10.1 1.1
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 8.7 9.9 8.2
Green Ext Time (p_c), s 5.0 1.7 4.9 1.7
Intersection Summary
HCM 2010 Ctrl Delay 10.2
HCM 2010 LOS B
Timing Report, Sorted By Phase Recent AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Recent PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 43 198 69 96 271 66 0 737 86 18 758 118
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.94 0.86 0.93 0.86 1.00 0.91 0.99 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 46 213 74 103 291 71 0 792 92 19 815 127
Adj No. of Lanes 120120020020
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222022222
Cap, veh/h 283 720 236 311 787 186 0 1616 188 61 1479 228
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 0.76 0.76 0.76
Sat Flow, veh/h 858 2259 741 910 2470 583 0 2925 330 25 2601 400
Grp Volume(v), veh/h 46 146 141 103 184 178 0 444 440 517 0 444
Grp Sat Flow(s),veh/h/ln 858 1593 1407 910 1593 1460 0 1593 1579 1626 0 1400
Q Serve(g_s), s 3.5 5.5 6.1 7.7 7.1 7.6 0.0 13.3 13.3 0.0 0.0 10.7
Cycle Q Clear(g_c), s 11.1 5.5 6.1 13.8 7.1 7.6 0.0 13.3 13.3 10.2 0.0 10.7
Prop In Lane 1.00 0.53 1.00 0.40 0.00 0.21 0.04 0.29
Lane Grp Cap(c), veh/h 283 508 448 311 508 465 0 906 898 972 0 796
V/C Ratio(X) 0.16 0.29 0.31 0.33 0.36 0.38 0.00 0.49 0.49 0.53 0.00 0.56
Avail Cap(c_a), veh/h 283 508 448 311 508 465 0 906 898 972 0 796
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.4 20.4 20.6 25.8 21.0 21.1 0.0 10.3 10.3 5.4 0.0 5.5
Incr Delay (d2), s/veh 1.2 1.4 1.8 2.8 2.0 2.4 0.0 1.9 1.9 2.1 0.0 2.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 2.6 2.6 2.2 3.4 3.3 0.0 6.3 6.2 5.0 0.0 4.6
LnGrp Delay(d),s/veh 26.7 21.9 22.4 28.7 23.0 23.5 0.0 12.2 12.2 7.5 0.0 8.3
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 333 465 884 961
Approach Delay, s/veh 22.8 24.5 12.2 7.9
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 12.7 13.1 15.3 15.8
Green Ext Time (p_c), s 8.9 2.6 8.7 2.3
Intersection Summary
HCM 2010 Ctrl Delay 14.1
HCM 2010 LOS B
Timing Report, Sorted By Phase Recent PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Recent AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 25 166 15 21 217 57 5 18 9 75 39 21
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.99 0.97 0.99 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 29 193 8 24 252 32 6 21 3 87 45 7
Adj No. of Lanes 120120010110
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 553 1615 67 637 1530 192 144 464 62 562 559 87
Arrive On Green 1.00 1.00 1.00 0.52 0.52 0.52 0.38 0.38 0.38 0.38 0.38 0.38
Sat Flow, veh/h 979 3112 128 1055 2950 370 236 1216 161 1228 1466 228
Grp Volume(v), veh/h 29 98 103 24 140 144 30 0 0 87 0 52
Grp Sat Flow(s),veh/h/ln 979 1593 1648 1055 1656 1663 1614 0 0 1228 0 1695
Q Serve(g_s), s 0.2 0.0 0.0 0.9 3.6 3.6 0.0 0.0 0.0 2.6 0.0 1.6
Cycle Q Clear(g_c), s 3.9 0.0 0.0 0.9 3.6 3.6 0.9 0.0 0.0 3.5 0.0 1.6
Prop In Lane 1.00 0.08 1.00 0.22 0.20 0.10 1.00 0.13
Lane Grp Cap(c), veh/h 553 826 855 637 859 863 669 0 0 562 0 646
V/C Ratio(X) 0.05 0.12 0.12 0.04 0.16 0.17 0.04 0.00 0.00 0.15 0.00 0.08
Avail Cap(c_a), veh/h 553 826 855 637 859 863 669 0 0 562 0 646
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.2 0.0 0.0 9.5 10.1 10.1 15.6 0.0 0.0 16.3 0.0 15.8
Incr Delay (d2), s/veh 0.2 0.3 0.3 0.1 0.4 0.4 0.1 0.0 0.0 0.6 0.0 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.1 0.1 0.3 1.7 1.8 0.4 0.0 0.0 1.3 0.0 0.8
LnGrp Delay(d),s/veh 0.3 0.3 0.3 9.6 10.5 10.6 15.7 0.0 0.0 16.9 0.0 16.0
LnGrp LOS AAAABBB B B
Approach Vol, veh/h 230 308 30 139
Approach Delay, s/veh 0.3 10.5 15.7 16.6
Approach LOS ABBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 35.0 45.0 35.0 45.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 29.5 40.5 29.5 40.5
Max Q Clear Time (g_c+I1), s 5.5 5.9 2.9 5.6
Green Ext Time (p_c), s 0.5 1.8 0.6 1.8
Intersection Summary
HCM 2010 Ctrl Delay 8.6
HCM 2010 LOS A
Timing Report, Sorted By Phase Recent AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 35 45 35 45
Maximum Split (%) 43.8% 56.3% 43.8% 56.3%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 79 44 79
End Time (s) 79 44 79 44
Yield/Force Off (s) 73.5 39.5 73.5 39.5
Yield/Force Off 170(s) 56.5 29.5 56.5 29.5
Local Start Time (s) 0 35 0 35
Local Yield (s) 29.5 75.5 29.5 75.5
Local Yield 170(s) 12.5 65.5 12.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 44 (55%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Recent PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 65 290 19 51 318 61 12 41 42 130 50 43
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.93 0.98 0.93 0.98 0.95 0.98 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 72 322 14 57 353 46 13 46 11 144 56 11
Adj No. of Lanes 120120010110
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 545 1802 78 621 1699 219 116 366 80 477 445 87
Arrive On Green 1.00 1.00 1.00 0.58 0.58 0.58 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 870 3100 134 914 2923 377 197 1150 251 1179 1397 274
Grp Volume(v), veh/h 72 165 171 57 198 201 70 0 0 144 0 67
Grp Sat Flow(s),veh/h/ln 870 1593 1641 914 1656 1644 1598 0 0 1179 0 1672
Q Serve(g_s), s 0.8 0.0 0.0 2.2 4.6 4.7 0.0 0.0 0.0 4.3 0.0 2.3
Cycle Q Clear(g_c), s 5.4 0.0 0.0 2.2 4.6 4.7 2.4 0.0 0.0 6.7 0.0 2.3
Prop In Lane 1.00 0.08 1.00 0.23 0.19 0.16 1.00 0.16
Lane Grp Cap(c), veh/h 545 926 954 621 963 955 563 0 0 477 0 533
V/C Ratio(X) 0.13 0.18 0.18 0.09 0.21 0.21 0.12 0.00 0.00 0.30 0.00 0.13
Avail Cap(c_a), veh/h 545 926 954 621 963 955 563 0 0 477 0 533
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.3 0.0 0.0 7.5 8.0 8.0 19.4 0.0 0.0 20.7 0.0 19.3
Incr Delay (d2), s/veh 0.5 0.4 0.4 0.3 0.5 0.5 0.5 0.0 0.0 1.6 0.0 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.1 0.1 0.6 2.2 2.3 1.2 0.0 0.0 2.7 0.0 1.1
LnGrp Delay(d),s/veh 0.8 0.4 0.4 7.8 8.5 8.5 19.8 0.0 0.0 22.3 0.0 19.8
LnGrp LOS AAAAAAB C B
Approach Vol, veh/h 408 456 70 211
Approach Delay, s/veh 0.5 8.4 19.8 21.5
Approach LOS A A B C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 30.0 50.0 30.0 50.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 24.5 45.5 24.5 45.5
Max Q Clear Time (g_c+I1), s 8.7 7.4 4.4 6.7
Green Ext Time (p_c), s 0.9 3.4 1.0 3.4
Intersection Summary
HCM 2010 Ctrl Delay 8.7
HCM 2010 LOS A
Timing Report, Sorted By Phase Recent PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 30 50 30 50
Maximum Split (%) 37.5% 62.5% 37.5% 62.5%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 68 18 68 18
End Time (s) 18 68 18 68
Yield/Force Off (s) 12.5 63.5 12.5 63.5
Yield/Force Off 170(s) 75.5 53.5 75.5 53.5
Local Start Time (s) 0 30 0 30
Local Yield (s) 24.5 75.5 24.5 75.5
Local Yield 170(s) 7.5 65.5 7.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 68 (85%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Recent AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 42 402 14 231 486 28 21 135 121 41 138 33
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1493 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 49 467 14 269 565 28 24 157 6 48 160 3
Adj No. of Lanes 120120111120
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 557 1989 60 622 1951 97 239 302 256 194 575 11
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 739 2811 84 819 2757 136 1094 1676 1420 1094 3197 60
Grp Volume(v), veh/h 49 235 246 269 291 302 24 157 6 48 80 83
Grp Sat Flow(s),veh/h/ln 739 1418 1478 819 1421 1472 1094 1676 1420 1094 1593 1664
Q Serve(g_s), s 2.1 4.7 4.7 13.7 6.0 6.0 1.5 6.8 0.3 3.3 3.4 3.5
Cycle Q Clear(g_c), s 8.1 4.7 4.7 18.4 6.0 6.0 5.0 6.8 0.3 10.1 3.4 3.5
Prop In Lane 1.00 0.06 1.00 0.09 1.00 1.00 1.00 0.04
Lane Grp Cap(c), veh/h 557 1003 1045 622 1006 1042 239 302 256 194 287 300
V/C Ratio(X) 0.09 0.23 0.24 0.43 0.29 0.29 0.10 0.52 0.02 0.25 0.28 0.28
Avail Cap(c_a), veh/h 557 1003 1045 622 1006 1042 350 472 399 305 448 468
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 1.00 1.00 1.00
Uniform Delay (d), s/veh 5.8 4.1 4.1 7.3 4.3 4.3 30.5 29.7 27.0 34.2 28.3 28.3
Incr Delay (d2), s/veh 0.3 0.5 0.5 2.2 0.7 0.7 0.2 1.4 0.0 0.7 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 1.9 2.0 3.4 2.5 2.6 0.5 3.3 0.1 1.0 1.5 1.6
LnGrp Delay(d),s/veh 6.1 4.7 4.6 9.5 5.0 5.0 30.7 31.1 27.0 34.9 28.8 28.8
LnGrp LOS AAAAAACCCCCC
Approach Vol, veh/h 530 862 187 211
Approach Delay, s/veh 4.8 6.4 30.9 30.2
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.1 18.9 61.1 18.9
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 10.1 8.8 20.4 12.1
Green Ext Time (p_c), s 7.0 1.1 6.6 1.0
Intersection Summary
HCM 2010 Ctrl Delay 11.3
HCM 2010 LOS B
Timing Report, Sorted By Phase Recent AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Recent PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 39 515 56 191 464 36 32 202 265 62 228 55
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 42 560 52 208 504 34 35 220 43 67 248 26
Adj No. of Lanes 120120111120
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 515 1686 156 476 1731 116 262 414 345 222 716 74
Arrive On Green 0.64 0.64 0.64 0.64 0.64 0.64 0.25 0.25 0.25 0.25 0.25 0.25
Sat Flow, veh/h 762 2633 244 711 2703 182 979 1676 1397 990 2897 300
Grp Volume(v), veh/h 42 303 309 208 265 273 35 220 43 67 135 139
Grp Sat Flow(s),veh/h/ln 762 1426 1451 711 1422 1462 979 1676 1397 990 1593 1604
Q Serve(g_s), s 2.1 7.7 7.8 15.1 6.6 6.6 2.4 9.1 1.9 5.0 5.6 5.7
Cycle Q Clear(g_c), s 8.7 7.7 7.8 22.9 6.6 6.6 8.2 9.1 1.9 14.1 5.6 5.7
Prop In Lane 1.00 0.17 1.00 0.12 1.00 1.00 1.00 0.19
Lane Grp Cap(c), veh/h 515 913 929 476 911 936 262 414 345 222 393 396
V/C Ratio(X) 0.08 0.33 0.33 0.44 0.29 0.29 0.13 0.53 0.12 0.30 0.34 0.35
Avail Cap(c_a), veh/h 515 913 929 476 911 936 344 555 463 305 528 531
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.98 0.98 0.98 1.00 1.00 1.00
Uniform Delay (d), s/veh 8.3 6.6 6.6 11.8 6.4 6.4 28.2 26.1 23.4 32.2 24.8 24.8
Incr Delay (d2), s/veh 0.3 1.0 1.0 2.9 0.8 0.8 0.2 1.0 0.2 0.8 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 3.3 3.3 3.3 2.8 2.9 0.7 4.3 0.8 1.4 2.5 2.6
LnGrp Delay(d),s/veh 8.6 7.5 7.5 14.7 7.2 7.2 28.4 27.1 23.6 33.0 25.3 25.4
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 654 746 298 341
Approach Delay, s/veh 7.6 9.3 26.8 26.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 55.7 24.3 55.7 24.3
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 10.7 11.1 24.9 16.1
Green Ext Time (p_c), s 7.0 2.0 6.0 1.7
Intersection Summary
HCM 2010 Ctrl Delay 14.2
HCM 2010 LOS B
Timing Report, Sorted By Phase Recent PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Recent AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 2/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 1 374 8 5 467 3 3 0 7 5 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 411 9 5 513 3 3 0 8 5 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 516 0 0 420 0 0 686 945 210 734 948 258
Stage 1 - - - - - - 418 418 - 526 526 -
Stage 2 - - - - - - 268 527 - 208 422 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1046 - - 1136 - - 334 260 796 308 259 741
Stage 1 - - - - - - 583 589 - 503 527 -
Stage 2 - - - - - - 714 527 - 775 587 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1046 - - 1136 - - 331 258 796 303 257 741
Mov Cap-2 Maneuver - - - - - - 331 258 - 303 257 -
Stage 1 - - - - - - 582 588 - 502 524 -
Stage 2 - - - - - - 708 524 - 767 586 -
Approach SE NW NE SW
HCM Control Delay, s 0 0.1 11.6 15.1
HCM LOS B C
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 560 1136 - - 1046 - - 365
HCM Lane V/C Ratio 0.02 0.005 - - 0.001 - - 0.021
HCM Control Delay (s) 11.6 8.2 0 - 8.4 0 - 15.1
HCM Lane LOS B A A - A A - C
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0.1
Lanes and Geometrics Recent AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 2/21/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.997 0.999 0.902 0.961
Flt Protected 0.987 0.966
Satd. Flow (prot) 0 3529 0 0 3536 0 0 1658 0 0 1729 0
Flt Permitted 0.987 0.966
Satd. Flow (perm) 0 3529 0 0 3536 0 0 1658 0 0 1729 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 362 191
Travel Time (s) 10.9 11.7 8.2 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 471 7 4 504 1 3 0 19 1 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 554 8 5 593 1 4 0 22 1 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 594 0 0 562 0 0 864 1162 281 880 1165 297
Stage 1 - - - - - - 558 558 - 603 603 -
Stage 2 - - - - - - 306 604 - 277 562 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 978 - - 1005 - - 248 194 716 241 193 699
Stage 1 - - - - - - 482 510 - 453 487 -
Stage 2 - - - - - - 679 486 - 706 508 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 978 - - 1005 - - 246 193 716 232 192 699
Mov Cap-2 Maneuver - - - - - - 246 193 - 232 192 -
Stage 1 - - - - - - 482 510 - 453 484 -
Stage 2 - - - - - - 673 483 - 684 508 -
Approach SE NW NE SW
HCM Control Delay, s 0 0.1 11.6 15.4
HCM LOS B C
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 568 1005 - - 978 - - 348
HCM Lane V/C Ratio 0.046 0.005 ----- 0.007
HCM Control Delay (s) 11.6 8.6 0 - 0 - - 15.4
HCM Lane LOS B A A - A - - C
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Recent PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 0.95 0.95 0.95 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.886 0.932
Flt Protected 0.992 0.976
Satd. Flow (prot) 0 3532 0 0 3539 0 0 1637 0 0 1694 0
Flt Permitted 0.992 0.976
Satd. Flow (perm) 0 3532 0 0 3539 0 0 1637 0 0 1694 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 314 199
Travel Time (s) 10.6 12.0 7.1 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Recent AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 19 384 8 21 419 57 7 19 20 40 29 23
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.95 0.91 0.95 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1491 1642 1676 1507 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 20 409 8 22 446 54 7 20 2 43 31 0
Adj No. of Lanes 120120010111
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 617 2033 40 669 1841 222 97 226 20 304 299 254
Arrive On Green 0.72 0.72 0.72 0.72 0.72 0.72 0.18 0.18 0.18 0.18 0.18 0.00
Sat Flow, veh/h 803 2841 56 867 2573 310 232 1267 111 1177 1676 1425
Grp Volume(v), veh/h 20 204 213 22 247 253 29 0 0 43 31 0
Grp Sat Flow(s),veh/h/ln 803 1416 1480 867 1432 1450 1610 0 0 1177 1676 1425
Q Serve(g_s), s 0.7 3.8 3.8 0.7 4.7 4.8 0.0 0.0 0.0 1.0 1.2 0.0
Cycle Q Clear(g_c), s 5.5 3.8 3.8 4.5 4.7 4.8 1.1 0.0 0.0 2.2 1.2 0.0
Prop In Lane 1.00 0.04 1.00 0.21 0.24 0.07 1.00 1.00
Lane Grp Cap(c), veh/h 617 1013 1059 669 1025 1038 343 0 0 304 299 254
V/C Ratio(X) 0.03 0.20 0.20 0.03 0.24 0.24 0.08 0.00 0.00 0.14 0.10 0.00
Avail Cap(c_a), veh/h 617 1013 1059 669 1025 1038 609 0 0 507 587 499
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.91 0.91 0.91 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 4.9 3.8 3.8 4.5 3.9 3.9 27.5 0.0 0.0 27.9 27.5 0.0
Incr Delay (d2), s/veh 0.1 0.4 0.4 0.1 0.6 0.6 0.1 0.0 0.0 0.2 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 1.6 1.7 0.2 2.0 2.1 0.5 0.0 0.0 0.8 0.6 0.0
LnGrp Delay(d),s/veh 5.0 4.2 4.2 4.6 4.5 4.5 27.6 0.0 0.0 28.1 27.7 0.0
LnGrp LOS AAAAAAC CC
Approach Vol, veh/h 437 522 29 74
Approach Delay, s/veh 4.2 4.5 27.6 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.7 18.3 61.7 18.3
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 7.5 3.1 6.8 4.2
Green Ext Time (p_c), s 3.6 0.3 3.6 0.3
Intersection Summary
HCM 2010 Ctrl Delay 6.6
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Recent AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates recent am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 55
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Recent PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 18 437 24 30 444 75 29 43 65 116 58 50
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.95 0.92 0.95 0.94
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1494 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 21 514 23 35 522 72 34 51 25 136 68 4
Adj No. of Lanes 120120010111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 523 1890 84 554 1721 236 129 172 71 339 353 282
Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.21 0.21 0.21 0.21 0.21 0.21
Sat Flow, veh/h 721 2767 124 760 2519 346 331 818 338 1130 1676 1338
Grp Volume(v), veh/h 21 263 274 35 296 298 110 0 0 136 68 4
Grp Sat Flow(s),veh/h/ln 721 1420 1471 760 1432 1433 1488 0 0 1130 1676 1338
Q Serve(g_s), s 1.0 5.8 5.8 1.5 6.6 6.7 0.3 0.0 0.0 3.2 2.7 0.2
Cycle Q Clear(g_c), s 7.6 5.8 5.8 7.3 6.6 6.7 4.6 0.0 0.0 7.8 2.7 0.2
Prop In Lane 1.00 0.08 1.00 0.24 0.31 0.23 1.00 1.00
Lane Grp Cap(c), veh/h 523 970 1005 554 978 979 372 0 0 339 353 282
V/C Ratio(X) 0.04 0.27 0.27 0.06 0.30 0.30 0.30 0.00 0.00 0.40 0.19 0.01
Avail Cap(c_a), veh/h 523 970 1005 554 978 979 447 0 0 397 440 351
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.82 0.82 0.82 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.6 4.9 4.9 6.4 5.1 5.1 26.7 0.0 0.0 27.9 26.0 25.0
Incr Delay (d2), s/veh 0.1 0.6 0.6 0.2 0.8 0.8 0.4 0.0 0.0 0.8 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 2.3 2.4 0.3 2.8 2.8 2.1 0.0 0.0 2.7 1.3 0.1
LnGrp Delay(d),s/veh 6.7 5.5 5.5 6.6 5.9 5.9 27.2 0.0 0.0 28.6 26.2 25.0
LnGrp LOS AAAAAAC CCC
Approach Vol, veh/h 558 629 110 208
Approach Delay, s/veh 5.5 5.9 27.2 27.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 59.1 20.9 59.1 20.9
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 9.6 6.6 9.3 9.8
Green Ext Time (p_c), s 4.8 1.0 4.8 0.9
Intersection Summary
HCM 2010 Ctrl Delay 10.3
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Recent PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates recent pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 55
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Intersection type
Land Use (from structure plan)
Commercial
corridors
Other corridors within:
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
D E* D D
Any Leg E E D E
Any Movement E E D E
Stop sign control
(arterial/arterial,
arterial/collector or local-
any approach leg)
N/A F** F** E
Stop sign control
(collector/local--any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
APPENDIX D
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 29 130 57 38 211 28 0 498 64 23 547 34
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 32 144 63 42 234 31 0 553 71 26 608 38
Adj No. of Lanes 120120020020
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222022222
Cap, veh/h 343 693 287 368 899 117 0 1611 206 84 1619 100
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 988 2173 901 1040 2821 368 0 2916 362 62 2847 175
Grp Volume(v), veh/h 32 103 104 42 131 134 0 310 314 348 0 324
Grp Sat Flow(s),veh/h/ln 988 1593 1481 1040 1593 1597 0 1593 1601 1593 0 1492
Q Serve(g_s), s 2.0 3.8 4.1 2.5 4.9 5.0 0.0 8.3 8.4 0.0 0.0 0.0
Cycle Q Clear(g_c), s 7.0 3.8 4.1 6.6 4.9 5.0 0.0 8.3 8.4 0.0 0.0 0.0
Prop In Lane 1.00 0.61 1.00 0.23 0.00 0.23 0.07 0.12
Lane Grp Cap(c), veh/h 343 508 472 368 508 509 0 906 911 954 0 849
V/C Ratio(X) 0.09 0.20 0.22 0.11 0.26 0.26 0.00 0.34 0.34 0.36 0.00 0.38
Avail Cap(c_a), veh/h 343 508 472 368 508 509 0 906 911 954 0 849
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 22.9 19.9 20.0 22.4 20.2 20.3 0.0 9.2 9.3 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.9 1.1 0.6 1.2 1.3 0.0 1.0 1.0 1.1 0.0 1.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 1.8 1.8 0.8 2.3 2.4 0.0 3.9 3.9 0.3 0.0 0.3
LnGrp Delay(d),s/veh 23.4 20.8 21.0 23.0 21.4 21.5 0.0 10.3 10.3 1.1 0.0 1.3
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 239 307 624 672
Approach Delay, s/veh 21.2 21.7 10.3 1.2
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 9.0 10.4 8.6
Green Ext Time (p_c), s 5.3 1.8 5.3 1.8
Intersection Summary
HCM 2010 Ctrl Delay 10.3
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 45 208 73 101 285 69 0 775 90 19 797 124
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.94 0.86 0.93 0.86 1.00 0.91 0.99 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 48 224 78 109 306 74 0 833 97 20 857 133
Adj No. of Lanes 120120020020
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222022222
Cap, veh/h 275 719 237 305 788 185 0 1615 188 61 1478 227
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 0.76 0.76 0.76
Sat Flow, veh/h 846 2256 743 900 2474 580 0 2924 331 26 2598 398
Grp Volume(v), veh/h 48 154 148 109 194 186 0 467 463 542 0 468
Grp Sat Flow(s),veh/h/ln 846 1593 1406 900 1593 1461 0 1593 1578 1622 0 1401
Q Serve(g_s), s 3.8 5.8 6.4 8.4 7.5 8.0 0.0 14.3 14.3 0.0 0.0 11.7
Cycle Q Clear(g_c), s 11.7 5.8 6.4 14.8 7.5 8.0 0.0 14.3 14.3 11.1 0.0 11.7
Prop In Lane 1.00 0.53 1.00 0.40 0.00 0.21 0.04 0.28
Lane Grp Cap(c), veh/h 275 508 448 305 508 466 0 906 898 969 0 797
V/C Ratio(X) 0.17 0.30 0.33 0.36 0.38 0.40 0.00 0.52 0.52 0.56 0.00 0.59
Avail Cap(c_a), veh/h 275 508 448 305 508 466 0 906 898 969 0 797
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.9 20.6 20.7 26.4 21.1 21.3 0.0 10.5 10.5 5.5 0.0 5.6
Incr Delay (d2), s/veh 1.4 1.5 2.0 3.2 2.2 2.6 0.0 2.1 2.1 2.3 0.0 3.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 2.8 2.7 2.4 3.6 3.5 0.0 6.8 6.7 5.5 0.0 5.0
LnGrp Delay(d),s/veh 27.2 22.1 22.7 29.6 23.3 23.8 0.0 12.6 12.6 7.9 0.0 8.8
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 350 489 930 1010
Approach Delay, s/veh 23.1 24.9 12.6 8.3
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 13.7 13.7 16.3 16.8
Green Ext Time (p_c), s 9.5 2.7 9.3 2.3
Intersection Summary
HCM 2010 Ctrl Delay 14.5
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 26 174 16 22 228 60 5 19 9 79 41 22
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.99 0.97 0.99 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 30 202 9 26 265 35 6 22 3 92 48 7
Adj No. of Lanes 120120010110
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 544 1609 71 632 1522 198 140 471 60 562 565 82
Arrive On Green 1.00 1.00 1.00 0.52 0.52 0.52 0.38 0.38 0.38 0.38 0.38 0.38
Sat Flow, veh/h 965 3101 137 1046 2934 383 226 1235 157 1227 1481 216
Grp Volume(v), veh/h 30 103 108 26 148 152 31 0 0 92 0 55
Grp Sat Flow(s),veh/h/ln 965 1593 1646 1046 1656 1661 1618 0 0 1227 0 1697
Q Serve(g_s), s 0.2 0.0 0.0 1.0 3.8 3.9 0.0 0.0 0.0 2.8 0.0 1.7
Cycle Q Clear(g_c), s 4.1 0.0 0.0 1.0 3.8 3.9 0.9 0.0 0.0 3.7 0.0 1.7
Prop In Lane 1.00 0.08 1.00 0.23 0.19 0.10 1.00 0.13
Lane Grp Cap(c), veh/h 544 826 854 632 859 861 671 0 0 562 0 647
V/C Ratio(X) 0.06 0.12 0.13 0.04 0.17 0.18 0.05 0.00 0.00 0.16 0.00 0.09
Avail Cap(c_a), veh/h 544 826 854 632 859 861 671 0 0 562 0 647
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.2 0.0 0.0 9.5 10.2 10.2 15.6 0.0 0.0 16.4 0.0 15.8
Incr Delay (d2), s/veh 0.2 0.3 0.3 0.1 0.4 0.4 0.1 0.0 0.0 0.6 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.1 0.1 0.3 1.8 1.9 0.5 0.0 0.0 1.5 0.0 0.8
LnGrp Delay(d),s/veh 0.4 0.3 0.3 9.6 10.6 10.6 15.7 0.0 0.0 17.0 0.0 16.1
LnGrp LOS AAAABBB B B
Approach Vol, veh/h 241 326 31 147
Approach Delay, s/veh 0.3 10.5 15.7 16.7
Approach LOS ABBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 35.0 45.0 35.0 45.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 29.5 40.5 29.5 40.5
Max Q Clear Time (g_c+I1), s 5.7 6.1 2.9 5.9
Green Ext Time (p_c), s 0.6 2.0 0.6 2.0
Intersection Summary
HCM 2010 Ctrl Delay 8.7
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Bkgrd AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 35 45 35 45
Maximum Split (%) 43.8% 56.3% 43.8% 56.3%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 79 44 79
End Time (s) 79 44 79 44
Yield/Force Off (s) 73.5 39.5 73.5 39.5
Yield/Force Off 170(s) 56.5 29.5 56.5 29.5
Local Start Time (s) 0 35 0 35
Local Yield (s) 29.5 75.5 29.5 75.5
Local Yield 170(s) 12.5 65.5 12.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 44 (55%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 68 305 20 54 332 64 13 43 44 137 53 45
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.93 0.98 0.93 0.98 0.95 0.98 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 76 339 15 60 369 49 14 48 12 152 59 12
Adj No. of Lanes 120120010110
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 535 1800 79 613 1694 223 118 361 82 477 442 90
Arrive On Green 1.00 1.00 1.00 0.58 0.58 0.58 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 856 3097 136 900 2915 383 202 1133 258 1176 1387 282
Grp Volume(v), veh/h 76 174 180 60 208 210 74 0 0 152 0 71
Grp Sat Flow(s),veh/h/ln 856 1593 1641 900 1656 1642 1593 0 0 1176 0 1670
Q Serve(g_s), s 0.9 0.0 0.0 2.4 4.8 4.9 0.0 0.0 0.0 4.6 0.0 2.4
Cycle Q Clear(g_c), s 5.8 0.0 0.0 2.4 4.8 4.9 2.5 0.0 0.0 7.1 0.0 2.4
Prop In Lane 1.00 0.08 1.00 0.23 0.19 0.16 1.00 0.17
Lane Grp Cap(c), veh/h 535 926 954 613 963 954 561 0 0 477 0 532
V/C Ratio(X) 0.14 0.19 0.19 0.10 0.22 0.22 0.13 0.00 0.00 0.32 0.00 0.13
Avail Cap(c_a), veh/h 535 926 954 613 963 954 561 0 0 477 0 532
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.3 0.0 0.0 7.5 8.0 8.0 19.4 0.0 0.0 20.8 0.0 19.4
Incr Delay (d2), s/veh 0.6 0.4 0.4 0.3 0.5 0.5 0.5 0.0 0.0 1.8 0.0 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.1 0.1 0.6 2.3 2.4 1.2 0.0 0.0 2.8 0.0 1.2
LnGrp Delay(d),s/veh 0.9 0.4 0.4 7.8 8.5 8.6 19.9 0.0 0.0 22.6 0.0 19.9
LnGrp LOS AAAAAAB C B
Approach Vol, veh/h 430 478 74 223
Approach Delay, s/veh 0.5 8.5 19.9 21.7
Approach LOS A A B C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 30.0 50.0 30.0 50.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 24.5 45.5 24.5 45.5
Max Q Clear Time (g_c+I1), s 9.1 7.8 4.5 6.9
Green Ext Time (p_c), s 1.0 3.6 1.0 3.6
Intersection Summary
HCM 2010 Ctrl Delay 8.8
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Bkgrd PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 30 50 30 50
Maximum Split (%) 37.5% 62.5% 37.5% 62.5%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 68 18 68 18
End Time (s) 18 68 18 68
Yield/Force Off (s) 12.5 63.5 12.5 63.5
Yield/Force Off 170(s) 75.5 53.5 75.5 53.5
Local Start Time (s) 0 30 0 30
Local Yield (s) 24.5 75.5 24.5 75.5
Local Yield 170(s) 7.5 65.5 7.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 68 (85%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 44 423 15 243 511 29 22 142 127 43 145 35
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1493 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 51 492 15 283 594 29 26 165 8 50 169 6
Adj No. of Lanes 120120111120
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 535 1970 60 600 1934 94 241 313 265 196 585 21
Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.19 0.19 0.19 0.19 0.19 0.19
Sat Flow, veh/h 718 2810 86 800 2759 135 1082 1676 1420 1084 3135 111
Grp Volume(v), veh/h 51 248 259 283 306 317 26 165 8 50 85 90
Grp Sat Flow(s),veh/h/ln 718 1418 1477 800 1421 1472 1082 1676 1420 1084 1593 1653
Q Serve(g_s), s 2.3 5.1 5.1 15.9 6.6 6.6 1.7 7.1 0.4 3.5 3.7 3.7
Cycle Q Clear(g_c), s 8.9 5.1 5.1 21.0 6.6 6.6 5.4 7.1 0.4 10.6 3.7 3.7
Prop In Lane 1.00 0.06 1.00 0.09 1.00 1.00 1.00 0.07
Lane Grp Cap(c), veh/h 535 994 1036 600 996 1032 241 313 265 196 297 308
V/C Ratio(X) 0.10 0.25 0.25 0.47 0.31 0.31 0.11 0.53 0.03 0.26 0.29 0.29
Avail Cap(c_a), veh/h 535 994 1036 600 996 1032 344 472 399 299 448 465
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.3 4.3 4.3 8.1 4.6 4.6 30.3 29.4 26.6 34.1 28.0 28.0
Incr Delay (d2), s/veh 0.4 0.6 0.6 2.7 0.8 0.8 0.2 1.4 0.0 0.7 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 2.1 2.2 3.9 2.8 2.9 0.5 3.4 0.1 1.1 1.7 1.7
LnGrp Delay(d),s/veh 6.6 4.9 4.9 10.8 5.4 5.3 30.5 30.7 26.7 34.8 28.5 28.5
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 558 906 199 225
Approach Delay, s/veh 5.1 7.0 30.5 29.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 60.6 19.4 60.6 19.4
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 10.9 9.1 23.0 12.6
Green Ext Time (p_c), s 7.6 1.2 7.0 1.0
Intersection Summary
HCM 2010 Ctrl Delay 11.7
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 41 541 59 201 488 38 34 212 279 65 240 58
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 45 588 55 218 530 36 37 230 74 71 261 30
Adj No. of Lanes 120120111120
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 492 1662 155 453 1707 116 264 429 358 221 733 83
Arrive On Green 0.63 0.63 0.63 0.63 0.63 0.63 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 742 2631 246 691 2701 183 965 1676 1398 955 2866 325
Grp Volume(v), veh/h 45 318 325 218 279 287 37 230 74 71 144 147
Grp Sat Flow(s),veh/h/ln 742 1426 1451 691 1422 1462 965 1676 1398 955 1593 1598
Q Serve(g_s), s 2.4 8.5 8.5 17.5 7.2 7.2 2.6 9.5 3.3 5.5 5.9 6.1
Cycle Q Clear(g_c), s 9.6 8.5 8.5 26.0 7.2 7.2 8.7 9.5 3.3 15.0 5.9 6.1
Prop In Lane 1.00 0.17 1.00 0.13 1.00 1.00 1.00 0.20
Lane Grp Cap(c), veh/h 492 901 917 453 899 924 264 429 358 221 407 409
V/C Ratio(X) 0.09 0.35 0.35 0.48 0.31 0.31 0.14 0.54 0.21 0.32 0.35 0.36
Avail Cap(c_a), veh/h 492 901 917 453 899 924 337 555 463 293 528 529
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00
Uniform Delay (d), s/veh 8.9 7.0 7.0 13.2 6.7 6.7 28.0 25.7 23.4 32.2 24.4 24.4
Incr Delay (d2), s/veh 0.4 1.1 1.1 3.6 0.9 0.9 0.2 1.0 0.3 0.8 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 3.5 3.6 3.8 3.0 3.1 0.7 4.5 1.3 1.5 2.7 2.7
LnGrp Delay(d),s/veh 9.3 8.1 8.1 16.8 7.6 7.6 28.2 26.7 23.7 33.0 24.9 24.9
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 688 784 341 362
Approach Delay, s/veh 8.1 10.2 26.2 26.5
Approach LOS A B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 55.0 25.0 55.0 25.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 11.6 11.5 28.0 17.0
Green Ext Time (p_c), s 7.5 2.2 6.0 1.8
Intersection Summary
HCM 2010 Ctrl Delay 14.8
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Short Bkgrd AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 0.2
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 393 8 0 496 4 0 0 7 0 0 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 432 9 0 545 4 0 0 8 0 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 549 0 0 441 0 0 709 985 436 983 988 275
Stage 1 - - - - - - 436 436 - 547 547 -
Stage 2 - - - - - - 273 549 - 436 441 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 1017 - - 1119 - - 335 247 619 215 246 723
Stage 1 - - - - - - 598 579 - 490 517 -
Stage 2 - - - - - - 710 516 - 598 576 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1017 - - 1119 - - 331 247 619 212 246 723
Mov Cap-2 Maneuver - - - - - - 331 247 - 212 246 -
Stage 1 - - - - - - 598 579 - 490 517 -
Stage 2 - - - - - - 702 516 - 591 576 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 10.9 10
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 619 1119 - - 1017 - - 723
HCM Lane V/C Ratio 0.012 ------ 0.011
HCM Control Delay (s) 10.9 0 - - 0 - - 10
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0
Lanes and Geometrics Short Bkgrd AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.997 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1857 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1857 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 362 191
Travel Time (s) 10.9 11.7 8.2 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 495 7 0 534 1 0 0 20 0 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 582 8 0 628 1 0 0 24 0 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 629 0 0 591 0 0 900 1215 586 1227 1220 315
Stage 1 - - - - - - 586 586 - 629 629 -
Stage 2 - - - - - - 314 629 - 598 591 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 949 - - 985 - - 246 181 509 144 179 682
Stage 1 - - - - - - 495 496 - 438 474 -
Stage 2 - - - - - - 672 474 - 488 494 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 949 - - 985 - - 245 181 509 137 179 682
Mov Cap-2 Maneuver - - - - - - 245 181 - 137 179 -
Stage 1 - - - - - - 495 496 - 438 474 -
Stage 2 - - - - - - 670 474 - 465 494 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 12.4 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 509 985 - - 949 - - 682
HCM Lane V/C Ratio 0.046 ------ 0.003
HCM Control Delay (s) 12.4 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Short Bkgrd PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1859 0 0 3539 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1859 0 0 3539 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 314 199
Travel Time (s) 10.6 12.0 7.1 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 20 404 8 22 440 60 7 20 21 42 30 24
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1490 1642 1676 1507 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 21 430 9 23 468 57 7 21 3 45 32 0
Adj No. of Lanes 110120010111
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 601 1040 22 597 1838 223 92 221 28 305 299 254
Arrive On Green 0.72 0.72 0.72 0.72 0.72 0.72 0.18 0.18 0.18 0.18 0.18 0.00
Sat Flow, veh/h 785 1454 30 850 2571 312 206 1236 155 1176 1676 1425
Grp Volume(v), veh/h 21 0 439 23 260 265 31 0 0 45 32 0
Grp Sat Flow(s),veh/h/ln 785 0 1485 850 1432 1450 1597 0 0 1176 1676 1425
Q Serve(g_s), s 0.8 0.0 9.6 0.9 5.0 5.1 0.0 0.0 0.0 1.0 1.3 0.0
Cycle Q Clear(g_c), s 5.9 0.0 9.6 10.5 5.0 5.1 1.2 0.0 0.0 2.3 1.3 0.0
Prop In Lane 1.00 0.02 1.00 0.21 0.23 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 601 0 1062 597 1024 1037 340 0 0 305 299 254
V/C Ratio(X) 0.03 0.00 0.41 0.04 0.25 0.26 0.09 0.00 0.00 0.15 0.11 0.00
Avail Cap(c_a), veh/h 601 0 1062 597 1024 1037 603 0 0 507 587 499
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.91 0.00 0.91 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 5.0 0.0 4.6 6.7 4.0 4.0 27.5 0.0 0.0 27.9 27.5 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.1 0.1 0.6 0.6 0.1 0.0 0.0 0.2 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 4.1 0.2 2.1 2.2 0.6 0.0 0.0 0.9 0.6 0.0
LnGrp Delay(d),s/veh 5.1 0.0 5.7 6.8 4.6 4.6 27.6 0.0 0.0 28.1 27.7 0.0
LnGrp LOS A AAAAC CC
Approach Vol, veh/h 460 548 31 77
Approach Delay, s/veh 5.7 4.7 27.6 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.7 18.3 61.7 18.3
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 11.6 3.2 12.5 4.3
Green Ext Time (p_c), s 3.9 0.3 3.9 0.3
Intersection Summary
HCM 2010 Ctrl Delay 7.3
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Bkgrd AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 55
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 19 459 25 32 467 79 30 45 68 122 61 53
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.95 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1494 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 22 540 27 38 549 75 35 53 29 144 72 0
Adj No. of Lanes 110120010111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 503 958 48 446 1713 233 126 170 78 339 360 306
Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.21 0.21 0.21 0.21 0.21 0.00
Sat Flow, veh/h 701 1410 71 742 2522 343 314 794 365 1126 1676 1425
Grp Volume(v), veh/h 22 0 567 38 311 313 117 0 0 144 72 0
Grp Sat Flow(s),veh/h/ln 701 0 1481 742 1432 1433 1473 0 0 1126 1676 1425
Q Serve(g_s), s 1.1 0.0 15.9 2.2 7.1 7.2 0.5 0.0 0.0 3.7 2.8 0.0
Cycle Q Clear(g_c), s 8.2 0.0 15.9 18.2 7.1 7.2 4.9 0.0 0.0 8.6 2.8 0.0
Prop In Lane 1.00 0.05 1.00 0.24 0.30 0.25 1.00 1.00
Lane Grp Cap(c), veh/h 503 0 1006 446 973 973 375 0 0 339 360 306
V/C Ratio(X) 0.04 0.00 0.56 0.09 0.32 0.32 0.31 0.00 0.00 0.42 0.20 0.00
Avail Cap(c_a), veh/h 503 0 1006 446 973 973 442 0 0 393 440 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.82 0.00 0.82 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.0 0.0 6.7 11.4 5.3 5.3 26.6 0.0 0.0 28.0 25.8 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.9 0.4 0.9 0.9 0.5 0.0 0.0 0.8 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 7.0 0.5 3.0 3.0 2.2 0.0 0.0 2.9 1.3 0.0
LnGrp Delay(d),s/veh 7.1 0.0 8.6 11.8 6.1 6.1 27.1 0.0 0.0 28.8 26.0 0.0
LnGrp LOS A ABAAC CC
Approach Vol, veh/h 589 662 117 216
Approach Delay, s/veh 8.5 6.5 27.1 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.8 21.2 58.8 21.2
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 17.9 6.9 20.2 10.6
Green Ext Time (p_c), s 5.4 1.0 5.4 0.9
Intersection Summary
HCM 2010 Ctrl Delay 11.7
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Bkgrd PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX E
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 150 65 45 245 35 0 580 75 30 635 40
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 37 158 68 47 258 37 0 611 79 32 668 42
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 329 696 285 359 889 126 0 1609 208 90 1600 99
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 962 2183 893 1023 2789 394 0 2912 365 73 2813 174
Grp Volume(v), veh/h 37 113 113 47 146 149 0 343 347 381 0 361
Grp Sat Flow(s),veh/h/ln 962 1593 1483 1023 1593 1591 0 1593 1601 1567 0 1492
Q Serve(g_s), s 2.4 4.2 4.5 2.8 5.5 5.6 0.0 9.5 9.5 0.0 0.0 0.0
Cycle Q Clear(g_c), s 8.0 4.2 4.5 7.3 5.5 5.6 0.0 9.5 9.5 0.0 0.0 0.0
Prop In Lane 1.00 0.60 1.00 0.25 0.00 0.23 0.08 0.12
Lane Grp Cap(c), veh/h 329 508 473 359 508 507 0 906 911 940 0 849
V/C Ratio(X) 0.11 0.22 0.24 0.13 0.29 0.29 0.00 0.38 0.38 0.41 0.00 0.42
Avail Cap(c_a), veh/h 329 508 473 359 508 507 0 906 911 940 0 849
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.5 20.0 20.1 22.8 20.4 20.5 0.0 9.5 9.5 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.7 1.0 1.2 0.8 1.4 1.5 0.0 1.2 1.2 1.3 0.0 1.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 2.0 2.0 0.9 2.6 2.7 0.0 4.4 4.4 0.3 0.0 0.4
LnGrp Delay(d),s/veh 24.2 21.0 21.3 23.6 21.9 22.0 0.0 10.7 10.7 1.3 0.0 1.6
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 263 342 690 742
Approach Delay, s/veh 21.6 22.1 10.7 1.4
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 10.0 11.5 9.3
Green Ext Time (p_c), s 6.2 2.0 6.1 2.0
Intersection Summary
HCM 2010 Ctrl Delay 10.6
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd AM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 55 240 85 115 330 80 0 900 105 25 925 145
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.95 0.86 0.94 0.86 1.00 0.91 1.00 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 58 253 89 121 347 84 0 947 111 26 974 153
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 256 715 239 288 787 186 0 1614 189 65 1459 226
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 813 2245 751 872 2470 582 0 2922 333 32 2566 398
Grp Volume(v), veh/h 58 176 166 121 220 211 0 531 527 614 0 539
Grp Sat Flow(s),veh/h/ln 813 1593 1403 872 1593 1460 0 1593 1578 1595 0 1401
Q Serve(g_s), s 4.9 6.8 7.3 10.0 8.8 9.2 0.0 17.3 17.3 0.0 0.0 0.0
Cycle Q Clear(g_c), s 14.1 6.8 7.3 17.3 8.8 9.2 0.0 17.3 17.3 0.0 0.0 0.0
Prop In Lane 1.00 0.54 1.00 0.40 0.00 0.21 0.04 0.28
Lane Grp Cap(c), veh/h 256 508 447 288 508 465 0 906 897 954 0 797
V/C Ratio(X) 0.23 0.35 0.37 0.42 0.43 0.45 0.00 0.59 0.59 0.64 0.00 0.68
Avail Cap(c_a), veh/h 256 508 447 288 508 465 0 906 897 954 0 797
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 27.3 20.9 21.1 27.7 21.5 21.7 0.0 11.2 11.2 0.0 0.0 0.0
Incr Delay (d2), s/veh 2.1 1.9 2.4 4.4 2.7 3.2 0.0 2.8 2.8 3.3 0.0 4.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 3.2 3.1 2.7 4.2 4.1 0.0 8.2 8.2 0.9 0.0 1.0
LnGrp Delay(d),s/veh 29.3 22.7 23.4 32.2 24.2 24.8 0.0 13.9 14.0 3.3 0.0 4.6
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 400 552 1058 1153
Approach Delay, s/veh 24.0 26.2 14.0 3.9
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 16.1 19.3 19.3
Green Ext Time (p_c), s 12.9 2.8 11.0 2.0
Intersection Summary
HCM 2010 Ctrl Delay 13.7
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd PM
18: College (US 287) & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 70
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 30 205 20 25 265 70 10 20 10 90 50 25
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.99 0.97 0.99 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 32 216 12 26 279 42 11 21 4 95 53 9
Adj No. of Lanes 120120010110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 532 1589 88 624 1494 222 209 373 65 562 551 94
Arrive On Green 1.00 1.00 1.00 0.52 0.52 0.52 0.38 0.38 0.38 0.38 0.38 0.38
Sat Flow, veh/h 947 3063 169 1030 2880 428 394 978 172 1227 1445 245
Grp Volume(v), veh/h 32 112 116 26 159 162 36 0 0 95 0 62
Grp Sat Flow(s),veh/h/ln 947 1593 1639 1030 1656 1651 1544 0 0 1227 0 1691
Q Serve(g_s), s 0.3 0.0 0.0 1.0 4.1 4.2 0.0 0.0 0.0 2.8 0.0 1.9
Cycle Q Clear(g_c), s 4.5 0.0 0.0 1.0 4.1 4.2 1.1 0.0 0.0 3.8 0.0 1.9
Prop In Lane 1.00 0.10 1.00 0.26 0.31 0.11 1.00 0.15
Lane Grp Cap(c), veh/h 532 826 850 624 859 856 647 0 0 562 0 645
V/C Ratio(X) 0.06 0.14 0.14 0.04 0.18 0.19 0.06 0.00 0.00 0.17 0.00 0.10
Avail Cap(c_a), veh/h 532 826 850 624 859 856 647 0 0 562 0 645
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.2 0.0 0.0 9.5 10.2 10.3 15.6 0.0 0.0 16.4 0.0 15.9
Incr Delay (d2), s/veh 0.2 0.3 0.3 0.1 0.5 0.5 0.2 0.0 0.0 0.6 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.1 0.1 0.3 2.0 2.0 0.5 0.0 0.0 1.5 0.0 0.9
LnGrp Delay(d),s/veh 0.4 0.3 0.3 9.6 10.7 10.8 15.8 0.0 0.0 17.1 0.0 16.2
LnGrp LOS AAAABBB B B
Approach Vol, veh/h 260 347 36 157
Approach Delay, s/veh 0.4 10.7 15.8 16.7
Approach LOS ABBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 35.0 45.0 35.0 45.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 29.5 40.5 29.5 40.5
Max Q Clear Time (g_c+I1), s 5.8 6.5 3.1 6.2
Green Ext Time (p_c), s 0.6 2.1 0.7 2.1
Intersection Summary
HCM 2010 Ctrl Delay 8.7
HCM 2010 LOS A
Timing Report, Sorted By Phase Long Bkgrd AM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 35 45 35 45
Maximum Split (%) 43.8% 56.3% 43.8% 56.3%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 79 44 79
End Time (s) 79 44 79 44
Yield/Force Off (s) 73.5 39.5 73.5 39.5
Yield/Force Off 170(s) 56.5 29.5 56.5 29.5
Local Start Time (s) 0 35 0 35
Local Yield (s) 29.5 75.5 29.5 75.5
Local Yield 170(s) 12.5 65.5 12.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 44 (55%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 80 355 25 60 385 75 15 50 50 160 60 50
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.93 0.98 0.93 0.98 0.95 0.98 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 84 374 20 63 405 58 16 53 16 168 63 15
Adj No. of Lanes 120120010110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 511 1781 95 595 1676 238 117 346 95 476 427 102
Arrive On Green 1.00 1.00 1.00 0.58 0.58 0.58 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 823 3063 163 869 2883 409 199 1086 298 1167 1341 319
Grp Volume(v), veh/h 84 194 200 63 231 232 85 0 0 168 0 78
Grp Sat Flow(s),veh/h/ln 823 1593 1634 869 1656 1635 1583 0 0 1167 0 1660
Q Serve(g_s), s 1.2 0.0 0.0 2.6 5.4 5.5 0.0 0.0 0.0 5.1 0.0 2.7
Cycle Q Clear(g_c), s 6.7 0.0 0.0 2.6 5.4 5.5 2.9 0.0 0.0 8.0 0.0 2.7
Prop In Lane 1.00 0.10 1.00 0.25 0.19 0.19 1.00 0.19
Lane Grp Cap(c), veh/h 511 926 950 595 963 950 558 0 0 476 0 529
V/C Ratio(X) 0.16 0.21 0.21 0.11 0.24 0.24 0.15 0.00 0.00 0.35 0.00 0.15
Avail Cap(c_a), veh/h 511 926 950 595 963 950 558 0 0 476 0 529
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.4 0.0 0.0 7.6 8.2 8.2 19.6 0.0 0.0 21.1 0.0 19.5
Incr Delay (d2), s/veh 0.7 0.5 0.5 0.4 0.6 0.6 0.6 0.0 0.0 2.0 0.0 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.1 0.1 0.7 2.6 2.6 1.4 0.0 0.0 3.2 0.0 1.3
LnGrp Delay(d),s/veh 1.1 0.5 0.5 7.9 8.7 8.8 20.1 0.0 0.0 23.1 0.0 20.1
LnGrp LOS AAAAAAC C C
Approach Vol, veh/h 478 526 85 246
Approach Delay, s/veh 0.6 8.7 20.1 22.2
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 30.0 50.0 30.0 50.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 24.5 45.5 24.5 45.5
Max Q Clear Time (g_c+I1), s 10.0 8.7 4.9 7.5
Green Ext Time (p_c), s 1.1 4.1 1.2 4.1
Intersection Summary
HCM 2010 Ctrl Delay 9.0
HCM 2010 LOS A
Timing Report, Sorted By Phase Long Bkgrd PM
37: Mathews/Walnut & Mountain
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 30 50 30 50
Maximum Split (%) 37.5% 62.5% 37.5% 62.5%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 68 18 68 18
End Time (s) 18 68 18 68
Yield/Force Off (s) 12.5 63.5 12.5 63.5
Yield/Force Off 170(s) 75.5 53.5 75.5 53.5
Local Start Time (s) 0 30 0 30
Local Yield (s) 24.5 75.5 24.5 75.5
Local Yield 170(s) 7.5 65.5 7.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 68 (85%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 50 490 20 280 595 35 25 165 145 50 170 40
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1494 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 53 516 18 295 626 33 26 174 22 53 179 11
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 508 1937 67 576 1903 100 244 327 277 198 594 36
Arrive On Green 0.69 0.69 0.69 0.69 0.69 0.69 0.20 0.20 0.20 0.20 0.20 0.20
Sat Flow, veh/h 695 2798 97 780 2748 145 1067 1676 1421 1062 3045 186
Grp Volume(v), veh/h 53 261 273 295 324 335 26 174 22 53 93 97
Grp Sat Flow(s),veh/h/ln 695 1419 1476 780 1422 1471 1067 1676 1421 1062 1593 1638
Q Serve(g_s), s 2.6 5.6 5.6 18.4 7.3 7.3 1.7 7.5 1.0 3.8 4.0 4.1
Cycle Q Clear(g_c), s 9.9 5.6 5.6 23.9 7.3 7.3 5.8 7.5 1.0 11.2 4.0 4.1
Prop In Lane 1.00 0.07 1.00 0.10 1.00 1.00 1.00 0.11
Lane Grp Cap(c), veh/h 508 982 1022 576 984 1018 244 327 277 198 311 319
V/C Ratio(X) 0.10 0.27 0.27 0.51 0.33 0.33 0.11 0.53 0.08 0.27 0.30 0.30
Avail Cap(c_a), veh/h 508 982 1022 576 984 1018 336 472 400 290 448 461
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.9 4.6 4.6 9.2 4.9 4.9 30.0 28.9 26.3 34.0 27.5 27.5
Incr Delay (d2), s/veh 0.4 0.7 0.6 3.2 0.9 0.9 0.2 1.3 0.1 0.7 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 2.4 2.5 4.4 3.0 3.1 0.5 3.6 0.4 1.1 1.8 1.9
LnGrp Delay(d),s/veh 7.3 5.3 5.3 12.4 5.8 5.8 30.2 30.3 26.4 34.7 28.1 28.1
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 587 954 222 243
Approach Delay, s/veh 5.5 7.8 29.9 29.5
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 59.9 20.1 59.9 20.1
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 11.9 9.5 25.9 13.2
Green Ext Time (p_c), s 8.2 1.3 7.3 1.1
Intersection Summary
HCM 2010 Ctrl Delay 12.2
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 50 630 70 235 565 45 40 245 325 75 280 65
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 53 663 66 247 595 41 42 258 161 79 295 39
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 437 1593 158 394 1644 113 269 467 390 217 783 102
Arrive On Green 0.61 0.61 0.61 0.61 0.61 0.61 0.28 0.28 0.28 0.28 0.28 0.28
Sat Flow, veh/h 696 2614 260 638 2698 186 929 1676 1400 862 2815 367
Grp Volume(v), veh/h 53 361 368 247 313 323 42 258 161 79 165 169
Grp Sat Flow(s),veh/h/ln 696 1426 1448 638 1423 1462 929 1676 1400 862 1593 1590
Q Serve(g_s), s 3.3 10.6 10.6 26.5 8.8 8.9 3.1 10.5 7.5 6.9 6.7 6.9
Cycle Q Clear(g_c), s 12.2 10.6 10.6 37.1 8.8 8.9 9.9 10.5 7.5 17.4 6.7 6.9
Prop In Lane 1.00 0.18 1.00 0.13 1.00 1.00 1.00 0.23
Lane Grp Cap(c), veh/h 437 869 882 394 867 890 269 467 390 217 443 442
V/C Ratio(X) 0.12 0.42 0.42 0.63 0.36 0.36 0.16 0.55 0.41 0.36 0.37 0.38
Avail Cap(c_a), veh/h 437 869 882 394 867 890 318 555 464 262 528 527
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00
Uniform Delay (d), s/veh 10.9 8.2 8.2 17.9 7.8 7.8 27.3 24.6 23.5 32.0 23.2 23.3
Incr Delay (d2), s/veh 0.6 1.5 1.5 7.4 1.2 1.1 0.3 1.0 0.7 1.0 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 4.5 4.5 5.4 3.7 3.8 0.8 5.0 3.0 1.7 3.0 3.1
LnGrp Delay(d),s/veh 11.5 9.6 9.6 25.3 9.0 9.0 27.6 25.6 24.2 33.1 23.8 23.8
LnGrp LOS B A A C A A CCCCCC
Approach Vol, veh/h 782 883 461 413
Approach Delay, s/veh 9.8 13.6 25.3 25.6
Approach LOS A B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 53.2 26.8 53.2 26.8
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 14.2 12.5 39.1 19.4
Green Ext Time (p_c), s 9.2 2.8 2.9 1.9
Intersection Summary
HCM 2010 Ctrl Delay 16.5
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Bkgrd PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Long Bkgrd AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Intersection
Int Delay, s/veh 0.2
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 455 10 0 580 5 0 0 10 0 0 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 479 11 0 611 5 0 0 11 0 0 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 616 0 0 489 0 0 789 1100 484 1097 1102 308
Stage 1 - - - - - - 484 484 - 613 613 -
Stage 2 - - - - - - 305 616 - 484 489 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 960 - - 1074 - - 294 212 582 179 211 689
Stage 1 - - - - - - 563 551 - 447 482 -
Stage 2 - - - - - - 680 481 - 563 548 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 960 - - 1074 - - 290 212 582 176 211 689
Mov Cap-2 Maneuver - - - - - - 290 212 - 176 211 -
Stage 1 - - - - - - 563 551 - 447 482 -
Stage 2 - - - - - - 670 481 - 553 548 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 11.3 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 582 1074 - - 960 - - 689
HCM Lane V/C Ratio 0.018 ------ 0.015
HCM Control Delay (s) 11.3 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Long Bkgrd AM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.997 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1857 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1857 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 362 191
Travel Time (s) 10.9 11.7 8.2 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 575 10 0 620 5 0 0 25 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 605 11 0 653 5 0 0 26 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 658 0 0 616 0 0 937 1269 611 1279 1271 329
Stage 1 - - - - - - 611 611 - 655 655 -
Stage 2 - - - - - - 326 658 - 624 616 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 926 - - 964 - - 232 168 493 133 167 667
Stage 1 - - - - - - 480 483 - 422 462 -
Stage 2 - - - - - - 661 460 - 472 481 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 926 - - 964 - - 230 168 493 126 167 667
Mov Cap-2 Maneuver - - - - - - 230 168 - 126 167 -
Stage 1 - - - - - - 480 483 - 422 462 -
Stage 2 - - - - - - 656 460 - 447 481 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 12.7 10.4
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 493 964 - - 926 - - 667
HCM Lane V/C Ratio 0.053 ------ 0.008
HCM Control Delay (s) 12.7 0 - - 0 - - 10.4
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0
Lanes and Geometrics Long Bkgrd PM
1: Chestnut/Driveway & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1859 0 0 3536 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1859 0 0 3536 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 314 199
Travel Time (s) 10.6 12.0 7.1 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 470 10 25 510 70 10 25 25 50 35 30
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1491 1642 1676 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 495 11 26 537 67 11 26 3 53 37 1
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 555 1037 23 543 1829 227 107 212 21 308 302 232
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 730 1452 32 800 2562 319 277 1176 118 1172 1676 1286
Grp Volume(v), veh/h 26 0 506 26 299 305 40 0 0 53 37 1
Grp Sat Flow(s),veh/h/ln 730 0 1485 800 1432 1449 1572 0 0 1172 1676 1286
Q Serve(g_s), s 1.1 0.0 11.8 1.2 6.1 6.1 0.0 0.0 0.0 1.1 1.5 0.1
Cycle Q Clear(g_c), s 7.2 0.0 11.8 13.0 6.1 6.1 1.6 0.0 0.0 2.6 1.5 0.1
Prop In Lane 1.00 0.02 1.00 0.22 0.27 0.07 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 1060 543 1022 1034 340 0 0 308 302 232
V/C Ratio(X) 0.05 0.00 0.48 0.05 0.29 0.29 0.12 0.00 0.00 0.17 0.12 0.00
Avail Cap(c_a), veh/h 555 0 1060 543 1022 1034 596 0 0 507 587 450
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.93 0.00 0.93 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 5.4 0.0 5.0 7.8 4.1 4.1 27.5 0.0 0.0 27.9 27.5 26.9
Incr Delay (d2), s/veh 0.1 0.0 1.4 0.2 0.7 0.7 0.2 0.0 0.0 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 5.2 0.3 2.5 2.6 0.8 0.0 0.0 1.0 0.7 0.0
LnGrp Delay(d),s/veh 5.6 0.0 6.4 8.0 4.9 4.9 27.7 0.0 0.0 28.2 27.7 26.9
LnGrp LOS A AAAAC CCC
Approach Vol, veh/h 532 630 40 91
Approach Delay, s/veh 6.4 5.0 27.7 28.0
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.6 18.4 61.6 18.4
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 13.8 3.6 15.0 4.6
Green Ext Time (p_c), s 4.8 0.4 4.7 0.4
Intersection Summary
HCM 2010 Ctrl Delay 7.9
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Bkgrd AM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lb am.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 535 30 35 540 90 35 50 80 140 70 60
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.96 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1495 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 563 30 37 568 79 37 53 38 147 74 11
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 489 949 51 422 1699 236 123 159 95 336 366 280
Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 687 1405 75 724 2515 349 297 729 433 1119 1676 1285
Grp Volume(v), veh/h 26 0 593 37 323 324 128 0 0 147 74 11
Grp Sat Flow(s),veh/h/ln 687 0 1480 724 1432 1432 1459 0 0 1119 1676 1285
Q Serve(g_s), s 1.3 0.0 17.4 2.3 7.5 7.6 0.8 0.0 0.0 3.8 2.9 0.5
Cycle Q Clear(g_c), s 8.9 0.0 17.4 19.7 7.5 7.6 5.5 0.0 0.0 9.4 2.9 0.5
Prop In Lane 1.00 0.05 1.00 0.24 0.29 0.30 1.00 1.00
Lane Grp Cap(c), veh/h 489 0 1000 422 967 967 377 0 0 336 366 280
V/C Ratio(X) 0.05 0.00 0.59 0.09 0.33 0.34 0.34 0.00 0.00 0.44 0.20 0.04
Avail Cap(c_a), veh/h 489 0 1000 422 967 967 439 0 0 385 440 337
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.85 0.00 0.85 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.3 0.0 7.0 12.4 5.4 5.4 26.6 0.0 0.0 28.1 25.6 24.7
Incr Delay (d2), s/veh 0.2 0.0 2.2 0.4 0.9 0.9 0.5 0.0 0.0 0.9 0.3 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 7.5 0.5 3.2 3.2 2.5 0.0 0.0 3.0 1.4 0.2
LnGrp Delay(d),s/veh 7.5 0.0 9.2 12.8 6.4 6.4 27.1 0.0 0.0 29.0 25.8 24.7
LnGrp LOS A ABAAC CCC
Approach Vol, veh/h 619 684 128 232
Approach Delay, s/veh 9.2 6.7 27.1 27.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.5 21.5 58.5 21.5
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 19.4 7.5 21.7 11.4
Green Ext Time (p_c), s 5.7 1.1 5.6 0.9
Intersection Summary
HCM 2010 Ctrl Delay 12.1
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Bkgrd PM
39: Linden & Jefferson (State 14)
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lb pm.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX F
HCM 2010 Signalized Intersection Summary Short Total AM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 29 130 57 48 211 28 0 498 77 23 547 34
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 32 144 63 53 234 31 0 553 86 26 608 38
Adj No. of Lanes 120120020020
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222022222
Cap, veh/h 343 693 287 368 899 117 0 1566 243 84 1617 99
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 988 2173 901 1040 2821 368 0 2838 427 62 2844 175
Grp Volume(v), veh/h 32 103 104 53 131 134 0 319 320 348 0 324
Grp Sat Flow(s),veh/h/ln 988 1593 1481 1040 1593 1597 0 1593 1588 1591 0 1490
Q Serve(g_s), s 2.0 3.8 4.1 3.1 4.9 5.0 0.0 8.6 8.7 0.0 0.0 0.0
Cycle Q Clear(g_c), s 7.0 3.8 4.1 7.2 4.9 5.0 0.0 8.6 8.7 0.0 0.0 0.0
Prop In Lane 1.00 0.61 1.00 0.23 0.00 0.27 0.07 0.12
Lane Grp Cap(c), veh/h 343 508 472 368 508 509 0 906 903 953 0 848
V/C Ratio(X) 0.09 0.20 0.22 0.14 0.26 0.26 0.00 0.35 0.35 0.37 0.00 0.38
Avail Cap(c_a), veh/h 343 508 472 368 508 509 0 906 903 953 0 848
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 22.9 19.9 20.0 22.6 20.2 20.3 0.0 9.3 9.3 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.9 1.1 0.8 1.2 1.3 0.0 1.1 1.1 1.1 0.0 1.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 1.8 1.8 1.0 2.3 2.4 0.0 4.0 4.0 0.3 0.0 0.3
LnGrp Delay(d),s/veh 23.4 20.8 21.0 23.4 21.4 21.5 0.0 10.4 10.4 1.1 0.0 1.3
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 239 318 639 672
Approach Delay, s/veh 21.2 21.8 10.4 1.2
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 9.0 10.7 9.2
Green Ext Time (p_c), s 5.4 1.8 5.3 1.8
Intersection Summary
HCM 2010 Ctrl Delay 10.4
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total AM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Short Total PM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 45 208 73 114 285 69 0 775 103 19 797 124
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.94 0.86 0.93 0.86 1.00 0.91 0.99 0.83
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 48 224 78 123 306 74 0 833 111 20 857 133
Adj No. of Lanes 120120020020
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222022222
Cap, veh/h 275 719 237 305 788 185 0 1585 211 61 1457 223
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 0.76 0.76 0.76
Sat Flow, veh/h 846 2256 743 900 2474 580 0 2871 371 25 2562 393
Grp Volume(v), veh/h 48 154 148 123 194 186 0 476 468 550 0 460
Grp Sat Flow(s),veh/h/ln 846 1593 1406 900 1593 1461 0 1593 1566 1622 0 1359
Q Serve(g_s), s 3.8 5.8 6.4 9.6 7.5 8.0 0.0 14.7 14.7 0.0 0.0 12.0
Cycle Q Clear(g_c), s 11.7 5.8 6.4 16.0 7.5 8.0 0.0 14.7 14.7 11.3 0.0 12.0
Prop In Lane 1.00 0.53 1.00 0.40 0.00 0.24 0.04 0.29
Lane Grp Cap(c), veh/h 275 508 448 305 508 466 0 906 891 969 0 773
V/C Ratio(X) 0.17 0.30 0.33 0.40 0.38 0.40 0.00 0.53 0.53 0.57 0.00 0.60
Avail Cap(c_a), veh/h 275 508 448 305 508 466 0 906 891 969 0 773
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.9 20.6 20.7 26.8 21.1 21.3 0.0 10.6 10.6 5.6 0.0 5.7
Incr Delay (d2), s/veh 1.4 1.5 2.0 3.9 2.2 2.6 0.0 2.2 2.2 2.4 0.0 3.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 2.8 2.7 2.7 3.6 3.5 0.0 6.9 6.8 5.8 0.0 5.0
LnGrp Delay(d),s/veh 27.2 22.1 22.7 30.8 23.3 23.8 0.0 12.8 12.8 8.0 0.0 9.0
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 350 503 944 1010
Approach Delay, s/veh 23.1 25.3 12.8 8.5
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 14.0 13.7 16.7 18.0
Green Ext Time (p_c), s 9.7 2.8 9.5 2.1
Intersection Summary
HCM 2010 Ctrl Delay 14.8
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total PM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Roundabout Short Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Intersection
Intersection Delay, s/veh 7.1
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 266 389 38 170
Demand Flow Rate, veh/h 271 397 38 174
Vehicles Circulating, veh/h 190 78 366 331
Vehicles Exiting, veh/h 315 326 95 138
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 17 3 5 4
Ped Cap Adj 0.998 1.000 0.999 0.999
Approach Delay, s/veh 7.0 7.6 5.1 6.9
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 271 397 38 174
Cap Entry Lane, veh/h 934 1045 784 812
Entry HV Adj Factor 0.983 0.979 0.989 0.977
Flow Entry, veh/h 266 389 38 170
Cap Entry, veh/h 916 1023 774 792
V/C Ratio 0.291 0.380 0.049 0.215
Control Delay, s/veh 7.0 7.6 5.1 6.9
LOSAAAA
95th %tile Queue, veh 1201
HCM 2010 Roundabout Short Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Intersection
Intersection Delay, s/veh
Intersection LOS
Approach SW
Entry Lanes 1
Conflicting Circle Lanes 1
Adj Approach Flow, veh/h 42
Demand Flow Rate, veh/h 42
Vehicles Circulating, veh/h 427
Vehicles Exiting, veh/h 48
Follow-Up Headway, s 3.186
Ped Vol Crossing Leg, #/h 0
Ped Cap Adj 1.000
Approach Delay, s/veh 5.5
Approach LOS A
Lane Left
Designated Moves LR
Assumed Moves LR
RT Channelized
Lane Util 1.000
Critical Headway, s 5.193
Entry Flow, veh/h 42
Cap Entry Lane, veh/h 737
Entry HV Adj Factor 0.993
Flow Entry, veh/h 42
Cap Entry, veh/h 732
V/C Ratio 0.057
Control Delay, s/veh 5.5
LOS A
95th %tile Queue, veh 0
Lanes and Geometrics Short Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Lane Group EBL2 EBL EBT EBR WBL WBT WBR WBR2 NBL NBT NBR2 SBL2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 8 12 13 8 12 8 16 8 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 115 0 0
Storage Lanes 0 0 0 0 0
Taper Length (ft) 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.990 0.966 0.964
Flt Protected 0.992 0.997 0.992
Satd. Flow (prot) 0 0 1646 0 0 1668 0 0 0 1817 0 0
Flt Permitted 0.992 0.997 0.992
Satd. Flow (perm) 0 0 1646 0 0 1668 0 0 0 1817 0 0
Link Speed (mph) 30 30 25
Link Distance (ft) 817 738 1572
Travel Time (s) 18.6 16.8 42.9
Intersection Summary
Area Type: CBD
Lane Group SBL SBT SBR SWL2 SWL SWR SWR2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 11 14 8 12 12 12 12
Grade (%) 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.979 0.916
Flt Protected 0.973 0.981
Satd. Flow (prot) 0 1703 0 0 1506 0 0
Flt Permitted 0.973 0.981
Satd. Flow (perm) 0 1703 0 0 1506 0 0
Link Speed (mph) 25 30
Link Distance (ft) 497 534
Travel Time (s) 13.6 12.1
Intersection Summary
HCM 2010 Roundabout Short Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Intersection
Intersection Delay, s/veh 11.1
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 451 527 111 264
Demand Flow Rate, veh/h 460 537 113 269
Vehicles Circulating, veh/h 299 158 616 485
Vehicles Exiting, veh/h 455 571 143 216
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 28 21 35 43
Ped Cap Adj 0.996 0.997 0.995 0.994
Approach Delay, s/veh 12.4 11.3 8.3 10.6
Approach LOS BBAB
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 460 537 113 269
Cap Entry Lane, veh/h 838 965 610 696
Entry HV Adj Factor 0.982 0.981 0.983 0.981
Flow Entry, veh/h 452 527 111 264
Cap Entry, veh/h 820 943 597 678
V/C Ratio 0.551 0.558 0.186 0.389
Control Delay, s/veh 12.4 11.3 8.3 10.6
LOSBBAB
95th %tile Queue, veh 3412
HCM 2010 Roundabout Short Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Intersection
Intersection Delay, s/veh
Intersection LOS
Approach SW
Entry Lanes 1
Conflicting Circle Lanes 1
Adj Approach Flow, veh/h 51
Demand Flow Rate, veh/h 51
Vehicles Circulating, veh/h 650
Vehicles Exiting, veh/h 45
Follow-Up Headway, s 3.186
Ped Vol Crossing Leg, #/h 0
Ped Cap Adj 1.000
Approach Delay, s/veh 7.2
Approach LOS A
Lane Left
Designated Moves LR
Assumed Moves LR
RT Channelized
Lane Util 1.000
Critical Headway, s 5.193
Entry Flow, veh/h 51
Cap Entry Lane, veh/h 590
Entry HV Adj Factor 0.992
Flow Entry, veh/h 51
Cap Entry, veh/h 585
V/C Ratio 0.086
Control Delay, s/veh 7.2
LOS A
95th %tile Queue, veh 0
Lanes and Geometrics Short Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Lane Group EBL2 EBL EBT EBR WBL WBT WBR WBR2 NBL NBT NBR2 SBL2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 8 12 13 8 12 8 16 8 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 115 0 0
Storage Lanes 0 0 0 0 0
Taper Length (ft) 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.993 0.975 0.940
Flt Protected 0.990 0.994 0.994
Satd. Flow (prot) 0 0 1648 0 0 1679 0 0 0 1775 0 0
Flt Permitted 0.990 0.994 0.994
Satd. Flow (perm) 0 0 1648 0 0 1679 0 0 0 1775 0 0
Link Speed (mph) 30 30 25
Link Distance (ft) 817 733 1572
Travel Time (s) 18.6 16.7 42.9
Intersection Summary
Area Type: CBD
Lane Group SBL SBT SBR SWL2 SWL SWR SWR2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 11 14 8 12 12 12 12
Grade (%) 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.974 0.918
Flt Protected 0.971 0.981
Satd. Flow (prot) 0 1691 0 0 1510 0 0
Flt Permitted 0.971 0.981
Satd. Flow (perm) 0 1691 0 0 1510 0 0
Link Speed (mph) 25 30
Link Distance (ft) 347 536
Travel Time (s) 9.5 12.2
Intersection Summary
HCM 2010 Signalized Intersection Summary Short Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 45 425 15 259 511 29 22 146 137 43 153 35
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1493 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 52 494 15 301 594 29 26 170 9 50 178 8
Adj No. of Lanes 120120111120
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 532 1961 59 595 1925 94 240 318 269 196 588 26
Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.19 0.19 0.19 0.19 0.19 0.19
Sat Flow, veh/h 718 2810 85 798 2759 135 1071 1676 1420 1078 3102 139
Grp Volume(v), veh/h 52 249 260 301 306 317 26 170 9 50 91 95
Grp Sat Flow(s),veh/h/ln 718 1418 1477 798 1421 1472 1071 1676 1420 1078 1593 1648
Q Serve(g_s), s 2.4 5.1 5.2 17.8 6.6 6.6 1.7 7.3 0.4 3.5 3.9 4.0
Cycle Q Clear(g_c), s 9.0 5.1 5.2 22.9 6.6 6.6 5.7 7.3 0.4 10.8 3.9 4.0
Prop In Lane 1.00 0.06 1.00 0.09 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 532 989 1031 595 992 1027 240 318 269 196 302 312
V/C Ratio(X) 0.10 0.25 0.25 0.51 0.31 0.31 0.11 0.53 0.03 0.26 0.30 0.30
Avail Cap(c_a), veh/h 532 989 1031 595 992 1027 338 472 400 295 448 463
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.4 4.4 4.4 8.6 4.7 4.7 30.3 29.2 26.4 34.1 27.9 27.9
Incr Delay (d2), s/veh 0.4 0.6 0.6 3.0 0.8 0.8 0.2 1.4 0.0 0.7 0.6 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 2.2 2.3 4.4 2.8 2.9 0.5 3.5 0.2 1.1 1.8 1.8
LnGrp Delay(d),s/veh 6.8 5.0 5.0 11.7 5.5 5.4 30.5 30.6 26.5 34.8 28.4 28.4
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 561 924 205 236
Approach Delay, s/veh 5.2 7.5 30.4 29.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 60.3 19.7 60.3 19.7
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 11.0 9.3 24.9 12.8
Green Ext Time (p_c), s 7.8 1.2 7.0 1.0
Intersection Summary
HCM 2010 Ctrl Delay 12.0
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 43 544 59 217 488 38 34 218 291 65 248 58
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 47 591 55 236 530 36 37 237 91 71 270 31
Adj No. of Lanes 120120111120
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 488 1653 153 448 1695 115 264 435 363 219 744 84
Arrive On Green 0.63 0.63 0.63 0.63 0.63 0.63 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 742 2632 244 689 2699 183 957 1676 1399 935 2866 325
Grp Volume(v), veh/h 47 320 326 236 279 287 37 237 91 71 149 152
Grp Sat Flow(s),veh/h/ln 742 1426 1451 689 1422 1460 957 1676 1399 935 1593 1599
Q Serve(g_s), s 2.5 8.6 8.6 20.0 7.3 7.3 2.6 9.8 4.1 5.7 6.1 6.2
Cycle Q Clear(g_c), s 9.8 8.6 8.6 28.7 7.3 7.3 8.9 9.8 4.1 15.4 6.1 6.2
Prop In Lane 1.00 0.17 1.00 0.13 1.00 1.00 1.00 0.20
Lane Grp Cap(c), veh/h 488 895 911 448 893 916 264 435 363 219 414 415
V/C Ratio(X) 0.10 0.36 0.36 0.53 0.31 0.31 0.14 0.54 0.25 0.32 0.36 0.37
Avail Cap(c_a), veh/h 488 895 911 448 893 916 332 555 463 286 528 530
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.2 7.1 7.1 14.0 6.9 6.9 27.9 25.5 23.4 32.2 24.2 24.2
Incr Delay (d2), s/veh 0.4 1.1 1.1 4.4 0.9 0.9 0.2 1.1 0.4 0.9 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 3.7 3.7 4.3 3.0 3.1 0.7 4.6 1.6 1.5 2.7 2.8
LnGrp Delay(d),s/veh 9.6 8.3 8.2 18.4 7.8 7.8 28.1 26.6 23.8 33.0 24.7 24.8
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 693 802 365 372
Approach Delay, s/veh 8.3 10.9 26.1 26.3
Approach LOS A B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 54.7 25.3 54.7 25.3
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 11.8 11.8 30.7 17.4
Green Ext Time (p_c), s 7.8 2.3 5.6 1.8
Intersection Summary
HCM 2010 Ctrl Delay 15.2
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Short Total AM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Intersection
Int Delay, s/veh 0.2
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 393 22 0 496 4 0 0 10 0 0 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 85 85 91 91 85 85 85 91 85 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 432 26 0 545 4 0 0 12 0 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 549 0 0 458 0 0 718 994 445 992 1005 275
Stage 1 - - - - - - 445 445 - 547 547 -
Stage 2 - - - - - - 273 549 - 445 458 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 1017 - - 1103 - - 330 244 612 212 241 723
Stage 1 - - - - - - 591 574 - 490 517 -
Stage 2 - - - - - - 710 516 - 591 566 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1017 - - 1103 - - 326 244 612 208 241 723
Mov Cap-2 Maneuver - - - - - - 326 244 - 208 241 -
Stage 1 - - - - - - 591 574 - 490 517 -
Stage 2 - - - - - - 702 516 - 580 566 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 11 10
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 612 1103 - - 1017 - - 723
HCM Lane V/C Ratio 0.019 ------ 0.011
HCM Control Delay (s) 11 0 - - 0 - - 10
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Short Total AM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.992 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1848 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1848 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 534 191
Travel Time (s) 10.9 11.7 12.1 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 495 21 0 534 1 0 0 25 0 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 582 25 0 628 1 0 0 29 0 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 629 0 0 607 0 0 909 1224 595 1238 1236 315
Stage 1 - - - - - - 595 595 - 629 629 -
Stage 2 - - - - - - 314 629 - 609 607 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 949 - - 971 - - 243 178 503 142 175 682
Stage 1 - - - - - - 490 492 - 438 474 -
Stage 2 - - - - - - 672 474 - 481 485 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 949 - - 971 - - 242 178 503 134 175 682
Mov Cap-2 Maneuver - - - - - - 242 178 - 134 175 -
Stage 1 - - - - - - 490 492 - 438 474 -
Stage 2 - - - - - - 670 474 - 453 485 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 12.6 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 503 971 - - 949 - - 682
HCM Lane V/C Ratio 0.058 ------ 0.003
HCM Control Delay (s) 12.6 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0
Lanes and Geometrics Short Total PM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.994 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1852 0 0 3539 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1852 0 0 3539 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 536 199
Travel Time (s) 10.6 12.0 12.2 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Short Total AM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 20 415 8 22 440 60 7 22 21 45 30 24
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1490 1642 1676 1507 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 21 441 8 23 468 57 7 23 3 48 32 0
Adj No. of Lanes 110120010111
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 601 1043 19 588 1837 223 88 228 26 306 300 255
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.00
Sat Flow, veh/h 785 1459 26 843 2571 312 188 1274 146 1174 1676 1425
Grp Volume(v), veh/h 21 0 449 23 260 265 33 0 0 48 32 0
Grp Sat Flow(s),veh/h/ln 785 0 1485 843 1432 1450 1609 0 0 1174 1676 1425
Q Serve(g_s), s 0.8 0.0 9.9 0.9 5.1 5.1 0.0 0.0 0.0 1.1 1.3 0.0
Cycle Q Clear(g_c), s 5.9 0.0 9.9 10.8 5.1 5.1 1.3 0.0 0.0 2.4 1.3 0.0
Prop In Lane 1.00 0.02 1.00 0.21 0.21 0.09 1.00 1.00
Lane Grp Cap(c), veh/h 601 0 1062 588 1024 1037 342 0 0 306 300 255
V/C Ratio(X) 0.03 0.00 0.42 0.04 0.25 0.26 0.10 0.00 0.00 0.16 0.11 0.00
Avail Cap(c_a), veh/h 601 0 1062 588 1024 1037 606 0 0 506 587 499
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.91 0.00 0.91 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 5.0 0.0 4.7 6.9 4.0 4.0 27.5 0.0 0.0 27.9 27.5 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.1 0.1 0.6 0.6 0.1 0.0 0.0 0.2 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 4.3 0.2 2.1 2.2 0.6 0.0 0.0 0.9 0.6 0.0
LnGrp Delay(d),s/veh 5.1 0.0 5.8 7.0 4.6 4.6 27.6 0.0 0.0 28.1 27.6 0.0
LnGrp LOS A AAAAC CC
Approach Vol, veh/h 470 548 33 80
Approach Delay, s/veh 5.8 4.7 27.6 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.7 18.3 61.7 18.3
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 11.9 3.3 12.8 4.4
Green Ext Time (p_c), s 4.0 0.3 4.0 0.3
Intersection Summary
HCM 2010 Ctrl Delay 7.4
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total AM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 55
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Total PM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 19 470 25 32 467 79 30 47 68 125 61 53
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.95 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1494 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 22 553 27 38 549 75 35 55 31 147 72 6
Adj No. of Lanes 110120010111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 502 956 47 434 1708 233 123 173 82 338 363 278
Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 701 1412 69 733 2522 343 300 797 378 1122 1676 1284
Grp Volume(v), veh/h 22 0 580 38 311 313 121 0 0 147 72 6
Grp Sat Flow(s),veh/h/ln 701 0 1481 733 1432 1433 1475 0 0 1122 1676 1284
Q Serve(g_s), s 1.1 0.0 16.6 2.3 7.2 7.2 0.4 0.0 0.0 3.9 2.8 0.3
Cycle Q Clear(g_c), s 8.3 0.0 16.6 18.9 7.2 7.2 5.1 0.0 0.0 9.0 2.8 0.3
Prop In Lane 1.00 0.05 1.00 0.24 0.29 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 502 0 1003 434 970 971 377 0 0 338 363 278
V/C Ratio(X) 0.04 0.00 0.58 0.09 0.32 0.32 0.32 0.00 0.00 0.43 0.20 0.02
Avail Cap(c_a), veh/h 502 0 1003 434 970 971 443 0 0 390 440 337
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.82 0.00 0.82 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.0 0.0 6.9 11.9 5.3 5.3 26.5 0.0 0.0 28.0 25.7 24.7
Incr Delay (d2), s/veh 0.1 0.0 2.0 0.4 0.9 0.9 0.5 0.0 0.0 0.9 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 7.2 0.5 3.0 3.0 2.3 0.0 0.0 3.0 1.3 0.1
LnGrp Delay(d),s/veh 7.2 0.0 8.9 12.3 6.2 6.2 27.0 0.0 0.0 28.9 25.9 24.7
LnGrp LOS A ABAAC CCC
Approach Vol, veh/h 602 662 121 225
Approach Delay, s/veh 8.8 6.6 27.0 27.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.7 21.3 58.7 21.3
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 18.6 7.1 20.9 11.0
Green Ext Time (p_c), s 5.5 1.1 5.4 0.9
Intersection Summary
HCM 2010 Ctrl Delay 11.9
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total PM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX G
HCM 2010 Signalized Intersection Summary Short Total AM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 29 130 57 38 211 28 0 504 71 23 557 34
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 32 144 63 42 234 31 0 560 79 26 619 38
Adj No. of Lanes 120120020020
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222022222
Cap, veh/h 343 693 287 368 899 117 0 1590 224 83 1622 98
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 988 2173 901 1040 2821 368 0 2879 393 61 2852 172
Grp Volume(v), veh/h 32 103 104 42 131 134 0 318 321 354 0 329
Grp Sat Flow(s),veh/h/ln 988 1593 1481 1040 1593 1597 0 1593 1595 1593 0 1492
Q Serve(g_s), s 2.0 3.8 4.1 2.5 4.9 5.0 0.0 8.6 8.7 0.0 0.0 0.0
Cycle Q Clear(g_c), s 7.0 3.8 4.1 6.6 4.9 5.0 0.0 8.6 8.7 0.0 0.0 0.0
Prop In Lane 1.00 0.61 1.00 0.23 0.00 0.25 0.07 0.12
Lane Grp Cap(c), veh/h 343 508 472 368 508 509 0 906 907 954 0 849
V/C Ratio(X) 0.09 0.20 0.22 0.11 0.26 0.26 0.00 0.35 0.35 0.37 0.00 0.39
Avail Cap(c_a), veh/h 343 508 472 368 508 509 0 906 907 954 0 849
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 22.9 19.9 20.0 22.4 20.2 20.3 0.0 9.3 9.3 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.9 1.1 0.6 1.2 1.3 0.0 1.1 1.1 1.1 0.0 1.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 1.8 1.8 0.8 2.3 2.4 0.0 4.0 4.0 0.3 0.0 0.3
LnGrp Delay(d),s/veh 23.4 20.8 21.0 23.0 21.4 21.5 0.0 10.4 10.4 1.1 0.0 1.3
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 239 307 639 683
Approach Delay, s/veh 21.2 21.7 10.4 1.2
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 9.0 10.7 8.6
Green Ext Time (p_c), s 5.5 1.8 5.4 1.8
Intersection Summary
HCM 2010 Ctrl Delay 10.3
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total AM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Short Total PM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 45 208 73 101 285 69 0 781 97 19 810 124
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.94 0.86 0.93 0.86 1.00 0.91 0.99 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 48 224 78 109 306 74 0 840 104 20 871 133
Adj No. of Lanes 120120020020
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 222222022222
Cap, veh/h 275 719 237 305 788 185 0 1602 198 61 1482 224
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 0.76 0.76 0.76
Sat Flow, veh/h 846 2256 743 900 2474 580 0 2901 349 25 2605 393
Grp Volume(v), veh/h 48 154 148 109 194 186 0 475 469 550 0 474
Grp Sat Flow(s),veh/h/ln 846 1593 1406 900 1593 1461 0 1593 1573 1622 0 1402
Q Serve(g_s), s 3.8 5.8 6.4 8.4 7.5 8.0 0.0 14.7 14.7 0.0 0.0 12.0
Cycle Q Clear(g_c), s 11.7 5.8 6.4 14.8 7.5 8.0 0.0 14.7 14.7 11.3 0.0 12.0
Prop In Lane 1.00 0.53 1.00 0.40 0.00 0.22 0.04 0.28
Lane Grp Cap(c), veh/h 275 508 448 305 508 466 0 906 895 969 0 797
V/C Ratio(X) 0.17 0.30 0.33 0.36 0.38 0.40 0.00 0.52 0.52 0.57 0.00 0.59
Avail Cap(c_a), veh/h 275 508 448 305 508 466 0 906 895 969 0 797
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.9 20.6 20.7 26.4 21.1 21.3 0.0 10.6 10.6 5.6 0.0 5.7
Incr Delay (d2), s/veh 1.4 1.5 2.0 3.2 2.2 2.6 0.0 2.2 2.2 2.4 0.0 3.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 2.8 2.7 2.4 3.6 3.5 0.0 6.9 6.8 5.8 0.0 5.1
LnGrp Delay(d),s/veh 27.2 22.1 22.7 29.6 23.3 23.8 0.0 12.8 12.8 8.0 0.0 8.9
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 350 489 944 1024
Approach Delay, s/veh 23.1 24.9 12.8 8.4
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 14.0 13.7 16.7 16.8
Green Ext Time (p_c), s 9.7 2.7 9.5 2.3
Intersection Summary
HCM 2010 Ctrl Delay 14.6
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total PM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Short Total AM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 33 174 16 22 228 60 5 19 9 79 41 22
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.99 0.97 0.99 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 38 202 9 26 265 35 6 22 3 92 48 7
Adj No. of Lanes 120120010110
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 222222222222
Cap, veh/h 544 1609 71 632 1522 198 140 471 60 562 565 82
Arrive On Green 1.00 1.00 1.00 0.52 0.52 0.52 0.38 0.38 0.38 0.38 0.38 0.38
Sat Flow, veh/h 965 3101 137 1046 2934 383 226 1235 157 1227 1481 216
Grp Volume(v), veh/h 38 103 108 26 148 152 31 0 0 92 0 55
Grp Sat Flow(s),veh/h/ln 965 1593 1646 1046 1656 1661 1618 0 0 1227 0 1697
Q Serve(g_s), s 0.3 0.0 0.0 1.0 3.8 3.9 0.0 0.0 0.0 2.8 0.0 1.7
Cycle Q Clear(g_c), s 4.2 0.0 0.0 1.0 3.8 3.9 0.9 0.0 0.0 3.7 0.0 1.7
Prop In Lane 1.00 0.08 1.00 0.23 0.19 0.10 1.00 0.13
Lane Grp Cap(c), veh/h 544 826 854 632 859 861 671 0 0 562 0 647
V/C Ratio(X) 0.07 0.12 0.13 0.04 0.17 0.18 0.05 0.00 0.00 0.16 0.00 0.09
Avail Cap(c_a), veh/h 544 826 854 632 859 861 671 0 0 562 0 647
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.2 0.0 0.0 9.5 10.2 10.2 15.6 0.0 0.0 16.4 0.0 15.8
Incr Delay (d2), s/veh 0.2 0.3 0.3 0.1 0.4 0.4 0.1 0.0 0.0 0.6 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.1 0.1 0.3 1.8 1.9 0.5 0.0 0.0 1.5 0.0 0.8
LnGrp Delay(d),s/veh 0.4 0.3 0.3 9.6 10.6 10.6 15.7 0.0 0.0 17.0 0.0 16.1
LnGrp LOS AAAABBB B B
Approach Vol, veh/h 249 326 31 147
Approach Delay, s/veh 0.3 10.5 15.7 16.7
Approach LOS ABBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 35.0 45.0 35.0 45.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 29.5 40.5 29.5 40.5
Max Q Clear Time (g_c+I1), s 5.7 6.2 2.9 5.9
Green Ext Time (p_c), s 0.6 2.0 0.6 2.0
Intersection Summary
HCM 2010 Ctrl Delay 8.6
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Total AM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 35 45 35 45
Maximum Split (%) 43.8% 56.3% 43.8% 56.3%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 79 44 79
End Time (s) 79 44 79 44
Yield/Force Off (s) 73.5 39.5 73.5 39.5
Yield/Force Off 170(s) 56.5 29.5 56.5 29.5
Local Start Time (s) 0 35 0 35
Local Yield (s) 29.5 75.5 29.5 75.5
Local Yield 170(s) 12.5 65.5 12.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 44 (55%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Short Total PM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 75 305 20 54 332 64 13 43 44 137 53 45
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.93 0.98 0.93 0.98 0.95 0.98 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 83 339 15 60 369 49 14 48 12 152 59 12
Adj No. of Lanes 120120010110
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, % 222222222222
Cap, veh/h 535 1800 79 613 1694 223 118 361 82 477 442 90
Arrive On Green 1.00 1.00 1.00 0.58 0.58 0.58 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 856 3097 136 900 2915 383 202 1133 258 1176 1387 282
Grp Volume(v), veh/h 83 174 180 60 208 210 74 0 0 152 0 71
Grp Sat Flow(s),veh/h/ln 856 1593 1641 900 1656 1642 1593 0 0 1176 0 1670
Q Serve(g_s), s 1.0 0.0 0.0 2.4 4.8 4.9 0.0 0.0 0.0 4.6 0.0 2.4
Cycle Q Clear(g_c), s 5.9 0.0 0.0 2.4 4.8 4.9 2.5 0.0 0.0 7.1 0.0 2.4
Prop In Lane 1.00 0.08 1.00 0.23 0.19 0.16 1.00 0.17
Lane Grp Cap(c), veh/h 535 926 954 613 963 954 561 0 0 477 0 532
V/C Ratio(X) 0.16 0.19 0.19 0.10 0.22 0.22 0.13 0.00 0.00 0.32 0.00 0.13
Avail Cap(c_a), veh/h 535 926 954 613 963 954 561 0 0 477 0 532
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.3 0.0 0.0 7.5 8.0 8.0 19.4 0.0 0.0 20.8 0.0 19.4
Incr Delay (d2), s/veh 0.6 0.4 0.4 0.3 0.5 0.5 0.5 0.0 0.0 1.8 0.0 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.1 0.1 0.6 2.3 2.4 1.2 0.0 0.0 2.8 0.0 1.2
LnGrp Delay(d),s/veh 0.9 0.4 0.4 7.8 8.5 8.6 19.9 0.0 0.0 22.6 0.0 19.9
LnGrp LOS AAAAAAB C B
Approach Vol, veh/h 437 478 74 223
Approach Delay, s/veh 0.5 8.5 19.9 21.7
Approach LOS A A B C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 30.0 50.0 30.0 50.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 24.5 45.5 24.5 45.5
Max Q Clear Time (g_c+I1), s 9.1 7.9 4.5 6.9
Green Ext Time (p_c), s 1.0 3.7 1.0 3.7
Intersection Summary
HCM 2010 Ctrl Delay 8.7
HCM 2010 LOS A
Timing Report, Sorted By Phase Short Total PM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 30 50 30 50
Maximum Split (%) 37.5% 62.5% 37.5% 62.5%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 68 18 68 18
End Time (s) 18 68 18 68
Yield/Force Off (s) 12.5 63.5 12.5 63.5
Yield/Force Off 170(s) 75.5 53.5 75.5 53.5
Local Start Time (s) 0 30 0 30
Local Yield (s) 24.5 75.5 24.5 75.5
Local Yield 170(s) 7.5 65.5 7.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 68 (85%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 TWSC Short Total AM
2: Mountain/Walnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Intersection
Int Delay, s/veh 1.3
Movement SEL SET NWT NWR SWL SWR
Vol, veh/h 0 0 112 24 0 22
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 20 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 132 28 0 26
Major/Minor Major2 Minor2
Conflicting Flow All - 0 132 132
Stage 1 - - 132 -
Stage 2 - - 0 -
Critical Hdwy - - 7.12 6.22
Critical Hdwy Stg 1 - - 6.12 -
Critical Hdwy Stg 2 - - - -
Follow-up Hdwy - - 3.518 3.318
Pot Cap-1 Maneuver - - 840 917
Stage 1 - - 871 -
Stage 2 - - - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 840 917
Mov Cap-2 Maneuver - - 840 -
Stage 1 - - 871 -
Stage 2 - - - -
Approach NW SW
HCM Control Delay, s 0 9
HCM LOS A
Minor Lane/Major Mvmt NWT NWRSWLn1
Capacity (veh/h) - - 917
HCM Lane V/C Ratio - - 0.028
HCM Control Delay (s) - - 9
HCM Lane LOS - - A
HCM 95th %tile Q(veh) - - 0.1
Lanes and Geometrics Short Total AM
2: Mountain/Walnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Lane Group SEL SET NWT NWR SWL SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 20 0 0
Storage Lanes 0 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.865
Flt Protected
Satd. Flow (prot) 0 0 1863 1583 0 1611
Flt Permitted
Satd. Flow (perm) 0 0 1863 1583 0 1611
Link Speed (mph) 30 30 30
Link Distance (ft) 166 98 362
Travel Time (s) 3.8 2.2 8.2
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Short Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 49 435 15 259 511 29 22 142 127 43 153 35
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1492 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 57 506 15 301 594 29 26 165 8 50 178 8
Adj No. of Lanes 120120111120
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 534 1970 58 591 1933 94 237 313 265 196 580 26
Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.19 0.19 0.19 0.19 0.19 0.19
Sat Flow, veh/h 718 2812 83 789 2759 135 1071 1676 1420 1084 3102 139
Grp Volume(v), veh/h 57 255 266 301 306 317 26 165 8 50 91 95
Grp Sat Flow(s),veh/h/ln 718 1418 1478 789 1421 1472 1071 1676 1420 1084 1593 1647
Q Serve(g_s), s 2.6 5.2 5.3 18.0 6.6 6.6 1.7 7.1 0.4 3.5 3.9 4.0
Cycle Q Clear(g_c), s 9.2 5.2 5.3 23.3 6.6 6.6 5.7 7.1 0.4 10.6 3.9 4.0
Prop In Lane 1.00 0.06 1.00 0.09 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 534 993 1035 591 996 1032 237 313 265 196 298 308
V/C Ratio(X) 0.11 0.26 0.26 0.51 0.31 0.31 0.11 0.53 0.03 0.25 0.31 0.31
Avail Cap(c_a), veh/h 534 993 1035 591 996 1032 338 472 399 299 448 463
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.3 4.4 4.4 8.6 4.6 4.6 30.5 29.3 26.6 34.1 28.0 28.1
Incr Delay (d2), s/veh 0.4 0.6 0.6 3.1 0.8 0.8 0.2 1.4 0.0 0.7 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 2.2 2.3 4.4 2.8 2.9 0.5 3.4 0.1 1.1 1.8 1.9
LnGrp Delay(d),s/veh 6.7 5.0 5.0 11.7 5.4 5.3 30.7 30.7 26.6 34.8 28.6 28.6
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 578 924 199 236
Approach Delay, s/veh 5.2 7.4 30.5 29.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 60.6 19.4 60.6 19.4
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 11.2 9.1 25.3 12.6
Green Ext Time (p_c), s 8.0 1.2 7.1 1.0
Intersection Summary
HCM 2010 Ctrl Delay 11.9
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 49 556 59 217 488 38 34 212 279 65 248 58
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 53 604 55 236 530 36 37 230 82 71 270 30
Adj No. of Lanes 120120111120
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 492 1665 151 445 1705 116 261 430 358 221 738 81
Arrive On Green 0.63 0.63 0.63 0.63 0.63 0.63 0.26 0.26 0.26 0.26 0.26 0.26
Sat Flow, veh/h 742 2638 240 681 2701 183 957 1676 1398 948 2877 316
Grp Volume(v), veh/h 53 326 333 236 279 287 37 230 82 71 148 152
Grp Sat Flow(s),veh/h/ln 742 1426 1452 681 1422 1462 957 1676 1398 948 1593 1601
Q Serve(g_s), s 2.8 8.7 8.8 20.3 7.2 7.2 2.6 9.5 3.7 5.6 6.1 6.2
Cycle Q Clear(g_c), s 10.0 8.7 8.8 29.1 7.2 7.2 8.9 9.5 3.7 15.0 6.1 6.2
Prop In Lane 1.00 0.17 1.00 0.13 1.00 1.00 1.00 0.20
Lane Grp Cap(c), veh/h 492 900 916 445 898 923 261 430 358 221 408 410
V/C Ratio(X) 0.11 0.36 0.36 0.53 0.31 0.31 0.14 0.54 0.23 0.32 0.36 0.37
Avail Cap(c_a), veh/h 492 900 916 445 898 923 332 555 463 292 528 530
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00
Uniform Delay (d), s/veh 9.1 7.1 7.1 14.0 6.8 6.8 28.1 25.6 23.5 32.1 24.4 24.4
Incr Delay (d2), s/veh 0.4 1.1 1.1 4.5 0.9 0.9 0.2 1.0 0.3 0.8 0.5 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 3.7 3.8 4.4 3.0 3.1 0.7 4.5 1.5 1.5 2.7 2.8
LnGrp Delay(d),s/veh 9.5 8.2 8.2 18.5 7.7 7.7 28.3 26.6 23.8 33.0 24.9 25.0
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 712 802 349 371
Approach Delay, s/veh 8.3 10.9 26.2 26.5
Approach LOS A B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 55.0 25.0 55.0 25.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 12.0 11.5 31.1 17.0
Green Ext Time (p_c), s 8.0 2.3 5.6 1.8
Intersection Summary
HCM 2010 Ctrl Delay 15.0
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Short Total AM
1: Jefferson (State 14) & Driveway RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Intersection
Int Delay, s/veh 0.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 393 38 0 496 4 0 0 24 0 0 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 85 85 91 91 85 85 85 91 85 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 432 45 0 545 4 0 0 28 0 0 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 549 0 0 477 0 0 727 1003 454 1001 1024 275
Stage 1 - - - - - - 454 454 - 547 547 -
Stage 2 - - - - - - 273 549 - 454 477 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 1017 - - 1085 - - 325 241 605 209 235 723
Stage 1 - - - - - - 585 568 - 490 517 -
Stage 2 - - - - - - 710 516 - 585 555 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1017 - - 1085 - - 322 241 605 199 235 723
Mov Cap-2 Maneuver - - - - - - 322 241 - 199 235 -
Stage 1 - - - - - - 585 568 - 490 517 -
Stage 2 - - - - - - 702 516 - 558 555 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 11.2 10
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 605 1085 - - 1017 - - 723
HCM Lane V/C Ratio 0.047 ------ 0.011
HCM Control Delay (s) 11.2 0 - - 0 - - 10
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Short Total AM
1: Jefferson (State 14) & Driveway RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.987 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1839 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1839 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 362 191
Travel Time (s) 10.9 11.7 8.2 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Intersection
Int Delay, s/veh 0.5
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 495 37 0 534 1 0 0 43 0 0 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 582 44 0 628 1 0 0 51 0 0 2
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 629 0 0 626 0 0 918 1233 604 1258 1255 315
Stage 1 - - - - - - 604 604 - 629 629 -
Stage 2 - - - - - - 314 629 - 629 626 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 949 - - 956 - - 239 176 497 137 171 682
Stage 1 - - - - - - 484 487 - 438 474 -
Stage 2 - - - - - - 672 474 - 469 476 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 949 - - 956 - - 238 176 497 123 171 682
Mov Cap-2 Maneuver - - - - - - 238 176 - 123 171 -
Stage 1 - - - - - - 484 487 - 438 474 -
Stage 2 - - - - - - 670 474 - 421 476 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 13.1 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 497 956 - - 949 - - 682
HCM Lane V/C Ratio 0.102 ------ 0.003
HCM Control Delay (s) 13.1 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.3 0 - - 0 - - 0
Lanes and Geometrics Short Total PM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.991 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1846 0 0 3539 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1846 0 0 3539 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 332 199
Travel Time (s) 10.6 12.0 7.5 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Short Total AM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 20 415 8 22 440 60 7 22 37 45 30 24
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1490 1642 1676 1507 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 21 441 8 23 468 57 7 23 4 48 32 0
Adj No. of Lanes 110120010111
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 601 1043 19 588 1837 223 86 221 34 306 300 255
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.00
Sat Flow, veh/h 785 1459 26 843 2571 312 179 1234 188 1173 1676 1425
Grp Volume(v), veh/h 21 0 449 23 260 265 34 0 0 48 32 0
Grp Sat Flow(s),veh/h/ln 785 0 1485 843 1432 1450 1601 0 0 1173 1676 1425
Q Serve(g_s), s 0.8 0.0 9.9 0.9 5.1 5.1 0.0 0.0 0.0 1.0 1.3 0.0
Cycle Q Clear(g_c), s 5.9 0.0 9.9 10.8 5.1 5.1 1.4 0.0 0.0 2.4 1.3 0.0
Prop In Lane 1.00 0.02 1.00 0.21 0.21 0.12 1.00 1.00
Lane Grp Cap(c), veh/h 601 0 1062 588 1024 1036 341 0 0 306 300 255
V/C Ratio(X) 0.03 0.00 0.42 0.04 0.25 0.26 0.10 0.00 0.00 0.16 0.11 0.00
Avail Cap(c_a), veh/h 601 0 1062 588 1024 1036 603 0 0 506 587 499
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.91 0.00 0.91 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 5.0 0.0 4.7 6.9 4.0 4.0 27.5 0.0 0.0 27.9 27.5 0.0
Incr Delay (d2), s/veh 0.1 0.0 1.1 0.1 0.6 0.6 0.1 0.0 0.0 0.2 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 4.3 0.2 2.1 2.2 0.6 0.0 0.0 0.9 0.6 0.0
LnGrp Delay(d),s/veh 5.1 0.0 5.8 7.0 4.6 4.6 27.6 0.0 0.0 28.1 27.6 0.0
LnGrp LOS A AAAAC CC
Approach Vol, veh/h 470 548 34 80
Approach Delay, s/veh 5.8 4.7 27.6 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.7 18.3 61.7 18.3
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 11.9 3.4 12.8 4.4
Green Ext Time (p_c), s 4.0 0.3 4.0 0.3
Intersection Summary
HCM 2010 Ctrl Delay 7.5
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total AM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates st am rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 55
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Short Total PM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 19 470 25 32 467 79 30 47 84 125 61 53
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.96 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1494 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 22 553 27 38 549 75 35 55 38 147 72 6
Adj No. of Lanes 110120010111
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 500 954 47 432 1704 232 118 165 95 335 366 280
Arrive On Green 0.68 0.68 0.68 0.68 0.68 0.68 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 701 1412 69 733 2522 343 277 758 437 1117 1676 1285
Grp Volume(v), veh/h 22 0 580 38 311 313 128 0 0 147 72 6
Grp Sat Flow(s),veh/h/ln 701 0 1481 733 1432 1433 1472 0 0 1117 1676 1285
Q Serve(g_s), s 1.1 0.0 16.7 2.3 7.2 7.3 0.5 0.0 0.0 3.9 2.8 0.3
Cycle Q Clear(g_c), s 8.3 0.0 16.7 19.0 7.2 7.3 5.5 0.0 0.0 9.3 2.8 0.3
Prop In Lane 1.00 0.05 1.00 0.24 0.27 0.30 1.00 1.00
Lane Grp Cap(c), veh/h 500 0 1000 432 968 968 378 0 0 335 366 280
V/C Ratio(X) 0.04 0.00 0.58 0.09 0.32 0.32 0.34 0.00 0.00 0.44 0.20 0.02
Avail Cap(c_a), veh/h 500 0 1000 432 968 968 441 0 0 385 440 337
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.82 0.00 0.82 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.1 0.0 6.9 12.0 5.4 5.4 26.6 0.0 0.0 28.1 25.5 24.6
Incr Delay (d2), s/veh 0.1 0.0 2.0 0.4 0.9 0.9 0.5 0.0 0.0 0.9 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 7.3 0.5 3.0 3.0 2.4 0.0 0.0 3.0 1.3 0.1
LnGrp Delay(d),s/veh 7.3 0.0 8.9 12.4 6.3 6.3 27.1 0.0 0.0 29.0 25.8 24.6
LnGrp LOS A ABAAC CCC
Approach Vol, veh/h 602 662 128 225
Approach Delay, s/veh 8.9 6.6 27.1 27.8
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.5 21.5 58.5 21.5
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 18.7 7.5 21.0 11.3
Green Ext Time (p_c), s 5.5 1.1 5.4 0.9
Intersection Summary
HCM 2010 Ctrl Delay 12.0
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Short Total PM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates st pm rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX H
HCM 2010 Signalized Intersection Summary Long Total AM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 150 65 45 245 35 0 585 90 30 645 40
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.98
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 37 158 68 47 258 37 0 616 95 32 679 42
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 329 696 285 359 889 126 0 1568 241 89 1601 97
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 962 2183 893 1023 2789 394 0 2841 424 71 2815 171
Grp Volume(v), veh/h 37 113 113 47 146 149 0 355 356 387 0 366
Grp Sat Flow(s),veh/h/ln 962 1593 1483 1023 1593 1591 0 1593 1589 1567 0 1491
Q Serve(g_s), s 2.4 4.2 4.5 2.8 5.5 5.6 0.0 9.9 10.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 8.0 4.2 4.5 7.3 5.5 5.6 0.0 9.9 10.0 0.0 0.0 0.0
Prop In Lane 1.00 0.60 1.00 0.25 0.00 0.27 0.08 0.11
Lane Grp Cap(c), veh/h 329 508 473 359 508 507 0 906 904 940 0 848
V/C Ratio(X) 0.11 0.22 0.24 0.13 0.29 0.29 0.00 0.39 0.39 0.41 0.00 0.43
Avail Cap(c_a), veh/h 329 508 473 359 508 507 0 906 904 940 0 848
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.5 20.0 20.1 22.8 20.4 20.5 0.0 9.6 9.6 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.7 1.0 1.2 0.8 1.4 1.5 0.0 1.3 1.3 1.3 0.0 1.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 2.0 2.0 0.9 2.6 2.7 0.0 4.7 4.7 0.3 0.0 0.4
LnGrp Delay(d),s/veh 24.2 21.0 21.3 23.6 21.9 22.0 0.0 10.9 10.9 1.3 0.0 1.6
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 263 342 711 753
Approach Delay, s/veh 21.6 22.1 10.9 1.5
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 10.0 12.0 9.3
Green Ext Time (p_c), s 6.4 2.0 6.3 2.0
Intersection Summary
HCM 2010 Ctrl Delay 10.7
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Long Total PM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 55 240 85 130 330 80 0 905 120 25 940 145
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.95 0.86 0.94 0.86 1.00 0.91 1.00 0.83
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 58 253 89 137 347 84 0 953 126 26 989 153
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 256 715 239 288 787 186 0 1587 210 65 1443 220
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 813 2245 751 872 2470 582 0 2875 369 32 2537 387
Grp Volume(v), veh/h 58 176 166 137 220 211 0 544 535 630 0 538
Grp Sat Flow(s),veh/h/ln 813 1593 1403 872 1593 1460 0 1593 1567 1595 0 1361
Q Serve(g_s), s 4.9 6.8 7.3 11.5 8.8 9.2 0.0 17.9 17.9 0.0 0.0 0.0
Cycle Q Clear(g_c), s 14.1 6.8 7.3 18.8 8.8 9.2 0.0 17.9 17.9 0.0 0.0 0.0
Prop In Lane 1.00 0.54 1.00 0.40 0.00 0.24 0.04 0.28
Lane Grp Cap(c), veh/h 256 508 447 288 508 465 0 906 891 954 0 774
V/C Ratio(X) 0.23 0.35 0.37 0.48 0.43 0.45 0.00 0.60 0.60 0.66 0.00 0.69
Avail Cap(c_a), veh/h 256 508 447 288 508 465 0 906 891 954 0 774
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 27.3 20.9 21.1 28.3 21.5 21.7 0.0 11.3 11.3 0.0 0.0 0.0
Incr Delay (d2), s/veh 2.1 1.9 2.4 5.5 2.7 3.2 0.0 2.9 3.0 3.6 0.0 5.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 3.2 3.1 3.2 4.2 4.1 0.0 8.4 8.3 1.0 0.0 1.1
LnGrp Delay(d),s/veh 29.3 22.7 23.4 33.9 24.2 24.8 0.0 14.2 14.3 3.6 0.0 5.1
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 400 568 1079 1168
Approach Delay, s/veh 24.0 26.8 14.3 4.3
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 16.1 19.9 20.8
Green Ext Time (p_c), s 13.5 2.8 11.2 1.6
Intersection Summary
HCM 2010 Ctrl Delay 14.1
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total PM
18: College (US 287) & Mountain Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 70
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Roundabout Long Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Intersection
Intersection Delay, s/veh 7.4
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 285 405 43 179
Demand Flow Rate, veh/h 290 414 43 183
Vehicles Circulating, veh/h 199 86 387 350
Vehicles Exiting, veh/h 334 344 102 145
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 17 3 5 4
Ped Cap Adj 0.998 1.000 0.999 0.999
Approach Delay, s/veh 7.3 7.9 5.3 7.2
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 290 414 43 183
Cap Entry Lane, veh/h 926 1037 767 796
Entry HV Adj Factor 0.983 0.979 0.990 0.977
Flow Entry, veh/h 285 405 43 179
Cap Entry, veh/h 908 1015 759 778
V/C Ratio 0.314 0.399 0.056 0.230
Control Delay, s/veh 7.3 7.9 5.3 7.2
LOSAAAA
95th %tile Queue, veh 1201
HCM 2010 Roundabout Long Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Intersection
Intersection Delay, s/veh
Intersection LOS
Approach SW
Entry Lanes 1
Conflicting Circle Lanes 1
Adj Approach Flow, veh/h 43
Demand Flow Rate, veh/h 43
Vehicles Circulating, veh/h 452
Vehicles Exiting, veh/h 48
Follow-Up Headway, s 3.186
Ped Vol Crossing Leg, #/h 0
Ped Cap Adj 1.000
Approach Delay, s/veh 5.7
Approach LOS A
Lane Left
Designated Moves LR
Assumed Moves LR
RT Channelized
Lane Util 1.000
Critical Headway, s 5.193
Entry Flow, veh/h 43
Cap Entry Lane, veh/h 719
Entry HV Adj Factor 0.993
Flow Entry, veh/h 43
Cap Entry, veh/h 714
V/C Ratio 0.060
Control Delay, s/veh 5.7
LOS A
95th %tile Queue, veh 0
Lanes and Geometrics Long Total AM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Lane Group EBL2 EBL EBT EBR WBL WBT WBR WBR2 NBL NBT NBR2 SBL2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 8 12 13 8 12 8 16 8 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 115 0 0
Storage Lanes 0 0 0 0 0
Taper Length (ft) 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.990 0.967 0.965
Flt Protected 0.992 0.997 0.987
Satd. Flow (prot) 0 0 1646 0 0 1670 0 0 0 1810 0 0
Flt Permitted 0.992 0.997 0.987
Satd. Flow (perm) 0 0 1646 0 0 1670 0 0 0 1810 0 0
Link Speed (mph) 30 30 25
Link Distance (ft) 817 738 1572
Travel Time (s) 18.6 16.8 42.9
Intersection Summary
Area Type: CBD
Lane Group SBL SBT SBR SWL2 SWL SWR SWR2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 11 14 8 12 12 12 12
Grade (%) 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.980 0.915
Flt Protected 0.973 0.982
Satd. Flow (prot) 0 1705 0 0 1506 0 0
Flt Permitted 0.973 0.982
Satd. Flow (perm) 0 1705 0 0 1506 0 0
Link Speed (mph) 25 30
Link Distance (ft) 497 534
Travel Time (s) 13.6 12.1
Intersection Summary
HCM 2010 Roundabout Long Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Intersection
Intersection Delay, s/veh 13.0
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 500 573 122 289
Demand Flow Rate, veh/h 510 585 124 294
Vehicles Circulating, veh/h 325 177 680 530
Vehicles Exiting, veh/h 499 627 155 237
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 28 21 35 43
Ped Cap Adj 0.996 0.997 0.995 0.994
Approach Delay, s/veh 14.9 13.1 9.3 12.1
Approach LOS BBAB
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 510 585 124 294
Cap Entry Lane, veh/h 816 947 572 665
Entry HV Adj Factor 0.980 0.979 0.983 0.982
Flow Entry, veh/h 500 573 122 289
Cap Entry, veh/h 797 924 560 649
V/C Ratio 0.627 0.620 0.218 0.445
Control Delay, s/veh 14.9 13.1 9.3 12.1
LOSBBAB
95th %tile Queue, veh 4412
HCM 2010 Roundabout Long Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Intersection
Intersection Delay, s/veh
Intersection LOS
Approach SW
Entry Lanes 1
Conflicting Circle Lanes 1
Adj Approach Flow, veh/h 53
Demand Flow Rate, veh/h 53
Vehicles Circulating, veh/h 714
Vehicles Exiting, veh/h 48
Follow-Up Headway, s 3.186
Ped Vol Crossing Leg, #/h 0
Ped Cap Adj 1.000
Approach Delay, s/veh 7.7
Approach LOS A
Lane Left
Designated Moves LR
Assumed Moves LR
RT Channelized
Lane Util 1.000
Critical Headway, s 5.193
Entry Flow, veh/h 53
Cap Entry Lane, veh/h 553
Entry HV Adj Factor 0.992
Flow Entry, veh/h 53
Cap Entry, veh/h 549
V/C Ratio 0.096
Control Delay, s/veh 7.7
LOS A
95th %tile Queue, veh 0
Lanes and Geometrics Long Total PM
37: Mathews/Walnut & Mountain & Chestnut Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Lane Group EBL2 EBL EBT EBR WBL WBT WBR WBR2 NBL NBT NBR2 SBL2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 8 12 13 8 12 8 16 8 12
Grade (%) 0% 0% 0%
Storage Length (ft) 100 0 115 0 0
Storage Lanes 0 0 0 0 0
Taper Length (ft) 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.993 0.975 0.941
Flt Protected 0.990 0.995 0.993
Satd. Flow (prot) 0 0 1648 0 0 1681 0 0 0 1775 0 0
Flt Permitted 0.990 0.995 0.993
Satd. Flow (perm) 0 0 1648 0 0 1681 0 0 0 1775 0 0
Link Speed (mph) 30 30 25
Link Distance (ft) 817 733 1572
Travel Time (s) 18.6 16.7 42.9
Intersection Summary
Area Type: CBD
Lane Group SBL SBT SBR SWL2 SWL SWR SWR2
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 11 14 8 12 12 12 12
Grade (%) 0% 0%
Storage Length (ft) 100 0 0 0
Storage Lanes 0 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.975 0.918
Flt Protected 0.971 0.981
Satd. Flow (prot) 0 1693 0 0 1510 0 0
Flt Permitted 0.971 0.981
Satd. Flow (perm) 0 1693 0 0 1510 0 0
Link Speed (mph) 25 30
Link Distance (ft) 347 536
Travel Time (s) 9.5 12.2
Intersection Summary
HCM 2010 Signalized Intersection Summary Long Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 50 495 20 295 595 35 25 170 155 50 180 40
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1493 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 53 521 18 311 626 33 26 179 24 53 189 14
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 505 1929 67 570 1894 100 242 332 282 198 595 44
Arrive On Green 0.69 0.69 0.69 0.69 0.69 0.69 0.20 0.20 0.20 0.20 0.20 0.20
Sat Flow, veh/h 695 2799 97 776 2748 145 1055 1676 1421 1055 3003 220
Grp Volume(v), veh/h 53 264 275 311 324 335 26 179 24 53 99 104
Grp Sat Flow(s),veh/h/ln 695 1419 1476 776 1422 1471 1055 1676 1421 1055 1593 1631
Q Serve(g_s), s 2.7 5.7 5.7 20.4 7.3 7.3 1.7 7.7 1.1 3.8 4.3 4.4
Cycle Q Clear(g_c), s 10.0 5.7 5.7 26.1 7.3 7.3 6.1 7.7 1.1 11.5 4.3 4.4
Prop In Lane 1.00 0.07 1.00 0.10 1.00 1.00 1.00 0.14
Lane Grp Cap(c), veh/h 505 978 1018 570 980 1014 242 332 282 198 316 323
V/C Ratio(X) 0.10 0.27 0.27 0.55 0.33 0.33 0.11 0.54 0.09 0.27 0.31 0.32
Avail Cap(c_a), veh/h 505 978 1018 570 980 1014 329 472 400 286 448 459
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.0 4.7 4.7 9.7 5.0 5.0 30.1 28.8 26.2 33.9 27.4 27.5
Incr Delay (d2), s/veh 0.4 0.7 0.7 3.7 0.9 0.9 0.2 1.4 0.1 0.7 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 2.4 2.5 4.9 3.0 3.1 0.5 3.7 0.4 1.1 1.9 2.0
LnGrp Delay(d),s/veh 7.4 5.4 5.4 13.5 5.9 5.9 30.2 30.1 26.3 34.6 28.0 28.0
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 592 970 229 256
Approach Delay, s/veh 5.6 8.3 29.7 29.4
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 59.6 20.4 59.6 20.4
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 12.0 9.7 28.1 13.5
Green Ext Time (p_c), s 8.5 1.3 7.2 1.1
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 50 635 70 250 565 45 40 250 340 75 290 65
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 53 668 65 263 595 41 42 263 180 79 305 40
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 433 1585 154 388 1631 112 269 474 396 216 796 103
Arrive On Green 0.60 0.60 0.60 0.60 0.60 0.60 0.28 0.28 0.28 0.28 0.28 0.28
Sat Flow, veh/h 696 2621 255 636 2696 186 920 1676 1401 843 2818 365
Grp Volume(v), veh/h 53 363 370 263 313 323 42 263 180 79 171 174
Grp Sat Flow(s),veh/h/ln 696 1426 1449 636 1423 1459 920 1676 1401 843 1593 1590
Q Serve(g_s), s 3.3 10.8 10.8 29.9 8.9 9.0 3.1 10.7 8.5 7.0 6.9 7.1
Cycle Q Clear(g_c), s 12.3 10.8 10.8 40.8 8.9 9.0 10.1 10.7 8.5 17.7 6.9 7.1
Prop In Lane 1.00 0.18 1.00 0.13 1.00 1.00 1.00 0.23
Lane Grp Cap(c), veh/h 433 863 877 388 861 883 269 474 396 216 450 449
V/C Ratio(X) 0.12 0.42 0.42 0.68 0.36 0.37 0.16 0.56 0.45 0.37 0.38 0.39
Avail Cap(c_a), veh/h 433 863 877 388 861 883 314 555 464 257 528 527
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.1 8.4 8.4 19.2 8.0 8.0 27.2 24.4 23.6 32.0 23.1 23.1
Incr Delay (d2), s/veh 0.6 1.5 1.5 9.1 1.2 1.2 0.3 1.0 0.8 1.0 0.5 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 4.6 4.7 6.2 3.8 3.9 0.8 5.0 3.3 1.7 3.1 3.2
LnGrp Delay(d),s/veh 11.7 9.9 9.9 28.3 9.2 9.2 27.5 25.4 24.4 33.0 23.6 23.7
LnGrp LOS B A A C A A CCCCCC
Approach Vol, veh/h 786 899 485 424
Approach Delay, s/veh 10.0 14.8 25.2 25.4
Approach LOS B B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 52.9 27.1 52.9 27.1
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 14.3 12.7 42.8 19.7
Green Ext Time (p_c), s 9.4 2.9 0.6 1.9
Intersection Summary
HCM 2010 Ctrl Delay 17.0
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Long Total AM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 455 25 0 580 5 0 0 15 0 0 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 479 26 0 611 5 0 0 16 0 0 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 616 0 0 505 0 0 797 1108 492 1105 1118 308
Stage 1 - - - - - - 492 492 - 613 613 -
Stage 2 - - - - - - 305 616 - 492 505 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 960 - - 1060 - - 291 209 576 176 206 689
Stage 1 - - - - - - 558 547 - 447 482 -
Stage 2 - - - - - - 680 481 - 558 539 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 960 - - 1060 - - 287 209 576 171 206 689
Mov Cap-2 Maneuver - - - - - - 287 209 - 171 206 -
Stage 1 - - - - - - 558 547 - 447 482 -
Stage 2 - - - - - - 670 481 - 543 539 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 11.4 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 576 1060 - - 960 - - 689
HCM Lane V/C Ratio 0.027 ------ 0.015
HCM Control Delay (s) 11.4 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Long Total AM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.993 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1850 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1850 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 534 191
Travel Time (s) 10.9 11.7 12.1 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Intersection
Int Delay, s/veh 0.3
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 575 25 0 620 5 0 0 30 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 605 26 0 653 5 0 0 32 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 658 0 0 632 0 0 944 1276 618 1289 1287 329
Stage 1 - - - - - - 618 618 - 655 655 -
Stage 2 - - - - - - 326 658 - 634 632 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 926 - - 951 - - 229 166 488 130 164 667
Stage 1 - - - - - - 476 480 - 422 462 -
Stage 2 - - - - - - 661 460 - 466 473 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 926 - - 951 - - 227 166 488 122 164 667
Mov Cap-2 Maneuver - - - - - - 227 166 - 122 164 -
Stage 1 - - - - - - 476 480 - 422 462 -
Stage 2 - - - - - - 656 460 - 436 473 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 12.9 10.4
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 488 951 - - 926 - - 667
HCM Lane V/C Ratio 0.065 ------ 0.008
HCM Control Delay (s) 12.9 0 - - 0 - - 10.4
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0
Lanes and Geometrics Long Total PM
1: Chestnut/Driveway & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.994 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1852 0 0 3536 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1852 0 0 3536 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 536 199
Travel Time (s) 10.6 12.0 12.2 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Long Total AM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 480 10 25 510 70 10 30 40 55 35 30
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1491 1642 1676 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 505 10 26 537 67 11 32 5 58 37 3
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 555 1039 21 535 1827 227 93 219 30 309 303 232
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 730 1456 29 793 2562 319 211 1213 166 1165 1676 1287
Grp Volume(v), veh/h 26 0 515 26 299 305 48 0 0 58 37 3
Grp Sat Flow(s),veh/h/ln 730 0 1485 793 1432 1449 1590 0 0 1165 1676 1287
Q Serve(g_s), s 1.1 0.0 12.2 1.2 6.1 6.1 0.0 0.0 0.0 0.9 1.5 0.2
Cycle Q Clear(g_c), s 7.2 0.0 12.2 13.4 6.1 6.1 1.9 0.0 0.0 2.8 1.5 0.2
Prop In Lane 1.00 0.02 1.00 0.22 0.23 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 1059 535 1021 1033 343 0 0 309 303 232
V/C Ratio(X) 0.05 0.00 0.49 0.05 0.29 0.29 0.14 0.00 0.00 0.19 0.12 0.01
Avail Cap(c_a), veh/h 555 0 1059 535 1021 1033 601 0 0 506 587 450
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.93 0.00 0.93 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 5.5 0.0 5.0 8.0 4.2 4.2 27.6 0.0 0.0 27.9 27.5 26.9
Incr Delay (d2), s/veh 0.1 0.0 1.5 0.2 0.7 0.7 0.2 0.0 0.0 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 5.3 0.3 2.5 2.6 0.9 0.0 0.0 1.1 0.7 0.1
LnGrp Delay(d),s/veh 5.6 0.0 6.5 8.1 4.9 4.9 27.8 0.0 0.0 28.2 27.6 26.9
LnGrp LOS A AAAAC CCC
Approach Vol, veh/h 541 630 48 98
Approach Delay, s/veh 6.5 5.0 27.8 28.0
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.6 18.4 61.6 18.4
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 14.2 3.9 15.4 4.8
Green Ext Time (p_c), s 4.8 0.5 4.8 0.5
Intersection Summary
HCM 2010 Ctrl Delay 8.2
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total AM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Total PM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 545 30 35 540 90 35 55 95 145 70 60
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.96 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1495 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 574 30 37 568 79 37 58 48 153 74 11
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 484 943 49 408 1686 234 114 161 110 331 375 288
Arrive On Green 0.67 0.67 0.67 0.67 0.67 0.67 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 687 1407 74 717 2515 349 256 718 492 1107 1676 1288
Grp Volume(v), veh/h 26 0 604 37 323 324 143 0 0 153 74 11
Grp Sat Flow(s),veh/h/ln 687 0 1480 717 1432 1432 1467 0 0 1107 1676 1288
Q Serve(g_s), s 1.3 0.0 18.2 2.4 7.7 7.7 0.9 0.0 0.0 4.2 2.9 0.5
Cycle Q Clear(g_c), s 9.1 0.0 18.2 20.6 7.7 7.7 6.2 0.0 0.0 10.5 2.9 0.5
Prop In Lane 1.00 0.05 1.00 0.24 0.26 0.34 1.00 1.00
Lane Grp Cap(c), veh/h 484 0 992 408 960 960 385 0 0 331 375 288
V/C Ratio(X) 0.05 0.00 0.61 0.09 0.34 0.34 0.37 0.00 0.00 0.46 0.20 0.04
Avail Cap(c_a), veh/h 484 0 992 408 960 960 440 0 0 374 440 338
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.85 0.00 0.85 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.6 0.0 7.4 13.1 5.6 5.6 26.5 0.0 0.0 28.3 25.2 24.3
Incr Delay (d2), s/veh 0.2 0.0 2.4 0.4 0.9 1.0 0.6 0.0 0.0 1.0 0.3 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 7.9 0.5 3.2 3.2 2.8 0.0 0.0 3.2 1.4 0.2
LnGrp Delay(d),s/veh 7.7 0.0 9.7 13.5 6.6 6.6 27.1 0.0 0.0 29.3 25.5 24.4
LnGrp LOS A ABAAC CCC
Approach Vol, veh/h 630 684 143 238
Approach Delay, s/veh 9.6 6.9 27.1 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.1 21.9 58.1 21.9
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 20.2 8.2 22.6 12.5
Green Ext Time (p_c), s 5.8 1.2 5.7 0.9
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total PM
39: Linden & Jefferson (State 14) Roundabout at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rndabt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX I
HCM 2010 Signalized Intersection Summary Long Total AM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 35 150 65 45 245 35 0 585 85 30 645 40
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.97 0.99 0.97 1.00 0.97 1.00 0.99
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 37 158 68 47 258 37 0 616 89 32 679 42
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 329 696 285 359 889 126 0 1584 228 89 1602 97
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 962 2183 893 1023 2789 394 0 2868 401 72 2817 171
Grp Volume(v), veh/h 37 113 113 47 146 149 0 352 353 387 0 366
Grp Sat Flow(s),veh/h/ln 962 1593 1483 1023 1593 1591 0 1593 1593 1567 0 1493
Q Serve(g_s), s 2.4 4.2 4.5 2.8 5.5 5.6 0.0 9.8 9.8 0.0 0.0 0.0
Cycle Q Clear(g_c), s 8.0 4.2 4.5 7.3 5.5 5.6 0.0 9.8 9.8 0.0 0.0 0.0
Prop In Lane 1.00 0.60 1.00 0.25 0.00 0.25 0.08 0.11
Lane Grp Cap(c), veh/h 329 508 473 359 508 507 0 906 906 940 0 849
V/C Ratio(X) 0.11 0.22 0.24 0.13 0.29 0.29 0.00 0.39 0.39 0.41 0.00 0.43
Avail Cap(c_a), veh/h 329 508 473 359 508 507 0 906 906 940 0 849
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.5 20.0 20.1 22.8 20.4 20.5 0.0 9.5 9.6 0.0 0.0 0.0
Incr Delay (d2), s/veh 0.7 1.0 1.2 0.8 1.4 1.5 0.0 1.3 1.3 1.3 0.0 1.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 2.0 2.0 0.9 2.6 2.7 0.0 4.5 4.6 0.3 0.0 0.4
LnGrp Delay(d),s/veh 24.2 21.0 21.3 23.6 21.9 22.0 0.0 10.8 10.8 1.3 0.0 1.6
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 263 342 705 753
Approach Delay, s/veh 21.6 22.1 10.8 1.5
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 10.0 11.8 9.3
Green Ext Time (p_c), s 6.3 2.0 6.2 2.0
Intersection Summary
HCM 2010 Ctrl Delay 10.6
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 38 8 38 8
End Time (s) 8 38 8 38
Yield/Force Off (s) 2.5 32.5 2.5 32.5
Yield/Force Off 170(s) 68.5 15.5 68.5 15.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 60
Offset: 8 (10%), Referenced to phase 2:SBTL and 6:NBT, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Long Total PM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 55 240 85 115 330 80 0 905 115 25 940 145
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.95 0.86 0.94 0.86 1.00 0.91 1.00 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1676 1642 0 1676 1642 1642 1676 1642
Adj Flow Rate, veh/h 58 253 89 121 347 84 0 953 121 26 989 153
Adj No. of Lanes 120120020020
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222022222
Cap, veh/h 256 715 239 288 787 186 0 1597 203 65 1463 223
Arrive On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.00 0.57 0.57 1.00 1.00 1.00
Sat Flow, veh/h 813 2245 751 872 2470 582 0 2891 356 32 2572 393
Grp Volume(v), veh/h 58 176 166 121 220 211 0 541 533 622 0 546
Grp Sat Flow(s),veh/h/ln 813 1593 1403 872 1593 1460 0 1593 1571 1594 0 1402
Q Serve(g_s), s 4.9 6.8 7.3 10.0 8.8 9.2 0.0 17.7 17.7 0.0 0.0 0.0
Cycle Q Clear(g_c), s 14.1 6.8 7.3 17.3 8.8 9.2 0.0 17.7 17.7 0.0 0.0 0.0
Prop In Lane 1.00 0.54 1.00 0.40 0.00 0.23 0.04 0.28
Lane Grp Cap(c), veh/h 256 508 447 288 508 465 0 906 893 954 0 798
V/C Ratio(X) 0.23 0.35 0.37 0.42 0.43 0.45 0.00 0.60 0.60 0.65 0.00 0.69
Avail Cap(c_a), veh/h 256 508 447 288 508 465 0 906 893 954 0 798
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 27.3 20.9 21.1 27.7 21.5 21.7 0.0 11.3 11.3 0.0 0.0 0.0
Incr Delay (d2), s/veh 2.1 1.9 2.4 4.4 2.7 3.2 0.0 2.9 2.9 3.5 0.0 4.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 3.2 3.1 2.7 4.2 4.1 0.0 8.4 8.3 0.9 0.0 1.1
LnGrp Delay(d),s/veh 29.3 22.7 23.4 32.2 24.2 24.8 0.0 14.2 14.2 3.5 0.0 4.7
LnGrp LOS CCCCCC BBA A
Approach Vol, veh/h 400 552 1074 1168
Approach Delay, s/veh 24.0 26.2 14.2 4.1
Approach LOS C C B A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 50.0 30.0 50.0 30.0
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 44.5 24.5 44.5 24.5
Max Q Clear Time (g_c+I1), s 2.0 16.1 19.7 19.3
Green Ext Time (p_c), s 13.3 2.8 11.1 2.0
Intersection Summary
HCM 2010 Ctrl Delay 13.8
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total PM
18: College (US 287) & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Phase Number 2468
Movement SBTL EBTL NBT WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 50 30 50 30
Maximum Split (%) 62.5% 37.5% 62.5% 37.5%
Minimum Split (s) 26.5 29.5 26.5 29.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 2.5 2.5 2.5
Minimum Initial (s) 10 7 10 7
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 14 17 14 17
Dual Entry Yes Yes Yes Yes
Inhibit Max No No No No
Start Time (s) 65 35 65 35
End Time (s) 35 65 35 65
Yield/Force Off (s) 29.5 59.5 29.5 59.5
Yield/Force Off 170(s) 15.5 42.5 15.5 42.5
Local Start Time (s) 30 0 30 0
Local Yield (s) 74.5 24.5 74.5 24.5
Local Yield 170(s) 60.5 7.5 60.5 7.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 70
Offset: 35 (44%), Referenced to phase 2:SBTL, Start of Red
Splits and Phases: 18: College (US 287) & Mountain
HCM 2010 Signalized Intersection Summary Long Total AM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 40 205 20 25 265 70 10 20 10 90 50 25
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 0.99 0.97 0.99 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 42 216 12 26 279 42 11 21 4 95 53 9
Adj No. of Lanes 120120010110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 532 1589 88 624 1494 222 209 373 65 562 551 94
Arrive On Green 1.00 1.00 1.00 0.52 0.52 0.52 0.38 0.38 0.38 0.38 0.38 0.38
Sat Flow, veh/h 947 3063 169 1030 2880 428 394 978 172 1227 1445 245
Grp Volume(v), veh/h 42 112 116 26 159 162 36 0 0 95 0 62
Grp Sat Flow(s),veh/h/ln 947 1593 1639 1030 1656 1651 1544 0 0 1227 0 1691
Q Serve(g_s), s 0.4 0.0 0.0 1.0 4.1 4.2 0.0 0.0 0.0 2.8 0.0 1.9
Cycle Q Clear(g_c), s 4.6 0.0 0.0 1.0 4.1 4.2 1.1 0.0 0.0 3.8 0.0 1.9
Prop In Lane 1.00 0.10 1.00 0.26 0.31 0.11 1.00 0.15
Lane Grp Cap(c), veh/h 532 826 850 624 859 856 647 0 0 562 0 645
V/C Ratio(X) 0.08 0.14 0.14 0.04 0.18 0.19 0.06 0.00 0.00 0.17 0.00 0.10
Avail Cap(c_a), veh/h 532 826 850 624 859 856 647 0 0 562 0 645
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.2 0.0 0.0 9.5 10.2 10.3 15.6 0.0 0.0 16.4 0.0 15.9
Incr Delay (d2), s/veh 0.3 0.3 0.3 0.1 0.5 0.5 0.2 0.0 0.0 0.6 0.0 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.1 0.1 0.3 2.0 2.0 0.5 0.0 0.0 1.5 0.0 0.9
LnGrp Delay(d),s/veh 0.5 0.3 0.3 9.6 10.7 10.8 15.8 0.0 0.0 17.1 0.0 16.2
LnGrp LOS AAAABBB B B
Approach Vol, veh/h 270 347 36 157
Approach Delay, s/veh 0.4 10.7 15.8 16.7
Approach LOS ABBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 35.0 45.0 35.0 45.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 29.5 40.5 29.5 40.5
Max Q Clear Time (g_c+I1), s 5.8 6.6 3.1 6.2
Green Ext Time (p_c), s 0.6 2.2 0.7 2.2
Intersection Summary
HCM 2010 Ctrl Delay 8.6
HCM 2010 LOS A
Timing Report, Sorted By Phase Long Total AM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 35 45 35 45
Maximum Split (%) 43.8% 56.3% 43.8% 56.3%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 44 79 44 79
End Time (s) 79 44 79 44
Yield/Force Off (s) 73.5 39.5 73.5 39.5
Yield/Force Off 170(s) 56.5 29.5 56.5 29.5
Local Start Time (s) 0 35 0 35
Local Yield (s) 29.5 75.5 29.5 75.5
Local Yield 170(s) 12.5 65.5 12.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 44 (55%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 Signalized Intersection Summary Long Total PM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 90 355 25 60 385 75 15 50 50 160 60 50
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 0.99 0.93 0.98 0.93 0.98 0.95 0.98 0.93
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1676 1642 1676 1744 1642 1642 1744 1642 1676 1744 1642
Adj Flow Rate, veh/h 95 374 20 63 405 58 16 53 16 168 63 15
Adj No. of Lanes 120120010110
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 511 1781 95 595 1676 238 117 346 95 476 427 102
Arrive On Green 1.00 1.00 1.00 0.58 0.58 0.58 0.32 0.32 0.32 0.32 0.32 0.32
Sat Flow, veh/h 823 3063 163 869 2883 409 199 1086 298 1167 1341 319
Grp Volume(v), veh/h 95 194 200 63 231 232 85 0 0 168 0 78
Grp Sat Flow(s),veh/h/ln 823 1593 1634 869 1656 1635 1583 0 0 1167 0 1660
Q Serve(g_s), s 1.4 0.0 0.0 2.6 5.4 5.5 0.0 0.0 0.0 5.1 0.0 2.7
Cycle Q Clear(g_c), s 6.9 0.0 0.0 2.6 5.4 5.5 2.9 0.0 0.0 8.0 0.0 2.7
Prop In Lane 1.00 0.10 1.00 0.25 0.19 0.19 1.00 0.19
Lane Grp Cap(c), veh/h 511 926 950 595 963 950 558 0 0 476 0 529
V/C Ratio(X) 0.19 0.21 0.21 0.11 0.24 0.24 0.15 0.00 0.00 0.35 0.00 0.15
Avail Cap(c_a), veh/h 511 926 950 595 963 950 558 0 0 476 0 529
HCM Platoon Ratio 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 0.4 0.0 0.0 7.6 8.2 8.2 19.6 0.0 0.0 21.1 0.0 19.5
Incr Delay (d2), s/veh 0.8 0.5 0.5 0.4 0.6 0.6 0.6 0.0 0.0 2.0 0.0 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.1 0.1 0.7 2.6 2.6 1.4 0.0 0.0 3.2 0.0 1.3
LnGrp Delay(d),s/veh 1.2 0.5 0.5 7.9 8.7 8.8 20.1 0.0 0.0 23.1 0.0 20.1
LnGrp LOS AAAAAAC C C
Approach Vol, veh/h 489 526 85 246
Approach Delay, s/veh 0.6 8.7 20.1 22.2
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 30.0 50.0 30.0 50.0
Change Period (Y+Rc), s 5.5 4.5 5.5 4.5
Max Green Setting (Gmax), s 24.5 45.5 24.5 45.5
Max Q Clear Time (g_c+I1), s 10.0 8.9 4.9 7.5
Green Ext Time (p_c), s 1.1 4.2 1.2 4.2
Intersection Summary
HCM 2010 Ctrl Delay 8.9
HCM 2010 LOS A
Timing Report, Sorted By Phase Long Total PM
37: Mathews/Walnut & Mountain RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Phase Number 2468
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode Max Max Max Max
Maximum Split (s) 30 50 30 50
Maximum Split (%) 37.5% 62.5% 37.5% 62.5%
Minimum Split (s) 29.5 21.5 29.5 21.5
Yellow Time (s) 3333
All-Red Time (s) 2.5 1.5 2.5 1.5
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 17 10 17 10
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 68 18 68 18
End Time (s) 18 68 18 68
Yield/Force Off (s) 12.5 63.5 12.5 63.5
Yield/Force Off 170(s) 75.5 53.5 75.5 53.5
Local Start Time (s) 0 30 0 30
Local Yield (s) 24.5 75.5 24.5 75.5
Local Yield 170(s) 7.5 65.5 7.5 65.5
Intersection Summary
Cycle Length 80
Control Type Pretimed
Natural Cycle 55
Offset: 68 (85%), Referenced to phase 4:EBTL, Start of Red
Splits and Phases: 37: Mathews/Walnut & Mountain
HCM 2010 TWSC Long Total AM
2: Mountain/Walnut & Chestnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Intersection
Int Delay, s/veh 1.3
Movement SEL SET NWT NWR SWL SWR
Vol, veh/h 0 0 130 25 0 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 20 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 137 26 0 26
Major/Minor Major2 Minor2
Conflicting Flow All - 0 137 137
Stage 1 - - 137 -
Stage 2 - - 0 -
Critical Hdwy - - 7.12 6.22
Critical Hdwy Stg 1 - - 6.12 -
Critical Hdwy Stg 2 - - - -
Follow-up Hdwy - - 3.518 3.318
Pot Cap-1 Maneuver - - 834 911
Stage 1 - - 866 -
Stage 2 - - - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 834 911
Mov Cap-2 Maneuver - - 834 -
Stage 1 - - 866 -
Stage 2 - - - -
Approach NW SW
HCM Control Delay, s 0 9.1
HCM LOS A
Minor Lane/Major Mvmt NWT NWRSWLn1
Capacity (veh/h) - - 911
HCM Lane V/C Ratio - - 0.029
HCM Control Delay (s) - - 9.1
HCM Lane LOS - - A
HCM 95th %tile Q(veh) - - 0.1
Lanes and Geometrics Long Total AM
2: Mountain/Walnut & Chestnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/23/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Lane Group SEL SET NWT NWR SWL SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 20 0 0
Storage Lanes 0 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.865
Flt Protected
Satd. Flow (prot) 0 0 1863 1583 0 1611
Flt Permitted
Satd. Flow (perm) 0 0 1863 1583 0 1611
Link Speed (mph) 30 30 30
Link Distance (ft) 144 121 362
Travel Time (s) 3.3 2.8 8.2
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
2: Mountain/Walnut & Chestnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Intersection
Int Delay, s/veh 1.1
Movement SEL SET NWT NWR SWL SWR
Vol, veh/h 0 0 215 25 0 30
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - 20 - 0
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 226 26 0 32
Major/Minor Major2 Minor2
Conflicting Flow All - 0 226 226
Stage 1 - - 226 -
Stage 2 - - 0 -
Critical Hdwy - - 7.12 6.22
Critical Hdwy Stg 1 - - 6.12 -
Critical Hdwy Stg 2 - - - -
Follow-up Hdwy - - 3.518 3.318
Pot Cap-1 Maneuver - - 729 813
Stage 1 - - 777 -
Stage 2 - - - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - 729 813
Mov Cap-2 Maneuver - - 729 -
Stage 1 - - 777 -
Stage 2 - - - -
Approach NW SW
HCM Control Delay, s 0 9.6
HCM LOS A
Minor Lane/Major Mvmt NWT NWRSWLn1
Capacity (veh/h) - - 813
HCM Lane V/C Ratio - - 0.039
HCM Control Delay (s) - - 9.6
HCM Lane LOS - - A
HCM 95th %tile Q(veh) - - 0.1
Lanes and Geometrics Long Total PM
2: Mountain/Walnut & Chestnut RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Lane Group SEL SET NWT NWR SWL SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 20 0 0
Storage Lanes 0 1 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.850 0.865
Flt Protected
Satd. Flow (prot) 0 0 1863 1583 0 1611
Flt Permitted
Satd. Flow (perm) 0 0 1863 1583 0 1611
Link Speed (mph) 30 30 30
Link Distance (ft) 160 174 314
Travel Time (s) 3.6 4.0 7.1
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Long Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 55 500 20 295 595 35 25 165 145 50 180 40
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1493 1642 1676 1496 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 58 526 18 311 626 33 26 174 22 53 189 14
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 508 1937 66 570 1902 100 239 328 278 199 587 43
Arrive On Green 0.69 0.69 0.69 0.69 0.69 0.69 0.20 0.20 0.20 0.20 0.20 0.20
Sat Flow, veh/h 695 2800 96 773 2748 145 1055 1676 1421 1062 3003 220
Grp Volume(v), veh/h 58 266 278 311 324 335 26 174 22 53 99 104
Grp Sat Flow(s),veh/h/ln 695 1419 1476 773 1422 1471 1055 1676 1421 1062 1593 1631
Q Serve(g_s), s 2.9 5.7 5.7 20.4 7.3 7.3 1.7 7.5 1.0 3.8 4.3 4.4
Cycle Q Clear(g_c), s 10.2 5.7 5.7 26.1 7.3 7.3 6.1 7.5 1.0 11.2 4.3 4.4
Prop In Lane 1.00 0.06 1.00 0.10 1.00 1.00 1.00 0.14
Lane Grp Cap(c), veh/h 508 982 1022 570 984 1018 239 328 278 199 311 319
V/C Ratio(X) 0.11 0.27 0.27 0.55 0.33 0.33 0.11 0.53 0.08 0.27 0.32 0.32
Avail Cap(c_a), veh/h 508 982 1022 570 984 1018 329 472 400 290 448 459
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 0.99 1.00 1.00 1.00
Uniform Delay (d), s/veh 6.9 4.7 4.7 9.6 4.9 4.9 30.3 28.9 26.3 33.9 27.6 27.6
Incr Delay (d2), s/veh 0.5 0.7 0.7 3.7 0.9 0.9 0.2 1.3 0.1 0.7 0.6 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 2.4 2.5 4.9 3.0 3.1 0.5 3.6 0.4 1.1 1.9 2.0
LnGrp Delay(d),s/veh 7.4 5.4 5.3 13.4 5.8 5.8 30.5 30.2 26.4 34.6 28.2 28.2
LnGrp LOS AAABAACCCCCC
Approach Vol, veh/h 602 970 222 256
Approach Delay, s/veh 5.5 8.2 29.9 29.5
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 59.9 20.1 59.9 20.1
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 47.5 21.5 47.5 21.5
Max Q Clear Time (g_c+I1), s 12.2 9.5 28.1 13.2
Green Ext Time (p_c), s 8.6 1.3 7.2 1.1
Intersection Summary
HCM 2010 Ctrl Delay 12.4
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total AM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 2/22/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 53 27 53 27
Maximum Split (%) 66.3% 33.8% 66.3% 33.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 2 55 2 55
End Time (s) 55 2 55 2
Yield/Force Off (s) 49.5 76.5 49.5 76.5
Yield/Force Off 170(s) 33.5 63.5 33.5 62.5
Local Start Time (s) 27 0 27 0
Local Yield (s) 74.5 21.5 74.5 21.5
Local Yield 170(s) 58.5 8.5 58.5 7.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 55 (69%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 60 645 70 250 565 45 40 245 325 75 290 65
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 0.99 0.98 0.99 0.95
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1501 1642 1644 1497 1642 1676 1676 1676 1676 1676 1642
Adj Flow Rate, veh/h 63 679 66 263 595 41 42 258 168 79 305 40
Adj No. of Lanes 120120111120
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 436 1594 155 386 1642 113 265 468 391 217 787 102
Arrive On Green 0.61 0.61 0.61 0.61 0.61 0.61 0.28 0.28 0.28 0.28 0.28 0.28
Sat Flow, veh/h 696 2620 254 629 2698 186 920 1676 1400 856 2818 365
Grp Volume(v), veh/h 63 369 376 263 313 323 42 258 168 79 171 174
Grp Sat Flow(s),veh/h/ln 696 1426 1449 629 1423 1462 920 1676 1400 856 1593 1590
Q Serve(g_s), s 4.0 10.9 11.0 30.4 8.8 8.9 3.1 10.5 7.9 6.9 6.9 7.1
Cycle Q Clear(g_c), s 12.9 10.9 11.0 41.4 8.8 8.9 10.2 10.5 7.9 17.4 6.9 7.1
Prop In Lane 1.00 0.18 1.00 0.13 1.00 1.00 1.00 0.23
Lane Grp Cap(c), veh/h 436 868 881 386 865 889 265 468 391 217 445 444
V/C Ratio(X) 0.14 0.43 0.43 0.68 0.36 0.36 0.16 0.55 0.43 0.36 0.38 0.39
Avail Cap(c_a), veh/h 436 868 881 386 865 889 313 555 464 261 528 527
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.97 0.97 0.97 1.00 1.00 1.00
Uniform Delay (d), s/veh 11.1 8.3 8.3 19.2 7.9 7.9 27.5 24.6 23.6 32.0 23.3 23.3
Incr Delay (d2), s/veh 0.7 1.5 1.5 9.3 1.2 1.1 0.3 1.0 0.7 1.0 0.5 0.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 4.7 4.8 6.3 3.7 3.9 0.8 5.0 3.1 1.7 3.1 3.2
LnGrp Delay(d),s/veh 11.8 9.8 9.8 28.6 9.0 9.0 27.7 25.5 24.3 33.0 23.8 23.9
LnGrp LOS B A A C A A CCCCCC
Approach Vol, veh/h 808 899 468 424
Approach Delay, s/veh 10.0 14.7 25.3 25.6
Approach LOS A B C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 53.2 26.8 53.2 26.8
Change Period (Y+Rc), s 5.5 5.5 5.5 5.5
Max Green Setting (Gmax), s 43.5 25.5 43.5 25.5
Max Q Clear Time (g_c+I1), s 14.9 12.5 43.4 19.4
Green Ext Time (p_c), s 9.6 2.9 0.1 1.9
Intersection Summary
HCM 2010 Ctrl Delay 16.9
HCM 2010 LOS B
Timing Report, Sorted By Phase Long Total PM
38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 49 31 49 31
Maximum Split (%) 61.3% 38.8% 61.3% 38.8%
Minimum Split (s) 28.5 25.5 28.5 26.5
Yellow Time (s) 3.5 3 3.5 3.5
All-Red Time (s) 2 2.5 2 2
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 16 13 16 14
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 33 2 33 2
End Time (s) 2 33 2 33
Yield/Force Off (s) 76.5 27.5 76.5 27.5
Yield/Force Off 170(s) 60.5 14.5 60.5 13.5
Local Start Time (s) 31 0 31 0
Local Yield (s) 74.5 25.5 74.5 25.5
Local Yield 170(s) 58.5 12.5 58.5 11.5
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 2 (3%), Referenced to phase 2:SETL, Start of Red
Splits and Phases: 38: Mountain/Lincoln & Riverside (State 14)/Jefferson (State 14)
HCM 2010 TWSC Long Total AM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Intersection
Int Delay, s/veh 0.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 455 40 0 580 5 0 0 25 0 0 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - 0 - - 0
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 479 42 0 611 5 0 0 26 0 0 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 616 0 0 521 0 0 805 1116 500 1113 1134 308
Stage 1 - - - - - - 500 500 - 613 613 -
Stage 2 - - - - - - 305 616 - 500 521 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 960 - - 1045 - - 287 207 570 174 202 689
Stage 1 - - - - - - 552 542 - 447 482 -
Stage 2 - - - - - - 680 481 - 552 531 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 960 - - 1045 - - 283 207 570 166 202 689
Mov Cap-2 Maneuver - - - - - - 283 207 - 166 202 -
Stage 1 - - - - - - 552 542 - 447 482 -
Stage 2 - - - - - - 670 481 - 527 531 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 11.6 10.3
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 570 1045 - - 960 - - 689
HCM Lane V/C Ratio 0.046 ------ 0.015
HCM Control Delay (s) 11.6 0 - - 0 - - 10.3
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
Lanes and Geometrics Long Total AM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.989 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1842 0 0 3536 0 0 0 1611 0 0 1611
Flt Permitted
Satd. Flow (perm) 0 1842 0 0 3536 0 0 0 1611 0 0 1611
Link Speed (mph) 30 30 30 30
Link Distance (ft) 480 516 362 191
Travel Time (s) 10.9 11.7 8.2 4.3
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Intersection
Int Delay, s/veh 0.6
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Vol, veh/h 0 575 40 0 620 5 0 0 50 0 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 605 42 0 653 5 0 0 53 0 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 658 0 0 647 0 0 952 1284 626 1308 1302 329
Stage 1 - - - - - - 626 626 - 655 655 -
Stage 2 - - - - - - 326 658 - 653 647 -
Critical Hdwy 4.14 - - 4.12 - - 7.33 6.53 6.23 7.33 6.53 6.93
Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.53 5.53 -
Critical Hdwy Stg 2 - - - - - - 6.53 5.53 - 6.13 5.53 -
Follow-up Hdwy 2.22 - - 2.218 - - 3.519 4.019 3.319 3.519 4.019 3.319
Pot Cap-1 Maneuver 926 - - 939 - - 226 164 483 126 160 667
Stage 1 - - - - - - 471 476 - 422 462 -
Stage 2 - - - - - - 661 460 - 455 466 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 926 - - 939 - - 224 164 483 112 160 667
Mov Cap-2 Maneuver - - - - - - 224 164 - 112 160 -
Stage 1 - - - - - - 471 476 - 422 462 -
Stage 2 - - - - - - 656 460 - 405 466 -
Approach SE NW NE SW
HCM Control Delay, s 0 0 13.4 10.4
HCM LOS B B
Minor Lane/Major Mvmt NELn1 NWL NWT NWR SEL SET SERSWLn1
Capacity (veh/h) 483 939 - - 926 - - 667
HCM Lane V/C Ratio 0.109 ------ 0.008
HCM Control Delay (s) 13.4 0 - - 0 - - 10.4
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.4 0 - - 0 - - 0
Lanes and Geometrics Long Total PM
1: Chestnut/Driveway & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Lane Group SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.991 0.999 0.865 0.865
Flt Protected
Satd. Flow (prot) 0 1846 0 0 3536 0 0 1611 0 0 1611 0
Flt Permitted
Satd. Flow (perm) 0 1846 0 0 3536 0 0 1611 0 0 1611 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 466 530 314 199
Travel Time (s) 10.6 12.0 7.1 4.5
Intersection Summary
Area Type: Other
HCM 2010 Signalized Intersection Summary Long Total AM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 480 10 25 510 70 10 30 40 55 35 30
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 0.91 0.91 0.95 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1676 1491 1642 1676 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 505 11 26 537 67 11 32 5 58 37 3
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 15 15 2 15 15 222222
Cap, veh/h 555 1036 23 534 1827 227 93 219 30 309 303 232
Arrive On Green 0.71 0.71 0.71 0.71 0.71 0.71 0.18 0.18 0.18 0.18 0.18 0.18
Sat Flow, veh/h 730 1453 32 793 2562 319 211 1213 166 1165 1676 1287
Grp Volume(v), veh/h 26 0 516 26 299 305 48 0 0 58 37 3
Grp Sat Flow(s),veh/h/ln 730 0 1485 793 1432 1449 1590 0 0 1165 1676 1287
Q Serve(g_s), s 1.1 0.0 12.2 1.2 6.1 6.1 0.0 0.0 0.0 0.9 1.5 0.2
Cycle Q Clear(g_c), s 7.2 0.0 12.2 13.4 6.1 6.1 1.9 0.0 0.0 2.8 1.5 0.2
Prop In Lane 1.00 0.02 1.00 0.22 0.23 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 1059 534 1021 1033 343 0 0 309 303 232
V/C Ratio(X) 0.05 0.00 0.49 0.05 0.29 0.29 0.14 0.00 0.00 0.19 0.12 0.01
Avail Cap(c_a), veh/h 555 0 1059 534 1021 1033 601 0 0 506 587 450
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.93 0.00 0.93 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 5.5 0.0 5.0 8.0 4.2 4.2 27.6 0.0 0.0 27.9 27.5 26.9
Incr Delay (d2), s/veh 0.1 0.0 1.5 0.2 0.7 0.7 0.2 0.0 0.0 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 5.3 0.3 2.5 2.6 0.9 0.0 0.0 1.1 0.7 0.1
LnGrp Delay(d),s/veh 5.6 0.0 6.5 8.2 4.9 4.9 27.8 0.0 0.0 28.2 27.6 26.9
LnGrp LOS A AAAAC CCC
Approach Vol, veh/h 542 630 48 98
Approach Delay, s/veh 6.5 5.0 27.8 28.0
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 61.6 18.4 61.6 18.4
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 44 27.0 42.5 27.0
Max Q Clear Time (g_c+I1), s 14.2 3.9 15.4 4.8
Green Ext Time (p_c), s 4.8 0.5 4.8 0.5
Intersection Summary
HCM 2010 Ctrl Delay 8.2
HCM 2010 LOS A
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total AM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 3/13/2015 Synchro 9 Light Report
Delich Associates lt am rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 48 32 48 32
Maximum Split (%) 60.0% 40.0% 60.0% 40.0%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 11 59 11 59
End Time (s) 59 11 59 11
Yield/Force Off (s) 54.5 6 53.5 6
Yield/Force Off 170(s) 44.5 74 39.5 74
Local Start Time (s) 32 0 32 0
Local Yield (s) 75.5 27 74.5 27
Local Yield 170(s) 65.5 15 60.5 15
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 59 (74%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
HCM 2010 Signalized Intersection Summary Long Total PM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations
Volume (veh/h) 25 545 30 35 540 90 35 55 95 145 70 60
Number 5 2 12 1 6 16 7 4 14 3 8 18
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 0.92 0.92 0.96 0.90
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1644 1495 1642 1644 1508 1642 1642 1744 1642 1676 1676 1676
Adj Flow Rate, veh/h 26 574 30 37 568 79 37 58 48 153 74 11
Adj No. of Lanes 110120010111
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 4 15 15 4 15 15 222222
Cap, veh/h 484 943 49 408 1686 234 114 161 110 331 375 288
Arrive On Green 0.67 0.67 0.67 0.67 0.67 0.67 0.22 0.22 0.22 0.22 0.22 0.22
Sat Flow, veh/h 687 1407 74 717 2515 349 256 718 492 1107 1676 1288
Grp Volume(v), veh/h 26 0 604 37 323 324 143 0 0 153 74 11
Grp Sat Flow(s),veh/h/ln 687 0 1480 717 1432 1432 1467 0 0 1107 1676 1288
Q Serve(g_s), s 1.3 0.0 18.2 2.4 7.7 7.7 0.9 0.0 0.0 4.2 2.9 0.5
Cycle Q Clear(g_c), s 9.1 0.0 18.2 20.6 7.7 7.7 6.2 0.0 0.0 10.5 2.9 0.5
Prop In Lane 1.00 0.05 1.00 0.24 0.26 0.34 1.00 1.00
Lane Grp Cap(c), veh/h 484 0 992 408 960 960 385 0 0 331 375 288
V/C Ratio(X) 0.05 0.00 0.61 0.09 0.34 0.34 0.37 0.00 0.00 0.46 0.20 0.04
Avail Cap(c_a), veh/h 484 0 992 408 960 960 440 0 0 374 440 338
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.85 0.00 0.85 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 7.6 0.0 7.4 13.1 5.6 5.6 26.5 0.0 0.0 28.3 25.2 24.3
Incr Delay (d2), s/veh 0.2 0.0 2.4 0.4 0.9 1.0 0.6 0.0 0.0 1.0 0.3 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 7.9 0.5 3.2 3.2 2.8 0.0 0.0 3.2 1.4 0.2
LnGrp Delay(d),s/veh 7.7 0.0 9.7 13.5 6.6 6.6 27.1 0.0 0.0 29.3 25.5 24.4
LnGrp LOS A ABAAC CCC
Approach Vol, veh/h 630 684 143 238
Approach Delay, s/veh 9.6 6.9 27.1 27.9
Approach LOS A A C C
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 58.1 21.9 58.1 21.9
Change Period (Y+Rc), s * 5.5 5.0 5.5 5.0
Max Green Setting (Gmax), s * 51 20.0 49.5 20.0
Max Q Clear Time (g_c+I1), s 20.2 8.2 22.6 12.5
Green Ext Time (p_c), s 5.8 1.2 5.7 0.9
Intersection Summary
HCM 2010 Ctrl Delay 12.6
HCM 2010 LOS B
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
Timing Report, Sorted By Phase Long Total PM
39: Linden & Jefferson (State 14) RT-in/RT-out at Walnut
Fort Collins CBD Hotel 4:30 pm 8/9/2012 CBD Hotel Synchro 9 Light Report
Delich Associates lt pm rt.syn
Phase Number 2468
Movement SETL NETL NWTL SWTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 55 25 55 25
Maximum Split (%) 68.8% 31.3% 68.8% 31.3%
Minimum Split (s) 21.5 24 26.5 24
Yellow Time (s) 3.5 3 3.5 3
All-Red Time (s) 1222
Minimum Initial (s) 7777
Vehicle Extension (s) 3333
Minimum Gap (s) 3333
Time Before Reduce (s) 0000
Time To Reduce (s) 0000
Walk Time (s) 7777
Flash Dont Walk (s) 10 12 14 12
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 17 72 17 72
End Time (s) 72 17 72 17
Yield/Force Off (s) 67.5 12 66.5 12
Yield/Force Off 170(s) 57.5 0 52.5 0
Local Start Time (s) 25 0 25 0
Local Yield (s) 75.5 20 74.5 20
Local Yield 170(s) 65.5 8 60.5 8
Intersection Summary
Cycle Length 80
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 72 (90%), Referenced to phase 2:SETL and 6:NWTL, Start of Red
Splits and Phases: 39: Linden & Jefferson (State 14)
APPENDIX J
Mountain
Laporte
College
Remington
Mathews
Linden
Chestnut
Pine
Jefferson Riverside
Lincoln
Walnut
Maple
SITE
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, March 2015
Pedestrian LOS Worksheet
Project Location Classification: Pedestrian District
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Commercial area to the
north of the site Commercial
Minimum A A B A A
1 Actual A A B A A
Proposed A A B A A
Commercial area
adjacent to the site Commercial
Minimum A A B A A
2 Actual A A A A A
Proposed A A A A A
Commercial area to the
east of the site Commercial
Minimum A A B A A
3 Actual A A B A A
Proposed A A B A A
Commercial area to the
south of the site Commercial
Minimum A A B A A
4 Actual A A B A A
Proposed A A B A A
Residential area to the
southeast of the site Residential
Minimum A A B A A
5 Actual A A B A A
Proposed A A B A A
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Mountain
Laporte
College
Remington
Mathews
Linden
Chestnut
Pine
Jefferson Riverside
Lincoln
Walnut
Maple
SITE
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Fort Collins CBD Hotel TIS, February 2015
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Commercial area to the
1 north of the site Commercial C A A
Commercial area to the
2 north of the site Commercial C A A
Commercial area to the
3 east of the site Commercial C A A
Commercial area to the
south of the site
4 Commercial C A A
480/545
10/30
70/90
510/540
25/35
455/575
40/40
25/50
10/5
5/5
580/620
AM/PM
Rounded to Nearest
5 Vehicles
595/565
295/250
10/35
30/55
40/95
30/60
35/70
55/145
25/25
480/545
10/30
70/90
510/540
25/35
455/575
25/25
15/30
10/5
5/5
580/620
259/217
Linden
Jefferson
Walnut
Riverside
Mathews
22/28
24/24
Chestnut
79/137
41/53
22/45
5/13
19/43
NOM
9/44
22/54
228/332
60/64
24/24
14/18
NOM
10/13
12/15
393/495
22/21
10/25
7/2
4/1
496/534
50/60
25/50
AM/PM
Rounded to Nearest
5 Vehicles
455/575
10/10
10/25
10/5
5/5
580/620
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
79/137
41/53
22/45
402/515
14/56
28/36
486/464
231/191
Linden
Chestnut
Jefferson
Walnut
Riverside
Mathews
75/130
39/50
21/43