HomeMy WebLinkAboutSALUD FAMILY HEALTH CENTER - PDP - PDP160015 - REPORTS - DRAINAGE REPORTOctober 12, 2016 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR SALUD FAMILY HEALTH CENTER Fort Collins, Colorado Prepared for: Salud Family Health Centers 203 S. Rollie Ave. Fort Lupton, CO 80621 Prepared by: 301 N. Howes, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1067-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. October 12, 2016 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for SALUD FAMILY HEALTH CENTER Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Salud Family Health Ceter development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PhD, PE Senior Project Engineer Salud Family Health Center Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 5 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 6 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept ............................................................................................................................... 7 B. Specific Details .................................................................................................................................. 8 V. CONCLUSIONS ........................................................................................................ 9 A. Compliance with Standards .............................................................................................................. 9 B. Drainage Concept .............................................................................................................................. 9 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B - USDA Soils Information APPENDIX C – SWMM Modeling; Detention Computations APPENDIX D – LID/Water Quality Treatment Information APPENDIX E – Erosion Control Report Salud Family Health Center Preliminary Drainage Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 MAP POCKET: Proposed Drainage Exhibit Salud Family Health Center Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the northwest quarter of Section 10, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located just east of the intersection of Laporte Ave. and North Taft Hill Rd. 4. The proposed development site is in the City of Fort Collins West Vine Master Basin. Detention requirements for this basin are to detain the difference between the 100- year developed inflow rate and the historic 2-year release rate. However, due to site constraints, the proposed drainage concept for the site is to place an interim pumped detention pond in the northwest corner of Lot 6. 5. The pumped detention pond is to be located so that in the future a gravity tie-in to a future City of Fort Collins Regional Pond, which is anticipated to be constructed just northwest of the project site. A rough anticipated construction date for this pond is the year 2025. In the interim period, the onsite detention pond will be pumped. The Salud Family Health Center Preliminary Drainage Report 2 pump will be sized to discharge at a rate that adequately evacuates all storm runoff from the pond to meet State of Colorado revised Statute 37-92-602(8). This states that 97% of all the stormwater runoff from a 5-year or less event be released within 72 hours of the storm event, and 99% of all of the stormwater runoff from greater than a 5-year event be released within 120 hours of the storm event. Water quality treatment methods are proposed for the site, and are described in further detail below. 6. As this is an infill site, much of the area surrounding the site is fully developed. 7. A small amount of offsite flows enter the site from the east. Offsite runoff peak flow rates have been calculated and are provided in Appendix A. B. Description of Property 1. The development area is roughly 22.7 net acres. Figure 1 – Aerial Photograph 2. The subject property is currently composed of existing buildings, and landscaped areas. Existing ground slopes are mild to moderate (i.e., 1 - 6±%) through the interior of the property. General topography slopes from south to north; however, the front portion of the property has an existing parking lot that slopes from north to south, towards Laporte Avenue. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Nunn Clay Loam, and Fort Collins Loam which fall into Hydrologic SITE Salud Family Health Center Preliminary Drainage Report 3 Soil Group C. 4. The proposed project site plan is composed of the development of a medical building, associated parking and extension of a public roadway which will serve as access to the building and parking areas. Associated site work, water, and sewer lines will be constructed with the development. Onsite detention and water quality treatment is proposed and will consist of several features which are discussed in Section IV, below. Figure 2– Proposed Site Plan 5. There are no known irrigation laterals crossing the site. 6. The proposed land use is commercial. C. Floodplain 1. The project site is encroached by a City of Fort Collins designated floodplain (West Vine 100-year floodplain and floodway). No FEMA 100-year floodplains encroach the site. 2. It is noted that the West Vine floodplain spill from the Larimer Canal No. 2 irrigation Salud Family Health Center Preliminary Drainage Report 4 ditch enters the project site; however, current floodplain mapping changes are under way by the City of Fort Collins, and we are working with City Stormwater Utility Staff and the owning entity of the Larimer No. 2 to incorporate the changes regarding this spill from the Larimer No. 2. We are currently working with the City on the modeling of the spill from the ditch and are in process with the design of a side spill weir and grading within the project site to allow for this spill to safely pass along the western perimeter of the site (just west of the large existing building that is to remain and to be renovated). We have also discussed the construction of this side spill weir with the Larimer No. 2 and have had a favorable response. We will submit side spill weir plans to both the City and the Larimer No. 2 at Final design. 3. A separate Floodplain Modeling Report will be submitted to address proposed changes to the current floodplain and floodway through the site which will incorporate the side spill weir and grading within the site. Figure 3 –Current City of Fort Collins Floodplain Mapping II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The proposed development site is in the City of Fort Collins West Vine Master Basin. Detention requirements for this basin are to detain the difference between the 100- year developed inflow rate and the historic 2-year release rate. However, due to site constraints, the proposed drainage concept for the site is to place an interim pumped detention pond in the northwest corner of Lot 6. SITE Salud Family Health Center Preliminary Drainage Report 5 B. Sub-Basin Description 1. The overall subject property historically drains overland from south to north. However, the front portion of the property has an existing parking lot that slopes from north to south, towards Laporte Avenue. 2. A more detailed description of the project drainage patterns is provided below. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated using detention and LID treatment methods prior to exiting the site. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality treatment, where none previously existed, sediment with erosion potential is removed from downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Salud Family Health Center Preliminary Drainage Report 6 The proposed development will provide LID and water quality treatment; thus, eliminating sources of potential pollution previously left exposed to weathering and runoff processes. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the property lines will generally be maintained. As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above, the subject property is located in a City designated floodplain. The proposed project does not propose to modify any natural drainageways. F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. Salud Family Health Center Preliminary Drainage Report 7 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. LID will be provided in a forebay upstream of the proposed detention pond. Water quality capture volume will be provided in the lower stage of the detention pond. Forebay volume and water quality capture volume computations are provided in Appendix D. 3. Drainage patterns anticipated for drainage basins shown in the Drainage Exhibit are described below. Drainage basins have been defined for preliminary design purposes and are subject to change at Final design; however, general drainage patterns and concepts are not expected to be significantly altered. Basins 1 and 2 Basins 1 and 2 are composed of the current development areas which include renovation of the existing building, proposed parking areas, landscaped areas and the proposed Pond 1. Basin 1 is composed primarily of landscaped areas and Pond 1, and runoff will generally sheet flow into Pond 1. Runoff from Basin 2 will be conveyed into the proposed LID forebay prior to discharge into Pond 1 via proposed parking lot curb and gutter, inlets and storm system as shown on the Drainage Exhibit. Basin 3 Basin 3 is composed of primarily of undeveloped area landscaped areas, and runoff will generally sheet flow into north to adjacent offsite land. We are not increasing land slope or drainage area, and are not concentrating flow within this basin; therefore increase in runoff to offsite properties will be experienced. Basins 4 and 7 Basins 4 and 7 are anticipated to be developed in the future. A future LID feature and detention pond is to be provided within Basin 7 which will detain and release into the currently proposed storm line running from this basin into proposed Pond 1. Basin 4, however, has been accounted for in the design of the proposed Pond 1 at the northwest corner of the site, and future development of this basin will only need to create some form of acceptable LID at such time as the basin develops. Also, when this basin develops, conveyance will need to be constructed from the basin into the Pond 1. Basins 5, 6, and 9 Basins 5, 6, and 9 are anticipated to be developed in the future. General drainage patterns, based on existing topography are from south to north, into the Larimer Canal No. 2 irrigation ditch. These future development sites will be required to meet all City and Ditch standards when developed. We anticipate that these sites will need to detain flows as well as provide water quality treatment prior to discharge into the Larimer Canal No. 2. We are showing a “future” LID feature and detention pond on the Drainage Exhibit within Basin 5 and Basin 9 as a placeholder for LID and detention. We anticipate that in the future the LID feature and pond shown in Basin 5 will treat and detain runoff from Basins 5 and 6, and the LID feature and pond shown in Basin 9 will treat and detain runoff from Basin 9. It is noted, however, at which Salud Family Health Center Preliminary Drainage Report 8 time the development occurs, current detention and water quality standards at the time of development will apply. Basins 8 Basin 8 is composed of dedicated Right of Way that will serve as access for the proposed parking area and building in Basin 2. A portion of this Right of Way that will connect in the future along the site eastern boundary (Please see Drainage Exhibit) has been included in runoff computations for this basin, although only part of the roadway is to be constructed with the current phase of development. Runoff from this basin will be conveyed via curb and gutter to a storm system, and then into the proposed LID forebay prior to discharge into proposed Pond 1, as shown on the Drainage Exhibit. Basin 10 Area within Basin 10 is currently is composed of an existing parking lot and landscaped area, and historically drains south into Laporte Avenue. We anticipate future development of this area to maintain this drainage pattern and to simply be a repair or overlay of the existing parking lot. We understand that currently, in such a case, as long as imperviousness does not increase from historic conditions, detention would not be required, and we have noted the historic drainage quantity on the Drainage Exhibit. However, at which time development occurs, current City standards will apply. Basin OS1 Basin OS1 consists primarily of offsite area to the east of the site which historically drains across the project site. This offsite drainage will be accounted for at Final, and the proposed storm system will be designed to safely pass100-year flows from this offsite area. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. A detention basin is proposed in the west portion of the site and will detain up to the 100-year storm event and release at or below the allowable (for West Vine Basin) 2-year historic runoff rate calculated as 0.31 cfs per acre (Please see calculations provided in Appendix A). A lowered release rate is anticipated, as the release from the pond will be pumped. The pump will be sized to discharge at a rate of 0.60 cfs based on current preliminary design, requiring a 100-year detention volume of 3.52 acre-feet. This release rate has been determined in order that both Pond 1 and a future interconnected Pond 2, as shown on the Drainage Exhibit will adequately evacuate all storm runoff from the interconnected pond system to meet State of Colorado revised Statute 37-92-602(8). This states that 97% of all the stormwater runoff from a 5- year or less event be released within 72 hours of the storm event, and 99% of all of the stormwater runoff from greater than a 5-year event be released within 120 hours of the storm event. 2. A porous landscape detention (PLD) holding cell/forebay is proposed as the primary LID treatment method for the current development proposed within Basins site. The PLD will provide standard 12-hour porous landscape detention (PLD) treatment. Salud Family Health Center Preliminary Drainage Report 9 3. Final design details, and construction documentation shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. 4. Stormwater facility Standard Operating Procedures (SOP) will be provided by the City of Fort Collins in the Development Agreement. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the West Vine Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and water quality mitigation features. 2. The drainage concept for the proposed development is consistent with requirements for the West Vine Basin. Salud Family Health Center Preliminary Drainage Report 10 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 1067-001 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….…………………………………0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawn, Rain Garden, or Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1 167402 3.71 0.00 0.00 0.00 0.00 3.71 0.25 0.25 0.31 0.0% 2 233621 5.21 1.64 0.25 1.04 0.00 2.28 0.64 0.64 0.80 53.8% 3 128166 2.94 0.00 0.00 0.00 0.00 2.94 0.25 0.25 0.31 0.0% 4 102827 2.36 0.00 1.18 1.18 0.00 0.00 0.95 0.95 1.19 90.0% 5 53579 1.23 0.00 0.62 0.62 0.00 0.00 0.95 0.95 1.19 90.0% 6 61174 1.47 0.00 0.74 0.74 0.00 0.00 0.95 0.95 1.19 90.0% 7 116348 2.67 0.00 1.34 1.34 0.00 0.00 0.95 0.95 1.19 90.0% 8 78531 1.80 1.44 0.09 0.00 0.00 0.27 0.85 0.85 1.06 84.5% 9 30867 0.71 0.00 0.35 0.35 0.00 0.00 0.95 0.95 1.19 90.0% Overland Flow, Time of Concentration: Project: 1067-001 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 1067-001 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1 1 3.71 30 30 27 0.25 0.25 0.31 1.31 2.23 4.78 1.22 2.07 5.54 2 2 5.21 19 19 17 0.64 0.64 0.80 1.68 2.86 6.10 5.62 9.59 25.57 3 3 2.94 34 34 31 0.25 0.25 0.31 1.21 2.06 4.42 0.89 1.52 4.06 4 4 2.36 17 17 16 0.95 0.95 1.19 1.78 3.04 6.41 3.99 6.81 17.97 5 5 1.23 13 13 12 0.95 0.95 1.19 2.02 3.45 7.29 2.35 4.03 10.65 6 6 1.80 16 16 15 0.85 0.85 1.06 1.84 3.14 6.62 2.80 4.78 12.60 7 7 2.67 17 17 16 0.95 0.95 1.19 1.78 3.04 6.41 4.52 7.70 20.33 8 8 1.47 8 8 8 0.95 0.95 1.19 2.40 4.10 8.59 3.35 5.73 14.99 9 9 0.71 12 12 12 0.95 0.95 1.19 2.05 3.50 7.29 1.38 2.36 6.13 10 10 0.44 6 6 6 0.95 0.95 1.19 2.67 4.56 9.63 1.12 1.91 5.03 11 11 0.22 6 6 5 0.79 0.79 0.99 2.76 4.72 9.95 0.48 0.82 2.16 OS1 OS1 1.08 19 19 18 0.47 0.47 0.59 1.65 2.82 6.01 0.84 1.44 3.83 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC 10/1/16 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q  C f  C  i  A  CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 1067-001 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….…………………………………. 0.95 100% Date: Concrete …….......……………….….……….………………..….……………………………… 0.95 90% Gravel ……….…………………….….…………………………..………………………………. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawn, Rain Garden, or Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 719114 16.51 0.02 0.08 1.06 0.74 14.61 0.29 0.29 0.36 6.3% HISTORIC COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 May 1, 2016 Overland Flow, Time of Concentration: Project: 1067-001 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 1067-001 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: H1 H1 16.51 40 40 38 0.29 0.29 0.36 1.07 1.83 3.90 5.09 8.70 23.18 Historic 2-year cfs per acre= 0.31 (Q2/Area) Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) HISTORIC RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC May 1, 2016 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q  C f  C i  A DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Figure RO-1—Estimate of Average Overland Flow Velocity for Use With the Rational Formula 2007-01 RO-13 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. C A = K A + ( 1 . 31 i 3 − 1 . 44 i 2 + 1 . 135 i − 0 . 12 ) for CA ≥ 0, otherwise CA = 0 (RO-6) C CD = K CD + ( 0 . 858 i 3 − 0 . 786 i 2 + 0 . 774 i + 0 . 04 ) (RO-7) C B = (CA + C CD ) 2 2007-01 RO-9 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-5— Runoff Coefficients, C Percentage Imperviousness Type C and D NRCS Hydrologic Soil Groups 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 25% 0.20 0.28 0.36 0.46 0.51 0.56 30% 0.22 0.30 0.38 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 40% 0.28 0.35 0.42 0.50 0.54 0.58 45% 0.31 0.37 0.44 0.51 0.55 0.59 50% 0.34 0.40 0.46 0.53 0.57 0.60 55% 0.37 0.43 0.48 0.55 0.58 0.62 60% 0.41 0.46 0.51 0.57 0.60 0.63 65% 0.45 0.49 0.54 0.59 0.62 0.65 70% 0.49 0.53 0.57 0.62 0.65 0.68 75% 0.54 0.58 0.62 0.66 0.68 0.71 80% 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 90% 0.73 0.75 0.77 0.80 0.82 0.83 95% 0.80 0.82 0.84 0.87 0.88 0.89 100% 0.89 0.90 0.92 0.94 0.95 0.96 TYPE B NRCS HYDROLOGIC SOILS GROUP 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 15% 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 0.39 0.43 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 45% 0.26 0.32 0.38 0.44 0.48 0.51 50% 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.45 0.49 0.54 0.57 0.59 70% 0.45 0.49 0.53 0.58 0.60 0.62 75% 0.51 0.54 0.58 0.62 0.64 0.66 80% 0.57 0.59 0.63 0.66 0.68 0.70 85% 0.63 0.66 0.69 0.72 0.73 0.75 90% 0.71 0.73 0.75 0.78 0.80 0.81 95% 0.79 0.81 0.83 0.85 0.87 0.88 100% 0.89 0.90 0.92 0.94 0.95 0.96 2007-01 RO-11 Urban Drainage and Flood Control District RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) TABLE RO-5 (Continued)—Runoff Coefficients, C Percentage Imperviousness Type A NRCS Hydrologic Soils Group 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.00 0.00 0.05 0.12 0.16 0.20 5% 0.00 0.02 0.10 0.16 0.20 0.24 10% 0.00 0.06 0.14 0.20 0.24 0.28 15% 0.02 0.10 0.17 0.23 0.27 0.30 20% 0.06 0.13 0.20 0.26 0.30 0.33 25% 0.09 0.16 0.23 0.29 0.32 0.35 30% 0.13 0.19 0.25 0.31 0.34 0.37 35% 0.16 0.22 0.28 0.33 0.36 0.39 40% 0.19 0.25 0.30 0.35 0.38 0.41 45% 0.22 0.27 0.33 0.37 0.40 0.43 50% 0.25 0.30 0.35 0.40 0.42 0.45 55% 0.29 0.33 0.38 0.42 0.45 0.47 60% 0.33 0.37 0.41 0.45 0.47 0.50 65% 0.37 0.41 0.45 0.49 0.51 0.53 70% 0.42 0.45 0.49 0.53 0.54 0.56 75% 0.47 0.50 0.54 0.57 0.59 0.61 80% 0.54 0.56 0.60 0.63 0.64 0.66 85% 0.61 0.63 0.66 0.69 0.70 0.72 90% 0.69 0.71 0.73 0.76 0.77 0.79 95% 0.78 0.80 0.82 0.84 0.85 0.86 100% 0.89 0.90 0.92 0.94 0.95 0.96 RO-12 2007-01 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Figure RO-3— Watershed Imperviousness, Single-Family Residential Ranch Style Houses 2007-01 RO-15 Urban Drainage and Flood Control District RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) Figure RO-4—Watershed Imperviousness, Single-Family Residential Split-Level Houses RO-16 2007-01 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Figure RO-5—Watershed Imperviousness, Single-Family Residential Two-Story Houses Figure RO-6—Runoff Coefficient, C, vs. Watershed Percentage Imperviousness NRCS Hydrologic Soil Group A 2007-01 RO-17 Urban Drainage and Flood Control District RUNOFF DRAINAGE CRITERIA MANUAL (V. 1) Figure RO-7—Runoff Coefficient, C, vs. Watershed Percentage Imperviousness NRCS Hydrologic Soil Group B Figure RO-8—Runoff Coefficient, C, vs. Watershed Percentage Imperviousness NRCS Hydrologic Soil Groups C and D RO-18 2007-01 Urban Drainage and Flood Control District APPENDIX B WATER USUUSDA SOILS INFORMATION United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Natural Area, Colorado Resources Conservation Service May 17, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (http:// offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................7 Soil Map................................................................................................................8 Legend..................................................................................................................9 Map Unit Legend................................................................................................10 Map Unit Descriptions........................................................................................10 Larimer County Area, Colorado......................................................................12 35—Fort Collins loam, 0 to 3 percent slopes..............................................12 36—Fort Collins loam, 3 to 5 percent slopes..............................................13 74—Nunn clay loam, 1 to 3 percent slopes.................................................14 References............................................................................................................16 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 6 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 8 Custom Soil Resource Report Soil Map 4493150 4493210 4493270 4493330 4493390 4493450 4493510 4493150 4493210 4493270 4493330 4493390 4493450 4493510 490470 490530 490590 490650 490710 490770 490830 490890 490950 491010 491070 490470 490530 490590 490650 490710 490770 490830 490890 490950 491010 491070 40° 35' 33'' N 105° 6' 45'' W 40° 35' 33'' N 105° 6' 19'' W 40° 35' 19'' N 105° 6' 45'' W 40° 35' 19'' N 105° 6' 19'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,850 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 35 Fort Collins loam, 0 to 3 percent slopes 10.8 30.4% 36 Fort Collins loam, 3 to 5 percent slopes 9.5 26.5% 74 Nunn clay loam, 1 to 3 percent slopes 15.3 43.1% Totals for Area of Interest 35.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments Custom Soil Resource Report 10 on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 11 Larimer County Area, Colorado 35—Fort Collins loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlnc Elevation: 4,020 to 6,730 feet Mean annual precipitation: 14 to 16 inches Mean annual air temperature: 46 to 48 degrees F Frost-free period: 143 to 154 days Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fort Collins Setting Landform: Interfluves Down-slope shape: Linear Across-slope shape: Linear Parent material: Pleistocene or older alluvium derived from igneous, metamorphic and sedimentary rock and/or eolian deposits Typical profile Ap - 0 to 4 inches: loam Bt1 - 4 to 9 inches: clay loam Bt2 - 9 to 16 inches: clay loam Bk1 - 16 to 29 inches: loam Bk2 - 29 to 80 inches: loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.20 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 12 percent Salinity, maximum in profile: Nonsaline (0.1 to 1.0 mmhos/cm) Sodium adsorption ratio, maximum in profile: 0.5 Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 4c Hydrologic Soil Group: C Ecological site: Loamy Plains (R067BY002CO) Custom Soil Resource Report 12 Minor Components Nunn Percent of map unit: 10 percent Landform: Terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Ecological site: Loamy Plains (R067BY002CO) Vona Percent of map unit: 5 percent Landform: Interfluves Landform position (two-dimensional): Backslope, footslope Landform position (three-dimensional): Side slope, base slope Down-slope shape: Linear Across-slope shape: Linear Ecological site: Sandy Plains (R067BY024CO) 36—Fort Collins loam, 3 to 5 percent slopes Map Unit Setting National map unit symbol: jpw9 Elevation: 4,800 to 5,500 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fort Collins Setting Landform: Terraces, fans Landform position (three-dimensional): Base slope, riser Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium Typical profile H1 - 0 to 9 inches: loam H2 - 9 to 20 inches: loam, clay loam H2 - 9 to 20 inches: loam, silt loam, fine sandy loam H3 - 20 to 60 inches: H3 - 20 to 60 inches: H3 - 20 to 60 inches: Custom Soil Resource Report 13 Properties and qualities Slope: 3 to 5 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Very high (about 25.5 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: Loamy Plains (R067XY002CO) Minor Components Ascalon Percent of map unit: 5 percent Kim Percent of map unit: 3 percent Stoneham Percent of map unit: 2 percent 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: jpxn Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces, fans Landform position (three-dimensional): Base slope, tread Custom Soil Resource Report 14 Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium Typical profile H1 - 0 to 10 inches: clay loam H2 - 10 to 60 inches: clay loam, clay H2 - 10 to 60 inches: Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Very high (about 18.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Minor Components Ulm Percent of map unit: 10 percent Satanta Percent of map unit: 5 percent Custom Soil Resource Report 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 16 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 17 APPENDIX C SWMM Modeling; Detention Computations ^tDDϱ 3DJH ^tDD^,Dd/ EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.015) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ JAN-01-2020 00:00:00 Ending Date .............. JAN-05-2020 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 4.816 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.924 0.704 Surface Runoff ........... 3.844 2.929 Final Surface Storage .... 0.074 0.056 Continuity Error (%) ..... -0.541 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 3.846 1.253 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 3.846 1.253 Internal Outflow ......... 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 *************************** Subcatchment Runoff Summary *************************** ---------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS ---------------------------------------------------------------------------------------------- Basin7 3.669 0.000 0.000 0.138 3.467 0.251 24.707 0.945 Basin1 3.669 0.000 0.000 1.708 1.971 0.199 8.835 0.537 Basin2 3.669 0.000 0.000 0.704 2.931 0.415 36.418 0.799 Basin8 3.669 0.000 0.000 0.217 3.393 0.166 16.312 0.925 Basin4 3.669 0.000 0.000 0.137 3.467 0.222 21.845 0.945 -------------------------------------------------------------------------------------------- System 3.669 0.000 0.000 0.704 2.929 1.253 106.903 0.798 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- Outlet OUTFALL 0.00 0.00 96.00 0 00:00 Pond_2_Future STORAGE 0.26 3.24 100.24 0 02:08 Pond_1 STORAGE 2.57 4.38 101.38 0 08:18 ******************* Node InFlow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- Outlet OUTFALL 0.00 0.61 0 01:42 0.000 1.253 Pond_2_Future STORAGE 24.71 24.71 0 00:40 0.251 0.251 Pond_1 STORAGE 82.20 82.98 0 00:40 1.002 1.253 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- Pond_2_Future STORAGE 96.01 3.240 6.760 Pond_1 STORAGE 96.01 4.377 5.623 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** SWMM 5 Page 2 Storage Volume Summary ********************** -------------------------------------------------------------------------------------- Average Avg Maximum Max Time of Max Maximum Volume Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------- Pond_2_Future 1.510 1 26.245 10 0 02:08 1.22 Pond_1 65.079 9 143.714 19 0 08:18 0.61 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- Outlet 94.71 0.51 0.61 1.253 ----------------------------------------------------------- System 94.71 0.51 0.61 1.253 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence Velocity Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- Outlet_2 DUMMY 1.22 0 02:08 Outlet_1 DUMMY 0.61 0 01:42 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Fri Oct 07 15:17:13 2016 Analysis ended on: Fri Oct 07 15:17:13 2016 Total elapsed time: < 1 sec SWMM 5 Page 3 Link Outlet_1 Flow Elapsed Time (hours) 0 10 20 30 40 50 60 70 80 90 100 Flow (CFS) 0.8 0.6 0.4 0.2 0.0 SWMM 5 Page 1 Node Pond_1 Volume Elapsed Time (hours) 0 10 20 30 40 50 60 70 80 90 100 Volume (ft3) 160000.0 140000.0 120000.0 100000.0 80000.0 60000.0 40000.0 20000.0 0.0 SWMM 5 Page 1 APPENDIX D LID/WATER QUALITY TREATMENT INFORMATION Basin (s) Forebay ID Basin New Impervious Area (Ac.) Req'd Min. Area to be Treated (Ac.) LID Forebay Req'd Min. Volume (Cu.-Ft.) 2, 8 1 3.42 2.57 3724 5,6 2 (Future) 2.43 1.82 2646 7 3 (Future) 2.40 1.80 2617 9 4 (Future) 0.64 0.48 696 4 5 (Future) 2.12 1.59 2309 10 6 (Future) 0.40 0.30 436 8.56 Ac. 75 % 75% On-Site Treatment by LID Summary Table Total Site New Impervious Area Treated = Percent of New Impervious Area Treated = WATER QUALITY DESIGN CALCULATIONS Forebay 1 Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 2, 6 NEW IMPERVIOUS AREA (ac) = 3.42 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 2.565 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 3724 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WATER QUALITY DESIGN CALCULATIONS Extended Detention-Pond 1 Water Quality Capture Volume - Extended Detention (40-Hr.) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 2, 6 BASIN AREA (ac) = 7.010 <-- INPUT from runoff calcs BASIN IMPERVIOUSNESS PERCENT = 61.70 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.6170 <-- CALCULATED WQCV (watershed inches) = 0.242 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.141 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 REQ'D TREATMENT VOLUME (ac-ft) = 0.071 <-- CALCULATED (50% OF BASIN RUNOFF) WATER QUALITY DESIGN CALCULATIONS Forebay 2 (Future) Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 5,6 NEW IMPERVIOUS AREA (ac) = 2.430 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 1.823 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 2646 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WATER QUALITY DESIGN CALCULATIONS Extended Detention-Pond 2 (Future) Water Quality Capture Volume - Extended Detention (40-Hr.) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 5,6 BASIN AREA (ac) = 2.700 <-- INPUT from runoff calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.090 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 REQ'D TREATMENT VOLUME (ac-ft) = 0.045 <-- CALCULATED (50% OF BASIN RUNOFF) WATER QUALITY DESIGN CALCULATIONS Forebay 3 (Future) Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 7 NEW IMPERVIOUS AREA (ac) = 2.403 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 1.802 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 2617 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WATER QUALITY DESIGN CALCULATIONS Extended Detention-Pond 3 (Future) Water Quality Capture Volume - Extended Detention (40-Hr.) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 7 BASIN AREA (ac) = 2.670 <-- INPUT from runoff calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.089 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 REQ'D TREATMENT VOLUME (ac-ft) = 0.045 <-- CALCULATED (50% OF BASIN RUNOFF) WATER QUALITY DESIGN CALCULATIONS Forebay 4 (Future) Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 9 NEW IMPERVIOUS AREA (ac) = 0.639 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 0.479 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 696 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WATER QUALITY DESIGN CALCULATIONS Extended Detention-Pond 4 (Future) Water Quality Capture Volume - Extended Detention (40-Hr.) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 9 BASIN AREA (ac) = 0.710 <-- INPUT from runoff calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.024 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 REQ'D TREATMENT VOLUME (ac-ft) = 0.012 <-- CALCULATED (50% OF BASIN RUNOFF) WATER QUALITY DESIGN CALCULATIONS Forebay 5 (Future) Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 4 NEW IMPERVIOUS AREA (ac) = 2.120 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 1.590 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 2309 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WATER QUALITY DESIGN CALCULATIONS Forebay 6 (Future) Water Quality Capture Volume (12-Hr. PLD) Project: 1067-001 By: ATC Date: 9/15/16 REQUIRED STORAGE & OUTLET WORKS: BASIN(S) : 10 NEW IMPERVIOUS AREA (ac) = 0.400 <-- INPUT from impervious calcs 75% OF NEW IMPERVIOUS AREA (ac) = 0.300 <-- CALCULATED PERCENT IMPERVIOUS = 100.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 1.0000 <-- CALCULATED WQCV (watershed inches) = 0.400 <-- CALCULATED from Figure 3-2 WQCV (cu-ft) = 436 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 APPENDIX E EROSION CONTROL REPORT Salud Family Health Center Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET DRAINAGE EXHIBITS X X X X X X X X X X X GV X X X X X X X X X X X X X X X X X X X X X X S S X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S M M M M GAS MH M GAS MH M X X 1 4 10 2 4 5 7 GABRIEL PROPERTIES, LLC DAVID & GRETCHEN OSBORN 10 1760 W. LAPORTE AVE, LLC WILLIAM S. ECKERT ERNEST M. & KRISTEN K. SCHMIDTBERGER ERNEST M. & KRISTEN K. SCHMIDTBERGER CITY OF FORT COLLINS LAPORTE AVENUE LLC LAPORTE AVENUE LLC JACOB BROADCASTING OF COLORADO DAVID & GRETCHEN OSBORN ONE-STORY METAL BUILDING DAVID & GRETCHEN OSBORN GABRIEL PROPERTIES, LLC 9 6 11 8 11 2' CONCRETE PAN PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED POND OUTFALL PROPOSED STORM MH WITH PUMP PROPOSED WATER QUALITY WEIR DETENTION / EXTENDED DETENTION POND 1 IRRIGATION DITCH EMERGENCY SPILLWAY (CONCRETE WEIR) BERM FUTURE DETENTION/EXTENDED EXISTING BANK DETENTION POND 2 LID FOREBAY 1 (12-HOUR PLD DESIGN) PROPOSED INLET 2' CONCRETE PAN 20' DRAINAGE EASEMENT FUTURE LID FEATURE 2 FUTURE LID FEATURE 3 FUTURE LID FEATURE 5 TO TREAT BASIN 4 PRIOR TO DISCHARGE INTO FUTURE CONVEYANCE LOT 1 LOT 2 LOT 6 LOT 4 LOT 3 LOT 5 LOT 7 PROPERTY LINE (TYP) LOT LINE (TYP) 7 FUTURE CONVEYANCE (PIPE OR SWALE) TO CONVEY FLOW FROM BASIN 4 INTO DETENTION POND 1 FUTURE DETENTION/EXTENDED DETENTION POND 3 5 1 3 2 3 POND EMERGENCY SPILL SECTION TIES TO NATURAL GRADE TO MAINTAIN FLOODPLAIN REQUIREMENTS 8 6 FUTURE LID FEATURE 6 FUTURE LID FEATURE 4 FUTURE DETENTION/EXTENDED DETENTION POND 4 9 FUTURE DEVELOPMENT WITHIN BASIN 10 ALLOWED TO MATCH HISTORIC 100-YEAR RUNOFF FROM EXISTING PARKING LOT OF 4.3 CFS OS1 OS1 CITY FLOODPLAIN BOUNDARY (TYP) CITY FLOODWAY BOUNDARY (TYP) FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION LEGEND: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARKS. NOTES: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner PROPOSED CONTOUR PROPOSED SWALE EXISTING CONTOUR PROPOSED VERTICAL PROPOSED OVERLAND FLOW DIRECTION CURB & GUTTER EXISTING STORM SEWER LINE PROPERTY BOUNDARY EXISTING INLET GRATE PROPOSED UNDERDRAIN UD PROPOSED STORM DRAIN PROPOSED RIBBON CURB PROPOSED PERMEABLE PAVERS B a BASIN ACREAGE DESIGN POINT BASIN DELINEATION MAJOR RUNOFF COEFFICIENT PROPOSED BASIN LINES Sheet Of 15 Sheets SALUD FAMILY HEALTH CENTER These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET ENGINEER ING N O R T H E RN 10/05/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C5.00 DRAINAGE EXHIBIT ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 NORTH KEYMAP C5.00 75% On-Site Treatment by LID Summary Table Basin (s) Forebay ID Basin New Impervious Area (Ac.) Req'd Min. Area to be Treated (Ac.) LID Forebay Req'd Min. Volume (Cu.-Ft.) 2, 8 1 3.42 2.57 3724 5,6 2 (Future) 2.43 1.82 2646 7 3 (Future) 2.40 1.80 2617 9 4 (Future) 0.64 0.48 696 4 5 (Future) 2.12 1.59 2309 10 6 (Future) 0.40 0.30 436 Total Site New Impervious Area Treated = 8.56 Ac. Percent of New Impervious Area Treated = 75 % DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 1 3.71 0.25 0.31 29.7 27.5 1.2 5.5 2 2 5.21 0.64 0.80 18.5 17.3 5.6 25.6 3 3 2.94 0.25 0.31 33.9 31.4 0.9 4.1 4 4 2.36 0.95 1.19 16.8 15.7 4.0 18.0 5 5 1.23 0.95 1.19 12.9 12.0 2.4 10.6 6 6 1.80 0.85 1.06 15.9 14.8 2.8 12.6 7 7 2.67 0.95 1.19 16.8 15.7 4.5 20.3 8 8 1.47 0.95 1.19 8.2 7.8 3.4 15.0 9 9 0.71 0.95 1.19 12.4 11.5 1.4 6.1 10 10 0.44 0.95 1.19 6.2 5.8 1.1 5.0 11 11 0.22 0.79 0.99 5.9 5.5 0.5 2.2 OS1 OS1 1.08 0.47 0.59 19.1 17.8 0.8 3.8 SWMM 5 Page 1 the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 9 (min) 10-yr Tc (min) 100-yr Tc (min) H1 H1 No 0.25 0.25 0.31 400 0.80% 34.2 34.2 31.7 0 0.00% N/A N/A 482 0.80% 1.34 6.0 40 40 38 HISTORIC TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC May 1, 2016 Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L   (min) 10-yr Tc (min) 100-yr Tc (min) 1 1 No 0.25 0.25 0.31 325 0.90% 29.7 29.7 27.5 0 0.00% 0.00 N/A 0 0.00% N/A N/A 30 30 27 2 2 No 0.25 0.25 0.31 110 1.00% 16.7 16.7 15.4 220 1.00% 2.00 1.8 0 0.00% N/A N/A 19 19 17 3 3 No 0.25 0.25 0.31 323 0.60% 33.9 33.9 31.4 0 0.00% N/A N/A 0 0.00% N/A N/A 34 34 31 4 4 No 0.25 0.25 0.31 90 1.00% 15.1 15.1 14.0 150 0.50% 1.41 1.8 0 0.00% N/A N/A 17 17 16 5 5 No 0.25 0.25 0.31 90 2.00% 12.0 12.0 11.1 75 0.50% 1.41 0.9 0 0.00% N/A N/A 13 13 12 6 6 No 0.25 0.25 0.31 90 1.00% 15.1 15.1 14.0 100 1.00% 2.00 0.8 0 0.00% N/A N/A 16 16 15 7 7 No 0.25 0.25 0.31 90 1.00% 15.1 15.1 14.0 150 0.50% 1.41 1.8 0 0.00% N/A N/A 17 17 16 8 8 No 0.25 0.25 0.31 20 2.00% 5.6 5.6 5.2 310 1.00% 2.00 2.6 0 0.00% N/A N/A 8 8 8 9 9 No 0.25 0.25 0.31 90 2.00% 12.0 12.0 11.1 50 1.00% 2.00 0.4 0 0.00% N/A N/A 12 12 12 10 10 No 0.25 0.25 0.31 20 2.00% 5.6 5.6 5.2 45 0.50% 1.41 0.5 0 0.00% N/A N/A 6 6 6 11 11 No 0.25 0.25 0.31 20 2.00% 5.6 5.6 5.2 30 1.00% 2.00 0.3 0 0.00% N/A N/A 6 6 5 OS1 OS1 No 0.25 0.25 0.31 120 1.00% 17.4 17.4 16.1 144 0.50% 1.41 1.7 0 0.00% N/A N/A 19 19 18 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC 10/1/16 Time of Concentration (Equation RO-4)   3 1 1 . 87 1 . 1 * S C Cf L Ti   10 20213 0.44 0.00 0.22 0.22 0.00 0.00 0.95 0.95 1.19 90.0% 11 8566 0.22 0.16 0.01 0.00 0.00 0.05 0.79 0.79 0.99 76.7% OS1 46907 1.08 0.00 0.10 0.25 0.00 0.73 0.47 0.47 0.59 28.8% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 10/1/16