Loading...
HomeMy WebLinkAboutTHE EXCHANGE - BASIC DEVELOPMENT REVIEW - BDR160019 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDrainage Letter and LID Report Date: October 12, 2016 Project: The Exchange Project No. 379-060 Basic Development Review (BDR) Fort Collins, Colorado Attn: City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 To whomever it concerns: This letter serves to address the stormwater impacts of the proposed project known as “The Exchange”. The project is a redevelopment of the 200 block of North College Avenue. The redevelopment consists primarily of façade improvements to the existing buildings, along with a small expansion of the southern- most building. Also, the existing parking lot is being replaced by a pedestrian area with seating areas and a grassy central lawn. The total impervious area of the site will be reduced due to the removal of the existing parking area and the addition of the large grassy area in the center of the site. For this reason, the total runoff was assumed to also be reduced and, therefore, no stormwater detention is proposed. Although stormwater quantity detention is not required, stormwater quality will be addressed by permanent Best Management Practices (BMPs) and Low Impact Development (LID) requirements. The project will maintain the existing overall drainage patterns for the most part, however modifications to the interior drainage patterns will be made in order to capture and treat as much of the affected project site as possible with LID methods. In general, the central grass area will be lowered so that all adjacent areas of paving can drain to the inlets located at the corners of the grass area. These inlets will direct flows into an underground detention facility that will provide storage for the water quality capture volume (WQCV). The vaults will have an open bottom to allow the WQCV to infiltrate into the underlying soils. Flows in excess of the WQCV will pass over a weir in the downstream inlet and proceed via a storm drain into an existing area inlet located at the intersection of the alley and Pine Street. During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 18,000 sf area of disturbance for the project is more than 10,000 sf, a comprehensive Stormwater Management Plan will be prepared for this project at Final Design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. There are no regulatory floodplains associated with the project. The City LID requirements specify that either 75% of all impermeable areas are provided LID treatment OR 50% LID treatment by which 25% is treated by permeable pavers. In the case of this project, we will meet or exceed the 75% treatment of impermeable areas through the use of LID. The treatment will be provided by an infiltration gallery that will treat 18,319 square-feet of impervious area on the site, which is 83.1% of the total impervious area within the affected project areas, which exceeds the amount required by city code. A LID Treatment Exhibit is provided with this report. To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. On-site detention is proven to be unnecessary. Stormwater quality has been provided, and meets the city requirements for Low Impact Development treatment. Therefore, it is my professional opinion that The Exchange satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andy Reese Project Manager enc. CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: The Exchange Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.50 . 40% Roofs …….…….………………..……………….…………………………………………….0.95 . 90% Pavers…………………………...………………..…………………………………………….0.40 . 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….0.15 . 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 0.42 0.00 0.20 0.04 0.07 0.00 0.18 0.73 0.73 0.91 51% OS1 0.04 0.00 0.01 0.01 0.01 0.00 0.01 0.83 0.83 1.00 59% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 October 12, 2016 Overland Flow, Time of Concentration: Project: The Exchange Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: The Exchange Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) C2 C10 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) Flow, WQ (cfs) A1 A1 0.42 8 8 7 0.73 0.73 0.91 2.46 4.21 8.80 0.8 1.3 3.4 0.38 OS1 OS1 0.04 5 5 5 0.83 0.83 1.00 2.85 4.87 9.95 0.1 0.2 0.4 0.05 DEVELOPED RUNOFF COMPUTATIONS A. Reese October 12, 2016 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Q = C f ( C )( i )( A ) Basin ID Basin Area (s.f.) Basin Area (ac) Composite % Imperv. Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) Flow, WQ (cfs) Treatment Area (sf) A1 18,319 0.42 51% 0.75 1.29 3.37 0.38 13,349 OS1 1,786 0.04 59% 0.10 0.16 0.41 0.05 1,583 DEVELOPED RUNOFF SUMMARY Project Title Date: Project Number Calcs By: Basin(S) 0.8 WQCV = Watershed inches of Runoff (inches) 62.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.194 in A = 0.43 ac V = 0.0070 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) The Exchange October 12, 2016 379-060 A. Reese A1 303 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event 0.194 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø ö ç Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Rate (cfs) Chamber Volume (cfs) Installed Chamber Volume (cfs) Mimimum No. of Chambers Minimum Release Rate (cfs) Required Chamber Volume by FAA Method (cf) Provided Number of Chambers Provided Chamber Volume (cf) Total Installed Chamber Volume (cf) 1 303 0.38 SC-740 0.024 45.90 74.90 5 0.12 242 6 275 449 Vault Configuration Summary Note: "Chamber Volume" refers to the open volume within the vaults. "Installed Chamber Volume" refers to the total volume provided, including the surrounding aggregates. D:\Projects\379-060\Drainage\LID\379-060_Vault Summary.xlsx The Exchange Fort Collins, Colorado A. Reese Date: October 12, 2016 Pond No.: Vault 1 A1 WQ 0.91 Area (A)= 0.43 acres Quantity Detention 242 ft 3 Max Release Rate = 0.12 cfs Time Time Ft.Collins WQ Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 1.43 0.6 167 36 131 10 600 1.11 0.4 259 72 187 15 900 0.94 0.4 329 108 221 20 1200 0.81 0.3 378 144 234 25 1500 0.72 0.3 420 180 240 30 1800 0.65 0.3 458 216 242 35 2100 0.59 0.2 481 252 229 40 2400 0.54 0.2 502 288 214 45 2700 0.50 0.2 523 324 199 50 3000 0.46 0.2 540 360 180 55 3300 0.44 0.2 562 396 166 60 3600 0.41 0.2 578 432 146 65 3900 0.39 0.2 588 468 120 70 4200 0.37 0.1 600 504 96 75 4500 0.35 0.1 607 540 67 80 4800 0.33 0.1 620 576 44 85 5100 0.32 0.1 629 612 17 90 5400 0.31 0.1 644 648 -4 95 5700 0.29 0.1 647 684 -37 100 6000 0.28 0.1 657 720 -63 105 6300 0.27 0.1 666 756 -90 110 6600 0.26 0.1 671 792 -121 115 6900 0.3 0.1 688 828 -140 120 7200 0.25 0.1 690 864 -174 Vault Volume Calculation | FAA Method Project: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = D:\Projects\379-060\Drainage\LID\379-060_FAA_Vault 1.xlsm\ è = æ 12 hr D:\Projects\379-060\Drainage\WatQual\379-060_WQ Volume.xls (min) 10-yr Tc (min) 100-yr Tc (min) A1 A1 No 0.25 0.25 0.31 39 1.94% 8.0 8.0 7.4 0 n/a N/A N/A 0 n/a N/A N/A 8 8 7 OS1 OS1 No 0.95 0.25 1.00 21 5.19% 0.7 4.2 0.5 0 n/a N/A N/A 0 n/a N/A N/A 5 5 5 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow A. Reese October 12, 2016 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - =