HomeMy WebLinkAboutTHE EXCHANGE - BASIC DEVELOPMENT REVIEW - BDR160019 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision:
Project Name:
Project Type:
Project Number: Items for New Projects & Resubmittals Final Redlines
Date Received:
Review Round:
Planner:
Engineer:
# Label Sets Needed (1,2,3….):
Labels Received Y/N:
RETURN ALL REDLINES
1 1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1
1 1 1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1
1 1 1
1 1 1 1 1 E
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1
12 12 12 10 0 5 3 4 0 6 0 0 0 0 0 0 0 0 0 0 Revised: 1-29-2016
P P P P P P P P P P P P P P P P P P P P
T.I.A.(letter or full report)
Utility Plans
10/12/2016
Planning Objectives
Comment Response Letter
Site Plan
Landscape Plan
New projects: APO labels & list:
Ted Shepard
K. A.
Wetland Delineation
Ecological Study (ECS)
Hazmat Review
Soils Study- New/Update
Digital copy of all materials
L.U.C. Mod. Requests
Drainage Report
Building Materials Exhibit
Easements (As Needed)
SWMP (Erosion Report)
Utility Plan
Site Plan
Landscape Plan
Plat
Building Elevations
Item Waived(W); Deferred (D); or n/a
File: Project Planner
Building Inspection
Century Link
Comcast
Development Review Engineering
Economic Development
Environmental Planner
Forestry
GIS
Historic Preservation
CFC Light & Power
Neighborhood Services
Park Planning
Pavement Management
Post Office
Poudre Fire Authority
Real Estate Planning
Outside Agency Sanitation Dist:
Outside Agency Water District:
Street Oversizing
Technical Services
Traffic Operations
Transfort
Transportation Planning
Water Conservation
Received:
County Assessor
CDOT
Ditch Co:
Railroad: ___________________
School District
Other: Extra-Public File
1
Total:
Format Required: (P)aper, Digital (CD)
Xcel Energy
Zoning
City Water Utilities Eng. (Stormwater)
City Erosion Control (SWMP Review)
Lighting Plan
Plat
Building Elevations
Lighting Plan
Drainage Report
Turnaround Time: 2 weeks Comments Due: 10.26.2016
The Exchange
BDR
BDR160019