HomeMy WebLinkAbout2133 TIMBERLINE RD., OFFICE & RESTAURANT - MAJOR AMENDMENT - MJA150009 - CORRESPONDENCE - (5)Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
February 17, 2016
Keith Meyer
1315 OAKRIDGE DR SUITE 120
Fort Collins, CO 80525
RE: 2133 S Timberline Rd.-Office and Restaurant, MJA150009, Round Number 2
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
02/12/2016: Change Legal so that it reads: "Timberline Center, Third Filing, Lot 3"
01/12/2016: Change the legal description on the Utility Plan to "Timberline Center,
Third Filing" as depicted on the replat.
Comment Number: 1 Comment Originated: 01/12/2016
02/12/2016: The legal for the lot to the west should read: "Lot 2, Timberline Center,
Second Filing"
01/12/2016: Please list all neighboring lots with the legal descriptions. Please see
redlines.
Comment Number: 3 Comment Originated: 01/12/2016
02/12/2016: Please indicate with a callout that the building envelope that is shown
on this sheet is existing.
01/12/2016: The Existing Conditions Sheet (Sheet 3) doesn't show the existing
blanket utility easement. The building envelope and blanket easement shows what is
being proposed with the replat.
Comment Number: 5 Comment Originated: 01/12/2016
02/12/2016: Pleas provide a letter of intent for an offsite easement to complete this
work.
01/12/2016: Will this development be removing & repairing the landscape islands
on Lot 2, Timberline Center, Second Filing? An offsite easement will be required to
perform the work.
Comment Number: 6 Comment Originated: 01/12/2016
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Seth Lorson, at
970-224-6189 or slorson@fcgov.com.
Page 1 of 5
02/12/2016: Clearly indicate the new location of the building envelope. There are
conflicting sheets that show the previous building envelope on the Second Filing and
others that show the new building envelope with the replat of this lot. Only show the
old building envelope on the Existing Conditions sheet (Sheet 3)
01/12/2016: Show and label all easements with labels. It is unclear where
easement boundary is to the west.
Comment Number: 8 Comment Originated: 01/12/2016
02/12/2016: It appears that areas on the souther parking island will not drain. See
redlines.
01/12/2016: Please take a look at the Overall Grading Plan sheet (Sheet 8). It looks
like there are a couple low spots that won't drain. Also, there are a couple spot
elevations that do not match the elevations that were approved for Lot 2, Timberline
Center, Second Filing.
Comment Number: 11 Comment Originated: 01/12/2016
02/12/2016: Portions of the bio-swale still sit outside of the blanket drainge
easement and into the building envelope. Please adjust.
01/12/2016: The proposed bio-swale to the south of the property needs to be in a
drainage easement. Currently it is within the building envelope. Please adjust the
boundary and plat to reflect this change.
Comment Number: 12 Comment Originated: 01/12/2016
02/12/2016: The vacation of the drainage and slope easement can be vacated by
separate document, but it would be a lot easier to do it via plat. If you choose to
vacate by separate document, there is a $400 vacation fee. Separate legals and
exhibits would be needed. Also, recording fees to the county will also be needed.
Since this project is already replatting, it would be the most efficient. If this
development still decides to vacate by separate document, Utility Plans will need to
include a note stating that the easement will be vacated by separate document.
01/12/2016: The slope and drainage easement at the southeast corner of the
property is no longer needed. Please adjust the plat to show the removal of this
easement. The blanket Utility, drainage, access & emergency access easement
can remain.
Comment Number: 14 Comment Originated: 01/12/2016
02/12/2016: Please refer to the Lot as "Lot 1, Timberline Center, Third Filing" as
shown on the replat for all sheets. Utility Plans say 2nd Filing. See redlines.
Comment Number: 15 Comment Originated: 02/12/2016
02/12/2016: It appears there is an incorrect lot line shown on the plans. See
redlines on sheet 4.
Comment Number: 16 Comment Originated: 02/12/2016
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
02/08/2016:
01/19/2016:
Contact the City Forester for an on-site meeting to inventory existing trees on the
site.
Comment Number: 1 Comment Originated: 01/19/2016
Page 2 of 5
02/08/2016:
01/19/2016:
List percentage of each tree species used and check that it meets the Minimum
Species Diversity standard LUC 3.2.1 D 3.
Comment Number: 2 Comment Originated: 01/19/2016
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
01/13/2016: Primary power will be need to be fed from the three phase transformer
located at Burger King. This transformer and the electrical lines must be in a utility
easement. The location of this transformer needs to be determined to ensure that it
is currently in a utility easement. If it is not an easement will need to be obtained.
Comment Number: 1 Comment Originated: 01/13/2016
01/13/2016: Transformer and meter location needs to be coordinated with Light &
Power and shown on the drawings. Transformer must have an 8 feet front and 3
feet side/rear clearance. It must also be situated 10 feet of a drive over surface.
Comment Number: 2 Comment Originated: 01/13/2016
01/13/2016: A one-line diagram and Commercial Service form (C-1) must be
provided to ensure proper transformer sizing. A link to a C-1 form is below.
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 3 Comment Originated: 01/13/2016
02/17/2016: From first comment regarding utility easement, primary power will be
fed off of the transformer located at the north lot (Burger King). It needs to be
verified that this transformer and any primary line feeding 2133 lot is in a utility
easement. If the Burger King lot does not have an easement for this equipment, one
will need to be established.
Comment Number: 6 Comment Originated: 02/17/2016
02/17/2016: Coordinate transformer and meter locations with Todd Vedder. Plans
call out for an eectrical vault on the primary side of the transformer but not sure if
this is needed or required. Transformer will also have to be within 10 feet of a
drivable surface.
Comment Number: 7 Comment Originated: 02/17/2016
02/17/2016: Existing conduit is fed to the site from the north. Coordinate with Light
& Power to have this located to determine if it has to be relocated in order to meet
design needs.
Comment Number: 8 Comment Originated: 02/17/2016
02/17/2016: Please contact Todd Vedder with Light & Power Engineering
Department if you have any questions at 970.224.6152. Please reference our
Electric Construction, Policies Practices & Procedures to ensure requirements and
policies are met. http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 9 Comment Originated: 02/17/2016
Department: Outside Agencies
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: General
Page 3 of 5
01/19/2016: Comcast
Please call me to get Comcast service into the building. Area is designed.
Don Kapperman 970-567-0245
Comment Number: 1 Comment Originated: 01/19/2016
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
02/16/2016: The LID techniques need to be volume based to count towards the
75% requirement. The eastern half of the roof is not being treated in this way. The
City suggests rain gardens east of the building which will provide the necessary
treatment.
01/12/2016: The LID techniques proposed to meet the City's LID requirement needs
to be determined before a public hearing. The current site plan only supports
porous pavement and other techniques would not coincide with the current site plan.
A bio-retention facility could not be accommodated with the current site plan.
Comment Number: 2 Comment Originated: 01/12/2016
02/16/2016: The City has used a standard limit for impervious area draining into
bio-swales of 10 to 1. This design is proposing roughly 12 to 1. This may be
acceptable to this specific site if is determined to be the best option feasible.
01/12/2016: The bio-swale at the southern edge of the site looks to be taking a large
amount of flow. The swale needs to be sized to treat the area draining to it. these
type of swales can not be counted as LID treatment unless they are sized
appropriately.
Comment Number: 7 Comment Originated: 01/12/2016
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
02/12/2016: There are cut off text issues. See redlines.
Comment Number: 17 Comment Originated: 02/12/2016
Topic: Landscape Plans
02/12/2016: Please make changes as marked. See redlines.
01/07/2016: Please make sure the project name/title matches all other plans.
Comment Number: 8 Comment Originated: 01/07/2016
Topic: Plat
02/12/2016: A revised plat was not provided for review. We will need to review
before filed.
01/07/2016: Please add the space in the Statement Of Ownership And Subdivision
as marked. See redlines.
Comment Number: 1 Comment Originated: 01/07/2016
02/12/2016: A revised plat was not provided for review. We will need to review
before filed.
01/07/2016: Please make the major road names text larger in the vicinity map. See
redlines.
Comment Number: 2 Comment Originated: 01/07/2016
Page 4 of 5
02/12/2016: A revised plat was not provided for review. We will need to review
before filed.
01/07/2016: Please show the right of way lines on the opposite side of all adjacent
streets. See redlines.
Comment Number: 3 Comment Originated: 01/07/2016
02/12/2016: A revised plat was not provided for review. We will need to review
before filed.
01/07/2016: Please label all surrounding properties with "Unplatted" or the
subdivision name. This includes properties across right of ways. See redlines.
Comment Number: 4 Comment Originated: 01/07/2016
02/12/2016: A revised plat was not provided for review. We will need to review
before filed.
01/07/2016: Please correct the name in the titleblock. See redlines.
Comment Number: 5 Comment Originated: 01/07/2016
Topic: Site Plan
02/12/2016: Please make changes as marked. See redlines.
01/07/2016: Please make sure the project name/title matches all other plans.
Comment Number: 6 Comment Originated: 01/07/2016
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
02/17/2016: no further comments
Comment Number: 2 Comment Originated: 02/17/2016
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
01/12/2016: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Comment Number: 1 Comment Originated: 01/12/2016