Loading...
HomeMy WebLinkAboutTHE STANDARD AT FORT COLLINS - PDP - PDP160035 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT The Standard at Fort Collins Fort Collins, Colorado October 18, 2016 Prepared for: Landmark Properties 4455 Epps Bridge Parkway, Suite 20 Athens, GA 30606 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1290-001 P This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. October 18, 2016 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Report for The Standard @ Fort Collins Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Preliminary Development Review submittal for the proposed The Standard @ Fort Collins. Comments from the Preliminary Development Review Letter dated September 1, 2016 have been addressed. Written responses thereto can be found in the comprehensive response to comments letter on file with Current Planning. This report has been prepared in accordance to the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed The Standard @ Fort Collins project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Nicholas W. Haws, PE Cody Snowdon Project Manager Project Engineer The Standard @ Fort Collins Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 2 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 5 A. Major Basin Description ............................................................................................................... 5 B. Sub-Basin Description .................................................................................................................. 5 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations .................................................................................................................................. 5 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 6 D. Hydrological Criteria .................................................................................................................... 7 E. Hydraulic Criteria ......................................................................................................................... 7 F. Floodplain Regulations Compliance .............................................................................................. 7 G. Modifications of Criteria .............................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 8 A. General Concept .......................................................................................................................... 8 B. Specific Details ............................................................................................................................. 9 V. CONCLUSIONS ...................................................................................................... 13 A. Compliance with Standards ........................................................................................................ 13 B. Drainage Concept ...................................................................................................................... 13 References ....................................................................................................................... 14 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (For Future Use) B.2 – Inlets (For Future Use) B.3 – Detention Facilities (For Future Use) APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report The Standard @ Fort Collins Final Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2 – Proposed Site Plan ............................................................................................... 3 Figure 3 – Existing FEMA Floodplains .................................................................................... 4 Figure 4 – Existing City Floodplains ....................................................................................... 4 MAP POCKET: C8.00 - Drainage Exhibit C8.01 – Historic Drainage Exhibit The Standard @ Fort Collins Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The Standard @ Fort Collins project is located in the southwest quarter of Section 14, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located south of Lake Street and expands all the way to West Prospect Road. It encompasses Blue Ridge Apartments (775 West Lake Street) and four single family residences (900, 836 832, and 820 West Prospect Road). 4. Currently the existing lots do not have any stormwater or water quality facilities. The northern property consists of Blue Ridge Apartments, which includes an existing building, two parking lots and associated sidewalks. The southern properties consist of single family residences, which includes, multiple buildings, gravel drives, and associated sidewalks. The northern project site is composed of 81 percent imperviousness, while the southern portion of the project is composed of only 20 percent imperviousness, resulting in an overall imperviousness of 49 percent. The existing site all drains to both West Lake Street and West Prospect Road. 5. The project is currently bordered to the south by West Prospect Road, west by The Standard @ Fort Collins Final Drainage Report 2 Plymouth Congregational Church, north by West Lake Street and east by Farmhouse Fraternity. B. Description of Property 1. The Standard @ Fort Collins is approximately 4.23 net acres. Figure 1 – Aerial Photograph 2. The Standard @ Fort Collins consists of five properties with five existing structures and multiple out buildings. The northern lot consist of Blue Ridge Apartments with two parking lots and associated sidewalks. The southern lot consists of four single family residences with associated gravel driveways, multiple accessory buildings and associated sidewalks. There is no off-site drainage entering the existing properties. All runoff generated from the project drains either south to West Prospect Road or north to West Lake Street. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 100 percent of the site consists of Altvan- Satanta loam, which falls into Hydrologic Soil Groups B. 4. The proposed development will include the demolition of the existing structures, parking lots, gravel drives and associated sidewalks. The proposed project will include two large multi-family buildings, an internal parking structure and a central drive aisle acting as a pedestrian spine between West Prospect Road and West Lake Street. The central drive aisle and courtyards are planned to be composed of StormTech chambers underneath the surface. These areas will act as a portion of the project’s water quality and detention facility. Internal to Building B, a concrete vault is proposed to treat stormwater through the use of a sand filter, as well as detaining the major storm event. The surrounding green space will act as the remaining water quality. The Standard @ Fort Collins Final Drainage Report 3 Figure 2– Proposed Site Plan 5. No irrigation facilities or major drainageways are within the property limits. 6. The project site is within the High Density Mixed-Use Neighborhood District (H-M-N) Zoning District. The proposed use is permitted within the zone district. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. 2. The FEMA Panel 0801010979H illustrates the proximity of the project site to the nearest FEMA delineated regulatory floodplain. It is noted that the vertical datum utilized for site survey work is the City of Fort Collins Benchmark #29-92 Elevation = 5025.67 (NAVD 88) The Standard @ Fort Collins Final Drainage Report 4 Figure 3 – Existing FEMA Floodplains Figure 4 – Existing City Floodplains The Standard @ Fort Collins Final Drainage Report 5 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Standard @ Fort Collins is located within the Old Town Basin, which is located primarily in Old Town Fort Collins. B. Sub-Basin Description 1. The property historically drains from the southeast corner of the southern lots and to the northeast corner of the northern lot. Stormwater is routed via overland flow across the existing lots. The project only consists of two basins; Basin HN1 and HS1 representing the historic basin draining to the north and the historic basin draining to the south, respectively. The stormwater within Historic Basin HN1, historically discharges directly into West Lake Street at a rate of 4.11 cfs and 20.03 cfs for the 2-year and 100-year storm event, respectively. The stormwater within Historic Basin HS1, historically discharges directly into West Prospect Road at a rate of 1.36 cfs and 6.21 cfs for the 2-year and 100-year storm event, respectively. See Section IV.A.4. below, for a more detailed description of the projects proposed drainage patterns. 2. No drainage is routed onto the property from the surrounding properties. A full-size copy of the Historic and Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with The Standard @ Fort Collins project. B. Four Step Process The overall stormwater management strategy employed with The Standard @ Fort Collins project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Selecting a site that has been previously developed and currently consist of Blue Ridged Apartments and single family residences, two asphalt parking lots, multiple gravel access drives and associated sidewalks. Providing vegetated open areas along the north, south, east and west portion of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through drain rock both within the underground detention section to increase time of concentration, promote infiltration and provide initial water quality. The Standard @ Fort Collins Final Drainage Report 6 Routing runoff through the drain rock within the underground detention area to increase time of concentration, promote infiltration and provide water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The stormwater generated from Building B will be routed internally and discharge into a pond/sand filter located in the garage. The water quality event will be filtered through the sand layer and discharge into West Lake Street. Stormwater generated from the northern portion of the central drive will be either treated through the use of StormTech Chambers or permeable pavers. Stormwater generated from the southern portion of the central drive will be treated through the use of pavers. Stormwater generated from Building A will be routed internal and discharge into StormTech Chambers located around the building where it will be treated through the drain rock section. The areas running off-site to the west and the east only consist of landscape area and will be routed across landscape before leaving the site. Step 3 – Stabilize Drainageways As stated in Section I.B.5, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to The Standard @ Fort Collins, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Once again, site selection has a positive effect on stream stabilization. By repurposing an already developed, under-utilized site with existing stormwater infrastructure, combined with LID, the likelihood of bed and bank erosion is greatly reduced. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments and is not applicable for this project. C. Development Criteria Reference and Constraints 1. There are no known drainage studies for the existing properties. 2. There are drainage studies for both the Stadium Apartments to the north and The Slab Project east, but those projects will not have any effect on The Standard @ Fort Collins project. 3. The subject property is essentially an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the north property lines adjacent to West Lake Street will be maintained. Existing elevations along the south property lines adjacent to the West Prospect Road will be maintained. Existing elevations along the west will also be maintained. Areas along the southern property line of Building B and east of the southern half of the alley will be raised through use of a landscape wall. As previously mentioned, overall drainage patterns within the Master Drainage Basin will be maintained. To alleviate the current drainage problem within West Lake Street, the majority of the drainage will be routed to West Prospect Road. The Standard @ Fort Collins Final Drainage Report 7 D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains into both West Lake Street and West Prospect Road. The majority of the site drains stormwater via overland flow. 2. All drainage facilities proposed with The Standard @ Fort Collins project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is not located within any regulatory floodplain. 4. The Standard @ Fort Collins project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year or City floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed The Standard @ Fort Collins development is not requesting any modification at this time. The Standard @ Fort Collins Final Drainage Report 8 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of The Standard @ Fort Collins drainage design are to maintain existing drainage patterns, minimize the amount of drainage routed to West Lake Street and ensure no adverse impacts to any adjacent properties. 2. As previously mentioned, there are no off-site flows draining onto the existing property. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The Standard @ Fort Collins project is composed of four major drainage basins, designated as Basins N, S, ON, and OS. The drainage patterns for each major basin are further described below. Basin N Basin N is further subdivided into three (3) sub-basins, designated as Basins N1, N2, and N3. Sub-basin N1 is composed primarily of the drive located west of Building B and the fire turnaround located north of Building A. It consists of some landscape surfacing, but predominantly hardscape. Stormwater generated from this sub-basin is routed via overland and gutter flow and discharges into underground StormTech Chambers during the water quality event, while bypassing this system during the major event and discharging undetained into Sub-basin A2. Sub-basin A2 is composed primarily of the drive located west of Building B and consists of some landscape surfacing, but predominantly hardscape. Stormwater generated from this sub-basin is routed via overland flow and gutter flow and is treated through use of a paver section. During the major storm event, runoff from both Basin A1 and A2 will be discharged undetained into West Lake Street. Sub-basin N3 is composed entirely of Building B. Stormwater generated from this sub-basin is routed internal to the building and discharges into a detention structure within the parking garage. The structure has two components incorporated within the design. The lower section of the structure will include a sand bed and treat the stormwater before releasing the Water Quality event into West Lake Street. The upper section will be open and used for detention of storm events larger than the Water Quality event. The stormwater within this section will be routed to West Prospect Road by use of a siphoned storm drain. Basin S Basin S is further subdivided into six (6) sub-basins, designated as Basins S1-S6. Sub-basin S1 is composed of the area to the west and north Building A, as well as a portion of the roof from Building A. Stormwater generated from this sub-basin will be routed both internal and external to the building and discharges directly into Detention Pond S1. Pond S1 was designed with isolator rows to treat the Water Quality Event and sized to detain the 100-year event. Sub-basin S2 is composed of the western courtyard, as well as a portion of the roof from Building A. Stormwater generated from this sub-basin will be routed both internal and external to the building and discharges directly into Detention Pond S2. Pond S2 was designed with isolator rows to treat the Water Quality Event and sized to detain the 100-year event. Sub-basin S3 is The Standard @ Fort Collins Final Drainage Report 9 composed of the central courtyard, as well as a portion of the roof from Building A. Stormwater generated from this sub-basin will be routed both internal and external to the building and discharges directly into Detention Pond S3. Pond S3 was designed with isolator rows to treat the Water Quality Event and sized to detain the 100-year event. Sub-basin S4 is composed of the eastern courtyard, as well as a portion of the roof from Building A. Stormwater generated from this sub-basin will be routed both internal and external to the building and discharges directly into Detention Pond S4. Pond S4 was designed with isolator rows to treat the Water Quality Event and sized to detain the 100-year event. Sub-basin S4 is composed of a portion of the roof from Building A. Stormwater generated from this sub-basin will be routed internal to the building and discharges directly into Detention Pond S5. Pond S5 was designed with isolator rows to treat the Water Quality Event and sized to detain the 100-year event. Basin ON Basin ON is further subdivided into two (2) sub-basins, designated as Basins ON1 and ON2. Sub-basin ON1 is composed primarily of the area located north of the Building B, and consists of landscape sand public sidewalk. Stormwater generated from this sub-basin is routed via overland flow and discharges undetained into West Lake Street. Sub-basin ON2 is composed of a small area located east and south of Building B and consists entirely of landscaping. Stormwater generated from this sub-basin is routed via overland flow and discharges undetained to the east and south. Basin OS Basin OS is further subdivided into two (2) sub-basins, designated as Basins OS1 and OS2. Sub-basin OS1 is composed primarily of the area located south of the Building A, and consists of landscape sand public sidewalk. Stormwater generated from this sub-basin is routed via overland flow and discharges undetained into West Prospect Road. Sub-basin OS2 is composed of a small area located north of Building A and consists entirely of landscaping. Stormwater generated from this sub-basin is routed via overland flow and discharges undetained to the north. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The main drainage problem associated with this project site is the deficiency of water quality present within the existing site. The northern portion of the site (Blue Ridge Apartments) drains overland and discharges directly into the West Lake Street without water quality. The southern portion of the site (single family residences) drains overland flow and discharges directly into the West Prospect Road without water quality. The proposed site will mitigate this issue by instituting the following water quality devices: All of the runoff generated from the proposed roof of Building A (Sub-basin N3) will be routed through a sand filter before discharging into West Lake Street. All of the runoff generated from the proposed roof of Building A (Sub-basins S1- S6) will be routed to StormTech Chambers and filter through the drain rock surrounding the chambers before discharging in to West Prospect Road. All of the runoff generated to the west of Building A (Sub-basin S1) will be treated by a paver section, as well as the StormTech Chambers within the drive aisle. The Standard @ Fort Collins Final Drainage Report 10 The runoff generated from the central drive corridor will be treated through a combination of the paver section and StormTech Chambers. The landscape areas surrounding the project (Sub-basin ON1, ON2, OS1, and OS2) will be treated by use of a grass buffer, as the run on area is less that 1:1. 2. The release rate for the undeveloped land (pre-development) was established by calculating the 2-year peak runoff rate of the existing pervious area and the 100-year peak runoff rate of the existing impervious area located within the project area, resulting in an overall release of 23.68 cfs. In excluding all portions of the proposed project that releases undetained (Sub-basins N1, N2, S6, OS1, OS2, ON1, and ON2), the overall allowable peak runoff rate for the remaining site was calculated at 15.47 cfs. This remaining release rate was divided among Sub-Basins N2, S1, S2, S3, S4 and S5. This release rates were utilized in the FAA method for design of Ponds S1-S5 and N3. (Refer to Appendix B for these calculations). 3. Detention Pond Calculations Pond N3 Calculations for Pond N3, based on the characteristics of Sub-basin N3 and an adjusted release rate of 9.58 cfs, indicate a detention volume of 3,225 cu. ft. This does not included the Water Quality Capture Volume (WQCV) of 2,484 cu. ft., resulting in an overall detention volume of 5,709 cu. ft. Water quality will be treated through the use of a sand filter and discharge into West Lake Street, while overall quantity detention will be released into West Prospect Road. Pond S1 Calculations for Pond S1, based on the characteristics of Sub-basin S1 and an adjusted release rate of 1.96 cfs, indicate a detention volume of 1,230 cu. ft. This volume includes the 12-hour release WQCV calculated for this basin (327 cu. ft.). During a Water Quality storm event, the WQCV will be routed directly into an isolator row. The isolator rows were sized to capture either the 12-hour release WQCV within the chambers and the surrounding aggregate or the volume required to detain the Water Quality storm event only within the chambers, whichever is greater. Pond S2 Calculations for Pond S2, based on the characteristics of Sub-basin S2 and an adjusted release rate of 1.01 cfs, indicate a detention volume of 1,123 cu. ft. This volume includes the 12-hour release WQCV calculated for this basin (224 cu. ft.). During a Water Quality storm event, the WQCV will be routed directly into an isolator row. The isolator rows were sized to capture either the 12-hour release WQCV within the chambers and the surrounding aggregate or the volume required to detain the Water Quality storm event only within the chambers, whichever is greater. Pond S3 Calculations for Pond S3, based on the characteristics of Sub-basin S3 and an adjusted release rate of 1.03 cfs, indicate a detention volume of 1,123 cu. ft. This volume includes the 12-hour release WQCV calculated for this basin (232 cu. ft.). During a Water Quality storm event, the WQCV will be routed directly into an isolator row. The isolator rows were sized to capture either the 12-hour release WQCV within the chambers and the surrounding aggregate or the volume required to detain the Water Quality storm event only within the chambers, whichever is greater. The Standard @ Fort Collins Final Drainage Report 11 Pond S4 Calculations for Pond S4, based on the characteristics of Sub-basin S4 and an adjusted release rate of 0.88 cfs, indicate a detention volume of 1,123 cu. ft. This volume includes the 12-hour release WQCV calculated for this basin (215 cu. ft.). During a Water Quality storm event, the WQCV will be routed directly into an isolator row. The isolator rows were sized to capture either the 12-hour release WQCV within the chambers and the surrounding aggregate or the volume required to detain the Water Quality storm event only within the chambers, whichever is greater. Pond S5 Calculations for Pond S5, based on the characteristics of Sub-basin S5 and an adjusted release rate of 1.01 cfs, indicate a detention volume of 620 cu. ft. This volume includes the 12-hour release WQCV calculated for this basin (239 cu. ft.). During a Water Quality storm event, the WQCV will be routed directly into an isolator row. The isolator rows were sized to capture either the 12-hour release WQCV within the chambers and the surrounding aggregate or the volume required to detain the Water Quality storm event only within the chambers, whichever is greater. 4. Detention Pond Results Pond N3 The total storage available within Pond N3 is 5,780 cu. ft at a High Water Surface Elevation (HWSE) of 5030.4. The top of the structure will provide more than the required 12-inches of freeboard. The WQCV is achieved at a water surface elevation of 5028.5 feet, while the 100-year detention volume is achieved at a water surface elevation of 5028.90 feet. In the case that the outlet structure within Pond N1 were to clog, stormwater will exit the pond structure through vents within the exterior wall and discharge into the drainage swale to the east that was designed for The Slab. Once within this swale, the emergency flow will discharge directly into West Lake Street. Pond S1 The storage volume available within StormTech Vault Structure within Pond S1 is 1,230 cu. ft. This includes the volume stored in the aggregate surrounding the chambers. To achieve water quality, a total of 16 chambers are proposed to be wrapped and installed as isolator rows. The water quality volume achieved within isolator rows (aggregate included) is 469 cu. ft., while the volume achieved within only the chambers of the isolator row is 235 cu. ft. In the case that the area inlet within Sub-basin S1 should clog or backwatering should occur, stormwater would overtop the inlet and discharge directly into West Prospect Road. Pond S2 The storage volume available within StormTech Vault Structure within Pond S2 is 1,123 cu. ft. This includes the volume stored in the aggregate surrounding the chambers. To achieve water quality, a total of 4 chambers are proposed to be wrapped and installed as isolator rows. The water quality volume achieved within isolator rows (aggregate included) is 300 cu. ft., while the volume achieved within only the chambers of the isolator row is 184 cu. ft. In the case that the outlet structure within Sub-basin S2 should clog or backwatering should occur, stormwater will bubble up from the outlet structure and overtop the wall located at the south end of the courtyard and discharge directly into West Prospect Road. The Standard @ Fort Collins Final Drainage Report 12 Pond S3 The storage volume available within StormTech Vault Structure within Pond S3 is 1,123 cu. ft. This includes the volume stored in the aggregate surrounding the chambers. To achieve water quality, a total of 4 chambers are proposed to be wrapped and installed as isolator rows. The water quality volume achieved within isolator rows (aggregate included) is 300 cu. ft., while the volume achieved within only the chambers of the isolator row is 184 cu. ft. In the case that the outlet structure within Sub-basin S3 should clog or backwatering should occur, stormwater will bubble up from the outlet structure and overtop the wall located at the south end of the courtyard and discharge directly into West Prospect Road. Pond S4 The storage volume available within StormTech Vault Structure within Pond S4 is 1,123 cu. ft. This includes the volume stored in the aggregate surrounding the chambers. To achieve water quality, a total of 4 chambers are proposed to be wrapped and installed as isolator rows. The water quality volume achieved within isolator rows (aggregate included) is 300 cu. ft., while the volume achieved within only the chambers of the isolator row is 184 cu. ft. In the case that the outlet structure within Sub-basin S4 should clog or backwatering should occur, stormwater will bubble up from the outlet structure and overtop the wall located at the south end of the courtyard and discharge directly into West Prospect Road. Pond S5 The storage volume available within StormTech Vault Structure within Pond S5 is 620 cu. ft. This includes the volume stored in the aggregate surrounding the chambers. To achieve water quality, a total of 4 chambers are proposed to be wrapped and installed as isolator rows. The water quality volume achieved within isolator rows (aggregate included) is 117 cu. ft., while the volume achieved within only the chambers of the isolator row is 59 cu. ft. In the case that the outlet structure within Sub-basin S2 should clog or backwatering should occur, stormwater bubble up from the outlet structure and overtop into the central drive aisle, where it will be routed directly into West Prospect Road. The Standard @ Fort Collins Final Drainage Report 13 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with The Standard @ Fort Collins project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with The Standard @ Fort Collins project complies with the City of Fort Collins’ Master Drainage Plan for the Old Town Basin. 3. There are no regulatory floodplains associated with The Standard @ Fort Collins development. 4. The drainage plan and stormwater management measures proposed with The Standard @ Fort Collins development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. The Standard @ Fort Collins will detain for the pervious area converted to impervious areas by releasing at the 2-year existing rate during the developed100-year storm. 2. The proposed The Standard @ Fort Collins development will not impact the Master Drainage Plan recommendations for the Old Town major drainage basin. The Standard @ Fort Collins Final Drainage Report 14 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Standard @ Fort Collins Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: C. Snowdon Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. HN1 87709 2.01 0.84 0.27 0.61 0.00 0.30 0.83 0.83 1.00 81% HS1 96447 2.21 0.00 0.14 0.25 0.24 1.58 0.33 0.33 0.41 20% Total 184156 4.23 0.84 0.41 0.86 0.24 1.88 0.57 0.57 0.71 49% HN1 (Impervious) 74619 1.71 0.84 0.27 0.61 0.00 0.00 0.95 0.95 1.00 95% HN1 (Pervious) 13090 0.30 0.00 0.00 0.00 0.00 0.30 0.15 0.15 0.19 0% HS2 (Impervious) 27620 0.63 0.00 0.14 0.25 0.24 0.00 0.78 0.78 0.97 71% HS2 (Pervious) 68827 1.58 0.00 0.00 0.00 0.00 1.58 0.15 0.15 0.19 0% HISTORIC COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Notes October 18, 2016 Overland Flow, Time of Concentration: Project: Standard @ Fort Collins Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: Standard @ Fort Collins Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: hn1 HN1 2.01 8 8 5 0.83 0.83 1.00 2.46 4.21 9.95 4.11 7.03 20.03 hs1 HS1 2.21 15 15 14 0.33 0.33 0.41 1.87 3.19 6.82 1.36 2.33 6.21 N/A HN1 (Impervious) 1.71 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 4.64 7.93 17.04 N/A HN1 (Pervious) 0.30 5 5 5 0.15 0.15 0.19 2.85 4.87 9.95 0.13 0.22 0.56 N/A HS2 (Impervious) 0.63 6 6 5 0.78 0.78 0.97 2.67 4.56 9.95 1.31 2.25 6.12 N/A HS2 (Pervious) 1.58 20 20 19 0.15 0.15 0.19 1.61 2.74 5.75 0.38 0.65 1.70 Total Release = 23.68 HISTORIC RUNOFF COMPUTATIONS Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Notes C. Snowdon October 18, 2016 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) C2 Total allowable release from Basin Hs1 = 6.51 Total allowable release from Basin HN1 = 17.17 Flow, Q10 (cfs) Flow, Q100 (cfs) C10 C 100 Q = C f ( C )( i )( A ) Page 3 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\Hist-Direct-Runoff CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Standard @ Fort Collins Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. N1 9556 0.219 0.000 0.152 0.000 0.000 0.020 0.047 0.73 0.73 0.91 62% N2 6619 0.152 0.000 0.087 0.000 0.000 0.042 0.023 0.68 0.68 0.84 51% N3 66237 1.521 0.000 0.000 1.520 0.000 0.000 0.000 0.95 0.95 1.00 90% S1 17810 0.409 0.000 0.051 0.265 0.000 0.024 0.069 0.78 0.78 0.98 70% S2 11793 0.271 0.000 0.038 0.179 0.000 0.000 0.054 0.79 0.79 0.99 72% S3 11790 0.271 0.000 0.043 0.180 0.000 0.000 0.048 0.81 0.81 1.00 74% S4 10923 0.251 0.000 0.031 0.174 0.000 0.000 0.045 0.81 0.81 1.00 74% Overland Flow, Time of Concentration: Project: Standard @ Fort Collins Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Rational Method Equation: Project: Standard @ Fort Collins Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: n1 N1 0.22 5 5 5 0.73 0.73 0.91 2.85 4.87 9.95 0.45 0.78 1.98 1.98 n2 N2 0.15 5 5 5 0.68 0.68 0.84 2.85 4.87 9.95 0.29 0.50 1.28 1.28 n3 N3 1.52 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 4.12 7.03 15.13 9.58 s1 S1 0.41 5 5 5 0.78 0.78 0.98 2.85 4.87 9.95 0.91 1.56 3.98 1.96 s2 S2 0.27 5 5 5 0.79 0.79 0.99 2.85 4.87 9.95 0.61 1.04 2.67 1.01 s3 S3 0.27 5 5 5 0.81 0.81 1.00 2.85 4.87 9.95 0.62 1.07 2.69 1.03 s4 S4 0.25 5 5 5 0.81 0.81 1.00 2.85 4.87 9.95 0.58 0.98 2.50 0.88 s5 S5 0.21 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.56 0.95 2.04 1.01 s6 S6 0.18 7 7 5 0.68 0.68 0.85 2.60 4.44 9.95 0.32 0.55 1.53 1.53 on1 ON1 0.13 5 5 5 0.45 0.45 0.56 2.85 4.87 9.95 0.16 0.28 0.71 0.71 on2 ON2 0.15 5 5 5 0.15 0.15 0.19 2.85 4.87 9.95 0.06 0.11 0.28 0.28 os1 OS1 0.40 5 5 5 0.46 0.46 0.58 2.85 4.87 9.95 0.52 0.90 2.29 2.29 os2 OS2 0.08 5 5 5 0.15 0.15 0.19 2.85 4.87 9.95 0.03 0.06 0.14 0.14 Total 23.68 DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) C. Snowdon October 18, 2016 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) 100-year Release Rate DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) n1 N1 0.219 0.73 0.91 5.0 5.0 0.45 1.98 n2 N2 0.152 0.68 0.84 5.0 5.0 0.29 1.28 n3 N3 1.521 0.95 1.00 5.0 5.0 4.12 15.13 s1 S1 0.409 0.78 0.98 5.0 5.0 0.91 3.98 s2 S2 0.271 0.79 0.99 5.0 5.0 0.61 2.67 s3 S3 0.271 0.81 1.00 5.0 5.0 0.62 2.69 s4 S4 0.251 0.81 1.00 5.0 5.0 0.58 2.50 s5 S5 0.205 0.95 1.00 5.0 5.0 0.56 2.04 s6 S6 0.182 0.68 0.85 6.9 5.0 0.32 1.53 on1 ON1 0.126 0.45 0.56 5.0 5.0 0.16 0.71 on2 ON2 0.150 0.15 0.19 5.0 5.0 0.06 0.28 os1 OS1 0.396 0.46 0.58 5.0 5.0 0.52 2.29 os2 OS2 0.076 0.15 0.19 5.0 5.0 0.03 0.14 DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) hn1 HN1 2.014 0.83 1.00 7.7 5.0 4.11 20.03 hs1 HS1 2.214 0.33 0.41 15.1 13.8 1.36 6.21 Page 7 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\SUMMARY-TABLE APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Inlets B.3 – Detention Facilities APPENDIX B.1 STORM SEWERS (FOR FUTURE USE) APPENDIX B.2 INLETS (FOR FUTURE USE) APPENDIX B.3 DETENTION FACILITIES Pond No : N2 100-yr 1.00 5.00 min 3225 ft3 1.52 acres 0.074 ac-ft Max Release Rate = 9.50 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 4540 1.00 9.50 2850 1690 10 7.720 7045 0.75 7.13 4275 2770 15 6.520 8925 0.67 6.33 5700 3225 20 5.600 10221 0.63 5.94 7125 3096 25 4.980 11362 0.60 5.70 8550 2812 30 4.520 12375 0.58 5.54 9975 2400 35 4.080 13032 0.57 5.43 11400 1632 40 3.740 13652 0.56 5.34 12825 827 45 3.460 14209 0.56 5.28 14250 -41 50 3.230 14738 0.55 5.23 15675 -937 55 3.030 15208 0.55 5.18 17100 -1892 60 2.860 15660 0.54 5.15 18525 -2865 65 2.720 16135 0.54 5.12 19950 -3815 70 2.590 16545 0.54 5.09 21375 -4830 75 2.480 16974 0.53 5.07 22800 -5826 80 2.380 17376 0.53 5.05 24225 -6849 85 2.290 17764 0.53 5.03 25650 -7886 90 2.210 18152 0.53 5.01 27075 -8923 95 2.130 18466 0.53 5.00 28500 -10034 100 2.060 18800 0.53 4.99 29925 -11125 105 2.000 19165 0.52 4.98 31350 -12185 110 1.940 19475 0.52 4.97 32775 -13300 115 1.890 19835 0.52 4.96 34200 -14365 120 1.840 20150 0.52 4.95 35625 -15475 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado Pond No : s1 100-yr 0.98 5.00 min 1230 ft3 0.41 acres 0.028 ac-ft Max Release Rate = 1.96 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 1196 1.00 1.96 588 608 10 7.720 1857 0.75 1.47 882 975 15 6.520 2352 0.67 1.31 1176 1176 20 5.600 2694 0.63 1.23 1470 1224 25 4.980 2994 0.60 1.18 1764 1230 30 4.520 3261 0.58 1.14 2058 1203 35 4.080 3434 0.57 1.12 2352 1082 40 3.740 3598 0.56 1.10 2646 952 45 3.460 3744 0.56 1.09 2940 804 50 3.230 3884 0.55 1.08 3234 650 55 3.030 4008 0.55 1.07 3528 480 60 2.860 4127 0.54 1.06 3822 305 65 2.720 4252 0.54 1.06 4116 136 70 2.590 4360 0.54 1.05 4410 -50 75 2.480 4473 0.53 1.05 4704 -231 80 2.380 4579 0.53 1.04 4998 -419 85 2.290 4681 0.53 1.04 5292 -611 90 2.210 4783 0.53 1.03 5586 -803 95 2.130 4866 0.53 1.03 5880 -1014 100 2.060 4954 0.53 1.03 6174 -1220 105 2.000 5050 0.52 1.03 6468 -1418 110 1.940 5132 0.52 1.02 6762 -1630 115 1.890 5227 0.52 1.02 7056 -1829 120 1.840 5310 0.52 1.02 7350 -2040 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond S1 A = Pond No : s2 100-yr 0.99 5.00 min 1123 ft3 0.27 acres 0.026 ac-ft Max Release Rate = 1.01 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 801 1.00 1.01 303 498 10 7.720 1243 0.75 0.76 454 789 15 6.520 1574 0.67 0.67 605 969 20 5.600 1803 0.63 0.63 757 1046 25 4.980 2004 0.60 0.61 908 1096 30 4.520 2183 0.58 0.59 1059 1123 35 4.080 2299 0.57 0.58 1211 1088 40 3.740 2408 0.56 0.57 1362 1046 45 3.460 2506 0.56 0.56 1514 993 50 3.230 2600 0.55 0.55 1665 935 55 3.030 2683 0.55 0.55 1816 866 60 2.860 2762 0.54 0.55 1968 795 65 2.720 2846 0.54 0.54 2119 727 70 2.590 2918 0.54 0.54 2270 648 75 2.480 2994 0.53 0.54 2422 573 80 2.380 3065 0.53 0.54 2573 492 85 2.290 3133 0.53 0.53 2724 409 90 2.210 3202 0.53 0.53 2876 326 95 2.130 3257 0.53 0.53 3027 230 100 2.060 3316 0.53 0.53 3178 138 105 2.000 3380 0.52 0.53 3330 51 110 1.940 3435 0.52 0.53 3481 -46 115 1.890 3499 0.52 0.53 3632 -134 120 1.840 3554 0.52 0.53 3784 -229 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado Pond No : s3 100-yr 1.00 5.00 min 1123 ft3 0.27 acres 0.026 ac-ft Max Release Rate = 1.03 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 809 1.00 1.03 309 500 10 7.720 1255 0.75 0.77 464 792 15 6.520 1590 0.67 0.69 618 972 20 5.600 1821 0.63 0.64 773 1049 25 4.980 2024 0.60 0.62 927 1097 30 4.520 2205 0.58 0.60 1082 1123 35 4.080 2322 0.57 0.59 1236 1086 40 3.740 2432 0.56 0.58 1391 1042 45 3.460 2532 0.56 0.57 1545 987 50 3.230 2626 0.55 0.57 1700 926 55 3.030 2710 0.55 0.56 1854 856 60 2.860 2790 0.54 0.56 2009 782 65 2.720 2875 0.54 0.55 2163 712 70 2.590 2948 0.54 0.55 2318 630 75 2.480 3024 0.53 0.55 2472 552 80 2.380 3096 0.53 0.55 2627 469 85 2.290 3165 0.53 0.55 2781 384 90 2.210 3234 0.53 0.54 2936 299 95 2.130 3290 0.53 0.54 3090 200 100 2.060 3350 0.53 0.54 3245 105 105 2.000 3415 0.52 0.54 3399 16 110 1.940 3470 0.52 0.54 3554 -84 115 1.890 3534 0.52 0.54 3708 -174 120 1.840 3590 0.52 0.54 3863 -272 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado Pond No : s4 100-yr 1.00 5.00 min 1123 ft3 0.25 acres 0.026 ac-ft Max Release Rate = 0.88 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 749 1.00 0.88 263 487 10 7.720 1163 0.75 0.66 394 769 15 6.520 1473 0.67 0.58 525 948 20 5.600 1687 0.63 0.55 656 1030 25 4.980 1875 0.60 0.53 788 1087 30 4.520 2042 0.58 0.51 919 1123 35 4.080 2151 0.57 0.50 1050 1101 40 3.740 2253 0.56 0.49 1181 1072 45 3.460 2345 0.56 0.49 1313 1032 50 3.230 2432 0.55 0.48 1444 988 55 3.030 2510 0.55 0.48 1575 935 60 2.860 2584 0.54 0.47 1706 878 65 2.720 2663 0.54 0.47 1838 825 70 2.590 2730 0.54 0.47 1969 762 75 2.480 2801 0.53 0.47 2100 701 80 2.380 2867 0.53 0.46 2231 636 85 2.290 2931 0.53 0.46 2363 569 90 2.210 2995 0.53 0.46 2494 502 95 2.130 3047 0.53 0.46 2625 422 100 2.060 3102 0.53 0.46 2756 346 105 2.000 3163 0.52 0.46 2888 275 110 1.940 3214 0.52 0.46 3019 195 115 1.890 3273 0.52 0.46 3150 123 120 1.840 3325 0.52 0.46 3281 44 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado Pond No : s5 100-yr 1.00 5.00 min 620 ft3 0.21 acres 0.014 ac-ft Max Release Rate = 1.01 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 612 1.00 1.01 304 308 10 7.720 950 0.75 0.76 456 494 15 6.520 1203 0.67 0.68 608 595 20 5.600 1378 0.63 0.63 760 618 25 4.980 1531 0.60 0.61 912 620 30 4.520 1668 0.58 0.59 1064 604 35 4.080 1756 0.57 0.58 1216 541 40 3.740 1840 0.56 0.57 1368 473 45 3.460 1915 0.56 0.56 1520 396 50 3.230 1986 0.55 0.56 1671 315 55 3.030 2050 0.55 0.55 1823 226 60 2.860 2111 0.54 0.55 1975 135 65 2.720 2175 0.54 0.55 2127 47 70 2.590 2230 0.54 0.54 2279 -49 75 2.480 2288 0.53 0.54 2431 -143 80 2.380 2342 0.53 0.54 2583 -241 85 2.290 2394 0.53 0.54 2735 -341 90 2.210 2446 0.53 0.53 2887 -441 95 2.130 2489 0.53 0.53 3039 -550 100 2.060 2534 0.53 0.53 3191 -657 105 2.000 2583 0.52 0.53 3343 -760 110 1.940 2625 0.52 0.53 3495 -870 115 1.890 2673 0.52 0.53 3647 -973 120 1.840 2716 0.52 0.53 3799 -1083 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond S5 A = APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 70.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.220 in A = 0.41 ac V = 0.0075 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 327 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark S1 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : s1 WQ 0.78 5.00 min 229 ft3 0.41 acres 0.01 ac-ft Max Release Rate = 0.14 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 136 1.00 0.14 41 95 10 1.105 212 1.00 0.14 82 129 15 0.935 268 0.67 0.09 82 186 20 0.805 308 0.63 0.09 103 205 25 0.715 342 0.60 0.08 123 219 30 0.650 373 0.58 0.08 144 229 35 0.585 392 0.57 0.08 165 227 40 0.535 410 0.56 0.08 185 225 45 0.495 426 0.56 0.08 206 221 50 0.460 440 0.55 0.08 226 214 55 0.435 458 0.55 0.07 247 211 60 0.410 471 0.54 0.07 267 203 65 0.385 479 0.54 0.07 288 191 70 0.365 489 0.54 0.07 309 181 75 0.345 495 0.53 0.07 329 166 80 0.330 505 0.53 0.07 350 156 85 0.315 513 0.53 0.07 370 142 90 0.305 525 0.53 0.07 391 135 95 0.290 527 0.53 0.07 411 116 100 0.280 536 0.53 0.07 432 104 105 0.270 543 0.52 0.07 452 90 110 0.260 547 0.52 0.07 473 74 115 0.255 561 0.52 0.07 494 68 120 0.245 563 0.52 0.07 514 49 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Client : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia I a = 51.0 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.510 C) Tributary Watershed Area ATotal = 6,619 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 1,843 sq ft (Minimum recommended permeable pavement area = 1345 sq ft) E) Impervious Tributary Ratio RT = 1.3 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 92 cu ft (WQCV = (0.8 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 16.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.30 D) Slope of the Base Course/Subgrade Interface S = ft / ft E) Length Between Lateral Flow Barriers L = ft F) Volume Provided Based on Depth of Base Course V = 691 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (D min - 6*SL-1)) / 12] * Area 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) The Standard @ Fort Collins - Basin N2 Fort Collins, CO Design Procedure Form: Permeable Pavement Systems (PPS) Cody Snowdon Northern Engineering October 18, 2016 Choose One Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) C) Distance from the Lowest Elevation of the Storage Volume y = 2.0 ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = 2.00 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = inches (Use a minimum orifice diameter of 3/8-inches) Notes: Fort Collins, CO The Standard @ Fort Collins - Basin N2 Design Procedure Form: Permeable Pavement Systems (PPS) Cody Snowdon Northern Engineering October 18, 2016 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A WQ - Basin N2 - UD-BMP_v3.03.xlsm, PPS 10/18/2016, 11:14 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia I a = 51.0 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.510 C) Tributary Watershed Area ATotal = 6,619 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 1,843 sq ft (Minimum recommended permeable pavement area = 1345 sq ft) E) Impervious Tributary Ratio RT = 1.3 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 92 cu ft (WQCV = (0.8 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 16.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.30 D) Slope of the Base Course/Subgrade Interface S = ft / ft E) Length Between Lateral Flow Barriers L = ft F) Volume Provided Based on Depth of Base Course V = 691 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (D min - 6*SL-1)) / 12] * Area 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) The Standard @ Fort Collins - Basin N2 Fort Collins, CO Design Procedure Form: Permeable Pavement Systems (PPS) Cody Snowdon Northern Engineering October 18, 2016 Choose One Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) C) Distance from the Lowest Elevation of the Storage Volume y = 2.0 ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = 2.00 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = inches (Use a minimum orifice diameter of 3/8-inches) Notes: Fort Collins, CO The Standard @ Fort Collins - Basin N2 Design Procedure Form: Permeable Pavement Systems (PPS) Cody Snowdon Northern Engineering October 18, 2016 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A WQ - Basin N3 - UD-BMP_v3.03.xlsm, PPS 10/18/2016, 11:14 AM Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 72.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.227 in A = 0.27 ac V = 0.0051 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 224 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark S2 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : s2 WQ 0.78 5.00 min 176 ft3 0.27 acres 0.00 ac-ft Max Release Rate = 0.07 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 90 1.00 0.07 21 69 10 1.105 140 1.00 0.07 42 98 15 0.935 178 0.67 0.05 42 135 20 0.805 204 0.63 0.04 53 151 25 0.715 227 0.60 0.04 64 163 30 0.650 247 0.58 0.04 74 173 35 0.585 260 0.57 0.04 85 175 40 0.535 271 0.56 0.04 96 176 45 0.495 283 0.56 0.04 106 176 50 0.460 292 0.55 0.04 117 175 55 0.435 303 0.55 0.04 127 176 60 0.410 312 0.54 0.04 138 174 65 0.385 317 0.54 0.04 149 169 70 0.365 324 0.54 0.04 159 165 75 0.345 328 0.53 0.04 170 158 80 0.330 335 0.53 0.04 180 154 85 0.315 340 0.53 0.04 191 149 90 0.305 348 0.53 0.04 202 146 95 0.290 349 0.53 0.04 212 137 100 0.280 355 0.53 0.04 223 132 105 0.270 360 0.52 0.04 233 126 110 0.260 363 0.52 0.04 244 119 115 0.255 372 0.52 0.04 255 117 120 0.245 373 0.52 0.04 265 108 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. C = Tc = A = S2 Input Variables Results Design Point Design Storm Required Detention Volume Client : Landmark DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 74.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.235 in A = 0.27 ac V = 0.0053 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 232 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark S3 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : s3 WQ 0.78 5.00 min 148 ft3 0.27 acres 0.00 ac-ft Max Release Rate = 0.09 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 90 1.00 0.09 28 62 10 1.105 140 1.00 0.09 57 84 15 0.935 178 0.67 0.06 57 121 20 0.805 204 0.63 0.06 71 133 25 0.715 227 0.60 0.06 85 142 30 0.650 247 0.58 0.06 99 148 35 0.585 260 0.57 0.05 113 146 40 0.535 271 0.56 0.05 127 144 45 0.495 283 0.56 0.05 142 141 50 0.460 292 0.55 0.05 156 136 55 0.435 303 0.55 0.05 170 134 60 0.410 312 0.54 0.05 184 128 65 0.385 317 0.54 0.05 198 119 70 0.365 324 0.54 0.05 212 112 75 0.345 328 0.53 0.05 226 102 80 0.330 335 0.53 0.05 241 94 85 0.315 340 0.53 0.05 255 85 90 0.305 348 0.53 0.05 269 79 95 0.290 349 0.53 0.05 283 66 100 0.280 355 0.53 0.05 297 58 105 0.270 360 0.52 0.05 311 48 110 0.260 363 0.52 0.05 325 37 115 0.255 372 0.52 0.05 340 32 120 0.245 373 0.52 0.05 354 19 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. C = Tc = A = S3 Input Variables Results Design Point Design Storm Required Detention Volume Client : Landmark DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 74.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.235 in A = 0.25 ac V = 0.0049 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 215 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark S4 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : s4 WQ 0.78 5.00 min 156 ft3 0.25 acres 0.00 ac-ft Max Release Rate = 0.07 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 84 1.00 0.07 21 62 10 1.105 130 1.00 0.07 42 87 15 0.935 165 0.67 0.05 42 122 20 0.805 189 0.63 0.04 53 136 25 0.715 210 0.60 0.04 64 146 30 0.650 229 0.58 0.04 74 155 35 0.585 241 0.57 0.04 85 156 40 0.535 251 0.56 0.04 96 156 45 0.495 262 0.56 0.04 106 156 50 0.460 270 0.55 0.04 117 153 55 0.435 281 0.55 0.04 127 154 60 0.410 289 0.54 0.04 138 151 65 0.385 294 0.54 0.04 149 145 70 0.365 300 0.54 0.04 159 141 75 0.345 304 0.53 0.04 170 134 80 0.330 310 0.53 0.04 180 130 85 0.315 315 0.53 0.04 191 123 90 0.305 322 0.53 0.04 202 121 95 0.290 324 0.53 0.04 212 111 100 0.280 329 0.53 0.04 223 106 105 0.270 333 0.52 0.04 233 100 110 0.260 336 0.52 0.04 244 92 115 0.255 344 0.52 0.04 255 90 120 0.245 345 0.52 0.04 265 80 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. C = Tc = A = S4 Input Variables Results Design Point Design Storm Required Detention Volume Client : Landmark DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 90.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.321 in A = 0.21 ac V = 0.0055 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 239 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark S5 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : s5 WQ 0.78 5.00 min 50 ft3 0.21 acres 0.00 ac-ft Max Release Rate = 0.14 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 68 1.00 0.14 42 26 10 1.105 106 1.00 0.14 85 21 15 0.935 135 0.67 0.09 85 50 20 0.805 154 0.63 0.09 106 48 25 0.715 171 0.60 0.08 127 44 30 0.650 187 0.58 0.08 149 38 35 0.585 196 0.57 0.08 170 27 40 0.535 205 0.56 0.08 191 14 45 0.495 214 0.56 0.08 212 1 50 0.460 221 0.55 0.08 233 -13 55 0.435 230 0.55 0.08 255 -25 60 0.410 236 0.54 0.08 276 -40 65 0.385 240 0.54 0.08 297 -57 70 0.365 245 0.54 0.08 318 -73 75 0.345 248 0.53 0.08 340 -91 80 0.330 253 0.53 0.08 361 -108 85 0.315 257 0.53 0.07 382 -125 90 0.305 263 0.53 0.07 403 -140 95 0.290 264 0.53 0.07 425 -160 100 0.280 269 0.53 0.07 446 -177 105 0.270 272 0.52 0.07 467 -195 110 0.260 274 0.52 0.07 488 -214 115 0.255 281 0.52 0.07 509 -228 120 0.245 282 0.52 0.07 531 -249 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. C = Tc = A = S5 Input Variables Results Design Point Design Storm Required Detention Volume Client : Landmark DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Title Date: Project Number Calcs By: Client Basin 0.8 WQCV = Watershed inches of Runoff (inches) 62.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.194 in A = 0.22 ac V = 0.0035 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Standard @ Fort Collins June 22, 2016 1290-001 C. Snowdon Landmark N1 155 cu. ft. Drain Time a = i = WQCV = 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Pond No : n1 WQ 0.78 5.00 min 128 ft3 0.22 acres 0.00 ac-ft Max Release Rate = 0.07 cfs Time (min) Ft Collins WQ Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 1.425 73 1.00 0.07 21 52 10 1.105 113 1.00 0.07 41 72 15 0.935 144 0.67 0.05 41 103 20 0.805 165 0.63 0.04 51 114 25 0.715 183 0.60 0.04 62 122 30 0.650 200 0.58 0.04 72 128 35 0.585 210 0.57 0.04 82 128 40 0.535 219 0.56 0.04 93 127 45 0.495 228 0.56 0.04 103 125 50 0.460 236 0.55 0.04 113 123 55 0.435 245 0.55 0.04 123 122 60 0.410 252 0.54 0.04 134 118 65 0.385 256 0.54 0.04 144 113 70 0.365 262 0.54 0.04 154 108 75 0.345 265 0.53 0.04 165 101 80 0.330 271 0.53 0.04 175 96 85 0.315 274 0.53 0.04 185 89 90 0.305 281 0.53 0.04 195 86 95 0.290 282 0.53 0.04 206 77 100 0.280 287 0.53 0.04 216 71 105 0.270 291 0.52 0.04 226 64 110 0.260 293 0.52 0.04 237 57 115 0.255 301 0.52 0.04 247 54 120 0.245 301 0.52 0.04 257 44 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. Client : Landmark DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Project Name : The Standard @ Fort Collins Project Number : 1290-001 C = Tc = A = N1 Input Variables Results Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Ratea (cfs) Chamber Volumeb (cf) Installed Camber w/ Aggregatec (cf) Mimimum No. of Chambersd Total Release Ratee (cfs) Required Storage Volume by FAA Method (cf) Mimimum No. of Chambersf Storage Provided within the Chambersg (cf) Total Installed System Volumeh (cf) S1 327 0.46 SC-160 0.011 14.70 29.30 12 0.14 229 16 235 469 S2 224 0.31 SC-740 0.024 45.90 74.90 3 0.07 176 4 184 300 S3 232 0.31 SC-740 0.024 45.90 74.90 4 0.09 148 4 184 300 S4 215 0.29 SC-740 0.024 45.90 74.90 3 0.07 156 4 184 300 S5 239 0.28 SC-310 0.016 14.70 29.30 9 0.14 50 4 59 117 N1 155 0.23 SC-160 0.011 14.70 29.30 6 0.07 128 9 132 264 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. e. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Chamber Configuration Summary \\broncos\engineers\Projects\1290-001\Drainage\WatQual\1290-001 Chamber Summary.xlsx Chamber Dimensions SC-310 SC-310 SC-740 Width (in) 25.0 34.0 51.0 Length (in) 84.4 85.4 85.4 Height (in) 12.0 16.0 30.0 Floor Area (sf) 14.7 20.2 30.2 Chamber Volume (cf) 6.9 14.7 45.9 Chamber/Aggregate Volume (cf) 15.0 29.3 74.9 Flow Rate* 0.35 gpm/sf 1 cf = 7.48052 gal 1 gallon = 0.133681 cf 1 GPM = 0.002228 cfs *Flow rate based on 1/2 of Nov 07 QMAX in Figure 17 of UNH Testing Report SC-160 SC-310 SC-740 Flow Rate/chamber (cfs) 0.011426 0.015724 0.023586 StormTech Chamber Data Chamber Flow Rate Chamber Flow Rate Conversion (gpm/sf to cfs) \\broncos\engineers\Projects\1290-001\Drainage\WatQual\1290-001 Chamber Summary.xlsx Design Point Basin ID Basin Area Treatment Type LID System Area Treated by LID System Percent of Site Treated by LID System Area of Pavers Area of Asphalt Parking Percent Pavers Run-on Area for Paver Section Run-on Area Ratio n1 N1 0.219 ac. StormTech Chambers Yes 0.219 ac. 5% 0.020 ac. 0.152 ac. 13.16% 0.064 3.2 n2 N2 0.152 ac. Pavers Yes 0.152 ac. 4% 0.042 ac. 0.087 ac. 48.28% 0.087 2.1 n3 N3 1.521 ac. Sand Filter Yes 1.521 ac. 36% 0.000 ac. 0.000 ac. N/A 0 N/A s1 S1 0.409 ac. StormTech Chambers Yes 0.409 ac. 10% 0.024 ac. 0.051 ac. 47.06% 0 N/A s2 S2 0.271 ac. StormTech Chambers Yes 0.271 ac. 6% 0.000 ac. 0.038 ac. N/A 0 N/A s3 S3 0.271 ac. StormTech Chambers Yes 0.271 ac. 6% 0.000 ac. 0.043 ac. N/A 0 N/A s4 S4 0.251 ac. StormTech Chambers Yes 0.251 ac. 6% 0.000 ac. 0.031 ac. N/A 0 N/A s5 S5 0.205 ac. StormTech Chambers Yes 0.205 ac. 5% 0.000 ac. 0.000 ac. N/A 0 N/A s6 S6 0.182 ac. Pavers Yes 0.182 ac. 4% 0.023 ac. 0.113 ac. 20.35% 0.0719 3.1 on1 ON1 0.126 ac. Grass Buffer No N/A 0% 0.000 ac. 0.047 ac. N/A 0 N/A on2 ON2 0.150 ac. Grass Buffer No N/A 0% 0.000 ac. 0.000 ac. N/A 0 N/A os1 OS1 0.396 ac. Grass Buffer No N/A 0% 0.000 ac. 0.155 ac. N/A 0 N/A os2 OS2 0.076 ac. Grass Buffer No N/A 0% 0.000 ac. 0.000 ac. N/A 0 N/A Total 4.23 ac. 3.481 ac. 82% 0.109 ac. 0.717 ac. 15.20% APPENDIX D EROSION CONTROL REPORT Lake Avenue Apartments Final Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT UP D.S. D.S. R.D. D.S. D.S. D.S. D.S. D.S. D.S. D.S. R.D. D.S. X X X X X X X X X X X X X X X X X X X X X X X X X UD UD UD UD UD UD UD W UD UD UD UD UD UD UD UD UD MAJOR STORM EVENT OUTLET FROM INTERNAL POND STRUCTURE WATER QUALITY EVENT OUTLET FROM INTERNAL POND STRUCTURE s1 s1 s1 s1 s1 s2 s2 s3 s3 s4 s4 s5 s5 s6 n3 n3 n2 on1 on2 os2 os1 N3 ON1 S1 OS1 S3 S2 S4 OS2 N2 S5 S6 ON2 POND S4 (SC-740 CHAMBERS) POND S3 (SC-740 CHAMBERS) POND S2 (SC-740 CHAMBERS) POND S1 (SC-160 CHAMBERS) POND S5 (SC-310 CHAMBERS) POND N2 (WITH SAND FILTER) PROSPECT ROAD (30' PUBLIC ROW) LAKE STREET (60' PUBLIC ROW) THE SLAB STADIUM APARTMENTS STORM LINE C2 STORM LINE C1 STORM LINE B STORM LINE A UNDERDRAIN PERMEABLE PAVERS UNDERDRAIN PERMEABLE PAVERS WATER QUALITY STRUCTURE WATER QUALITY STRUCTURE WATER QUALITY STRUCTURE WATER QUALITY STRUCTURE WATER QUALITY STRUCTURE WATER QUALITY STRUCTURE POND OUTLET STRUCTURE POND OUTLET STRUCTURE POND OUTLET STRUCTURE POND OUTLET STRUCTURE POND OUTLET STRUCTURE WATER QUALITY STRUCTURE ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER ROOF LEADER AREA INLET AREA INLET STORM LINE A OUTFALL STORM LINE B OUTFALL SIDEWALK CHASE SIDEWALK CHASE SIDEWALK CHASE STORM LINE C OUTFALL AREA INLET AREA INLET W/ WATER QUALITY PLATE 21 SC-160 CHAMBERS FOR WATER QUALITY N1 INFLOW CURB & GUTTER n1 THE SLAB STORM WATER OUTFALL STADIUM APARTMENTS STORM WATER OUTFALL Sheet of 14 STANDARD AT FORT COLLINS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com C5.00 DRAINAGE EXHIBIT GRAPHIC SCALE: LEGEND: ST 4950 4:1 NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A2 a3 FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: 14 RUNOFF SUMMARY TABLE: BASIN ID TOTAL AREA (acres) C2 C100 Q2 (cfs) Q100 (cfs) N1 0.219 0.73 0.91 0.45 1.98 N2 0.152 0.68 0.84 0.29 1.28 N3 1.521 0.95 1.00 4.12 15.13 S1 0.409 0.78 0.98 0.91 3.98 S2 0.271 0.79 0.99 0.61 2.67 S3 0.271 0.81 1.00 0.62 2.69 S4 0.251 0.81 1.00 0.58 2.50 S5 0.205 0.95 1.00 0.56 2.04 S6 0.182 0.68 0.85 0.32 1.53 ON1 0.126 0.45 0.56 0.16 0.71 ON2 0.150 0.15 0.19 0.06 0.28 OS1 0.396 0.46 0.58 0.52 2.29 OS2 0.076 0.15 0.19 0.03 0.14 Design Point Design Storm Required Detention Volume Page 12 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr Project Name : The Standard @ Fort Collins Project Number : 1290-001 Page 10 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr Project Name : The Standard @ Fort Collins Project Number : 1290-001 Page 8 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr Project Name : The Standard @ Fort Collins Project Number : 1290-001 Page 6 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr Project Name : The Standard @ Fort Collins Project Number : 1290-001 Page 4 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel WQ - Basin N3 - UD-BMP_v3.03.xlsm, PPS 10/18/2016, 11:14 AM No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel WQ - Basin N2 - UD-BMP_v3.03.xlsm, PPS 10/18/2016, 11:14 AM Landmark The Standard @ Fort Collins 1290-001 Project Name : Project Number : S1 Page 2 of 14 1290-001 Chamber Summary.xlsx ö ç è = æ 12 hr Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1290-001_Pond S5_DetentionVolume_FAAModified Method.xls 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond S4 Page 1 of 1 1290-001_Pond S4_DetentionVolume_FAAModified Method.xls 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond S3 Page 1 of 1 1290-001_Pond S3_DetentionVolume_FAAModified Method.xls 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond S2 Page 1 of 1 1290-001_Pond S2_DetentionVolume_FAAModified Method.xls Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1290-001_Pond S1_DetentionVolume_FAAModified Method.xls 1290-001 The Standard @ Fort Collins Project Number : Project Name : Pond N2 Page 1 of 1 1290-001_Pond N2_DetentionVolume_FAAModified Method.xls Q = C f ( C )( i )( A ) Page 6 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\Direct-Runoff Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) n1 N1 No 0.73 0.73 0.91 25 9.40% 1.7 1.7 0.8 174 1.01% 2.01 1.4 0.5 N/A N/A 5 5 5 n2 N2 No 0.68 0.68 0.84 27 3.85% 2.6 2.6 1.6 157 1.70% 2.61 1.0 1.5 N/A N/A 5 5 5 n3 N3 No 0.95 0.95 1.00 N/A N/A N/A N/A 345 2.00% 2.83 2.0 1.5 N/A N/A 5 5 5 s1 S1 No 0.78 0.78 0.98 N/A N/A N/A N/A 80 2.00% 2.83 0.5 N/A N/A N/A 5 5 5 s2 S2 No 0.79 0.79 0.99 N/A N/A N/A N/A 100 2.00% 2.83 0.6 N/A N/A N/A 5 5 5 s3 S3 No 0.81 0.81 1.00 N/A N/A N/A N/A 100 2.00% 2.83 0.6 N/A N/A N/A 5 5 5 s4 S4 No 0.81 0.81 1.00 N/A N/A N/A N/A 100 2.00% 2.83 0.6 N/A N/A N/A 5 5 5 s5 S5 No 0.95 0.95 1.00 N/A N/A N/A N/A 100 2.00% 2.83 0.6 N/A N/A N/A 5 5 5 s6 S6 No 0.68 0.68 0.85 100 2.47% 5.8 5.8 3.5 120 0.93% 1.93 1.0 N/A N/A N/A 7 7 5 on1 ON1 No 0.45 0.45 0.56 19 5.05% 3.1 3.1 2.5 N/A N/A N/A N/A N/A N/A 5 5 5 on2 ON2 No 0.15 0.15 0.19 12 16.50% 2.4 2.4 2.3 N/A N/A N/A N/A N/A N/A 5 5 5 os1 OS1 No 0.46 0.46 0.58 41 3.56% 5.0 5.0 4.1 N/A N/A N/A N/A N/A N/A 5 5 5 os2 OS2 No 0.15 0.15 0.19 13 18.38% 2.4 2.4 2.3 N/A N/A N/A N/A N/A N/A 5 5 5 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Internal Building Flow Swale Flow Design Point Basin Overland Flow C. Snowdon October 18, 2016 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = Page 5 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\Tc-10-yr_&_100-yr S5 8937 0.205 0.000 0.000 0.205 0.000 0.000 0.000 0.95 0.95 1.00 90% S6 7925 0.182 0.000 0.113 0.000 0.000 0.023 0.046 0.68 0.68 0.85 56% ON1 5475 0.126 0.000 0.047 0.000 0.000 0.000 0.078 0.45 0.45 0.56 34% ON2 6520 0.150 0.000 0.000 0.000 0.000 0.000 0.150 0.15 0.15 0.19 0% OS1 17264 0.396 0.000 0.155 0.000 0.000 0.000 0.241 0.46 0.46 0.58 35% OS2 3296 0.076 0.000 0.000 0.000 0.000 0.000 0.076 0.15 0.15 0.19 0% TOTAL 184145 4.23 0.000 0.718 2.524 0.000 0.109 1.095 0.78 0.78 0.97 69% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 October 18, 2016 **Soil Classification of site is Sandy Loam** C. Snowdon Page 4 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\C-Values (min) 10-yr Tc (min) 100-yr Tc (min) hn1 HN1 No 0.83 0.83 1.00 77 0.40% 6.0 6.0 2.2 205 1.01% 2.01 1.7 N/A N/A N/A 8 8 5 hs1 HS1 No 0.33 0.33 0.41 118 1.96% 12.5 12.5 11.2 N/A N/A N/A 113 0.23% 0.72 2.6 15 15 14 N/A HN1 (Impervious) No 0.95 0.95 1.00 77 0.40% 3.3 3.3 2.2 205 1.01% 2.01 1.7 N/A N/A N/A 5 5 5 N/A HN1 (Pervious) No 0.15 0.15 0.19 22 4.23% 5.2 5.2 4.9 N/A N/A N/A N/A N/A N/A 5 5 5 N/A HS2 (Impervious) No 0.78 0.78 0.97 84 2.13% 4.3 4.3 1.7 N/A N/A N/A 130 0.50% 1.06 2.0 6 6 5 N/A HS2 (Pervious) No 0.15 0.15 0.19 80 0.50% 20.0 20.0 19.2 N/A N/A N/A N/A N/A N/A 20 20 19 HISTORIC TIME OF CONCENTRATION COMPUTATIONS C. Snowdon October 18, 2016 Design Point Basin Overland Flow Gutter Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = Page 2 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\Hist-Tc-10-yr_&_100-yr 10-year Cf = 1.00 **Soil Classification of site is Sandy Loam** Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Existing Impervious Area Breakdown Page 1 of 7 D:\Projects\1290-001\Drainage\Hydrology\1290-001_Rational-Calcs.xlsx\Hist-C-Values