Loading...
HomeMy WebLinkAboutWEST PLUM HOUSING - PDP - PDP160029 - PLANS - UTILITY PLANS40' FL - FL 20' FL - CROWN 20' FL - CROWN \A1;20' FL - CROWN PROPOSED PLUM STREET (66' ROW) PROPOSED BUILDING 12' TRAVEL LANE 30" VERTICAL CURB & GUTTER 30" VERTICAL CURB & GUTTER EXISTING ±57.5' ROW NORTH RIGHT-OF-WAY 12' TRAVEL LANE 8' BIKE/ PARKING 8' BIKE/ PARKING ADD'L ±8.5' ROW PROPOSED ±66' ROW SOUTH RIGHT-OF-WAY 9' UTIL & ACCESS ESMT EXISTING BUILDING 4' MIN. EXISTING ±43' FL - FL ± 21.5' FL - CROWN ± 21.5' FL - CROWN \A1;%%P 21.5' FL - CROWN PROPOSED CITY PARK AVE (ROW VARIES) PROPOSED BUILDING EXISTING 30" VERTICAL CURB & GUTTER PROPOSED ROW (WIDTH VARIES) EAST RIGHT-OF-WAY 9' UTIL & ACCESS ESMT 7' WALK (5' WITHIN ROW) 8' PARKWAY EXISTING WALK (6' WITHIN ROW) EXISTING 7' PARKWAY 6' WALK (4.5' WITHIN ROW) 8' PARKWAY WEST RIGHT-OF-WAY EXISTING 4' WALK (ATTACHED) No. Revisions: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary G S S D D T M LID WV H Y D H Y D WV WV E / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X T T T T T T T G G G G G G G G G G G G T T T T T T CTV CTV CTV CTV OHU OHU OHU OHU OHU OHU OHU 9' UTILITY EASEMENT 9' UTILITY EASEMENT 5' UTILITY EASEMENT UTILITY EASEMENT DS2 DS2 DS2 DS2 DS2 DS3 DS3 T / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X VAULT ELEC T FO T FO ELEC VAULT ELEC / / / / / / / / / / / / / / / / / / / / / / / / X X X VAULT ELEC VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC FO S S D D T WV H Y D H Y D WV WV / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X T T T T T T T G G G G G G G T T T T T T CTV CTV CTV CTV ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W V AULT ELEC S T FO T FO ELEC VAULT ELEC W W D ST / / / / / / / / D D T / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X T T T T T T T T T T T T T ST ST ST ST ST ST ST ST ST ST ST ST VAULT ELEC T FO T FO ELEC VAULT ELEC D ST / / / / / / / / / / / / / / / / / / / / / / / / X X X VAULT ELEC VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC FO VAULT D D T X X X X X X X X X X X X X X X T T T T T T T T T T T T T ST ST ST ST ST ST ST ST ST ST ST VAULT ELEC T FO T FO ELEC VAULT ELEC D ST X X X VAULT ELEC VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC FO VAULT ELEC T FO E X X X X X X TF 1 0.76 9' UTILITY EASEMENT PROPOSED CONCRETE COLLAR & CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE PAN PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE 9' UTILITY EASEMENT 5' UTILITY EASEMENT UTILITY EASEMENT THE LOFTS AT CAMPUS WEST TOWN SQUARE CONDOMINIUMS CITY PARK CONDOMINIUMS (BOOK 1291, PAGE 862) THE DISTRICT AT CAMPUS WEST (REC. NO. 20130032356) 5' UTILITY EASEMENT PROPOSED STORM DRAIN DETENTION VAULT 3 0.13 3 2 0.36 2 1 4 0.03 4 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C600 DRAINAGE EXHIBIT A. Reese B. Ruch 1"=20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 LEGEND: 4953 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET DESIGN POINT A FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 NOTES: 1. REFER TO THE PRELIMINARY DRAINAGE REPORT FOR WEST PLUM HOUSING, DATED OCTOBER 19, 2016 FOR ADDITIONAL INFORMATION. BASIN DESIGNATION AREA BASIN (AC) BENCHMARK FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION C 0.60 ac PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK 19-97 AT THE SOUTHEAST CORNER OF WEST ELIZABETH AND SHIELDS ST., ON A CONCRETE TRAFFIC SIGNAL BASE. ELEV.=5025.74 CITY OF FORT COLLINS BENCHMARK 3-08 SOUTHWEST CORNER OF MULBERRY ST. AND SHIELDS ST. ON A CONCRETE TRAFFIC SIGNAL BASE. ELEV.=5030.29 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - 3.17' BASIS OF BEARINGS THE BASIS OF BEARINGS IS THE SOUTH LINE OF THE NORTHEAST QUARTER OF SECTION 15, AS BEARING SOUTH 89°04'20" EAST. DEVELOPED RUNOFF SUMMARY TABLE BASIN ID TOTAL AREA (acres) C2 C10 C100 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q10 (cfs) Q100 (cfs) 1 0.76 0.95 0.95 1.00 6.8 6.8 5.7 1.87 3.20 7.35 2 0.36 0.63 0.63 0.79 12.0 12.0 11.4 0.48 0.82 2.14 3 0.13 0.15 0.15 0.19 8.4 8.4 7.9 0.05 0.08 0.21 4 0.03 0.15 0.15 0.19 5.6 5.6 5.2 0.01 0.02 0.06 ELEC T FO E X X X X X X TF 9' UTILITY EASEMENT 5' UTILITY EASEMENT UTILITY EASEMENT 5' UTILITY EASEMENT PROPOSED CONCRETE COLLAR & CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE PAN PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE 9' UTILITY EASEMENT THE LOFTS AT CAMPUS WEST TOWN SQUARE CONDOMINIUMS CITY PARK CONDOMINIUMS (BOOK 1291, PAGE 862) THE DISTRICT AT CAMPUS WEST (REC. NO. 20130032356) PROPOSED STORM DRAIN DETENTION VAULT FFE=41.25 FFE=39.60 FFE=41.25 POOL=41.19 FFE= 40.21 FFE=40.47 40.59 40.59 40.85 38.22 38.22 37.06 36.75 36.75 36.22 36.01 35.05 35.82 35.22 36.02 35.77 36.58 36.73 37.04 36.89 36.22 35.58 34.97 36.25 36.33 37.43 36.41 37.25 38.16 38.43 38.75 37.97 38.07 38.44 38.75 39.25 38.48 38.93 38.97 38.58 39.00 39.11 39.75 39.74 40.01 40.89 38.22 40.56 36.83 40.56 38.60 38.31 38.70 (40.01) 40.10 40.35 40.54 40.65 41.05 41.11 41.15 41.15 41.09 40.73 39.50 40.76 41.09 39.03 39.09 39.09 40.48 40.47 40.36 40.70 39.40 36.91 36.99 37.27 37.18 41.20 41.19 41.05 41.05 41.11 41.25 41.25 40.47 40.48 39.44 39.06 40.12 40.44 39.28 39.12 38.97 40.42 40.42 39.87 39.35 39.31 38.79 38.83 38.30 38.26 38.00 38.14 36.27 36.08 36.13 (35.09) (35.61) (35.77) 40.32 (40.58) (40.61) 40.48 0.6% 0.6% 0.6% (39.02) PROPOSED 6' SIDEWALK PROPOSED 7' SIDEWALK 44' - 40' - 38.46 38.40 5' CURB TRANSITION 40.85 (36.80) (35.62) (36.00) (40.93) TIE TO EXISTING SIDEWALK R20' R15' R15' 36.81 36.30 40.71 40.60 TIE TO EXISTING SIDEWALK 8-RISERS 7-RISERS 3-RISERS 4-RISERS 5-RISERS 2-RISERS 39.03 39.11 40.68 40.77 41.25 41.25 41.06 40.07 41.25 41.25 39.87 39.36 39.23 38.86 41.25 41.25 38.73 41.25 41.25 37.16 37.12 41.16 41.25 39.52 39.60 40.68 40.68 40.62 40.60 40.35 41.06 41.16 41.25 (40.89) (40.44) (40.15) 7.2% 9.2% 4.9% 7:1 4:1 6:1 21:1 12:1 40.58 6.0% 4.3% 3.4% 3.6% 2.6% 5.0% 41.08 41.08 40.47 12.0% 9' UTILITY EASEMENT 40.59 40.25 39.75 39.95 40.09 39.49 39.45 39.25 40.25 39.03 36.69 36.65 37.25 36.98 37.06 37.17 LEGEND: 5013 PROPOSED CONTOUR EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 4. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. NOTES: 2.0% (47.45) EXISTING SPOT ELEVATION PROPOSED STORM PROPOSED VERTICAL CURB AND GUTTER CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C400 GRADING PLAN A. Reese B. Ruch 1"=20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 / / / / / / / / / / / / / / / / FO X X X G G G G FO FO FO VAULT ELEC S S H Y D WV WV VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC FO VAULT ELEC T FO E X X X X X X CTV CTV CTV CTV CTV FO FO FO FO FO FO FO FO E E E E E E E E E E E E E E E E E E E E E E CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G E E E E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S 6" W SS SS S W S G G G G E E E E E E E E E E E E E E E E E E E E E DS2 DS2 DS2 DS2 DS2 F F F F F E E E E E E E E E E E E E E E F F F F DS3 DS3 F W F F W S F TF 9' UTILITY EASEMENT 9' UTILITY EASEMENT 5' UTILITY EASEMENT UTILITY EASEMENT 5' UTILITY EASEMENT EXISTING 8" WATER LINE EXISTING 12" PVC SANITARY SEWER EXISTING FH EXISTING FH CONNECT TO EXISTING 8" WATER MAIN 8"x6" TAPPING SADDLE w/ 6" GV (S) CUT IN MANHOLE CONNECT TO EXISTING 12" SANITARY SEWER PROPOSED 6" FIRE SERVICE PROPOSED 4" WATER SERVICE PROPOSED CONCRETE COLLAR & CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE PAN PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE THE LOFTS AT CAMPUS WEST TOWN SQUARE CONDOMINIUMS CITY PARK CONDOMINIUMS (BOOK 1291, PAGE 862) THE DISTRICT AT CAMPUS WEST (REC. NO. 20130032356) PROPOSED STORM DRAIN DETENTION VAULT PROPOSED ELECTRIC TRANSFORMER UTILITY EASEMENT CONNECT TO EXISTING 8" WATER MAIN 8"x4" TAPPING SADDLE w/ 4" GV (S) PROPOSED WATER METER EXISTING FH PROPOSED 8" SANITARY SEWER SERVICE NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C300 UTILITY PLAN A. Reese B. Ruch 1"=20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 8. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OR FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 9. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. 10. ALL SANITARY SEWER SERVICE CONNECTION INVERTS AND LOCATIONS BASED ON BEST AVAILABLE DATA. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. 11. PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND INLET BOX STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 12. ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY THE CITY OF FORT COLLINS. ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443/C877 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). STORM DRAINS SHOWN ON THIS DRAWING AS POLYVINYL CHLORIDE (PVC) SHALL BE C-900 OR APPROVED EQUAL. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 14. CONTRACTOR SHALL COORDINATE ANY NECESSARY TELEPHONE, CABLE, FIBER, GAS, AND ELECTRIC LOWERINGS (OR RE-ROUTING) WITH THE RESPECTIVE UTILITY PROVIDERS. 15. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND UTILITY PROVIDERS. EXISTING WATER MAIN LEGEND: W G T CTV EXISTING STORM SEWER EXISTING CABLE EXISTING TELEPHONE EXISTING GAS PROPOSED SEWER SERVICE S EXISTING SANITARY SEWER SS PROPOSED CURB & GUTTER PROPOSED WATER SERVICE PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D EASEMENT LINE PROPERTY BOUNDARY EXISTING LOTLINE W PROPOSED WATER MAIN PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED ELECTRIC TRANSFORMER PROPOSED ELECTRIC E EXISTING PAVEMENT TO BE REMOVED PROPOSED FIRE DEPARTMENT CONNECTION FDC TF PROPOSED FIRE SERVICE F EXISTING ELECTRIC E VAULT ELEC T FO E X X X X X X PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 2' SIDEWALK CHASE PROPOSED 6' SIDEWALK PROPOSED 7' SIDEWALK PROPOSED 30" VERITCAL CURB & GUTTER THE LOFTS AT CAMPUS WEST TOWN SQUARE CONDOMINIUMS CITY PARK CONDOMINIUMS (BOOK 1291, PAGE 862) THE DISTRICT AT CAMPUS WEST (REC. NO. 20130032356) EXISTING 30" VERTICAL CURB & GUTTER PROPOSED CONCRETE DRIVEWAY TIE TO EXISTING SIDEWALK EXISTING PAVEMENT MARKINGS (TYP.) PROPOSED 2' CONCRETE PAN TIE TO EXISTING CURB & GUTTER TIE TO EXISTING CURB & GUTTER PROPOSED ACCESS RAMPS PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE PROPOSED 1' SIDEWALK CHASE 5' UTILITY EASEMENT 44' - 40' - \A1;40' {\fISOCPEUR|b0|i0|c186|p34;}-{\fISOCPEUR|b0|i0|c186|p34;} PROPOSED SAWCUT LINE DETENTION VAULT UTILITY EASEMENT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C200 PAVING PLAN A. Reese B. Ruch 1"=20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 1. SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS. 2. PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL. 3. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 4. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 5. ALL PUBLIC CONCRETE SIDEWALKS SHALL BE 6" THICK. ALLEY DRIVEWAY/SIDEWALK CONCRETE SHALL BE 8" (MIN.) THICK. ACTUAL ALLEY CONCRETE THICKNESS SHALL BE BASED ON FINAL PAVEMENT DESIGN. 6. REFER TO SITE AND LANDSCAPE PLANS (BY OTHERS) FOR ADDITIONAL INFORMATION RELATED TO DECORATIVE PAVING, HARDSCAPES, AND OTHER SITE AMENITIES. PROPOSED VERTICAL CURB & GUTTER ACCESS RAMP w/ TRUNCATED DOMES EASEMENTS PUBLIC CONCRETE FLATWORK PROPERTY BOUNDARY PROPOSED LOT LINE PROPOSED EDGE OF PAVEMENT ASPHALT PATCH PRIVATE CONCRETE FLATWORK OHU OHU ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W V AULT ELEC S T FO T FO ELEC VAULT ELEC W W D ST / / / / / / / / / / / / / / / / / / / / / / / / FO X X X X X X X X X X X X X X G G G G FO FO FO W W W VAULT ELEC S S VAULT CABLE H Y D WV WV VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC FO G G G W E E G E VAULT ELEC T FO E E E CABLE W S O T T T T T T E E E X X X E E CTV CTV OHU OHU OHU OHU CTV X X X X X E E E T X CTV CTV CTV CTV CTV FO FO FO FO FO FO FO FO E E E E E E E E E X X X X E E E E E E E E E E E E E E E E E CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G G G E E E E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S 6" W SS SS S W S G G G G E E E E E E E E E E E E E E E E E E E E E DS2 DS2 DS2 DS2 DS2 F F F F F E E E E E E E E E E E E E E E F F F F DS3 DS3 F / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / THE LOFTS AT CAMPUS WEST TOWN SQUARE CONDOMINIUMS CITY PARK CONDOMINIUMS (BOOK 1291, PAGE 862) THE DISTRICT AT CAMPUS WEST (REC. NO. 20130032356) / / / / / / / / / / / / / / EXISTING 8" WATER LINE EXISTING 12" PVC SANITARY SEWER EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING BUILDING TO BE REMOVED EXISTING TREE TO BE REMOVED (TYP.) EXISTING TREE TO BE REMOVED (TYP.) EXISTING GAS LINE TO BE REMOVED EXISTING GAS LINE TO BE REMOVED EXISTING GAS LINE TO BE REMOVED EXISTING GAS LINE TO BE REMOVED EXISTING UTILITIES TO BE REMOVED EXISTING UTILITIES TO BE REMOVED EXISTING UTILITIES TO BE REMOVED EXISTING UTILITIES TO BE REMOVED EXISTING UTILITIES TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING GRAVEL DRIVE TO BE REMOVED EXISTING CURB AND GUTTER EXISTING 4' SIDEWALK TO BE REMOVED EXISTING 4' SIDEWALK TO BE REMOVED PROPOSED SAWCUT LINE PROPOSED SAWCUT LINE EXISTING CURB & GUTTER TO BE REMOVED PAVEMENT REMOVAL AREA EXISTING TREE TO BE REMAIN EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING FENCE TO BE REMOVED EXISTING WATER SPIGOT TO BE REMOVED ±40' - 44' - EXISTING FENCE TO BE REMOVED EXISTING FH EXISTING FH EXISTING CABLE VAULT TO BE RELOCATED EXISTING FH EXISTING LIGHT TO BE RELOCATED / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING WATER SERVICE TO BE ABANDONED AT MAIN EXISTING WATER SERVICE TO BE ABANDONED AT MAIN EXISTING WATER SERVICE TO BE ABANDONED AT MAIN EXISTING WATER SERVICE TO BE ABANDONED AT MAIN EXISTING EDGE OF ASPHALT EXISTING EDGE OF ASPHALT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C100 & DEMOLITION PLAN EXISTING CONDITIONS A. Reese B. Ruch 1"=30' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com NORTH LEGEND: EXISTING STORM SEWER EXISTING VALVE EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 H Y EXISTING TREES (TO BE REMOVED) EXISTING PAVEMENT TO BE REMOVED 1. ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2. WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3. ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4. PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5. DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6. NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7. LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8. THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9. ALL TREE REMOVAL SHOWN SHALL BE COMPLETED OUTSIDE OF THE SONGBIRD NESTING SEASON (FEB 1 - JULY 31) OR CONDUCT A SURVEY OF TREES ENSURING NO ACTIVE NESTS IN THE AREA. 10. REFER TO LANDSCAPE AND IRRIGATION PLANS FOR ADDITIONAL TREE PROTECTION MEASURES. TREE PROTECTION NOTES: SUBSURFACE EXPLORATION BY: NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7. ADDITIONAL TREES NOT SHOWN ON THESE PLANS MAY EXIST AND MAY REQUIRE REMOVAL. COORDINATION OF WHICH TREES ARE TO REMAIN AND WHICH ARE TO BE REMOVED SHOULD BE COORDINATED WITH THE CITY FORESTER. REFER TO LANDSCAPE PLANS AND TREE MITIGATION PLAN FOR ADDITIONAL INFORMATION. 8. CONTRACTOR SHALL COORDINATE WITH FORT COLLINS UTILITY FIELD OPERATIONS DEPARTMENT AT (970) 221-6700 FOR WATER AND SEWER SERVICE ABANDONMENT. TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET) 0-2 1 3-4 2 5-9 5 10-14 10 15-19 12 OVER 19 15 S O W VAULT ELEC ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 NORTHERN ENGINEERING PROJECT NO. 1252-001 DATE: JUNE 2016 TERRACON CONSULTANTS, INC. GEOTECHNICAL ENGINEERING REPORT PLUM STREET PROJECT 1303 AND 1307 WEST PLUM STREET FORT COLLINS, COLORADO TERRACON PROJECT NO. 20165035 DATE: MAY 19, 2016 sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Preliminary Drainage Report for West Plum Housing, dated October 19, 2016 by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by th e construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 City of Fort Collins Benchmark 19-97 At the Southeast corner of West Elizabeth and Shields St., on a concrete traffic signal base. ELEV.=5025.74 City of Fort Collins Benchmark 3-08 Southwest corner of Mulberry St. and Shields St. on a concrete traffic signal base. ELEV.=5030.29 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.17' Basis of Bearings The Basis of Bearings is the South line of the Northeast Quarter of Section 15, as bearing South 89°04'20" East. 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. For additional information see separate Stormwater Management Plan / Erosion Control Report for West Plum Housing. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Preliminary Drainage Report for West Plum Housing, dated October 19, 2016 by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal valve box and "water" lid per City Water Detail 11A. C002 GENERAL & CONSTRUCTION NOTES A. Reese B. Ruch NTS No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Oct. 26, 2016 PROJECT: 1252-001 Sheet of 7 Sheets WEST PLUM HOUSING These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 10/26/16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E N G I N E E R I N G N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com OCTOBER 2016 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: VICINITY MAP NORTH 1"=1500' PROJECT DATUM: NAVD88 City of Fort Collins Benchmark 19-97 At the Southeast corner of West Elizabeth and Shields St., on a concrete traffic signal base. ELEV.= 5025.74 City of Fort Collins Benchmark 3-08 Southwest corner of Mulberry St. and Shields St. on a concrete traffic signal base. ELEV.= 5030.29 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.17' Basis of Bearings The Basis of Bearings is the South line of the Northeast Quarter of Section 15, as bearing South 89°04'20" East. Northern Engineering Project No. 1252-001 Date: June 2016 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A TRACT OF LAND LOCATED IN THE NORTHEAST QUARTER OF SECTION 15, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO OWNER/APPLICANT PROJECT TEAM: SITE ENGINEER Northern Engineering Services, Inc. Nick Haws, PE, LEED AP 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SURVEYOR ARCHITECT CONTACT INFORMATION PROJECT TEAM: SHEET INDEX E N G I N E E R I N G N O R T H E RN PRELIMINARY UTILITY PLANS FOR City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS----------------- Xcel Energy----------------------------- Pat Kreager (970) 225-7840 ELECTRIC-------- City of Fort Collins Light & Power-- Luke Unruh (970) 416-2724 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink------------------------------- William Johnson (970) 377-6401 WATER------------ City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 WASTEWATER--City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 STORMWATER- City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 LANDSCAPE ARCHITECT GEOTECH PROJECT LOCATION WEST PLUM HOUSING Humphreys & Partners Architects, L.P. Yaohua Yu 5339 Alpha Road, Suite 300 Dallas, Texas 75240 (972) 701-9636 Ripley Design, Inc. Stephanie Van Dyken, PLA, APA 419 Canyon Avenue, Suite 200 Fort Collins, Colorado 80513 (970) 224-5828 Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 E N G I N E E R I N G N O R T H E RN Terracon Consultants, Inc. Kurt A. Stauder, P.G. 1901 Sharp Point Drive, Suite C Fort Collins, CO 80525 (970) 484-0359 C001 COVER SHEET A. Reese B. Ruch NTS C001 COVER SHEET Terracon Consultants, Inc. Geotechnical Engineering Report Plum Street Project 1303 and 1307 West Plum Street Fort Collins, Colorado Terracon Project No. 20165035 Date: May 19, 2016 SUBSURFACE EXPLORATION BY: C002 GENERAL & CONSTRUCTION NOTES S. SHIELDS ST. W. MULBERRY ST. W. ELIZABETH ST. CSU W. PLUM ST. W. LAUREL ST. CITY PARK AVE. ■ land planning ■ landscape architecture ■ ■ urban design ■ entitlement ■ C100 EXISTING CONDITIONS & DEMOLITION PLAN C200 PAVING PLAN C300 UTILITY PLAN C400 GRADING PLAN C500 (RESERVED FOR DETAILS) Plum Owner Ft Collins CO LLC 999 South Shady Grove Road, Suite 600 Memphis, TN 38120 (901) 259-2500 C600 DRAINAGE EXHIBIT TYPICAL SECTION