Loading...
HomeMy WebLinkAboutALTA VISTA (903 BUCKINGHAM ST.) WTE - PDP - PDP160028 - PLANS - UTILITY PLANSPROJECT DESCRIPTION: IDEMNIFICATION STATEMENT: TITLE SHEET T-1 PROPOSED TELE- COMMUNICATIONS FACILITY SITE NAME: PROJECT DESCRIPTION: TOWER TYPE: SITE ADDRESS: 68' SILO ALTA VISTA ZONING JURISDICTION: ZONING: I: INDUSTRIAL DISTRICT CITY OF FORT COLLINS 903 BUCKINGHAM STREET FORT COLLINS, CO 80524 (LARIMER COUNTY) POWER COMPANY: CONTACT: PHONE: METER# NEAR SITE: TELEPHONE COMPANY: CONTACT: PHONE: PEDESTAL # NEAR SITE: TOWER ENGINEERING PROFESSIONALS 5545 W. 56TH AVE., UNIT E ARVADA, CO 80002 NICHOLAS M. CONSTANTINE (303) 566-9914 WiBLUE, INC. KEN BRADTKE (303) 448-8896 SITE CONSTRUCTION MANAGER: SITE APPLICANT: SURVEYOR: CIVIL ENGINEER: PROPERTY OWNER: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: ADDRESS: CITY, STATE, ZIP: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: ADDRESS: CITY, STATE, ZIP: CONTACT: PHONE: NAME: CONTACT: NOTES: LEGEND 1-A COORDINATES BUCKINGHAM STREET SITE PLAN & COMPOUND DETAIL C-1 SITE PLAN 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING COMPOUND DETAIL CONSTRUCTION NOTES: ³ ´ ³ ´ ³ ´ GEOTEXTILE FABRIC NOTES: SITE GRADING NOTES: 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING SOIL & EROSION 3 10-25-16 ZONING CONTROL PLAN C-2 CONSTRUCTION NOTES SILT FENCE DETAILS SOIL & EROSION CONTROL PLAN IMPERMEABLE AREA CALCULATIONS GRADING & DRAINAGE PLANS C-3 SITE PLAN GRADING 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING COMPOUND GRADING BUCKINGHAM STREET CODES TESTING GUARANTEE CO-ORDINATION: EXAMINATION OF SITE CUTTING, PATCHING AND EXCAVATION: SCOPE: ELECTRICAL NOTES: CONDUCTORS GROUNDING PENETRATIONS: EXTERIOR CONDUIT: EQUIPMENT: RACEWAYS ABBREVIATIONS AND LEGEND MATERIALS POWER NOTES: UTILITY PLAN SCHEDULE 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING E-1 ELECTRICAL NOTES & UTILITY COORDINATION ELECTRICAL NOTES UTILITY COORDINATION NOTES: FRONT VIEW REAR VIEW POWER PANEL SCHEDULE NOTES: VZW SERVICE RACK (FRONT AND BACK) ATLAS SERVICE RACK (FRONT) ATLAS SERVICE RACK (BACK) ONE LINE DIAGRAM NOTES: NOTES: NOTES: DRAWING NOTES: 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING E-2 ELECTRICAL DETAILS SERVICE RACK DETAILS ONE LINE ELEVATION ONE LINE DETAIL UNDERGROUND CONDUIT(S) TRENCH DETAIL POWER AND TELCO PLAN NOT USED FIXED GENERATOR GROUNDING NOTES DRAWING NOTES: NOTES: SINGLE CONNECTOR AT GROUND BARS BACK TO BACK CONNECTOR AT GROUND BARS SINGLE CONNECTOR AT STEEL OBJECTS BACK TO BACK CONNECTOR AT STEEL OBJECTS SINGLE CONNECTOR AT METALLIC/STEEL OBJECTS BACK TO BACK CONNECTOR AT METALLIC/STEEL OBJECTS TOP VIEW SIDE VIEW GROUNDING DETAILS E-3 ELECTRICAL DETAIL 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING TOWER GROUNDING ISOLATED GROUND BAR COPPER-CLAD STEEL GND ROD TOWER GROUNDING MOUNTING DETAIL COAX ISOLATED GROUND BAR EXTERNAL CIGBE - BOTTOM TYPE 1 GROUND BAR TYPE 2 GROUND BAR COAX ISOLATED GROUND BAR EXT. CIGBE - TOP & INTERMEDIATE GROUNDING PLAN GROUNDING AT GATE POST TRENCH DETAIL INSPECTION WELL DETAIL CONNECTOR AND HARDWARE DETAIL CADWELD GROUNDING DETAIL PHONE: N CLARK LAND SURVEYING, INC. 1740 EAGLEBRIDGE BLVD, STE 140 PUEBLO, CO 81008 NATHANIEL J. MAESTAS, P.L.S. (719) 582-1270 PROJECT DESCRIPTION 1-A COORDINATES CODE COMPLIANCE UTILITY INFORMATION ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITES. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING: 1. INTERNATIONAL BUILDING CODE (2012 EDITION) 3. ANSI/TIA/EIA-222-G 4. NATIONAL ELECTRIC CODE (2014 EDITION, COLORADO ADMINISTRATIVE CODE) 5. LOCAL BUILDING CODE 6. CITY/COUNTY ORDINANCES CONTACT INFORMATION PROJECT INFORMATION SHEET INDEX DRIVING DIRECTIONS LOCATION MAP FROM DENVER, CO TAKE I-25 NORTH FOR 59.1 MILES. TAKE EXIT 269B TO MERGE ONTO CO-14 W TOWARD FT COLLINS AND FOLLOW FOR 2.9 MILES. TURN RIGHT ONTO S LEMAY AVE. TURN LEFT ONTO BUCKINGHAM ST. SITE WILL BE ON THE LEFT IN 0.2 MILES. 903 BUCKINGHAM STREET FORT COLLINS, CO 80524 (LARIMER COUNTY) UTILITY PLANS FOR ALTA VISTA LATITUDE: :ƒ  1ƒ  LONGITUDE: *INFORMATION PROVIDED BY CLARK LAND SURVEYING, INC. IN THE FORM OF A 1-A CERTIFICATION DATED OCTOBER 14, 2015. GTG INVESTMENTS LLC 903 BUCKINGHAM ST FORT COLLINS, CO 80524 CENTURY LINK CUSTOMER SERVICE (877) 496-8581 TBD FORT COLLINS LIGHT & POWER CUSTOMER SERVICE (970) 221-6700 TBD SHEET: DESCRIPTION: REV 3 UTILITY PLANS FOR ALTA VISTA KES NMC 0 07-08-16 ZONING DO NOT USE FOR CONSTRUCTION PRELIMINARY 1 07-29-16 ZONING 2 08-30-16 ZONING 3 10-25-16 ZONING PARCEL NUMBER: 97121-59-001 GROUND ELEVATION: 4947.5' ATLAS ONE, LLC. 4450 ARAPAHOE AVE, SUITE 100 BOULDER, CO 80303 CALEB CROSSLAND (303)448-8896 LEGAL DESCRIPTION: LOT 1, COLORADO IRON AND METAL SECOND FILING. (NAD '83) * (NAD '83) * (NAVD '88) * AREA OF CONSTRUCTION: “64)7 /($6($5($ 2. INTERNATIONAL CODE COUNCIL PRESENT OCCUPANCY: MANUFACTURING LOT 1, COLORADO IRON AND METAL SECOND FILING, NE 1 4, S12 T7N, R69W, 6TH P.M. All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Mr. Terry Farrill, P.E., District Engineer Date Mr. Michael D. DiTullio, Manager Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT Larimer County Engineering Date Reviewed by: LARIMER COUNTY APPROVAL