Loading...
HomeMy WebLinkAbout2133 S. TIMBERLINE RD., OFFICE & RESTAURANT - FDP - FDP160015 - CORRESPONDENCE - REVISIONSPage 1 of 5 Application: 2133 Timberline Road – Office/Restaurant Lot 11 – Timberline Center Lot 1 – Timberline Center 3rd Filing Response to FDP Comments provided on April 27, 2016 Acknowledged. The applicant has coordinated with Xcel Energy. A gas main is immediately west of the new building. Natural gas service is expected from this main. Acknowledged. Note 47 has been removed. Acknowledged. Note 19 has been updated to March 24, 2016 – the last date of the erosion control report submittal. Acknowledged. Notes have been updated and removed. Page 2 of 5 Acknowledged. The islands have been shown only on the existing conditions sheet. Acknowledged. The emergency access easements have been coordinated with PFA (Jim Lynxwiler) and are shown as requested. This easement configuration is consistent with the other emergency access easements across the Timberline Center development. Comment acknowledged. It is not the responsibility of this development to verify whether or not existing public infrastructure is located within public easements or rights of way. The accepted and approved subdivision plans for Timberline Center provide for public easements that accommodate the existing facilities. Acknowledged. A C-1 form and one-line will be provided prior to starting construction. Acknowledged. AutoCAD drawings (latest version) will be provided upon approval of the project mylar drawings. Page 3 of 5 Acknowledged. LID sizing calculations have been provided for both the rain garden to the west of the building and the roof drain catchment gardens on the east side of the building in the updated drainage memo in Appendix C. Acknowledged. An outlet structure has been added with rim elevation 1-foot above the rain garden flat filter area. Overall elevation of the rain garden has been adjusted to meet Urban Drainage requirements and the inlet to the rain garden will be a 1-foot curb cut. Acknowledged. A typical detail for each LID has been added with proposed grading. An overall rain garden sizing calculation has been provided for these gardens in the drainage memo Appendix C. Acknowledged. Details adjusted per redlines. Page 4 of 5 This comment has been previously addressed. The sheet size is 24x36 inches. The image on the sheet is 22x34 inches allowing the plans to be scaled ½ size on 11x17 inch paper. This sheet size has been submitted and accepted by the City in the past. The sheets will remain as presented in the FDP 1st round. We do not understand this comment as there are no coordinate values provided for the utilities. There is only horizontal control layout information provided for the building and site features (curb, gutter, etc.). We also do not understand the need for this as the property corners are fully defined on the plat and the coordinate base is conformed to the site plans. The utilities being constructed as part of this project are private. Regardless, a property corner coordinate table has been added to Sheet 5 of the Utility Plans. Acknowledged. Descriptions have been modified. Acknowledged. The plat has been updated. Page 5 of 5 Acknowledged. The site plans have been updated. Acknowledged. The minor amendment has been corrected and resubmitted. END FDP COMMENT RESPONSE