Loading...
HomeMy WebLinkAbout625 S. PETERSON MULTI-FAMILY - FDP - FDP160039 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTProject Development Plan (PDP) Final Drainage Report for 625 Peterson Street Redevelopment submitted to: City of Fort Collins, Colorado September 20, 2016 760 Whalers Way Bldg C, Suite 200 Fort Collins, CO 80525 970.226.0557 main 303.595.9103 metro 970.226.0204 fax ideas@tstinc.com www.tstinc.com September 20, 2016 Mr. Mark Taylor, P.E., CFM City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: 625 Peterson Street Redevelopment Project No. 0663.0012.00 Dear Mr. Taylor: We are pleased to submit this Final Drainage Report for the 625 Peterson Street Redevelopment. This report analyzes the developed stormwater runoff from the project and provides stormwater infrastructure and water quality management for runoff. The 625 Peterson Street Redevelopment is located in the City of Fort Collins Old Town Moderate Risk Floodplain. It is understood that there are no floodplain elevation standards for this development, but we have taken the elevation recommendations into account when designing this site. This report has been prepared based on the City of Fort Collins Stormwater Criteria Manual and complies with the PDP submittal requirements for a final drainage report. Respectfully, TST, INC. CONSULTING ENGINEERS Jon Sweet, P.E. Eric M. Fuhrman, P.E. JFS/EMF/jrm 625 Peterson Street Redevelopment PDP Final Drainage Report TABLE OF CONTENTS Page 1.0 Introduction 1.1 Scope and Purpose ................................................................................................... 1 1.2 Project Location and Description ............................................................................... 1 2.0 Existing Conditions ........................................................................................................ 3 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis ...................................................................... 3 3.2 Drainage Plan Development ...................................................................................... 4 3.2.1 Channel Design ................................................................................................ 4 3.2.2 Detention Requirements and Water Quality Capture Volume Design ............... 5 3.3 Low Impact Development .......................................................................................... 5 3.4 Old Town Moderate Risk Floodplain Management .................................................... 7 4.0 Conclusion ....................................................................................................................... 7 5.0 References ....................................................................................................................... 8 Figures Figure 1. Vicinity Map.................................................................................................................. 2 Figure 2. Four-Step Process for Stormwater Quality Management ............................................. 6 Tables Table 1. Existing VS. Proposed Impervious Area ........................................................................ 5 Appendices Appendix A: Rational Method Hydrologic Analysis Appendix B: Channel Design Appendix C: Water Quality Capture Volume Appendix D: Low Impact Development 625 Peterson Street Redevelopment PDP Final Drainage Report Page 1 1.0 Introduction 1.1 Scope and Purpose This report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual requirements and complies with Project Development Plan (PDP) submittal requirements which present the results of a preliminary drainage analysis for the 625 Peterson Street Redevelopment. 1.2 Project Location and Description The 625 Peterson Street Redevelopment is a 12,000 s.f. existing single family lot located in the northwest quarter of Section 13, Township 7 North, Range 69 West. The site is located on the west side of Peterson Street approximately halfway between East Laurel Street and East Myrtle Street. Please refer to Figure 1 on the next page for a Vicinity Map. This development is located within the City of Fort Collins Old Town Moderate Risk Floodplain. The Base Flood Elevation (BFE) at the rear of the property is approximately 4989.9 and the front is at roughly 4988.9 (NAVD88). This floodplain has no elevation standards for development, but it is recommended that the lowest finished floor and all duct work, heating, ventilation and air conditioning, hot water heaters, electric, etc. be elevated a minimum of 24” above the BFE. 625 Peterson Street Redevelopment PDP Final Drainage Report Page 2 Figure 1. 2.0 Existing Conditions The existing site contains a single family residence, shed/garage type structures and interconnecting paver/concrete pathways and patios. The site generally drains to the east, or toward the front of the lot, at roughly 0.8%. There is an existing concrete alley in the back of the lot that flows north at approximately 0.3% and is captured by area inlets in the alley roughly 185’ to the north. The front of the lot has a vertical curb and gutter. This gutter flows south at roughly 0.3% to the intersection of Peterson Street and East Laurel Street where runoff is picked up by a curb inlet. 625 Peterson Street Redevelopment PDP Final Drainage Report Page 3 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis The drainage plan presented in this report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual and the City of Fort Collins submittal requirements for a Project Development Plan (PDP). The drainage basin presented in this report is less than 90 acres, therefore, the method used to analyze drainage for this project will be the Rational Method. Runoff calculations for both the 2- year and 100-year storms will be presented here. The Rational Method is given by: Q = C(Cf)IA where  Q is the maximum rate of runoff in cfs  C is the runoff coefficient  Cf is the runoff coefficient frequency factor adjustment  I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration  A is the total area of the basin in acres The runoff coefficient C has different values depending on the design storm recurrence interval. The runoff coefficient is also dependent on land use or surface characteristics/imperviousness. Runoff coefficients were assigned using Table RO-11 from the Fort Collins Stormwater Criteria Manual. The frequency factor adjustment, Cf, varies depending on the storm frequency and can be found in Table RO-12 of the Fort Collins Stormwater Criteria Manual. The rainfall intensity is selected from Rainfall Intensity Duration Frequency Curves for the City of Fort Collins (Tables RA-7 through RA-9 of the Fort Collins Stormwater Criteria Manual). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration tc = ti + tt where  tc is the time of concentration in minutes  ti is the initial or overland flow time in minutes  tt is the conveyance travel time in minutes The initial or overland flow time is calculated with the UDFCD equation: 625 Peterson Street Redevelopment PDP Final Drainage Report Page 4   0.33 f i S 1.87 1.1 * C D t  C  3.2 Drainage Plan Development The 625 Peterson Street project is proposed to remodel the existing single family home and expand the footprint on the west side to accommodate 3 new rental units. A new parking area will be required off the rear alley. The existing property to the north has a shallow swale along it’s south property line that captures flow from this property and routes it to Peterson Street. The property to the south has roof drains directed onto their driveway, which directs runoff east, to Peterson Street. Therefore offsite flows onto the property are assumed to be zero for this analysis. Basin A, as shown on the Drainage Plan, is located in the rear of the property along the existing concrete alley. This basin consists of the parking area and trash enclosure. The parking will sheet flow in a southeast direction at a 1.65% slope toward the curb-cut and 2’ gutter. Basin B is located along the south property line and extends from the front to the back of the lot. This basin is a mixture of grass, landscaping, concrete walkways and half of the existing and proposed roof area. These areas will generally sheet flow at 1% - 2% toward the southeast where runoff will be captured in a 2’ wide gutter, located on the south property line, and directed toward Peterson Street. Basin C encompasses the northern portion of the property and consisted of grass, landscaping, concrete walkways, a new concrete driveway and half of the proposed and existing roof area. This basin will drain toward the northeast and will be directed toward Peterson Street in a 2’ wide concrete. Basin runoff results are provided in Appendix A. 3.2.1 Channel Design Proposed channels and swales at this project site have been analyzed using Bentley Flowmaster V8i, Select Series 1 software. These swales have been designed to include 133% of design flow. The standard 1’ of freeboard above the normal water depth is not possible due to existing conditions and the flat nature of the site. Swale A-A, B-B, and C-C are 2’ concrete gutters located on the south property line and sloped at a minimum of 0.5%, and maximum of 0.93%, to the east. This swale will convey runoff from 625 Peterson Street Redevelopment PDP Final Drainage Report Page 5 Basin A and B. Swale D-D is a 2’ concrete gutter located on the north property line and will convey Basin C at a 0.8% slope toward Peterson Street. The results of the channel design are provided in Appendix B. 3.2.2 Detention Requirements and Water Quality Capture Volume Design As per the City standard, developments with less than 5,000 sf of new impervious area are not required to provide detention. This site has a new impervious area total less than 5,000 sf and therefore this project will not provide detention. Please see Table 1 below for existing versus proposed impervious area information. Hardscape/Pavement* 3960 Roof 3058 Hardscape/Pavement 940 Roof 2378 New Impervious Area 3700 *Hardscape/Pavement area excludes proposed pervious paver area. EX SITE 3318 PROPOSED SITE 7018 Table 1 Existing VS. Proposed Impervious Area Basin/ Sub-Basin Attribute Attribute Area (sf) Total Impervious Area (sf) The Water Quality Capture Volume (WQCV) has been calculated using Equation 3-3 and Figure 3-2 from the Urban Storm Drainage Criteria Manual Volume 3. The WQCV for this site is 0.0039 ac-ft, or 170 cu-ft. Permeable pavement areas proposed for this project site are capable of storing approximately 0.007 ac-ft, or 293 cu-ft of WQCV within the sub-structure of these paved areas. However, this water quality will be implemented within Basin A only. Due to significant site constraints, including a small site, and the inability to daylight an underdrain, Basins B and C will not have a water quality component. A variance to cover this non-standard approach is included with this report. WQCV calculations are presented in Appendix C, and the permeable pavements storage calculations are shown in Appendix D. 3.3 Low Impact Development With the building coverage and parking areas on this small lot, the amount of imperviousness on this site will be fairly high. However, the grading design aims to minimize the “directly 625 Peterson Street Redevelopment PDP Final Drainage Report Page 6 connected impervious area” (DCIA) as much as possible. Strategies to minimize directly connected impervious areas follow the Four-Step Process for Stormwater Quality Management, as outlined in Volume 3 of the Urban Storm Drainage Criteria Manual. The four-step process is shown below. Figure 2. Four-Step Process for Stormwater Quality Management Step 1: Runoff Reduction Practices for this project site are planned to include porous pavers in the parking area and maintaining grassed/landscaped areas where possible. The porous pavers will aid in the stormwater filtration for runoff generated by the parking area. The grassed/landscaped areas will help to minimize the directly connected impervious roof and hardscape areas. This will also provide the opportunity for runoff infiltration and increase the time of concentration. Step 2: BMP’s to Provide WQCV with Slow Release for this project site will employ LID techniques such as a permeable pavement system and grassed/landscaped areas within the project site. The City of Fort Collins criteria for low impact development, as outlined in the Stormwater Criteria Manual in Volume 3, Chapter 3, are as follows:  No less than 50% of any newly added impervious area must be treated using one or a 625 Peterson Street Redevelopment PDP Final Drainage Report Page 7 combination of LID techniques, and  No less than 25% of any newly added pavement areas must be treated using a permeable pavement technology that is considered a LID technique Step 3: Stabilized Drainageways will come in the form of reseeding and/or sodding the open areas between downspout locations and the swales on the north and south property lines. Step 4: Site Specific Source Control BMP’s may include things like proper maintenance of the permeable pavers. LID calculations are included in Appendix D. 3.4 Old Town Moderate Risk Floodplain Management This development is located within the City of Fort Collins Old Town Moderate Risk Floodplain. The Base Flood Elevations (BFE’s) have been provided by the City Stormwater Department and are approximately 4989.9 at the rear of the property and 4988.9 (NAVD88) at the front. This floodplain has no elevation standards for development, but it is recommended that the lowest finished floor and all duct work, heating, ventilation and air conditioning, hot water heaters, electric, etc. be elevated a minimum of 24” above the BFE. The new units are to be located in the center of the site, so we have assumed a BFE of 4989.5 at this location. Due to site constraints the finished floor (and duct work, HVAC, etc.) will be set 18”, rather than 24”, above this BFE at 4991.00. The finished floor elevation of the existing home is 4988.21 and will need to stay at this elevation. 4.0 Conclusion The City of Fort Collins Stormwater Criteria Manual has been used to establish the criteria for a developed condition runoff plan within the 625 Peterson Street Redeveloped area. This PDP drainage design report has highlighted the following items:  Project site development is within the confines of the City regulatory Old Town Moderate Risk Floodplain.  Stormwater detention will not be required due to the fact that this project will add less than 5,000 s.f. of new impervious area.  Water quality has been provided through the use of permeable pavers. Areas that we have been unable to provide water quality for are covered under the attached variance.  LID techniques are planned to be implemented within the site design that include the use of minimizing directly connected impervious areas. These are through the use of permeable pavement. 625 Peterson Street Redevelopment PDP Final Drainage Report Page 8 5.0 References 1. City of Fort Collins Stormwater Criteria Manual, Amendments to the Urban Drainage and Flood Control District Criteria Manual, Adopted December 2011, Last Revision April 2012. 2. Urban Drainage and Flood Control District Criteria Manual, Volume 3, August 2011 3. Natural Resources Conservation Services, 2013, Web Soil Survey: Soil Survey Area Larimer County Area, Version 8, Dec 23, 2013 4. Chapter 10 of the Fort Collins Municipal Code, http://colocode.com/fcmunihtml.html APPENDIX A Rational Method Hydrologic Analysis +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 3HWHUVRQ6WUHHW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI                                   ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ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²6XPPDU\E\0DS8QLW²/DULPHU&RXQW\$UHD&RORUDGR &2 0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,  )RUW&ROOLQVORDPWR SHUFHQWVORSHV &   7RWDOVIRU$UHDRI,QWHUHVW   'HVFULSWLRQ +\GURORJLFVRLOJURXSVDUHEDVHGRQHVWLPDWHVRIUXQRIISRWHQWLDO6RLOVDUH DVVLJQHGWRRQHRIIRXUJURXSVDFFRUGLQJWRWKHUDWHRIZDWHULQILOWUDWLRQZKHQWKH VRLOVDUHQRWSURWHFWHGE\YHJHWDWLRQDUHWKRURXJKO\ZHWDQGUHFHLYHSUHFLSLWDWLRQ IURPORQJGXUDWLRQVWRUPV 7KHVRLOVLQWKH8QLWHG6WDWHVDUHDVVLJQHGWRIRXUJURXSV $%&DQG' 7LHEUHDN5XOH+LJKHU +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 3HWHUVRQ6WUHHW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI 625 Peterson Street Redevelopment PDP Final Drainage Report Appendix A Developed Runoff Developed condition runoff was evaluated in accordance with the criteria established by the City of Fort Collins Stormwater Criteria Manual dated February 26, 2013. Design guidelines and information were also obtained from the Urban Storm Drainage Criteria Manual (USDCM) where applicable. A full description of this method is available through those manuals. The Rational Method computes only the peak flow at a design point and does not provide hydrograph information. Rational Method City of Fort Collins The Rational Method calculates peak runoff using the equation: Q = CCfIA Where: Q = The maximum rate of runoff (cfs) C = Rational Method Runoff Coefficient for the design storm frequency. City of Fort Collins runoff coefficients are found in Table 3-3 of the SDDC manual. Cf = Storm Frequency Coefficient found in Table 3-4 of the SDDC manual. I = Average intensity of rainfall in inches per hour for a duration equal to the time of concentration, Tc. City of Fort Collins rainfall intensity data are shown in this Appendix. A = Basin Area (acres) Rational Method Runoff Coefficients, C, are a function of the basin land use and the design storm frequency. They are listed in Table 3-3 of the Storm Drainage Design Criteria manual. For basins containing more than one land use, a weighted average runoff coefficient has been computed. Time of Concentration, Tc, is the sum of the overland travel time, to, and the channel or conduit flow time, tt. Time of concentration is used to select the correct rainfall intensity for the rational method equation. T c  t i  t t where: Tc = Time of Concentration (min), to = Overland Travel Time (min), tt = Channel or Conduit flow time (min). Overland Travel Time, to, is computed using the frequency adjusted runoff coefficient and is applicable to all design storm intervals. 625 Peterson Street Redevelopment PDP Final Drainage Report Appendix A ( ) 3 1 1 . 8 ( 1 . 1 ) 0 . 5 S CC L t f o   Where: to = Overland Travel Time (min) C5 = The Rational Method runoff coefficient for the 5 – year storm L = Length of overland flow (ft), Maximum = 400 feet. S = Average basin slope (%) Channel or Conduit Travel Time, tt, is determined from the velocity of flow computed for the hydraulic properties of the channel, ditch, gutter, pipe or sewer. For the purposes of this report, the following equation was used: V L tt 60 *  Where: tt = Channel or Conduit Travel Time (min) L = Length of channel or conduit flow (ft) V = Velocity of flow (fps), determined from Figure 3-2 625 Peterson Street Redevelopment PDP Final Drainage Report Appendix A 625 Peterson Street Redevelopment PDP Final Drainage Report City of Fort Collins IDF Curves Duration 2-yr 10-yr 100-yr 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.40 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.13 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 625 Peterson Street Redevelopment PDP Final Drainage Report From the Town of Timnath Design Criteria Manual and Construction Specifications y = 2.5665e-0.021x R² = 0.9633 y = 26.332x-0.53 R² = 0.9879 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0 10 20 30 40 50 60 70 Rainfall Intensity (in/hr) Storm Duration (min) City of Fort Collins IDF Curves 2-yr 10-yr 100-yr Expon. (2-yr) Power (100-yr) Appendix A 625 Peterson Street Redevelopment PDP Final Drainage Report City of Fort Collins Rational Method Runoff Coefficients Lawn, Heavy, <2% Slope 0.20 Lawn, Heavy, >7% Slope 0.35 Lawn, Heavy, 2-7% Slope 0.25 Lawn, Sandy, <2% Slope 0.10 Lawn, Sandy, >7% Slope 0.20 Lawn, Sandy, 2-7% Slope 0.15 Roofs 0.95 Streets: Permeable Pavers 0.30 Streets: Gravel 0.50 Streets: Paved 0.95 From Table 3-3 of the City of Fort Collins, Stormwater Criteria Manual Runoff Coefficient Appendix A 625 Peterson Street Redevelopment PDP Final Drainage Report C2 C10 C100 Streets: Paved 0.057 0.95 Streets: Permeable Pavers 0.022 0.30 Lawn, Heavy, <2% Slope 0.000 0.20 Roofs 0.000 0.95 Streets: Paved 0.023 0.95 Streets: Permeable Pavers 0.000 0.30 Lawn, Heavy, <2% Slope 0.040 0.20 Roofs 0.033 0.95 Streets: Paved 0.016 0.95 Lawn, Heavy, <2% Slope 0.048 0.20 Roofs 0.036 0.95 Total 0.28 Total % Imp. 59.7% Streets: Paved 0.024 0.95 Lawn, Heavy, <2% Slope 0.197 0.20 Roofs 0.055 0.95 Rational Method Frequency Adjustment Factors Min year Max year Frequency Factor, Cf 2 10 1 11 25 1.1 26 50 1.2 51 100 1.25 From Table 3-4 in the City of Fort Collins, SDDCCS Frequency Adjusted Runoff Coefficients (C*Cf) 0.59 Basin Composite Runoff Coefficients Basin/ Sub- Basin Area (ac) Attribute Attribute Area (ac) Runoff Coefficient, C Percent Impervious Composite C 0.41 Table A-1 0.79 A 0.08 0.96 0.52 C 0.10 51.6% 0.77 0.64 0.59 0.59 0.73 72.1% 0.77 0.77 EX 0.28 28.5% 0.41 0.41 B 0.10 58.1% 0.64 0.64 Appendix A 625 Peterson Street Redevelopment PDP Final Drainage Report Overland Flow Average Channelized Channel Channel Channelized Length, D Overland Slope Tov Tov Tov Flow Length Slope Velocity Time (Tt) (ft) (%) 2-year 10-year 100-year (ft) (%) (ft/s) (min) 2-year 10-year 100-year A 0.77 0.77 0.96 45 1 4 4 2 48 0.5 1.4 0.6 5 5 5 B 0.64 0.64 0.79 35 1 5 5 3 115 0.5 1.4 1.4 6 6 5 C 0.59 0.59 0.73 25 1 5 5 3 130 0.8 1.7 1.3 6 6 5 Time of Concentration Basin Tc = Tov + Tt (min) Table A-2 Basin Time of Concentration Frequency Adj. Runoff Coefficients (C*Cf) C2 C 10 C100 Overland Travel Time Appendix A 625 Peterson Street Redevelopment PDP Final Drainage Report 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - Year 10 - Year 100 - Year 2 - Year 10 - Year 100 - Year A 0.08 0.77 0.77 0.96 5 5 5 2.85 4.87 9.95 0.2 0.3 0.8 B 0.10 0.64 0.64 0.79 6 6 5 2.67 4.56 9.95 0.2 0.3 0.8 C 0.10 0.59 0.59 0.73 6 6 5 2.67 4.56 9.95 0.2 0.3 0.7 Total 0.5 0.8 2.2 Time of Concentration, Tc (min) Table A-3 Basin Peak Discharge Basin Rainfall Intensity (in/hr) Peak Discharge (cfs) Basin Area (ac) Frequency Adj. Runoff Coefficients Appendix A APPENDIX B Channel Design 625 Peterson Street Redevelopment PDP Final Drainage Report Channel ID 100-yr Design Flow (cfs) Slope (%) Bottom Width (ft) Side Slope (H:V) Flow Depth (ft) Max Velocity (fps) Protection Required? A-A* 0.80 0.50% 0 6.7 0.30 2.71 no B-B* 1.60 0.93% 0 6.7 0.34 4.07 no C-C* 1.60 0.50% 0 6.7 0.39 3.23 no D-D** 0.70 0.80% 0 3 0.29 2.74 no SOUTH SIDEWALK CHASE 1.60 4.00% 2 vertical 0.14 5.67 no NORTH SIDEWALK CHASE 0.70 5.00% 2 vertical 0.08 4.47 no **Swale D is a 2 foot trickle pan. Table B-1 Channel Summary *Swale A, B and C are 2 foot gutter sections. Appendix D Project Description Solve For Spread Input Data Channel Slope 0.00500 ft/ft Discharge 0.80 ft³/s Gutter Width 2.00 ft Gutter Cross Slope 0.15 ft/ft Road Cross Slope 0.15 ft/ft Roughness Coefficient 0.013 Results Spread 1.98 ft Flow Area 0.29 ft² Depth 0.30 ft Gutter Depression 0.00 ft Velocity 2.71 ft/s Worksheet for Peterson Gutter Flow A-A 12/16/2015 8:48:29 AM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Solve For Spread Input Data Channel Slope 0.00930 ft/ft Discharge 1.60 ft³/s Gutter Width 2.00 ft Gutter Cross Slope 0.15 ft/ft Road Cross Slope 0.15 ft/ft Roughness Coefficient 0.013 Results Spread 2.29 ft Flow Area 0.39 ft² Depth 0.34 ft Gutter Depression 0.00 ft Velocity 4.07 ft/s Worksheet for Peterson Gutter Flow B-B 12/16/2015 8:47:58 AM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Solve For Spread Input Data Channel Slope 0.00500 ft/ft Discharge 1.60 ft³/s Gutter Width 2.00 ft Gutter Cross Slope 0.15 ft/ft Road Cross Slope 0.15 ft/ft Roughness Coefficient 0.013 Results Spread 2.57 ft Flow Area 0.50 ft² Depth 0.39 ft Gutter Depression 0.00 ft Velocity 3.23 ft/s Worksheet for Peterson Gutter Flow C-C 12/16/2015 8:47:38 AM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.00800 ft/ft Left Side Slope 3.00 ft/ft (H:V) Right Side Slope 3.00 ft/ft (H:V) Discharge 0.70 ft³/s Results Normal Depth 0.29 ft Flow Area 0.26 ft² Wetted Perimeter 1.85 ft Hydraulic Radius 0.14 ft Top Width 1.75 ft Critical Depth 0.32 ft Critical Slope 0.00486 ft/ft Velocity 2.74 ft/s Velocity Head 0.12 ft Specific Energy 0.41 ft Froude Number 1.26 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.29 ft Critical Depth 0.32 ft Channel Slope 0.00800 ft/ft Critical Slope 0.00486 ft/ft Worksheet for Peterson Concrete Swale D-D 5/18/2016 3:01:13 PM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.04000 ft/ft Bottom Width 2.00 ft Discharge 1.60 ft³/s Results Normal Depth 0.14 ft Flow Area 0.28 ft² Wetted Perimeter 2.28 ft Hydraulic Radius 0.12 ft Top Width 2.00 ft Critical Depth 0.27 ft Critical Slope 0.00524 ft/ft Velocity 5.67 ft/s Velocity Head 0.50 ft Specific Energy 0.64 ft Froude Number 2.66 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.14 ft Critical Depth 0.27 ft Channel Slope 0.04000 ft/ft Critical Slope 0.00524 ft/ft Worksheet for Peterson South Sidewalk Chase 5/18/2016 2:55:15 PM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.05000 ft/ft Bottom Width 2.00 ft Discharge 0.70 ft³/s Results Normal Depth 0.08 ft Flow Area 0.16 ft² Wetted Perimeter 2.16 ft Hydraulic Radius 0.07 ft Top Width 2.00 ft Critical Depth 0.16 ft Critical Slope 0.00555 ft/ft Velocity 4.47 ft/s Velocity Head 0.31 ft Specific Energy 0.39 ft Froude Number 2.81 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.08 ft Critical Depth 0.16 ft Channel Slope 0.05000 ft/ft Critical Slope 0.00555 ft/ft Worksheet for Peterson Nouth Sidewalk Chase 5/18/2016 3:00:15 PM Bentley Systems, Inc. Haestad Methods Solution Bentley Center FlowMaster V8i (SELECTseries 1) [08.11.01.03] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 APPENDIX C Water Quality Capture Volume Calculating the WQCV and Volume Reduction Chapter 3 3-6 Urban Drainage and Flood Control District August 2011 Urban Storm Drainage Criteria Manual Volume 3 Once the WQCV in watershed inches is found from Figure 3-2 or using Equation 3-1 and/or 3-2, the required BMP storage volume in acre-feet can be calculated as follows: 𝑉 = � WQCV 12 � 𝐴 Equation 3-3 Where: V = required storage volume (acre-ft) A = tributary catchment area upstream (acres) WQCV = Water Quality Capture Volume (watershed inches) Figure 3-2. Water Quality Capture Volume (WQCV) Based on BMP Drain Time 625 Peterson Street Redevelopment PDP Final Drainage Report % Imperviousness 59.74% WQCV (inches)* 0.17 inches Volume = (WQCV/12)xA 0.0039 ac-ft *WQCV in 12-hr drain time from Figure 3-2. Water Quality Capture Volume (WQCV) Based on BMP Drain Time UDFCD Storm Drainage Criteria Manual Volume 3 Table C-1 Water Quality Capture Volume (WQCV) Appendix C APPENDIX D Low Impact Development 625 Peterson Street Redevelopment PDP Final Drainage Report Low Impact Development (LID) Table D-1 Volume 3, Chapter 3, Section 3.1 Low Impact Development Criteria Basin Proposed Impervious Area (acres) Overall Area (acres) Impervious Area routed to LID (acres) LID Technique to be Applied A 0.057 0.079 0.079 Permeable Pavers B 0.040 0.096 0.000 None C 0.037 0.100 0.000 None Total 0.134 0.275 0.079 59.05% No less than 50% of any newly added impervious area must be treated using one or a combination of LID techniques Appendix D 625 Peterson Street Redevelopment PDP Final Drainage Report Table D-2 Volume 3, Chapter 3, Section 3.1 Low Impact Development Criteria Basin Newly Added Pavement Area (acres) Permeable Pavement Area (acres) % of Permeable Pavement A 0.079 0.022 27.85% B 0.000 0.000 0.00% C 0.000 0.000 0.00% Total 0.079 0.022 27.85% No less than 25% of any newly added pavement areas must be treated using a permeable pavement technology that is considered an LID technique Appendix D 625 Peterson Street Redevelopment PDP Final Drainage Report Table D-3 Permeable Pavement Reservoirs Sloped Installations V = P[(D-6sL-1)/12]A Basin Slope of Permeable Pavement (ft/ft) Length Between Lateral Flow Barriers (ft) Permeable Pavement Area (ft2) Volume Available in Reservoir (ft3) Length Between Lateral Flow Barriers (ft) A 0.0165 18.5 960 293 18.5 Total (ft 3 ) 293 Total (acre-ft) 0.007 where P (porosity) ~ 0.4 D (depth in inches) = 12 s (slope in ft/ft) varies, see table L (Length between flow barriers) varies, see table A (Area in ft2) varies, see table UDFCD Design Procedure Form for Permeable Pavement Systems (PPS) Appendix D Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia I a = 72.1 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.721 C) Tributary Watershed Area ATotal = 3,445 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 960 sq ft (Minimum recommended permeable pavement area = 913 sq ft) E) Impervious Tributary Ratio RT = 1.9 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 65 cu ft (WQCV = (0.8 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 12.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.40 D) Slope of the Base Course/Subgrade Interface S = 0.017 ft / ft E) Length Between Lateral Flow Barriers (max = 20.65 ft.) L = 18.5 ft F) Volume Provided Based on Depth of Base Course V = 293 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (D min - 6*SL-1)) / 12] * Area Volume assumes uniform slope & lateral flow barrier spacing. Calculate the volume of each cell individually when this varies. 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 1 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) 625 Peterson Redevelopment Basin A Design Procedure Form: Permeable Pavement Systems (PPS) Jon Sweet TST, Inc. Consulting Engineers December 16, 2015 Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) C) Distance from the Lowest Elevation of the Storage Volume y = 0.2 ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = 3.88 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = 0.30 inches (Use a minimum orifice diameter of 3/8-inches) Notes: 625 Peterson Redevelopment Design Procedure Form: Permeable Pavement Systems (PPS) Jon Sweet TST, Inc. Consulting Engineers December 16, 2015 Basin A Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A LID BASIN A.xlsm, PPS 12/16/2015, 9:22 AM 760 Whalers Way Bldg C, Suite 200 Fort Collins, CO 80525 ideas@tstinc.com 970.226.0557 main 303.595.9103 metro 970.226.0204 fax www.tstinc.com Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel LID BASIN A.xlsm, PPS 12/16/2015, 9:22 AM From the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Appendix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²/DULPHU&RXQW\$UHD&RORUDGR 3HWHUVRQ6WUHHW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI OLVWHGEHORZ 6RLO6XUYH\$UHD /DULPHU&RXQW\$UHD&RORUDGR 6XUYH\$UHD'DWD 9HUVLRQ6HS 6RLOPDSXQLWVDUHODEHOHG DVVSDFHDOORZV IRUPDSVFDOHV RUODUJHU 'DWH V DHULDOLPDJHVZHUHSKRWRJUDSKHG $SU²$SU  7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUH FRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQG LPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJ RIPDSXQLWERXQGDULHVPD\EHHYLGHQW +\GURORJLF6RLO*URXS²/DULPHU&RXQW\$UHD&RORUDGR 3HWHUVRQ6WUHHW 1DWXUDO5HVRXUFHV &RQVHUYDWLRQ6HUYLFH :HE6RLO6XUYH\ 1DWLRQDO&RRSHUDWLYH6RLO6XUYH\  3DJHRI VKHHW