Loading...
HomeMy WebLinkAbout2590 MIDPOINT DRIVE - FDP - FDP160031 - REPORTS - DRAINAGE REPORTDrainage Report for Hess Land, LLC 2590 Midpoint Drive Fort Collins, CO 80525 Prepared by: Mike Beach, P.E. Date: September 26, 2016 5255 Ronald Reagan Blvd, Suite 210 Johnstown, CO 80534 (303) 322-6480 EMAIL: mbeach@ridgetopeng.com Project # 16‐015‐002 Page 2 Section Page 1. Project Engineer’s Certification ........................................................................................ 3 2. Project Location & Overview ............................................................................................ 4 3. Drainage Design Criteria ................................................................................................... 4 4. Hydraulic Calculations ....................................................................................................... 5 5. Facility Design .................................................................................................................... 6 6. Conclusion ......................................................................................................................... 8 7. References ......................................................................................................................... 8 Appendix A – Site Vicinity Map Appendix B – Flood Insurance Rate Map Appendix C – NRCS Soils Map Appendix D – Hydrologic Criteria Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO‐3 – Recommended Percentage Imperviousness Values Appendix E – Hydraulic Calculations Runoff Coefficients & Imperviousness Time of Concentration ‐ SF‐2 Rational Method Runoff Flows – SF‐3 (2‐Year Event) Rational Method Runoff Flows – SF‐3 (100‐Year Event) Detention Volume by Modified FAA Method (Subbasins 1 & 2) Orifice Calculations Detention Basin Stage‐Discharge Table (Subbasins 1 & 2) Rain Garden Calculations (Subbasins 1 & 2) Historic Runoff Flow Calculations (Coefficients, TOC, 2‐Yr event) LID Table Appendix F – Maps Subbasin Map Holsinger Drywall Stormwater Plan Table of Contents Project # 16‐015‐002 Page 3 Section 1: PROJECT ENGINEER’S CERTIFICATION I hereby attest that this Final Drainage Report for the design of stormwater management facilities for Lot 18 (2590 Midpoint Drive) was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the responsible parties thereof. __________________________ Mike Beach, P.E. Registered Professional Engineer State of Colorado No. 45088 Project # 16‐015‐002 Page 4 Section 2: Project Location & Overview Location The sites address is 2590 Midpoint Drive, Fort Collins, CO; which is in the SE 1/4, of the NW 1/4, of Section 20, TWP 7 N, R 68 W of the 6th PM in Larimer County, CO. Located along the north side of Midpoint Drive and east of South Timberline Road, the site is described as Lot 18 of the Prospect Industrial Park and contains 0.86 acres of undeveloped vacant land. (See Appendix A – Site Vicinity Map) Existing Condition The existing site is covered by native vegetation and slopes predominately towards Midpoint Drive at approximately 0.5% slope. Stormwater runoff collected into Midpoint Drive is conveyed via gutter towards Sharp Point Drive where it is deposited into an inlet that conveys the water to Poudre River. Proposed Condition The intent of the development is to construct a new single story pre‐engineered metal building, approximately 9,047 SF, asphalt concrete parking, crushed asphalt overflow parking, landscaping and a stormwater detention and conveyance system for Hess Land, LLC. Floodplain FEMA Floodplain mapping in this neighborhood is located on map‐panel 08069C0992G, revised May 2, 2012, which indicates the subject property is located in Zone X, which is outside the 100‐year floodplain. (Appendix B – Flood Insurance Rate Map) Existing Soils The Natural Resource Conservation Service mapped the historic soils on the site as part of the Caruso clay loam. The Hydrologic Class is Type ‘D’ Soils. (Appendix C – NRCS Soils Map) Section 3: Drainage Design Criteria Reference Manuals Storm drainage design criteria is defined in the City of Fort Collins “Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and Amendments, which references to the “Urban Drainage and Flood Control District” (UDFCD) and the “Urban Storm Drainage Criteria Manual” (USDCM), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual), are used and referenced in this report. Four Step Process The City of Fort Collins has adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM for selecting BMP’s in urban redevelopment areas. The goal of this process is to minimize adverse impacts on receiving waters. The following describe how each step of the process are incorporated in the proposed development: Project # 16‐015‐002 Page 5 Step 1 – Employ Runoff Reduction Practices By selecting a site that is undeveloped that currently does not have detention or water quality treatment, the impacts of the proposed development will be less due to the addition of the detention pond with the water quality capture volume included. The project proposes to install rain gardens with underdrains and dry wells to aid in conveyance and infiltration opportunities and reduce the effects of the added impervious areas. Step 2 – Water Quality Capture Volume (WQCV) In order to reduce the sediment load and other pollutants leaving the site, it is important to provide WQCV to minimize the downstream impacts. This project proposes to provide rain garden/detention ponds located on the site. These ponds are sized to capture the WQCV and allow infiltration & release to the proposed drywells. Step 3 – Stabilize Drainageways Since this site is in close proximity to Poudre River it is important to take this Step into consideration. By providing stormwater detention and water quality and lowering the historic runoff and providing a metered outflow the project impacts to the drainageway are essentially reduced. The majority of the drainageway leaving the site is already stabilized. Step 4 – Implement Site Specific and Other Source Control BMP’s The proposed project will contain the following BMP’s: Rain Garden/Dry Wells: All runoff from the site will be directed into and through the proposed BMP facilities prior to leaving the site. As in the adjacent site (2600 Midpoint Dr., Lot 19), we are proposing to install Dry Wells as necessary to connect the Rain Garden Underdrains and aid in infiltration into the existing soil stratum. Maintenance: In order for BMP’s to remain effective proper maintenance needs are required. Scheduled visual inspections and routine repair after larger storm events are critical in the maintenance and effectiveness of the installed BMP’s. The sites owner will be advised of these practices during installation in order to maximize the efficiency of the installed BMP’s. Maintenance Standard Operating Procedures are also included in the Development Agreement with the City. Section 4: Hydraulic Calculations Criteria Runoff criteria for the proposed sites was analyzed for the 2‐YR and 100‐YR storm events. The Rational Method is being used for the design of the proposed improvements. Rainfall Intensities used in the proposed design were determined as a function of the Time of Concertation for each subbasin. The values used were determined by the City of Fort Collins Rainfall Intensity/Duration/Frequency curve (Figure 3‐1 and Table 3‐1a (see Appendix D). Project # 16‐015‐002 Page 6 Imperviousness Values from Table RO‐3 (USDCM) were used in determining the sites imperviousness. The overall proposed site improvements and landscaping equate to a total onsite proposed Imperviousness of 58%. Level 1 Watershed‐Level Volume Reduction Method is applied to the extent possible on the site. Grass areas are strategically located in order to provide surface flow where allowed, prior to the stormwater leaving the site. Time of Concentration & Runoff Coefficient The onsite area was separated into two (2) subbasins with slopes varying between 0.5% to 4%. The calculated Time of Concentration (TC) for each basin are listed in Appendix E. See Basin Map in Appendix F for more information. WQCV The UD‐BMP_v3.03 (UDFCD) spreadsheet was used to calculate the required Rain Garden water quality capture volume for each of the two subbasins. See Appendix E for design information. Detention A “Modified FAA” Detention Spreadsheet for each of the subbasins was used to analyze the 100‐year storm event with the allowable predeveloped 2‐year release. See Appendix E for design information. Section 5: Facility Design The proposed improvements will increase the amount of impervious area; however, measures have been included in the design to minimize the amount of stormwater release from the site. Detention is sized for the 100‐year rainfall event for each of the proposed ponds. The outlet structures are designed to release at the historic predeveloped 2‐year event at a release of 0.142 cfs per for Subbasin 1.0 and 0.201 cfs per for Subbasin 2.0 (see Appendix E for historic calcs). The runoff will sheet flow until a concentrated point and then be conveyed via trickle channel or gutters and then deposited into the respective pond. The site was broken into three developed subbasins; Subbasin 1.0 (0.331 acres), Subbasin 2.0 (0.470 acres), and Subbasin 3.0 (0.053 acres). See Appendix E for breakdown of the different area types for each subbasin and Appendix F for the Subbasin Map. Subbasin 1.0 contains the proposed building and minor areas adjacent to the building. The runoff will be conveyed to the back of the building and outlet into proposed drainage pan behind the building, which will convey the water to the new pond located between the new building and Midpoint Drive. Project # 16‐015‐002 Page 7 Subbasin 2.0 is primarily the parking and paved areas which drains to the west to a shared detention/water quality pond with Lot 19. This pond is being reworked to include sufficient volume as necessary for the newly added Subbasin 2 from Lot 18 (this project), as well as maintaining the required volume from the adjacent site as determined in the Holsinger Drywall (Lot 19) approved plans dated (4‐12‐2007). See Appendix F for that original design included. Lot 19 pond as constructed today includes an approximate total volume of 9,291 CF (which includes water quality and detention). Two existing “drywells” exist on Lot 19 as well to aid in infiltration and water quality and will be kept at full build out of Lot 18. Care was taken in the design to maintain the same 100‐Yr WSEL for the shared pond with both contributing lots, which confirms the existing outlet structure will not need structural modifications. The combined Lot 18 and 19 WQCV and Detention modeling was completed to determine the new outlet orifice size and 100‐Yr WSEL. The existing water quality/detention outlet structure on Lot 19 will only need modifications to the steel orifice plate, which currently has three ½” diameter perforations. The new plate as detailed in the construction drawings will require one orifice with a 2‐3/4” orifice. See Appendix E for calculations. No other modifications are required to the existing outlet structure. Subbasin 3.0 contains a small portion of the access driveway, sidewalk, and landscape area that due to the existing grades on the site being substantially higher than the adjacent roadway cannot be directed to one of the detention ponds. The contributing area for this Subbasin is approximately 0.053 acres. This runoff would sheet flow to Midpoint Drive and continue along the curb and gutter to the next available catch basin. See Basin Map in Appendix F for a reiteration of the existing and proposed volumes. The 100‐ Year water surface elevation with runoff from both site into this shared pond is shown on the Subbasin Map. For Water Quality, the project proposes to include the WQCV as Rain Gardens below the Detention Pond with Underdrains tied directly to Drywells to aid in the infiltration and natural discharge of the runoff. Both of the ponds include sized Rain Gardens for the appropriate events in accordance with the City of Fort Collins criteria. Below is a summary of each of subbasins design with supporting calculations within the Appendix of this report. Dev. 2‐ Year Flow (cfs) Dev. 100‐Year Flow (cfs) WQCV (ac‐ft) 100‐Year Vol. (ac‐ft) Tot. Volume Req'd (ac‐ft) Tot. Volume Provided (ac‐ft) Release Rate (cfs) Orifice (in) Sub 1.0 0.6 2.98 0.005 0.084 0.089 0.100 0.142 1‐1/2" Sub 2.0 0.62 3.07 0.008 0.114 0.122 0.142 0.201 2‐3/4" Project # 16‐015‐002 Page 8 Dev. 2‐ Year Flow (cfs) Dev. 100‐ Year Flow (cfs) WQC V (ac‐ ft) 100‐ Year Vol. (ac‐ft) Tot. Volume Req'd (ac‐ft) Tot. Volume Provided (ac‐ft) 2‐Yr Hist. Release Rate (cfs) Orifice (in) Sub 1.0 0.6 2.98 0.005 0.076 0.081 0.100 0.142 1‐1/2”" Sub 2.0 0.62 3.07 0.008 0.087 0.095 0.142 0.201 2‐3/4" Sub 3.0 0.12 0.54 N/A N/A N/A N/A N/A N/A Section 6: Conclusions All computations that have been reviewed or completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volumes 1 &2. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention and water quality treatment of impervious areas by releasing the 100‐Year storm event at the Predeveloped 2‐Year runoff rates. The Water Quality design will benefit the site by reducing the initial discharge from the site and removal of any sediments or other pollutants generated by the developed site. Section 7: References  The Natural Resource Conservation Service Soil Survey for Larimer County and the WSS website.  FEMA FIRM map‐panel 08069C0992G Effective 05/02/2012.  “City of Fort Collins Stormwater Criteria Manual” dated December 2011  Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual (UDFCD), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual). w Appendix A Site Vicinity Map Appendix B Flood Insurance Rate Map Appendix C NRCS Soils Map Soil Map—Larimer County Area, Colorado (Lot 18 - Midpoint Dr) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/29/2016 Page 1 of 3 4489990 4490010 4490030 4490050 4490070 4490090 4490110 4490130 4490150 4490170 4489990 4490010 4490030 4490050 4490070 4490090 4490110 4490130 4490150 4490170 497390 497410 497430 497450 497470 497490 497510 497530 497390 497410 497430 497450 497470 497490 497510 497530 40° 33' 44'' N 105° 1' 51'' W 40° 33' 44'' N 105° 1' 45'' W 40° 33' 38'' N 105° 1' 51'' W 40° 33' 38'' N 105° 1' 45'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 45 90 180 270 Feet 0 10 20 40 60 Meters Map Scale: 1:944 if printed on A portrait (8.5" x 11") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 percent slope 1.9 100.0% Totals for Area of Interest 1.9 100.0% Soil Map—Larimer County Area, Colorado Lot 18 - Midpoint Dr Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/29/2016 Page 3 of 3 Appendix D Hydrologic Criteria RAINFALL INTENSITY-DURATION-FREQUENCY CURVE 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 STORM DURATION (minutes) RAINFALL INTENSITY (inches/hour) 2-Year Storm 10-Year Storm 100-Year Storm Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. (11) Section 4.0 is amended to read as follows: 4.0 Intensity-Duration-Frequency Curves for Rational Method: The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. C A = K A + ( 1 . 31 i 3 − 1 . 44 i 2 + 1 . 135 i − 0 . 12 ) for CA ≥ 0, otherwise CA = 0 (RO-6) C CD = K CD + ( 0 . 858 i 3 − 0 . 786 i 2 + 0 . 774 i + 0 . 04 ) (RO-7) C B = (CA + C CD ) 2 2007-01 RO-9 Urban Drainage and Flood Control District Appendix E Hydraulic Calculations Historic Runoff Coefficients & Percent Impervious Calculated By: RSB Project - Lot 18 - Midpoint Dr Checked By: MRB Job Number: 16-015-002 Date: 7/28/2016 IMP% Soil Types: Caruso Clay loam, 0-1 % Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: D Table RO-3 (UDSDCM Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.20 0 Landscaping (steep) 0.35 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.20 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv EX-1 0.331 14418 0 0 0 0 4980 0.20 0 EX-2 0.470 20473 0 0 0 0 7077 0.20 0 EX-3 0.053 2309 0 0 0 0 2309 0.20 0 Total Basin 0.85 37200 0 0 0 0 14366 0.08 0 Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year Historic TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: Lot 18 CALCULATED BY: MRB DATE: 7/28/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME t c CHECK FINAL REMARKS DATA TIME (ti) (t t) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) EX-1 0.20 0.33 60 1.5 11.4 175 0.5 0.025 2.1 1.4 12.8 235 11.3 11.3 EX-2 0.20 0.47 75 1.0 14.6 155 0.5 0.025 2.1 1.2 15.8 230 11.3 11.3 EX-3 0.20 0.05 45 1.0 11.3 0 0.5 0.025 2.1 0.0 11.3 45 10.3 10.3 Total Basin 0.08 0.85 50 2.0 10.7 200 0.5 0.025 1.3 2.6 13.3 250 11.4 11.4 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: Lot 18 RATIONAL METHOD PEAK RUNOOF Calculated By: RSB Event: 2-Year Date: 7/28/2016 Historic Flow Rate Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) EX-1 0.20 0.33 0.20 11.3 2.14 0.142 EX-2 0.20 0.47 0.20 11.3 2.14 0.201 EX-3 0.20 0.05 0.20 10.3 2.25 0.024 Total Basin 0.20 0.85 0.20 11.4 2.15 0.367 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Runoff Coefficients & Percent Impervious Calculated By: RSB Project - Lot 18 - Midpoint Dr Checked By: MRB Job Number: 16-015-002 Date: 7/28/2016 IMP% Soil Types: Caruso Clay loam, 0-1 % Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: D Table RO-3 (UDSDCM Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.20 0 Landscaping (steep) 0.35 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.20 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv 1.0 0.331 14418 9047 0 0 874 4980 0.72 62 2.0 0.470 20473 0 8097 5037 720 6662 0.60 53 3.0 0.053 2309 0 1505 0 389 415 0.82 81 Total Basin 0.85 37200 9047 9602 5037 1983 12057 0.66 58 Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: Lot 18 CALCULATED BY: MRB DATE: 7/28/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME t c CHECK FINAL REMARKS DATA TIME (ti) (t t) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.72 0.33 60 1.5 4.8 175 0.5 0.016 1.3 2.2 7.0 235 11.3 7.0 2.0 0.60 0.47 75 1.0 8.1 155 0.5 0.016 1.4 1.8 10.0 230 11.3 10.0 3.0 0.82 0.05 25 2.0 2.1 25 1.9 0.016 1.4 0.3 2.4 50 10.3 5.0 Total Basin 0.66 0.85 50 2.0 4.6 200 0.5 0.016 1.3 2.6 7.2 250 11.4 7.2 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check STANDARD FORM SF-2 Event: 100-Year TIME OF CONCENTRATION Cf = 1.25 SUBDIVISION: Lot 18 CALCULATED BY: MRB DATE: 7/28/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASINS) tc DESIG: C AREA C*Cf LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.72 0.33 0.90 60 1.5 2.5 175 0.5 0.016 1.3 2.2 4.7 235 11.3 5.0 2.0 0.60 0.47 0.75 75 1.0 5.7 155 0.5 0.016 1.4 1.8 7.6 230 11.3 7.6 3.0 0.82 0.05 1.02 25 2.0 0.6 25 1.9 0.016 1.4 0.3 0.9 50 10.3 5.0 Total Basin 0.66 0.85 0.82 50 2.0 2.9 200 0.5 0.016 1.3 2.6 5.5 250 11.4 5.5 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: Lot 18 RATIONAL METHOD PEAK RUNOOF Calculated By: RSB Event: 2-Year Date: 7/28/2016 Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.72 0.33 0.72 7.0 2.52 0.60 2.0 0.60 0.47 0.60 10.0 2.21 0.62 3.0 0.82 0.05 0.82 5.0 2.85 0.12 Total Basin 0.66 0.85 0.66 7.2 2.50 1.41 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Location: Lot 18 RATIONAL METHOD PEAK RUNOOF Calculated By: RSB Event: 100-Year Date: 7/28/2016 Cf = 1.25 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.72 0.33 0.90 5.0 9.95 2.98 2.0 0.60 0.47 0.75 7.6 8.76 3.07 3.0 0.82 0.05 1.02 5.0 9.95 0.54 Total Basin 0.66 0.85 0.82 5.5 9.54 6.71 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: Lot 18 - Midpoint Dr CALCULATED BY: MRB PROJECT NUMBER: 16-015-002 DATE: 7/26/2016 BASIN: 1.0 Equations: A trib. To pond = 0.331 acre QD = CiA C100 = 0.90 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 0.30 acre Vo =m*QPO*(60*T) QPO = 0.142 cfs S = Vi - Vo tc = 5 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 3.0 889 1.00 43 847 0.019 10 7.72 2.3 1380 0.75 64 1316 0.030 20 5.60 1.7 2002 0.63 107 1895 0.044 30 4.52 1.3 2424 0.58 149 2275 0.052 40 3.74 1.1 2674 0.56 192 2482 0.057 50 3.23 1.0 2887 0.55 234 2652 0.061 60 2.86 0.9 3067 0.54 277 2790 0.064 70 2.62 0.8 3278 0.54 320 2959 0.068 80 2.38 0.7 3403 0.53 362 3041 0.070 90 2.22 0.7 3571 0.53 405 3167 0.073 100 2.05 0.6 3664 0.53 447 3217 0.074 110 1.93 0.6 3795 0.52 490 3305 0.076 120 1.80 0.5 3861 0.52 533 3328 0.076 130 1.60 0.5 3718 0.52 575 3143 0.072 140 1.40 0.4 3503 0.52 618 2886 0.066 150 1.20 0.4 3217 0.52 660 2557 0.059 160 1.15 0.3 3289 0.52 703 2586 0.059 170 1.10 0.3 3342 0.51 746 2597 0.060 180 1.05 0.3 3378 0.51 788 2590 0.059 Required Storage Volume: 3328 ft3 0.076 acre-ft DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: Lot 18 - Midpoint Dr CALCULATED BY: MRB PROJECT NUMBER: 16-015-002 DATE: 7/26/2016 BASIN: 2.0 Equations: A trib. To pond = 0.470 acre QD = CiA C100 = 0.75 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 0.35 acre Vo =m*QPO*(60*T) QPO = 0.201 cfs S = Vi - Vo tc = 7.6 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 3.5 1052 1.00 60 992 0.023 10 7.72 2.7 1633 0.88 106 1527 0.035 20 5.60 2.0 2369 0.69 166 2202 0.051 30 4.52 1.6 2868 0.63 227 2641 0.061 40 3.74 1.3 3164 0.60 287 2877 0.066 50 3.23 1.1 3416 0.58 347 3068 0.070 60 2.86 1.0 3629 0.56 408 3222 0.074 70 2.62 0.9 3879 0.55 468 3411 0.078 80 2.38 0.8 4027 0.55 528 3499 0.080 90 2.22 0.8 4226 0.54 589 3637 0.083 100 2.05 0.7 4336 0.54 649 3687 0.085 110 1.93 0.7 4490 0.53 709 3781 0.087 120 1.80 0.6 4568 0.53 769 3799 0.087 130 1.60 0.6 4399 0.53 830 3569 0.082 140 1.40 0.5 4145 0.53 890 3255 0.075 150 1.20 0.4 3807 0.53 950 2857 0.066 160 1.15 0.4 3892 0.52 1011 2881 0.066 170 1.10 0.4 3955 0.52 1071 2884 0.066 180 1.05 0.4 3997 0.52 1131 2866 0.066 Required Storage Volume: 3799 ft3 0.087 acre-ft Orifice Calculations Lot 18 ‐ Midpoint Dr d = diameter (inches) Q = flow (cfs) h = hydraulic head (ft) d = sqrt((36.88*Q)/(sqrt(h))) Subbasin 1.0 Diameter Standard Size d = sqrt(36.88*0.049)/(sqrt(2.5) = 1.45‐inches 1‐1/2" Orifice Subbasin 2.0 d = sqrt(36.88*0.070)/(sqrt(1.0) = 2.72‐inches 2‐3/4" Orifice Spillway Emergency Spillways for Both Subbasins are set at the same elevation as the 100‐Yr WSEL, which is the same elevation of the top of the outlet structure. Any event above the 100‐Yr event will fill the ponds and overtop the structure/spillway and be released into the adjacent roadway. PROPOSED DETENTION POND - STAGE/STORAGE Pond: 1.0 Location: Lot 18 Calculated By: MRB Date: 7/28/2016 V = 1/3 d (A + B + sqrt(A*B)) V = Volume between Contours, ft^2 d = Depth between Contours, ft A = Surface Area of Contour, ft^2 96 0 96.5 245 0.00 0.00 97 525 0.00 0.01 WQCV = 97.5 835 0.01 0.01 0.00 98 1125 0.01 0.02 0.01 99 1665 0.03 0.06 0.04 100‐Year WSEL = 100 2228 0.04 0.10 0.09 Required Detention Volume = 0.076 See "Detention Volume Calculations" Provided Detention = 0.090 Required WQCV = 0.005 See "WQCV" RG Calc Sheet Provided WQCV = 0.010 Total Required Volume = 0.081 Total Volume Provided = 0.100 Stage (ft) Surface Area (ft^2) Incremental Storage (ac‐ft) Total Storage (ac‐ft) Detention Storage (ac‐ ft) PROPOSED DETENTION POND - STAGE/STORAGE Pond: 2.0 Location: Lot 18 Calculated By: MRB Date: 7/28/2016 V = 1/3 d (A + B + sqrt(A*B)) V = Volume between Contours, ft^2 d = Depth between Contours, ft A = Surface Area of Contour, ft^2 97 0 97.8 501 0.003 0.003 WQCV = 98.8 2000 0.027 0.030 99 5175 0.016 0.046 0.016 100‐Year WSEL = 99.6 8937 0.096 0.142 0.112 Required Detention Volume = 0.087 See "Detention Volume Calculations" Provided Detention = 0.112 Required WQCV = 0.008 See "WQCV" RG Calc Sheet Provided WQCV = 0.030 Total Required Volume = 0.095 Total Volume Provided = 0.142 Stage (ft) Surface Area (ft^2) Incremental Storage (ac‐ft) Total Storage (ac‐ft) Detention Storage (ac‐ ft) Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 62.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.620 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.19 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 14,418 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 233.6 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 156 sq ft D) Actual Flat Surface Area AActual = 245 sq ft E) Area at Design Depth (Top Surface Area) ATop = 835 sq ft F) Rain Garden Total Volume VT= 540 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering May 24, 2016 Lot 18 - Midpoint Drive Basin 1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03_Basin 1, RG 5/24/2016, 4:39 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering May 24, 2016 Lot 18 - Midpoint Drive Basin 1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03_Basin 1, RG 5/24/2016, 4:39 PM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 53.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.530 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 22,825 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 326.6 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 218 sq ft D) Actual Flat Surface Area AActual = 501 sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering September 25, 2016 Lot 18 - Midpoint Dr Basin 2 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03_Basin 2, RG 9/25/2016, 12:18 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering September 25, 2016 Lot 18 - Midpoint Dr Basin 2 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03_Basin 2, RG 9/25/2016, 12:18 PM LID Table 75% On-Site Treatment by LID Requried New Impervious Area 15,691 sq. ft. Required Minimum Impervious Area to be Treated 11768 sq. ft. Area tributary to Rain Gardens 13,751 sq. ft. Run-on Area N/A sq. ft. Impervious Area Treated by Rain Gardens 13751 sq. ft. Actual % On-Site Treated by LID 88% Project # 16‐015‐002 Page 14 Appendix F Maps MIDPOINT DRIVE LOT 18 BUILDING 9,047 SF FFE = 4901 LOT 19, HOLSINGER DRYWALL FFE: 4897.6 SUBBASIN 1.0 AREA = 0.331 AC SUBBASIN 2.0 AREA = 0.470 AC SUBBASIN 3.0 AREA = 0.053 AC DRAINAGE PLAN C-2.1 6 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION DATE SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com DRAWN BY: CHECKED BY: PROJECT NO.: R4 ARCHITECTS LOT 18 SPEC. BUILDING 226 REMINGTON, UNIT 3 FORT COLLINS, CO 2590 MIDPOINT DR FORT COLLINS, CO 16015002 MRB BSA 10 SUBMITTAL FINAL DEVELOPMENT PLAN 7/27/2016 CITY COMMENTS 09/02/2016 WATER QUALITY TREATMENT LEGEND Know what'sbelow. Call before you dig. R Minimum 8" Thick Layer of CDOT No. 4 Aggregate Minimum 4" Perforated PVC Pipe (Optional Depending on Underlying This unofficial copy was downloaded on Dec-23-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA This unofficial copy was downloaded on Dec-23-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA Soil Conditions) 12" Ponding Depth Minimum 12" Thick Layer of Bioretention Sand Media (see Bioretention Sand Media Specification below) Minimum 6" Thick Layer of Pea Gravel Diaphragm Parking/Building Water Surface Minimum CDOT No. 4 Aggregate Above and Below PVC Pipe Undisturbed Soil CONNECT UNDERDRAIN TO DRY WELL the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Larimer County Area, Colorado (Lot 18 - Midpoint Dr) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 2/29/2016 Page 2 of 3