Loading...
HomeMy WebLinkAbout2590 MIDPOINT DRIVE - FDP - FDP160031 - PLANS - ELEVATIONSFloor Plan 100' - 0" Eave Height #1 116' - 0" J B A R1 1" 12" C7 C8 C8 W1 W2 C5 C5 C5 C12 C11 C11 C4 C4 C13 H G F E D C Floor Plan 100' - 0" Eave Height #1 116' - 0" A B J Eave Height #2 112' - 0" 1" 12" R1 R1 1" W1 12" W2 R1 C7 C1 C7 C8 C8 C8 C7 W2 W1 C2 C5 C5 C5 C5 C5 C8 C4 C4 C D E F G H C13 W1 Floor Plan 100' - 0" Eave Height #1 116' - 0" 1 4 9 Eave Height #2 112' - 0" C1 C8 C8 C7 C2 C3 C8 C8 C8 C8 R1 C7 R1 C8 C7 C8 C7 C7 W1 W2 W2 W1 W2 C13 C13 2 3 5 6 7 8 C5 C5 C6 W2 C3 C14 Floor Plan 100' - 0" Eave Height #1 116' - 0" 9 4 1 Eave Height #2 112' - 0" R1 R1 R1 C7 C7 C7 C7 W1 C1 C5 10' - 0" 8' - 6" C5 W2 W2 W1 W1 C5 C5 C5 R1 C5 C11 C11 C5 C9 C12 12' - 0" 14' - 0" 8' - 6" 6' - 0" C4 C4 C4 C4 C4 C6 8 7 6 5 3 2 C11 C11 C4 Interior Concrete Slab on Grade - Concrete floor slab on grade (see structural for thickness, reinforcing and control joints) over - 4" granular fill and - Vapor barrier (15 Mil Stego Wrap) over - Subgrade prepared per geotechnical report No. xxxxxxxx by XXX dated Month Day, Year NOTE: * Refer to ACI Design Manual, Section 302.1. ** It is the responsilibility fo the GC to ensure that water does not collect in the gravel layer below the slab. Pour slab immediately after placing gravel and protect all openings and blockouts in the slab from moisture penetration until they are infilled. Provide unit cost for moisture testing for water vapor emmission and sealing of the top surface. Exterior Concrete - Fiber reinforced 4" concret floor slab on grade (4000 psi air entrained concrete) with - Medium broom finish per plan with troweled edges and hand tooled joints (1/2 depth of slab at Max. 12'-0" O.C. ea. way w/ expansion joints at Max 3:1 or 30'-0" ea. way over 4" granular fill and - Subgrade prepared per geotechnical report No. xxxxxxxx by XXX dated Month Day, Year - Refer to drawings (Arch., Landscape and Civil for indication of paving patterns and/or colored concrete) Note: * Provide 6" concrete at trash enclosure pad. WALL SYSTEMS ROOF SYSTEMS FLOOR SYSTEMS SOFFIT SYSTEMS Horizontal Metal Panel 2 1/2" All Weather Insulated Metal Panel, R-20 - Mesa (DM40) provile - Horizontal layout - Color: Weathered Copper - See system manuf. details for components and conditions • Steel girts by building manuf. • Structrual steel framing by building manuf. Embosed Metal Panel • 2 1/2" All Weather Insulated Metal Panel, R-20 - Adobe Texture (HE40-A) provile - Vertical layout - Color: Sandstone - See system manuf. details for components and conditions • Steel girts by building manuf. • Structrual steel framing by building manuf. W1 W2 Horizontal Metal Panel • 1 1/2" All Weather Insulated Metal Panel, R-12, attached to metal building purlins - HR Series (H3) provile - Color: Sandstone - See system manuf. details for components and conditions • R-19 min., Simple Save System, finish: standard liner fabric between • Steel perlins by building manuf. on • Structrual steel framing by building manuf. R1 S1 Prefinished Metal Soffit Panel • All Weather Metal Panel - Smooth soffit panel - Color: TBD - See system manuf. details for components and conditions • Steel girts by building manuf. • Structrual steel framing by building manuf. F1 F2 Issued Drawing Number Scale Accordingly if Reduced Project No.: Drawn by: Reviewed by: In Association with: ARCHITECTS r4 architects.com 226 Remington Unit #3 Fort Collins, CO 80524 phone 970/224-0630 www.r4architects.com Contact: Blake Larsen Email: blake@larsensd.com Larsen Structural Design Phone: (970) 568-3355 Fort Collins, CO 80524 19 Old Town Square, Suite 238 Structural Engineer Contact: thomas-s@int-mech.com Email: Tom Segelhorst Integrated Mechanical Phone: (970) 556-0570 Fort Collins, CO 80524 223 Linden St., Suite 204 Mechanical & Plumbing Contact: Chuck Polson Email: chuck@apsinc.biz APS, Inc. Phone: (970) 381-7462 Highlands Ranch, CO 80129 9249 S. Broadway, #200-836 Electrical Engineer Contact: Mike Beach Email: mbeach@ridgetopeng.com Ridgetop Phone: (303) 322-6480 Johnstown, CO 80534 5225 Ronald Reagan Blvd. Suite 210 Civil Engineer Contact: Cathy Mathis Email: cathy@tbgroup.us TB Group Phone: (970) 532-5891 Berthoud, CO 80531 444 Mountain Avenue Planning/LA Contact: Todd Rogers Email: todd@meritelec.com Merit Electric Phone: (970) 266-8100 Fort Collins, CO 80525 2643 Midpoint Dr. Owner Contact: Matt Melssen Email: matt.melssen@elderconstructioninc.com Elder Construction Phone: (970) 744-4731 Windsor, CO 80550 7380 Greendale Road General Contractor JDO MR A2.1 Exterior Elevations Schematic Design 2590 Midpoint Dr. Fort Collins, CO 80525 2016-02 Lot 18, Prospect Industrial Park 1/8" = 1'-0" 3 North East Elevation 1/8" = 1'-0" 4 South West Elevation 1/8" = 1'-0" 2 South East Elevation 1/8" = 1'-0" 1 North West Elevation Keynote Legend Key Value Keynote Text C1 Steel canopy as part of building manufacture package C2 Electrical gear and meters painted to match adjacent building material C3 Gas meter painted to match adjacent building material C4 Exterior light fixture, refer to electrical C5 Storefront system, refer to sheet A7.1 for elevations, details, & dimensions C6 Exterior insulated hollow metal door & frame w/ thermal threshold, painted to match adjacent building material C7 Prefinished metal fascia per metal building manufacture, color: TBD C8 Prefinished open faced downspouts and gutters per metal building manufacture, color: TBD C9 Knox box per PFA requirements C10 Steel trash enclosure gate, 1 1/2" metal decking, factory primed and field painted, color: TBD C11 Steel pipe bollard C12 Prefinished overhead sectional door, insulated, color: TBD C13 Proposed location for ground mounted condensing units, final location TBD C14 Fire department connection General System Notes Building Perspective Looking East No. Description Date 1 Concept Review Application 01/08/2016 2 PDP Submittal 03/17/2016 3 PDP Submittal #2 05/03/2016 4 FDP Submittal 07/27/2016 5 FDP Submittal #2 10/03/2016