Loading...
HomeMy WebLinkAboutHARMONY COMMONS HOTEL - PDP - PDP160027 - PLANS - BUILDING EXTERIORT.O. SLAB 100' - 0" R2 - SUBFLOOR 110' - 6" R3 - SUBFLOOR 121' - 0" R4 - SUBFLOOR 131' - 6" T.O. ROOF 142' - 0" STO - EIFS - COLOR - 02 STO - EIFS - COLOR - 03 STO - EIFS - COLOR - 01 PREFINISHED BREAK METAL CORNICE DETAIL STO - EIFS - COLOR - 04 CULTURED LEDGESTONE MASONRY - BRICK - PEWTER MASONRY - BRICK - EBONY BREAK METAL TOWER ROOF MASONRY, BRICK FRIEZE DETAIL KAWNEER STOREFRONT - DARK BRONZE FINISH STEEL SUN SHADING DEVICE, DARK BRONZE T.O. SLAB 100' - 0" R2 - SUBFLOOR 110' - 6" R3 - SUBFLOOR 121' - 0" R4 - SUBFLOOR 131' - 6" T.O. ROOF 142' - 0" A203 4 52' - 0" HIGHEST POINT AT STAIR 45' - 6" HEIGHT AT TYPICAL PARAPET STO - EIFS - COLOR - 02 STO - EIFS - COLOR - 03 PREFINISHED BREAK METAL CORNICE DETAIL STO - EIFS - COLOR - 01 CULTURED LEDGESTONE STO - EIFS - COLOR - 04 MASONRY - BRICK - PEWTER MASONRY - BRICK - EBONY STEEL ROOF TRELLIS, DARK BRONZE KAWNEER STOREFRONT - DARK BRONZE FINISH PORTE-COCHERE MASONRY, BRICK FRIEZE DETAIL ARCHITECT'S PROJECT NUMBER COPYRIGHT © 2016 PAUL T. BERGNER, AIA, ARCHITECT, PC/ALL RIGHTS RESERVED SHEET NUMBER SHEET TITLE KEY PLAN CURRENT PHASE ISSUE DATE 9/29/2016 7:34:53 PM A201 BUILDING ELEVATIONS LOT 6, HARMONY COMMONS FORT COLLINS, CO 80528 16106 PDR OCTOBER 2016 A201 3/32" = 1'-0" 1 SOUTH ELEVATION A201 3/32" = 1'-0" 2 NORTH ELEVATION NO. DESCRIPTION DATE T.O. SLAB 100' - 0" R2 - SUBFLOOR 110' - 6" R3 - SUBFLOOR 121' - 0" R4 - SUBFLOOR 131' - 6" T.O. ROOF 142' - 0" STO - EIFS - COLOR - 02 CULTURED STO - EIFS - COLOR - 03 LEDGESTONE STO - EIFS - COLOR - 04 CULTURED LEDGESTONE MASONRY - BRICK - PEWTER MASONRY - BRICK - EBONY BREAK METAL TOWER ROOF STEEL SUN SHADING DEVICE, DARK BRONZE MASONRY, BRICK FRIEZE DETAIL METAL CANOPY AT PORTE-COCHERE EIFS ARTICULATION AT ACCENT BANDING T.O. SLAB 100' - 0" R2 - SUBFLOOR 110' - 6" R3 - SUBFLOOR 121' - 0" R4 - SUBFLOOR 131' - 6" T.O. ROOF 142' - 0" STO - EIFS - COLOR - 02 STO - EIFS - COLOR - 01 STO - EIFS - COLOR - 03 STEEL ROOF TRELLIS, DARK BRONZE STO - EIFS - COLOR - 04 CULTURED LEDGESTONE MASONRY - BRICK - PEWTER MASONRY - BRICK - EBONY BREAK METAL TOWER ROOF KAWNEER STOREFRONT - DARK BRONZE FINISH MASONRY, BRICK FRIEZE DETAIL STEEL SUN SHADING DEVICE, DARK BRONZE APPLIED WINDOW ACCENT FINS, COLOR TO MATCH WINDOW UNIT ARCHITECT'S PROJECT NUMBER COPYRIGHT © 2016 PAUL T. BERGNER, AIA, ARCHITECT, PC/ALL RIGHTS RESERVED SHEET NUMBER SHEET TITLE KEY PLAN CURRENT PHASE ISSUE DATE 9/29/2016 7:35:07 PM A202 BUILDING ELEVATIONS LOT 6, HARMONY COMMONS FORT COLLINS, CO 80528 16106 PDR OCTOBER 2016 A202 3/32" = 1'-0" 1 EAST ELEVATION A202 3/32" = 1'-0" 8' - 0" 1' - 6" 8' - 0" 1' - 6" STEEL TRASH ENCLOSURE ROOF TRELLIS, DARK BRONZE BREAK METAL WALL CAP, DARK BRONZE CULTURED LEDGESTONE TO MATCH BUILDING FACADE 1 A203 A203 2 N 1' - 2" 3' - 4" M.O. 9' - 4 1/8" 13' - 10 1/8" 5' - 1 1/2" T.O. SLAB 100' - 0" R2 - SUBFLOOR 110' - 6" R3 - SUBFLOOR 121' - 0" R4 - SUBFLOOR 131' - 6" T.O. ROOF 142' - 0" STEEL ROOF TRELLIS, DARK BRONZE BREAK METAL CORNICE, RE: CORNICE DETAIL STO, EIFS RAINSCREEN SYSTEM, 1" FRY REGLET REVEALS, SMOOTH FINISH APPLIED WINDOW ACCENT FIN, COLOR TO MATCH WINDOW UNIT AND PTAC GRILLE, 2 SIDES ONLY ON CENTRAL TOWER ELEMENT METAL PORTE-COCHERE ROOF CLUTURED LEDGESTONE ON PORTE-COCHERE SUPPORT COLUMN STO, EIFS RAINSCREEN SYSTEM, 1" TALL AND DEEP REVEALS, MEDIUM SAND FINISH KAWNEER STOREFRONT SYSTEM, TRIFAB 451, DARK BRONZE FRAME FINISH, GLASS SELECTION WILL BE MADE BASED ON NECESSARY ACOUSTIC, THERMAL, AND SUN SHIELDING PROPERTIES MASONRY, BRICK, PEWTER, EACH BAND OF ACCENT MASONRY SHALL MAINTAIN 1" PROJECTION FROM PLANE OF FIELD MASONRY (BRICK, EBONY) EIFS RAINSCREEN ARTICULATION, 1-1/2" PROJECTION FROM FACE OF CLADDING WITH 1" TALL REVEAL AT TOP AND BOTTOM. ALTERNATE s 15 14 14 15 15 14 14 14 4912 4915 4914 4913 14 14 13 13.23 13.23 13.74 14.48 13.81 13.81 13.16 13.38 12.88 13.51 13.06 14.49 14.45 13.82 12.77 13.66 14.54 13.93 13.84 13.75 13.93 14.04 14.19 14.04 13.29 13.47 13.20 13.25 13.28 13.50 13.06 13.11 14.26 14.94 14.52 14.65 14.83 14.51 14.03 13.80 13.84 13.76 14.38 14.20 14.10 13.30 13.03 12.73 12.78 12.87 14.03 13.08 13.90 14.31 13.12 13.40 13.97 14.11 13.93 13.94 13.43 13.06 13.45 14.70 13.19 13.55 13.58 13.39 13.33 13.98 14.01 13.94 13.98 13.13 12.95 13.45 13.03 12.94 12.94 13.05 13.14 12.96 13.85 13.63 14.31 14.71 13.93 13.93 14.33 13.16 13.08 13.06 13.09 12.89 13.60 12.85 13.18 12.90 13.71 13.01 13.71 13.07 13.27 13.57 13.18 12.98 13.18 13.05 13.09 13.10 13.11 14.79 14.20 14.14 14.30 14.60 15.02 13.97 13.98 13.92 13.76 13.55 13.50 13.25 12.89 12.95 13.29 13.12 13.45 13.36 13.36 13.60 13.78 13.82 13.76 13.85 13.77 13.85 13.85 14.44 13.73 13.80 13.78 14.13 14.05 14.17 12.95 12.91 13.05 13.26 13.40 12.91 13.05 13.01 13.36 13.66 13.62 14.36 14.32 14.62 14.33 14.37 14.29 14.12 14.02 13.77 13.68 13.85 14.87 14.73 13.32 13.73 13.20 13.07 12.91 13.67 13.07 13.53 14.22 14.48 14.38 14.15 14.32 14.22 14.62 14.00 14.07 14.69 14.59 14.05 13.53 13.93 13.39 14.24 12.64 13.79 13.58 13.78 13.19 13.07 13.47 13.31 12.91 13.07 14.07 12.81 13.47 13.24 13.39 13.81 13.27 13.35 13.96 13.53 13.58 14.28 13.97 13.29 14.31 14.33 14.02 13.63 14.27 14.21 13.81 14.37 13.19 13.12 13.16 13.53 13.73 14.10 13.98 13.93 12.91 13.09 13.38 13.37 12.94 13.59 12.74 13.98 13.82 13.84 14.14 14.09 13.41 9'UE TIMBERWOOD DRIVE (LOCAL) 14 S PA 67 SF 12756 SF 1ST FLOOR 101 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 AA5AA3AA3AA3 AA2 AA4 AA4 AA4 BB BB BBBB E-VAULT S R 6' WALK VACATED ESMT S12°17'21"W 71.34' S26°30'09"W 110.32' R=600' CH= 64.41' F W FDC HARMONY COMMONS HARMONY COMMONS PHASE 1 T NOTE: SHADOWS SHOWN ARE FOR 12 (NOON) AND 3PM DECEMBER 21ST, IN FORT COLLINS, COLORADO. THE LONGER OF THE 2 SHADOWS REPRESENTS THE 3PM SCENARIO. ONLY ADJACENT PARKING AREAS WILL RECEIVE SHADOWS, NO ADJACENT BUILDINGS WILL RECIEVE SHADOWS CAST BY THE BUILDING. ARCHITECT'S PROJECT NUMBER COPYRIGHT © 2016 PAUL T. BERGNER, AIA, ARCHITECT, PC/ALL RIGHTS RESERVED SHEET NUMBER SHEET TITLE KEY PLAN CURRENT PHASE ISSUE DATE 9/29/2016 8:14:16 PM A204 BUILDING SHADOW ANALYSIS LOT 6, HARMONY COMMONS FORT COLLINS, CO 80528 16106 PDR OCTOBER 2016 A204 1" = 40'-0" 2 SHADOW ANALYSIS NO. DESCRIPTION DATE COLOR TO BE USED FOR FURTHER DIFFERENTIATION EIFS RAINSCREEN ARTICULATION AT WINDOW HEAD. ALTERNATE COLOR WILL CREATE VARIATION AND ENHANCE SHADOW LINES INSET WINDOW UNITS SHALL PROVIDE DEPTH AND LAYERING TO THE BUILDING FACADE WHILE CREATING VARIED SHADOW LINES THROUGHOUT THE DAY BUILDING AND FACADE ARTICULATION, PROTRUSIONS AND VARIATIONS ALONG THE BUILDING FACADE WILL ADD DEPTH AND INTRIGUE TO THE BUILDING'S ARCHITECTURE WHILE CREATING VISUALLY APPEALING FACADES ON ALL ELEVATIONS. DIFFERING PARAPET HEIGHTS ENSURE VARIATION ALONG THE TOP OF THE BUILDING WHILE DIFFERENT CORNICE OPTIONS PROVIDE A CLEAN TERMINATION POINT FOR THE CONTEMPORARY DESIGN OF THE BUILDING. FURTHER ARTICULATION, ACCENTS, AND DETAILING WITHIN THE CLADDING SYSTEMS STRENGTHEN THE VARIATION AND TEXTURE OF THE BUILDING FROM ALL VIEW CORRIDORS. CANT STRIP 22 GA. PREFINISHED METAL PARAPET CAP, PROVIDE 4" STRIP COVER WHEN METAL PARAPET CAPS LAP OVER EACH OTHER. PROVIDE FULL BED OF URETHANE SEALANT AT LAPS MECHANICALLY ATTACHED METAL CLEAT (1 GUAGE HEAVIER THAN METAL CAP) FLASHING ATTACHEMENTS, EACH SIDE. SET CLEAT IN SEALANT AT ATTACHEMENTS AND SEAL ATTACHMENTS FULLY ADHERED MEMBRANE ROOFING UP AND OVER PARAPET WALL, 4" MIN. DOWN EXT. FACE 5/8" GLASS MAT GYP SHEATHING, TYP. BOTH SIDES 3 3/4" >15˚ 1" 2" PREFABICATED MTL. BREAK MTL CORNICE 8" 2" 8" 1' - 6" 1/2" 1/2" 2 1/2" 1 1/2" ARCHITECT'S PROJECT NUMBER COPYRIGHT © 2015 PAUL T. BERGNER, AIA, ARCHITECT, PC/ALL RIGHTS RESERVED SHEET NUMBER SHEET TITLE KEY PLAN CURRENT PHASE ISSUE DATE THESE DRAWINGS ARE INCOMPLETE AND ARE INTENDED FOR CONVEYING DESIGN SYSTEM CONCEPTS. ANY PRICING OR BUDGETING PERFORMED WITH THESE DRAWINGS MUST CARRY A CONTINGENCY TO COVER WHAT ITEMS MAY CHANGE OR BE ADDED AS THE DESIGN PROCESS IS COMPLETED. CLIENT LOGO 9/29/2016 7:45:16 PM A203 ENLARGED ELEVATIONS AND DETAILS LOT 6, HARMONY COMMONS FORT COLLINS, CO 80528 16106 PDR OCTOBER 2016 4836 S. COLLEGE AVE. SUITE 11 FORT COLLINS, CO 80525 ph: 970.226.1686 fx: 970.207.4068 No. Description Date A203 1/4" = 1'-0" 1 TRASH ENCLOSURE - EAST ELEVATION A203 1/4" = 1'-0" 2 TRASH ENCLOSURE - SOUTH ELEVATION A203 1/4" = 1'-0" 3 OVERALL TRASH ENCLOSURE PLAN A203 1/4" = 1'-0" 4 ENLARGED EAST ELEVATION A203 3" = 1'-0" 5 CORNICE DETAIL 2 WEST ELEVATION A202 3 AERIAL PERSPECTIVE - 02 A202 4 AERIAL PERSPECTIVE - 01 NO. DESCRIPTION DATE