September 28, 2016
Harmony 23 PDP
Planning Objectives
Harmony 23 is a multi-family housing project proposed to be located at the southwest
corner of Harmony Road and Strauss Cabin Road. In July of 2016, the Planning and
Zoning Board approved a Modification to allow 100% secondary use (residential) on this
site.
Location and site characteristics
The site is triangular shape with steep topography along the western edge. The
Boxelder Ditch meanders through the middle portion of the site crossing under Strauss
Cabin Road near the southern end of the site.
An Ecological Characterization Study (ECS) has been prepared by Professional
Wetlands Consulting, Inc., and was submitted 10 days prior to the PDP Submittal as
required. The special features identified in the report include the Fossil Creek Reservoir
Inlet Ditch (FCRID), and the Boxelder Ditch. The Boxelder Ditch Company intends to
move their ditch to the eastern edge of the site parallel to Strauss Cabin Road, prior to
the development of this project. The FCRID is located adjacent to the project site
running along the western edge and is identified as a wildlife corridor. The site
development will occur outside of the City’s recommended 50-foot buffer. Wetlands on
the project site consist of 411 square feet of cattail wetlands which are proposed to be
mitigated on site or by a fee in lieu to the City.
Access
Access to the property is from Strauss Cabin Road at two locations aligning with access
points proposed on the Harmony & I-25 Overall Development Plan (ODP) approved in
2014. The first access point on Strauss Cabin connects to a street-like private drive
ending in a roundabout centered on the clubhouse. Initially this access will allow full
turning movements, however, it is anticipated that after full build out of adjacent
properties it will become right-in/right/out only, and the second access point will be
utilized to exit the site if residents need to travel north on Strauss Cabin Road.
Site Plan
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
The 3-story buildings are generally oriented to the adjacent public streets or to the
interior central green that includes the clubhouse and pool. The multi-family buildings
include 24 and 36-unit buildings. In addition, the project proposes mixed-use buildings
along the western property boundary. The mixed-use buildings consist of two dwelling
units located on top of 5-car garages that also act as retaining walls in order to
accommodate the steep slopes present along the western edge.
In total, the project includes 364 dwelling units in 1, 2 and 3-bedroom configurations.
The overall gross density is 14.6 dwelling units per acre. Parking is distributed
throughout the site making it convenient for users. There are 635 spaces provided with
140 of those located in garages. Garages are distributed throughout the site acting as
retaining walls along the western edge and providing visual relief in the larger parking
lots. The parking count exceeds the City’s requirement by 38 spaces. Likewise, the
amount of bicycle parking proposed exceeds the requirement by 65 spaces with 93
percent of those enclosed.
Site amenities include a centrally located clubhouse with swimming pool that acts as a
community gathering space encouraging social interaction. The clubhouse includes a
great room/lounge, game room, sales office, cyber/business center, fitness facility,
sauna, multi-purpose room for yoga and other classes, a bike share and repair space,
and community mail center. Other site amenities include trails, a playground, dog park,
dog wash facility, picnic shelter/decks as well as benches and/or seat walls at
appropriate locations. The pedestrian circulation system provides attractive, convenient
and safe connections between dwelling units, parking and site amenities.
Landscape
There is a tremendous amount of open space included in the site plan intended to
achieve several goals and objectives. Building setbacks along both arterial streets
average over 80 feet providing a significant amount of landscape between buildings and
street edge. The corner at the intersection of the arterials has been left as open space
in order to achieve the Harmony Corridor Plan goal of providing a gateway landscape
that reflects the Poudre River riparian corridor. Cottonwood trees as well as native and
indigenous plants will be utilized to convey the river landscape along both project street
frontages. At the south end of the site another open space surrounded by a trail
provides another opportunity for visual relief along the arterial street as well as providing
recreational opportunities for residents.
Architecture
The architecture is derived from the dynamic topography of the site, which is at the
transition of the upland bench to the alluvial fan of the Poudre River. The transition is
reflected upstream in deep cut river bank walls and on to cliff edges of the Poudre
canyon. This natural language of strong horizontals interrupted by vertical edges is the
backbone of the unifying architectural character. The cottonwood trees which are
located to the north of our site share similar design language of strong verticals and
horizontal lines. This is depicted in our abstracted character study.
Thinking outside of the box for over two decades.
419 Canyon Ave. Suite 200 Fort Collins, CO 80521 tel. 970.224.5828 fax 970.224.1662
www.ripleydesigninc.com
The development is anchored by the central club house. The club house design and
placement greets residents and guests as the form draws your eye to the activity areas
beyond. The development is further activated by the diverse residential building types
and orientation. With high design, longevity and low maintenance a goal; the
architecture utilizes a mix of flat panel cementitious siding, horizontal metal accent
panel, and large commercial glazing. The architectural elements of the residential
buildings provide massing connections to the adjacent garage structure and loft
buildings.
The overall holistic scale of the development not only embraces the dynamic setting of
the site however will be compatible in scale to the future adjacent commercial buildings.
Community Outreach
Two neighborhood meetings were held, the first on September 24, 2015 and the second
on September 26, 2016. Questions, comments and responses were noted and are
available to citizens, staff and decision-makers.
City Plan Principles and Policies
The project is supported by many City Plan Principles and Policies.
Environmental Health is supported by providing wide naturalistic landscape setbacks
along the arterial streets with two significant open spaces that allow for wetland
development; provide water quality treatment and detention as well as recreational
opportunities. In addition, the wildlife corridor along the FCRID is protected by a
minimum 50-foot buffer with no development planned within the buffer zone.
Community and Neighborhood Livability is achieved by the creation of a cohesive,
distinct, vibrant and attractive neighborhood close to employment, shopping and
recreational opportunities. The project adds to the supply of rental housing, helping to
make housing choices available and more affordable. Preserving large areas of open
space provides opportunities to make nature accessible in the City.
Safety and Wellness is supported by encouraging residents to exercise by providing a
continuous network of trails on-site that connect to sidewalks on adjacent streets and
eventually to the City’s community regional trail through the Arapahoe Bend Natural
Area to the north.
Transportation policies are achieved by locating housing where residents can walk or
ride their bike to places of employment, shopping and recreational opportunities.