HomeMy WebLinkAboutHARMONY 23 - PDP - PDP160031 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Harmony 23 TIS, September 2016
ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 8
Bicycle Facilities .............................................................................................................. 8
Transit Facilities .............................................................................................................. 8
III. PROPOSED DEVELOPMENT ................................................................................. 9
Trip Generation ............................................................................................................... 9
Trip Distribution ............................................................................................................... 9
Background Traffic Projections ....................................................................................... 9
Trip Assignment ............................................................................................................ 13
Signal Warrants ............................................................................................................. 13
Geometry ...................................................................................................................... 13
Operation Analysis ........................................................................................................ 20
Pedestrian Level of Service ........................................................................................... 23
Bicycle Level of Service ................................................................................................ 27
Transit Level of Service ................................................................................................. 27
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 28
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 7
2. Trip Generation ......................................................................................................... 9
3. Short Range (2021) Background Peak Hour Operation .......................................... 22
4. Long Range (2035) Background Peak Hour Operation ........................................... 24
5. Short Range (2021) Total Peak Hour Operation ..................................................... 25
6. Long Range (2035) Total Peak Hour Operation ...................................................... 26
DELICH Harmony 23 TIS, September 2016
ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry.................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Site Plan .................................................................................................................. 10
5. Trip Distribution ....................................................................................................... 11
6. Short Range (2021) Background Peak Hour Traffic ................................................ 12
7. Long Range (2035) Background Peak Hour Traffic................................................. 14
8. Short Range (2021) Site Generated Peak Hour Traffic ........................................... 15
9. Long Range (2035) Site Generated Peak Hour Traffic ............................................ 16
10. Short Range (2021) Total Peak Hour Traffic ........................................................... 17
11. Long Range (2035) Total Peak Hour Traffic ............................................................ 18
12. Short Range (2021) Geometry ................................................................................ 19
13. Long Range (2035) Geometry ................................................................................. 21
APPENDICES
A. Base Assumptions Packet
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Peak Hour Signal Warrants
E. Short Range (2021) Background Peak Hour Operation
F. Long Range (2035) Background Peak Hour Operation
G. Short Range (2021) Total Peak Hour Operation
H. Long Range (2035) Total Peak Hour Operation
I. Pedestrian/Bicycle Level of Service
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Harmony 23. The Harmony 23 site is
located in the southeast quadrant of the Harmony/Strauss Cabin intersection in Fort
Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (Terra Development Group), the project engineer (TST), the project planner
(Ripley Design), and the Fort Collins Traffic Engineering staff. This study generally
conforms to the format set forth in the Fort Collins transportation impact study guidelines
contained in the “Larimer County Urban Area Street Standards” (LCUASS). Appendix A
contains the Transportation Impact Study Base Assumptions form and related
attachments for the Harmony 23. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine morning and afternoon peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Harmony 23 site is shown in Figure 1. It is important that a
thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial. Land adjacent to the site is flat
(<2% grade) from a traffic operations perspective. The center of Fort Collins is to the
northwest of the site.
Roads
The primary streets near the Harmony 23 site are Harmony Road, Strauss Cabin
Road, and Kechter Road. The existing geometry at the Harmony/Strauss Cabin,
Strauss Cabin/Rock Creek, and Kechter/Strauss Cabin intersections is shown in Figure
2.
Harmony Road is to the north of (adjacent to) the Harmony 23 site. Harmony
Road is an east-west street designated as a six-lane arterial street on the Fort Collins
Master Street Plan. Currently, Harmony Road has a six-lane cross section, with
auxiliary lanes at intersections. At the Harmony/Strauss Cabin intersection, Harmony
Road has eastbound and westbound left-turn lanes, three through lanes in each
direction, and a westbound right-turn lane. There are also right-turn acceleration lanes
in both the eastbound and westbound directions. The Harmony/Strauss Cabin
intersection has stop sign control on Strauss Cabin Road. The existing speed limit in
this area is 55 mph.
Strauss Cabin Road is to the west of (adjacent to) the Harmony 23 site. On the
Fort Collins Master Street Plan, it is a north-south street designated as a two-lane
arterial street south of Harmony Road and designated as a collector street north of
Harmony Road. Currently, Strauss Cabin Road has a two-lane cross section with
minimal shoulders, north of Harmony Road. Strauss Cabin Road intersects with
Horsetooth Road one mile to the north. North of Harmony Road, Strauss Cabin Road
(and Horsetooth Road) are not paved. Recent daily traffic volumes indicate that Strauss
Cabin Road and Horsetooth Road meet paving requirements. South of Harmony Road,
Strauss Cabin Road has a two-lane cross section with approximately 4 foot shoulders.
At the Harmony/Strauss Cabin and Kechter/Strauss Cabin intersections, Strauss Cabin
Road has all northbound and southbound movements combined in single lanes. The
existing speed limit in this area is 40 mph.
TIMNATH
Harmony
25
Strauss Cabin
Kechter
CR5
Harmony
23
CR7
Horsetooth
SCALE: 1"=2000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 3
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 6
8/4
1/1
79/24
4/7
0/1
15/11
3/10
1694/2387
7/39
36/53
2147/2237
34/81
4/1
2/2
4/3
20/35
1/4
29/46
28/21
300/441
3/8
39/20
390/491
0/2
Harmony
Kechter
Strauss Cabin
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 5
Kechter Road is to the south of the Harmony 23 site. Kechter Road is an east-
west street designated as a two-lane arterial street on the Fort Collins Master Street
Plan. Currently, Kechter Road has a two-lane cross section, with auxiliary lanes at
intersections. At the Kechter/Strauss Cabin intersection, Kechter Road has eastbound
and westbound left-turn lanes and combined through/right-turn lanes in each direction.
The Kechter/Strauss Cabin intersection has stop sign control on Strauss Cabin Road.
Existing Traffic
Figure 3 shows recent morning and afternoon peak hour traffic counts at the
Harmony/Strauss Cabin and Kechter/Strauss Cabin intersections. Recent morning and
afternoon count data at the Harmony/Strauss Cabin and Kechter/Strauss Cabin
intersections was obtained in August and September 2016. Raw count data is provided
in Appendix B.
Existing Operation
Using the volumes shown in Figure 3, the Harmony/Strauss Cabin and Kechter/
Strauss Cabin intersections were evaluated and the morning and afternoon peak hour
operation and calculated delay for levels of service E & F are displayed in Table 1.
Calculation forms are provided in Appendix C. Currently, the Kechter/Strauss Cabin
intersection operates at acceptable levels of service. At the Harmony/Strauss Cabin
intersection, the minor street legs and the major street left-turn movement are
experiencing significant delays in the peak hours. It was observed that the minor street
left-turn and through movements utilize the median area to make two-step maneuvers.
The intersection was evaluated using techniques provided in the 2010 Highway
Capacity Manual (2010HCM). The Synchro software does not analyze two-step
maneuvers at four-legged intersections using the 2010HCM and the 2010HCM
techniques cannot analyze stop sign controlled intersections with more than 3 lanes.
Therefore, the calculated delay may be exaggerated. A description of level of service for
signalized and unsignalized intersections from the 2010 Highway Capacity Manual is
provided in Appendix C. Table 4-3 showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) is also provided in Appendix C. Acceptable operation at signalized
intersections during the peak hours is defined as level of service D or better for the
overall intersection, and level of service E or better for any leg or movement. At
arterial/arterial and collector/collector unsignalized intersections, acceptable operation
during the peak hours is defined as level of service E overall and level of service F for
any approach leg. At arterial/collector, arterial/local, collector/local, and local/local
unsignalized intersections, acceptable operation during the peak hours is defined as
level of service D overall and level of service F for any approach leg. In such areas, it is
expected that there would be substantial delays to the minor street movements at
unsignalized intersections during the peak hours.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 7
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
(delay)
AM PM
Harmony/Strauss Cabin
(stop sign)
NB LT/T/RT F (>300 secs) Volume exceeds capacity
SB LT/T/RT Volume exceeds capacity Volume exceeds capacity
EB LT E (56.0 secs) F (50.1 secs)
WB LT E (42.0 secs) F (259.7 secs)
OVERALL C A
Kechter/Strauss Cabin
(stop sign)
NB LT/T/RT C C
SB LT/T/RT C C
EB LT A A
WB LT A A
OVERALL A A
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 8
Pedestrian Facilities
There are sidewalks along both sides of Harmony Road, east of Strauss Cabin
Road. There are no sidewalks along this section of Strauss Cabin Road, except for a
small section on the west side of the road, adjacent to the Observatory Village
neighborhood, and on the west side of the road, south of Kechter Road. There are
sidewalks on both sides of Kechter Road, west of Strauss Cabin Road.
Bicycle Facilities
Bicycle lanes exist on both sides of Harmony Road and on both sides of Kechter
Road, west of Strauss Cabin Road. There are no bicycle lanes on Strauss Cabin Road.
Transit Facilities
Currently, Transfort Route 16 operates on Harmony Road serving the Harmony
Transfer Center.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 9
III. PROPOSED DEVELOPMENT
The Harmony 23 is a proposed residential apartment development. Figure 4
shows the site plan of the Harmony 23 site. Harmony 23 will consist of 358 apartment
dwelling units and will be constructed by/before the short range (2021) future. The short
range analysis (Year 2021) includes development of the Harmony 23 and an
appropriate increase in background traffic, due to normal growth, and other approved
developments in the area. The long range analysis year is considered to be 2035 and
includes full development of the Harmony 23 site.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 9
th
Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at this site. Table 2 shows the weekday daily,
morning, and afternoon peak hour trip generation for the Harmony 23 site. At full
development, the Harmony 23 land uses will generate the following traffic: 2294
weekday vehicle trip ends, 179 morning peak hour vehicle trip ends, and 215 afternoon
peak hour vehicle trip ends.
TABLE 2
Trip Generation
Code Use Size
AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Apartment 358 D.U. EQ 2294 EQ 36 EQ 143 EQ 140 EQ 75
Trip Distribution
Directional distribution of the generated trips was determined for the Harmony 23
site. Figure 5 shows the vehicle trip distribution used for the Harmony 23 site. The trip
distribution was discussed and agreed to in the scoping exercise.
Background Traffic Projections
Figure 6 shows the short range (2021) background morning and afternoon peak
hour vehicle traffic projections at the key intersections. Short range (2021) background
traffic forecasts were developed by factoring the existing traffic by two percent per year
and adding site generated traffic from the HTP Retail, Eldon James Industrial, and the
Harmony & Strauss Cabin Convenience Shopping Center (short range).
SCALE: 1"=300'
SITE PLAN Figure 4
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 10
Harmony
25
Strauss Cabin
Kechter
45% 30%
10% 5%
Creek
Rock
5%
5%
NOM
SCALE: 1"=1000'
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 11
AM/PM
SHORT RANGE (2021) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 12
68/102
5/7
153/126
4/8
7/10
17/12
3/11
1876/2613
80/170
40/59
2397/2446
104/216
4/1
2/2
4/3
35/58
1/4
56/116
50/45
352/515
3/9
125/76
458/578
0/2
Harmony
Kechter
Strauss Cabin
Hacienda
53/149
138/247
115/42
37/48
111/193
26/32
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 13
For the long range (2035) future, the site generated traffic volumes from various
properties in the area were used in addition to a one percent per year general increase
in background traffic. Figure 7 shows the long range (2035) background peak hour
traffic at the key intersections.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 5, Figures 8 and 9 show the
assignment of the short range (2021) and long range (2035) site generated peak hour
traffic, respectively. The site generated vehicle traffic was combined with the
background traffic to determine the total forecasted vehicle traffic at the key
intersections. Figures 10 and 11 show the short range (2021) and long range (2035)
total peak hour traffic at the key intersections, respectively.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). While the
Harmony/Strauss Cabin intersection does not currently meet peak hour signal warrants,
using the forecasted short range (2021) background traffic, the peak hour signal warrants
will be met. It is recommended that this intersection be signalized in/by the short range
(2021) future. Short range (2021) and long range (2035) peak hour signal warrants for the
Kechter/Strauss Cabin intersection are provided in Appendix D. The Kechter/Strauss
Cabin intersection will meet the peak hour signal warrant during the afternoon peak hour in
the short range (2021) background future. The Kechter/Strauss Cabin intersection will
meet the peak hour signal warrant in the long range (2035) background future during both
peak hours. This intersection is a candidate for roundabout control, since it is not likely
that it will meet other signal warrants. It will be analyzed with both stop sign and
roundabout control in the short range (2021) future and just roundabout control in the long
range (2035) future.
Geometry
The following geometric evaluations utilize the short range (2021) total peak hour
traffic forecasts (Figure 10) and the long range (2035) total peak hour traffic forecasts
(Figure 11).
The short range (2021) geometry is shown in Figure 12. The cross section of
Strauss Cabin Road should have a center left-turn lane, one through lane in each
direction, and bicycle lanes. The center left-turn lane is a requirement on all arterial
streets. This would be true for both the background and total traffic forecasts. Hacienda
LONG RANGE (2035) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 14
220/375
45/50
Harmony
Kechter
Strauss Cabin
AM/PM
Rounded to Nearest
5 Vehicles
Hacienda
Access A
105/260
20/80
215/285
60/45
75/35
235/185
35/70
2110/2860
255/210
125/270
2445/2585
290/215
40/30
25/15
25/15
60/115
15/30
100/165
130/65
400/585
25/45
190/135
520/650
10/25
120/250
245/170
375/290
240/265
30/5
25/160
35/85
AM/PM
SHORT RANGE (2021) SITE
GENERATED PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 15
Harmony
Kechter
Strauss Cabin
North Access
South Access
4/13
4/15
8/34
15/8
34/18
14/7
64/34
7/3
43/23
1/7
16/63
11/42
Hacienda
4/15
34/18
20/78
8/34
80/42
15/8
14/7
8/4
2/7
4/14
LONG RANGE (2035) SITE
GENERATED PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 16
114/60
Harmony
Kechter
Strauss Cabin
North Access
South Access
Hacienda
Access A
20/78
8/34
15/8
8/28
8/34
15/8
114/60
14/7
64/34
7/3
43/23
1/7
16/63
11/42
14/7
8/4
2/7
4/14
AM/PM
AM/PM
SHORT RANGE (2021) TOTAL
PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 17
4/15
149/60
37/48
20/78
61/183
138/247
80/42
NOM
15/8
111/193
NOM
26/32
Harmony
Kechter
Strauss Cabin
North Access
South Access
4/13
156/105
8/34
94/189
34/18
14/7
132/136
12/10
196/149
4/8
8/17
17/12
3/11
1876/2613
96/233
40/59
2397/2446
115/258
4/1
2/2
4/3
49/65
1/4
64/120
54/59
352/515
3/9
127/83
458/578
0/2
Hacienda
LONG RANGE (2035) TOTAL
PEAK HOUR TRAFFIC Figure 11
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 18
335/435
45/50
10/30
240/265
30/5
10/35
260/180
375/290
115/60
NOM
15/5
25/160
NOM
35/85
Harmony
Kechter
Strauss Cabin
North Access
South Access
AM/PM
Rounded to Nearest
5 Vehicles
Hacienda
Access A
170/295
25/80
260/310
60/45
80/40
235/185
35/70
2110/2860
270/275
125/270
2445/2585
300/260
40/30
25/15
25/15
75/125
15/30
110/170
135/80
400/585
25/45
195/145
520/650
10/25
20/80
630/495
15/10
135/210
SHORT RANGE (2021) GEOMETRY Figure 12
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 19
Harmony
Kechter
Strauss Cabin
North Access
South Access
Hacienda
- Proposed Lane
- Right-turn Acceleration Lane
- Existing Lane
OR
STOP
Strauss
Cabin
Kechter
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 20
Drive (Harmony & Strauss Cabin Convenience Shopping Center) will allow full-turning
movements as a temporary condition in the short range (2021) future. Therefore, the
North Access for Harmony 23 can operate as a full-movement intersection in the short
range (2021) future. Right-turn lanes were evaluated using Figure 8-4 in LCUASS. A
southbound right-turn deceleration lane will be required approaching the North Access.
Since Strauss Cabin Road is an arterial street, it should have left-turn lanes at
intersections regardless of what the traffic volumes are at any given intersection.
Therefore, a southbound left-turn lane is required at the Kechter/Strauss Cabin
intersection with the background traffic. In addition, a westbound right-turn lane is
shown to be required at the Kechter/Strauss Cabin intersection with the short range
(2021) background traffic. As mentioned earlier, this intersection will be analyzed with
stop sign control and roundabout control. However, the south leg of Strauss Cabin
Road is a local street and a northbound left-turn lane is not required on this leg. With
the current stop sign control and implementation of a southbound left-turn lane, lane
alignment may be problematic unless improvements are made on the south leg. An
alternative improvement would be to build a right-turn lane and have southbound left
turns and through traffic in the existing single lane. There is merit in building a
roundabout at this location. That decision rests with the City. If roundabout control is
expected in the next year or so, then it is recommended that no geometric
improvements be made at this intersection. If roundabout control is not expected for
some time, then it is recommended that the required westbound right-turn lane and the
southbound right-turn lane be constructed.
The long range (2035) geometry is shown in Figure 13. Much of the verbiage
related to the short range (2021) geometry is applicable in the long range (2035) future.
Roundabout control at the Kechter/Strauss Cabin intersection is recommended.
Operation Analysis
Operation analyses were performed at the key intersections. The operation
analyses were conducted for the short range analysis, reflecting a year 2021 condition,
and for the long range analysis, reflecting a year 2035 condition. Under the short range
(2021) and long range (2035) conditions, the calculated delay for each movement and
leg is provided when the level of service falls in the LOS D, LOS E, or LOS F
categories.
Using the short range (2021) background morning and afternoon peak hour
traffic volumes, the key intersections operate as indicated in Table 3. The short range
(2021) operation analyses were conducted with the existing stop sign control at the
Kechter/Strauss Cabin intersection and signal control at the Harmony/Strauss Cabin
intersection. The Kechter/Strauss Cabin intersection was analyzed with the required
geometry as discussed in the Geometry section. Calculation forms for these analyses
are provided in Appendix E. The Harmony/Strauss Cabin intersection operates
acceptably with signalization. The minor street approaches at the Kechter/Strauss
LONG RANGE (2035) GEOMETRY Figure 13
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Page 21
Harmony
Kechter
Strauss Cabin
North Access
South Access
Hacienda
Access A
- Denotes Lane
- Right-turn Acceleration Lane
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 22
TABLE 3
Short Range (2021) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Harmony/Strauss Cabin
(signal)
EB LT B B
EB T B C
EB RT A B
EB APPROACH B C
WB LT B E (56.0 secs)
WB T B B
WB RT A A
WB APPROACH B B
NB LT D (44.4 secs) D (49.0 secs)
NB T D (39.6 secs) D (42.0 secs)
NB RT A A
NB APPROACH D (44.1 secs) D (48.6 secs)
SB LT D (40.6 secs) D (42.6 secs)
SB T/RT D (39.7 secs) D (42.1 secs)
SB APPROACH D (40.3 secs) D (42.4 secs)
OVERALL B C
Strauss Cabin/Hacienda
(stop sign)
WB LT/RT B B
SB LT A A
OVERALL A A
Kechter/Strauss Cabin
(stop sign)
(with the required WB RT lane and
a SB RT lane)
NB LT/T/RT C C
SB LT/T E (35.1 secs) F (103.5 secs)
SB RT B B
SB APPROACH D (26.4 secs) F (74.1 secs)
EB LT A A
WB LT A A
OVERALL A A
Kechter/Strauss Cabin
(roundabout)
EB LT/T/RT A B
WB LT/T/RT B B
NB LT/T/RT A A
SB LT/T/RT A B
OVERALL B B
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 23
Cabin intersection will experience delays commensurate with level of service F during
the afternoon peak hour with stop sign control. The Kechter/Strauss Cabin intersection
will operate acceptably with roundabout control.
Using the long range (2035) background morning and afternoon peak hour traffic
volumes, the key intersections operate as indicated in Table 4. Calculation forms for
these analyses are provided in Appendix F. Under the long range (2035) background
traffic condition, the Harmony/Strauss Cabin intersection was analyzed with signal
control and reasonable geometric improvements in order to achieve acceptable
operation. The Kechter/Strauss Cabin intersection was analyzed with roundabout
control.
Using the traffic volumes shown in Figure 10, the key intersections operate in the
short range (2021) total condition as indicated in Table 5. Calculation forms for these
analyses are provided in Appendix G. The key intersections operate acceptably during
the peak hours. The key intersections will meet the Fort Collins operational criteria with
the geometry shown in Figure 12. The Kechter/Strauss Cabin intersection was
analyzed with stop sign and roundabout control. It is important to note that the
intersection meets the Fort Collins level of service criterion for an arterial/arterial stop
sign controlled intersection. The level of service threshold for arterial/arterial stop sign
controlled intersections is level of service F or better for any approach leg. As
mentioned earlier, there is merit in building a roundabout at this location and is
recommended.
Using the traffic volumes shown in Figure 11, the key intersections operate in the
long range (2035) total condition as indicated in Table 6. Calculation forms for these
analyses are provided in Appendix H. The site access intersections operate acceptably
during the peak hours. The key intersections will meet the Fort Collins operational
criteria with the geometry shown in Figure 15. The Kechter/Strauss Cabin intersection
was analyzed with roundabout control.
Pedestrian Level of Service
Appendix I shows a map of the area that is within 1320 feet of the Harmony 23
site. The Harmony 23 site is located within an area termed as an “activity center &
corridor,” which sets the level of service threshold at LOS B & C for all measured
factors. There are three destination areas within 1320 feet of the proposed Harmony 23:
1) the Harmony & Strauss Cabin Convenience Shopping Center; 2) the residential area
to the southwest; and 3) the commercial area west of the site. Sidewalks exist along
both sides of Harmony Road, east of Strauss Cabin Road. It is expected that the
Harmony 23 will construct sidewalks along its frontage of Harmony Road and Strauss
Cabin Road, as well as within the development itself.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 24
TABLE 4
Long Range (2035) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Harmony/Strauss Cabin
(signal)
EB LT E (60.8 secs) E (72.6 secs)
EB T C C
EB RT B A
EB APPROACH C C
WB LT E (56.3 secs) E (62.1 secs)
WB T B C
WB RT A A
WB APPROACH C C
NB LT D (52.9 secs) E (62.8 secs)
NB T D (54.3 secs) E (73.8 secs)
NB RT A A
NB APPROACH D (53.2 secs) E (65.4 secs)
SB LT D (53.4 secs) E (60.7 secs)
SB T D (54.8 secs) E (66.9 secs)
SB RT A A
SB APPROACH D (53.7 secs) E (61.7 secs)
OVERALL C C
Strauss Cabin/Hacienda
(RT-in/RT-out) WB RT B B
Strauss Cabin/Access A
(stop sign)
WB LT/RT D (34.2 secs) C
SB LT A A
OVERALL A A
Kechter/Strauss Cabin
(roundabout)
EB LT/T/RT B D (25.3 secs)
WB LT/T/RT D (25.6 secs) D (26.2 secs)
NB LT/T/RT A A
SB LT/T/RT B C
OVERALL C C
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 25
TABLE 5
Short Range (2021) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Harmony/Strauss Cabin
(signal)
EB LT B B
EB T B C
EB RT A B
EB APPROACH B C
WB LT B E (68.1 secs)
WB T B B
WB RT A A
WB APPROACH B B
NB LT D (51.9 secs) D (53.3 secs)
NB T D (39.9 secs) D (42.1 secs)
NB RT A A
NB APPROACH D (50.9 secs) D (52.5 secs)
SB LT D (41.0 secs) D (42.8 secs)
SB T/RT D (39.7 secs) D (42.4 secs)
SB APPROACH D (40.6 secs) D (42.5 secs)
OVERALL B C
Strauss Cabin/Hacienda-North
Access
(stop sign)
EB LT/T/RT C E (39.1 secs)
WB LT/T/RT B B
NB LT A A
SB LT A A
OVERALL A A
Strauss Cabin/ South Access
(stop sign)
EB LT/RT B B
NB LT A A
OVERALL A A
Kechter/Strauss Cabin
(stop sign)
(with the required WB RT lane and
a SB RT lane)
NB LT/T/RT C C
SB LT/T E (38.4 secs) F (127.1 secs)
SB RT B B
SB APPROACH D (27.2 secs) F (88.0 secs)
EB LT A A
WB LT A A
OVERALL A B
Kechter/Strauss Cabin
(roundabout)
EB LT/T/RT A B
WB LT/T/RT B B
NB LT/T/RT A A
SB LT/T/RT A B
OVERALL B B
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 26
TABLE 6
Long Range (2035) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Harmony/Strauss Cabin
(signal)
EB LT E (60.8 secs) E (72.6 secs)
EB T C C
EB RT B A
EB APPROACH C C
WB LT E (57.0 secs) E (78.6 secs)
WB T B C
WB RT A A
WB APPROACH C C
NB LT D (54.9 secs) E (74.5 secs)
NB T D (51.6 secs) E (73.8 secs)
NB RT A A
NB APPROACH D (54.5 secs) E (74.4 secs)
SB LT D (53.4 secs) E (60.7 secs)
SB T E (57.6 secs) E (69.7 secs)
SB RT A A
SB APPROACH D (54.4 secs) E (62.3 secs)
OVERALL C C
Strauss Cabin/Hacienda-North
Access
(RT-in/RT-out)
EB RT B A
WB RT B C
Strauss Cabin/Access A-South
Access
(stop sign)
EB LT/T/RT F (276.2 secs) F (74.3 secs)
WB LT/T F (67.1 secs) F (71.8 secs)
WB RT A B
WB APPROACH E (43.2 secs) D (32.2 secs)
NB LT A A
SB LT A A
OVERALL E (38.0 secs) B
Kechter/Strauss Cabin
(roundabout)
EB LT/T/RT B D (27.9 secs)
WB LT/T/RT D (26.7 secs) D (29.6 secs)
NB LT/T/RT A A
SB LT/T/RT B C
OVERALL C D (27.2 secs)
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 27
Bicycle Level of Service
Based upon Fort Collins bicycle LOS criteria, there is one destination area within
1320 feet of the Harmony 23: 1) the commercial area (Harmony & Strauss Cabin
Convenience Shopping Center) east of the site. The bicycle level of service is
acceptable. The bicycle LOS Worksheet is provided in Appendix I.
Transit Level of Service
Currently, operates on Harmony Road serving the Harmony Transfer Center.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 28
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Harmony 23 development on the short
range (2021) and long range (2035) street system in the vicinity of the proposed
development. As a result of this analysis, the following is concluded:
• The development of the Harmony 23 site is feasible from a traffic engineering
standpoint. At full development, the Harmony 23 land uses will generate the
following traffic: 2294 weekday vehicle trip ends, 179 morning peak hour vehicle
trip ends, and 215 afternoon peak hour vehicle trip ends.
• Currently, the Kechter/Strauss Cabin intersection operates at acceptable levels
of service. At the Harmony/Strauss Cabin intersection, the minor street legs and
the major street left-turn movement are experiencing significant delays in the
peak hours. It was observed that the minor street left-turn and through
movements utilize the median area to make two-step maneuvers.
• In the short range (2021) background future, the peak hour signal warrant will be
met at the Harmony/Strauss Cabin intersection. It is recommended that this
intersection be signalized. The Kechter/Strauss Cabin intersection will meet the
peak hour signal warrant in/by the long range (2035) future. Signalization is not
recommended at this intersection. This intersection is a candidate for
roundabout control and is recommended. The decision with regard to
intersection control rests with the City of Fort Collins.
• The short range (2021) and long range (2035) geometry is shown in Figures 12
and 13, respectively. Refer to the detailed discussion with regard to intersection
geometry on pages 22 and 24.
• In the short range (2021) future, given development of the Harmony 23 and an
increase in background traffic, the key intersections operate acceptably during
the peak hours. At the Harmony/Strauss Cabin intersection, acceptable
operation is achieved with signalization and the geometry improvements shown
in Figure 12. As an arterial street, Strauss Cabin Road will require a center left-
turn lane. At the Kechter/Strauss Cabin intersection with stop sign control, the
recommended additional auxiliary lanes are a westbound right-turn lane and a
southbound right-turn lane, and are required with the background traffic. If the
City determines that a roundabout at this intersection is desired in the short
range (2021) future, there is merit in not building the auxiliary lanes at this
intersection with stop sign control.
DELICH Harmony 23 TIS, September 2016
ASSOCIATES Page 29
• In the long range (2035) future, given development of the Harmony 23 and an
increase in background traffic, the key intersections operate acceptably during
the peak hours. At the Harmony/Strauss Cabin intersection, acceptable
operation is achieved with the geometric improvements shown in Figure 13.
• Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines.
APPENDIX A
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 9/1/2016 Observer: Vickie
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Harmony/Strauss Cabin
S = straight
L = left turn
Time Northbound: Strauss Cabin Southbound: Strauss Cabin Total Eastbound: Harmony Westbound: Harmony Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 3 0 33 36 3 0 0 3 39 1 485 2 488 5 565 11 581 1069 1108
7:45 1 1 19 21 2 0 3 5 26 0 473 4 477 10 623 8 641 1118 1144
8:00 2 0 20 22 3 0 0 3 25 0 368 1 369 7 476 7 490 859 884
8:15 2 0 7 9 7 0 1 8 17 2 368 0 370 12 483 10 505 875 892
7:30-8:30 8 1 79 88 15 0 4 19 107 3 1694 7 1704 34 2147 36 2217 3921 4028
PHF 0.67 0.25 0.6 0.61 0.54 n/a 0.33 0.59 0.38 0.87 0.44 0.87 0.71 0.86 0.82 0.86 0.88
4:30 1 0 6 7 1 0 2 3 10 1 599 14 614 21 532 13 566 1180 1190
4:45 2 0 9 11 4 1 1 6 17 2 550 13 565 24 580 19 623 1188 1205
5:00 1 0 3 4 3 0 2 5 9 5 620 4 629 17 571 9 597 1226 1235
5:15 0 1 6 7 3 0 2 5 12 2 618 8 628 19 554 12 585 1213 1225
4:30-5:30 4 1 24 29 11 1 7 19 48 10 2387 39 2436 81 2237 53 2371 4807 4855
PHF 0.5 0.25 0.67 0.66 0.69 0.25 0.88 0.79 0.5 0.96 0.7 0.97 0.84 0.96 0.7 0.95 0.98
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 8/30/2016 & 9-8-2016 Observer: Vickie
Day: Tuesday & Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Kechter/Strauss Cabin
S = straight
L = left turn
Time Northbound: Strauss Cabin Southbound: Strauss Cabin Total Eastbound: Kechter Westbound: Kechter Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 2 0 1 3 13 1 3 17 20 11 102 1 114 0 116 16 132 246 266
7:45 1 2 2 5 6 0 6 12 17 8 78 1 87 0 147 14 161 248 265
8:00 1 0 1 2 6 0 8 14 16 7 72 1 80 0 80 8 88 168 184
8:15 0 0 0 0 4 0 3 7 7 2 48 0 50 0 47 1 48 98 105
7:30-8:30 4 2 4 10 29 1 20 50 60 28 300 3 331 0 390 39 429 760 820
PHF 0.5 0.25 0.5 0.5 0.56 0.25 0.63 0.74 0.64 0.74 0.75 0.73 n/a 0.66 0.61 0.67 0.77
4:30 1 1 2 4 12 0 7 19 23 2 115 2 119 1 118 9 128 247 270
4:45 0 1 1 2 7 0 8 15 17 5 118 0 123 0 118 6 124 247 264
5:00 0 0 0 0 14 4 9 27 27 7 109 5 121 1 131 1 133 254 281
5:15 0 0 0 0 13 0 11 24 24 7 99 1 107 0 124 4 128 235 259
4:30-5:30 1 2 3 6 46 4 35 85 91 21 441 8 470 2 491 20 513 983 1074
PHF 0.25 0.5 0.38 0.38 0.82 0.25 0.8 0.79 0.75 0.93 0.4 0.96 0.5 0.94 0.56 0.96 0.96
APPENDIX C
HCM 2010 TWSC Recent AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent am synchro 9.syn
Intersection
Int Delay, s/veh 18.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 1694 7 34 2147 36 8 1 79 15 0 4
Future Vol, veh/h 3 1694 7 34 2147 36 8 1 79 15 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 350 - 200 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 3 1925 8 39 2440 41 9 1 90 17 0 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 2440 0 0 1933 0 0 2989 4453 966 3294 4457 1220
Stage 1 - - - - - - 1936 1936 - 2517 2517 -
Stage 2 - - - - - - 1053 2517 - 777 1940 -
Critical Hdwy 5.34 - - 5.34 - - 6.44 6.54 7.14 6.44 6.54 7.14
Critical Hdwy Stg 1 - - - - - - 7.34 5.54 - 7.34 5.54 -
Critical Hdwy Stg 2 - - - - - - 6.74 5.54 - 6.74 5.54 -
Follow-up Hdwy 3.12 - - 3.12 - - 3.82 4.02 3.92 3.82 4.02 3.92
Pot Cap-1 Maneuver 74 - - 135 - - 15 ~ 1 219 ~ 9 1 148
Stage 1 - - - - - - 43 111 - ~ 16 56 -
Stage 2 - - - - - - 218 56 - 323 111 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 74 - - 135 - - 11 ~ 1 219 - 1 148
Mov Cap-2 Maneuver - - - - - - 11 ~ 1 - - 1 -
Stage 1 - - - - - - 41 107 - ~ 15 40 -
Stage 2 - - - - - - 150 40 - 181 107 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.6 $ 835.5
HCM LOS F -
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 42 74 - - 135 - - -
HCM Lane V/C Ratio 2.381 0.046 - - 0.286 - - -
HCM Control Delay (s) $ 835.5 56 - - 42 - - -
HCM Lane LOS F F - - E - - -
HCM 95th %tile Q(veh) 10.7 0.1 - - 1.1 - - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Lanes and Geometrics Recent AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent am synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 250 0 350 200 0 0 0 0
Storage Lanes 1 0 1 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.850 0.878 0.969
Flt Protected 0.950 0.950 0.996 0.963
Satd. Flow (prot) 1770 5080 0 1770 5085 1583 0 1629 0 0 1738 0
Flt Permitted 0.950 0.950 0.996 0.963
Satd. Flow (perm) 1770 5080 0 1770 5085 1583 0 1629 0 0 1738 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 795 922 5287 613
Travel Time (s) 18.1 21.0 120.2 13.9
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent pm synchro 9.syn
Intersection
Int Delay, s/veh 4.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 2387 39 81 2237 53 4 1 24 11 1 7
Future Vol, veh/h 10 2387 39 81 2237 53 4 1 24 11 1 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 350 - 200 - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 10 2436 40 83 2283 54 4 1 24 11 1 7
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 2283 0 0 2476 0 0 3555 4924 1238 3443 4944 1141
Stage 1 - - - - - - 2476 2476 - 2448 2448 -
Stage 2 - - - - - - 1079 2448 - 995 2496 -
Critical Hdwy 5.34 - - 5.34 - - 6.44 6.54 7.14 6.44 6.54 7.14
Critical Hdwy Stg 1 - - - - - - 7.34 5.54 - 7.34 5.54 -
Critical Hdwy Stg 2 - - - - - - 6.74 5.54 - 6.74 5.54 -
Follow-up Hdwy 3.12 - - 3.12 - - 3.82 4.02 3.92 3.82 4.02 3.92
Pot Cap-1 Maneuver 90 - - ~ 71 - - 6 ~ 1 144 ~ 7 ~ 1 167
Stage 1 - - - - - - 17 59 - 18 61 -
Stage 2 - - - - - - 210 61 - 237 57 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 90 - - ~ 71 - - - 0 144 - 0 167
Mov Cap-2 Maneuver - - - - - - - 0 - - 0 -
Stage 1 - - - - - - 15 52 - 16 0 -
Stage 2 - - - - - - - 0 - 171 51 -
Approach EB WB NB SB
HCM Control Delay, s 0.2 8.9
HCM LOS - -
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 90 - - ~ 71 - - -
HCM Lane V/C Ratio - 0.113 - - 1.164 - - -
HCM Control Delay (s) - 50.1 - - 259.7 - - -
HCM Lane LOS - F - - F - - -
HCM 95th %tile Q(veh) - 0.4 - - 6.3 - - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Lanes and Geometrics Recent PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent pm synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 250 0 350 200 0 0 0 0
Storage Lanes 1 0 1 1 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.91 0.91 1.00 0.91 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.850 0.888 0.950
Flt Protected 0.950 0.950 0.993 0.972
Satd. Flow (prot) 1770 5075 0 1770 5085 1583 0 1643 0 0 1720 0
Flt Permitted 0.950 0.950 0.993 0.972
Satd. Flow (perm) 1770 5075 0 1770 5085 1583 0 1643 0 0 1720 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 795 922 5287 613
Travel Time (s) 18.1 21.0 120.2 13.9
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent AM
6: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent am synchro 9.syn
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 28 300 3 0 390 39 4 2 4 29 1 20
Future Vol, veh/h 28 300 3 0 390 39 4 2 4 29 1 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 33 353 4 0 459 46 5 2 5 34 1 24
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 505 0 0 356 0 0 915 926 355 906 904 482
Stage 1 - - - - - - 421 421 - 482 482 -
Stage 2 - - - - - - 494 505 - 424 422 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1060 - - 1203 - - 253 269 689 257 277 584
Stage 1 - - - - - - 610 589 - 565 553 -
Stage 2 - - - - - - 557 540 - 608 588 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1060 - - 1203 - - 236 261 689 247 268 584
Mov Cap-2 Maneuver - - - - - - 236 261 - 247 268 -
Stage 1 - - - - - - 591 571 - 547 553 -
Stage 2 - - - - - - 533 540 - 583 570 -
Approach EB WB NB SB
HCM Control Delay, s 0.7 0 16.3 18.7
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 329 1060 - - 1203 - - 322
HCM Lane V/C Ratio 0.036 0.031 ----- 0.183
HCM Control Delay (s) 16.3 8.5 - - 0 - - 18.7
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.7
Lanes and Geometrics Recent AM
6: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent am synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.986 0.944 0.945
Flt Protected 0.950 0.980 0.972
Satd. Flow (prot) 1770 1859 0 1863 1837 0 0 1723 0 0 1711 0
Flt Permitted 0.950 0.980 0.972
Satd. Flow (perm) 1770 1859 0 1863 1837 0 0 1723 0 0 1711 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 577 674 629 5287
Travel Time (s) 13.1 15.3 14.3 120.2
Intersection Summary
Area Type: Other
HCM 2010 TWSC Recent PM
6: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent pm synchro 9.syn
Intersection
Int Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 441 8 2 491 20 1 2 3 46 4 35
Future Vol, veh/h 21 441 8 2 491 20 1 2 3 46 4 35
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 22 459 8 2 511 21 1 2 3 48 4 36
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 532 0 0 468 0 0 1053 1043 464 1036 1037 522
Stage 1 - - - - - - 507 507 - 526 526 -
Stage 2 - - - - - - 546 536 - 510 511 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1036 - - 1094 - - 204 229 598 210 231 555
Stage 1 - - - - - - 548 539 - 535 529 -
Stage 2 - - - - - - 522 523 - 546 537 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1036 - - 1094 - - 185 224 598 204 226 555
Mov Cap-2 Maneuver - - - - - - 185 224 - 204 226 -
Stage 1 - - - - - - 536 528 - 524 528 -
Stage 2 - - - - - - 483 522 - 530 526 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 0 16.9 23.9
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 310 1036 - - 1094 - - 278
HCM Lane V/C Ratio 0.02 0.021 - - 0.002 - - 0.318
HCM Control Delay (s) 16.9 8.6 - - 8.3 - - 23.9
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 1.3
Lanes and Geometrics Recent PM
6: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates recent pm synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 0 0 0 0 0
Storage Lanes 1 0 1 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.997 0.994 0.932 0.945
Flt Protected 0.950 0.950 0.992 0.973
Satd. Flow (prot) 1770 1857 0 1770 1852 0 0 1722 0 0 1713 0
Flt Permitted 0.950 0.950 0.992 0.973
Satd. Flow (perm) 1770 1857 0 1770 1852 0 0 1722 0 0 1713 0
Link Speed (mph) 30 30 30 30
Link Distance (ft) 577 674 629 5287
Travel Time (s) 13.1 15.3 14.3 120.2
Intersection Summary
Area Type: Other
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-3
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall
Any
Approach Leg
Any
Movement
Signalized D1
E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized D3 F4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
Roundabout E3,5 E5,4 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
300 400 500 600 700 800 900 1000 1100 1200 1300
100
200
300
400
500
AM 4500 VPH
*75
*100
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
NB LT/T/RT AM 226 VPH
PM 5515 VPH
NB LT/T/RT PM 235 VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR
ABOVE 70 KM/H (40 MPH) ON MAJOR STREET)
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 100 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 75 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE BACKGROUND PEAK HOUR WARRANT AT HARMONY/STRAUSS CABIN
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 92 VPH
AM 988 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 178 VPH
PM 1225 VPH
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE BACKGROUND PEAK HOUR WARRANT AT KECHTER/STRAUSS CABIN
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 92 VPH
AM 988 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 178 VPH
PM 1225 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 92 VPH
AM 988 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 178 VPH
PM 1225 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 114 VPH
AM 994 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 189 VPH
PM 1246 VPH
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
SHORT RANGE TOTAL PEAK HOUR WARRANT AT KECHTER/STRAUSS CABIN
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 114 VPH
AM 994 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 189 VPH
PM 1246 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 114 VPH
AM 994 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 189 VPH
PM 1246 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 175 VPH
AM 1275 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 310 VPH
PM 1505 VPH
MINOR STREET APPROACH - VPH
MAJOR STREET - TOTAL OF BOTH APPROACH -
VEHICLES PER HOUR (VPH)
*Note: 150 vph applies as the lower threshold volume for a minor-street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor-street approach with one lane.
LONG RANGE BACKGROUND PEAK HOUR WARRANT AT KECHTER/STRAUSS CABIN
MUTCD, 2003 EDITION, PAGE 4C-7
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 175 VPH
AM 1275 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 310 VPH
PM 1505 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
400
500
600
SB LT/T/RT AM 175 VPH
AM 1275 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 310 VPH
PM 1505 VPH
400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
100
200
300
APPENDIX E
HCM 2010 Signalized Intersection Summary Short Bkgrd AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 3 1876 80 104 2397 40 68 5 153 17 7 4
Future Volume (veh/h) 3 1876 80 104 2397 40 68 5 153 17 7 4
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 3 2132 52 118 2724 28 77 6 0 19 8 0
Adj No. of Lanes 131131111110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 122 3369 1049 223 3544 1103 277 288 245 279 288 0
Arrive On Green 0.01 0.66 0.66 0.05 0.70 0.70 0.15 0.15 0.00 0.15 0.15 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5085 1583 1402 1863 1583 1404 1863 0
Grp Volume(v), veh/h 3 2132 52 118 2724 28 77 6 0 19 8 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1583 1402 1863 1583 1404 1863 0
Q Serve(g_s), s 0.1 26.8 1.3 2.1 38.5 0.6 5.4 0.3 0.0 1.3 0.4 0.0
Cycle Q Clear(g_c), s 0.1 26.8 1.3 2.1 38.5 0.6 5.8 0.3 0.0 1.6 0.4 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 122 3369 1049 223 3544 1103 277 288 245 279 288 0
V/C Ratio(X) 0.02 0.63 0.05 0.53 0.77 0.03 0.28 0.02 0.00 0.07 0.03 0.00
Avail Cap(c_a), veh/h 181 3369 1049 302 3544 1103 277 288 245 279 288 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 11.5 10.8 6.5 15.2 10.9 5.1 42.0 39.4 0.0 40.1 39.5 0.0
Incr Delay (d2), s/veh 0.1 0.9 0.1 1.9 1.7 0.0 2.5 0.1 0.0 0.5 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 12.7 0.6 2.5 18.2 0.3 2.3 0.2 0.0 0.5 0.2 0.0
LnGrp Delay(d),s/veh 11.5 11.7 6.6 17.2 12.5 5.2 44.4 39.6 0.0 40.6 39.7 0.0
LnGrp LOS BBABBADD DD
Approach Vol, veh/h 2187 2870 83 27
Approach Delay, s/veh 11.6 12.7 44.1 40.3
Approach LOS B B D D
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.1 79.9 22.0 4.4 83.6 22.0
Change Period (Y+Rc), s 4.0 8.0 6.0 4.0 8.0 6.0
Max Green Setting (Gmax), s 9.0 67.0 16.0 4.0 72.0 16.0
Max Q Clear Time (g_c+I1), s 4.1 28.8 3.6 2.1 40.5 7.8
Green Ext Time (p_c), s 0.1 37.4 0.2 0.0 31.0 0.2
Intersection Summary
HCM 2010 Ctrl Delay 12.9
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Bkgrd AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max Max None C-Max Max
Maximum Split (s) 13 75 22 8 80 22
Maximum Split (%) 11.8% 68.2% 20.0% 7.3% 72.7% 20.0%
Minimum Split (s) 8 24 10 8 24 10
Yellow Time (s) 354354
All-Red Time (s) 132132
Minimum Initial (s) 442442
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 82 95 60 82 90 60
End Time (s) 95 60 82 90 60 82
Yield/Force Off (s) 91 52 76 86 52 76
Yield/Force Off 170(s) 91 41 76 86 41 76
Local Start Time (s) 97 0 75 97 105 75
Local Yield (s) 106 67 91 101 67 91
Local Yield 170(s) 106 56 91 101 56 91
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 95 (86%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 Signalized Intersection Summary Short Bkgrd PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 11 2613 170 216 2446 59 102 7 126 12 10 8
Future Volume (veh/h) 11 2613 170 216 2446 59 102 7 126 12 10 8
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 11 2666 115 220 2496 42 104 7 0 12 10 0
Adj No. of Lanes 131131111110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 142 3074 957 261 3508 1092 287 310 264 289 310 0
Arrive On Green 0.02 0.60 0.60 0.10 0.69 0.69 0.17 0.17 0.00 0.17 0.17 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5085 1583 1399 1863 1583 1403 1863 0
Grp Volume(v), veh/h 11 2666 115 220 2496 42 104 7 0 12 10 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1583 1399 1863 1583 1403 1863 0
Q Serve(g_s), s 0.3 52.3 3.7 9.3 35.9 1.0 8.1 0.4 0.0 0.9 0.5 0.0
Cycle Q Clear(g_c), s 0.3 52.3 3.7 9.3 35.9 1.0 8.6 0.4 0.0 1.2 0.5 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 142 3074 957 261 3508 1092 287 310 264 289 310 0
V/C Ratio(X) 0.08 0.87 0.12 0.84 0.71 0.04 0.36 0.02 0.00 0.04 0.03 0.00
Avail Cap(c_a), veh/h 183 3074 957 298 3508 1092 287 310 264 289 310 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 11.6 19.7 10.1 38.5 11.3 5.9 45.5 41.8 0.0 42.3 41.9 0.0
Incr Delay (d2), s/veh 0.2 3.6 0.3 17.6 1.3 0.1 3.5 0.1 0.0 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 25.2 1.7 8.4 17.0 0.5 3.4 0.2 0.0 0.4 0.3 0.0
LnGrp Delay(d),s/veh 11.8 23.3 10.4 56.0 12.6 6.0 49.0 42.0 0.0 42.6 42.1 0.0
LnGrp LOS B C BEBADD DD
Approach Vol, veh/h 2792 2758 111 22
Approach Delay, s/veh 22.7 16.0 48.6 42.4
Approach LOS C B D D
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 15.4 79.6 25.0 5.2 89.8 25.0
Change Period (Y+Rc), s 4.0 8.0 6.0 4.0 8.0 6.0
Max Green Setting (Gmax), s 14.0 69.0 19.0 4.0 79.0 19.0
Max Q Clear Time (g_c+I1), s 11.3 54.3 3.2 2.3 37.9 10.6
Green Ext Time (p_c), s 0.2 14.6 0.3 0.0 40.6 0.2
Intersection Summary
HCM 2010 Ctrl Delay 20.0
HCM 2010 LOS C
Timing Report, Sorted By Phase Short Bkgrd PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max Max None C-Max Max
Maximum Split (s) 18 77 25 8 87 25
Maximum Split (%) 15.0% 64.2% 20.8% 6.7% 72.5% 20.8%
Minimum Split (s) 8 24 10 8 24 10
Yellow Time (s) 354354
All-Red Time (s) 132132
Minimum Initial (s) 442442
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 77 95 52 77 85 52
End Time (s) 95 52 77 85 52 77
Yield/Force Off (s) 91 44 71 81 44 71
Yield/Force Off 170(s) 91 33 71 81 33 71
Local Start Time (s) 102 0 77 102 110 77
Local Yield (s) 116 69 96 106 69 96
Local Yield 170(s) 116 58 96 106 58 96
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 65
Offset: 95 (79%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 TWSC Short Bkgrd AM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 5.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 26 111 115 37 138 53
Future Vol, veh/h 26 111 115 37 138 53
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - 150 175 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 31 131 135 44 162 62
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 522 135 0 0 135 0
Stage 1 135 - - - - -
Stage 2 387 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 515 914 - - 1449 -
Stage 1 891 - - - - -
Stage 2 686 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 457 914 - - 1449 -
Mov Cap-2 Maneuver 457 - - - - -
Stage 1 891 - - - - -
Stage 2 609 - - - - -
Approach WB NB SB
HCM Control Delay, s 10.9 0 5.6
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 768 1449 -
HCM Lane V/C Ratio - - 0.21 0.112 -
HCM Control Delay (s) - - 10.9 7.8 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.8 0.4 -
Lanes and Geometrics Short Bkgrd AM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 150 175
Storage Lanes 1 0 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.891 0.850
Flt Protected 0.991 0.950
Satd. Flow (prot) 1645 0 1863 1583 1770 1863
Flt Permitted 0.991 0.950
Satd. Flow (perm) 1645 0 1863 1583 1770 1863
Link Speed (mph) 30 35 30
Link Distance (ft) 566 4684 657
Travel Time (s) 12.9 91.2 14.9
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 6.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 32 193 42 48 247 149
Future Vol, veh/h 32 193 42 48 247 149
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - 150 175 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 38 227 49 56 291 175
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 805 49 0 0 49 0
Stage 1 49 - - - - -
Stage 2 756 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 352 1020 - - 1558 -
Stage 1 973 - - - - -
Stage 2 464 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 286 1020 - - 1558 -
Mov Cap-2 Maneuver 286 - - - - -
Stage 1 973 - - - - -
Stage 2 377 - - - - -
Approach WB NB SB
HCM Control Delay, s 12.4 0 4.9
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 747 1558 -
HCM Lane V/C Ratio - - 0.354 0.187 -
HCM Control Delay (s) - - 12.4 7.8 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 1.6 0.7 -
Lanes and Geometrics Short Bkgrd PM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 150 175
Storage Lanes 1 0 1 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.884 0.850
Flt Protected 0.993 0.950
Satd. Flow (prot) 1635 0 1863 1583 1770 1863
Flt Permitted 0.993 0.950
Satd. Flow (perm) 1635 0 1863 1583 1770 1863
Link Speed (mph) 30 35 30
Link Distance (ft) 566 4684 657
Travel Time (s) 12.9 91.2 14.9
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 352 3 0 458 125 4 2 4 56 1 35
Future Vol, veh/h 50 352 3 0 458 125 4 2 4 56 1 35
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - 150 - - - - - 150
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 59 414 4 0 539 147 5 2 5 66 1 41
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 539 0 0 418 0 0 1073 1073 416 1076 1074 539
Stage 1 - - - - - - 534 534 - 539 539 -
Stage 2 - - - - - - 539 539 - 537 535 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1029 - - 1141 - - 198 220 637 197 220 542
Stage 1 - - - - - - 530 524 - 527 522 -
Stage 2 - - - - - - 527 522 - 528 524 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1029 - - 1141 - - 174 207 637 185 207 542
Mov Cap-2 Maneuver - - - - - - 174 207 - 185 207 -
Stage 1 - - - - - - 500 494 - 497 522 -
Stage 2 - - - - - - 486 522 - 492 494 -
Approach EB WB NB SB
HCM Control Delay, s 1.1 0 19.7 26.4
HCM LOS C D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 257 1029 - - 1141 - - 185 542
HCM Lane V/C Ratio 0.046 0.057 ----- 0.362 0.076
HCM Control Delay (s) 19.7 8.7 - - 0 - - 35.1 12.2
HCM Lane LOS C A - - A - - E B
HCM 95th %tile Q(veh) 0.1 0.2 - - 0 - - 1.5 0.2
Lanes and Geometrics Short Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 1 0 1 1 0 0 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.850 0.944 0.850
Flt Protected 0.950 0.980 0.953
Satd. Flow (prot) 1770 1861 0 1863 1863 1583 0 1723 0 0 1775 1583
Flt Permitted 0.950 0.980 0.953
Satd. Flow (perm) 1770 1861 0 1863 1863 1583 0 1723 0 0 1775 1583
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4684
Travel Time (s) 12.7 11.8 7.0 106.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Intersection
Int Delay, s/veh 9.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 45 515 9 2 578 76 1 2 3 116 4 58
Future Vol, veh/h 45 515 9 2 578 76 1 2 3 116 4 58
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - 150 - - - - - 150
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 47 536 9 2 602 79 1 2 3 121 4 60
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 602 0 0 546 0 0 1243 1241 541 1244 1246 602
Stage 1 - - - - - - 635 635 - 606 606 -
Stage 2 - - - - - - 608 606 - 638 640 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 975 - - 1023 - - 151 175 541 151 174 500
Stage 1 - - - - - - 467 472 - 484 487 -
Stage 2 - - - - - - 483 487 - 465 470 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 975 - - 1023 - - 125 166 541 143 165 500
Mov Cap-2 Maneuver - - - - - - 125 166 - 143 165 -
Stage 1 - - - - - - 444 449 - 461 486 -
Stage 2 - - - - - - 420 486 - 438 447 -
Approach EB WB NB SB
HCM Control Delay, s 0.7 0 20.8 74.1
HCM LOS C F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 234 975 - - 1023 - - 144 500
HCM Lane V/C Ratio 0.027 0.048 - - 0.002 - - 0.868 0.121
HCM Control Delay (s) 20.8 8.9 - - 8.5 - - 103.5 13.2
HCM Lane LOS C A - - A - - F B
HCM 95th %tile Q(veh) 0.1 0.2 - - 0 - - 5.8 0.4
Lanes and Geometrics Short Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/15/2016 Synchro 9 Light Report
Delich Associates sb pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 1 0 1 1 0 0 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.850 0.932 0.850
Flt Protected 0.950 0.950 0.992 0.954
Satd. Flow (prot) 1770 1859 0 1770 1863 1583 0 1722 0 0 1777 1583
Flt Permitted 0.950 0.950 0.992 0.954
Satd. Flow (perm) 1770 1859 0 1770 1863 1583 0 1722 0 0 1777 1583
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4684
Travel Time (s) 12.7 11.8 7.0 106.5
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Short Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates sb am rndabt.syn
Intersection
Intersection Delay, s/veh 11.1
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 477 686 12 108
Demand Flow Rate, veh/h 486 700 12 110
Vehicles Circulating, veh/h 68 67 549 555
Vehicles Exiting, veh/h 597 494 5 212
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.7 13.3 5.7 7.7
Approach LOS ABAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 486 700 12 110
Cap Entry Lane, veh/h 1056 1057 653 649
Entry HV Adj Factor 0.981 0.980 0.997 0.982
Flow Entry, veh/h 477 686 12 108
Cap Entry, veh/h 1036 1036 650 637
V/C Ratio 0.460 0.662 0.018 0.170
Control Delay, s/veh 8.7 13.3 5.7 7.7
LOSABAA
95th %tile Queue, veh 2501
Lanes and Geometrics Short Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates sb am rndabt.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.971 0.944 0.949
Flt Protected 0.994 0.980 0.970
Satd. Flow (prot) 0 1850 0 0 1809 0 0 1723 0 0 1715 0
Flt Permitted 0.994 0.980 0.970
Satd. Flow (perm) 0 1850 0 0 1809 0 0 1723 0 0 1715 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4684
Travel Time (s) 12.7 11.8 7.0 106.5
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Short Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates sb pm rndabt.syn
Intersection
Intersection Delay, s/veh 12.2
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 592 683 6 185
Demand Flow Rate, veh/h 604 697 6 188
Vehicles Circulating, veh/h 129 51 718 617
Vehicles Exiting, veh/h 676 673 15 131
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 12.3 12.8 6.7 10.2
Approach LOS BBAB
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 604 697 6 188
Cap Entry Lane, veh/h 993 1074 551 610
Entry HV Adj Factor 0.981 0.980 0.993 0.984
Flow Entry, veh/h 592 683 6 185
Cap Entry, veh/h 974 1052 548 600
V/C Ratio 0.608 0.649 0.011 0.308
Control Delay, s/veh 12.3 12.8 6.7 10.2
LOSBBAB
95th %tile Queue, veh 4501
Lanes and Geometrics Short Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates sb pm rndabt.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.984 0.932 0.956
Flt Protected 0.996 0.992 0.968
Satd. Flow (prot) 0 1852 0 0 1833 0 0 1722 0 0 1724 0
Flt Permitted 0.996 0.992 0.968
Satd. Flow (perm) 0 1852 0 0 1833 0 0 1722 0 0 1724 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4684
Travel Time (s) 12.7 11.8 7.0 106.5
Intersection Summary
Area Type: Other
APPENDIX F
HCM 2010 Signalized Intersection Summary Long Bkgrd AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 35 2110 255 290 2445 125 105 20 215 235 75 60
Future Volume (veh/h) 35 2110 255 290 2445 125 105 20 215 235 75 60
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 37 2221 206 305 2574 106 111 21 0 247 79 0
Adj No. of Lanes 131231211211
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 63 2802 964 392 3202 1153 198 102 86 340 178 137
Arrive On Green 0.04 0.55 0.55 0.11 0.63 0.63 0.06 0.05 0.00 0.10 0.10 0.00
Sat Flow, veh/h 1774 5085 1583 3442 5085 1583 3442 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 37 2221 206 305 2574 106 111 21 0 247 79 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1721 1695 1583 1721 1863 1583 1721 1863 1583
Q Serve(g_s), s 2.3 38.3 6.4 9.5 41.8 2.1 3.5 1.2 0.0 7.7 4.4 0.0
Cycle Q Clear(g_c), s 2.3 38.3 6.4 9.5 41.8 2.1 3.5 1.2 0.0 7.7 4.4 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 63 2802 964 392 3202 1153 198 102 86 340 178 137
V/C Ratio(X) 0.59 0.79 0.21 0.78 0.80 0.09 0.56 0.21 0.00 0.73 0.44 0.00
Avail Cap(c_a), veh/h 81 2802 964 407 3202 1153 282 102 86 407 178 137
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 52.3 19.7 9.7 47.4 15.3 4.4 50.5 49.7 0.0 48.1 47.0 0.0
Incr Delay (d2), s/veh 8.6 2.4 0.5 9.0 2.2 0.2 2.5 4.6 0.0 5.2 7.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 18.3 2.9 5.0 20.0 1.0 1.7 0.7 0.0 3.9 2.6 0.0
LnGrp Delay(d),s/veh 60.8 22.1 10.2 56.3 17.5 4.5 52.9 54.3 0.0 53.4 54.8 0.0
LnGrp LOS E C BEBADD DD
Approach Vol, veh/h 2464 2985 132 326
Approach Delay, s/veh 21.7 21.0 53.2 53.7
Approach LOS CCDD
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 17.5 67.6 9.3 15.5 8.9 76.3 13.9 11.0
Change Period (Y+Rc), s 6.0 8.0 4.0 6.0 6.0 8.0 4.0 6.0
Max Green Setting (Gmax), s 12.0 57.0 8.0 9.0 4.0 65.0 12.0 5.0
Max Q Clear Time (g_c+I1), s 11.5 40.3 5.5 6.4 4.3 43.8 9.7 3.2
Green Ext Time (p_c), s 0.1 16.6 0.1 0.1 0.0 21.0 0.2 0.1
Intersection Summary
HCM 2010 Ctrl Delay 23.8
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Bkgrd AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Phase Number 12345678
Movement WBL EBT NBL SBT EBL WBT SBL NBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None C-Max None Max None C-Max None Max
Maximum Split (s) 18 65 12 15 10 73 16 11
Maximum Split (%) 16.4% 59.1% 10.9% 13.6% 9.1% 66.4% 14.5% 10.0%
Minimum Split (s) 10 24 8 10 10 24 8 10
Yellow Time (s) 45344534
All-Red Time (s) 23122312
Minimum Initial (s) 44424442
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 92 0 65 77 92 102 65 81
End Time (s) 0 65 77 92 102 65 81 92
Yield/Force Off (s) 104 57 73 86 96 57 77 86
Yield/Force Off 170(s) 104 46 73 86 96 46 77 86
Local Start Time (s) 92 0 65 77 92 102 65 81
Local Yield (s) 104 57 73 86 96 57 77 86
Local Yield 170(s) 104 46 73 86 96 46 77 86
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 Signalized Intersection Summary Long Bkgrd PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 70 2860 210 215 2585 270 260 80 285 185 35 45
Future Volume (veh/h) 70 2860 210 215 2585 270 260 80 285 185 35 45
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 71 2918 159 219 2638 229 265 82 0 189 36 0
Adj No. of Lanes 131231211211
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 103 3032 1102 300 3178 1114 344 133 113 271 93 66
Arrive On Green 0.06 0.60 0.60 0.09 0.63 0.63 0.10 0.07 0.00 0.08 0.05 0.00
Sat Flow, veh/h 1774 5085 1583 3442 5085 1583 3442 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 71 2918 159 219 2638 229 265 82 0 189 36 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1721 1695 1583 1721 1863 1583 1721 1863 1583
Q Serve(g_s), s 4.7 65.2 4.1 7.4 48.5 6.0 9.0 5.1 0.0 6.4 2.2 0.0
Cycle Q Clear(g_c), s 4.7 65.2 4.1 7.4 48.5 6.0 9.0 5.1 0.0 6.4 2.2 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 103 3032 1102 300 3178 1114 344 133 113 271 93 66
V/C Ratio(X) 0.69 0.96 0.14 0.73 0.83 0.21 0.77 0.62 0.00 0.70 0.39 0.00
Avail Cap(c_a), veh/h 103 3032 1102 301 3178 1114 344 133 113 287 93 66
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 55.4 22.9 6.2 53.4 17.5 6.2 52.7 54.1 0.0 53.9 55.2 0.0
Incr Delay (d2), s/veh 17.2 9.7 0.3 8.7 2.7 0.4 10.2 19.6 0.0 6.8 11.7 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.8 33.0 1.8 3.9 23.3 2.7 4.8 3.4 0.0 3.3 1.5 0.0
LnGrp Delay(d),s/veh 72.6 32.6 6.4 62.1 20.2 6.6 62.8 73.8 0.0 60.7 66.9 0.0
LnGrp LOS E C A E C A E E E E
Approach Vol, veh/h 3148 3086 347 225
Approach Delay, s/veh 32.2 22.2 65.4 61.7
Approach LOS C C E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.4 78.6 15.0 11.0 12.0 82.0 12.4 13.6
Change Period (Y+Rc), s 6.0 8.0 4.0 6.0 6.0 8.0 4.0 6.0
Max Green Setting (Gmax), s 9.5 70.5 11.0 5.0 6.0 74.0 9.0 7.0
Max Q Clear Time (g_c+I1), s 9.4 67.2 11.0 4.2 6.7 50.5 8.4 7.1
Green Ext Time (p_c), s 0.0 3.3 0.0 0.0 0.0 23.4 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 30.3
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Bkgrd PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Phase Number 12345678
Movement WBL EBT NBL SBT EBL WBT SBL NBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None C-Max None Max None C-Max None Max
Maximum Split (s) 15.5 78.5 15 11 12 82 13 13
Maximum Split (%) 12.9% 65.4% 12.5% 9.2% 10.0% 68.3% 10.8% 10.8%
Minimum Split (s) 10 24 8 10 10 24 8 10
Yellow Time (s) 453445 3.54
All-Red Time (s) 231223 0.52
Minimum Initial (s) 44424442
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 104.5 0 78.5 93.5 104.5 116.5 78.5 91.5
End Time (s) 0 78.5 93.5 104.5 116.5 78.5 91.5 104.5
Yield/Force Off (s) 114 70.5 89.5 98.5 110.5 70.5 87.5 98.5
Yield/Force Off 170(s) 114 59.5 89.5 98.5 110.5 59.5 87.5 98.5
Local Start Time (s) 104.5 0 78.5 93.5 104.5 116.5 78.5 91.5
Local Yield (s) 114 70.5 89.5 98.5 110.5 70.5 87.5 98.5
Local Yield 170(s) 114 59.5 89.5 98.5 110.5 59.5 87.5 98.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 TWSC Long Bkgrd AM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Intersection
Int Delay, s/veh 1.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 120 220 45 0 620
Future Vol, veh/h 0 120 220 45 0 620
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - 150 - -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 126 232 47 0 653
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 232 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.23 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.319 - - - -
Pot Cap-1 Maneuver 0 806 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 806 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 10.3 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 806 -
HCM Lane V/C Ratio - - 0.157 -
HCM Control Delay (s) - - 10.3 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 0.6 -
Lanes and Geometrics Long Bkgrd AM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 150 0
Storage Lanes 0 1 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95
Ped Bike Factor
Frt 0.865 0.850
Flt Protected
Satd. Flow (prot) 0 1611 1863 1583 0 3539
Flt Permitted
Satd. Flow (perm) 0 1611 1863 1583 0 3539
Link Speed (mph) 35 35 35
Link Distance (ft) 305 648 647
Travel Time (s) 5.9 12.6 12.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Intersection
Int Delay, s/veh 3.1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 250 375 50 0 460
Future Vol, veh/h 0 250 375 50 0 460
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - 150 - -
Veh in Median Storage, # 1 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 263 395 53 0 484
Major/Minor Minor1 Major1 Major2
Conflicting Flow All - 395 0 0 - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 6.23 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.319 - - - -
Pot Cap-1 Maneuver 0 653 - - 0 -
Stage 1 0 - - - 0 -
Stage 2 0 - - - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 653 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach WB NB SB
HCM Control Delay, s 14.2 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBT
Capacity (veh/h) - - 653 -
HCM Lane V/C Ratio - - 0.403 -
HCM Control Delay (s) - - 14.2 -
HCM Lane LOS - - B -
HCM 95th %tile Q(veh) - - 1.9 -
Lanes and Geometrics Long Bkgrd PM
6: Strauss Cabin Road & Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 150 0
Storage Lanes 0 1 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95
Ped Bike Factor
Frt 0.865 0.850
Flt Protected
Satd. Flow (prot) 0 1611 1863 1583 0 3539
Flt Permitted
Satd. Flow (perm) 0 1611 1863 1583 0 3539
Link Speed (mph) 30 35 30
Link Distance (ft) 305 648 647
Travel Time (s) 6.9 12.6 14.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd AM
8: Strauss Cabin Road & Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Intersection
Int Delay, s/veh 5.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 35 25 240 30 375 245
Future Vol, veh/h 35 25 240 30 375 245
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 37 26 253 32 395 258
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1315 268 0 0 284 0
Stage 1 268 - - - - -
Stage 2 1047 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 174 771 - - 1278 -
Stage 1 777 - - - - -
Stage 2 338 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 120 771 - - 1278 -
Mov Cap-2 Maneuver 120 - - - - -
Stage 1 777 - - - - -
Stage 2 234 - - - - -
Approach WB NB SB
HCM Control Delay, s 34.2 0 5.5
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 185 1278 -
HCM Lane V/C Ratio - - 0.341 0.309 -
HCM Control Delay (s) - - 34.2 9.1 -
HCM Lane LOS - - D A -
HCM 95th %tile Q(veh) - - 1.4 1.3 -
Lanes and Geometrics Long Bkgrd AM
8: Strauss Cabin Road & Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 100 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.944 0.985
Flt Protected 0.971 0.950
Satd. Flow (prot) 1707 0 1835 0 1770 1863
Flt Permitted 0.971 0.950
Satd. Flow (perm) 1707 0 1835 0 1770 1863
Link Speed (mph) 30 35 30
Link Distance (ft) 317 4046 648
Travel Time (s) 7.2 78.8 14.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Bkgrd PM
8: Strauss Cabin Road & Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Intersection
Int Delay, s/veh 7.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 85 160 265 5 290 170
Future Vol, veh/h 85 160 265 5 290 170
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 200 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 89 168 279 5 305 179
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1071 282 0 0 284 0
Stage 1 282 - - - - -
Stage 2 789 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 244 757 - - 1278 -
Stage 1 766 - - - - -
Stage 2 448 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 186 757 - - 1278 -
Mov Cap-2 Maneuver 281 - - - - -
Stage 1 766 - - - - -
Stage 2 341 - - - - -
Approach WB NB SB
HCM Control Delay, s 21.1 0 5.5
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 477 1278 -
HCM Lane V/C Ratio - - 0.541 0.239 -
HCM Control Delay (s) - - 21.1 8.7 -
HCM Lane LOS - - C A -
HCM 95th %tile Q(veh) - - 3.2 0.9 -
Lanes and Geometrics Long Bkgrd PM
8: Strauss Cabin Road & Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 100 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.912 0.998
Flt Protected 0.983 0.950
Satd. Flow (prot) 1670 0 1859 0 1770 1863
Flt Permitted 0.983 0.950
Satd. Flow (perm) 1670 0 1859 0 1770 1863
Link Speed (mph) 30 35 30
Link Distance (ft) 317 4046 648
Travel Time (s) 7.2 78.8 14.7
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Long Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Intersection
Intersection Delay, s/veh 18.0
Intersection LOS C
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 584 758 94 184
Demand Flow Rate, veh/h 596 773 97 187
Vehicles Circulating, veh/h 134 210 676 612
Vehicles Exiting, veh/h 665 563 54 371
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 12.2 25.6 8.6 10.1
Approach LOS B D A B
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 596 773 97 187
Cap Entry Lane, veh/h 988 916 575 613
Entry HV Adj Factor 0.979 0.981 0.974 0.982
Flow Entry, veh/h 584 758 94 184
Cap Entry, veh/h 968 898 560 602
V/C Ratio 0.603 0.844 0.169 0.305
Control Delay, s/veh 12.2 25.6 8.6 10.1
LOS B D A B
95th %tile Queue, veh 4 10 1 1
Lanes and Geometrics Long Bkgrd AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb am rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.994 0.964 0.963 0.954
Flt Protected 0.988 0.999 0.978 0.972
Satd. Flow (prot) 0 1829 0 0 1794 0 0 1754 0 0 1727 0
Flt Permitted 0.988 0.999 0.978 0.972
Satd. Flow (perm) 0 1829 0 0 1794 0 0 1754 0 0 1727 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4046
Travel Time (s) 12.7 11.8 7.0 92.0
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Long Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Intersection
Intersection Delay, s/veh 24.5
Intersection LOS C
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 731 852 64 327
Demand Flow Rate, veh/h 745 870 65 333
Vehicles Circulating, veh/h 237 118 874 758
Vehicles Exiting, veh/h 854 821 108 230
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 25.3 26.2 9.7 21.1
Approach LOS D D A C
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 745 870 65 333
Cap Entry Lane, veh/h 892 1004 472 529
Entry HV Adj Factor 0.981 0.980 0.980 0.983
Flow Entry, veh/h 731 852 64 327
Cap Entry, veh/h 874 984 462 521
V/C Ratio 0.836 0.866 0.138 0.629
Control Delay, s/veh 25.3 26.2 9.7 21.1
LOS D D A C
95th %tile Queue, veh 10 11 0 4
Lanes and Geometrics Long Bkgrd PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lb pm rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.991 0.977 0.966 0.950
Flt Protected 0.995 0.998 0.976 0.974
Satd. Flow (prot) 0 1837 0 0 1816 0 0 1756 0 0 1724 0
Flt Permitted 0.995 0.998 0.976 0.974
Satd. Flow (perm) 0 1837 0 0 1816 0 0 1756 0 0 1724 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4046
Travel Time (s) 12.7 11.8 7.0 92.0
Intersection Summary
Area Type: Other
APPENDIX G
HCM 2010 Signalized Intersection Summary Short Total AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 3 1876 96 115 2397 40 132 12 196 17 8 4
Future Volume (veh/h) 3 1876 96 115 2397 40 132 12 196 17 8 4
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 3 2132 64 131 2724 23 150 14 0 19 9 0
Adj No. of Lanes 131131111110
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, % 222222222222
Cap, veh/h 123 3355 1045 226 3544 1103 276 288 245 272 288 0
Arrive On Green 0.01 0.66 0.66 0.05 0.70 0.70 0.15 0.15 0.00 0.15 0.15 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5085 1583 1400 1863 1583 1394 1863 0
Grp Volume(v), veh/h 3 2132 64 131 2724 23 150 14 0 19 9 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1583 1400 1863 1583 1394 1863 0
Q Serve(g_s), s 0.1 27.0 1.6 2.4 38.5 0.5 11.2 0.7 0.0 1.3 0.5 0.0
Cycle Q Clear(g_c), s 0.1 27.0 1.6 2.4 38.5 0.5 11.7 0.7 0.0 2.0 0.5 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 123 3355 1045 226 3544 1103 276 288 245 272 288 0
V/C Ratio(X) 0.02 0.64 0.06 0.58 0.77 0.02 0.54 0.05 0.00 0.07 0.03 0.00
Avail Cap(c_a), veh/h 182 3355 1045 300 3544 1103 276 288 245 272 288 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 11.5 11.0 6.6 17.0 10.9 5.1 44.5 39.6 0.0 40.5 39.5 0.0
Incr Delay (d2), s/veh 0.1 0.9 0.1 2.3 1.7 0.0 7.5 0.3 0.0 0.5 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 12.7 0.7 2.8 18.2 0.2 4.9 0.4 0.0 0.5 0.2 0.0
LnGrp Delay(d),s/veh 11.5 11.9 6.7 19.3 12.5 5.2 51.9 39.9 0.0 41.0 39.7 0.0
LnGrp LOS BBABBADD DD
Approach Vol, veh/h 2199 2878 164 28
Approach Delay, s/veh 11.7 12.8 50.9 40.6
Approach LOS B B D D
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.4 79.6 22.0 4.4 83.6 22.0
Change Period (Y+Rc), s 4.0 8.0 6.0 4.0 8.0 6.0
Max Green Setting (Gmax), s 9.0 67.0 16.0 4.0 72.0 16.0
Max Q Clear Time (g_c+I1), s 4.4 29.0 4.0 2.1 40.5 13.7
Green Ext Time (p_c), s 0.1 37.2 0.4 0.0 31.0 0.1
Intersection Summary
HCM 2010 Ctrl Delay 13.7
HCM 2010 LOS B
Timing Report, Sorted By Phase Short Total AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max Max None C-Max Max
Maximum Split (s) 13 75 22 8 80 22
Maximum Split (%) 11.8% 68.2% 20.0% 7.3% 72.7% 20.0%
Minimum Split (s) 8 24 10 8 24 10
Yellow Time (s) 354354
All-Red Time (s) 132132
Minimum Initial (s) 442442
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 82 95 60 82 90 60
End Time (s) 95 60 82 90 60 82
Yield/Force Off (s) 91 52 76 86 52 76
Yield/Force Off 170(s) 91 41 76 86 41 76
Local Start Time (s) 97 0 75 97 105 75
Local Yield (s) 106 67 91 101 67 91
Local Yield 170(s) 106 56 91 101 56 91
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 95 (86%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 Signalized Intersection Summary Short Total PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 11 2613 233 258 2446 59 136 10 149 12 17 8
Future Volume (veh/h) 11 2613 233 258 2446 59 136 10 149 12 17 8
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1900
Adj Flow Rate, veh/h 11 2666 155 263 2496 42 139 10 0 12 17 0
Adj No. of Lanes 131131111110
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 142 2966 924 294 3508 1092 281 310 264 287 310 0
Arrive On Green 0.02 0.58 0.58 0.13 0.69 0.69 0.17 0.17 0.00 0.17 0.17 0.00
Sat Flow, veh/h 1774 5085 1583 1774 5085 1583 1390 1863 1583 1399 1863 0
Grp Volume(v), veh/h 11 2666 155 263 2496 42 139 10 0 12 17 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1774 1695 1583 1390 1863 1583 1399 1863 0
Q Serve(g_s), s 0.3 55.1 5.4 12.6 35.9 1.0 11.2 0.5 0.0 0.9 0.9 0.0
Cycle Q Clear(g_c), s 0.3 55.1 5.4 12.6 35.9 1.0 12.1 0.5 0.0 1.4 0.9 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 142 2966 924 294 3508 1092 281 310 264 287 310 0
V/C Ratio(X) 0.08 0.90 0.17 0.90 0.71 0.04 0.49 0.03 0.00 0.04 0.05 0.00
Avail Cap(c_a), veh/h 183 2966 924 294 3508 1092 281 310 264 287 310 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 12.0 21.9 11.5 40.4 11.3 5.9 47.2 41.9 0.0 42.5 42.1 0.0
Incr Delay (d2), s/veh 0.2 4.9 0.4 27.8 1.3 0.1 6.1 0.2 0.0 0.3 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 26.8 2.5 10.8 17.0 0.5 4.8 0.3 0.0 0.4 0.5 0.0
LnGrp Delay(d),s/veh 12.2 26.8 11.9 68.1 12.6 6.0 53.3 42.1 0.0 42.8 42.4 0.0
LnGrp LOS B C BEBADD DD
Approach Vol, veh/h 2832 2801 149 29
Approach Delay, s/veh 25.9 17.7 52.5 42.5
Approach LOS C B D D
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 18.0 77.0 25.0 5.2 89.8 25.0
Change Period (Y+Rc), s 4.0 8.0 6.0 4.0 8.0 6.0
Max Green Setting (Gmax), s 14.0 69.0 19.0 4.0 79.0 19.0
Max Q Clear Time (g_c+I1), s 14.6 57.1 3.4 2.3 37.9 14.1
Green Ext Time (p_c), s 0.0 11.9 0.4 0.0 40.6 0.2
Intersection Summary
HCM 2010 Ctrl Delay 22.7
HCM 2010 LOS C
Timing Report, Sorted By Phase Short Total PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/26/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None C-Max Max None C-Max Max
Maximum Split (s) 18 77 25 8 87 25
Maximum Split (%) 15.0% 64.2% 20.8% 6.7% 72.5% 20.8%
Minimum Split (s) 8 24 10 8 24 10
Yellow Time (s) 354354
All-Red Time (s) 132132
Minimum Initial (s) 442442
Vehicle Extension (s) 333333
Minimum Gap (s) 333333
Time Before Reduce (s) 000000
Time To Reduce (s) 000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s) 77 95 52 77 85 52
End Time (s) 95 52 77 85 52 77
Yield/Force Off (s) 91 44 71 81 44 71
Yield/Force Off 170(s) 91 33 71 81 33 71
Local Start Time (s) 102 0 77 102 110 77
Local Yield (s) 116 69 96 106 69 96
Local Yield 170(s) 116 58 96 106 58 96
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 80
Offset: 95 (79%), Referenced to phase 2:EBTL and 6:WBTL, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 TWSC Short Total AM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 7.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 80 0 15 26 0 111 4 149 37 138 61 20
Future Vol, veh/h 80 0 15 26 0 111 4 149 37 138 61 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 200 - 150 200 - 200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 94 0 18 31 0 131 5 175 44 162 72 24
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 646 581 72 590 581 175 72 0 0 175 0 0
Stage 1 396 396 - 185 185 - - - - - - -
Stage 2 250 185 - 405 396 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 385 425 990 419 425 868 1528 - - 1401 - -
Stage 1 629 604 - 817 747 - - - - - - -
Stage 2 754 747 - 622 604 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 297 375 990 374 375 868 1528 - - 1401 - -
Mov Cap-2 Maneuver 297 375 - 374 375 - - - - - - -
Stage 1 627 534 - 814 745 - - - - - - -
Stage 2 638 745 - 540 534 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 21.1 11.7 0.2 5
HCM LOS C B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1528 - - 334 694 1401 - -
HCM Lane V/C Ratio 0.003 - - 0.335 0.232 0.116 - -
HCM Control Delay (s) 7.4 - - 21.1 11.7 7.9 - -
HCM Lane LOS A - - C B A - -
HCM 95th %tile Q(veh) 0 - - 1.4 0.9 0.4 - -
Lanes and Geometrics Short Total AM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 200 150 200 200
Storage Lanes 0 0 0 0 1 1 1 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.978 0.891 0.850 0.850
Flt Protected 0.960 0.991 0.950 0.950
Satd. Flow (prot) 0 1749 0 0 1645 0 1770 1863 1583 1770 1863 1583
Flt Permitted 0.960 0.991 0.950 0.950
Satd. Flow (perm) 0 1749 0 0 1645 0 1770 1863 1583 1770 1863 1583
Link Speed (mph) 35 35 35 35
Link Distance (ft) 412 566 644 657
Travel Time (s) 8.0 11.0 12.5 12.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 7.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 42 0 8 32 0 193 15 60 48 247 183 78
Future Vol, veh/h 42 0 8 32 0 193 15 60 48 247 183 78
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 200 - 150 200 - 200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 49 0 9 38 0 227 18 71 56 291 215 92
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1015 902 215 907 902 71 215 0 0 71 0 0
Stage 1 796 796 - 106 106 - - - - - - -
Stage 2 219 106 - 801 796 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 217 277 825 257 277 991 1355 - - 1529 - -
Stage 1 380 399 - 900 807 - - - - - - -
Stage 2 783 807 - 378 399 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 141 221 825 215 221 991 1355 - - 1529 - -
Mov Cap-2 Maneuver 141 221 - 215 221 - - - - - - -
Stage 1 375 323 - 888 796 - - - - - - -
Stage 2 596 796 - 303 323 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 39.1 14.2 0.9 3.8
HCM LOS E B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 1355 - - 163 655 1529 - -
HCM Lane V/C Ratio 0.013 - - 0.361 0.404 0.19 - -
HCM Control Delay (s) 7.7 - - 39.1 14.2 7.9 - -
HCM Lane LOS A - - E B A - -
HCM 95th %tile Q(veh) 0 - - 1.5 2 0.7 - -
Lanes and Geometrics Short Total PM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 200 150 200 200
Storage Lanes 0 0 0 0 1 1 1 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.979 0.884 0.850 0.850
Flt Protected 0.959 0.993 0.950 0.950
Satd. Flow (prot) 0 1749 0 0 1635 0 1770 1863 1583 1770 1863 1583
Flt Permitted 0.959 0.993 0.950 0.950
Satd. Flow (perm) 0 1749 0 0 1635 0 1770 1863 1583 1770 1863 1583
Link Speed (mph) 35 35 35 35
Link Distance (ft) 412 566 644 657
Travel Time (s) 8.0 11.0 12.5 12.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
9: Strauss Cabin Road & South Access
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 1.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 34 14 4 156 94 8
Future Vol, veh/h 34 14 4 156 94 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 200 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 40 16 5 184 111 9
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 308 115 120 0 - 0
Stage 1 115 - - - - -
Stage 2 193 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 684 937 1468 - - -
Stage 1 910 - - - - -
Stage 2 840 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 682 937 1468 - - -
Mov Cap-2 Maneuver 682 - - - - -
Stage 1 910 - - - - -
Stage 2 837 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.3 0.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1468 - 741 - -
HCM Lane V/C Ratio 0.003 - 0.076 - -
HCM Control Delay (s) 7.5 - 10.3 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.2 - -
Lanes and Geometrics Short Total AM
9: Strauss Cabin Road & South Access
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 200 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.961 0.990
Flt Protected 0.966 0.950
Satd. Flow (prot) 1729 0 1770 1863 1844 0
Flt Permitted 0.966 0.950
Satd. Flow (perm) 1729 0 1770 1863 1844 0
Link Speed (mph) 35 35 35
Link Distance (ft) 410 4040 644
Travel Time (s) 8.0 78.7 12.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
9: Strauss Cabin Road & South Access
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 7 13 105 189 34
Future Vol, veh/h 18 7 13 105 189 34
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - 200 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 21 8 15 124 222 40
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 396 242 262 0 - 0
Stage 1 242 - - - - -
Stage 2 154 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 609 797 1302 - - -
Stage 1 798 - - - - -
Stage 2 874 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 602 797 1302 - - -
Mov Cap-2 Maneuver 602 - - - - -
Stage 1 798 - - - - -
Stage 2 864 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.8 0.9 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1302 - 646 - -
HCM Lane V/C Ratio 0.012 - 0.046 - -
HCM Control Delay (s) 7.8 - 10.8 - -
HCM Lane LOS A - B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
Lanes and Geometrics Short Total PM
9: Strauss Cabin Road & South Access
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12
Grade (%) 0% 0% 0%
Storage Length (ft) 0 0 200 0
Storage Lanes 1 0 1 0
Taper Length (ft) 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.963 0.979
Flt Protected 0.965 0.950
Satd. Flow (prot) 1731 0 1770 1863 1824 0
Flt Permitted 0.965 0.950
Satd. Flow (perm) 1731 0 1770 1863 1824 0
Link Speed (mph) 35 35 35
Link Distance (ft) 410 4040 644
Travel Time (s) 8.0 78.7 12.5
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 54 352 3 0 458 127 4 2 4 64 1 49
Future Vol, veh/h 54 352 3 0 458 127 4 2 4 64 1 49
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - 150 - - - - - 150
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 64 414 4 0 539 149 5 2 5 75 1 58
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 539 0 0 418 0 0 1082 1082 416 1085 1084 539
Stage 1 - - - - - - 543 543 - 539 539 -
Stage 2 - - - - - - 539 539 - 546 545 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1029 - - 1141 - - 195 217 637 194 217 542
Stage 1 - - - - - - 524 520 - 527 522 -
Stage 2 - - - - - - 527 522 - 522 519 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1029 - - 1141 - - 165 204 637 182 204 542
Mov Cap-2 Maneuver - - - - - - 165 204 - 182 204 -
Stage 1 - - - - - - 491 488 - 494 522 -
Stage 2 - - - - - - 470 522 - 484 487 -
Approach EB WB NB SB
HCM Control Delay, s 1.2 0 20.2 27.2
HCM LOS C D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 248 1029 - - 1141 - - 182 542
HCM Lane V/C Ratio 0.047 0.062 ----- 0.42 0.106
HCM Control Delay (s) 20.2 8.7 - - 0 - - 38.4 12.4
HCM Lane LOS C A - - A - - E B
HCM 95th %tile Q(veh) 0.1 0.2 - - 0 - - 1.9 0.4
Lanes and Geometrics Short Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 1 0 1 1 0 0 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.850 0.944 0.850
Flt Protected 0.950 0.980 0.953
Satd. Flow (prot) 1770 1861 0 1863 1863 1583 0 1723 0 0 1775 1583
Flt Permitted 0.950 0.980 0.953
Satd. Flow (perm) 1770 1861 0 1863 1863 1583 0 1723 0 0 1775 1583
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4040
Travel Time (s) 12.7 11.8 7.0 91.8
Intersection Summary
Area Type: Other
HCM 2010 TWSC Short Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Intersection
Int Delay, s/veh 12
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 59 515 9 2 578 83 1 2 3 120 4 65
Future Vol, veh/h 59 515 9 2 578 83 1 2 3 120 4 65
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - 150 - - - - - 150
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 61 536 9 2 602 86 1 2 3 125 4 68
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 602 0 0 546 0 0 1272 1270 541 1273 1275 602
Stage 1 - - - - - - 664 664 - 606 606 -
Stage 2 - - - - - - 608 606 - 667 669 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 975 - - 1023 - - 144 168 541 144 167 500
Stage 1 - - - - - - 450 458 - 484 487 -
Stage 2 - - - - - - 483 487 - 448 456 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 975 - - 1023 - - 116 157 541 135 156 500
Mov Cap-2 Maneuver - - - - - - 116 157 - 135 156 -
Stage 1 - - - - - - 422 429 - 454 486 -
Stage 2 - - - - - - 413 486 - 416 427 -
Approach EB WB NB SB
HCM Control Delay, s 0.9 0 21.6 88
HCM LOS C F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2
Capacity (veh/h) 223 975 - - 1023 - - 136 500
HCM Lane V/C Ratio 0.028 0.063 - - 0.002 - - 0.95 0.135
HCM Control Delay (s) 21.6 8.9 - - 8.5 - - 127.1 13.3
HCM Lane LOS C A - - A - - F B
HCM 95th %tile Q(veh) 0.1 0.2 - - 0 - - 6.5 0.5
Lanes and Geometrics Short Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 1 0 1 1 0 0 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.850 0.932 0.850
Flt Protected 0.950 0.950 0.992 0.954
Satd. Flow (prot) 1770 1859 0 1770 1863 1583 0 1722 0 0 1777 1583
Flt Permitted 0.950 0.950 0.992 0.954
Satd. Flow (perm) 1770 1859 0 1770 1863 1583 0 1722 0 0 1777 1583
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4040
Travel Time (s) 12.7 11.8 7.0 91.8
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Short Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Intersection
Intersection Delay, s/veh 11.2
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 482 688 12 134
Demand Flow Rate, veh/h 491 702 12 136
Vehicles Circulating, veh/h 77 72 563 555
Vehicles Exiting, veh/h 614 503 5 219
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.9 13.5 5.8 8.2
Approach LOS ABAA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 491 702 12 136
Cap Entry Lane, veh/h 1046 1051 644 649
Entry HV Adj Factor 0.981 0.980 0.997 0.985
Flow Entry, veh/h 482 688 12 134
Cap Entry, veh/h 1026 1031 641 639
V/C Ratio 0.469 0.668 0.019 0.210
Control Delay, s/veh 8.9 13.5 5.8 8.2
LOSABAA
95th %tile Queue, veh 3501
Lanes and Geometrics Short Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st am rndabt.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.999 0.971 0.944 0.942
Flt Protected 0.993 0.980 0.973
Satd. Flow (prot) 0 1848 0 0 1809 0 0 1723 0 0 1707 0
Flt Permitted 0.993 0.980 0.973
Satd. Flow (perm) 0 1848 0 0 1809 0 0 1723 0 0 1707 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4040
Travel Time (s) 12.7 11.8 7.0 91.8
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Short Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Intersection
Intersection Delay, s/veh 12.8
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 606 690 6 197
Demand Flow Rate, veh/h 618 704 6 201
Vehicles Circulating, veh/h 133 65 736 617
Vehicles Exiting, veh/h 684 677 15 152
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 12.8 13.4 6.8 10.6
Approach LOS BBAB
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 618 704 6 201
Cap Entry Lane, veh/h 989 1059 541 610
Entry HV Adj Factor 0.981 0.980 0.993 0.980
Flow Entry, veh/h 606 690 6 197
Cap Entry, veh/h 970 1038 538 597
V/C Ratio 0.625 0.665 0.011 0.330
Control Delay, s/veh 12.8 13.4 6.8 10.6
LOSBBAB
95th %tile Queue, veh 5501
Lanes and Geometrics Short Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates st pm rndabt.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 150 0 150 150 0 0 0 150
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.998 0.983 0.932 0.953
Flt Protected 0.995 0.992 0.969
Satd. Flow (prot) 0 1850 0 0 1831 0 0 1722 0 0 1720 0
Flt Permitted 0.995 0.992 0.969
Satd. Flow (perm) 0 1850 0 0 1831 0 0 1722 0 0 1720 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4040
Travel Time (s) 12.7 11.8 7.0 91.8
Intersection Summary
Area Type: Other
APPENDIX H
HCM 2010 Signalized Intersection Summary Long Total AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 35 2110 270 300 2445 125 170 25 260 235 80 60
Future Volume (veh/h) 35 2110 270 300 2445 125 170 25 260 235 80 60
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 37 2221 227 316 2574 106 179 26 0 247 84 0
Adj No. of Lanes 131231211211
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 222222222222
Cap, veh/h 63 2709 967 402 3123 1129 268 130 111 340 169 130
Arrive On Green 0.04 0.53 0.53 0.12 0.61 0.61 0.08 0.07 0.00 0.10 0.09 0.00
Sat Flow, veh/h 1774 5085 1583 3442 5085 1583 3442 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 37 2221 227 316 2574 106 179 26 0 247 84 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1721 1695 1583 1721 1863 1583 1721 1863 1583
Q Serve(g_s), s 2.3 39.9 7.2 9.8 43.5 2.3 5.6 1.4 0.0 7.7 4.7 0.0
Cycle Q Clear(g_c), s 2.3 39.9 7.2 9.8 43.5 2.3 5.6 1.4 0.0 7.7 4.7 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 63 2709 967 402 3123 1129 268 130 111 340 169 130
V/C Ratio(X) 0.59 0.82 0.23 0.79 0.82 0.09 0.67 0.20 0.00 0.73 0.50 0.00
Avail Cap(c_a), veh/h 81 2709 967 407 3123 1129 282 130 111 407 169 130
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 52.3 21.3 9.7 47.2 16.6 4.9 49.3 48.2 0.0 48.1 47.6 0.0
Incr Delay (d2), s/veh 8.6 2.9 0.6 9.7 2.6 0.2 5.6 3.4 0.0 5.2 10.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 19.2 3.3 5.2 21.0 1.0 2.9 0.9 0.0 3.9 2.9 0.0
LnGrp Delay(d),s/veh 60.8 24.2 10.3 57.0 19.2 5.0 54.9 51.6 0.0 53.4 57.6 0.0
LnGrp LOS E C BEBADD DE
Approach Vol, veh/h 2485 2996 205 331
Approach Delay, s/veh 23.5 22.7 54.5 54.4
Approach LOS CCDD
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 17.8 65.6 11.6 15.0 8.9 74.6 13.9 12.7
Change Period (Y+Rc), s 6.0 8.0 4.0 6.0 6.0 8.0 4.0 6.0
Max Green Setting (Gmax), s 12.0 57.0 8.0 9.0 4.0 65.0 12.0 5.0
Max Q Clear Time (g_c+I1), s 11.8 41.9 7.6 6.7 4.3 45.5 9.7 3.4
Green Ext Time (p_c), s 0.0 15.0 0.0 0.1 0.0 19.3 0.2 0.1
Intersection Summary
HCM 2010 Ctrl Delay 25.9
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Total AM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Phase Number 12345678
Movement WBL EBT NBL SBT EBL WBT SBL NBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None C-Max None Max None C-Max None Max
Maximum Split (s) 18 65 12 15 10 73 16 11
Maximum Split (%) 16.4% 59.1% 10.9% 13.6% 9.1% 66.4% 14.5% 10.0%
Minimum Split (s) 10 24 8 10 10 24 8 10
Yellow Time (s) 45344534
All-Red Time (s) 23122312
Minimum Initial (s) 44424442
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 92 0 65 77 92 102 65 81
End Time (s) 0 65 77 92 102 65 81 92
Yield/Force Off (s) 104 57 73 86 96 57 77 86
Yield/Force Off 170(s) 104 46 73 86 96 46 77 86
Local Start Time (s) 92 0 65 77 92 102 65 81
Local Yield (s) 104 57 73 86 96 57 77 86
Local Yield 170(s) 104 46 73 86 96 46 77 86
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 Signalized Intersection Summary Long Total PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 70 2860 275 260 2585 270 295 80 310 185 40 45
Future Volume (veh/h) 70 2860 275 260 2585 270 295 80 310 185 40 45
Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863
Adj Flow Rate, veh/h 71 2918 235 265 2638 229 301 82 0 189 41 0
Adj No. of Lanes 131231211211
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 222222222222
Cap, veh/h 103 3030 1102 301 3178 1114 344 133 113 271 93 66
Arrive On Green 0.06 0.60 0.60 0.09 0.63 0.63 0.10 0.07 0.00 0.08 0.05 0.00
Sat Flow, veh/h 1774 5085 1583 3442 5085 1583 3442 1863 1583 3442 1863 1583
Grp Volume(v), veh/h 71 2918 235 265 2638 229 301 82 0 189 41 0
Grp Sat Flow(s),veh/h/ln 1774 1695 1583 1721 1695 1583 1721 1863 1583 1721 1863 1583
Q Serve(g_s), s 4.7 65.3 6.4 9.1 48.5 6.0 10.4 5.1 0.0 6.4 2.6 0.0
Cycle Q Clear(g_c), s 4.7 65.3 6.4 9.1 48.5 6.0 10.4 5.1 0.0 6.4 2.6 0.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 103 3030 1102 301 3178 1114 344 133 113 271 93 66
V/C Ratio(X) 0.69 0.96 0.21 0.88 0.83 0.21 0.87 0.62 0.00 0.70 0.44 0.00
Avail Cap(c_a), veh/h 103 3030 1102 301 3178 1114 344 133 113 287 93 66
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 55.4 23.0 6.5 54.1 17.5 6.2 53.3 54.1 0.0 53.9 55.4 0.0
Incr Delay (d2), s/veh 17.2 9.8 0.4 24.5 2.7 0.4 21.3 19.6 0.0 6.8 14.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.8 33.0 2.9 5.4 23.3 2.7 6.0 3.4 0.0 3.3 1.7 0.0
LnGrp Delay(d),s/veh 72.6 32.8 7.0 78.6 20.2 6.6 74.5 73.8 0.0 60.7 69.7 0.0
LnGrp LOS E C A E C A E E E E
Approach Vol, veh/h 3224 3132 383 230
Approach Delay, s/veh 31.8 24.1 74.4 62.3
Approach LOS C C E E
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.5 78.5 15.0 11.0 12.0 82.0 12.4 13.6
Change Period (Y+Rc), s 6.0 8.0 4.0 6.0 6.0 8.0 4.0 6.0
Max Green Setting (Gmax), s 9.5 70.5 11.0 5.0 6.0 74.0 9.0 7.0
Max Q Clear Time (g_c+I1), s 11.1 67.3 12.4 4.6 6.7 50.5 8.4 7.1
Green Ext Time (p_c), s 0.0 3.2 0.0 0.0 0.0 23.4 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 31.7
HCM 2010 LOS C
Timing Report, Sorted By Phase Long Total PM
3: Strauss Cabin Road & Harmony Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Phase Number 12345678
Movement WBL EBT NBL SBT EBL WBT SBL NBT
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None C-Max None Max None C-Max None Max
Maximum Split (s) 15.5 78.5 15 11 12 82 13 13
Maximum Split (%) 12.9% 65.4% 12.5% 9.2% 10.0% 68.3% 10.8% 10.8%
Minimum Split (s) 10 24 8 10 10 24 8 10
Yellow Time (s) 453445 3.54
All-Red Time (s) 231223 0.52
Minimum Initial (s) 44424442
Vehicle Extension (s) 33333333
Minimum Gap (s) 33333333
Time Before Reduce (s) 00000000
Time To Reduce (s) 00000000
Walk Time (s) 5 5
Flash Dont Walk (s) 11 11
Dual Entry No Yes No Yes No Yes No Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s) 104.5 0 78.5 93.5 104.5 116.5 78.5 91.5
End Time (s) 0 78.5 93.5 104.5 116.5 78.5 91.5 104.5
Yield/Force Off (s) 114 70.5 89.5 98.5 110.5 70.5 87.5 98.5
Yield/Force Off 170(s) 114 59.5 89.5 98.5 110.5 59.5 87.5 98.5
Local Start Time (s) 104.5 0 78.5 93.5 104.5 116.5 78.5 91.5
Local Yield (s) 114 70.5 89.5 98.5 110.5 70.5 87.5 98.5
Local Yield 170(s) 114 59.5 89.5 98.5 110.5 59.5 87.5 98.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 90
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBT, Start of Green
Splits and Phases: 3: Strauss Cabin Road & Harmony Road
HCM 2010 TWSC Long Total AM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Intersection
Int Delay, s/veh 1.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 15 0 0 120 0 335 45 0 630 20
Future Vol, veh/h 0 0 15 0 0 120 0 335 45 0 630 20
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - 150 - - 200
Veh in Median Storage, # - 0 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 16 0 0 126 0 353 47 0 663 21
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All - - 332 - - 353 - 0 0 - - 0
Stage 1 - - - - - - - - - - - -
Stage 2 - - - - - - - - - - - -
Critical Hdwy - - 6.93 - - 6.23 - - - - - -
Critical Hdwy Stg 1 - - - - - - - - - - - -
Critical Hdwy Stg 2 - - - - - - - - - - - -
Follow-up Hdwy - - 3.319 - - 3.319 - - - - - -
Pot Cap-1 Maneuver 0 0 665 0 0 690 0 - - 0 - -
Stage 1 0 0 - 0 0 - 0 - - 0 - -
Stage 2 0 0 - 0 0 - 0 - - 0 - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver - - 665 - - 690 - - - - - -
Mov Cap-2 Maneuver - - - - - - - - - - - -
Stage 1 - - - - - - - - - - - -
Stage 2 - - - - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.5 11.4 0 0
HCM LOS B B
Minor Lane/Major Mvmt NBT NBR EBLn1WBLn1 SBT SBR
Capacity (veh/h) - - 665 690 - -
HCM Lane V/C Ratio - - 0.024 0.183 - -
HCM Control Delay (s) - - 10.5 11.4 - -
HCM Lane LOS - - B B - -
HCM 95th %tile Q(veh) - - 0.1 0.7 - -
Lanes and Geometrics Long Total AM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 150 0 200
Storage Lanes 0 1 0 1 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00
Ped Bike Factor
Frt 0.865 0.865 0.850 0.850
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1863 1583 0 3539 1583
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1863 1583 0 3539 1583
Link Speed (mph) 35 35 35 35
Link Distance (ft) 327 305 648 647
Travel Time (s) 6.4 5.9 12.6 12.6
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 10 0 0 250 0 475 50 0 495 80
Future Vol, veh/h 0 0 10 0 0 250 0 475 50 0 495 80
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 0 - - 0 - - 150 - - 200
Veh in Median Storage, # - 0 - - 1 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 11 0 0 263 0 500 53 0 521 84
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All - - 261 - - 500 - 0 0 - - 0
Stage 1 - - - - - - - - - - - -
Stage 2 - - - - - - - - - - - -
Critical Hdwy - - 6.93 - - 6.23 - - - - - -
Critical Hdwy Stg 1 - - - - - - - - - - - -
Critical Hdwy Stg 2 - - - - - - - - - - - -
Follow-up Hdwy - - 3.319 - - 3.319 - - - - - -
Pot Cap-1 Maneuver 0 0 738 0 0 570 0 - - 0 - -
Stage 1 0 0 - 0 0 - 0 - - 0 - -
Stage 2 0 0 - 0 0 - 0 - - 0 - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver - - 738 - - 570 - - - - - -
Mov Cap-2 Maneuver - - - - - - - - - - - -
Stage 1 - - - - - - - - - - - -
Stage 2 - - - - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.9 16.6 0 0
HCM LOS A C
Minor Lane/Major Mvmt NBT NBR EBLn1WBLn1 SBT SBR
Capacity (veh/h) - - 738 570 - -
HCM Lane V/C Ratio - - 0.014 0.462 - -
HCM Control Delay (s) - - 9.9 16.6 - -
HCM Lane LOS - - A C - -
HCM 95th %tile Q(veh) - - 0 2.4 - -
Lanes and Geometrics Long Total PM
6: Strauss Cabin Road & North Access/Hacienda
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 150 0 200
Storage Lanes 0 1 0 1 0 1 0 1
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00
Ped Bike Factor
Frt 0.865 0.865 0.850 0.850
Flt Protected
Satd. Flow (prot) 0 0 1611 0 0 1611 0 1863 1583 0 3539 1583
Flt Permitted
Satd. Flow (perm) 0 0 1611 0 0 1611 0 1863 1583 0 3539 1583
Link Speed (mph) 30 30 35 30
Link Distance (ft) 284 305 648 647
Travel Time (s) 6.5 6.9 12.6 14.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total AM
8: Strauss Cabin Road & South Access/Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Intersection
Int Delay, s/veh 38
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 115 0 15 35 0 25 10 240 30 375 260 0
Future Vol, veh/h 115 0 15 35 0 25 10 240 30 375 260 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - 100 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 121 0 16 37 0 26 11 253 32 395 274 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1352 1368 274 1360 1352 268 274 0 0 284 0 0
Stage 1 1063 1063 - 289 289 - - - - - - -
Stage 2 289 305 - 1071 1063 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 127 147 765 126 150 771 1289 - - 1278 - -
Stage 1 270 300 - 719 673 - - - - - - -
Stage 2 719 662 - 267 300 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 93 101 765 93 103 771 1289 - - 1278 - -
Mov Cap-2 Maneuver ~ 93 101 - 93 103 - - - - - - -
Stage 1 268 207 - 713 667 - - - - - - -
Stage 2 689 656 - 181 207 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 276.2 43.2 0.3 5.4
HCM LOS F E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1289 - - 103 93 771 1278 - -
HCM Lane V/C Ratio 0.008 - - 1.329 0.396 0.034 0.309 - -
HCM Control Delay (s) 7.8 - - 276.2 67.1 9.8 9.1 - -
HCM Lane LOS A - - F F A A - -
HCM 95th %tile Q(veh) 0 - - 9.6 1.6 0.1 1.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
Lanes and Geometrics Long Total AM
8: Strauss Cabin Road & South Access/Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 100 200 0 200 0
Storage Lanes 0 0 0 1 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.984 0.850 0.983
Flt Protected 0.958 0.950 0.950 0.950
Satd. Flow (prot) 0 1756 0 0 1770 1583 1770 1831 0 1770 1863 0
Flt Permitted 0.958 0.950 0.950 0.950
Satd. Flow (perm) 0 1756 0 0 1770 1583 1770 1831 0 1770 1863 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 323 317 4046 648
Travel Time (s) 7.3 7.2 78.8 14.7
Intersection Summary
Area Type: Other
HCM 2010 TWSC Long Total PM
8: Strauss Cabin Road & South Access/Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Intersection
Int Delay, s/veh 13.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 60 0 5 85 0 160 30 265 5 290 180 35
Future Vol, veh/h 60 0 5 85 0 160 30 265 5 290 180 35
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - 100 200 - - 200 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 63 0 5 89 0 168 32 279 5 305 189 37
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1163 1165 208 1166 1182 282 226 0 0 284 0 0
Stage 1 818 818 - 345 345 - - - - - - -
Stage 2 345 347 - 821 837 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 172 194 832 171 190 757 1342 - - 1278 - -
Stage 1 370 390 - 671 636 - - - - - - -
Stage 2 671 635 - 369 382 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 107 144 832 136 141 757 1342 - - 1278 - -
Mov Cap-2 Maneuver 107 144 - 136 141 - - - - - - -
Stage 1 361 297 - 655 621 - - - - - - -
Stage 2 509 620 - 279 291 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 74.3 32.2 0.8 5
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1342 - - 115 136 757 1278 - -
HCM Lane V/C Ratio 0.024 - - 0.595 0.658 0.222 0.239 - -
HCM Control Delay (s) 7.7 - - 74.3 71.8 11.1 8.7 - -
HCM Lane LOS A - - F F B A - -
HCM 95th %tile Q(veh) 0.1 - - 2.9 3.6 0.8 0.9 - -
Lanes and Geometrics Long Total PM
8: Strauss Cabin Road & South Access/Access A
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 100 200 0 200 0
Storage Lanes 0 0 0 1 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.990 0.850 0.997 0.975
Flt Protected 0.956 0.950 0.950 0.950
Satd. Flow (prot) 0 1763 0 0 1770 1583 1770 1857 0 1770 1816 0
Flt Permitted 0.956 0.950 0.950 0.950
Satd. Flow (perm) 0 1763 0 0 1770 1583 1770 1857 0 1770 1816 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 325 317 4046 648
Travel Time (s) 7.4 7.2 78.8 14.7
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Long Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Intersection
Intersection Delay, s/veh 18.7
Intersection LOS C
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 589 763 94 211
Demand Flow Rate, veh/h 601 778 97 215
Vehicles Circulating, veh/h 145 215 692 612
Vehicles Exiting, veh/h 682 574 54 381
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 12.6 26.7 8.7 11.0
Approach LOS B D A B
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 601 778 97 215
Cap Entry Lane, veh/h 977 911 566 613
Entry HV Adj Factor 0.979 0.981 0.974 0.980
Flow Entry, veh/h 589 763 94 211
Cap Entry, veh/h 957 894 551 600
V/C Ratio 0.615 0.854 0.171 0.351
Control Delay, s/veh 12.6 26.7 8.7 11.0
LOS B D A B
95th %tile Queue, veh 4 11 1 2
Lanes and Geometrics Long Total AM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt am rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.994 0.964 0.963 0.949
Flt Protected 0.988 0.999 0.978 0.973
Satd. Flow (prot) 0 1829 0 0 1794 0 0 1754 0 0 1720 0
Flt Permitted 0.988 0.999 0.978 0.973
Satd. Flow (perm) 0 1829 0 0 1794 0 0 1754 0 0 1720 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4046
Travel Time (s) 12.7 11.8 7.0 92.0
Intersection Summary
Area Type: Other
HCM 2010 Roundabout Long Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Intersection
Intersection Delay, s/veh 27.2
Intersection LOS D
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 747 863 64 343
Demand Flow Rate, veh/h 762 881 65 351
Vehicles Circulating, veh/h 243 135 897 758
Vehicles Exiting, veh/h 866 827 108 258
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 27.9 29.6 10.0 22.9
Approach LOS D D A C
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 762 881 65 351
Cap Entry Lane, veh/h 886 987 461 529
Entry HV Adj Factor 0.980 0.980 0.980 0.978
Flow Entry, veh/h 747 863 64 343
Cap Entry, veh/h 868 967 451 518
V/C Ratio 0.860 0.892 0.141 0.663
Control Delay, s/veh 27.9 29.6 10.0 22.9
LOS D D A C
95th %tile Queue, veh 11 13 0 5
Lanes and Geometrics Long Total PM
14: Strauss Cabin Road & Kechter Road
Harmony/I-25 Project 9/16/2016 Synchro 9 Light Report
Delich Associates lt pm rndabt synchro 9.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Width (ft) 12 12 12 12 12 12 12 12 12 12 12 12
Grade (%) 0% 0% 0% 0%
Storage Length (ft) 0 0 0 0 0 0 0 0
Storage Lanes 0 0 0 0 0 0 0 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor
Frt 0.992 0.976 0.966 0.948
Flt Protected 0.994 0.998 0.976 0.975
Satd. Flow (prot) 0 1837 0 0 1814 0 0 1756 0 0 1722 0
Flt Permitted 0.994 0.998 0.976 0.975
Satd. Flow (perm) 0 1837 0 0 1814 0 0 1756 0 0 1722 0
Link Speed (mph) 30 30 35 30
Link Distance (ft) 560 520 360 4046
Travel Time (s) 12.7 11.8 7.0 92.0
Intersection Summary
Area Type: Other
APPENDIX I
Harmony
Strauss Cabin
Rock Creek
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Pedestrian LOS Worksheet
Project Location Classification: Commercial Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Commercial area to the
east of the site Commercial
Minimum B B C B B
1 Actual A E B C D
Proposed A B B B B
Residential area to the
southwest of the site Residential
Minimum B B C B B
2 Actual A E A C D
Proposed A B A B B
Commercial area to the
west of the site Commercial
Minimum B B C B B
3 Actual A E A C C
Proposed A B A B B
Minimum
4 Actual
Proposed
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Harmony
Strauss Cabin
Rock Creek
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Harmony 23 TIS, September 2016
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Commercial area to the
1 west of the site Commercial C B B
2
3
4
400
500
600
SB LT/T/RT AM 175 VPH
AM 1275 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 310 VPH
PM 1505 VPH
400
500
600
SB LT/T/RT AM 114 VPH
AM 994 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 189 VPH
PM 1246 VPH
400
500
600
SB LT/T/RT AM 92 VPH
AM 988 VPH
1 LANE & 1 LANE
2 OR MORE LANES & 1 LANE
2 OR MORE LANES & 2 OR MORE LANES
*100
*150
SB LT/T/RT PM 178 VPH
PM 1225 VPH