Loading...
HomeMy WebLinkAboutHARMONY 23 - PDP - PDP160031 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTProject Development Plan (PDP) Preliminary Drainage Report for Harmony 23 submitted to: City of Fort Collins, Colorado September 28, 2016 760 Whalers Way Bldg C, Suite 200 Fort Collins, CO 80525 970.226.0557 main 303.595.9103 metro 970.226.0204 fax ideas@tstinc.com www.tstinc.com September 28, 2016 Mr. Shane Boyle, P.E., CFM City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: Project Development Plan (PDP) for H23 Project No. 1219.0002.00 Dear Mr. Boyle: We are pleased to submit this Preliminary Drainage Report for H23. This report analyzes the developed stormwater runoff from the project and provides stormwater infrastructure and water quality management for runoff. This report has been prepared based on the City of Fort Collins Stormwater Criteria Manual and complies with the PDP submittal requirements for a final drainage report. Respectfully, TST, INC. CONSULTING ENGINEERS Derek A. Patterson, P.E. Jon Sweet, P.E. DAP/JFS/jrm Harmony 23 Preliminary Drainage Report TABLE OF CONTENTS Page 1.0 Introduction 1.1 Scope and Purpose ..................................................................................................... 1 1.2 Project Location and Description ................................................................................. 1 1.3 Previous Studies ......................................................................................................... 3 1.4 Limitations of Future Projections ................................................................................. 3 2.0 Historic/Existing Conditions ......................................................................................... 3 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis ....................................................................... 6 3.2 Drainage Plan Development ....................................................................................... 7 3.2.1 Street Capacity ................................................................................................... 8 3.2.2 Inlet Design ........................................................................................................ 9 3.2.3 Storm Sewer Design .......................................................................................... 9 3.2.4 Channel Design .................................................................................................. 9 3.2.5 Riprap Design ..................................................................................................... 9 3.2.6 Detention Pond Design .................................................................................... 10 3.3 Low Impact Development .......................................................................................... 12 3.4 Floodplain Management ............................................................................................ 14 4.0 Conclusion ....................................................................................................................... 14 5.0 References ....................................................................................................................... 16 Figures Figure 1. Vicinity Map ................................................................................................................... 2 Figure 2. Outfall to the Poudre River ............................................................................................ 5 Figure 3. Four-Step Process for Stormwater Quality Management ............................................ 12 Appendices Appendix A: Rational Method Hydrologic Analysis Appendix B: Street Capacity and Inlet Analysis Appendix C: Storm Sewer Design Appendix D: Channel Design Appendix E: Riprap Design Appendix F: Detention Pond Design Appendix G: FIRM Maps and Original Floodplain Workmap Harmony 23 Preliminary Drainage Report Page 1 1.0 Introduction 1.1 Scope and Purpose This report presents the results of a preliminary drainage analysis for the H23 project. This report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual requirements and complies with Project Development Plan (PDP) submittal requirements. 1.2 Project Location and Description The H23 project is a multifamily development situated on approximately 25 acres. The project is located in the northeast corner of Section 4, Township 6 North, Range 68 West, more specifically at the southwest corner of the intersection of Harmony Road and Strauss Cabin Road. The site is generally bounded by the following roadways: Strauss Cabin Road on the east, Harmony Road on the north, and the Fossil Creek Reservoir Inlet Ditch (FCRID) along the south and west. Surrounding properties include: The Arapaho Bend Natural Area on the north side of Harmony Road, the Harmony & Strauss Cabin Convenience Shopping Center Subdivision (development recently approved) to the east of Strauss Cabin Road, Brookfield Subdivision to the southwest, and undeveloped land to the west. The Boxelder Ditch cuts through the site starting north at Harmony Road and running south through the middle of the site where it crosses Strauss Cabin Road approximately 1600’ south of Harmony Road. This development is located within the Cache la Poudre watershed and City of Fort Collins Poudre River drainage basin. This project site sits just west of the FEMA regulated floodway but within the 500-yr floodplain, per FEMA FIRM Maps 08069C0994F LOMR dated December 15, 2014. The floodplain and floodways lines are shown in Figure 1 on the next page. Harmony 23 Preliminary Drainage Report Page 2 Figure 1. Vicinity Map Harmony 23 Preliminary Drainage Report Page 3 1.3 Previous Studies  WEITZEL POND #1 Drainage Report for Harmony & Strauss Cabin  ODP Drainage Report for Harmony & Strauss Cabin  Harmony & Strauss Cabin Subdivision Filing No. 1 Convenience Shopping Center PDP Final Drainage Report  North I-25 EIS, August 2011  Poudre River Drainage Basin Master Plan 1.4 Limitations of Future Projections The analysis and proposed stormwater improvements contained in this study are for the H23 project area. Assumptions have been made to account for future development adjacent to the site where developed flows and storm infrastructure from this project will influence future designs. In addition, assumptions were made to account for interim and ultimate tail water conditions downstream of this site. It is assumed that the outfall from the H23 site will connect to a future stormwater system, which will ultimately daylight into a regional detention facility for the 266-acre Harmony and I-25 development. This regional detention facility is also assumed to be a non-potable irrigation pond. The final/ultimate water surface elevation in this future regional detention pond will need to be designed to not effect upstream developments. A master plan for the Harmony and I-25 development is in progress, but has not been completed at the time of this report. The grading and drainage plan provided herein assumes that the WEITZEL POND #1 project has progressed and has filled the portion of the Existing Gravel Pond #1 shown in the WEITZEL POND #1 plans. The report also assumes that the Convenience Shopping Center has been or is being constructed when construction begins on this project, and that the Box Elder Ditch will be realigned through the site. For this project the interim 100-yr WSEL in the interim regional pond is assumed to be a 4838.59, per the Convenience Shopping Center report. This tailwater elevation was assumed to be the worst case scenario, and was used for the H23 design and calculations. The ultimate/final water surface elevation in the regional detention pond is assumed to be equal to or lower than this elevation. Stream stability analysis, open water and wetlands mitigation are beyond the scope of this report and will be addressed separately or in a subsequent design report. 2.0 Historic/Existing Conditions Historically this area was undeveloped grasslands, that was eventually utilized for farming. The Boxelder Ditch which runs through the site was used for irrigation purposes. Today, this site is no longer used for farming and has returned back to undeveloped grasslands. The site Harmony 23 Preliminary Drainage Report Page 4 generally slopes from the west to the east to the low point in Strauss Cabin Road. Slopes vary from 1:1 on the west end to basically flat on the east. According to the Natural Resources Conservation Service (NRCS) the project site is characterized by Type A, B and D soils. The NRCS soils data for this site can be found in the Appendix The historic stormwater runoff rate from this site is based on the calculations provided in the Convenience Shopping Center report, which was determined to be 0.164 cfs/acre. There are currently a small amount wetlands located on the project site. As stated previously wetlands will be addressed separately in a subsequent design report if required. Harmony 23 Preliminary Drainage Report Page 5 Figure 2. Outfall to the Poudre River Harmony 23 Preliminary Drainage Report Page 6 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis The drainage plan presented in this report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual and the City of Fort Collins submittal requirements for a Project Development Plan (PDP). The drainage plan presented is based upon the allowable developed stormwater release rates prescribed for the Poudre River drainage basin, that being the 2-year historic rate. The drainage basin presented in this report is less than 90 acres, therefore, the method used to analyze drainage for this project will be the Rational Method. Runoff calculations for both the 2-year and 100-year storms will be presented here. The Rational Method is given by: Q = C(Cf)IA where  Q is the maximum rate of runoff in cfs  C is the runoff coefficient  Cf is the runoff coefficient frequency factor adjustment  I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration  A is the total area of the basin in acres The runoff coefficient C has different values depending on the design storm recurrence interval. The runoff coefficient is also dependent on land use or surface characteristics/imperviousness. Runoff coefficients were assigned using Table RO-11 from the Fort Collins Stormwater Criteria Manual. The frequency factor adjustment, Cf, varies depending on the storm frequency and can be found in Table RO-12 of the Fort Collins Stormwater Criteria Manual. The rainfall intensity is selected from Rainfall Intensity Duration Frequency Curves for the City of Fort Collins (Tables RA-7 through RA-9 of the Fort Collins Stormwater Criteria Manual). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration tc = ti + tt where  tc is the time of concentration in minutes  ti is the initial or overland flow time in minutes Harmony 23 Preliminary Drainage Report Page 7  tt is the conveyance travel time in minutes The initial or overland flow time is calculated with the UDFCD equation:  0.33 f i S t 1.87 1.1 * C D  C  3.2 Drainage Plan Development The H23 project is proposed to be a multifamily site accompanied by parking areas, open space, and public roadway improvements. The site and associated storm sewer system has been designed to collect and convey a majority runoff from this project, including portions of the fronting ½ of the surrounding public roadways to the two separate constructed wetland ponds located onsite. Due to design constraints a small portion of runoff from the project site will be collected and conveyed to an offsite detention pond where it will be detained and released. For preliminary design calculations the site was divided into several larger basins. All “N”, “S” and “U” basins described below will be further subdivided with final design. Basin N-1, as shown on the Drainage Plan, is the northern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into to Pond A. The calculated water quality capture volume (WQCV) from this basin will be treated in Pond A which is designed as a constructed wetland pond. They 100-yr detention portion of this basin will also be detained in Pond A where it will ultimately be released to the proposed storm sewer system in Strauss Cabin Road which conveys runoff to Pond B. Basin S-1 is the southern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into Pond B. Pond B which is designed as a constructed wetland pond will treat the WQCV from this basin. Basin S-2 incorporates the southern fronting portion of Strauss Cabin Road to the back of the detached sidewalk. Runoff from this basin is conveyed via curb & gutter to a low point in Strauss Cabin Road where it is conveyed via the proposed storm sewer system and into Pond B. The WQCV from this basin will be treated in Pond B. Basin U-1 incorporates the fronting portions of Harmony Road and Strauss Cabin Road in addition to a portion of the project site. Runoff from this basin is conveyed via curb & gutter to the low point in Strauss Cabin Road just south of Hacienda Drive, where it is conveyed via the proposed storm sewer system south to the offsite ponds designed with the Convenient Harmony 23 Preliminary Drainage Report Page 8 Shopping Center Report. All storage for this basin will be handled in the offsite ponds. Basins O-1, O-2, and O-3 are offsite basins that will pass through the site. No water quality or detention will be provided for these basins as they are not part of the subject property. Basins O-1 and O-2 are the areas between the FCRID and the property boundary which consists of gravel access road and undeveloped open space. Runoff from Basin O-1 will be routed through Pond A and ultimately Pond B, and runoff from Basin O-2 will be routed through Pond B. Basin O-3 is the area just south of the project which consists of a small portion of undeveloped open space and a portion of Strauss Cabin Road. Runoff from this basin is conveyed via curb & gutter to a low point in Strauss Cabin Road where it will be routed through Pond B. The 100-yr runoff volume for all “N” basins will be detained in Pond A, while all runoff for all “S” basins will be detained in Pond B. The 100-yr runoff volume for Basin U-1 will be detained in the existing ponds offsite. 3.2.1 Street Capacity Street capacities have been analyzed using the Urban Drainage UD-Inlet spreadsheet, version 4.01. Street capacity was analyzed along Strauss Cabin Road on the west side where ultimate roadway improvements are proposed between Harmony Road and the south end of this project. Table ST-2 and ST-3 in the City of Fort Collins Stormwater Criteria Manual state inundation standards for the minor and major storms. These standards are summarized in the table below. Table 1. Street ID Street Classification Minor Storm (2-yr) requirements Major Storm (100-yr) requirements Strauss Cabin Road 2-Lane Arterial No curb-overtopping, flow spread must leave at least 12’ wide travel path in each direction Depth of water must not exceed bottom of median gutter, 12” max depth at gutter flowline, flow must be contained within ROW. The streets meet the applicable requirements and will function below the allowed capacities. The results of the street capacity analysis can be found with supporting calculations in Appendix Harmony 23 Preliminary Drainage Report Page 9 B. 3.2.2 Inlet Design Inlets have been analyzed using the Urban Drainage UD-Inlet spreadsheet, version 4.01. CDOT Type R inlets are proposed to collect runoff and have been placed at the low points of the basins where infall, vertical curb & gutter is located and have been analyzed for a “sump” condition. These inlets have been sized to capture the 100-yr storm. On-grade Type 13 inlets have been strategically placed within the cross pans in the parking lot to intercept portions of runoff and direct it to the proposed storm sewer system. These have been placed to reduce the amount or runoff that would flow down the drive isle, and to help reduce inlet sizes further downstream. The results of the inlet analysis will be provided at final design in Appendix B. 3.2.3 Storm Sewer Design Storm sewer pipes have been analyzed using UDSEWER 2009, version 1.4. All storm pipes on this project site are designed to collect and convey the 100-yr storm runoff. The pipes have all been sized to ensure that the hydraulic grade lines remain below the flowline elevation at inlets and below rim elevations at manholes. The results of the storm sewer analysis will be provided at final design in Appendix C. 3.2.4 Channel Design Proposed channels and swales at this project site have been analyzed using Bentley Flowmaster V8i, Select Series 1 software. These swales have been designed to include 1’ of freeboard above the normal 100-yr water depth in the channel. Where the 1’ criteria isn’t possible, the swales have been checked to make sure they can pass at least 133% of design flow. Swale A-A is triangular swale located in Basin N-1 which conveys a portion of runoff within that basin directly into Pond A. The results of the channel design will be provided at final design in Appendix D. 3.2.5 Riprap Design Riprap has been proposed at the outlet pipe to Pond B. Although the approximate groundwater elevation is 4838 at this location and the pipe outlet and riprap are anticipated to be underwater Harmony 23 Preliminary Drainage Report Page 10 during an average day scenario, the groundwater in that pond may be lowered at any given time due to future construction activities at this site, so riprap has been proposed in this area as a ground stabilization measure. The results of riprap sizing will be provided at final design in Appendix E. All other pipes which discharge into the ponds onsite will discharge into concrete forebays. These forebays are designed to dissipate energy in addition to providing sedimentation. 3.2.6 Detention Pond Design The existing conditions for this area was analyzed with the Convenience Shopping Center report to determine the allowable release rate from the site. The 2-yr historic discharge for this area was determined to be 4.50 cfs for the 27.2 acres estimated in that report. This ends up being a release rate of approximately 0.165 cfs/acre (4.5/27.2) which is the allowable release rate used in this report. There will be two ponds utilized on this site for water quality and detention. Pond A on the northeast end of the site and Pond B on the south end of the site. Both are designed as constructed wetland ponds to treat the WQCV. Both ponds will be supplied by groundwater to help maintain vegetation and microorganisms. The Ex. Gravel Pond #2 utilized in the Convenience Shopping Center Report will be utilized to detain the 100-yr runoff from Basin U-1. Per conversations with the City stormwater staff, the existing gravel ponds can be used as a water quality feature. Therefore, the WQCV for Basin U-1 was not added into the total required volume being detained offsite in Ex. Gravel Pond #2. The UDFCD UD-BMP spreadsheet version 3.05 was used to calculate the WQCV for each of the two constructed wetland ponds. Pond A is sized to collect the WQCV for all N basins, and Pond B is sized to collect the WQCV for all S basins. The WQCV is designed to be released in 24-hr as recommend by UDFCD for a constructed wetland pond. In addition, the minimum permanent pool and forebay volumes were also sized using this spreadsheet. A mass-balance spreadsheet was used to calculate the overall 100-yr detention requirements for this site. The required 100-yr detention volumes for Pond A and Pond B calculated from this spreadsheet were determined to be 1.92 acre-feet, and 2.27 acre-feet respectively. An additional 20% was added to these volumes, per City Criteria, resulting in a total 100-yr volume of 2.39 acre-feet for Pond A and 3.98 acre-feet for Pond B. The total volume required in the ponds based on City Criteria is the 100-yr plus the WQCV. Therefore, the required total volume was determined to be 2.56 acre-feet for Pond A and 4.27 acre-feet for Pond B. The results for these ponds are provided in Table 2. Harmony 23 Preliminary Drainage Report Page 11 Table 2. Pond ID Contributing Area (acres) Groundwater Surface Elevation 2-yr Historic Release Rate (0.165 cfs/acre) 100-yr Detention Volume (120%) (ac-ft) WQCV (ac-ft) Total Provided Storage (ac-ft) Pond A 9.77 4843.00 1.67 2.31 0.16 2.78 Pond B 11.40 4839.00 2.78 2.73 0.19 3.05 Total Required 5.04 0.35 5.83 A mass-balance spreadsheet was used to calculate the overall 100-yr detention requirement for Basin U-1. The required 100-yr detention volume from this Basin was calculated to be 1.14 ac- ft. An additional 20% was added to the volume for a total volume of 1.37 ac-ft. This volume was then added to the 11.57 ac-ft required per the Convenience Shopping Center Report for a total volume of 12.94 ac-ft. Because Ex. Gravel Pond #1 has no available storage left, the 1.37 ac-ft was added to Ex. Gravel Pond #2. The approximate surface area of this pond was determined to be approximately 14.53 acres resulting in an increase of storage depth of 0.094 feet (1.37ac-ft / 14.53 acres). Because we will be adding additional storage volume in this pond, the emergency spillway designed with the Convenience Shopping Center report will need to be modified. To simplify the design, the 9.0 cfs release rate from the spillway structure will be maintained and both the 2-yr spillway crest (Ex. Elev.=4837.39) and the 100-yr spillway crest (Ex. Elev.=4837.64) will be raised 0.10 feet each. The undeveloped areas adjacent to the site denoted as O-1, O-2, and O-3 will release undetained through the site. This amount will be treated as a pass-through flow. The resulting amount of stormwater (100-yr) passing from Pond A will be approximately 1.1 cfs and 5.9 cfs for Pond B. The total 100-yr release from these undeveloped areas amounts to 7.0 cfs. Outlet structures for Pond A and B will consist of 3 stages. A WQCV stage (24-hr drain time), detention volume (2-yr historic release), and emergency overflow. An emergency overflow stage was added due to site constraints discussed below. All ponds will have a minimum 1’ of freeboard above the detention surface elevation. The ponds for this site were located in areas to maximize developable area. Emergency spillways for each pond have not been provided due to site constraints. Therefore, these ponds don’t have a defined spillway. Instead Pond A is designed to pass a portion of the emergency flow through the 100-yr overflow stage on the outlet structure. Any runoff which exceeds the overflow capacity will pond up to the Boxelder Ditch located along the east side of this pond, where it will ultimately either spill into and or across this ditch to the low point in Strauss Cabin Harmony 23 Preliminary Drainage Report Page 12 Road. The difference between the detention surface elevation of Pond A and the Boxelder Ditch is approximately 1.25’. Similar to Pond A, Pond B will also have an emergency overflow stage on the outlet structure. However, this outlet structure and outlet pipe will be sized to convey the 100-yr storm event. In the event that the outlet pipe becomes clogged, runoff would back up into the parking lot until it would spill down the drive entrance into Strauss Cabin Road. This elevation is approximately 4850. All buildings within this area will be designed at an elevation higher than the spill elevation to prevent flooding. 3.3 Low Impact Development With the building coverage and parking areas, the amount of new imperviousness introduced to this site will be approximately 60%. However, the grading design aims to minimize the “directly connected impervious area” (DCIA) as much as possible. Strategies to minimize directly connected impervious areas follow the Four-Step Process for Stormwater Quality Management, as outlined in Volume 3 of the Urban Storm Drainage Criteria Manual. The four-step process is shown below. Figure 4. Four-Step Process for Stormwater Quality Management Harmony 23 Preliminary Drainage Report Page 13 Step 1: Runoff Reduction Practices for this project site are planned to include parking lot drainage toward grassed swales located adjacent to parking lot areas to capture and route stormwater drainage toward the two separate ponds located on the north and south ends of the site. These grassed swales are intended to have meandering alignments to increase the aesthetic and the time of concentration. Step 2: BMP’s to Provide WQCV with Slow Release for this project site will employ LID techniques such as constructed wetland ponds to act as a sedimentation basin by allowing for the sediment, fines and pollution suspended in the stormwater to settle out into the groundwater fed ponds. The ponds will be equipped with outlet structures to control the release and improve water quality. The City of Fort Collins criteria for low impact development, as outlined in the Stormwater Criteria Manual in Volume 3, Chapter 3, are as follows:  No less than 75% of any newly developed or redeveloped area must be treated using one or a combination of LID techniques, OR  No less than 50% of any newly developed or redeveloped area must be treated using one or a combination of LID techniques when a permeable pavement area covering at least 25% of drivable surface area on private development property is constructed as one of the components of the LID treatment techniques used on that site. For this site, approximately 85% of the project will be treated using constructed wetland ponds, and therefore, permeable pavers will not be required. The other 15% will be treated in the massive gravel ponds located offsite. Step 3: Stabilized Drainageways will come in the form of seeding, planting, energy dissipation basins (forebays), and maintaining the constructed wetlands and grassed swales created for this project site. Step 4: Site Specific Source Control BMP’s will include things like proper maintenance and sedimentation removal of the forebays and constructed wetland ponds. The areas where the various LID techniques are planned to be utilized on the site are shown on the drainage map. LID calculations are included in Appendix F. Harmony 23 Preliminary Drainage Report Page 14 3.4 Floodplain Management This site is situated outside of any City of Fort Collins regulatory floodways and floodplains. This project site sits within the FEMA FIRM Map 08069C0994F dated December 19, 2006. The new LOMR (Case # 14-08-0580P, effective date 12-15-2014) that just received FEMA approval corrected the floodway and floodplain lines to align with the original floodplain workmap. Information provided in this LOMR was taken into consideration for this project. More specifically, flood zone designations within this project site per the LOMR are as follows:  Flood Zone X, Shaded 500-YEAR FLOODPLAIN: Areas of 0.2% annual chance flood hazard. Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile.  Flood Zone X, Unshaded: Areas determined to be outside the 0.2% annual chance floodplain. Chapter 10, Flood Prevention and Protection, of the Fort Collins Municipal Code provided guidance and limitations for building and development within the floodway and floodplain. Division 4 – Poudre River Flood Hazard Areas of this chapter provide specific standards for development within the Poudre River floodway and flood fringe. The “Limits of Development” as shown on the Grading and Drainage Plan are outside of the half-foot floodway. However, we recognize that a majority of this area still resides within the 500-year floodplain. Land uses proposed within the “Limits of Development” do not include any critical facilities, essential service critical facilities, hazardous materials facilities, government services, or at risk population facilities. All structures planned to be built within the “Limits of Development” will be elevated and flood-proofed 2 feet above the 100-year flood elevations (shown as Base Flood elevations on the FIRM maps.) 4.0 Conclusion The City of Fort Collins Stormwater Criteria Manual has been used to establish the criteria for a developed condition runoff plan within the H23 project. This PDP drainage design report has highlighted the following items:  Project site development is outside of the effective floodway boundary, but within the 500-yr floodplain.  LID techniques are planned to be implemented within the site design including measures that will help minimize directly connected impervious areas. These LID techniques will Harmony 23 Preliminary Drainage Report Page 15 include grassed swales and constructed wetland ponds.  Water quality and stormwater detention for the project will be provided in two separate wetland ponds located onsite. These ponds have been sized to release the 100-yr storm at the 2-yr historic release.  A small portion of this project will be detained offsite in the ex. Gravel ponds located east of the project.  All storm infrastructure has been sized to collect and convey the 100-yr storm event. Harmony 23 Preliminary Drainage Report Page 16 5.0 References 1. City of Fort Collins Stormwater Criteria Manual, Amendments to the Urban Drainage and Flood Control District Criteria Manual, Adopted December 2011, Last Revision April 2012. 2. Urban Drainage and Flood Control District Criteria Manual, Volume 3, August 2011 3. Federal Emergency Management Agency, 2006, Flood Insurance Rate Map, Larimer County, Colorado, Map Number 08069C0994F 4. Federal Emergency Management Agency, 2006, Flood Insurance Rate Map, Larimer County, Colorado, Map Number 08069C1013F 5. Natural Resources Conservation Services, 2013, Web Soil Survey: Soil Survey Area Larimer County Area, Version 8, Dec 23, 2013 6. Colorado Division of Reclamation, Mining & Safety website, http://mining.state.co.us/Pages/Home.aspx 7. Chapter 10 of the Fort Collins Municipal Code, http://colocode.com/fcmunihtml.html 8. LOMR, Case #14-08-0580P, Letter of Map Revision (LOMR-BD) Based on Better Data on the Cache la Poudre River I-25 Divided Flow Path Southwest of Harmony Road and Interstate 25, Anderson Consulting Engineers, Effective Date December 15, 2014. APPENDIX A Rational Method Hydrologic Analysis 6RLO,QIRUPDWLRQIRU$OO8VHV 6RLO3URSHUWLHVDQG4XDOLWLHV 7KH6RLO3URSHUWLHVDQG4XDOLWLHVVHFWLRQLQFOXGHVYDULRXVVRLOSURSHUWLHVDQGTXDOLWLHV GLVSOD\HGDVWKHPDWLFPDSVZLWKDVXPPDU\WDEOHIRUWKHVRLOPDSXQLWVLQWKHVHOHFWHG DUHDRILQWHUHVW$VLQJOHYDOXHRUUDWLQJIRUHDFKPDSXQLWLVJHQHUDWHGE\DJJUHJDWLQJ WKHLQWHUSUHWLYHUDWLQJVRILQGLYLGXDOPDSXQLWFRPSRQHQWV7KLVDJJUHJDWLRQSURFHVV LVGHILQHGIRUHDFKSURSHUW\RUTXDOLW\ 6RLO4XDOLWLHVDQG)HDWXUHV 6RLOTXDOLWLHVDUHEHKDYLRUDQGSHUIRUPDQFHDWWULEXWHVWKDWDUHQRWGLUHFWO\PHDVXUHG EXWDUHLQIHUUHGIURPREVHUYDWLRQVRIG\QDPLFFRQGLWLRQVDQGIURPVRLOSURSHUWLHV ([DPSOHVRLOTXDOLWLHVLQFOXGHQDWXUDOGUDLQDJHDQGIURVWDFWLRQ6RLOIHDWXUHVDUH DWWULEXWHVWKDWDUHQRWGLUHFWO\SDUWRIWKHVRLO([DPSOHVRLOIHDWXUHVLQFOXGHVORSHDQG GHSWKWRUHVWULFWLYHOD\HU7KHVHIHDWXUHVFDQJUHDWO\LPSDFWWKHXVHDQGPDQDJHPHQW RIWKHVRLO +\GURORJLF6RLO*URXS +\GURORJLFVRLOJURXSVDUHEDVHGRQHVWLPDWHVRIUXQRIISRWHQWLDO6RLOVDUHDVVLJQHG WRRQHRIIRXUJURXSVDFFRUGLQJWRWKHUDWHRIZDWHULQILOWUDWLRQZKHQWKHVRLOVDUHQRW SURWHFWHGE\YHJHWDWLRQDUHWKRURXJKO\ZHWDQGUHFHLYHSUHFLSLWDWLRQIURPORQJ GXUDWLRQVWRUPV 7KHVRLOVLQWKH8QLWHG6WDWHVDUHDVVLJQHGWRIRXUJURXSV $%&DQG' *URXS&6RLOVKDYLQJDVORZLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVHFRQVLVW FKLHIO\RIVRLOVKDYLQJDOD\HUWKDWLPSHGHVWKHGRZQZDUGPRYHPHQWRIZDWHURUVRLOV RIPRGHUDWHO\ILQHWH[WXUHRUILQHWH[WXUH7KHVHVRLOVKDYHDVORZUDWHRIZDWHU WUDQVPLVVLRQ *URXS'6RLOVKDYLQJDYHU\VORZLQILOWUDWLRQUDWH KLJKUXQRIISRWHQWLDO  &XVWRP6RLO5HVRXUFH5HSRUW 0DS²+\GURORJLF6RLO*URXS                                         ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ  : ƒ  1 ƒ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²+\GURORJLF6RLO*URXS +\GURORJLF6RLO*URXS²6XPPDU\E\0DS8QLW²/DULPHU&RXQW\$UHD&RORUDGR &2 0DSXQLWV\PERO 0DSXQLWQDPH 5DWLQJ $FUHVLQ$2, 3HUFHQWRI$2,  $TXHSWVORDP\ $'    &DUXVRFOD\ORDPWR SHUFHQWVORSH '    /DULPJUDYHOO\VDQG\ ORDPWRSHUFHQW VORSHV %    /DULPHU6WRQHKDP FRPSOH[WR SHUFHQWVORSHV %    3DROLILQHVDQG\ORDPWR SHUFHQWVORSHV $    6WRQHKDPORDPWR SHUFHQWVORSHV %   7RWDOVIRU$UHDRI,QWHUHVW   5DWLQJ2SWLRQV²+\GURORJLF6RLO*URXS $JJUHJDWLRQ0HWKRG'RPLQDQW&RQGLWLRQ &RPSRQHQW3HUFHQW&XWRII1RQH6SHFLILHG 7LHEUHDN5XOH+LJKHU &XVWRP6RLO5HVRXUFH5HSRUW  H23 Preliminary Drainage Report City of Fort Collins IDF Curves Duration 2-yr 10-yr 100-yr 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.40 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.13 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 H23 Preliminary Drainage Report From the Town of Timnath Design Criteria Manual and Construction Specifications y = 2.5665e-0.021x R² = 0.9633 y = 26.332x-0.53 R² = 0.9879 0.00 2.00 4.00 6.00 8.00 10.00 12.00 010203040506070 Rainfall Intensity (in/hr) Storm Duration (min) City of Fort Collins IDF Curves 2-yr 10-yr 100-yr Expon. (2-yr) Power (100-yr) Appendix A H23 Preliminary Drainage Report City of Fort Collins Rational Method Runoff Coefficients Lawn, Heavy, <2% Slope 0.20 Lawn, Heavy, >7% Slope 0.35 Lawn, Heavy, 2-7% Slope 0.25 Lawn, Sandy, <2% Slope 0.10 Lawn, Sandy, >7% Slope 0.20 Lawn, Sandy, 2-7% Slope 0.15 Roofs 0.95 Streets: Permeable Pavers 0.30 Streets: Gravel 0.50 Streets: Paved 0.95 From Table 3-3 of the City of Fort Collins, Stormwater Criteria Runoff Coefficient Appendix A H23 Preliminary Drainage Report C2 C10 C100 Streets: Paved 3.36 0.95 Lawn, Heavy, <2% Slope 4.31 0.20 Roofs 2.09 0.95 Total N Basins 9.77 Total % Imp. 54.6% Avg. 100-yr C100 = 0.77 Streets: Paved 4.17 0.95 Lawn, Heavy, <2% Slope 4.76 0.20 Roofs 1.63 0.95 Streets: Paved 0.66 0.95 Lawn, Heavy, <2% Slope 0.18 0.20 Roofs 0.00 0.95 Total S Basins 11.40 56.1% Avg. 100-yr C100 = 0.78 Streets: Paved 2.71 0.95 Lawn, Heavy, <2% Slope 2.59 0.20 Roofs 0.52 0.95 Total U Basins 5.82 55.5% Avg. 100-yr C100 = 0.77 Total 26.99 Total % Imp. 55.4% Avg. 100-yr C100 = 0.78 *Percent Impervious Values based on UDFCD Vol 1., Chapter 6, Table 6-3 Rational Method Frequency Adjustment Factors Min year Max year Frequency Factor, Cf 210 1 11 25 1.1 26 50 1.2 51 100 1.25 From Table 3-4 in the City of Fort Collins, SDDCCS U-1 5.82 55.5% 0.62 0.62 0.62 0.77 0.79 0.99 0.62 0.62 0.77 S-2 0.84 79.3% 0.79 0.79 0.61 0.61 0.76 0.62 Attribute Area (ac) Runoff Coefficient, C Percent Impervious S-1 10.56 54.3% 0.61 Composite C Frequency Adjusted Runoff Coefficients (C*Cf) Table A-1 N-1 9.77 Basin Composite Runoff Coefficients Basin/ Sub- Basin Area (ac) Attribute 54.6% Appendix A H23 Preliminary Drainage Report Overland Flow Average Channelized Channel Channel Channelized Length, D Overland Slope Tov Tov Tov Flow Length Slope Velocity Time (Tt) (ft) (%) 2-year 10-year 100-year (ft) (%) (ft/s) (min) 2-year 10-year 100-year N-1 0.62 0.62 0.77 190 2 10 10 7 615 2.2 3 3.4 13 13 10 S-1 0.61 0.61 0.76 66 2 6 6 4 1150 1 2 9.6 16 16 14 S-2 0.79 0.79 0.99 26 2 2 2 1 630 2.2 2.9 3.6 6 6 5 U-1 0.62 0.62 0.77 66 2 6 6 4 950 0.9 1.8 8.8 15 15 13 O-1 (EX. CONDITIONS OFFSITE) 0.20 0.20 0.25 50 33 4 4 4 0 0 1 0.0 5 5 5 O-2 (EX. CONDITIONS OFFSITE) 0.20 0.20 0.25 50 33 4 4 4 0 0.0 1.0 0.0 5 5 5 O-3 (EX. CONDITIONS OFFSITE) 0.20 0.20 0.25 26 2 7 7 6 136 3.6 3.6 0.6 8 8 7 Basin Table A-2 Basin Time of Concentration Frequency Adj. Runoff Coefficients (C*Cf) C2 C10 C100 Overland Travel Time Time of Concentration Tc = Tov + Tt (min) Appendix A H23 Preliminary Drainage Report 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - Year 10 - Year 100 - Year 2 - Year 10 - Year 100 - Year N-1 9.77 0.62 0.62 0.77 13 13 10 1.98 3.39 7.72 12.0 20.5 58.4 S-1 10.56 0.61 0.61 0.76 16 16 14 1.81 3.08 6.71 11.7 19.9 54.2 S-2 0.84 0.79 0.79 0.99 6 6 5 2.67 4.56 9.95 1.8 3.0 8.3 U-1 5.82 0.62 0.62 0.77 15 15 13 1.87 3.19 6.92 6.7 11.4 31.0 O-1 (EX. CONDITIONS OFFSITE) 0.44 0.20 0.20 0.25 5 5 5 2.85 4.87 9.95 0.3 0.4 1.1 O-2 (EX. CONDITIONS OFFSITE) 2.04 0.20 0.20 0.25 5 5 5 2.85 4.87 9.95 1.2 2.0 5.1 O-3 (EX. CONDITIONS OFFSITE) 0.38 0.20 0.20 0.25 8 8 7 2.40 4.10 8.80 0.2 0.3 0.8 Total Bypass Flow 7.0 Time of Concentration, Tc (min) Table A-3 Basin Peak Discharge Basin Rainfall Intensity (in/hr) Peak Discharge (cfs) Basin Area (ac) Frequency Adj. Runoff Coefficients Appendix A H23 Preliminary Drainage Report 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 1 (Pond A Outlet) N-1 9.77 13 13 10 0.62 0.62 0.77 1.98 3.39 7.72 11.97 20.50 58.36 12.23 20.93 59.45 2 (SDMH-1C) Pond A Release, U-1 5.82 15 15 13 0.62 0.62 0.77 1.87 3.19 6.92 8.32 13.06 32.65 8.57 13.49 33.74 *3 (SDMH-1A) Pond A and B Release, U-1 26.99 15 15 13 0.62 0.62 0.77 1.87 3.19 6.92 11.81 16.55 36.14 13.23 18.97 42.31 6 (Pond B Outlet) All S Basins 11.40 16 16 14 0.63 0.63 0.78 1.81 3.08 6.71 12.90 21.95 59.77 19.90 28.95 66.78 Contributing Basins & Design Point Design Points *Peak discharge based on combined release rates from Ponds A and B plus Basin U-1 which is released undetained from the site. Peak Discharge + Offsite Bypass Flows (cfs) Table A-4 Attenuation of Peak Discharge Time of Concentration, Tc (min) Weighted Runoff Coefficient Rainfall Intensity (in/hr) Peak Discharge (cfs) Area (acres) Appendix A APPENDIX B Street Capacity and Inlet Analysis Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 16.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020 Height of Curb at Gutter Flow Line HCURB = 6.00 inches Distance from Curb Face to Street Crown TCROWN = 40.0 ft Gutter Width W = 2.00 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.013 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 12.0 32.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 12.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) H23 Inlet-01A UD-Inlet_v4.01, Inlet-1A 9/27/2016, 1:47 PM Design Information (Input) MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 4 4 Water Depth at Flowline (outside of local depression) Ponding Depth = 4.4 9.2 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 5.00 5.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth dGrate = N/A N/A ft Depth for Curb Opening Weir Equation dCurb = 0.20 0.60 ft Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.42 0.87 Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.67 0.94 Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 7.2 45.8 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 6.7 31.0 cfs INLET IN A SUMP OR SAG LOCATION CDOT Type R Curb Opening H-Vert H-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths UD-Inlet_v4.01, Inlet-1A 9/27/2016, 1:47 PM APPENDIX F Detention Pond Design H23 Preliminary Drainage Report Detention Requirements Pond A - Major Storm (100-yr) Mass Balance Method 0.77 1.61 cfs 9.77 acres Detention Requirements 1.92 acre-feet City of Fort Collins criteria (120%) 2.31 acre-feet Time (min) Intensity (in/hr) Qin (cfs) Volume in (ft 3 ) Qout (cfs) Volumeout (ft 3 ) Volume detained (acre-feet) 5 9.95 74.853 22,455.86 1.61 484 0.504 10 7.72 58.077 34,846.07 1.61 967 0.778 15 6.52 49.049 44,144.38 1.61 1,451 0.980 20 5.60 42.128 50,553.89 1.61 1,934 1.116 25 4.98 37.464 56,196.06 1.61 2,418 1.235 30 4.52 34.004 61,206.31 1.61 2,902 1.338 35 4.08 30.693 64,456.21 1.61 3,385 1.402 40 3.74 28.136 67,525.55 1.61 3,869 1.461 45 3.46 26.029 70,278.93 1.61 4,353 1.513 50 3.23 24.299 72,896.90 1.61 4,836 1.562 55 3.03 22.794 75,221.48 1.61 5,320 1.605 60 2.86 21.515 77,455.78 1.61 5,803 1.645 65 2.70 20.312 79,216.14 1.61 6,287 1.674 70 2.60 19.560 82,150.07 1.61 6,771 1.730 75 2.50 18.807 84,632.63 1.61 7,254 1.776 80 2.40 18.055 86,663.81 1.61 7,738 1.812 85 2.30 17.303 88,243.62 1.61 8,221 1.837 90 2.20 16.550 89,372.05 1.61 8,705 1.852 100 2.05 15.422 92,531.67 1.61 9,672 1.902 110 1.90 14.294 94,337.17 1.61 10,640 1.921 120 1.75 13.165 94,788.54 1.61 11,607 1.910 130 1.60 12.037 93,885.79 1.61 12,574 1.867 140 1.40 10.532 88,469.30 1.61 13,541 1.720 150 1.20 9.027 81,247.32 1.61 14,508 1.532 160 1.15 8.651 83,052.82 1.61 15,476 1.551 170 1.10 8.275 84,406.94 1.61 16,443 1.560 180 1.05 7.899 85,309.69 1.61 17,410 1.559 Runoff Coefficient, C = 2-yr Release, Qout = Area = Appendix F Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR… Length of Basin Bottom, L = ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd = ft/ft Rectangle OR… Circle / Ellipse OR… Irregular X (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft 2 ft 2 User ft 3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 4843.00 (input) 18,220 0 0.418 0.000 4844.00 4.00 0.00 0.00 21,150 19,685 0.486 0.452 4845.00 4.00 0.00 0.00 24,180 42,350 0.555 0.972 4846.00 4.00 0.00 0.00 27,312 68,096 0.627 1.563 4847.00 4.00 0.00 0.00 30,544 97,024 0.701 2.227 4847.75 4.00 0.00 0.00 33,035 120,866 0.758 2.775 4848.00 4.00 0.00 0.00 38,013 129,747 0.873 2.979 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 4843.00 4844.00 4845.00 4846.00 4847.00 4848.00 4849.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 Stage (ft. elev.) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND UD Detention Pond A VolCalc, Basin 9/27/2016, 10:20 AM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Baseflow A) Is the permanent pool established by groundwater? 2. Surcharge Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 54.6 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 ) i = 0.546 C) Contributing Watershed Area Area = 9.770 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control) F) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 0.161 ac-ft Based on 24-hour Drain Time (VWQCV = (0.9 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12 * Area) G) For Watersheds Outside of the Denver Region, VWQCV OTHER = ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d 6*(VWQCV /0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = ac-ft (Only if a different WQCV Design Volume is desired) I) Predominant Watershed NRCS Soil Group WQCV selected. Soil group not required. J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i 1.28 For HSG B: EURVB = 1.36 * i 1.08 For HSG C/D: EURVC/D = 1.20 * i 1.08 EURV = ac-f t 3. Depth of Surcharge WQCV DWQCV = 1.0 ft (Should not exceed 2 feet, required even if EURV is chosen) 4. Basin Shape L : W = 4.0 : 1 (It is recommended to have a basin length to width ratio between 2:1 and 4:1) 5. Permanent Pool A) Minimum Permanent Pool Volume VPOOL = 0.120 ac-ft 6. Side Slopes A) Maximum Side Slope Above the Safety Wetland Bench Z = 4.00 ft / ft (Horiz. dist. per unit vertical, should be no steeper than 4:1) 7. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: DAP TST, Inc. Consulting Engineers Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR… Length of Basin Bottom, L = ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd = ft/ft Rectangle OR… Circle / Ellipse OR… Irregular X (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft 2 ft 2 User ft 3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 4842.00 (input) 15,391 0 0.353 0.000 4843.00 4.00 0.00 0.00 18,220 16,806 0.418 0.386 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 4842.00 4842.20 4842.40 4842.60 4842.80 4843.00 4843.20 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 Stage (ft. elev.) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND UD Detention Pond A PermPool VolCalc, Basin 9/27/2016, 10:19 AM H23 Preliminary Drainage Report Detention Requirements Pond B - Major Storm (100-yr) Mass Balance Method 0.78 1.88 cfs 11.40 acres Detention Requirements 2.27 acre-feet City of Fort Collins criteria (120%) 2.73 acre-feet Time (min) Intensity (in/hr) Qin (cfs) Volume in (ft 3 ) Qout (cfs) Volumeout (ft 3 ) Volume detained (acre-feet) 5 9.95 88.475 26,542.62 1.88 564 0.596 10 7.72 68.646 41,187.74 1.88 1,129 0.920 15 6.52 57.976 52,178.26 1.88 1,693 1.159 20 5.60 49.795 59,754.24 1.88 2,257 1.320 25 4.98 44.282 66,423.24 1.88 2,822 1.460 30 4.52 40.192 72,345.31 1.88 3,386 1.583 35 4.08 36.279 76,186.66 1.88 3,950 1.658 40 3.74 33.256 79,814.59 1.88 4,514 1.729 45 3.46 30.766 83,069.06 1.88 5,079 1.790 50 3.23 28.721 86,163.48 1.88 5,643 1.848 55 3.03 26.943 88,911.11 1.88 6,207 1.899 60 2.86 25.431 91,552.03 1.88 6,772 1.946 65 2.70 24.008 93,632.76 1.88 7,336 1.981 70 2.60 23.119 97,100.64 1.88 7,900 2.048 75 2.50 22.230 100,035.00 1.88 8,465 2.102 80 2.40 21.341 102,435.84 1.88 9,029 2.144 85 2.30 20.452 104,303.16 1.88 9,593 2.174 90 2.20 19.562 105,636.96 1.88 10,157 2.192 100 2.05 18.229 109,371.60 1.88 11,286 2.252 110 1.90 16.895 111,505.68 1.88 12,415 2.275 120 1.75 15.561 112,039.20 1.88 13,543 2.261 130 1.60 14.227 110,972.16 1.88 14,672 2.211 140 1.40 12.449 104,569.92 1.88 15,800 2.038 150 1.20 10.670 96,033.60 1.88 16,929 1.816 160 1.15 10.226 98,167.68 1.88 18,058 1.839 170 1.10 9.781 99,768.24 1.88 19,186 1.850 180 1.05 9.337 100,835.28 1.88 20,315 1.848 Runoff Coefficient, C = 2-yr Release, Qout = Area = Appendix F Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR… Length of Basin Bottom, L = ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd = ft/ft Rectangle OR… Circle / Ellipse OR… Irregular X (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft 2 ft 2 User ft 3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 4839.00 (input) 8,417 0 0.193 0.000 4840.00 4.00 0.00 0.00 10,896 9,657 0.250 0.222 4841.00 4.00 0.00 0.00 13,604 21,907 0.312 0.503 4842.00 4.00 0.00 0.00 16,778 37,098 0.385 0.852 4843.00 4.00 0.00 0.00 20,071 55,522 0.461 1.275 4844.00 4.00 0.00 0.00 23,406 77,261 0.537 1.774 4845.00 4.00 0.00 0.00 27,602 102,765 0.634 2.359 4846.00 4.00 0.00 0.00 32,629 132,880 0.749 3.051 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 4839.00 4840.00 4841.00 4842.00 4843.00 4844.00 4845.00 4846.00 4847.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 Stage (ft. elev.) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND UD Detention Pond B VolCalc, Basin 9/27/2016, 10:21 AM Sheet 1 of 3 Designer: Company: Date: Project: Location: 1. Baseflow A) Is the permanent pool established by groundwater? 2. Surcharge Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 56.1 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 ) i = 0.561 C) Contributing Watershed Area Area = 11.400 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control) F) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 0.191 ac-ft Based on 24-hour Drain Time (VWQCV = (0.9 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12 * Area) G) For Watersheds Outside of the Denver Region, VWQCV OTHER = ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d 6*(VWQCV /0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = ac-ft (Only if a different WQCV Design Volume is desired) I) Predominant Watershed NRCS Soil Group WQCV selected. Soil group not required. J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = 1.68 * i 1.28 For HSG B: EURVB = 1.36 * i 1.08 For HSG C/D: EURVC/D = 1.20 * i 1.08 EURV = ac-f t 3. Depth of Surcharge WQCV DWQCV = 1.0 ft (Should not exceed 2 feet, required even if EURV is chosen) 4. Basin Shape L : W = 4.0 : 1 (It is recommended to have a basin length to width ratio between 2:1 and 4:1) 5. Permanent Pool A) Minimum Permanent Pool Volume VPOOL = 0.143 ac-ft 6. Side Slopes A) Maximum Side Slope Above the Safety Wetland Bench Z = 4.00 ft / ft (Horiz. dist. per unit vertical, should be no steeper than 4:1) 7. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: DAP TST, Inc. Consulting Engineers Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR… Length of Basin Bottom, L = ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd = ft/ft Rectangle OR… Circle / Ellipse OR… Irregular X (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft 2 ft 2 User ft 3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 4838.00 (input) 6,220 0 0.143 0.000 4839.00 4.00 0.00 0.00 8,417 7,319 0.193 0.168 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 4838.00 4838.20 4838.40 4838.60 4838.80 4839.00 4839.20 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 Stage (ft. elev.) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND UD Detention Pond B PermPool VolCalc, Basin 9/27/2016, 10:19 AM APPENDIX G FIRM Maps and Original Floodplain Workmap Page 1 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Case No.: LOMR-APP 14-08-0580P Washington, D.C. 20472 Federal Emergency Management Agency LETTER OF MAP REVISION DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION COMMUNITY APPROXIMATE LATITUDE & LONGITUDE: 40.518, -104.995 SOURCE: USGS QUADRANGLE DATUM: NAD 83 City of Fort Collins Larimer County Colorado COMMUNITY NO.: 080102 BASIS OF REQUEST IDENTIFIER NO PROJECT UPDATE Cache La Poudre River I-25 Divided Flow Path ANNOTATED MAPPING ENCLOSURES ANNOTATED STUDY ENCLOSURES TYPE: FIRM* NO.: 08069C0994F DATE: December 19, 2006 TYPE: FIRM* NO.: 08069C1013F DATE: December 19, 2006 DATE OF EFFECTIVE FLOOD INSURANCE STUDY: Enclosures reflect changes to flooding sources affected by this revision. * FIRM - Flood Insurance Rate Map; ** FBFM - Flood Boundary and Floodway Map; *** FHBM - Flood Hazard Boundary Map FLOODING SOURCE(S) & REVISED REACH(ES) Cache La Poudre River I-25 Divided Flow Path - from approximately 110 feet downstream of County Road 36 to approximately 140 feet upstream of County Road 38 SUMMARY OF REVISIONS Flooding Source Effective Flooding Revised Flooding Increases Decreases Cache La Poudre River I-25 Divided Flow Path Zone AE Zone AE YES YES Zone X (shaded) Zone X (shaded) YES YES Floodway Floodway YES YES * BFEs - Base Flood Elevations DETERMINATION This document provides the determination from the Department of Homeland Security's Federal Emergency Management Agency (FEMA) regarding a request for a Letter of Map Revision (LOMR) for the area described above. Using the information submitted, we have determined that a revision to the flood hazards depicted in the Flood Insurance Study (FIS) report and/or National Flood Insurance Program (NFIP) map is warranted. This document revises the effective NFIP map, as indicated in the attached documentation. Please use the enclosed annotated map panels revised by this LOMR for floodplain management purposes and for all flood insurance policies and renewals in your community. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. 132942 PT202.BKR.14080580P.H20 102-I-C Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration FLOODWAY DATA TABLE: 4 February 06, 2013 Page 2 of 5 Issue Date: Effective Date: Case No.: 14-08-0580P LOMR-APP Washington, D.C. 20472 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Federal Emergency Management Agency LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) OTHER COMMUNITIES AFFECTED BY THIS REVISION CID Number: 080101 Name: Larimer County, Colorado AFFECTED MAP PANELS AFFECTED PORTIONS OF THE FLOOD INSURANCE STUDY REPORT DATE OF EFFECTIVE FLOOD INSURANCE STUDY FLOODWAY DATA TABLE: 4 TYPE: FIRM* TYPE: FIRM* NO.: 08069C0994F NO.: 08069C1013F DATE: December 19, 2006 DATE: December 19, 2006 This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. 132942 PT202.BKR.14080580P.H20 102-I-C Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration : February 6, 2013 Page 3 of 5 Issue Date: Effective Date: Case No.: 14-08-0580P LOMR-APP Washington, D.C. 20472 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Federal Emergency Management Agency LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (P.L. 93-234) and in accordance with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, P.L. 90-448), 42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements to which the regulations apply. We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of the NFIP regulations. COMMUNITY REMINDERS We based this determination on the base (1-percent-annual-chance) flood discharges computed in the FIS for your community without considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects upstream could cause increased flood discharges, which could cause increased flood hazards. A comprehensive restudy of your community’s flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of the FIS report for your community and could, therefore, establish greater flood hazards in this area. Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or State/Commonwealth law have been obtained. State/Commonwealth or community officials, based on knowledge of local conditions and in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take precedence over the minimum NFIP requirements. We will not print and distribute this LOMR to primary users, such as local insurance agents or mortgage lenders; instead, the community will serve as a repository for the new data. We encourage you to disseminate the information in this LOMR by preparing a news release for publication in your community's newspaper that describes the revision and explains how your community will provide the data and help interpret the NFIP maps. In that way, interested persons, such as property owners, insurance agents, and mortgage lenders, can benefit from the information. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. 132942 PT202.BKR.14080580P.H20 102-I-C Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration Page 4 of 5 Issue Date: Effective Date: Case No.: 14-08-0580P LOMR-APP Washington, D.C. 20472 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Federal Emergency Management Agency LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION (CONTINUED) We have designated a Consultation Coordination Officer (CCO) to assist your community. The CCO will be the primary liaison between your community and FEMA. For information regarding your CCO, please contact: Ms. Jeanine D. Petterson Director, Mitigation Division Federal Emergency Management Agency, Region VIII Denver Federal Center, Building 710 P.O. Box 25267 Denver, CO 80225-0267 (303) 235-4830 STATUS OF THE COMMUNITY NFIP MAPS We will not physically revise and republish the FIRM and FIS report for your community to reflect the modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and FIS report warrant physical revision and republication in the future, we will incorporate the modifications made by this LOMR at that time. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. 132942 PT202.BKR.14080580P.H20 102-I-C Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration Page 5 of 5 Issue Date: Effective Date: Case No.: 14-08-0580P LOMR-APP Washington, D.C. 20472 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Federal Emergency Management Agency LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION (CONTINUED) A notice of changes will be published in the Federal Register. This information also will be published in your local newspaper on or about the dates listed below and through FEMA’s Flood Hazard Mapping website at https://www.floodmaps.fema.gov/fhm/Scripts/bfe_main.asp. LOCAL NEWSPAPER Name: The Fort Collins Coloradoan Dates: August 8, 2014 and August 15, 2014 Within 90 days of the second publication in the local newspaper, a citizen may request that we reconsider this determination. Any request for reconsideration must be based on scientific or technical data. Therefore, this letter will be effective only after the 90-day appeal period has elapsed and we have resolved any appeals that we receive during this appeal period. Until this LOMR is effective, the revised flood hazard determination information presented in this LOMR may be changed. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. 132942 PT202.BKR.14080580P.H20 102-I-C Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration 15,100 3,600 11,992 1.3 4,820.7 4,820.7 4,821.4 0.7 18,988 901 2,871 1.6 4,826.7 4,826.7 4,827.6 0.9 C 20,738 385 446 6.0 4,833.5 4,833.5 4,833.9 0.4 D 21,993 1,011 1,277 2.1 4,836.7 4,836.7 4,837.7 1.0 E 23,278 1,004 4,622 1.0 4,837.1 4,837.1 4,838.0 0.9 F 24,268 1,000 3,848 1.2 4,837.3 4,837.3 4,838.2 0.9 G 24,993 900 890 5.3 4,841.1 4,841.1 4,841.3 0.2 H 25,893 1,000 3,163 1.5 4,842.2 4,842.2 4,843.2 1.0 I 27,193 700 1,154 4.1 4,843.9 4,843.9 4,844.7 0.8 J 27,903 600 726 6.5 4,849.9 4,849.9 4,850.4 0.5 K 29,603 796 3,402 1.4 4,850.3 4,850.3 4,851.3 1.0 L 30,103 451 692 6.8 4,853.3 4,853.3 4,853.6 0.3 1 Feet above Larimer-Weld County Line Road FEDERAL EMERGENCY MANAGEMENT AGENCY LARIMER COUNTY, CO AND INCORPORATED AREAS CACHE LA POUDRE RIVER - I-25 DIVIDED FLOW TABLE 4 FLOODWAY 1-PERCENT ANNUAL CHANCE FLOOD WATER SURFACE ELEVATION FLOODWAY DATA CACHE LA POUDRE RIVER - INTERSTATE HIGHWAY 25 DIVIDED FLOW FLOODING SOURCE A B CROSS SECTION DISTANCE1 WIDTH (FEET) SECTION AREA (SQUARE FEET) MEAN VELOCITY (FEET PER SECOND) REGULATORY (NAVD 88) INCREASE (FEET) WITHOUT FLOODWAY (FEET NAVD) WITH FLOODWAY (NAVD 88) REVISED DATA REVISED DATA 4834 4831 4832 FLOODING I-25 DIVIDED EFFECTS FLOW CHACHE LA POUDRE RIVER c7 STAR GAZER DRIVE ECLIPSE LANE OBSERVATORY DRIVE SOUTHERN CROSS LANE ROCK CREEK DRIVE STEELHEAD STREET PRECISION DRIVE , , , , K 4850.3 4850 4850 4847 4843 , , , , G 4841.1 , , , , H 4842.2 , , , , I 4843.9 BROOKFIELD DRIVE NORTHERN DRIVE LIGHTS CINQUEFOIL LANE 4837.1 , , , , C BIG DIPPER DRIVE LITTLE DRIVE DIPPER GALILEO DRIVE FULL DRIVE MOON , , , , J , , , , J 4849.9 , , , , L 4853.3 4835 4833 4836 4834 4834 4843 4828 4831 4836 4844 4831 4832 BYREVISED AREA LOMR DATED NOVEMBER 2008 14, 4853 4829 4830 4835 4837 4850 4837 4847 4837 4839 4841 4842 4843 4842 4841 4853 4850 REAVRIESAED 4836 4850 4837 4844 4839 , , , , I 4843.9 , , , , H 748 Whalers Way, Suite 200 Fort Collins, CO 80525 ideas@tstinc.com 970.226.0557 main 303.595.9103 metro 970.226.0204 fax www.tstinc.com 4842.2 , , , , F 4837.3 , , , , E 4837.1 , , , , D 4836.7 4833.5 , , , , C á á á á á á á á á á á á á á á á á á á á á á á á AB 4837.3 á á á á áá áá á á á á á á á á áá áá á á á á AC 4838.8 á á á á á á á á á á á á á á á á á á á á á á á á AD 4839.7 á á á á áá áá á á á á á á á á áá áá á á á á AE 4840.1 á á á á á á á á á á á á á á á á á á á á á á á á AF 4840.6 á á á á áá áá á á á á á á á á áá áá á á á á AG 4843.8 á á á á á á á á á á á á á á á á á á á á á á á á AH 4844.1 ZONE AE ZONE AE c36 k25 PONDS DRIVE COUNTY ROAD 36 ROAD Fort City Collins of 080102 Timnath Town of 080005 Town 080005 of Timnath Unincorporated Larimer County Areas 080101 FRONTAGE INTERSTATE ROAD 25 c 38 Cache I-La 25 Divided Poudre River Flow Path T. 7 N. T. 6 N. La Cache Poudre River BoxelderDitch Profile Baseline NOTE: IS LOCATED MAP AREA WITHIN SHOWN TOWNSHIP ON THIS 6 NORTH PANEL RANGE RANGE 68 68 WEST WEST. AND TOWNSHIP 7 NORTH 10 34 3 , , , , K 4850.3 BYREVISED LOMR AREA DATED JUNE 18, 2012 , , , , G 4841.1 Fossil Creek Reservoir Inlet HARMONY ROAD SCALE Map Projection: NAD83 STATE PLANE Colorado North FIPS 0501 (Feet) 1 inch = 500 feet 1:6,000 Western Hemisphere; Vertical Datum: NAVD88 0 250000 500 1,Feet 0 75 150 300 Meters NATIONAL FLOODPROGRAM INSURANCE FLOOD INSURANCE RATE MAP AndCOLORADO LARIMER Incorporated COUNTY, Areas PANEL 1013 OF 1420 Panel Contains: COMMUNITY NUMBER PANEL SUFFIX 1013 1013 1013 F F F FORT CITY OF COLLINS, LARIMER COUNTY TIMNATH, OF TOWN 080102 080101 080005 MAP NUMBER MAP REVISED 08069C1013F DECEMBER 19, 2006 VERSION N1U.MBER1.1.0 SPECIAL HAZARD FLOOD AREAS OTHER FLOOD AREAS HAZARD OF Without Base Flood Elevation (BFE) With BFE or Depth Regulatory Floodway 0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas depth areas of less less than than one one foot square or with mile drainage Future Chance Conditions Flood Hazard 1% Annual Area SeeLevee Notes. with Reduced Flood Risk due to Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X Zone X Zone X 4849.9 4850 ZONE AE Fossil Creek Reservoir Inlet ZONE AE REAVRIESAED NOTE: IS LOCATED MAP AREA WITHIN SHOWN TOWNSHIP ON THIS 6 NORTH, PANEL RANGE RANGE 68 68 WEST WEST. AND TOWNSHIP 7 NORTH, City of 080102 Fort Collins Unincorporated Larimer County Areas 080101 9 10 33 34 3 4 c36 City of 080102 Fort Collins T. T. 7 6 N. N. H ARMONY ROAD SCALE Map Projection: NAD83 STATE PLANE Colorado North FIPS 0501 (Feet) 1 inch = 500 feet 1:6,000 Western Hemisphere; Vertical Datum: NAVD88 0 250000 500 1,Feet 0 75 150 300 Meters NATIONAL FLOODPROGRAM INSURANCE FLOOD INSURANCE RATE MAP AndCOLORADO LARIMER Incorporated COUNTY, Areas PANEL 994 OF 1420 Panel Contains: COMMUNITY NUMBER PANEL SUFFIX 0994 0994 F F FORT CITY OF COLLINS, LARIMER COUNTY 080102 080101 MAP NUMBER MAP REVISED 08069C0994F DECEMBER 19, 2006 VERSION N1U.MBER1.1.0 SPECIAL HAZARD FLOOD AREAS OTHER FLOOD AREAS HAZARD OF Without Base Flood Elevation (BFE) With BFE or Depth Regulatory Floodway 0.of 2% 1% Annual annual Chance chance Flood flood with Hazard, average Areas depth areas of less less than than one one foot square or with mile drainage Future Chance Conditions Flood Hazard 1% Annual Area SeeLevee Notes. with Reduced Flood Risk due to Zone A,V, A99 Zone AE, AO, AH, VE, AR Zone X Zone X Zone X #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS H23 Check Basin Shape Pond B CWP Permanent Pool Volume UD Detention Pond B PermPool VolCalc, Basin 9/27/2016, 10:19 AM SW Corner of Harmony Road and Strauss Cabin Road September 27, 2016 H23 - Pond B Design Procedure Form: Constructed Wetland Pond (CWP) Riprap Pads Choose One Excess Urban Runoff Volume (EURV) Choose One A B C / D Water Quality Capture Volume (WQCV) Choose One YES NO UD-BMP_v3.05 - H23 Pond B, CWP 9/27/2016, 1:52 PM #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS H23 Check Basin Shape Pond B UD Detention Pond B VolCalc, Basin 9/27/2016, 10:21 AM #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS H23 Check Basin Shape Pond A CWP Permanent Pool Volume UD Detention Pond A PermPool VolCalc, Basin 9/27/2016, 10:19 AM SW Corner of Harmony Road and Strauss Cabin Road September 27, 2016 H23 - Pond A Design Procedure Form: Constructed Wetland Pond (CWP) Concrete forebays and riprap pads Choose One Excess Urban Runoff Volume (EURV) Choose One A B C / D Water Quality Capture Volume (WQCV) Choose One YES NO UD-BMP_v3.05 - H23 Pond A, CWP 9/27/2016, 1:52 PM #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS H23 Check Basin Shape Pond A UD Detention Pond A VolCalc, Basin 9/27/2016, 10:20 AM From the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Appendix A OLVWHGEHORZ 6RLO6XUYH\$UHD /DULPHU&RXQW\$UHD&RORUDGR 6XUYH\$UHD'DWD 9HUVLRQ6HS 6RLOPDSXQLWVDUHODEHOHG DVVSDFHDOORZV IRUPDSVFDOHV RUODUJHU 'DWH V DHULDOLPDJHVZHUHSKRWRJUDSKHG $SU²$SU  7KHRUWKRSKRWRRURWKHUEDVHPDSRQZKLFKWKHVRLOOLQHVZHUH FRPSLOHGDQGGLJLWL]HGSUREDEO\GLIIHUVIURPWKHEDFNJURXQG LPDJHU\GLVSOD\HGRQWKHVHPDSV$VDUHVXOWVRPHPLQRUVKLIWLQJ RIPDSXQLWERXQGDULHVPD\EHHYLGHQW &XVWRP6RLO5HVRXUFH5HSRUW  VKHHW ZKHQ WKRURXJKO\ZHW7KHVHFRQVLVWFKLHIO\RIFOD\VWKDWKDYHDKLJKVKULQNVZHOOSRWHQWLDO VRLOVWKDWKDYHDKLJKZDWHUWDEOHVRLOVWKDWKDYHDFOD\SDQRUFOD\OD\HUDWRUQHDUWKH VXUIDFHDQGVRLOVWKDWDUHVKDOORZRYHUQHDUO\LPSHUYLRXVPDWHULDO7KHVHVRLOVKDYH DYHU\VORZUDWHRIZDWHUWUDQVPLVVLRQ ,IDVRLOLVDVVLJQHGWRDGXDOK\GURORJLFJURXS $'%'RU&' WKHILUVWOHWWHULVIRU GUDLQHGDUHDVDQGWKHVHFRQGLVIRUXQGUDLQHGDUHDV2QO\WKHVRLOVWKDWLQWKHLUQDWXUDO FRQGLWLRQDUHLQJURXS'DUHDVVLJQHGWRGXDOFODVVHV &XVWRP6RLO5HVRXUFH5HSRUW  DQGWKUHH GXDOFODVVHV $'%'DQG&' 7KHJURXSVDUHGHILQHGDVIROORZV *URXS$6RLOVKDYLQJDKLJKLQILOWUDWLRQUDWH ORZUXQRIISRWHQWLDO ZKHQWKRURXJKO\ ZHW7KHVHFRQVLVWPDLQO\RIGHHSZHOOGUDLQHGWRH[FHVVLYHO\GUDLQHGVDQGVRU JUDYHOO\VDQGV7KHVHVRLOVKDYHDKLJKUDWHRIZDWHUWUDQVPLVVLRQ *URXS%6RLOVKDYLQJDPRGHUDWHLQILOWUDWLRQUDWHZKHQWKRURXJKO\ZHW7KHVHFRQVLVW FKLHIO\RIPRGHUDWHO\GHHSRUGHHSPRGHUDWHO\ZHOOGUDLQHGRUZHOOGUDLQHGVRLOVWKDW KDYHPRGHUDWHO\ILQHWH[WXUHWRPRGHUDWHO\FRDUVHWH[WXUH7KHVHVRLOVKDYHD PRGHUDWHUDWHRIZDWHUWUDQVPLVVLRQ