Loading...
HomeMy WebLinkAboutBRICK STONE APARTMENTS ON HARMONY - PDP ..... HEARING SET - PDP160019 - PLANS - UTILITY PLANSPP PPAA A A S SS S SS S S WWWW AA A A YY Y Y P AS S W A Y T TTT RR RR II II PP P PPP PP CC CC T TTTT R I P P C T R R R R OO O OM M M M A A AAVV V V A A A CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A. GENERAL NOTES 1. All materials, workmanship, and construction of ppublic improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Preliminary Drainage Report for Brick Stone Apartments dated June 29, 2016 by Northern Engineering Services, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall S CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC VAULT ELEC TELE TELE S VAULT F.O. VAULT ELEC H Y D T T T E E T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T W W W W W W W W W W W W W W W W W W W W T T T EV E E E E G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E G G S W F UD UD UD UD UD UD UD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD S CONTROL IRR CONTROL IRR CONTROL IRR TELE TELE S VAULT F.O. VAULT ELEC T T E E T T T T T T T EV E E E E G G G G G G G G G G G G G G G G G G G G G E E E E E E E E E E E E E E E E E E G G S W F UD UD UD UD UD UD UD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD S CONTROL IRR CONTROL IRR CONTROL IRR TELE TELE S T T E E T T T T T T T T T T T T T T T T T T T T T T T VAULT F.O. VAULT ELEC G G G LOD S89° 29' 13.31"E 50.000 EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) 12' TRAVEL LANE 6' BIKE LANE 12' TRAVEL LANE 6' BIKE LANE BUS STOP PAD SAWCUT LINE SAWCUT LINE SAWCUT LINE 5010 5015 5020 5025 5030 5035 5040 5045 5010 5015 5020 5025 5030 5035 5040 5045 9+50 10+00 11+00 12+00 13+00 14+00 5029.02 5028.32 5027.62 5026.92 5028.85 5028.67 5028.50 5028.15 5027.97 5027.80 5027.45 5027.27 5027.10 5026.70 5026.47 5026.34 PROPOSED GROUND EXISTING GROUND -0.50% -0.70% -0.90% PVI STA = 10+00.00 PVI ELEV = 5029.02 PVI STA = 12+99.77 IRR 6' BIKE LANE STORM DRAIN SEE SHEET ##### EXISTING DRIVE 26' TRAVEL LANE 8' SIDEWALK 12' TURN LANE RELOCATE LIGHT PROPOSED STRIPPING (TYP.) PROPOSED 30" VERTICAL CURB AND GUTTER EXISTING STRIPPING (TYP.) TURN LANE STRIPPING (TYP.) BIKE LANE STRIPPING (TYP.) SAWCUT LINE SAWCUT LINE PROPOSED GROUND EXISTING GROUND INLET 5010 5015 5020 5025 5030 5035 5040 5045 5010 5015 5020 5025 5030 5035 5040 5045 14+00 15+00 16+00 17+00 18+00 18+50 5026.21 5026.09 5025.96 5025.84 5025.71 5025.59 5025.46 5025.34 5025.21 5025.09 5024.96 5024.84 5024.71 5024.77 5024.90 PVI STA = 17+06.62 PVI ELEV = 5024.68 PVI STA = 17+65.95 PVI ELEV = 5025.02 -0.50% FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 10+50 5021 5024 5028 5032 5036 5021 5024 5028 5032 5036 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+00 5020 5024 5028 5032 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+50 5020 5024 5028 5032 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+00 5020 5024 5028 5032 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+00 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+50 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 16+00 5019 5020 5024 5028 5032 5019 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 16+50 5019 5020 5024 5028 5032 5019 5020 S CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC VAULT ELEC TELE TELE S VAULT F.O. VAULT ELEC H Y D T T T E T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD S CONTROL IRR CONTROL IRR CONTROL IRR TELE TELE S VAULT F.O. VAULT ELEC H Y D T T E G SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / w i1 EXISTING DRAINAGE CULVERT EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP MAIL CREEK FLOODWAY FORT COLLINS SUPPORTIVE HOUSING SUBDIVISION LOT 26 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES S F UD UD UD UD 50' DRAINAGE EASEMENT LARIMER COUNTY DITCH #2 48 MC-4500 CHAMBERS 118 MC-4500 CHAMBERS ISOLATOR ROW FLOW CONTROL MANHOLE FLOW CONTROL MANHOLE ISOLATOR ROW os.2 CTIY FLOODPLAIN INLET INLET INLET INLET PEDESTRIAN BRIDGE 10' DRAINAGE EASEMENT RIP RAP RIP RAP TOP OF BANK TOP OF BANK TOP OF BANK 3:1 3:1 5:1 4:1 4:1 4:1 4:1 3:1 8:1 4:1 4:1 ??? ??? ??? (3.3:1) (3.8:1) (1.4:1) (1.1:1) (2.1:1) (3.8:1) (2.8:1) (9.5:1) (2.7:1) (2.6:1) (3.2:1) (3.3:1) (9.2:1) (7.0:1) (2.9:1) (2.5:1) (3.9:1) (3.8:1) 8575 - 5006.91 NAVD 88 8385 - 5003.11 NAVD 88 8830 - 5010.09 NAVD 88 FFE=29.50 FFE=29.50 FFE=17.50 E.1 OS.4 W.1 OS.1 E.2 OS.2 OS.3 e 10' DRAINAGE EASEMENT CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GRAPHIC SCALE: LEGEND: ST A2 a3 4950 4:1 79.45  HP RUNOFF SUMMARY TABLE: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH C5.01 DRAINAGE EXHIBIT DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) w W.1 0.77 0.91 1.00 6.5 5.0 1.81 7.65 e E.1 1.17 0.91 1.00 5.1 5.0 3.04 11.66 e E.2 0.38 0.44 0.55 7.7 6.4 0.41 1.95 e OS.1 0.22 0.95 1.00 5.0 5.0 0.60 2.20 OS.2 0.85 0.95 1.00 5.0 5.0 2.30 8.45 OS.3 0.19 0.53 0.66 12.4 9.5 0.20 1.00 OS.4 1.85 0.27 0.34 18.3 16.8 0.85 3.89 11 Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Drng\1229-001_DRNG.dwg LAYOUT NAME: C5.01 DATE: Sep 26, 2016 - 12:36pm CAD OPERATOR: cody LIST OF XREFS: [1229-001_xSITE] [1229-001_xEXST] [1229-001_xGRAD] [1229-001_xTOPO] [NES-xborder] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / H1 OS1 MAIL CREEK FLOODWAY EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP LOT 26 FAIRWAY ESTATES LOT 25 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES LARIMER COUNTY DITCH #2 EXISTING PIPES APPEAR TO BE ABANDONED EXISTING ROADSIDE DITCH EXISTING RIPRAP RUNDOWN EXISTING IRRIGATION CONCRETE STRUCTURE EXISTING CONCRETE BOX CULVERTS EXISTING 24" RCP CITY FLOODPLAIN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GRAPHIC SCALE: LEGEND: ST A2 a3 4950 4:1 79.45  HP RUNOFF SUMMARY TABLE: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH C5.00 HISTORIC DRAINAGE EXHIBIT DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 4.30 0.26 0.33 12.7 11.7 2.27 10.26 os1 OS1 1.09 0.95 1.00 8.2 7.9 2.49 9.39 10 Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Drng\1229-001_EX_DRNG.dwg LAYOUT NAME: C5.00 DATE: Sep 26, 2016 - 12:35pm CAD OPERATOR: cody LIST OF XREFS: [1229-001_xEXST] [1229-001_xTOPO] [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 17+00 5019 5020 5024 5028 5032 5019 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 17+50 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 5022.3 5025.71 5022.2 5025.46 5022.3 5025.21 5022.2 5024.96 5022.2 5024.71 5022.1 5022.08 R.O.W R.O.W R.O.W R.O.W R.O.W R.O.W (-1.64%) (-60.07%) (6.95%) (91.94%) (-14.02%) (-5.40%) (-1.79%) (-97.05%) (-2.84%) (93.53%) (-8.15%) (-4.50%) (-100.01%) (-1.72%) (-85.47%) (-2.84%) (93.53%) (-6.90%) (-1.40%) (-3.56%) (-1.71%) (-1.66%) (-92.97%) (-6.28%) (86.51%) (10.94%) (-0.09%) (-5.40%) (-1.60%) (-87.27%) (-6.03%) (96.39%) (8.99%) (-1.94%) (-1.94%) (--5.73%) (73.92%) (12.85%) (20.63%) (2.72%) EXISTING GROUND PROPOSED GROUND PROPOSED GROUND EXISTING GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND 1.9% 2.2% 3.1% 3.4% 4.0% 2.3% IRR 6' BIKE LANE STORM DRAIN SEE SHEET ##### EXISTING DRIVE 26' TRAVEL LANE 15+00 15+50 16+00 16+50 17+00 17+50 18+00 8' SIDEWALK 12' TURN LANE RELOCATE LIGHT PROPOSED STRIPPING (TYP.) PROPOSED 30" VERTICAL CURB AND GUTTER EXISTING STRIPPING (TYP.) TURN LANE STRIPPING (TYP.) BIKE LANE STRIPPING (TYP.) SAWCUT LINE SAWCUT LINE Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Strt\1229-001_STRT.dwg LAYOUT NAME: C4.03 DATE: Sep 26, 2016 - 12:35pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [1229-001 Streets] [1229-001_STRT_LEG] [1229-001_xSITE] [1229-001_xEXST] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C4.03 CROSS SECTIONS EAST HARMONY ROAD FLOWLINE CROSS SECTIONS CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING EDGE OF ASPHALT ST / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 9 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+50 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+00 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+50 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+00 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 FLOW LINE Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+50 5018 5020 5024 5028 5032 5018 5020 5024 5028 5032 -60 -40 -20 0 20 40 60 5029.2 5029.21 5028.9 5028.32 5026.9 5027.97 5023.9 5027.62 5025.1 5027.27 5025.3 5026.92 5022.9 5026.47 5025.6 5025.62 5022.7 5025.96 R.O.W R.O.W R.O.W R.O.W R.O.W R.O.W R.O.W R.O.W R.O.W (-3.82%) (-92.90%) (-2.42%) (2.22%) (-14.90%) (10.68%) (-7.41%) (-4.12%) (-4.71%) (-7.31%) (-2.00%) (-8.80%) (-3.47%) (1.07%) (-1.67%) (-52.02%) (-1.59%) (-3.21%) (-1.02%) (-1.30%) (-31.77%) (-28.55%) (-0.63%) (-4.28%) (-1.59%) (-55.00%) (10.43%) (-12.34%) (-20.00%) (-5.55%) (-3.11%) (-1.38%) (-14.29%) (-43.87%) (-7.70%) (-2.74%) (-4.17%) (-1.47%) (108.74%) (-6.95%) (-2.20%) (-14.47%) (-3.73%) (-2.93%) PROPOSED GROUND EXISTING GROUND EXISTING GROUND PROPOSED GROUND PARAPET WALL EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND PROPOSED GROUND EXISTING GROUND 1.9% 2.4% 2.9% 2.8% 2.8% 2.7% 2.9% 2.6% 2.3% VAULT F.O. VAULT ELEC G G G LOD S89° 29' 13.31"E 50.000 EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 12' TRAVEL LANE 6' BIKE LANE 12' TRAVEL LANE 6' BIKE LANE BUS STOP PAD SAWCUT LINE SAWCUT LINE SAWCUT LINE Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Strt\1229-001_STRT.dwg LAYOUT NAME: C4.02 DATE: Sep 26, 2016 - 12:35pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [1229-001 Streets] [1229-001_STRT_LEG] [1229-001_xSITE] [1229-001_xEXST] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C4.02 CROSS SECTIONS EAST HARMONY ROAD FLOWLINE CROSS SECTIONS CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING EDGE OF ASPHALT ST / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 8 SEE SHEET C4.01 0.50% 0.80% PROPOSED GRADE EXISTING GROUND HALF OF A 6-LANE ARTERIAL EAST HARMONY ROAD Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Strt\1229-001_STRT.dwg LAYOUT NAME: C4.01 DATE: Sep 26, 2016 - 12:35pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [1229-001 Streets] [1229-001_STRT_LEG] [1229-001_xSITE] [1229-001_xEXST] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C4.01 PLAN AND PROFILE EAST HARMONY ROAD FLOWLINE EAST HARMONY FLOWLINE CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING EDGE OF ASPHALT ST / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 7 SOUTH FLOWLINE HARMONY ROAD SCALE : 1" = 20' (H) 1" = 2' (V) SEE SHEET C4.00 SEE SHEET C4.00 TYPICAL CROSS SECTION PVI ELEV = 5026.92 PVI STA = 13+52.30 PVI ELEV = 5026.45 -0.50% -0.70% -0.90% PVI STA = 10+00.00 PVI ELEV = 5029.02 PVI STA = 12+99.77 PVI ELEV = 5026.92 PVI STA = 13+52.30 PVI ELEV = 5026.45 (0.45%) HALF OF A 6-LANE ARTERIAL EAST HARMONY ROAD Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Strt\1229-001_STRT.dwg LAYOUT NAME: C4.00 DATE: Sep 26, 2016 - 12:34pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [1229-001 Streets] [1229-001_STRT_LEG] [1229-001_xSITE] [1229-001_xEXST] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C4.00 PLAN AND PROFILE EAST HARMONY ROAD FLOWLINE EAST HARMONY FLOWLINE SOUTH FLOWLINE HARMONY ROAD SCALE : 1" = 20' (H) 1" = 2' (V) CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER EXISTING EDGE OF ASPHALT ST / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50 FEET. 5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. PROPOSED STORM INLET PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE NORTH ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 6 SEE SHEET C4.01 TYPICAL CROSS SECTION SEE SHEET C4.01 T T T T T T T T T T T T T T T T T T T W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G G SS SS SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / H Y D MAIL CREEK FLOODWAY EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP 50' DRAINAGE EASEMENT 15' UTILITY EASEMENT FORT COLLINS SUPPORTIVE HOUSING SUBDIVISION LOT 26 FAIRWAY ESTATES LOT 25 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES 3-RISERS HANDICAP RAMPS 4 RISERS 4 RISERS 18" VERTICAL CURB & GUTTER 18" VERTICAL CURB & GUTTER 18" VERTICAL CURB & GUTTER RETAINING WALL (BY OTHERS) GARAGE STAIRS (SEE ARCH.) STAIRS (SEE ARCH.) 18" VERTICAL CURB & GUTTER INLET INLET INLET INLET RISERS 6' TALL METAL PICKET FENCE EXTENSION OF UNDERGROUND 10'x30' CONCRETE BOX CULVERT CITY FLOODPLAIN RETAINING WALL (BY OTHERS) RETAINING WALL/PARAPET WALL (BY OTHERS) 10'' DRAINAGE EASEMENT 10'' DRAINAGE EASEMENT EXPOSED BACK OF CURB 23.91 23.02 22.74 22.78 22.84 18.01 17.40 17.26 17.24 17.24 17.39 17.50 TOF 17.50 TOF 17.21 17.18 17.18 17.24 17.54 17.90 17.62 17.53 17.51 16.48 16.93 16.98 15.90 15.63 15.21 18.59 19.04 19.33 20.67 20.59 20.47 19.75 19.82 19.84 19.85 19.97 19.97 19.99 20.06 20.42 20.48 20.91 21.90 22.69 (22.54) (23.77) 19.86 BOC 17.50 BOC 19.12 BOC 19.19 BOC 18.93 <edit> 24.37 TOF 20.52 TOF 29.50 TOF 19.12 TOF 18.67 TOF 18.84 TOF 18.22 17.00 16.27 TOF 15.93 TOF 16.17 <edit> 18.31 TOF 17.19 18.39 TOF 19.19 TOF 21.82 TOF 24.74 TOF 26.90 TOF 28.98 TOF 27.84 TOF 27.84 TOF 27.66 TOF 23.60 TOF 23.50 TOF 21.66 20.43 17.97 18.44 18.74 16.68 16.44 16.30 23.78 23.72 23.78 22.71 22.77 21.71 21.56 19.08 19.02 18.30 17.06 15.11 16.88 18.10 17.95 17.41 28.26 28.50 TOW 28.45 28.59 28.65 28.81 28.43 27.58 27.79 28.72 26.92 26.77 27.17 26.56 26.96 25.60 25.77 24.71 25.54 25.15 25.36 25.50 25.53 25.67 25.16 25.16 23.13 23.17 22.99 23.08 19.01 8.50 TOW 8.45 BOW 13.25 BOW 16.75 TOW 16.75 TOW 12.45 BOW 12.19 BOW 17.25 TOW 11.12 BOW 17.90 TOW 15.95 TOW 15.45 BOW 14.86 TOW 14.67 BOW 11.00 TOW 3.99 BOW 12.00 TOW 5.61 BOW 7.14 BOW 11.65 TOW 13.00 TOW 8.84 BOW 8.73 TOW 8.67 BOW 16.85 TOW 15.02 BOW 20.50 TOW 14.49 BOW 17.10 BOW 22.00 TOW 17.67 BOW 23.20 TOW 17.74 BOW 23.50 TOW 23.72 TOW 23.22 BOW 22.99 BOW 23.29 TOW 28.75 TOW 23.15 BOW 18.16 BOW 27.65 TOW 23.08 BOW 21.22 BOW 28.74 TOW 28.74 TOW 21.06 BOW 3:1 4:1 4:1 4:1 3:1 5:1 3:1 3:1 4:1 3:1 6:1 4:1 4:1 4:1 4:1 4:1 4:1 8:1 6:1 24:1 5:1 15:1 4.6% 1.0% 0.7% 4.9% 4.3% 4.9% 1.2% 1.3% 3.3% 3.3% 5.3% 4.9% 4.8% 5.5% 18.81 BOC 18.71 BOC 18.46 BOC 17.50 BOC 20.44 BOC TOP OF BANK TOP OF BANK TOP OF BANK TOP OF BANK RIP RAP RIP RAP RISERS RISERS RISERS RISERS RISERS 14:1 19:1 21:1 15:1 16:1 16:1 12:1 9:1 23:1 18:1 16:1 16:1 16:1 9:1 9:1 14:1 "RIGHT LANE MUST TURN" SIGN "RIGHT LANE MUST TURN" SIGN "RIGHT LANE MUST TURN" SIGN "NO PARKING FIRE LANE" SIGN BUS STOP 27.85 27.45 26.67 26.83 30' EMERGENCY ACCESS AND DRAINAGE EASEMENT 30' EMERGENCY ACCESS AND DRAINAGE EASEMENT FFE=29.50 FFE=29.50 FFE=17.50 (2.8:1) (2.8:1) (9.5:1) (2.9:1) (3.6:1) (6.1:1) (2.7:1) (5.1:1) (5.2:1) (3.2:1) (3.3:1) (6.4:1) (7.0:1) (5.7:1) (2.9:1) (9.2:1) (8.7:1) (3.0:1) (2.1:1) (6.6:1) (1.2:1) (2.2:1) (2.1:1) (3.8:1) (1.9:1) (1.9:1) (4.0:1) (2.3:1) (3.2:1) T T FO G (29.57) (29.36) CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LEGEND: NOTES: (47.45) 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3. ALL PROJECT ELEVATIONS ARE ON THE VERTICAL DATUM NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR ALL STRUCTURAL WALLS, RETAINING WALLS, LANDSCAPE WALLS, ETC. 5. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE BUFFER ZONE. 6. THE NATURAL HABITAT BUFFER ZONE IS MEANT TO BE MAINTAINED IN A NATIVE LANDSCAPE. THIS WILL HELP PRESERVE THE INTENTION BEHIND THE BUFFER ZONES AND THE NATURAL FEATURES INTO THE FUTURE. LOD PROPOSED VERTICAL CURB & GUTTER PROPOSED STORM INLET PROPOSED CONTOUR EXISTING CONTOUR PROPOSED SWALE PROPERTY BOUNDARY PROPOSED LOT LINE PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED SLOPES PEDESTRIAN ACCESS RAMPS APPROXIMATE LIMITS OF DEVELOPMENT SIDEWALK CHASE FIELD SURVEY BY: Northern Engineering Services, Inc NE Project No. 1229-001 Date: October 30, 2015 NORTH ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Grad\1229-001_GRAD.dwg LAYOUT NAME: C3.00 DATE: Sep 26, 2016 - 12:34pm CAD OPERATOR: cody LIST OF XREFS: [1229-001_xTOPO] [1229-001_xEXST] [1229-001_xSITE] [NES-xborder] [1229-001_xPutil] [1229-001_xGRAD] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C3.00 GRADING PLAN 5 17.50 PROPOSED SPOT ELEVATION BACK OF CURB BOC 17.50 PROPOSED SPOT ELEVATION TOP OF FOUNDATION TOF 17.90 PROPOSED SPOT ELEVATION TOP OF WALL TOW 7.14 PROPOSED SPOT ELEVATION BOTTOM OF WALL BOW 17.50 PROPOSED SLOPES TOP OF BANK SEE BELOW SEE ABOVE T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G G SS SS SS SS SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / H Y D FORT COLLINS SUPPORTIVE HOUSING SUBDIVISION LOT 26 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES EXISTING SAN MH RIM=5019.78 INV IN=5013.27 (W) INV OUT=5013.07 (E) ELECTRIC TRANSFORMER ELECTRIC METER PROPOSED ELECTRIC VAULT PROPOSED FIRE HYDRANT 1" METER W/ CURB STOP CONNECT TO EXISTING WATERLINE W/ 1" EXISTING TELEPHONE LINE EXISTING TELEPHONE LINE EXISTING TELEPHONE LINE EXISTING UNDERGROUND FIBER OPTIC RELOCATED FIRE HYDRANT ELECTRIC METER ELECTRIC TRANSFROMER SANITARY SERVICE CLEANOUT ELECTRIC SERVICE (TYP.) GAS SERVICE (TYP.) GAS METER GAS METER EXISTING TELEPHONE LINE EXISTING GAS EXISTING 12" WATER LINE EXISTING 18" RCP TOP= 5023.34 EXISTING 18" RCP TOP= 5023.67 1" DOMESTIC WATER SERICE 45° BEND W/ TB N: 107738.40 E: 195468.38 12" X 6" SWIVEL TEE 1 - 6" GV (S) 2 - 12" GV (W,E) N: 107809.79 E: 195264.59 MAIL CREEK FLOODWAY EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP EXISTING STORM CULVERT 30' EMERGENCY ACCESS EASEMENT 12" X 6" SWIVEL TEE 1 - 6" GV (S) 2 - 12" GV (W,E) N: 107805.09 E: 195469.71 48 MC-4500 STORMTECH CHAMBERS ISOLATOR ROW 6" DOMESTIC FIRE SERVICE EXISTING FIRE HYDRANT CAP EXISTING 18" RCP 15' UTILITY EASEMENT 50' DRAINAGE EASEMENT PROPOSED CONCRETE CULVERT 6" ROOF LEADER AT 2.00% 6" ROOF LEADER AT 2.00% 6" ROOF LEADER AT 2.00% 6" ROOF LEADER AT 2.00% 20.98 LF 6" PVC ISOLATOR ROW 118 MC-4500 STORMTECH CHAMBERS CITY FLOODPLAIN TOP OF BANK TOP OF BANK TOP OF BANK ABANDON EXISTING 24" PIPE 1.10' WATER LINE LOWERING 10' DRAINAGE EASEMENT FURTHER COORDINATION WITH CITY AND UTILITY PROVIDERS TO DETERMINE PLACEMENT 10' DRAINAGE EASEMENT RIP-RAP RIP-RAP PROPOSED PARAPET WALL 30' DRAINAGE AND ACCESS EASEMENT 50' LARIMER COUNTY CANAL No. 2 IRRIGATION COMPANY EASEMENT 15' UTILITY EASEMENT DRAINAGE AND EMERGENCY ACCESS EASEMENT MH E1.0 INV. IN=5020.59 (NW) INV. OUT=5020.59 (S) FG=5025.46 INLET E1.0 INV. OUT=5021.53 (SE) FG=5025.42 MH E2.0 INV. IN=5014.67 (N) INV. OUT=5014.67 (W) FG=5023.17 MH E3.0 INV. IN=5010.66 (E) INV. IN=5010.65 (W) INV. OUT=5010.66 (S) FG=5021.21 BEGIN VAULT E2 INV. IN=5010.42 (N) INV. OUT=5010.41 (S) FG=5020.94 MH E3.1 INV. IN=5010.65 (S) INV. OUT=5010.65 (E) FG=5019.46 END VAULT E5 INV. IN=5010.65 (W) INV. OUT=5010.65 (E) BEGIN VAULT E5 FG=5018.87 INV. IN=5011.19 (S) INV. OUT=5010.80 (E) FG=5016.25 INLET E3.0 INV. OUT=5012.35 (N) FG=5015.37 END VAULT E2 INV. IN=5010.22 (N) INV. OUT=5010.22 (S) FG=5019.94 EAST MONITORING WELL INV. IN=5010.11 (N) INV. OUT=5010.11 (SE) FG=5019.85 EAST FLOW CONTROL MANHOLE INV. IN=5010.06 (N) INV. IN=5010.06 (NW) INV. OUT=5010.06 (SW) FG=5016.56 EAST FES INV. IN=5009.87 (NE) FG=5009.68 19.73 LF 15" HDPE @ 1.00% 19.40 LF 15" HDPE @ 0.79% 62.26 LF 15" HDPE @ 6.44% 169.18 LF 15" HDPE @ 3.50% 48.49 LF 15" HDPE @ 1.94% 21.59 LF 4" PVC @ 0.20% 58.79 LF 4" PERFORATED PVC @ 0.20% 51.59 LF 4" PERFORATED PVC @ 0.20% 70.73 LF 4" PERFROATED PVC @ 0.20% 38.52 LF 15" HDPE @ 0.00% 8.97 LF 15" HDPE @ 0.00% 8.92 LF 15" HDPE @ 0.00% 23.11 LF 15" HDPE @ 5.00% BEGIN VAULT W1 INV. OUT=5012.46 (S) FG=5027.14 WEST MONITORING WELL INV. IN=5012.30 (N) INV. OUT=5012.30 (SE) FG=5024.30 END VAULT W1 INV. IN=5012.33 (N) INV. OUT=5012.34 (S) FG=5024.25 MH W1.0 INV. IN=5012.28 (N) INV. IN=5012.28 (E) INV. IN=5012.28 (NW) INV. OUT=5012.28 (S) FG=5024.00 MH W1.1 INV. IN=5012.30 (S) INV. OUT=5012.30 (W) FG=5023.94 INLET W1.0 INV. OUT=5012.62 (N) FG=5023.68 WEST FES INV. IN=5011.78 (N) FG=5011.67 36.52 LF 15" HDPE @ 1.38% 5.28 LF 15" HDPE @ 6.00% 7.57 LF 4" PVC @ 0.20% 64.28 LF 4" PERFORATED PVC @ 0.23% INLET E2.0 INV. OUT=5011.05 (NE) FG=5016.64 16.73 LF 15" HDPE @ 5.00% 64.40 LF 60" HDPE @ 0.20% (TYP.) 96.60 LF 60" HDPE @ 0.20% 30' EMERGENCY ACCESS EASEMENT Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Util\1229-001_UTIL.dwg LAYOUT NAME: C2.00 DATE: Sep 26, 2016 - 12:33pm CAD OPERATOR: cody LIST OF XREFS: [1229-001_xSITE] [1229-001_xEXST] [NES-xborder] [1229-001_UTIL_LEG] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W G T E EXISTING STORM SEWER ST PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING GAS EXISTING ELECTRIC METER EXISTING WATER METER EXISTING IRRIGATION BOX EXISTING POWER POLE EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES PROPOSED FIRE SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET EXISTING LIGHT POLE PROPOSED FIRE DEPT. CONN. PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER FDC PROPOSED LIGHT POLE PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE W CONTROL IRR W S O E G PROPERTY BOUNDARY S PROPOSED SEWER SERVICE PROPOSED CURB STOP & METER PIT W PROPOSED RESIDENTIAL WATER SERVICE (SEE UTILITY DETAIL SHEETS) PROPOSED ELECTRIC TRANSFORMER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 6. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 9. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER SERVICE LOCATIONS. IF CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO INSTALLATION OR ORDERING OF MATERIALS. 10. ALL STORM SEWER IS TO BE OWNED AND MAINTAINED BY PROPERTY MANAGER. 11. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 12. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS WITH ARCHITECT AND UTILITY PROVIDERS. 13. CONTRACTOR TO COORDINATE FINAL LOCATION OF IRRIGATION SHUT-OFF VALVE AND BACKFLOW DEVICE WITH LANDSCAPE ARCHITECT AND SPRINKLER CONTRACTOR. 14. CONTRACTOR TO COORDINATE SITE LIGHTING (LANDSCAPE) TO ENSURE NO CONFLICTS WITH OTHER UTILITIES. 15. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE BUFFER ZONE. 16. THE NATURAL HABITAT BUFFER ZONE IS MEANT TO BE MAINTAINED IN A NATIVE LANDSCAPE. THIS WILL HELP PRESERVE THE INTENTION BEHIND THE BUFFER ZONES AND THE NATURAL FEATURES INTO THE FUTURE. F APPROXIMATE LIMITS OF DEVELOPMENT LOD TOP OF BANK CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GRAPHIC SCALE: ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 NORTH City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C2.00 UTILITY PLAN # T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G G SS SS SS SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / H Y D 20' WIDE FORT COLLINS - LOVELAND WATER DISTRICT EASEMENT / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP LOT 26 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES FORT COLLINS SUPPORTIVE HOUSING SUBDIVISION CITY FLOODPLAIN / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / PRESERVE & PROTECT EXISTING CONCRETE BOX CULVERT OUTLET AND DRAINAGE STRUCTURE PRESERVE AND PROTECT EXISTING RIPRAP CHANNEL PRESERVE & PROTECT EXISTING TREES EDGE OF SCRUB TREES. CLEAR & GRUB VEGETATION AS NECESSARY WHILE PRESERVING SLOPE PER GRADING, EROSION CONTROL, AND LANDSCAPING PLANS. PRESERVE & PROTECT EXISTING TREES PRESERVE & PROTECT EXISTING TREES REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREE REMOVE TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT SIGN PRESERVE & PROTECT SIGN PRESERVE & PROTECT SIGN REMOVE SIGN REMOVE CURB & GUTTER PRESERVE & PROTECT CONCRETE WALL PRESERVE & PROTECT STEEL STRUCTURE PRESERVE & PROTECT SIGN EXISTING SANITARY SEWER MH RIM: 5019.78 INV. IN: 5013.27 (W) INV. OUT: 5013.07 (E) EXISTING SANITARY SEWER MH RIM: 5015.26 INV. IN: 5009.51 (8" PVC - E) INV. IN: 5009.59 (8" PVC - N) INV. OUT: 5009.49 (8" PVC - S) REMOVE FENCE RELOCATE PHONE PEDESTAL (SEE UTILITY PLANS) REMOVE TREE RELOCATE ELECTRIC VAULT (SEE UTILITY PLANS) EXISTING CURB AND GUTTER TO BE REMOVED EXISTING 18" RCP TOP= 5023.67 TO BE CAPPED EXISTING 18" RCP TOP= 5023.34 TO BE CAPPED REMOVE 40.42 LF 24" RCP @ 0.32% REMOVE WALL EXISTING CURB AND GUTTER TO BE REMOVED EXISTING IRRIGATION DITCH TO BE REMOVED EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT TO BE RELOCATED EXISTING UNDERGROUND TELEPHONE LINE EXISTING FIBER OPITC EXISTING PHONE PEDESTAL DRY UTILITY VAULT RELOCATIONS TO BE COORDINATED WITH CITY AND UTILITY PROVIDER TOP OF BANK TOP OF BANK TOP OF BANK ± 6530 SQ. FT ASPHALT REMOVAL EXISTING IRRIGATION CONTROL TO REMAIN BASIS OF BEARING: (M) S89°56'52"E (R) N89°52'E (M) S89°56'52"E 634.75' (R) N89°52'E 635.03' (M) S00°04'28"W 419.86' (R) N00°08'19"W (M) N54°53'34"W 331.94' (R) S55°06'25"E (M) N82°16'40"W 312.59' (R) S82°27'47"E (M) N01°01'40"E 266.17' (R) N00°51'W UTILITY EASEMENT (M) S36°16'28"W 97.48' (R) N36°05'20"E EX. 12" WATER EX. 12" WATER MAIL CREEK FLOODWAY LARIMER COUNTY DITCH #2 SAW CUT SAW CUT 30' EMERGENCY ACCESS EASEMENT VAULT F.O. VAULT ELEC H Y D T T T T T FO G G ± 1000 SQ. FT. ASPHALT REMOVAL ± 136.77' LF OF CURB AND GUTTER REMOVAL EXISTING FH TO BE RELOCATED RELOCATION OF DRY UTILITIES TO BE COORDINATED WITH THE CITY AND UTILITY PROVIDERS EXISTING STRIPING TO BE REMOVED SAW CUT EAST HARMONY ROAD (PUBLIC ROW VARIES) 115 EAST HARMONY ROAD E LEGEND: G T FIELD SURVEY BY: NOTES: SS W X VAULT ELEC CONTROL IRR ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 C1.00 & DEMOLITION PLAN EXISTING CONDITIONS Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Exist\1229-001_ECON.dwg LAYOUT NAME: C1.00 DATE: Sep 26, 2016 - 12:33pm CAD OPERATOR: cody LIST OF XREFS: [1229-001_xTOPO] [1229-001_xADJ] [NES-xborder] [1229-001_xEXST] [1229-001_xSITE] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 ORIGINAL FIELD SURVEY NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 1229-001 DATE: OCTOBER 30, 2015 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 5. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 7. CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 9. LIMITS OF CONCRETE REPAIRS TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. CONCRETE SHALL BE REMOVED FROM JOINT TO JOINT. 10. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 11. CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ITEMS. 12. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 13. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 14. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R FO / / / / / / / / / / / / / / / / / / / / / / / / / / 3 SEE DETAIL 1 (THIS SHEET) 1 be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 City of Fort Collins benchmark Y402 Found 235.9' south of the center of Palmer drive, 105' east of the centerline of the northbound lanes of US Highway 287, west of a brick sign in a 5-inch logo cap. Elevation=5018.96 City of Fort Collins benchmark 4-08 On the south side of Harmony Rd. at the northwest corner of 625 East Harmony Rd. (Front Range Baptist Church) on the north wall of a concrete irrigation drop structure. Elevation=5017.14 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.20'. Basis of Bearings Basis of Bearings is the North line of the Northwest Quarter of Section 1, Township 6 North, Range 69 West of the 6th P.M. as bearing South 89°56'52" East (assumed bearing). 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: N.A. CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Preliminary Drainage Report for Brick Stone Apartments dated June 29, 2016 by Northern Engineering Services, Inc., shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\1229-001_COVR.dwg LAYOUT NAME: C0.01 DATE: Sep 26, 2016 - 12:32pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [Ripley Design] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C0.01 CONSTRUCTION NOTES GENERAL & 2 A L LLL L LL L E E E E YY YY C C CC T T TT R OM A VA L L E Y C T S S SS N N N N EE EEA A A A D D DD DD D D R R RR S N E A D D R SS SS AA AA NN NN D D DD Y YY Y C CC C OO OO VV V V EE EE LL LL N N N N S AN D Y CO V E L N SS S S AA A A WW WW GG G G R R RR AAAASS SS S S S S C C CC T T TT S A W G R A S S C T CC CC OO O O R R RROOO ONN N NAAA A DDDD OO OO CC C CTTT T C O R ONAD O CT CC C C AA A A SS SS T T T T L L L L EEE E RR R R II I I DD D D G G GG E E EE P P PP L L LL C A S T L E R I D G E P L PP PPRRRRAA A A II I IRRRR II IIEEEE SS S STTTT P RAIR I E ST MMM M AA A A PPP P LL L L EE EE T T TT O OO O NNN N C C C C TTT T M A P L E T O N C T M M MM A A A A II I I LL LL CC C C RR R R E E EEEE EE KK KK CCC C TTT T M A I L CR E E K C T G G GG R RRREEEEEEEEN N N N WWWWAAAAY Y YY D DDDR GREE RRR N WAY DR TT T TOOOOWWW WHHHHEEEEEEE TOWHEE E SSSSTTTT ST CC C C AA AA M M MM EEEE R R R R O O OO N N NN DDD D RR R R C A M E R O N D R MM MM EE E E A A A AD D D D OO OO WW WW RR RR UU U U N N N N D D DD RR R R M EA D O W R U N D R FF FF O OOO SS SSSS S S IIII L LL L C C C C TT TT WW WW F O SS I L C T W MMMMA A A A IIIIL L LL C CCCRR RR EE EEE E EE K KKK LL L L M NNNN A IL C R EEK L N CC CC O O OO N NNNEEEEJJ JJ O OOOS S SS RRRRDD DD C ONE J OS R D PPPP AA AA V V VV II I I LLL L IIIIOOOO NNNN L L L L N N NN P A V I L IO N L N NN N N IIII CC CC K K K KLL LL AA A A UU UU SS SS CCC C TT TT N I C K L A U S C T SSSSTTTTAA AARRRRLLLL IIIINNNNGGG STARLING G SSSSTTTT ST BB B B EE EE B E OO OO WWW W LLLL C C C C TT T T O W L C T SSSSAA AANNNNDDD DRRRREEEE EEEEDDD DCCC C TT TT SANDREED C T MMMMA AAAXXXXW WWW E E EE LL L L L L L L D D DD R RRR MAX W E L L DR P P P PA A AA R R RR KK K K WWW W A A A AY Y Y Y CC C CTT P TT A R K W AY C T GG GG OO OOS S SSHHHH A AAAWW WWKK KK DDDDR R RR G OSHAW K DR SS S S W W W W II I I TT TT C C CC H HH H GG GG RR RR A A A A S S S S S S SS CC C C TTTT S W I T C H G R A S S C T PPPP LLLLAAAAYY YYEEEERRRR D PLAYERDDDRRRR DR HHHHUUUUMM MMMMMMIIIIN N NN GGGGBBBBII IRRRRDDDD I D DDD RR R R HUMMI N GBIRD D R G G GG R R RR EE EE E E E E NNN N V VVVIIIIEE EE W W WW D DDDR RRR G R E E N VI E W DR B BBBEE EE LLL L VV V VEE EE DDDD E E EE R RRR E EE E P PPP LL L L B E L V E D E R E P L IIII SS S S E E EE LL LL NN NN I S E L N S AA A A II II LL L L L LLL NN N N A I L N PP PPA A A A RRR R KKK K W W WW AA A A YY YY CC C C II II R RR R P A R K W A Y C I R W W W W EE E E SSSS TTTT S S SS H HH H OO O O RR RR EE E E CCCC T T TT W E S T S HO R E C T BBBBLL LL UU UU E E E E S SSS TT TT E E E E MMMM C CC C T T T T BLU E S T E M C T BB B B RR RR EE EEA AAA K K K K WW W W AA AA T T T T EEEE R R RR C C C C TT TT B R E A K W A T E R C T S S SS P P PP R R RR I IIINN N N GG GG C CC CA AAANN NN YY YYO O OO NN NN CCCCTTT T S P RI N G C A N Y O N CT JJ JJ OO O O NNNN A A AA T TTT HH HH A A AA NNNN C CCC T T TT J O N A T H A N C T VV VV EE E E NN N N TT TT UUUU R R RR II I I LLLL NN NN V E N T U R I L N VV V V EE EE NNNN T T TT UUUU RRRR IIII LL LL NNN N V E N T UR I L N CC CC HH H H U U U U KK K K AA A AR RR R C C C C TTT T C H U K A R C T S S SS EE EE AA AA BBBB O OOOAAAARRRRD DDD LLLLNNNN S E A B OARD LN FF F F OO OO SS SS S SSS II II LL LL B B BB L LLL V V V V DD DD F O SS I L B L V D H HHH II I I GGG G HH HH P PP POO OO I II IN NNN TT TTEE EE DDD D RR RR H I G H P O I N T E D R CC C CA A AA SS S S T T T T L LLL EE EE R R RR I II I D DD D G G GG E E EE CC CC TTT T CAS T L E R I D G E C T FF FF OO O O SSSS SSSS II I I LL LL CC CC T TT T EEE E F O S S I L C T E NN N N AA AA PP PP AA AA VV V V AA A ALL LL L L L L E E E EYYY Y D D DD R RRR N A P A V A L LEY D R KKKKEEEE NNNNSSSSIII INNNNGGGGTTT TOOOONNNN DDD KENSINGTON DRRRR DR CCCCR RRREEEESSSST CRESTRRRRDDDD TTT RD C CCCRRRREEEES SSSTT T T RRRRDD CRES DD T RD PP PP II I I PP PP II II T T T T C C CC TT TT P I P I T C T GG GG RR RR EE E E EEEE NN NN VV VVAAAA LL LL EEEE DDD D RR RR G R EE N VA L E D R FFFF OO OO SS S S S S SS I I II L LLL RR RR I I II D D D D GGG G EEEE DD D D R R R R F O S S I L R I D G E D R H H HH OO O O GGG G A A AA NN NN DD DD R R RR H O G A N D R HH HHOO O O GGGGAAAA NNNN DDDDRR H RR O GAN DR W W WW E E EE SS SS TT TT SS S S HH H H O O OO RR RR EEE E W WWW AAA A YY Y Y W E S T S H O R E W A Y G G GG R RRRIIIIFFFFF F FF IIIITTTT HH HH D DDDRR RR GRIF F ITH D R E. HARMONY RD. S. COLLEGE AVE. (US 287) SEPTEMBER 2016 CONTACT INFORMATION PROJECT TEAM: Northern Engineering Services, Inc. Nick Haws, PE 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Northern Engineering Services, Inc. Eric Smith, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 ENGINEER ING N O R T H E RN ENGINEER ING N O R T H E RN I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT LOCATION VICINITY MAP NORTH SITE ENGINEER SURVEYOR PROJECT DATUM: NAVD88 City of Fort Collins benchmark Y402 Found 235.9' south of the center of Palmer drive, 105' east of the centerline of the northbound lanes of US Highway 287, west of a brick sign in a 5-inch logo cap. Elevation=5018.96 City of Fort Collins benchmark 4-08 On the south side of Harmony Rd. at the northwest corner of 625 East Harmony Rd. (Front Range Baptist Church) on the north wall of a concrete irrigation drop structure. Elevation=5017.14 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.20'. Basis of Bearings Basis of Bearings is the North line of the Northwest Quarter of Section 1, Township 6 North, Range 69 West of the 6th P.M. as bearing South 89°56'52" East (assumed bearing). Northern Engineering Services, Inc NE Project No. 1229-001 Date: October 30, 2015 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: SHEET INDEX COVER SHEET C3.00 GRADING PLAN GENERAL & CONSTRUCTION NOTES C0.00 C0.01 EXISTING CONDITIONS & DEMOLITION PLAN C1.00 PRELIMINARY UTILITY PLANS FOR A TRACT OF LAND LOCATED IN THE NORTHWEST QUARTER OF SECTION 1, TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO BRICK STONE APARTMENTS ON HARMONY CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7857 ELECTRIC-------- City of Fort Collins Light & Power-- Justin Fields (970) 224-6150 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink-------------------------------William Johnson (970) 377-6401 WATER------------ City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 WASTEWATER--City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 STORMWATER- City of Fort Collins Utilities----------- Wes Lamarque (970) 416-2418 Ben Massimino ##### UTILITY PLAN SEEC Enterprises P.O. Box 680513 Park City, UT 84068 PLANNER/ LANDSCAPE ARCHITECT DEVELOPER/APPLICANT Ripley Design, Inc. 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 (970) 224-5828 C4.00 EAST HARMONY ROAD PLAN AND PROFILE C4.01 EAST HARMONY ROAD PLAN AND PROFILE Sheet Of 11 Sheets BRICK STONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\1229-001_COVR.dwg LAYOUT NAME: C0.00 DATE: Sep 26, 2016 - 12:32pm CAD OPERATOR: cody LIST OF XREFS: [NES-xborder] [Ripley Design] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET E NGINEER ING N O R T H E RN 9.27.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 C0.00 COVER SHEET ■ land planning ■ landscape architecture ■ ■ urban design ■ entitlement ■ Eric L. Bracke, P.E., P.T.O.E. ELB Engineering, LLC 5401 Taylor Lane Fort Collins, CO 80528 (970) 988-7551 TRAFFIC ENGINEER C5.00 HISTORIC DRAINAGE EXHIBIT C5.01 DRAINAGE EXHIBIT 1 C4.02 EAST HARMONY ROAD CROSS SECTIONS C4.03 EAST HARMONY ROAD CROSS SECTIONS