HomeMy WebLinkAboutTIMBERLINE STORAGE - FDP - FDP160038 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1269-001 Location: Fort Collins, CO
Date: September 20, 2016 Total Acres: 4.82
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
each 6 $100.00 $600.00
each 4 $125.00 $500.00
each 28 $125.00 $3,500.00
each 1 $300.00 $300.00
each 1 $200.00 $200.00
Erosion Control Matting sq. yd. 0 $3.00 $0.00
acre 1.12 $1,000.00 $1,120.00
TOTAL = $6,220.00
TOTAL = $9,330.00
TOTAL = $7,230.00
REQUIRED AMOUNT OF SECURITY = $9,330.00
NOTE: 'Total Acres' represents total disturbed area.
COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5
(WHICHEVER IS GREATER)
Timberline Storage
Erosion Control Cost Estimate
Vehicle Tracking Control Pads
AMOUNT OF SECURITY = 1.5 x $6,220.00
Vegetate Landscaped Areas
Inlet Protection
Rock Socks
Concrete Washout Area
Wattle Dikes
- OR -
=
=
D:\Projects\1269-001\Drainage\Erosion\1269-001_Erosion-Escrow-Estimate.xls