Loading...
HomeMy WebLinkAboutVILLAGE ON HORSETOOTH (AFFORDABLE HOUSING) - PDP - PDP160025 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR VILLAGE ON HORSETOOTH AT 1506 W. HORSETOOTH ROAD FORT COLLINS, CO 80526 PREPARED FOR FORT COLLINS HOUSING AUTHORITY Fort Collins, CO 80521 SEPTEMBER 20, 2016 Fort Collins Housing Authority - Village on Horsetooth ENGINEER’S STATEMENT: “I hereby certify that this report (plan) for the Preliminary Drainage Design for the Fort Collins Housing Authority Village on Horsetooth was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Standards for the Responsible Parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others.” ______________________________ Charles R. Hager, IV, P.E. Registered Professional Engineer State of Colorado No. 37146 Fort Collins Housing Authority - Village on Horsetooth PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR FORT COLLINS HOUSING AUTHORITY VILLAGE ON HORSETOOTH JVA, Inc. 25 Old Town Square, Suite 200 Fort Collins, CO 80524 phone: 970-225-9099 JVA Project No. 2595c SEPTEMBER 20, 2016 Fort Collins Housing Authority - Village on Horsetooth Page 3 of 16 TABLE OF CONTENTS SITE LOCATION AND DESCRIPTION ......................................................................................... 5 DRAINAGE BASINS AND HISTORIC RUNOFF ............................................................................. 6 HISTORIC DRAINAGE ......................................................................................................... 6 DRAINAGE DESIGN CRITERIA ................................................................................................ 6 HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES ................................................... 6 HYDRAULIC CRITERIA ........................................................................................................ 6 VARIANCES FROM THE CRITERIA ............................................................................................ 7 DRAINAGE FACILITY DESIGN ................................................................................................. 7 GENERAL CONCEPT ......................................................................................................... 7 PROPOSED DEVELOPED SUBBASINS .................................................................................... 7 PROPOSED DETENTION POND AND LID ............................................................................ 10 HISTORIC/DEVELOPED BASIN COMPARISON ..................................................................... 10 STORMWATER POLLUTION PREVENTION/EROSION CONTROL .................................................. 11 TEMPORARY EROSION CONTROL ..................................................................................... 11 PERMANENT EROSION CONTROL ..................................................................................... 11 STORMWATER MANAGEMENT CONTROLS ............................................................................ 11 SEQUENCE OF CONSTRUCTION ACTIVITIES ............................................................................ 14 CONCLUSIONS .................................................................................................................. 15 REFERENCES ...................................................................................................................... 16 LIST OF TABLES TABLE 1. HISTORIC BASIN PROPERTIES AND FLOWS ..................................................................... 6 TABLE 2. DEVELOPED BASIN PROPERTIES AND FLOWS COEFFICIENTS ............................................. 9 Fort Collins Housing Authority - Village on Horsetooth Page 4 of 16 APPENDICES Appendix A – Figures Appendix B – Hydraulic/Hydrologic Computations Appendix C – Referenced Documents Fort Collins Housing Authority - Village on Horsetooth Page 5 of 16 SITE LOCATION AND DESCRIPTION The Village on Horsetooth (site) is being developed by the Fort Collins Housing Authority and is located in Southeast Quarter of Section 27, Township 7 North, Range 69 West of the 6th Principal Meridian, in Larimer County, Fort Collins, Colorado. Refer to Appendix A, Figure 1, for the site vicinity map. Horsetooth Road (Horsetooth) to the south, Pleasant Valley and Lake Canal (Canal) to the east, and residential subdivisions to the north and west border the property. There is open space and residential housing to the west. The site is located in the Foothills Stormwater Basin. The Foothill basin drains west to east through open channels and storm sewer that discharges into the Fossil Creek Reservoir Inlet Ditch. The Foothills Basin Master Plan Water Quality Conceptual Alternatives Map, provided by the City of Fort Collins, shows that the site is required to provide flood control and water quality; the map is attached in Appendix C. The current site is approximately 7.96 acres of partially developed land with an existing house and horse stable, arena and grazing open space area with a total percent impervious of 16.0%. The site historically generally drains to the east towards and into the Canal via overland flow with slopes ranging from 0.2% to 8.0%. The north half of Horsetooth bordering the site drains to the north onto the site and into the Canal. From the geotechnical report dated July 19, 2016, the soil is mainly sandy clay and clayey sand with no bedrock encountered in the borings. Ground water was located 19 to 22 feet below ground surface and did not drastically change several days after drilling. A soil map created using the USDA Natural Resources Conservation Service Web Soil Survey identifies the site’s soil as Altvan-Satanta Loams, which is in the hydrologic soil group B with infiltration rates ranging from 0.6 to 2 inches/hour. Further investigation of the soils infiltration rate in the locations of the detention pond and low impact development (LID) ponds will be completed. A summary of the conclusions of the geotechnical report and the web soil survey results are provided in Appendix C. According to the FEMA Flood Insurance Rate Map Panel Number 08069C0986G dated 05/02/2012, the site is located outside of the 100-year floodplain area. The map panel is attached in Appendix C. The proposed site construction includes the demolition of the existing home, horse stables and arena, gravel roadway and the construction of 9 new multi-unit residential buildings and clubhouse building with surrounding asphalt parking areas, playground and grass fields, sidewalks, water quality controls and detention pond. The site development will increase the overall percent impervious to 48.2%. The proposed development cannot drain or discharge into the Canal and must tie into the City of Fort Collins (City) storm sewer system located in Horsetooth or flow onto Horsetooth, which eventually drains to Fossil Creek Reservoir Inlet Ditch. Storm valley gutters, area inlets, under drains, curb cuts, chases, channels and culverts are located throughout the site to capture and convey runoff to the LIDs and detention pond. The main purpose of this study is to analyze the existing and developed drainage patterns in order to convey stormwater into the Horsetooth storm sewer system without causing adverse effects to the site and surrounding and downstream properties. The proposed scope of work will include new storm piping, valley gutters, area drains, inlets, curb cuts, and site grading to accommodate three bioretention ponds, a detention pond, and piping to the existing Horsetooth storm system. Fort Collins Housing Authority - Village on Horsetooth Page 6 of 16 An outlet structure and pipe with a restrictor plate will be installed in the pond to control the 100- year storm outflow rate to the calculated 2-year historical runoff rate. WQCV will be attained in the bioretention ponds. A spillway is located along the southeast edge of the pond and will direct flow onto Horsetooth if the outlet structure is ever clogged or not performing correctly. DRAINAGE BASINS AND HISTORIC RUNOFF HISTORIC DRAINAGE The site historically drains to the east towards and into the Pleasant Valley and Lake Canal via overland flow with slopes ranging from 0.2% to 8.0%. Runoff from the north half of Horsetooth bordering the site drains north onto the site and into the Canal. The site consists of a gravel roadway, house, horse stables, arena, and grazing area which have an overall percent impervious of 16.0%. The peak 2-year and 100-year runoff rates are 2.21 cfs and 28.78 cfs, respectively. The historic drainage is outlined below. Design flow calculations and the historical drainage map are provided in Appendix A. Table 1. Historic Basin Properties and Flows Drainage Basin Design Point Area (acre) % Impervious Q-2 (cfs) Q-100 (cfs) Runoff Coefficient H1 1 7.96 16.0% 2.21 28.78 0.53 Total 7.96 16.0% 2.21 28.78 0.53 DRAINAGE DESIGN CRITERIA HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES The drainage for the site was designed to meet or exceed the City of Fort Collin’s Standards and Specifications, including the Stormwater Criterial Manual which incorporates most of the Urban Drainage and Flood Control District Criteria Manual (USDCM). The site’s basin percent impervious values were calculated using impervious values from Table 6-3 in the USDCM. For the Modified FAA calculations, the values for the 2-year and 100-year event rainfall intensity duration for 0 to 60 minutes were taken from Table RA-7 in the City of Fort Collins’ Stormwater Criteria Manual. Equation 5.30 from the USDCM was used to calculate intensities for the 60 to 180 minute time steps. The runoff coefficients were calculated using USDCM’s Table 6-4 equations. HYDRAULIC CRITERIA The proposed drainage facility has been designed to comply with the City of Fort Collins Stormwater Criteria Manual, the Foothills Basin Master Plan design, and UDFCD’s Drainage Criteria Manual. The Foothills Basin Master Plan requires best management practices to have both flood control and water quality. Sizing for inlets and pipes have not been completed at this Fort Collins Housing Authority - Village on Horsetooth Page 7 of 16 time, but UD-Inlet Version 3.14, Manning’s Equation, Hydraflow, and Flowmaster will be utilized as needed for calculations. Preliminary drainage plans are included in the construction documents. The pond volume was calculated using the modified FAA method and includes the 100-year runoff volume but none of the WQCV because that volume is being captured and treated separately in the site’s three bioretention ponds. The City’s stormwater criteria manual. Pond volume, WQCV, bioretention sizing, and runoff calculations are attached in Appendix B. VARIANCES FROM THE CRITERIA As per the City’s comments dated May 9, 2016, the site is required to discharge the 100-year event at the historical 2-year rate. There is a micropool in the detention basin outlet structure to allow the bioretention underdrains to tie into the structure. There are no forebays in the pond since all concentrated flows entering the detention pond pass through one of the three bioretention ponds. Riprap aprons will act as velocity dissipaters for the concentrated runoff entering the bioretention ponds. DRAINAGE FACILITY DESIGN GENERAL CONCEPT As per the Foothills Basin Master Plan design, the site was graded in an attempt to capture all site runoff to be treated and detained in the three bioretention ponds and the extended detention basin located along the east side of the site. The detention pond has an outlet structure that ties into the City’s existing storm sewer system on the south side of Horsetooth. The shallow elevation of this connection restricts the bottom elevation of the detention pond. A very small portion of the site, 11.3%, was not able to be captured and treated onsite. This offsite flow will either drain onto Horsetooth Road and follow existing drainage pathways to the east or drain to the east into the Canal. The open space area in the center of the site will capture the runoff from the playground, sidewalk, and open space through the uses of area inlets which tie into the proposed storm system and discharges into LID Pond 3. Six of the roof drains will connect into the same system along with the south portion of the site. Furthermore, the east portion of the parking lot sheet flows into LID Pond 3. The west side of the site and three roofs will drain to the north into LID Pond 1. LID Pond 1 is hydraulically connected to LID Pond 2 by a culvert set 1.5 feet above the bottom of the pond. A portion of the parking lot to the north and east and one roof drain into LID Pond 2. All onsite runoff, besides the detention pond, will be directed to one of the three LID ponds. There are overflows in the ponds to allow for larger storm events to discharge into the detention pond. Also, the bioretention ponds will have an underdrain system that is connected through the three ponds and ties into the outlet structure micropool. The parking lot will act as part of the detention pond for larger storm events, but will have no greater than one foot of ponding at the deepest point. Vertical curb and gutter will be installed along Horsetooth road to convey flows east along the road, similar to what is occurring to the west and east along Horsetooth. PROPOSED DEVELOPED SUBBASINS The site was delineated into seventeen subbasins, A1-A7, B1-B3, and R1-R10. Basins A1-A7 and R1-R10 will be captured and treated in the bioretention ponds and detention pond. Basin B1-B3 are the offsite basins and will not be have treatment before leaving the site either to Horsetooth Fort Collins Housing Authority - Village on Horsetooth Page 8 of 16 Road or the Canal. Basin A1, A2 and A6 all contain a bioretention pond for LID treatment. Basins A3, A4 and A5 collect runoff into inlets and the proposed storm system that discharges into LID Pond 3. Basins A7 contains the detention pond. Roof basins R3-R5 and R8-R10 will either connect into the storm system or sheet flow into the parking lot and be transported to the LID Pond 3. Roof basins R1, R6, and R7 will be piped or sheet flow into LID Pond 1. Roof basin R2 will be piped into LID Pond 2. The developed drainage map is provided in Appendix A. SUBBASIN DESCRIPTIONS: • Subbasin A1 contains the most of the west portion of the sites and half of the north area. This includes parking lot, sidewalk and landscaped areas. Flow is directed into the parking lot and a valley gutter the runs to the north and has a valley grate as well as a curb cut to direct flow into LID Pond 1. LID Pond 1 is a bioretention pond with underdrain. A culvert connects Basin A1 to Basin A2.This area flows around to the east and through a culvert underneath the emergency access to Basin A6. • Subbasin A2 contains half of the north portion of the site and a little of the east portion. This includes landscaped, parking lot, sidewalk areas, and LID Pond 2. Runoff is directed across the parking lot to the curb and gutter and a curb cut into the bioretention pond. Once the pond is at capacity, flow then discharges into the detention pond. • Subbasin A3 contains the west portion of the sites south and west areas. This includes parking lot, landscaped and sidewalk areas. The basin drains onto the parking lot and into the valley gutter and curb and gutter to a sumped inlet. The inlet discharges into LID Pond 3. • Subbasin A4 contains the east portion of the sites south area. This includes sidewalk, landscape, and parking lot areas. The basin drains onto the parking lot and into the valley gutter and curb and gutter to a sumped inlet. The inlet discharges into LID Pond 3. • Subbasin A5 contains the open space area in the center of the site. This includes picnic areas, the playground, sidewalk and grass area. Flow is directed to the center of the open space where there are two area drains to collect flow into the storm system that discharges into the LID Pond 3. • Subbasin A6 contains most of the east portion of the parking lot area and LID Pond 3. Flow is directed to the east and is captured in the curb in gutter that has two curb cuts into the bioretention pond. The basin also includes landscaped and sidewalk areas. Once the bioretention pond is at capacity flow from basin A6 will discharge into the detention pond. • Subbasin A7 contains the detention pond and the concrete walk along the east edge of the pond. All A basins and R basins drain into the pond before being discharged into the Horsetooth storm system. • Subbasin B1 contains the south portion of the site that drains offsite. This includes landscaped area, sidewalk and the entrance into the property. Runoff will sheet flow across the landscaped areas and road onto Horsetooth Road and be directed to the east along the curb and gutter. • Subbasin B2 contains the north portion of the site that drains offsite. This area exists because of the detention basins berm. Flow is directed to the north into a swale running west to east that discharges into the Canal. Very minor flow, 0.60 cfs for the 100-year event, will enter the Canal. Fort Collins Housing Authority - Village on Horsetooth Page 9 of 16 • Subbasin B3 contains the east side of the dentention ponds embankment. Flow from the embankment will be directed to the east into the Canal. The 100-year peak flow is 1.44 cfs. • Roof Subbasins R1, R6, and R7 will be surface discharge into basin A1 or piped into the basins bioretention pond. • Roof Subbasin R2 will be piped into the bioretention pond in basin A2. • Roof Subbasins R3, R4, R5, R8, R9 and R10 will all eventually be discharged into basin A6’s bioretention pond. Roof Subbasins R3, R4, R5 will be piped into the sites storm system. Roof Subbasins R8, R9, and R10 will either be piped into the storm system or surface discharged into basins A3 or A4 where the flow will then be captured in inlets and piped to the bioretention pond. Table 2. Developed Basin Properties and Flows Coefficients Drainage Basin Design Point Area (acre) % Impervious Q-2 (cfs) Q-100 (cfs) Runoff Coeff's C100 A1 1 1.10 60.3% 1.46 7.09 0.75 A2 2 0.55 49.7% 0.57 3.15 0.70 A3 3 0.67 68.5% 0.97 4.39 0.79 A4 4 0.27 71.2% 0.44 1.96 0.80 A5 5 1.38 21.7% 0.57 5.72 0.56 A6 6 0.88 66.4% 1.31 6.01 0.78 A7 7 0.85 8.1% 0.14 3.23 0.49 B1 8 0.45 11.9% 0.10 1.76 0.51 B2 9 0.13 5.0% 0.02 0.60 0.48 B3 10 0.31 2.0% 0.02 1.44 0.46 R1 11 0.16 90.0% 0.38 1.47 0.90 R2 12 0.16 90.0% 0.37 1.45 0.90 R3 13 0.16 90.0% 0.38 1.47 0.90 R4 14 0.11 90.0% 0.25 0.98 0.90 R5 15 0.07 90.0% 0.16 0.61 0.90 R6 16 0.10 90.0% 0.23 0.90 0.90 R7 17 0.16 90.0% 0.37 1.45 0.90 R8 18 0.16 90.0% 0.38 1.47 0.90 R9 19 0.16 90.0% 0.37 1.45 0.90 R10 20 0.10 90.0% 0.23 0.90 0.90 Site Total 7.96 48.2% 8.70 47.52 0.69 Total to Pond 7.05 53.4% 8.56 43.71 0.72 Total Offsite (B Basins) 0.90 7.5% 0.14 3.80 0.49 Total To LID Pond 1 1.53 68.7% 2.43 10.91 0.79 Total To LID Pond 2 0.71 59.0% 0.94 4.60 0.74 Total To LID Pond 3 3.97 56.2% 5.05 24.97 0.73 Fort Collins Housing Authority - Village on Horsetooth Page 10 of 16 PROPOSED DETENTION POND AND LID As per the City’s requirement, the 100-year runoff volume is captured in the detention pond and has an outflow rate equal to the historical 2-year flow rate of 2.21 cfs. This is accomplished through the installation of a restrictor plate on the 15 inch RCP outlet pipe. Only a small portion of the sites area, 11.3%, was not designed to drain onsite into the detention pond and bioretention ponds. A total of 99.16% of the modified and added impervious surface is captured and treated in one of the bioretention ponds. The bottom of the pond is at an elevation of 5105.29 feet and is 5.20 feet deep with a total volume of 4.39 acre-ft. The detention pond emergency overflow spillway is located on the southern edge of the pond at an elevation of 5109.50 ft and will discharge to Horsetooth Road if the outlet structure of the pond is ever clogged or malfunctioning. The spillway will be designed to be able to discharge the peak 100-year runoff rate of 43.71 cfs with 9 inches of head. For the 100-year storm event, the pond will have a maximum water surface elevation of 5109.02 ft, which is a pond volume of approximately 1.33 acre-feet. There is a difference of 0.48 ft between the 100-year water surface elevation and spillway elevation because of the tie in elevation along Horsetooth. The top of pond was designed at 5110.50 ft to allow for 1 foot of freeboard above the spillway bottom. Access to the pond and outlet can be achieved by entering the pond from parking lot and driving along the pond bottom. Three bioretention ponds, labeled LID Pond 1, 2, and 3, were designed for water quality control. The WQCV is a total of 5,277 cf. All three ponds have a depth of 1.5 feet for site drainage purposes. The ponds will include 18 inches or amended soil, 6 inches of squeegee, and 12 inches of gravel with an underdrain in the gravel section. Both LID Pond 1 and 2 have sufficient bottom surface areas to treat the required WQCV entering the ponds. LID Pond 1 is required to treat 1,417 cf of WQCV. The pond has a bottom area of 3,347 sqft and will only have approximately 945 sqft of amended soil and underdrain system along the center of the pond. LID Pond 2 is required to treat 571 cf of WQCV. The pond has a bottom area of 2,111 sqft and will only have approximately 380 sqft of amended soil and underdrain system along the center of the pond. LID Pond 3 is required to treat 3,081 cf of WQCV. The pond has a bottom surface area of 1,731 sqft. Therefore, the amended soil area needs to be included up to an elevation of 5106.69 ft, which is 0.69 ft above the bottom of the pond. The total ponded area in all three ponds is 17,632 cf, which is much larger than the required WQCV. The underdrain pipe will have a very shallow slope and will tie into the outlet structure at a lower elevation than the outlet pipe creating a sump situation. The head from the higher elevations of the pond bottoms will force the underdrain to empty into the outlet structure and overflow into the outlet pipe. HISTORIC/DEVELOPED BASIN COMPARISON The site contains one historical basin that drains to the east into the Pleasant Valley and Lake Canal. The developed site still drains primarily to the east, but instead of draining into the Canal, the runoff is collected and discharged into the Horsetooth storm sewer system. A very small portion of the site 11.3% drains offsite. This includes the east and north sides of detention ponds embankment, 0.45 acres and 2.05 cfs, which will drain into the Canal. There is also a portion of the site, 0.45 acres and 1.76 cfs, which will drain south onto Horsetooth. The existing site has a peak 100-year runoff rate of 28.78 cfs. As required by the City, the detention pond has a discharge rate of 2.21 cfs into the Horsetooth system, which is equivalent to the historical 2-year peak runoff rate. In the event that the detention ponds outlet pipe is clogged, the pond’s overflow spillway will safely convey flow onto Horsetooth at a peak rate of 43.71 cfs. The site’s three LID ponds Fort Collins Housing Authority - Village on Horsetooth Page 11 of 16 will treat 99.16% of the sites WQCV, with only 0.98% of the impervious area draining offsite. The LID ponds will have amended soils with an underdrain system to promote infiltration. STORMWATER POLLUTION PREVENTION/EROSION CONTROL TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection provided by the use of erosion control wattles/sediment control logs, inlet protection, vehicle tracking control at access points to the site. All temporary erosion control measures are to be removed after they are deemed unnecessary. Refer to the Erosion Control Plan and Details for the Village on Horsetooth for additional detailed information. PERMANENT EROSION CONTROL Chapter 2 of the Urban Drainage and Flood Control District’s Urban Storm Drainage Criteria Manual Volume 3 (USDCM) provides guidelines for the selection of appropriate permanent structural BMPs for a site that is to be developed or redeveloped. The Village on Horsetooth is best characterized as a “conventional redevelopment” with over 1 acre of impervious area on the project site. The BMP decision tree for such sites is provided in Figure 2-2 of the USDCM. As previously stated, the site and surrounding vicinity is comprised of hydrologic soil group Type B soils, per the NRCS soil survey, with a depth to bedrock of greater than 5 feet. Permanent erosion control measures include, but are not limited to, the constructed detention ponds, riprap pads placed for culvert and flared end section outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. A general erosion control plan has been provided in the construction documents. STORMWATER MANAGEMENT CONTROLS The Stormwater Management Plan (SWMP) administrator is to be determined. According to the CDPHE Stormwater Fact Sheet – Construction, construction activities produce many different kinds of pollutants which may cause stormwater contamination problems. The main pollutant of concern at construction sites is sediment. Grading activities remove grass, rocks, pavement, and other protective ground covers, resulting in the exposure of underlying soil to the elements. The soil is then easily picked up by wind and/or washed away by rain or snowmelt. In addition, construction activities often require the use of toxic or hazardous materials such as fuel, fertilizers, pesticides, and herbicides, and building materials such as asphalt, sealants, and concrete, which may also pollute stormwater. These materials can be harmful to humans, plants, and aquatic life. There are no known potential pollution sources. However, this condition should be confirmed by the owner/operator or SWMP administrator. Other pollution sources that could be present include: runoff from vehicle washing, vehicle maintenance and/or fueling, There are no known existing Fort Collins Housing Authority - Village on Horsetooth Page 12 of 16 non-stormwater components of discharge (i.e., springs, landscape irrigation return flow, etc.), or any anticipated during construction. 1. All Disturbed and Stored Soil: The total disturbed area will be approximately 8.3 acres. Soil stockpiles should be kept below the locally mandated maximum height of 10 feet and surrounded with sediment control devices. If the storage of these soils occurs over a period greater than 30 days, then consider temporarily seeding the soil to minimize soil loss to wind and water erosion. 2. Vehicle Tracking of Sediments: The majority of the existing site is unpaved. A temporary stabilized stone pad (Vehicle Tracking Control pad, VTC) will be provided at points of ingress and egress onto the unpaved area. The VTC is designed to reduce the amount of mud transported onto the public roads by construction traffic. If the site is extraordinarily muddy, then consider designating an area to wash construction vehicles before they leave the site and enter the public right-of-way. A BMP such as this is a good way to avoid the costs associated with street cleaning or accidentally discharging large amounts of sediment into other storm drain systems. When in doubt, choose methods that prevent pollution rather than ones that force clean-up at the downstream end just before the stormwater enters the receiving waters. In other words, the most efficient construction site BMPs are those that prevent erosion from happening. 3. Inlet Protection (IP): gravel inlet protection will be used on all inlets to prevent sediment and debris from entering the storm drain system. 4. Street sweeping will be conducted as necessary to remove sediment tracked on to pavement and adjacent streets. 5. Management of Contaminated Soils: There are no known contaminated soils on site. If contaminated soils are found, the contractor shall report to the SWMP administrator. 6. Loading and Unloading Operations: Loading/unloading activities will occur within the paved area of the site or a temporary gravel staging area will be provided. 7. Outdoor Storage Activities: Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. 8. Vehicle and Equipment Maintenance and Fueling: Fort Collins Housing Authority - Village on Horsetooth Page 13 of 16 Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. Spill Management In general, spill prevention and response should include the following: a) Notification procedures to be used in the event of an accident. At the very least, the SWMP Administrator should be notified. Depending on the nature of the spill and the material involved, the Colorado Department of Health, downstream water users, or other agencies may also need to be notified. b) Instructions for clean-up procedures. c) Provisions for absorbents are to be made available for use in fuel areas, and for containers to be available for used absorbents. d) Procedures for properly washing out concrete trucks and other equipment in a manner and location so that the materials and wash water cannot discharge from the site, and never into a storm drain system or stream. 9. Significant Dust or Particulate Generating Processes: Disturbed areas not yet ready to be seeded, landscaped, paved, or otherwise stabilized shall be watered, or ripped as necessary to preclude visible dust emissions. Contractor shall make every effort to minimize particulate emissions from vehicles performing the work, including but not limited to regular maintenance of construction equipment. 10. Routine Maintenance Activates Involving Fertilizer, Pesticides, Detergents, Fuels, Solvents, Oils, Etc: Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. 11. On-site Waste Management Practices (Waste Piles, Liquid Wastes, Dumpsters, etc): Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. The area can be enclosed with temporary fencing and accessed through a gate with a lock. 12. Concrete Truck/Equipment Washing: A concrete washout facility will be provided onsite. Properly wash out concrete trucks and other equipment in a manner and location (a minimum of 50 feet away from any inlet structures) so that the materials and wash water cannot discharge from the site, and never into a storm drain system or stream. 13. Dedicated Asphalt and Concrete Batch Plants: There will be no dedicated batch plant on site. 14. Non-Industrial Waste Source Such as Workers Trash And Portable Toilets: Fort Collins Housing Authority - Village on Horsetooth Page 14 of 16 Garbage cans shall be located at break areas and portable toilets shall be provided if onsite bathroom facilities cannot be used. Locate dumpsters and portable toilets away from drainage courses (minimum 50 feet from any inlet structures) and stake down toilets to prevent tipping. 15. Other Areas or Procedures where Potential Spills can Occur: Records of spills, leaks, or overflows that result in the discharge of pollutants must be documented and maintained. Record all spills that are responded to, even if they do not result in a discharge of pollutants. Information that should be recorded for all occurrences includes the time and date, weather conditions, reasons for the spill, etc. Some spills may need to be reported to immediately. Specifically, a release of any chemical, oil, petroleum product, sewage, etc., which may enter waters of the State of Colorado (which include surface water, ground water and dry gullies or storm sewers leading to surface water) must be reported. More guidance is available on the web at www.colorado.gov. The Division’s toll-free 24-hour number for environmental hazards and chemical spills and releases is 1-877-518-5608. SEQUENCE OF CONSTRUCTION ACTIVITIES Construction Start Date (This is the day you expect to begin disturbing soils, including grubbing, stockpiling, excavating, demolition, and grading activities): January 2017 Final Stabilization Date (this is when the site is finally stabilized. This means that all disturbed areas have been either built on, paved, or a uniform vegetative cover reaching over 70% of the initial vegetative density has been established.) Even if you are doing one part of the project, the estimated completion date must be for the overall project: June 2018 Construction Sequencing: (Detailed construction sequencing to be determined by the contractor) 1. Installation of temporary erosion and sediment control measures. This includes all sediment control logs, and inlet protection where land disturbing activities will occur. 2. Sequence of all land disturbing activity. Overlot grading in preparation for pouring of new sidewalks and building foundations will occur early in the construction schedule. Additional land disturbance will occur around the site for utility installation and the construction of the new driveway approach and sidewalk. 3. Drainage facility construction. Construction of the detention pond, storm inlets and piping will occur early in the schedule. 4. Sediment basins, temporary channel stabilization. Sediment control logs or erosion control blankets will be installed on the banks of the vegetated detention pond and swale on the east side of the site. 5. Seeding All disturbed areas will be seeded upon completing of finish grading. Refer to the landscape plans for detailed planting and seeding schedule. 6. Mulching. Fort Collins Housing Authority - Village on Horsetooth Page 15 of 16 Spread straw mulch uniformly over seeded areas at a rate of 90 lbs per 1000 square feet of ground. No more than 25% of the ground should be visible. Crimp or pinch mulch into soil 2-4 inches by using either a mulch anchoring tool, a farm disk operating on the contour of the slope, or by cleating with bulldozer tracks operating up and down the slopes (to prevent tracks from forming gullies). 7. Required maintenance activities (e.g. after-storm checks of all BMPs, etc.). All temporary sediment control BMPs shall be inspected after each rain event to ensure proper protection and to determine if cleaning is necessary. Final cleaning of all storm facilities shall be provided upon final stabilization of site. CONCLUSIONS This Preliminary Drainage and Erosion Control Report for the Fort Collins Housing Authority Village on Horsetooth has been prepared to comply with the stormwater criteria set by the UDFCD and the City of Fort Collins. The proposed drainage system presented in this report is designed to convey the 100-year peak stormwater runoff through the site to the proposed detention pond. Through calculations and review of the proposed storm drain system, there appears to be adequate capacity to convey the proposed flows. This report also proposes best management practices for erosion control, permanent landscaping, riprap, and on-site construction facilities. It can therefore be concluded that development of the detention pond complies with all of the stormwater jurisdictional criteria and will not adversely affect the existing streets, storm drain system and/or detention/water quality facilities. Fort Collins Housing Authority - Village on Horsetooth Page 16 of 16 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, January 2016. 2. City of Fort Collins Stormwater Criteria Manual, City of Fort Collins, December 2013. 3. “Geotechnical Investigation FCHA Village At Horsetooth 1506 West Horsetooth Road Fort Collins, Colorado”, CTL Thompson Incorporated, Dated July 19, 2016. 4. City of Fort Collins Foothills Basin Master Plan, Retrieved from http://www.fcgov.com/ utilities/what-we-do/stormwater/drainage-basins/foothills-basin on August 8, 2016. APPENDIX A – FIGURES SHEET NUMBER C JVA, INC DATE: JOB NUMBER: CHECKED BY: DRAWN BY: DESIGNED BY: NO. DATE DRAWN DESIGNED REVISION / ISSUE DESCRIPTION JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 E-mail: info@jvajva.com Phone: 970.225.9099 Fax: 970.225.6963 CONSULTING ENGINEERS FCHA - VILLAGE ON HORSETOOTH 2595c 09/20/2016 HISTORIC DRAINAGE MAP LAT LAT CRH FIG 2 SHEET NUMBER C JVA, INC DATE: JOB NUMBER: CHECKED BY: DRAWN BY: DESIGNED BY: NO. DATE DRAWN DESIGNED REVISION / ISSUE DESCRIPTION JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 E-mail: info@jvajva.com Phone: 970.225.9099 Fax: 970.225.6963 CONSULTING ENGINEERS VILLAGE ON HORSETOOTH 2595c 09/20/2016 DEVELOPED DRAINAGE MAP LAT LAT CRH FIG 3 APPENDIX B – HYDRAULIC/HYDROLOGIC COMPUTATIONS JVA Incorporated JVA Office: 25 Old Town Square, S 200 Fort Collins Fort Collins, CO 80524 Ph: (970) 225 9099 Version 2016_XT: 6/30/2016 Project Information: Job Name: Village On Horsetooth Job Number: 2595c Date: 9/20/2016 Designed by: LAT Municipality : Fort_Collins Soil Type: B Runoff Calculations: Minor Design Storm: 2 year Major Design Storm: 100 year Detention Calculations: Minor Storm Detention: 2 year plus 0 % WQCV Major Storm Detention: 100 year plus 0 % WQCV Detention Volume by: ≤5ac FAA >5ac FAA+20% Enter WQCV : 1,417 cf (GB, PP, PLD, SFB, EDB,etc.) Allowable Release Rates (if applicable): Max release rate 1 cfs / acre? No Site Area: 7.96 acres Enter Offsite flows to bypass site (these will be added to the allowable release rates) Q2 = 0.00 cfs (bypass flows) Q2allow= 2.21 cfs Q100 = 0.00 cfs (bypass flows) Q100allow = 2.21 cfs Rainfall Data Information: Enter City, Town, or County: Fort_Collins Frequency of Design Event Do you need to Calc P1? No 2 yr 0.82 in 5 yr 1.14 in 10 yr 1.40 in 100 yr 2.86 in Runoff Coefficient Calculations: Use UDFCD Equations? Yes Intensity Duration Values: I-D-F FortCollinsIDF One Hour Point Rainfall P1 2595c - Rational Calculations 9182016.xlsx INTRO Page 1 of 1 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Historic Runoff Coefficient & Time of Concentration Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) tc Comp tc Final Basin Name Design Point Apaved streets (sf) Adrives/co nc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface K Velocity (fps) tt JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Composite Runoff Coefficient Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B C Value calculated from UDFCDCM Chapter 6 Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 A1 1 19,060 10,428 18,268 47,760 1.10 60.3% 0.54 0.56 0.61 0.75 A2 2 6,554 5,593 11,621 23,768 0.55 49.7% 0.44 0.46 0.53 0.70 A3 3 12,305 8,228 8,480 29,013 0.67 68.5% 0.61 0.64 0.68 0.79 A4 4 5,356 3,381 3,148 11,885 0.27 71.2% 0.63 0.66 0.70 0.80 A5 5 11,570 4,297 44,084 59,951 1.38 21.7% 0.19 0.20 0.30 0.56 A6 6 17,136 8,997 12,246 38,379 0.88 66.4% 0.59 0.62 0.66 0.78 A7 7 2,584 34,520 37,104 0.85 8.1% 0.07 0.08 0.19 0.49 B1 8 721 1,432 17,647 19,800 0.45 11.9% 0.11 0.11 0.22 0.51 B2 9 200 5,665 5,865 0.13 5.0% 0.04 0.05 0.17 0.48 B3 10 13,613 13,613 0.31 2.0% 0.02 0.02 0.14 0.46 R1 11 7,180 7,180 0.16 90.0% 0.80 0.84 0.85 0.90 R2 12 7,081 7,081 0.16 90.0% 0.80 0.84 0.85 0.90 R3 13 7,180 7,180 0.16 90.0% 0.80 0.84 0.85 0.90 R4 14 4,814 4,814 0.11 90.0% 0.80 0.84 0.85 0.90 R5 15 2,973 2,973 0.07 90.0% 0.80 0.84 0.85 0.90 R6 16 4,426 4,426 0.10 90.0% 0.80 0.84 0.85 0.90 R7 17 7,081 7,081 0.16 90.0% 0.80 0.84 0.85 0.90 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Composite Runoff Coefficient Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B C Value calculated from UDFCDCM Chapter 6 Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 Runoff Coeff's 19,060 10,428 18,687 0 0 0 18,268 0 66,443 1.53 68.7% 0.61 0.64 0.68 0.79 6,554 5,593 7,081 0 0 0 11,621 0 30,849 0.71 59.0% 0.52 0.55 0.60 0.74 34,797 32,176 33,654 4,297 0 0 67,958 0 172,882 3.97 56.2% 0.50 0.52 0.58 0.73 721 1,632 0 0 0 0 36,925 0 39,278 0.90 7.5% 0.07 0.07 0.19 0.49 60,411 50,781 59,422 4,297 0 0 132,367 0 307,278 7.05 53.4% 0.47 0.50 0.56 0.72 SITE % Imperv Total Area (ft2) Area of Imperv (ft2) Total Area (ft2) 7.5% 39,278 2,928 346,556 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/2016 Ph: (970) 225 9099 By: LAT Village On Horsetooth Water Quality Capture Volume (WQCV) Calculations (UDFCD Volume 3 Chapter 3) Location: Fort_Collins Major Design Storm: 100 Soil Type: B WQCV=a((0.91I3)-(1.19I2)+(0.78I)) Where: WQCV = Water Quality Capture Volume (watershed inches) a = Drain Time Coefficient (see table below ) I = Imperviousness (%/100) Drainage Time (hrs) Coefficient, a 12 0.8 Rain Garden =12hours 24 0.9 40 1.00 LID POND 1 LID POND 2 LID POND 3 a= 0.80 a= 0.80 a= 0.80 I= 0.687 %/100 I= 0.590 %/100 I= 0.562 %/100 WQCV= 0.213 watershed inches WQCV= 0.185 watershed inches WQCV= 0.178 watershed inches Vrequired=1.2*(WQCV/12)*A*43560 Vrequired=1.2*(WQCV/12)*A*43560 Vrequired=1.2*(WQCV/12)*A*43560 WQCV= 0.213 watershed inches WQCV= 0.185 watershed inches WQCV= 0.178 watershed inches A = 1.53 acre A = 0.71 acre A = 3.97 acre Vrequired = 1417 cf Vrequired = 571 cf Vrequired = 3081 cf Vrequired = 0.033 acre-ft Vrequired = 0.013 acre-ft Vrequired = 0.071 acre-ft WQCV ONSITE (ALL A BASIN AND R BASIN) a= 0.80 I= 0.534 %/100 WQCV= 0.172 watershed inches Vrequired=1.2*(WQCV/12)*A*43560 WQCV= 0.172 watershed inches A = 7.05 acre Vrequired = 5277 cf Vrequired = 0.121 acre-ft JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/2016 Ph: (970) 225 9099 By: LAT Village On Horsetooth Bioretention Ponds LID Underdrain Design (UDFCD Volume 3 Chapter 4) Location: Fort_Collins Onsite Required WQCV 5,277 Soil Type: B LID Pond 1 WEIGHTED INCREMENTAL CUMMULATIVE Required WQCV= 1,417 cf ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME Bottom Area= 3,347 sf ft ft ft 2 ft 2 ft 3 ft 3 Total Height of LID= 1.50 ft 5107.0 3,347 0 Provided Volume= 7,570 cf 5108.0 1.0 5,398 4,373 4,332 4,332 Area of Amended Soil= 945 sf 5108.5 0.5 7,617 6,508 3,238 7,570 Top of Pond 5108.50 1.50 7,570 cf 0.174 ac-ft LID Pond 2 Required WQCV= 571 cf WEIGHTED INCREMENTAL CUMMULATIVE Bottom Area= 2,111 sf ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME Total Height of LID= 1.50 ft ft ft ft 2 ft 2 ft 3 ft 3 Provided Volume= 5,536 cf 5107.0 2,111 0 Area of Amended Soil= 381 sf 5108.0 1.0 4,084 3,098 3,044 3,044 5108.5 0.5 5,944 5,014 2,492 5,536 Top of Pond 5108.50 1.50 5,536 cf 0.127 ac-ft LID Pond 3 Required WQCV= 3,081 cf WEIGHTED INCREMENTAL CUMMULATIVE Bottom Area= 1,731 sf ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME Total Height of LID= 1.50 ft ft ft ft 2 ft 2 ft 3 ft 3 Provided Volume= 4,526 cf 5106.0 1,731 0 Area of Amended Soil= 2,054 sf* 5106.25 0.25 2,148 1,940 484 484 *bottom area plus part of side slope 5106.5 0.3 2,574 2,153 589 1,073 5107.0 0.5 3,448 2,590 1,500 2,574 5107.5 0.5 4,381 3,915 1,953 4,526 Top of Pond 5107.50 1.50 4,526 cf 0.104 ac-ft * Uses Prismoidal Formula Total Site LID Volume 17,632 cf JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Time of Concentration Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B Sub-Basin Data tc Comp tc Final Basin Name Design Point ATotal (ac) C5 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface Cv Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc =(L/180)+ 10 (min) Min tc A1 1 1.10 0.56 49 4.3% 4.3 372 1.0% Paved areas & shallow paved swales 20 2.0 3.1 7.4 421 12.3 7.4 A2 2 0.55 0.46 55 2.7% 6.2 178 0.9% Grassed waterway 15 1.4 2.1 8.3 233 11.3 8.3 A3 3 0.67 0.64 90 1.8% 6.6 134 0.6% Paved areas & shallow paved swales 20 1.5 1.5 8.1 224 11.2 8.1 A4 4 0.27 0.66 78 1.3% 6.5 29 2.2% Paved areas & shallow JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Developed Storm Runoff Calculations Design Storm : 2 Year Point Hour Rainfall (P 1) : 0.82 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes A1 1 1.10 0.54 7.40 0.59 2.47 1.46 7.40 0.59 2.47 1.46 A2 2 0.55 0.44 8.30 0.24 2.37 0.57 8.30 0.24 2.37 0.57 A3 3 0.67 0.61 8.10 0.41 2.39 0.97 8.10 0.41 2.39 0.97 A4 4 0.27 0.63 6.70 0.17 2.57 0.44 6.70 0.17 2.57 0.44 A5 5 1.38 0.19 11.00 0.27 2.13 0.57 11.00 0.27 2.13 0.57 A6 6 0.88 0.59 7.10 0.52 2.51 1.31 7.10 0.52 2.51 1.31 A7 7 0.85 0.07 10.10 0.06 2.20 0.14 10.10 0.06 2.20 0.14 B1 8 0.45 0.11 10.60 0.05 2.16 0.10 10.60 0.05 2.16 0.10 B2 9 0.13 0.04 5.90 0.01 2.69 0.02 5.90 0.01 2.69 0.02 B3 10 0.31 0.02 5.00 0.01 2.85 0.02 5.00 0.01 2.85 0.02 R1 11 0.16 0.80 5.00 0.13 2.85 0.38 5.00 0.13 2.85 0.38 R2 12 0.16 0.80 5.00 0.13 2.85 0.37 5.00 0.13 2.85 0.37 R3 13 0.16 0.80 5.00 0.13 2.85 0.38 5.00 0.13 2.85 0.38 R4 14 0.11 0.80 5.00 0.09 2.85 0.25 5.00 0.09 2.85 0.25 R5 15 0.07 0.80 5.00 0.05 2.85 0.16 5.00 0.05 2.85 0.16 R6 16 0.10 0.80 5.00 0.08 2.85 0.23 5.00 0.08 2.85 0.23 R7 17 0.16 0.80 5.00 0.13 2.85 0.37 5.00 0.13 2.85 0.37 R8 18 0.16 0.80 5.00 0.13 2.85 0.38 5.00 0.13 2.85 0.38 R9 19 0.16 0.80 5.00 0.13 2.85 0.37 5.00 0.13 2.85 0.37 R10 20 0.10 0.80 5.00 0.08 2.85 0.23 5.00 0.08 2.85 0.23 Total to Pond 8.56 Total Site 8.70 Total Offsite 0.14 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Developed Storm Runoff Calculations Design Storm : 100 Year Point Hour Rainfall (P 1) : 2.86 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes A1 1 1.10 0.75 7.40 0.82 8.63 7.09 7.40 0.82 8.63 7.09 A2 2 0.55 0.70 8.30 0.38 8.28 3.15 8.30 0.38 8.28 3.15 A3 3 0.67 0.79 8.10 0.53 8.35 4.39 8.10 0.53 8.35 4.39 A4 4 0.27 0.80 6.70 0.22 8.95 1.96 6.70 0.22 8.95 1.96 A5 5 1.38 0.56 11.00 0.77 7.42 5.72 11.00 0.77 7.42 5.72 A6 6 0.88 0.78 7.10 0.69 8.76 6.01 7.10 0.69 8.76 6.01 A7 7 0.85 0.49 10.10 0.42 7.69 3.23 10.10 0.42 7.69 3.23 B1 8 0.45 0.51 10.60 0.23 7.54 1.76 10.60 0.23 7.54 1.76 B2 9 0.13 0.48 5.90 0.06 9.37 0.60 5.90 0.06 9.37 0.60 B3 10 0.31 0.46 5.00 0.14 9.95 1.44 5.00 0.14 9.95 1.44 R1 11 0.16 0.90 5.00 0.15 9.95 1.47 5.00 0.15 9.95 1.47 R2 12 0.16 0.90 5.00 0.15 9.95 1.45 5.00 0.15 9.95 1.45 R3 13 0.16 0.90 5.00 0.15 9.95 1.47 5.00 0.15 9.95 1.47 R4 14 0.11 0.90 5.00 0.10 9.95 0.98 5.00 0.10 9.95 0.98 R5 15 0.07 0.90 5.00 0.06 9.95 0.61 5.00 0.06 9.95 0.61 R6 16 0.10 0.90 5.00 0.09 9.95 0.90 5.00 0.09 9.95 0.90 R7 17 0.16 0.90 5.00 0.15 9.95 1.45 5.00 0.15 9.95 1.45 R8 18 0.16 0.90 5.00 0.15 9.95 1.47 5.00 0.15 9.95 1.47 R9 19 0.16 0.90 5.00 0.15 9.95 1.45 5.00 0.15 9.95 1.45 R10 20 0.10 0.90 5.00 0.09 9.95 0.90 5.00 0.09 9.95 0.90 Total to Pond 43.71 Total Site 47.52 Total Offsite 3.80 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Detention Pond Volume Calculations: FAA Procedure Based on FAA Procedure, per Federal Aviation Agency "Airport Drainage" Manual Drainage Basin A Design Storm 2 year Composite "C" Factor 0.56 Time of Concentration Tc 11.00 min (Max Tc) Basin Size 7.05 acre Release Rate Calculations Allowable Release Rate for Site 2.21 cfs (Historic Flows for Basin H1) Less Undetained Offsite Flows - 0.00 cfs Allowable Release Rate for Pond 2.21 cfs Rainfall Intensity Calculations Point Hour Rainfall (P1) : 0.82 C1= 28.5 Rainfall Intensity: FortCollinsIDF C2= 10 I= C1*P1/(C2+T0)^C3 C3= 0.789 Volume Calculations Inflow Volume = C * I * A * time (sec) Outflow Volume = Alowable Release Rate * time (sec) Storage Volume = Inflow Volume - Outflow Volume Time t (min) Intensity I (in/hr) Inflow Vin (ft3) Outflow Adjustment Factor m Average Outflow (cfs) Outflow Vout (ft3) Storage Vstor (ft3) 5.0 2.85 3,361 1.00 2.21 662 2,699 10.0 2.21 5,212 1.00 2.21 1,324 3,888 15.0 1.87 6,615 0.87 1.91 1,721 4,895 20.0 1.61 7,594 0.78 1.71 2,052 5,542 25.0 1.43 8,431 0.72 1.59 2,383 6,049 30.0 1.30 9,198 0.68 1.51 2,713 6,484 35.0 1.17 9,674 0.66 1.45 3,044 6,630 40.0 1.07 10,113 0.64 1.41 3,375 6,737 45.0 0.99 10,528 0.62 1.37 3,706 6,822 50.0 0.92 10,872 0.61 1.35 4,037 6,835 55.0 0.87 11,298 0.60 1.32 4,368 6,930 60.0 0.82 11,603 0.59 1.31 4,699 6,904 65.0 0.77 11,878 0.58 1.29 5,030 6,849 Intensity Equation 70.0 0.74 12,157 0.58 1.28 5,361 6,796 75.0 0.70 12,417 0.57 1.26 5,692 6,725 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT Village On Horsetooth Detention Pond Volume Calculations: FAA Procedure Based on FAA Procedure, per Federal Aviation Agency "Airport Drainage" Manual Drainage Basin A Design Storm 100 year Composite "C" Factor 0.72 Time of Concentration Tc 11.00 min (Max Tc) Basin Size 7.05 acre Release Rate Calculations Allowable Release Rate for Site 2.21 cfs (Historic Flows for Basin H1) Less Undetained Offsite Flows - 0.00 cfs Allowable Release Rate for Pond 2.21 cfs Rainfall Intensity Calculations Point Hour Rainfall (P1) : 2.86 C1= 28.5 Rainfall Intensity: FortCollinsIDF C2= 10 I= C1*P1/(C2+T0)^C3 C3= 0.789 Volume Calculations Inflow Volume = C * I * A * time (sec) Outflow Volume = Alowable Release Rate * time (sec) Storage Volume = Inflow Volume - Outflow Volume Time t (min) Intensity I (in/hr) Inflow Vin (ft3) Outflow Adjustment Factor m Average Outflow (cfs) Outflow Vout (ft3) Storage Vstor (ft3) 5.0 9.95 15,065 1.00 2.21 662 14,403 10.0 7.72 23,377 1.00 2.21 1,324 22,054 15.0 6.52 29,615 0.87 1.91 1,721 27,895 20.0 5.60 33,915 0.78 1.71 2,052 31,864 25.0 4.98 37,701 0.72 1.59 2,383 35,318 30.0 4.52 41,062 0.68 1.51 2,713 38,348 35.0 4.09 43,327 0.66 1.45 3,044 40,283 40.0 3.75 45,374 0.64 1.41 3,375 41,999 45.0 3.47 47,217 0.62 1.37 3,706 43,510 50.0 3.23 48,965 0.61 1.35 4,037 44,928 55.0 3.03 50,531 0.60 1.32 4,368 46,163 60.0 2.86 51,963 0.59 1.31 4,699 47,264 65.0 2.70 53,196 0.58 1.29 5,030 48,166 Intensity Equation 70.0 2.57 54,444 0.58 1.28 5,361 49,083 75.0 2.45 55,608 0.57 1.26 5,692 49,917 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT POND VOLUME CALCULATIONS - STAGE / STORAGE Pond Volume = Prismoidal Formula Volume Equation = (A1+A2+SQRT(A1*A2)*D/3 WEIGHTED INCREMENTAL CUMMULATIVE ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME ft ft ft 2 ft 2 ft 3 ft 3 5105.3 20 0 5105.5 0.2 92 56 10 10 5106.0 0.5 2,404 1,248 494 505 5106.5 0.5 4,003 3,204 1,585 2,090 5107.0 0.5 9,779 6,891 3,340 5,429 5107.5 0.5 12,731 11,255 5,611 11,041 5108.0 0.5 25,773 19,252 9,436 20,477 5108.5 0.5 30,327 28,050 14,010 34,487 5109.0 0.5 61,442 45,885 22,489 56,976 5109.5 0.5 79,226 70,334 35,073 92,049 5110.0 0.5 100,595 89,911 44,849 136,898 5110.5 0.5 116,970 108,783 54,340 191,238 Top of Pond 5110.50 5.20 191,238 cf 4.390 ac-ft Required Volume (ft 3 ) Required Volume (ac-ft) Water Surface Elevation Water Depth V2 + 0% WQCV 6,930 cf 0.159 ac-ft 5107.13 ft 1.83 ft V100 + 0% WQCV 58,109 cf 1.334 ac-ft 5109.02 ft 3.72 ft V2 + 0% WQCV V100 + 0% WQCV Vol Elev Vol Elev 5429.33 5107.00 56975.79 5109.00 6929.79 5107.13 58109.31 5109.02 11040.63 5107.50 92048.73 5109.50 Stage / Storage Input Table TOTAL VOLUME Pond Volume Summary Table Volume Interpolation Calculations 2595c - Rational Calculations 9182016.xlsx Vol Pond Page 1 of 2 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT 0 Top of Pond 191,238 cf 5110.50 V2 + 0% WQCV 6,930 cf 5107.13 ft V100 + 0% WQCV 58,109 cf 5109.02 ft 5105.0 5105.5 5106.0 5106.5 5107.0 5107.5 5108.0 5108.5 5109.0 5109.5 5110.0 5110.5 5111.0 0 50,000 100,000 150,000 200,000 250,000 WATER SURFACE ELEVATION (FEET ABOVE MSL) POND VOLUME (CF) STAGE VS. STORAGE Water Quality Detention Pond 2595c - Rational Calculations 9182016.xlsx Vol Pond Page 2 of 2 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 9/20/16 Ph: (970) 225 9099 By: LAT ORIFICE PLATE AT OUTLET PIPE WORKSHEET Orifice Plate using Headwater above opening and Q=cA(2gH)^.5 C= 0.65 QMAJOR allowable release rate: 2.21 cfs Summary of Available Pipe Releases 100-yr Water Surface Elev: 5109.02 ft Pipe Dia Area Head H Q Inv Elev at Outlet Struct: 5105.20 ft Outfall Pipe at centroid avail out Outlet Pipe at Structure: 15 in (in) (sf) (ft) (cfs) 12 0.79 3.32 7.46 15 1.23 3.19 11.43 18 1.77 3.07 16.13 24 3.14 2.82 27.49 30 4.91 2.57 41.00 36 7.07 2.32 56.09 Q=cA(2gH)^.5 C= 0.65 Iteration process Q 2.21 cfs c 0.65 Hhead 3.19 ft Needed Area 0.24 sf Using Area- determine Ao 0.24 sf Apipe 1.23 sf theta 4.188 rad Ao-calced 0.24 sf m -0.31 ft distance above(+) or below(-) center H 0.31 ft Height above pipe invert                    +          JVA Incorporated Job Name: CSU Medical Center 25 Old Town Square Job Number: 2487c Fort Collins, CO 80524 Date: 9/20/16 Ph: 970.225.9099 By: LAT Fax: 970.225.6923 CSU Medical Center Emergency Overflow Spillway Calculations Broad-Crested Weir Equation-Trapezoidal Shape where: Q = Discharge (cfs) C = Weir Coeffecient L = Weir Length (ft) H = Average Weir Head (ft) H:V =Side Slope Calculations Knowns: 4.00 0.75 3.087 5609.50 43.71 18.80 19.00 1.00 5610.5 27.00 Berm Width 6.0 Side Slopes (H:V) Desired Spillway Head Weir Coefficient Spillway Elevation 100-yr Pond Inflow Calculated Spillway Use Spillway Length Spillway Depth (including 6" freeboard) Top of Berm Elevation Top of Berm Length 2 5 2 3 H V H QCLH C       = + 2595c - Rational Calculations 9182016.xlsx Page 1 of 1 8/28/06 APPENDIX C – REFERENCED DOCUMENTS 400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 GEOTECHNICAL INVESTIGATION FCHA VILLAGE AT HORSETOOTH 1506 WEST HORESTOOTH ROAD FORT COLLINS, COLORADO FORT COLLINS HOUSING AUTHORITY 1715 West Mountain Avenue Fort Collins, Colorado 80521 Attention: Kristin Fritz, AICP Project No. FC07464-120 July 19, 2016 FORT COLLINS HOUSING AUTHORITY VILLAGE AT HORSETOOTH CTL | T PROJECT NO. FC07464-120 1 SCOPE This report presents the results of our Geotechnical Investigation for the proposed FCHA Village at Horsetooth in Fort Collins, Colorado. The purpose of the investigation was to evaluate the subsurface conditions and provide founda- tion recommendations and geotechnical design criteria for the project. The report was prepared from data developed during field exploration, la- boratory testing, engineering analysis and experience with similar conditions. The report includes a description of subsurface conditions found in our explorato- ry borings and discussions of site development as influenced by geotechnical considerations. Our opinions and recommendations regarding design criteria and construction details for site development, foundations, floor systems, slabs- on-grade, lateral earth loads, pavements and drainage are provided. If the pro- posed construction changes, we should be requested to review our recommen- dations. Our conclusions are summarized in the following paragraphs. SUMMARY OF CONCLUSIONS 1. Soils encountered in our borings consisted of interlayered sandy clay and clayey sand to the depths explored. Based on laboratory testing, the soils are generally non-expansive to low-swelling. No bedrock was encountered in our borings. 2. Groundwater was encountered at depths of 19 to 23 feet during drilling and was measured several days after drilling at depths of 19 to 22 feet. Existing groundwater levels are not expected to signifi- cantly affect the proposed construction. 3. We believe the proposed structures can be constructed on a spread footing foundation placed on natural, undisturbed soil and/or properly compacted fill. Foundation design and construction rec- ommendations are presented in this report. FORT COLLINS HOUSING AUTHORITY VILLAGE AT HORSETOOTH CTL | T PROJECT NO. FC07464-120 2 4. We believe slab-on-grade floors are appropriate for this site. Some movement of slab-on-grade floors should be anticipated. We ex- pect movements will be minor, on the order of 1 inch or less. If movement cannot be tolerated, structural floors should be consid- ered. 5. Pavement subgrade at this site will generally consist of A-4 and A- 2-4 materials according to AASHTO criteria, with expected poor to good subgrade support. Recommended section thicknesses and pavement materials are provided in this report. SITE CONDITIONS AND PROPOSED CONSTRUCTION The area of proposed development is on the north side of Horsetooth Road east of Big Ben Drive in Fort Collins, Colorado. An existing residence with horse stalls and associated pasture areas were located on site at the time of our investigation. The ground surface is generally flat; vegetation consisted of natural grasses, weeds and trees. A ditch runs along the eastern boundary of the proper- ty. We understand that the proposed construction will consist of nine apart- ment buildings having 96 units, a club house, and associated paved parking are- as and access drives. No below grade areas are planned. INVESTIGATION Subsurface conditions were investigated by drilling thirteen exploratory borings to depths of approximately 20 to 30 feet. Our representative observed drilling operations, logged the soil found in the borings, and obtained samples. Groundwater measurements were taken during and several days after drilling. Summary logs of the borings, including results of field penetration resistance tests, are presented on Figures 2 and 3. Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 1 of 3 4487500 4487530 4487560 4487590 4487620 4487650 4487680 4487710 4487500 4487530 4487560 4487590 4487620 4487650 4487680 4487710 490980 491010 491040 491070 491100 491130 491160 491190 491220 491250 491280 491310 490980 491010 491040 491070 491100 491130 491160 491190 491220 491250 491280 491310 40° 32' 24'' N 105° 6' 23'' W 40° 32' 24'' N 105° 6' 8'' W 40° 32' 17'' N 105° 6' 23'' W 40° 32' 17'' N 105° 6' 8'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,610 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 3 Altvan-Satanta loams, 0 to 3 percent slopes 8.2 100.0% Totals for Area of Interest 8.2 100.0% Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 3 of 3 Larimer County Area, Colorado 3—Altvan-Satanta loams, 0 to 3 percent slopes Map Unit Setting National map unit symbol: jpw2 Elevation: 5,200 to 6,200 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Altvan and similar soils: 45 percent Satanta and similar soils: 30 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Altvan Setting Landform: Benches, terraces Landform position (three-dimensional): Side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 10 inches: loam H2 - 10 to 18 inches: clay loam, loam, sandy clay loam H2 - 10 to 18 inches: loam, fine sandy loam, silt loam H2 - 10 to 18 inches: gravelly sand, gravelly coarse sand, coarse sand H3 - 18 to 30 inches: H3 - 18 to 30 inches: H3 - 18 to 30 inches: H4 - 30 to 60 inches: H4 - 30 to 60 inches: H4 - 30 to 60 inches: Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 1 of 3 Available water storage in profile: Very high (about 13.2 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Description of Satanta Setting Landform: Structural benches, terraces Landform position (three-dimensional): Side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium and/or eolian deposits Typical profile H1 - 0 to 9 inches: loam H2 - 9 to 18 inches: loam, clay loam, sandy clay loam H2 - 9 to 18 inches: loam, clay loam, fine sandy loam H2 - 9 to 18 inches: H3 - 18 to 60 inches: H3 - 18 to 60 inches: H3 - 18 to 60 inches: Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very high (about 27.4 inches) Interpretive groups Land capability classification (irrigated): 1 Land capability classification (nonirrigated): 3c Hydrologic Soil Group: B Minor Components Nunn Percent of map unit: 10 percent Larim Percent of map unit: 10 percent Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 2 of 3 Stoneham Percent of map unit: 5 percent Data Source Information Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 3 of 3 Village On Horsetooth - Wetlands Map Source: DS,Airbus USDA, Esri, USGS, DigitalGlobe, AEX, Getmapping, GeoEye, Earthstar Aerogrid, Geographics, IGN, IGP, swisstopo, CNES/and Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine August 11, 2016 0 0.130325 0.065 0.mi 0 0.05 0.1 0.2 km 1:4,058 This page National was produced Wetlands by the Inventory NWI mapper (NWI) This Service map is is not for responsible general reference for the accuracy only. The or US currentness Fish and Wildlife of the base be used data in shown accordance on this with map. the All layer wetlands metadata related found data on should the Wetlands Mapper web site. #* #* #* #* #* W PROSPECT RD W DRAKE RD W HARMONY RD W HORSETOOTH RD S TAFT HILL RD S SHIELDS ST S COLLEGE AVE S LEMAY AVE S TIMBERLINE RD ZIEGLER RD P l e a s a n t V a l l e y a n d L a k e Ca n a l N e w M er c er D i t ch Larime r Co u nty C anal N o . 2 S h e rw o od Later a l Spri n g C r e e k ShLerawkeood ParLkawkoeod WLaarkreen Cach e La P o udr e R i ver M c C lell a n d 's Ch a nn a l Larimer C ount y C a n a l N o. 2 Footh i l ls C han n el Dixon C a n y o n Lateral Foothills Mall Boltz MS TiCmhbuerrclihne Fort HCSollins EleBmeaetntiteary SEhleempaerndtsaoryn S TIMBERLINE RD E LEMAY AVE E PROSPECT RD UP RAILROAD Warren Troutman SCteawsaert Westfield FOOTHILLS Water Quality Master Concepetual Plan BASIN Alternatives Fort ● Retrofit Collins Existing High School Pond to Pond accommodate Volume Water Quality Collindale ●Pond Retrofit Existing PUD Pond to accommodate Volume Water Quality Warren ● Water Lake Quality Treatment provided Lake in Existing Warren Southmoor ● Retrofit Existing Village Pond Pond to accommodate Volume Water Quality Lake ● Water Sherwood Quality Treatment provided Sherwood in Existing Lake Parkwood ● Retrofit Existing East Pond Pond to accommodate Volume Water Quality Proposed Restoration Stream Improvement 0 500000 1,000 2,[ Feet NAIP Image - 2009 Proposed BMP Basin Type Foothills Basin Boundary Flood Control Only Water Quality Only Flood Control and Water Quality Proposed Improvements None Proposed Proposed WaterConceptual Quality Alternatives Undeveloped Area Water Stream - Canal Parks Proposed andRestoration Habitat Stream Improvements #* Proposed Water Quality Pond SITE the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 2 of 3   − = 2 * cos 2 sin 2 2 θ θ π π θ A o A pipe r r       = 2 cos θ m r H = r + m 2595c - Rational Calculations 9182016.xlsx Major Orifice Page 1 of 1 80.0 2.34 56,700 0.57 1.25 6,022 50,677 85.0 2.24 57,728 0.56 1.25 6,353 51,374 90.0 2.15 58,699 0.56 1.24 6,684 52,015 95.0 2.07 59,620 0.56 1.23 7,015 52,605 100.0 2.00 60,497 0.56 1.22 7,346 53,151 105.0 1.93 61,332 0.55 1.22 7,677 53,655 110.0 1.87 62,131 0.55 1.21 8,008 54,123 115.0 1.81 62,896 0.55 1.21 8,339 54,558 120.0 1.75 63,631 0.55 1.20 8,670 54,961 125.0 1.70 64,338 0.54 1.20 9,001 55,337 130.0 1.65 65,019 0.54 1.20 9,332 55,687 135.0 1.61 65,676 0.54 1.19 9,662 56,013 140.0 1.56 66,310 0.54 1.19 9,993 56,317 145.0 1.52 66,925 0.54 1.19 10,324 56,600 150.0 1.49 67,520 0.54 1.18 10,655 56,865 155.0 1.45 68,097 0.54 1.18 10,986 57,111 160.0 1.42 68,657 0.53 1.18 11,317 57,340 165.0 1.39 69,202 0.53 1.18 11,648 57,554 170.0 1.35 69,731 0.53 1.17 11,979 57,753 175.0 1.33 70,247 0.53 1.17 12,310 57,938 180.0 1.30 70,750 0.53 1.17 12,641 58,109 Max from FoCo CM Maximum Volume (ft3) 58,109 0% WQCV 0 ft3 Required 100Yr Volume 58,109 ft3 Detention Storage Calculations 2595c - Rational Calculations 9182016.xlsx Modified FAA-100-yr Page 1 of 1 80.0 0.67 12,661 0.57 1.25 6,022 6,638 85.0 0.64 12,890 0.56 1.25 6,353 6,537 90.0 0.62 13,107 0.56 1.24 6,684 6,423 95.0 0.59 13,313 0.56 1.23 7,015 6,298 100.0 0.57 13,509 0.56 1.22 7,346 6,163 105.0 0.55 13,695 0.55 1.22 7,677 6,018 110.0 0.53 13,874 0.55 1.21 8,008 5,866 115.0 0.52 14,044 0.55 1.21 8,339 5,706 120.0 0.50 14,209 0.55 1.20 8,670 5,539 125.0 0.49 14,366 0.54 1.20 9,001 5,366 130.0 0.47 14,518 0.54 1.20 9,332 5,187 135.0 0.46 14,665 0.54 1.19 9,662 5,003 140.0 0.45 14,807 0.54 1.19 9,993 4,813 145.0 0.44 14,944 0.54 1.19 10,324 4,620 150.0 0.43 15,077 0.54 1.18 10,655 4,422 155.0 0.42 15,206 0.54 1.18 10,986 4,220 160.0 0.41 15,331 0.53 1.18 11,317 4,014 165.0 0.40 15,452 0.53 1.18 11,648 3,805 170.0 0.39 15,571 0.53 1.17 11,979 3,592 175.0 0.38 15,686 0.53 1.17 12,310 3,376 180.0 0.37 15,798 0.53 1.17 12,641 3,158 Max from FoCo CM Maximum Volume (ft3) 6,930 0% WQCV 0 ft3 Required 2Yr Volume 6,930 ft3 Detention Storage Calculations 2595c - Rational Calculations 9182016.xlsx Modified FAA-2-yr Page 1 of 1 Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 2595c - Rational Calculations 9182016.xlsx Q100 Page 1 of 1 Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 2595c - Rational Calculations 9182016.xlsx Q Minor Page 1 of 1 paved swales 20 3.0 0.2 6.7 107 10.6 6.7 A5 5 1.38 0.20 183 2.1% 17.3 Grassed waterway 15 0.0 0.0 17.3 183 11.0 11.0 A6 6 0.88 0.62 55 1.5% 5.8 214 1.8% Paved areas & shallow paved swales 20 2.7 1.3 7.1 269 11.5 7.1 A7 7 0.85 0.08 34 5.2% 6.3 343 1.0% Grassed waterway 15 1.5 3.8 10.1 377 12.1 10.1 B1 8 0.45 0.11 115 0.8% 21.0 Paved areas & shallow paved swales 20 0.0 0.0 21.0 115 10.6 10.6 B2 9 0.13 0.05 15 11.9% 3.3 231 1.0% Grassed waterway 15 1.5 2.6 5.9 246 11.4 5.9 B3 10 0.31 0.02 25 14.6% 4.1 Grassed waterway 15 0.0 0.0 4.1 25 10.1 5.0 R1 11 0.16 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R2 12 0.16 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R3 13 0.16 0.84 45 2.0% 2.6 Paved areas & shallow paved swales 20 0.0 0.0 2.6 45 10.3 5.0 R4 14 0.11 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R5 15 0.07 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R6 16 0.10 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R7 17 0.16 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R8 18 0.16 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R9 19 0.16 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R10 20 0.10 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 Initial Overland Time (ti ) Travel Time (tt ) tt =Length/(Velocity x 60) tc Urbanized Check ON 2595c - Rational Calculations 9182016.xlsx Developed Tc Page 1 of 1 Percent of WQCV LID Treated 334% TOTAL VOLUME TOTAL VOLUME TOTAL VOLUME 0.84% % of Impervious Area not being detain. B Basin Area of Impervious / Total Site Area 99.16% % of Total Sites Impervious Area being detain. 11.3% Total Site Area not being sent to Detention Pond. B Basin Area / Total Site Area Total To LID Pond 1 (A1, R1, R6, R7) B Basin Total To LID Pond 3 (A3, A4, A5, A6, R3, R4, R5, R8, R9, R10) Total To LID Pond 2 (A2, R2) Tota; to Pond (All A and All R) Total Offsite (B1, B2, B3) 2595c - Rational Calculations 9182016.xlsx Developed C Page 2 of 2 R8 18 7,180 7,180 0.16 90.0% 0.80 0.84 0.85 0.90 R9 19 7,081 7,081 0.16 90.0% 0.80 0.84 0.85 0.90 R10 20 4,426 4,426 0.10 90.0% 0.80 0.84 0.85 0.90 61,132 52,413 59,422 4,297 0 0 169,292 0 346,556 7.96 48.2% 0.43 0.45 0.52 0.69 Runoff Coeff's Total Site 2595c - Rational Calculations 9182016.xlsx Developed C Page 1 of 2 (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180)+ 10 (min.) Min tc H1 1 17,418 530 8,896 61,172 258,545 346,561 7.96 16.0% 0.14 0.15 0.25 0.53 500 1.3% 35.5 143 0.8% Paved areas & shallow paved swales 20 1.8 1.3 36.9 643 13.6 13.6 TOTAL SITE 17,418 530 8,896 61,172 0 0 258,545 0 346,561 7.96 16.0% 0.14 0.15 0.25 0.53 Basin Name Design Point Time of Conc (tc) C2 C5 C10 C100 2 5 10 100 ATotal (sf) ATotal (ac) Q2 Q5 Q10 Q100 H1 1 13.6 0.14 0.15 0.25 0.53 1.94 0.00 3.33 6.79 346,561 7.96 2.21 0.00 6.75 28.78 TOTAL SITE 346,561 7.96 2.21 0.00 6.75 28.78 Initial Overland Time (ti) Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON Runoff Coeff's Rainfall Intensities (in/hr) Area Flow Rates (cfs) Runoff Coeff's 2595c - Rational Calculations 9182016.xlsx Historic Page 1 of 1