Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WOODWARD TECHNOLOGY CENTER (FORMERLY LINK-N-GREENS) - PDP - PDP130001 - PLANS - PHOTOMETRIC PLAN (6)
S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/08 S1/04 S1/04 S2/04 S1/04 S1/04 S1/04 S1/04 S1/04 S1/04 S1/04 S3/04 S3/04 S1/04 S1/08 S1/08 S2/04 S1/04 S2/04 S2/04 S4/04 S4/04 S4/04 S2/04 S2/04 S2/04 S1/04 S2/04 S1/04 S1/04 S1/04 S1/04 S1/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 S2/04 FORT COLLINS PROJECT DEVELOPMENT PLAN SUBMITTAL REVISIONS: DATE: GHAFARI ASSOCIATES, LLC 122 S MICHIGAN AVE, SUITE 1500 CHICAGO, IL 60603 USA TEL +1.312.984.2300 www.ghafari.com ELECTRICAL SITE LIGHTING PLAN OVERALL 14 January, 2013 EL1-00-00 PDP SUBMITTAL 01-14-13 AREA 1 REFER TO EL1-00-01 AREA 3 REFER TO EL1-00-03 (NOT ISSUED) AREA 2 REFER TO EL1-00-02 AREA 4 REFER TO EL1-00-04 NORTH ELECTRICAL SITE LIGHTING PLAN OVERALL SCALE: 1"=80'-0" 1. REFER TO EL5-00-01 FOR LIGHTING FIXTURE SCHEDULE, LIGHTING CALCULATION STATISTICS, AND DETAILS. 2. REFER TO CIVIL PLANS FOR PHASE 1 AREA OF WORK. GENERAL NOTES: SYMBOLS: LIGHTING POLE - SINGLE ARM LIGHTING POLE - DOUBLE ARM PDP RESUBMITTAL 01-30-13