HomeMy WebLinkAboutHARMONY COMMONS HOTEL - PDP - PDP160027 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTHydrology
Design Point Basins %imp Area Tc C2 C100 Q2 Q100 Notes
1 1 79.1 0.10 5.0 0.59 0.92 0.2 0.9
2 2 77.6 0.35 5.0 0.57 0.91 0.6 3.1
3 3 80.8 0.32 5.0 0.60 0.94 0.5 2.9
4 4 71.3 0.25 7.6 0.50 0.86 0.3 1.8
5 5 63.4 0.36 5.0 0.43 0.81 0.4 2.8
6 6 60.8 0.34 5.0 0.41 0.79 0.4 2.6
Site 71.1 1.72 0.51 0.86 10.60
Lot 6, Harmony Commons
Surface Characteristic Table and Hydrology Summary
Harmony Commons – Lot 6: Soil Survey Map:
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 1,091 - -
roof - 90 -
pavement 4,136 100 413,600
Sum: 5227.00 Sum: 413600.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 79.1
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 1
dp1 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:52 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 1
Area = 0.10 Acres
Percent Imperviousness = 79.1 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.74
Overide Runoff Coefficient, C = 0.92 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.62
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 5 0.62 N/A 0.05 1.55
1 0.0090 177 20.00 1.90 1.55
2
3
4
5
182 Computed Tc = 3.11
Regional Tc = 11.01
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 10.78 inch/hr Peak Flowrate, Qp = 0.99 cfs
Rainfall Intensity at Regional Tc, I = 7.44 inch/hr Peak Flowrate, Qp = 0.69 cfs
Rainfall Intensity at User-Defined Tc, I = 9.70 inch/hr Peak Flowrate, Qp = 0.89 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 1
Paved Areas &
dp1 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:34 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 1
Area = 0.10 Acres
Percent Imperviousness = 79.1 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.59
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.62
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 5 0.62 N/A 0.05 1.55
1 0.0090 177 20.00 1.90 1.55
2
3
4
5
182 Computed Tc = 3.11
Regional Tc = 11.01
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 3.09 inch/hr Peak Flowrate, Qp = 0.18 cfs
Rainfall Intensity at Regional Tc, I = 2.13 inch/hr Peak Flowrate, Qp = 0.12 cfs
Rainfall Intensity at User-Defined Tc, I = 2.78 inch/hr Peak Flowrate, Qp = 0.16 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 1
Paved Areas &
dp1 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:34 PM
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 2,563 - -
roof 3,495 90 314,550
pavement 7,949 100 794,900
pavers 1,239 60 74,340
Sum: 15246.00 Sum: 1183790.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 77.6
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 2
dp2 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:54 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 2
Area = 0.35 Acres
Percent Imperviousness = 77.6 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.73
Overide Runoff Coefficient, C = 0.91 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.60
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0400 19 0.60 N/A 0.13 2.48
1 0.0200 93 20.00 2.83 0.55
2
3
4
5
112 Computed Tc = 3.03
Regional Tc = 10.62
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 10.84 inch/hr Peak Flowrate, Qp = 3.44 cfs
Rainfall Intensity at Regional Tc, I = 7.55 inch/hr Peak Flowrate, Qp = 2.40 cfs
Rainfall Intensity at User-Defined Tc, I = 9.70 inch/hr Peak Flowrate, Qp = 3.08 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 2
Paved Areas &
dp2 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:35 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 2
Area = 0.35 Acres
Percent Imperviousness = 77.6 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.57
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.60
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0400 19 0.60 N/A 0.13 2.48
1 0.0200 93 20.00 2.83 0.55
2
3
4
5
112 Computed Tc = 3.03
Regional Tc = 10.62
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 3.11 inch/hr Peak Flowrate, Qp = 0.62 cfs
Rainfall Intensity at Regional Tc, I = 2.17 inch/hr Peak Flowrate, Qp = 0.43 cfs
Rainfall Intensity at User-Defined Tc, I = 2.78 inch/hr Peak Flowrate, Qp = 0.55 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 2
Paved Areas &
dp2 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:35 PM
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 1,718 - -
roof 2,720 90 244,800
pavement 7,773 100 777,320
pavers 1,728 60 103,680
Sum: 13939.20 Sum: 1125800.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 80.8
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 3
dp3 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:55 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 3
Area = 0.32 Acres
Percent Imperviousness = 80.8 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.75
Overide Runoff Coefficient, C = 0.94 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.63
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0400 19 0.63 N/A 0.14 2.32
1 0.0190 60 20.00 2.76 0.36
2
3
4
5
79 Computed Tc = 2.69
Regional Tc = 10.44
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 11.06 inch/hr Peak Flowrate, Qp = 3.32 cfs
Rainfall Intensity at Regional Tc, I = 7.61 inch/hr Peak Flowrate, Qp = 2.28 cfs
Rainfall Intensity at User-Defined Tc, I = 9.70 inch/hr Peak Flowrate, Qp = 2.91 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 3
Paved Areas &
dp3 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:35 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 3
Area = 0.32 Acres
Percent Imperviousness = 80.8 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.60
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.63
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0400 19 0.63 N/A 0.14 2.32
1 0.0190 60 20.00 2.76 0.36
2
3
4
5
79 Computed Tc = 2.69
Regional Tc = 10.44
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 3.17 inch/hr Peak Flowrate, Qp = 0.61 cfs
Rainfall Intensity at Regional Tc, I = 2.18 inch/hr Peak Flowrate, Qp = 0.42 cfs
Rainfall Intensity at User-Defined Tc, I = 2.78 inch/hr Peak Flowrate, Qp = 0.54 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 3
Paved Areas &
dp3 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:35 PM
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 2,851 - -
roof 2,720 90 244,800
pavement 5,319 100 531,900
Sum: 10890.00 Sum: 776700.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 71.3
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 4
dp4 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:56 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 4
Area = 0.25 Acres
Percent Imperviousness = 71.3 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.69
Overide Runoff Coefficient, C = 0.86 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.54
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 14 0.54 N/A 0.08 3.00
1 0.0050 393 20.00 1.41 4.63
2
3
4
5
407 Computed Tc = 7.63
Regional Tc = 12.26
User-Entered Tc = 7.63
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 8.54 inch/hr Peak Flowrate, Qp = 1.83 cfs
Rainfall Intensity at Regional Tc, I = 7.11 inch/hr Peak Flowrate, Qp = 1.52 cfs
Rainfall Intensity at User-Defined Tc, I = 8.54 inch/hr Peak Flowrate, Qp = 1.83 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 4
Paved Areas &
dp4 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:36 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 4
Area = 0.25 Acres
Percent Imperviousness = 71.3 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.50
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.54
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 14 0.54 N/A 0.08 3.00
1 0.0050 393 20.00 1.41 4.63
2
3
4
5
407 Computed Tc = 7.63
Regional Tc = 12.26
User-Entered Tc = 7.63
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 2.45 inch/hr Peak Flowrate, Qp = 0.31 cfs
Rainfall Intensity at Regional Tc, I = 2.04 inch/hr Peak Flowrate, Qp = 0.26 cfs
Rainfall Intensity at User-Defined Tc, I = 2.45 inch/hr Peak Flowrate, Qp = 0.31 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 4
Paved Areas &
dp4 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 5:00 PM
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 2,887 - -
roof - 90 -
pavement 5,672 100 567,160
pavers 7,123 60 427,380
Sum: 15681.60 Sum: 994540.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 63.4
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 5
dp5 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:57 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 5
Area = 0.36 Acres
Percent Imperviousness = 63.4 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.65
Overide Runoff Coefficient, C = 0.81 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.48
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 7 0.48 N/A 0.05 2.35
1 0.0180 79 20.00 2.68 0.49
2
3
4
5
86 Computed Tc = 2.84
Regional Tc = 10.48
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 10.96 inch/hr Peak Flowrate, Qp = 3.20 cfs
Rainfall Intensity at Regional Tc, I = 7.59 inch/hr Peak Flowrate, Qp = 2.21 cfs
Rainfall Intensity at User-Defined Tc, I = 9.70 inch/hr Peak Flowrate, Qp = 2.83 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 5
Paved Areas &
dp5 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:36 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 5
Area = 0.36 Acres
Percent Imperviousness = 63.4 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.43
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.48
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0200 7 0.48 N/A 0.05 2.36
1 0.0180 79 20.00 2.68 0.49
2
3
4
5
86 Computed Tc = 2.85
Regional Tc = 10.48
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 3.14 inch/hr Peak Flowrate, Qp = 0.49 cfs
Rainfall Intensity at Regional Tc, I = 2.18 inch/hr Peak Flowrate, Qp = 0.34 cfs
Rainfall Intensity at User-Defined Tc, I = 2.78 inch/hr Peak Flowrate, Qp = 0.43 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 5
Paved Areas &
dp5 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:36 PM
Project Title:
Catchment ID:
Illustration
Instructions: For each catchment subarea, enter values for A and C.
Subarea Area Runoff Product
ID acres Coeff.
A C* CA
input input input output
landscape 4,812 - -
roof 9,936 90 894,240
pavement 62 100 6,200
Sum: 14810.40 Sum: 900440.00
Area-Weighted Runoff Coefficient (sum CA/sum A) = 60.8
*See sheet "Design Info" for inperviousness-based runoff coefficient values.
For catchments larger than 90 acres, CUHP hydrograph and routing are recommended.
Area-Weighting for Runoff Coefficient Calculation
Lot 6, Harmony Commons
Basin 6
dp6 2yr UD-Rational v1.02a.xls, Weighted C 8/23/2016, 4:58 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 6
Area = 0.34 Acres
Percent Imperviousness = 60.8 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 100 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.64
Overide Runoff Coefficient, C = 0.79 (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.46
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0500 10 0.46 N/A 0.08 2.14
1 0.0210 91 15.00 2.17 0.70
2
3
4
5
101 Computed Tc = 2.84
Regional Tc = 10.56
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 10.96 inch/hr Peak Flowrate, Qp = 2.96 cfs
Rainfall Intensity at Regional Tc, I = 7.57 inch/hr Peak Flowrate, Qp = 2.05 cfs
Rainfall Intensity at User-Defined Tc, I = 9.70 inch/hr Peak Flowrate, Qp = 2.62 cfs
Calculated values for Tc & Qp are based on overide values entered for C & C-5.
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 6
Paved Areas &
dp6 100yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:34 PM
Project Title:
Catchment ID:
I. Catchment Hydrologic Data
Catchment ID = Basin 6
Area = 0.34 Acres
Percent Imperviousness = 60.8 %
NRCS Soil Type = C A, B, C, or D
II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3
Design Storm Return Period, Tr = 2 years (input return period for design storm)
C1 = 28.50 (input the value of C1)
C2= 10.00 (input the value of C2)
C3= 0.786 (input the value of C3)
P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info")
III. Analysis of Flow Time (Time of Concentration) for a Catchment
Runoff Coefficient, C = 0.41
Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.)
5-yr. Runoff Coefficient, C-5 = 0.46
Overide 5-yr. Runoff Coefficient, C = (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.)
Illustration
NRCS Land Heavy Tillage/ Short Nearly Grassed
Type Meadow Field Pasture/ Bare Swales/
Lawns Ground Waterways
Conveyance 2.5 5 7 10 15
Calculations: Reach Slope Length 5-yr NRCS Flow Flow
ID S L Runoff Convey- Velocity Time
Coeff ance V Tf
ft/ft ft C-5 fps minutes
input input output input output output
Overland 0.0500 10 0.46 N/A 0.08 2.14
1 0.0210 91 15.00 2.17 0.70
2
3
4
5
101 Computed Tc = 2.84
Regional Tc = 10.56
User-Entered Tc = 5.00
IV. Peak Runoff Prediction
Rainfall Intensity at Computed Tc, I = 3.14 inch/hr Peak Flowrate, Qp = 0.44 cfs
Rainfall Intensity at Regional Tc, I = 2.17 inch/hr Peak Flowrate, Qp = 0.30 cfs
Rainfall Intensity at User-Defined Tc, I = 2.78 inch/hr Peak Flowrate, Qp = 0.39 cfs
(Sheet Flow)
20
Shallow Paved Swales
Sum
CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD
Lot 6, Harmony Commons
Basin 6
Paved Areas &
dp6 2yr UD-Rational v1.02a.xls, Tc and PeakQ 8/23/2016, 4:36 PM
Storm Sewer
Harmony Commons – Lot 6 : Storm Sewer Analysis
Inlets
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020
Height of Curb at Gutter Flow Line HCURB = 6.00 inches
Distance from Curb Face to Street Crown TCROWN = 30.0 ft
Gutter Width W = 1.00 ft
Street Transverse Slope SX = 0.022 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX = 30.0 30.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches
Allow Flow Depth at Street Crown (leave blank for no) check = yes
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Lot 6 Harmony Commons
DP2
Copy of UD-Inlet_v4.03.xlsm, DP2 8/23/2016, 4:27 PM
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) = 3.00 3.00 feet
Warning 5 Width of a Unit Grate Wo = 1.73 1.73 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.31 0.31
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.60 3.60
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet
Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches
Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees
Warning 1 Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66
Low Head Performance Reduction (Calculated) MINOR MAJOR
Depth for Grate Midwidth dGrate = 0.451 0.451 ft
Depth for Curb Opening Weir Equation dCurb = 0.42 0.42 ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.94 0.94
Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = 0.94 0.94
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 4.1 4.1 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.6 3.1 cfs
Warning 1: Dimension entered is not a typical dimension for inlet type specified.
Warning 5: The width of unit is greater than the gutter width.
INLET IN A SUMP OR SAG LOCATION
Denver No. 16 Combination
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Denver No. 16 Combination
Override Depths
Copy of UD-Inlet_v4.03.xlsm, DP2 8/23/2016, 4:27 PM
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020
Height of Curb at Gutter Flow Line HCURB = 6.00 inches
Distance from Curb Face to Street Crown TCROWN = 30.0 ft
Gutter Width W = 1.00 ft
Street Transverse Slope SX = 0.019 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX = 30.0 30.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.0 inches
Allow Flow Depth at Street Crown (leave blank for no) check = yes
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Lot 6 Harmony Commons
DP3
Copy of UD-Inlet_v4.03.xlsm, DP3 8/23/2016, 4:27 PM
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) = 3.00 3.00 feet
Warning 5 Width of a Unit Grate Wo = 1.73 1.73 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.31 0.31
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.60 3.60
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet
Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches
Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees
Warning 1 Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.70 3.70
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66
Low Head Performance Reduction (Calculated) MINOR MAJOR
Depth for Grate Midwidth dGrate = 0.451 0.451 ft
Depth for Curb Opening Weir Equation dCurb = 0.42 0.42 ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.94 0.94
Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 1.00 1.00
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = 0.94 0.94
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 4.1 4.1 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.5 2.9 cfs
Warning 1: Dimension entered is not a typical dimension for inlet type specified.
Warning 5: The width of unit is greater than the gutter width.
INLET IN A SUMP OR SAG LOCATION
Denver No. 16 Combination
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
Denver No. 16 Combination
Override Depths
Copy of UD-Inlet_v4.03.xlsm, DP3 8/23/2016, 4:27 PM
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK = 10.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020
Height of Curb at Gutter Flow Line HCURB = 6.00 inches
Distance from Curb Face to Street Crown TCROWN = 10.0 ft
Gutter Width W = 1.00 ft
Street Transverse Slope SX = 0.020 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX = 10.0 10.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 6.0 6.2 inches
Allow Flow Depth at Street Crown (leave blank for no) check = yes
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Lot 6 Harmony Commons
DP4
Copy of UD-Inlet_v4.03.xlsm, DP4 8/23/2016, 5:13 PM
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Ponding Depth = 3.2 3.2 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) = N/A N/A feet
Width of a Unit Grate Wo = N/A N/A feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) = 10.00 10.00 feet
Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches
Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches
Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 1.00 1.00 feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = 3.60 3.60
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67
Low Head Performance Reduction (Calculated) MINOR MAJOR
Depth for Grate Midwidth dGrate = N/A N/A ft
Depth for Curb Opening Weir Equation dCurb = 0.18 0.18 ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = 0.30 0.30
Curb Opening Performance Reduction Factor for Long Inlets RFCurb = 0.70 0.70
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = N/A N/A
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 2.1 2.1 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.3 1.8 cfs
Warning 5: The width of unit is greater than the gutter width.
INLET IN A SUMP OR SAG LOCATION
CDOT Type R Curb Opening
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
CDOT Type R Curb Opening
Override Depths
Copy of UD-Inlet_v4.03.xlsm, DP4 8/23/2016, 5:13 PM
Project:
Inlet ID:
Gutter Geometry (Enter data in the blue cells)
Maximum Allowable Width for Spread Behind Curb TBACK = 0.0 ft
Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = ft/ft
Manning's Roughness Behind Curb (typically between 0.012 and 0.020) nBACK = 0.020
Height of Curb at Gutter Flow Line HCURB = 12.00 inches
Distance from Curb Face to Street Crown TCROWN = 27.0 ft
Gutter Width W = 3.00 ft
Street Transverse Slope SX = 0.017 ft/ft
Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.083 ft/ft
Street Longitudinal Slope - Enter 0 for sump condition SO = 0.000 ft/ft
Manning's Roughness for Street Section (typically between 0.012 and 0.020) nSTREET = 0.016
Minor Storm Major Storm
Max. Allowable Spread for Minor & Major Storm TMAX = 27.0 27.0 ft
Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 12.0 12.0 inches
Allow Flow Depth at Street Crown (leave blank for no) check = yes
MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm
MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = SUMP SUMP cfs
ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm)
(Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread)
Lot 6 Harmony Commons
DP5
Copy of UD-Inlet_v4.03.xlsm, DP5 8/23/2016, 4:27 PM
Design Information (Input) MINOR MAJOR
Type of Inlet Type =
Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 0.00 0.00 inches
Number of Unit Inlets (Grate or Curb Opening) No = 1 1
Water Depth at Flowline (outside of local depression) Ponding Depth = 7.9 7.9 inches
Grate Information MINOR MAJOR
Length of a Unit Grate Lo (G) = 2.92 2.92 feet
Width of a Unit Grate Wo = 2.92 2.92 feet
Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.70 0.70
Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50
Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 2.41 2.41
Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.67 0.67
Curb Opening Information MINOR MAJOR
Length of a Unit Curb Opening Lo (C) = N/A N/A feet
Height of Vertical Curb Opening in Inches Hvert = N/A N/A inches
Height of Curb Orifice Throat in Inches Hthroat = N/A N/A inches
Angle of Throat (see USDCM Figure ST-5) Theta = N/A N/A degrees
Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = N/A N/A feet
Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = N/A N/A
Curb Opening Weir Coefficient (typical value 2.3-3.7) Cw (C) = N/A N/A
Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = N/A N/A
Low Head Performance Reduction (Calculated) MINOR MAJOR
Depth for Grate Midwidth dGrate = 0.536 0.536 ft
Depth for Curb Opening Weir Equation dCurb = N/A N/A ft
Combination Inlet Performance Reduction Factor for Long Inlets RFCombination = N/A N/A
Curb Opening Performance Reduction Factor for Long Inlets RFCurb = N/A N/A
Grated Inlet Performance Reduction Factor for Long Inlets RFGrate = 1.00 1.00
MINOR MAJOR
Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.5 3.5 cfs
Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 0.4 2.8 cfs
INLET IN A SUMP OR SAG LOCATION
CDOT Type C Grate
H-Vert
H-Curb
W
Lo (C)
Lo (G)
Wo
WP
CDOT Type C Grate
Override Depths
Copy of UD-Inlet_v4.03.xlsm, DP5 8/23/2016, 4:27 PM
Grass Type Limiting Manning's n
A0.06
B0.04
C 0.033
D0.03
E 0.024
Analysis of Trapezoidal Grass-Lined Channel Using SCS Method
NRCS Vegetal Retardance (A, B, C, D, or E) A, B, C, D or E D
Manning's n (Leave cell D16 blank to manually enter an n value) n = see details below
Channel Invert Slope SO = 0.0050 ft/ft
Bottom Width B = 1.00 ft
Left Side Slope Z1 = 4.00 ft/ft
Right Side Slope Z2 = 4.00 ft/ft
Check one of the following soil types:
Soil Type: Max. Velocity (VMAX) Max Froude No. (FMAX)
Non-Cohesive 5.0 fps 0.60
Cohesive 7.0 fps 0.80
Paved N/A N/A
Minor Storm Major Storm
Max. Allowable Top Width of Channel for Minor & Major Storm TMAX = 10.00 10.00 feet
Max. Allowable Water Depth in Channel for Minor & Major Storm dMAX = 1.50 1.50 feet
Allowable Channel Capacity Based On Channel Geometry Minor Storm Major Storm
MINOR STORM Allowable Capacity is based on Top Width Criterion Qallow = 6.6 6.6 cfs
MAJOR STORM Allowable Capacity is based on Top Width Criterion dallow = 1.13 1.13 ft
Water Depth in Channel Based On Design Peak Flow
Design Peak Flow Qo = 0.4 2.6 cfs
Water Depth d = 0.53 0.91 feet
AREA INLET IN A SWALE
Lot 6 Harmony Commons
DP6
Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management'
Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management'
Choose One:
Non-Cohesive
Cohesive
Paved
Copy of UD-Inlet_v4.03.xlsm, DP6 8/23/2016, 4:27 PM
AREA INLET IN A SWALE
Lot 6 Harmony Commons
DP6
Inlet Design Information (Input)
Type of Inlet Inlet Type =
Angle of Inclined Grate (must be <= 30 degrees) θ = 0.00 degrees
Width of Grate W = 3.00 feet
Length of Grate L = 3.00 feet
Open Area Ratio ARATIO = 0.70
Height of Inclined Grate HB = 0.00 feet
Clogging Factor Cf = 0.50
Grate Discharge Coefficient Cd = 0.96
Orifice Coefficient Co = 0.64
Weir Coefficient Cw = 2.05
MINOR MAJOR
Water Depth at Inlet (for depressed inlets, 1 foot is added for depression) d = 0.53 0.91
Total Inlet Interception Capacity (assumes clogged condition) Qa = 7.2 15.4 cfs
Bypassed Flow, Qb = 0.0 0.0 cfs
Capture Percentage = Qa/Qo = C% 100 100 %
CDOT Type C CDOT Type C
Copy of UD-Inlet_v4.03.xlsm, DP6 8/23/2016, 4:27 PM
LID Calculations
Area acres sqft
Effective Impervious Area = 1.22 53,259
50% LID Treatment Area = 0.61 26,630
Parking Area = 0.68 29,718
25% Paver Threshold Area = 0.17 7,430
Area of Pavers Trbutary Impervious Area Tributary Area Ratio Max 3:1 Allowance LID Credit Area
1,239 7,229 5.8 3,717 4,956
1,728 5,741 3.3 5,184 6,912
1,884 10,915 5.8 5,652 7,536
730 1,783 2.4 2,190 2,513
1,697 0 0.0 5,091 1,697
406 166 0.4 1,218 572
7,684 25,834 33,518
LID ‐ Paver Credit Tabulation
Sheet 1 of 1
Designer:
Company:
Date:
Project:
Location:
1. Design Discharge for 2-Year Return Period Q2 = 0.20 cfs
2. Hydraulic Residence Time
A) : Length of Grass Swale LS = 90.0 ft
B) Calculated Residence Time (based on design velocity below) THR= 7.5 minutes
3. Longitudinal Slope (vertical distance per unit horizontal)
A) Available Slope (based on site constraints) Savail = 0.005 ft / ft
B) Design Slope SD = 0.005 ft / ft
4. Swale Geometry
A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft
B) Bottom Width of Swale (enter 0 for triangular section) WB = 1.00 ft
5. Vegetation
A) Type of Planting (seed vs. sod, affects vegetal retardance factor)
6. Design Velocity (0.3 ft / s maximum for desirable 5-minute residence time) V2 = 0.20 ft / s
7. Design Flow Depth (1 foot maximum) D2 = 0.39 ft
A) Flow Area A2 = 1.0 sq ft
B) Top Width of Swale WT = 4.1 ft
C) Froude Number (0.50 maximum) F = 0.07
D) Hydraulic Radius RH = 0.24
E) Velocity-Hydraulic Radius Product for Vegetal Retardance VR = 0.05
F) Manning's n (based on SCS vegetal retardance curve D for sodded grass) n = 0.200
G) Cumulative Height of Grade Control Structures Required HD = 0.00 ft
AN UNDERDRAIN IS
8. Underdrain REQUIRED IF THE
(Is an underdrain necessary?) DESIGN SLOPE < 2.0%
9. Soil Preparation
(Describe soil amendment)
10. Irrigation
Notes:
Design Procedure Form: Grass Swale (GS)
August 23, 2016
Harmony Commons - Lot 6
Fort Collins, CO
Choose One
Temporary Permanent
Choose One
Grass From Seed Grass From Sod
Choose One
YES NO
UD-BMP_v3.05.xlsm, GS 8/23/2016, 4:39 PM
This unofficial copy was downloaded on May-26-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact Engineering Office 281 North College Fort Collins, CO 80521 USA
This unofficial copy was downloaded on Aug-03-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com
For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA