Project Narrative
Project Location:
The project is located within the East Half of Section 21, Township 7 North, Range 68 West of the 6th
P.M. More specifically the project is located on the southwest corner of the intersection of Interstate 25
and E. Prospect Road. The project is located within a 142-acre property currently owned by Colorado
State University Research Foundation. The project will consist of relocating a portion of the Southwest
Frontage Road currently owned and maintained by the Colorado Department of Transportation (CDOT).
Project Process:
The relocation of the frontage road is proposed as a Road Project (RP) and is accompanied with a Right-
of-Way Dedication Application for the Right-of-Way required to encompass the new roadway alignment.
While the Right-of-Way dedication will include the width of a proposed ultimate section, the fees have
been calculated to include the Right-of-Way required for the interim section plus 4’ shoulders on both
sides for a total width of 36 feet.
Project Description:
The project is proposing an interim roadway section with an asphalt width of 28 feet, which allows for
two 12’ travel lanes with a 2’ asphalt shoulder on either side. This interim cross-section is proposed to
match the existing cross-section currently located on the site. A drainage swale is designed on the high
gradient side that will travel along the roadway and collects at a natural low point in the property,
where it is diverted under the roadway to the low gradient side. The low gradient side will tie into
existing grade at a 4:1 slope. The project will also include public infrastructure require for future
development within the relocation of the SW Frontage Road, which include public water and
wastewater.
This Road Project (RP) is proposed to be followed by a Planned Unit Development (PUD) process and a
Project Development Plan (PDP) for a portion of the overall PUD area, referred to Phase I hereon. The
reason for processing the Road Project prior to the PUD and PDP is to have the realignment of the
frontage road constructed prior to the improvements proposed by CDOT to the intersection of E.
Prospect Road and Interstate 25. The proposed improvements by CDOT would require a portion of the
SW Frontage Road to be relocated to allow for additional width within the CDOT Interstate 25 Corridor.
The alignment that CDOT is currently proposing does not meet Larimer County Urban Area Street
Standards (LCUASS) minimum radii for any street classification. This would require the realigned
frontage road to be removed and replaced per LCUASS minimum standards at the time of the PDP for
Phase I. The proposed interim section would remain until Phase I is approved and constructed, at which
point, the approved ultimate section would be constructed. Without knowing the exact ultimate section
that would be designed and approved, the interim section would result in the least amount of
reconstruction and redesign. Along with the interim cross-section, an interim pavement section is
proposed and would exclude the top lift of asphalt. This would allow for wearing to occur prior to the
construction of the ultimate section, at which point, the entire street section would be constructed with
the top lift allowing for the entire roadway to look and feel like a new street.
Submittal Documents:
The documents that will be submitted with the Road Project include the following items
• Project Narrative
• Utility Plans
• Transportation Development Review Fee Form
• Deed of Dedication
The project is located within the Boxelder Sanitation District and the ELCO Water District. Plans
required for water and sewer improvements will be sent directly to Boxelder and ELCO for their review
and approval. We would look to the City to route and coordinate with CDOT for review of this project.
With the project only including the relocation of the frontage road, many items required for a Project
Development Plan (PDP) are not included for reasons described hereon. A Geotechnical Report has not
been provided with Road Project, but a complete pavement design will be required at the time of
construction. A Traffic Impact Study has not been provided with the understanding that traffic counts
would stay consistent with existing conditions after the completion of the project. The functionality of
the roadway would also improve by the new alignment and larger sweeping curves. A Drainage Report
has not been included with the understanding that the overall impervious would stay the same with the
realignment of this roadway by keeping the existing roadway cross-section. With the project being
followed closely by a PUD and PDP application, we have not provided and Ecological Study. Through
previous meetings with City Staff, it was discussed that there is currently a high-quality wetland located
in the middle of the overall site. It is the overall project’s objective for the entire property to make all
enhancements and wetland mitigations in that one location to enhance the existing wetland and make it
a feature for the entire project to enjoy and use.
Maintenance & Repairs:
The standard Maintenance and Repair Agreements are proposed to start at the time the interim
roadway section is completed. These agreements would restart at the time the final lift of the ultimate
section is constructed for Phase 1 of the PDP to follow the project. It is proposed that after the
Maintenance Agreement period of the interim road has expired, the City of Fort Collins would take the
maintenance of the proposed frontage road, which would include snow clearing at the priority level of a
local roadway.