Loading...
HomeMy WebLinkAboutBRICK STONE APARTMENTS ON HARMONY - PDP - PDP160019 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT BRICKSTONE APARTMENTS Fort Collins, Colorado August 24, 2016 Prepared for: SEEC Enterprises, LLC PO Box 680513 Park City, Utah 84068 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1229-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. August 24, 2016 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage Report for Brickstone Apartments Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Conceptual Review submittal for the proposed Brickstone Apartments. This report has been prepared in accordance with the City of Fort Collins Stormwater Criteria Manual (FCSCM) and the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and serves to document the stormwater impacts associated with the proposed Brickstone Apartments project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Nicholas W. Haws, PE Blaine Mathisen Project Manager Project Engineer Brickstone Apartments Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 6 D. Hydrological Criteria ......................................................................................................................... 7 E. Hydraulic Criteria .............................................................................................................................. 7 F. Floodplain Regulations Compliance .................................................................................................. 7 G. Modifications of Criteria ................................................................................................................... 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 8 A. General Concept ............................................................................................................................... 8 B. Specific Details ................................................................................................................................ 10 V. CONCLUSIONS ...................................................................................................... 12 A. Compliance with Standards ............................................................................................................ 12 B. Drainage Concept ............................................................................................................................ 12 References ....................................................................................................................... 13 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (For Future Use) B.2 – Inlets B.3 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report APPENDIX E – Soils Resource Report Brickstone Apartments Final Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph – Google Earth ........................................................................... 1 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 - Existing City Floodplain ......................................................................................... 4 MAP POCKET: C5.00 - Historic Drainage Exhibit C5.01 - Drainage Exhibit Brickstone Apartments Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 – Aerial Photograph – Google Earth 2. Brickstone Apartments project is located in the Northwest Quarter of Section 1, Township 6 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located south of East Harmony Road and slightly east of South College Avenue. Brickstone Apartments will have the address of 201 W. Harmony Road. 4. Currently the existing lot remains completely undeveloped however there is currently stormwater infrastructure associated with the Brickstone Apartments project on site. There is a drainage ditch along the western property line (Larimer County Ditch #2) with a trash rack that the city regularly maintains and cleans out. This ditch conveys flow from the north to south into the Mail Creek Floodway which runs adjacent to the southern property line. There is also an existing irrigation ditch along the north property line that is used to convey flow from East Harmony Road east towards its ultimate design point. The project is currently bordered to the north by East Harmony Road, south by the Mail Creek Floodway, west by a commercial building, and east by an assisted living complex. Brickstone Apartments Preliminary Drainage Report 2 B. Description of Property 1. Brickstone Apartments project is approximately 4.408 net acres. However, due to the need for a turn lane onto the property, additional area will be associated with the Brickstone Apartments project. 2. Brickstone Apartments consists of a portion of an existing tract of land. There will be offsite runoff entering the property. Historically, flow generated between College Avenue and a low point along the northern property line within Harmony Road enters the site via curb cut and flows into an existing irrigation ditch. Runoff entering the existing irrigation ditch is conveyed east. Additional concentrated offsite flow enters the site through the Larimer County Ditch #2 along the west property line and runs down a rip-rap embankment until it also reaches Mail Creek Floodway. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 56.1 percent of the site consists of Altvan- Satanta loams, which fall into Hydrologic Soil Groups B. The other 43.9 percent of the site consists of Nunn clay loam, which falls into Hydrologic Soils Group C. A more precise soils investigation was performed by Terracon Consultants Inc. 4. The proposed development will include the clearing of existing vegetation within the limits of disturbance as well as four (4) deciduous trees. The proposed project will include a large multifamily building with associated parking both underground and uncovered. There will be a courtyard at the center of the building with an emergency access drive leading up to it. Along the south side of the building, there will be sidewalks with associated landscaping walls in order to maintain reasonable slopes and reduce the limits of disturbance. Water quality and detention will be provided underground via Stormtech chambers. When designing the water quality portion of the underground chambers a porosity of 0% will be assumed for the underdrain aggregate to accommodate for additional sediment build up. The isolator rows will be wrapped in a geotextile membrane to avoid sediment migration. As for the detention portion, the underground chambers were modeled with a typical 40% porosity for the underdrain aggregate. Brickstone Apartments Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 5. There are irrigation facilities (Larimer County Ditch #2), erosion buffer zones, and major drainage ways (Mail Creek Floodway) within the property limits. 6. The project site is within the Harmony Corridor District (H-C). The proposed use is permitted within this zone district. C. Floodplain 1. The subject property does not lie within a plottable FEMA floodplain. However, according to FIRM Panel 08069C1000F for Larimer County, dated December 19th, 2006, this tract lies in an area of minimal flood hazard, Zone X. 2. A portion of Brickstone Apartments project does however fall within the Mail Creek floodway which is a City of Fort Collins floodplain. Any development within the floodway must obtain a floodplain use permit, a no-rise certificate and also comply with the safety regulations of Chapter 10 of City Municipal Code. A portion of this property is located within the erosion buffer zone for Mail Creek. Construction of a structure is not allowed in an erosion buffer zone and all nonstructural development must meet the standards of Section 10-202 of City Municipal Code. Proposed vegetation within the erosion buffer zone must be non-irrigated native vegetation that enhances the stability of the creek. Brickstone Apartments Preliminary Drainage Report 4 Figure 3 - Existing City Floodplain II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. Brickstone Apartments is within the Mail Creek Drainage Basin. This basin generally drains from west to east to the confluence of Mail Creek and Fossil Creek, and ultimately to Fossil Creek Reservoir. 2. There are no previous drainage studies for the area associated with Brickstone Apartments project site. B. Sub-Basin Description 1. Brickstone Apartments historically sheet flows north to south towards Mail Creek. Basin H1 Basin H1 is associated with a majority of the project area (4.30 acres out of 4.408 acres) and all the runoff is discharged directly into Mail Creek. Within Basin H1 there is an existing drainage ditch (Larimer County Ditch #2) along the west property line that directs offsite flow via a rip-rap embankment towards Mail Creek. This offsite flow will not be disturbed or altered during or after the construction of Brickstone Apartments. Basin H1 lies within an erosion buffer zone which is associated with the Mail Creek Floodway. No structures will be placed within the erosion buffer zone. Brickstone Apartments Preliminary Drainage Report 5 Basin OS1 Basin OS1 is associated with the south side of the East Harmony Road right of way from College Avenue to the new drive entrance located at the northeast corner of the project site. Historically, the flow associated with this area has entered the site via a curb cut at a low point along the north property line and then entering an existing irrigation ditch that runs west to east along the south side of Harmony Road. However, the Brickstone Apartments project will extend the limits of the right of way to ultimate design all along the north property line, which will remove of the ditch. Instead of the historic flow from Harmony Road entering the irrigation ditch at the project site it will remain in a concentrated flow within the curb and gutter and eventually enter the existing irrigation ditch just west of S. Boardwalk Drive. There will be no detention or water quality provided for this off site basin on the Brickstone Apartments project site. 2. A more detailed description of the projects proposed drainage patterns follows in Section IV.A.4., below. 3. There is offsite flow associated with Brickstone Apartments as previously discussed. A full-size copy of the Historic and Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Brickstone Apartments project. B. Four Step Process The overall stormwater management strategy employed with the Brickstone Apartments project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Providing as much vegetated open areas as possible along the north, east, west and south portion of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through underground Stormtech Isolator Rows for water quality purposes. Stormwater will be routed through drain rock to increase infiltration Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on downstream storm infrastructure. Routing runoff from the roofs directly into isolator rows Brickstone Apartments will minimize the limits of disturbance to the fullest extent in order to maintain existing drainage patterns, specifically along the west property line where there is already an existing drainage ditch. Brickstone Apartments Preliminary Drainage Report 6 Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff and provide the necessary BMPs required for water quality. Stormwater generated on the western portion of the project site will remain unaltered and will be free released directly into Mail Creek. Due to grade constraints and the lack of space along the south side of the limits of disturbance all runoff generated from the landscape and sidewalks on the south side of the building will be free released into Mail Creek. The remaining portion of the site will be captured in inlets and roof leaders and routed to underground detention and water quality facilities. Runoff will be released at the historic 2-year event with a reduction because of the non-catchable flow leaving the site untreated. Step 3 – Stabilize Drainageways As stated in Section I.B.5, above, there are major drainageways in the subject site. The erosion buffer zone per city of Fort Collins City Flood Risk Map will remain completely undeveloped and no construction will be required within this zone. The Mail Creek floodway will also remain completely unaltered. The limits of disturbance associated with the Brickstone Apartments project will be reduced as much as possible. Flow associated with Larimer County Ditch #2 will also remain unaltered and the infrastructure with it will not be disturbed during construction. By under-utilizing the site and keeping a large area undisturbed, combined with LID, the likelihood of bed and bank erosion is greatly reduced. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The Brickstone Apartments project includes a multifamily building with a courtyard, associated parking (both above and below ground), landscaping walls, and a sidewalk path all of which will require the need for site specific source controls including: A localized trash enclosure placed in the underground parking lot C. Development Criteria Reference and Constraints 1. There are no known drainage studies for the existing property. 2. There is a drainage study for the adjacent lot to the east titled “Final Drainage Report for Fort Collins Supportive Housing” by S. A. Miro, Inc. dated May 25th, 2007 which discusses the historic use of the existing irrigation ditch that runs west to east along East Harmony Road. 3. The subject property is essentially an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the east, west, and south property lines will be maintained. Brickstone Apartments plans on disturbing as little of the existing grades as possible. During the construction of Brickstone Apartments Harmony Rd. will also be extended to its ultimate design along the northern property line. Therefore, the Brickstone Apartments Preliminary Drainage Report 7 existing irrigation ditch will be removed and the pipes under the shared access drive along the east property line will be abandoned. Overall drainage patterns of the existing site will be maintained. Release rates can not adversely impact existing infrastructure. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains north to south into Mail Creek. The majority of runoff historically related to the site sheet flows with the exception of Larimer County Ditch #2, which conveys offsite flows in a concentrated flow. 2. All drainage facilities proposed with the Brickstone Apartments project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is located within a City regulatory floodplain (Mail Creek Floodway). 4. The Brickstone Apartments project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, the project site falls within a City regulatory floodplain (Mail Creek Floodway). However, all structures are located outside of the City floodplain and erosion buffer zone. G. Modifications of Criteria 1. The proposed Brickstone Apartments development is not requesting modification at this time. Brickstone Apartments Preliminary Drainage Report 8 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Brickstone Apartments drainage design are to maintain existing drainage patterns and ensure no adverse impacts to any adjacent properties or existing infrastructure. 2. As previously mentioned, there are off-site flows draining onto the existing property. However, these flows are going to get constrained in the new Harmony Road curb and gutter. Brickstone Apartments anticipates capturing, detaining, and treating half of the new Harmony Road. This is discussed further below in the explanation of Basin OS.1. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The Brickstone Apartments project is associated with seven major drainage basins, designated as Basins W.1, E.1, E.2, OS.1, OS.2, OS.3, and OS.4. However, there are only five basins within the project boundaries (W.1, E.1, E.2, OS.3, and OS.4), the other two basins (OS.1 and OS.2) are associated with East Harmony Road. Basin W.1 Basin W.1 is located along the western portion of the building and the west half of the multifamily building has an associated emergency drive access. The majority of runoff generated in this basin comes from the western portion of the multifamily building roof. Runoff from the roof will enter roof leaders which will convey the flow to an isolator row within the underground Stormtech chambers located underneath the emergency access drive isle. The remaining portion of runoff is generated within the paved and landscaping areas directly west of the building. Runoff generated in this area will enter the underground Stormtech chambers via 5’ Type R inlet located at the south end of the emergency access drive. Water quality and detention will both occur within MC-4500 Stormtech chambers that are wrapped in a geotextile membrane to avoid sediment migration. Basin W.1 will release at a portion of the historic 2-year release rate via a flow control manhole directly into the Mail Creek Floodway. Basin E.1 Basin E.1 is located along the eastern property line and contains the eastern portion of the multifamily building, southeast parking lot, and a small portion of landscaping. A majority of runoff is produced via the roof which is routed via roof leaders into a proposed storm system which runs north to south underneath the shared access drive. The remaining portion of the runoff is generated within the parking lot and landscaping areas. Runoff from the parking lot and landscaping areas will sheet flow into one of two 5’ Type R Inlets located along the southern edges of the south parking lot. Once all the runoff has been gathered into the proposed storm system it will be conveyed to MC-4500 Stormtech chambers located underneath the south parking lot. Water quality and detention will both occur within MC-4500 Stormtech chambers. Basin E.1 will release at a portion of the historic 2-year release rate via a flow control manhole directly into the Mail Creek Floodway. Brickstone Apartments Preliminary Drainage Report 9 Basin E.2 Basin E.2 contains all the landscaping north of the multifamily building. Runoff generated in the landscaping area will sheet flow north into Harmony Road. Once into Harmony Road it will flow west to east via curb and gutter and eventually enter a proposed 10’ Type R Inlet within the new turn lane. Once in the inlet the runoff will be conveyed via the same storm system that Basin E.1 is being conveyed with. Runoff will be routed to MC-4500 Stormtech chambers located underneath the southern parking lot. Water quality and detention will both occur within the MC-4500 Stormtech chambers. Basin E.2 will release at a portion of the historic 2-year release rate via a flow control manhole directly into the Mail Creek Floodway. Basin OS.1 Basin OS.1 is 100% asphalt and is associated with 15’ north of the north property line and extended the entire width of the property line. This is equivalent to the addition of a local street. Even though this area is not within the projects boundaries, the Brickstone Apartments project will provide detention and water quality for the runoff generated within this ultimate design. Runoff generated in Basin OS.1 will enter the 10’ Type R Inlet that Basin E.2 is utilizing. Once in the inlet the runoff will be conveyed via the same storm system that Basins E.1 and E.2 are being conveyed in. Runoff will be routed to MC-4500 Stormtech chambers located underneath the southern parking lot. Water quality and detention will both occur within the MC-4500 Stormtech. Basin OS.1 will release at a portion of the historic 2-year release rate via a flow control manhole directly into the Mail Creek Floodway. Basin OS.2 Basin OS.2 is the same basin as the previously discussed Basin OS1 from the historic analysis. Basin OS.2 consists of the remaining portion of East Harmony Road that wasn’t included in Basin OS.1 stretching from College Ave. to roughly the middle of the Brickstone Apartments project site. Runoff generated within this basin will still reach its ultimate discharge location, just west of S. Boardwalk Drive, into the existing irrigation ditch. The runoff generated within Basin OS.2 will bypass the 10’ Type R Inlet associated with Basins OS.1 and E.2 because the inlet is designed to only capture the runoff generated in those two basins and allow all other flows to bypass. Basin OS.3 Basin OS.3 is within the limits of disturbance and occupies the area just south of the multifamily building and west of the southern parking lot and consists of landscaping, pedestrian sidewalks, and retaining walls. Historically this basin sheet flows south to Mail Creek undetained and untreated but because the Brickstone Apartments project is increasing the imperviousness of this area the runoff generated from this basin will be subtracted from the max allowable historic 2-year release rate. Basin OS.3 will continue to sheet flow south directly into Mail Creek untreated and undetained. Basin OS.4 Basin OS.4 contains the Larimer County Ditch #2 and the remaining portion of the undisturbed natural landscaping areas outside of the limits of disturbance and a Brickstone Apartments Preliminary Drainage Report 10 portion of land within the limits of disturbance. Due to existing conditions and grades it would be impractical to reduce the allowable release rate by a factor that is associated with runoff generated within both Basin OS.4 and the limits of disturbance. Therefore, runoff generated from this basin will not be subtracted from the max allowable historic 2-year release rate because historic drainage patterns and historic imperviousness is maintained. Runoff generated in Basin OS.4 will continue to sheet flow south into Mail Creek. B. Specific Details 1. The main drainage problems associated with this project site are the deficiency of existing stormwater infrastructure present, steep existing grades, city floodplains, existing drainage ditches, and an influx of runoff generated from East Harmony Road entering the site. Currently the majority of the site drains south via sheet flow directly into Mail Creek. The proposed site will mitigate these issues by instituting the following water quality devices: Basins W.1, E.1, E.2, and OS.1 will be routed into isolator rows within the underground systems. The Stormtech chambers will be wrapped with a geotextile membrane to avoid sediment migration. Restrictor plates will be placed at each of the two outfalls to control flow leaving the underground facilities. When sizing the water quality chambers a porosity of 0% for the underdrain aggregate (typically assumed to be 40%) was used to reduce any possibility of overloading the system with sediment buildup. 2. The release rate for the undeveloped land (pre-development) was established by calculating the Historic 2-year peak runoff rate for the entire project area (Basin H1) and reducing it by the runoff from Basin OS.3’s 100-year event (0.98 cfs) because it is leaving the developed site undetained and untreated. The overall historic 2-year peak runoff rate was calculated at 2.27 cfs, resulting in a maximum release rate of 1.29 cfs for the developed basins (W.1, E.1, E.2, and OS.1). This release rate was utilized in the FAA procedure detention storage computations (Refer to Appendix B for these calculations). 3. Detention Pond Calculations The Brickstone Apartments project has two separate underground detention facilities and they have a combined max release rate of 1.27 cfs. The release rate for each pond was determined as a portion of the max release rate. The West Pond is associated only with Basin W.1 which occupies 30% of the area associated with Basins W.1, E.1, E.2, and OS.1. Therefore, the West Pond will release at a rate of 30% of the max release rate, allowing for a release rate of 0.39 cfs. The remaining 70% of the max release rate of 1.29 will be allocated to East Pond, allowing for a release rate of 0.90 cfs. Adding those two release rates together (0.39 cfs + 0.90 cfs) brings the max release rate from the site to 1.29 cfs. Detention will be provided onsite in the form of underground detention using MC- 4500 chambers from Stormtech. West Pond The FAA method was used to size the underground pond for detention. Calculations for West Pond, based on characteristics of Basin W.1 with an adjusted release rate of 0.39 cfs, formulate a detention volume of 8,738 cu. ft. In order to detain 8,738 cu. Brickstone Apartments Preliminary Drainage Report 11 ft a total of 48 MC-4500 chambers will be used. West Pond will discharge south towards Mail Creek through a flow control manhole. East Pond The FAA method was used to size the underground pond for detention. Calculations for East Pond, based on characteristics of Basins E.1, E.2, and OS.1 with an adjusted release rate of 0.90 cfs, formulate a detention volume of 20,123 cu. ft. In order to detain 20,123 cu. ft. a total of 118 MC-4500 chambers will be used. East Pond will discharge south towards Mail Creek through a flow control manhole. 4. Water Quality Results Basin W.1 Basin W.1’s water quality will be provided via underground Stormtech chambers with an assumed porosity of 0% to allow for the entire water quality volume to be achieved exclusively within the chambers. Runoff will enter the underground system through either roof leaders or a 5’ Type R Inlet. Following UDFCD standards, a required WQCV of 823 cu. ft. must be provided for Basin W.1, and assuming an aggregate porosity of 0% means 5 MC-4500 chambers must be used to capture this runoff. The 5 water quality chambers will be wrapped with a geotextile membrane to further reduce sediment migration. However, Brickstone Apartments project will wrap 16 of the MC-4500 chambers associated with West Pond because of the limited space within the emergency access constrained the underground facility to a specific configuration. Therefore, Brickstone Apartments is going above and beyond in terms of providing water quality for Basin W.1. City of Fort Collins has agreed that the Stormtech chambers are an acceptable LID treatment. Basin E.1, E.2, and OS.1 Basin’s E.1, E.2, and OS.1 will also have water quality provided via underground Stormtech chambers with an assumed porosity of 0% (same as above). Runoff will enter the underground system through either roof leaders, a 5’ Type R Inlet, or a 10’ Type R Inlet. Following UDFCD standards, a required WQCV of 1577 cu. ft. must be provided for Basins E.1, E.2, and OS.1, and assuming an aggregate porosity of 0% yields 12 MC-4500 Stormtech chambers. The 12 water quality chambers will be wrapped with a geotextile membrane to further reduce sediment migration. However, Brickstone Apartments project will wrap 16 of the MC-4500 chambers associated with East Pond because of the configuration of the underground facility. Therefore Brickstone Apartments is going above and beyond in terms of providing water quality for Basins E.1, E.2, and OS.1. City of Fort Collins has agreed that the StormTech chambers are an acceptable LID. 5. West pond will have a total of 48 MC-4500 chambers, 16 of them will be wrapped with a geotextile membrane for water quality purposes. 6. East Pond will have a total of 118 MC-4500 chambers, 16 of them will be wrapped with a geotextile membrane for water quality purposes 7. Water quality chambers are only a portion of the detention chambers and are not stand alone entities. 8. In the case that any of the 5’ Type R inlets within Basin W.1 and E.1 get clogged runoff will overtop the curb and gutter and flow south towards Mail Creek as it has historically. 9. In the case that the 10’ Type R Inlet within the turn lane gets clogged runoff Brickstone Apartments Preliminary Drainage Report 12 will pond about 4.8” before overtopping the highpoint within the turn lane and then flow east towards S. Boardwalk Drive where it will enter the existing irrigation ditch, where it has historically gone. 10. Historic slopes found within the project site vary greatly across the entire site ranging from 2:1 all the way to 30:1 along the northern edge of the site. Brickstone Apartments attempted to maintain slopes no greater than 4:1 but unfortunately along the southeastern edge of the limits of disturbance there are proposed slopes of 3:1. By utilizing a 3:1 slope in this area it allowed the limits of disturbance to be as minimal as possible. Historically this area has always been at a slope equal to or greater than 3:1. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Brickstone Apartments project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Brickstone Apartments project complies with the City of Fort Collins’ Master Drainage Plan for the Mail Creek Basin. 3. There are city regulatory floodplains and erosion buffer zones associated with the Brickstone Apartments project. Nonstructural development will meet the standards of Section 10-202 of the City Municipal Code. The boundaries of the floodplain and erosion buffer zone will be included on all the plans so that it is readily evident that the Brickstone Apartments project is not disturbing or altering it. 4. The drainage plan and stormwater management measures proposed with the Brickstone Apartments development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. Brickstone Apartments will detain for a portion of the previous and proposed offsite runoff. Brickstone Apartments will be releasing at a reduced 2-year historic rate during the developed 100-year storm. 2. Brickstone Apartments will provide water quality for runoff that was not originally anticipated to be treated on site. 3. The proposed Brickstone Apartments development will not impact the Master Drainage Plan recommendations for the Mail Creek major drainage basin. Brickstone Apartments Preliminary Drainage Report 13 References 1. Final Drainage Report For Fort Collins Supportive Housing, May 25, 2007, S. A. Miro, Inc. 2. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 3. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 4. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 5. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Brick Stone Apartments CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Brick Stone Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..……………………………………………..0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 187189 4.30 0.000 0.008 0.000 0.183 0.000 4.11 0.26 0.26 0.33 2% OS1 47615 1.09 1.093 0.000 0.000 0.000 0.000 0.00 0.95 0.95 1.00 100% TOTAL 234804 5.39 1.093 0.008 0.000 0.183 0.000 4.11 0.33 0.33 0.41 22% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 August 9th, 2016 **Soil Classification of site is Clay Loam** Page 1 of 23 Historic D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs (Historic).xlsx\C-Values Brick Stone Apartments Overland Flow, Time of Concentration: Project: Brick Stone Apartments Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? (C*2-Cf yr Cf=1.00) (10-C*Cf yr Cf=1.00) (100-C*Cf yr Cf=1.25) Length, L (ft) Slope, S (%) 2-Ti yr (min) 10-Ti yr (min) 100-Ti yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) (min) Tt Length, L (ft) Slope, S (%) Velocity, V (ft/s) (min) Tt 2-yr (min) Tc 10-yr (min) Tc 100-yr (min) Tc h1 H1 No 0.26 0.26 0.33 294 9.44% 12.7 12.7 11.7 N/A N/A N/A N/A N/A 13 13 12 os1 OS1 No 0.95 0.95 1.00 31 3.30% 1.0 1.0 0.7 665 0.60% 1.55 7.2 N/A N/A N/A 8 8 8 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Brick Stone Apartments Rational Method Equation: Project: Brick Stone Apartments Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: h1 H1 4.30 13 13 12 0.26 0.26 0.33 2.02 3.45 7.29 2.27 3.88 10.26 os1 OS1 1.09 8 8 8 0.95 0.95 1.00 2.40 4.10 8.59 2.49 4.26 9.39 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen Q  C f  C  i  A  August 9th, 2016 Page 3 of 23 Historic D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs (Historic).xlsx\Direct-Runoff Brickstone Apartments CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Brickstone Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% . Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. W.1 33355.2 0.766 0.084 0.141 0.495 0.000 0.000 0.05 0.91 0.91 1.00 86% E.1 51773.8 1.189 0.316 0.295 0.495 0.000 0.000 0.08 0.90 0.90 1.00 86% E.2 16432.1 0.377 0.000 0.104 0.000 0.000 0.000 0.27 0.44 0.44 0.55 25% OS.1 9619.7 0.221 0.221 0.000 0.000 0.000 0.000 0.00 0.95 0.95 1.00 100% OS.2 37007.3 0.850 0.850 0.000 0.000 0.000 0.000 0.00 0.95 0.95 1.00 100% Brickstone Apartments Overland Flow, Time of Concentration: Project: Brickstone Apartments Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Brickstone Apartments Rational Method Equation: Project: Brickstone Apartments Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: w W.1 0.77 6 6 5 0.91 0.91 1.00 2.67 4.56 9.95 1.86 3.17 7.62 e E.1 1.19 5 5 5 0.90 0.90 1.00 2.85 4.87 9.95 3.05 5.22 11.83 e E.2 0.38 8 8 6 0.44 0.44 0.55 2.46 4.21 9.31 0.41 0.70 1.95 e OS.1 0.22 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.60 1.02 2.20 OS.2 0.85 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 2.30 3.93 8.45 OS.3 0.18 8 8 6 0.48 0.48 0.60 2.46 4.21 9.31 0.21 0.36 0.98 OS.4 1.85 18 18 17 0.27 0.27 0.34 1.70 2.90 6.20 0.86 1.46 3.91 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen August 18th, 2016 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) Page 3 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\Direct-Runoff Brickstone Apartments CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Brickstone Apartments Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: August 18th, 2016 Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Design Point Basin IDs Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. i1 E.2 & OS.1 26052 0.60 0.22 0.10 0.00 0.00 0.27 0.63 0.63 0.79 53% e E.1, E.2, & OS.1 77826 1.79 0.54 0.40 0.50 0.35 0.81 0.81 1.00 75% COMBINED DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS **Soil Classification of site is Sandy Loam** 10-year Cf = 1.00 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Page 4 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\Comb-C-Values Brickstone Apartments Overland Flow, Time of Concentration: Project: Brickstone Apartments Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Brickstone Apartments Rational Method Equation: Project: Brickstone Apartments Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: i1 E.2 & OS.1 0.60 5 8 9 0.63 0.63 0.79 2.85 4.21 8.03 1.1 1.6 3.8 e E.1, E.2, & OS.1 1.79 8 12 13 0.81 0.81 1.00 2.40 3.57 7.04 3.5 5.2 12.6 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) COMBINED DEVELOPED RUNOFF COMPUTATIONS B. Mathisen August 18th, 2016 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) C2 C10 Q = C f ( C )( i )( A ) Page 6 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\Comb-Direct-Runoff Brickstone Apartments DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) w W.1 0.77 0.91 1.00 6.4 5.0 1.86 7.62 e E.1 1.19 0.90 1.00 5.3 5.0 3.05 11.83 e E.2 0.38 0.44 0.55 7.7 6.4 0.41 1.95 e OS.1 0.22 0.95 1.00 5.0 5.0 0.60 2.20 OS.2 0.85 0.95 1.00 5.0 5.0 2.30 8.45 OS.3 0.18 0.48 0.60 7.9 6.4 0.21 0.98 OS.4 1.85 0.27 0.34 18.3 16.8 0.86 3.91 DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) i1 E.2 & OS.1 0.60 0.63 0.79 5.0 9.4 1.08 3.79 e E.1, E.2, & OS.1 1.79 0.81 1.00 8.2 12.7 3.48 12.58 Page 7 of 23 D:\Projects\Proposed 1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\SUMMARY-TABLE APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Inlets B.3 – Detention Facilities APPENDIX B.1 STORM SEWERS (FOR FUTURE USE) APPENDIX B.2 INLETS (FOR FUTURE USE) Worksheet Protected Project: Inlet ID: Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *QKnown = 1.1 3.8 cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Slope (ft/ft) Length (ft) Overland Flow = Channel Flow = Rainfall Information: Intensity I (inch/hr) = C1 * P1 / ( C2 + Tc ) ^ C3 Minor Storm Major Storm Design Storm Return Period, Tr = years Return Period One-Hour Precipitation, P1 = inches C1 = C2 = C3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Qb = 0.00 0.00 cfs Total Design Peak Flow, Q = 1.1 3.8 cfs <--- FILL IN THIS SECTION OR… FILL IN THE SECTIONS BELOW. <--- DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Brickstone Apartments East Harmony Road Design Point i1 Site is Urban Site is Non-Urban Show Details Site Type: Street Inlets Area Inlets in a Median Flows Developed For: Combo_Inlet.xlsm, Q-Peak 8/18/2016, 2:23 PM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Flow Depth = 3.3 4.8 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = N/A N/A feet Width of a Unit Grate Wo = N/A N/A feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat = 6.00 6.00 inches Angle of Throat (see USDCM Figure ST-5) Theta = 63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.67 0.67 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = 1.2 4.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 1.1 3.8 cfs INLET IN A SUMP OR SAG LOCATION Brickstone Apartments East Harmony Road Design Point i1 CDOT Type R Curb Opening H-Vert H-Curb W Lo (C) Lo (G) Wo WP Combo_Inlet.xlsm, Inlet In Sump 8/18/2016, 2:23 PM APPENDIX B.3 DETENTION FACILITIES Pond No : 1 100-yr 1.00 13.00 min 20123 ft3 1.79 acres 0.462 ac-ft Max Release Rate = 0.90 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 5343 1.00 0.90 270 5073 10 7.720 8291 1.00 0.90 540 7751 15 6.520 10504 0.93 0.84 756 9748 20 5.600 12029 0.83 0.74 891 11138 25 4.980 13371 0.76 0.68 1026 12345 30 4.520 14563 0.72 0.65 1161 13402 35 4.080 15337 0.69 0.62 1296 14041 40 3.740 16067 0.66 0.60 1431 14636 45 3.460 16722 0.64 0.58 1566 15156 50 3.230 17345 0.63 0.57 1701 15644 55 3.030 17898 0.62 0.56 1836 16062 60 2.860 18430 0.61 0.55 1971 16459 65 2.720 18988 0.60 0.54 2106 16882 70 2.590 19472 0.59 0.53 2241 17231 75 2.480 19976 0.59 0.53 2376 17600 80 2.380 20449 0.58 0.52 2511 17938 85 2.290 20905 0.58 0.52 2646 18259 90 2.210 21362 0.57 0.52 2781 18581 95 2.130 21732 0.57 0.51 2916 18816 100 2.060 22124 0.57 0.51 3051 19073 105 2.000 22554 0.56 0.51 3186 19368 110 1.940 22919 0.56 0.50 3321 19598 115 1.890 23343 0.56 0.50 3456 19887 120 1.840 23714 0.55 0.50 3591 20123 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1229-001 Brickstone Apartments Project Number : Project Name : East Pond A = Pond No : 1 100-yr 1.00 5.00 min 8738 ft3 0.77 acres 0.201 ac-ft Max Release Rate = 0.39 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 2298 1.00 0.39 117 2181 10 7.720 3567 0.75 0.29 176 3391 15 6.520 4518 0.67 0.26 234 4284 20 5.600 5174 0.63 0.24 293 4882 25 4.980 5752 0.60 0.23 351 5401 30 4.520 6265 0.58 0.23 410 5855 35 4.080 6597 0.57 0.22 468 6129 40 3.740 6912 0.56 0.22 527 6385 45 3.460 7193 0.56 0.22 585 6608 50 3.230 7461 0.55 0.21 644 6818 55 3.030 7699 0.55 0.21 702 6997 60 2.860 7928 0.54 0.21 761 7167 65 2.720 8168 0.54 0.21 819 7349 70 2.590 8376 0.54 0.21 878 7499 75 2.480 8593 0.53 0.21 936 7657 80 2.380 8796 0.53 0.21 995 7802 85 2.290 8993 0.53 0.21 1053 7940 90 2.210 9189 0.53 0.21 1112 8078 95 2.130 9349 0.53 0.21 1170 8179 100 2.060 9517 0.53 0.20 1229 8289 105 2.000 9702 0.52 0.20 1287 8415 110 1.940 9859 0.52 0.20 1346 8514 115 1.890 10042 0.52 0.20 1404 8638 120 1.840 10201 0.52 0.20 1463 8738 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Project Tittle Date: Project Number Calcs By: Client Pond Designation 0.8 WQCV = Watershed inches of Runoff (inches) 75.00% a = Runoff Volume Reduction (constant) i = Total imperviouness Ratio (i = Iwq/100) 0.240 in A = 1.79 ac V = 0.04 ac-ft 1557 cf V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Brickstone Apartments August 18th, 2016 1229-001 B. Mathisen SEEC Enterprises East Pond Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event 0.240 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV   Project Tittle Date: Project Number Calcs By: Client Pond Designation 0.8 WQCV = Watershed inches of Runoff (inches) 86.00% a = Runoff Volume Reduction (constant) i = Total imperviouness Ratio (i = Iwq/100) 0.296 in A = 0.77 ac V = 0.02 ac-ft 823 cf V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event Brickstone Apartments August 18th, 2016 1229-001 B. Mathisen SEEC Enterprises West Pond 0.296 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV   APPENDIX D EROSION CONTROL REPORT Brickstone Apartments Final Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E Soils Resource Report United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Natural Area, Colorado Resources Conservation Service June 15, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/portal/ nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (http:// offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................7 Soil Map................................................................................................................8 Legend..................................................................................................................9 Map Unit Legend................................................................................................10 Map Unit Descriptions........................................................................................10 Larimer County Area, Colorado......................................................................12 4—Altvan-Satanta loams, 3 to 9 percent slopes.........................................12 74—Nunn clay loam, 1 to 3 percent slopes.................................................13 References............................................................................................................15 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 6 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 8 Custom Soil Resource Report Soil Map 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 4485740 4485760 4485780 4485800 4485820 4485840 4485860 4485880 493570 493590 493610 493630 493650 493670 493690 493710 493730 493750 493770 493790 493570 493590 493610 493630 493650 493670 493690 493710 493730 493750 493770 493790 40° 31' 25'' N 105° 4' 33'' W 40° 31' 25'' N 105° 4' 23'' W 40° 31' 20'' N 105° 4' 33'' W 40° 31' 20'' N 105° 4' 23'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 15 30 60 90 Meters Map Scale: 1:1,110 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 4 Altvan-Satanta loams, 3 to 9 percent slopes 2.2 56.1% 74 Nunn clay loam, 1 to 3 percent slopes 1.7 43.9% Totals for Area of Interest 3.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If Custom Soil Resource Report 10 intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 11 Larimer County Area, Colorado 4—Altvan-Satanta loams, 3 to 9 percent slopes Map Unit Setting National map unit symbol: jpwf Elevation: 5,200 to 6,200 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Farmland of statewide importance Map Unit Composition Altvan and similar soils: 55 percent Satanta and similar soils: 35 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Altvan Setting Landform: Fans, benches, terraces Landform position (three-dimensional): Base slope, side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 9 inches: loam H2 - 9 to 16 inches: clay loam, loam, sandy clay loam H2 - 9 to 16 inches: loam, fine sandy loam, silt loam H2 - 9 to 16 inches: gravelly sand, gravelly coarse sand, coarse sand H3 - 16 to 31 inches: H3 - 16 to 31 inches: H3 - 16 to 31 inches: H4 - 31 to 60 inches: H4 - 31 to 60 inches: H4 - 31 to 60 inches: Properties and qualities Slope: 6 to 9 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very high (about 13.7 inches) Interpretive groups Land capability classification (irrigated): 4e Land capability classification (nonirrigated): 4e Custom Soil Resource Report 12 Hydrologic Soil Group: B Description of Satanta Setting Landform: Structural benches, terraces Landform position (three-dimensional): Side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium and/or eolian deposits Typical profile H1 - 0 to 9 inches: loam H2 - 9 to 14 inches: loam, clay loam, sandy clay loam H2 - 9 to 14 inches: loam, clay loam, fine sandy loam H2 - 9 to 14 inches: H3 - 14 to 60 inches: H3 - 14 to 60 inches: H3 - 14 to 60 inches: Properties and qualities Slope: 3 to 6 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very high (about 27.4 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Minor Components Nunn Percent of map unit: 6 percent Larimer Percent of map unit: 4 percent 74—Nunn clay loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: jpxn Elevation: 4,800 to 5,600 feet Custom Soil Resource Report 13 Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform: Terraces, fans Landform position (three-dimensional): Base slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Alluvium Typical profile H1 - 0 to 10 inches: clay loam H2 - 10 to 60 inches: clay loam, clay H2 - 10 to 60 inches: Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Very high (about 18.9 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Minor Components Ulm Percent of map unit: 10 percent Satanta Percent of map unit: 5 percent Custom Soil Resource Report 14 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nrcs.usda.gov/wps/ portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 15 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 16 MAP POCKET HISTORIC DRAINAGE EXHIBIT PROPOSED DRAINAGE EXHIBIT S CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC VAULT ELEC TELE TELE S VAULT F.O. VAULT ELEC H Y D T T T E T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G X / / LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD S CONTROL IRR CONTROL IRR CONTROL IRR TELE TELE S VAULT F.O. VAULT ELEC H Y D T T E G SS / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / w i1 EXISTING DRAINAGE CULVERT EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP MAIL CREEK FLOODWAY FORT COLLINS SUPPORTIVE HOUSING SUBDIVISION LOT 26 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES S F UD UD UD UD 50' DRAINAGE EASEMENT LARIMER COUNTY DITCH #2 48 MC-4500 CHAMBERS 118 MC-4500 CHAMBERS ISOLATOR ROW FLOW CONTROL MANHOLE\ FLOW CONTROL MANHOLE ISOLATOR ROW os.2 CTIY FLOODPLAIN INLET INLET INLET INLET PEDESTRIAN BRIDGE 10' DRAINAGE EASEMENT RIP RAP RIP RAP TOP OF BANK TOP OF BANK TOP OF BANK 3:1 3:1 5:1 3:1 3:1 4:1 4:1 3:1 8:1 4:1 4:1 5:1 1:1 1:1 (3.3:1) (3.8:1) (1.4:1) (1.1:1) (2.1:1) (3.8:1) (2.8:1) (9.5:1) (2.7:1) (2.6:1) (3.2:1) (3.3:1) (9.2:1) (7.0:1) (2.9:1) (2.5:1) (3.9:1) (3.8:1) 8575 - 5006.91 NAVD 88 8385 - 5003.11 NAVD 88 8830 - 5010.09 NAVD 88 FFE=29.50 FFE=29.50 FFE=17.50 E.1 OS.4 W.1 OS.1 E.2 OS.2 OS.3 e CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GRAPHIC SCALE: LEGEND: ST A2 a3 4950 4:1 79.45  HP RUNOFF SUMMARY TABLE: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH C5.01 DRAINAGE EXHIBIT DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) w W.1 0.77 0.91 1.00 6.5 5.0 1.81 7.65 e E.1 1.17 0.91 1.00 5.1 5.0 3.04 11.66 e E.2 0.38 0.44 0.55 7.7 6.4 0.41 1.95 e OS.1 0.22 0.95 1.00 5.0 5.0 0.60 2.20 OS.2 0.85 0.95 1.00 5.0 5.0 2.30 8.45 OS.3 0.19 0.53 0.66 12.4 9.5 0.20 1.00 OS.4 1.85 0.27 0.34 18.3 16.8 0.85 3.89 11 Sheet Of 11 Sheets BRICKSTONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Drng\1229-001_DRNG.dwg LAYOUT NAME: C5.01 DATE: Aug 23, 2016 - 2:35pm CAD OPERATOR: blaine LIST OF XREFS: [1229-001_xSITE] [1229-001_xEXST] [1229-001_xGRAD] [1229-001_xTOPO] [NES-xborder] [1229-001_xPutil] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET ENGINEER ING N O R T H E RN 8.24.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 RESIDENTIAL AC / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / H1 OS1 MAIL CREEK FLOODWAY EROSION BUFFER ZONE PER CITY OF FORT COLLINS CITY FLOOD RISK MAP LOT 26 FAIRWAY ESTATES LOT 25 FAIRWAY ESTATES FAIRWAY ESTATES LOT 26 FAIRWAY ESTATES 3RD EAST HARMONY ROAD (PUBLIC R.O.W. VARIES) FAIRWAY ESTATES LARIMER COUNTY DITCH #2 EXISTING PIPES APPEAR TO BE ABANDONED EXISTING ROADSIDE DITCH EXISTING RIPRAP RUNDOWN EXISTING IRRIGATION CONCRETE STRUCTURE EXISTING CONCRETE BOX CULVERTS EXISTING 24" RCP CITY FLOODPLAIN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R GRAPHIC SCALE: LEGEND: ST A2 a3 4950 4:1 79.45  HP RUNOFF SUMMARY TABLE: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 NORTH C5.00 HISTORIC DRAINAGE EXHIBIT DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 4.30 0.26 0.33 12.7 11.7 2.27 10.26 os1 OS1 1.09 0.95 1.00 8.2 7.9 2.49 9.39 10 Sheet Of 11 Sheets BRICKSTONE APARTMENTS ON HARMONY DRAWING FILENAME: D:\Projects\1229-001\Dwg\Drng\1229-001_EX_DRNG.dwg LAYOUT NAME: C5.00 DATE: Aug 23, 2016 - 12:28pm CAD OPERATOR: blaine LIST OF XREFS: [1229-001_xEXST] [1229-001_xTOPO] [NES-xborder] These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET ENGINEER ING N O R T H E RN 8.24.16 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 9     = 12 hr     = 12 hr 1229-001 Brickstone Apartments Project Number : Project Name : West Pond Page 1 of 1 1229-001_West Pond_DetentionVolume_FAAModified Method.xls Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1229-001_East Pond_DetentionVolume_FAAModified Method.xls Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) i1 E.2 & OS.1 No 0.63 0.63 0.79 15 2.10% 2.7 2.7 1.8 N/A N/A N/A N/A 5 8 9 e E.1, E.2, & OS.1 No 0.81 0.81 1.00 64 2.15% 3.3 3.3 1.2 452 0.60% 1.55 4.9 N/A N/A 8 12 13 COMBINED DEVELOPED TIME OF CONCENTRATION COMPUTATIONS B. Mathisen August 18th, 2016 Design Point Basin IDs Overland Flow Gutter/Pipe Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 5 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\Comb-Tc-10-yr_&_100-yr Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) w W.1 No 0.91 0.91 1.00 203 0.50% 6.4 6.4 3.4 25 100.00% 20.00 0.0 N/A N/A N/A 6 6 5 e E.1 No 0.90 0.90 1.00 166 1.10% 4.6 4.6 2.3 147 3.20% 3.58 0.7 N/A N/A N/A 5 5 5 e E.2 No 0.44 0.44 0.55 64 2.10% 7.7 7.7 6.4 N/A N/A N/A N/A N/A 8 8 6 e OS.1 No 0.95 0.95 1.00 10 0.80% 1.0 1.0 0.6 61 0.50% 1.41 0.7 N/A N/A N/A 5 5 5 OS.2 No 0.95 0.95 1.00 85 2.00% 2.1 2.1 1.4 149 4.00% 4.00 0.6 N/A N/A N/A 5 5 5 OS.3 No 0.48 0.48 0.60 85 2.50% 7.9 7.9 6.4 N/A N/A N/A N/A N/A 8 8 6 OS.4 No 0.27 0.27 0.34 311 3.30% 18.3 18.3 16.8 N/A N/A N/A N/A N/A 18 18 17 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen August 18th, 2016 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 2 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\Tc-10-yr_&_100-yr OS.3 7670.0 0.176 0.000 0.058 0.000 0.000 0.000 0.12 0.48 0.48 0.60 30% OS.4 80461.0 1.847 0.000 0.025 0.000 0.102 0.000 1.72 0.27 0.27 0.34 3% TOTAL 236319 5.425 1.471 0.623 0.990 0.102 0.000 2.24 0.61 0.61 0.76 55% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 August 18th, 2016 **Soil Classification of site is Clay Loam** Page 1 of 23 Proposed D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs(Proposed_final).xlsx\C-Values Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen August 9th, 2016 Time of Concentration (Equation RO-4)   1 3 1 . 87 1 . 1 * S Ti   C Cf L Page 2 of 23 Historic D:\Projects\1229-001\Drainage\Hydrology\1229-001_Rational-Calcs (Historic).xlsx\Tc-10-yr_&_100-yr