Loading...
HomeMy WebLinkAboutWEST PLUM HOUSING - PDP - PDP160029 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEETProject Routing Sheet New: X Revision: Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): 0 Labels Received Y/N: N RETURN ALL REDLINES 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 29 28 27 18 19 8 4 4 6 15 3 2 2 3 1 1 2 0 0 0 Revised: 1-29-2016 P P P P P P P P P P P P P P P P P P P P T.I.A.(letter or full report) Utility Plans Sep. 14. 2016 Planning Objectives Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Seth Lorson Building Perspectives Economic Health Unit Plans Soils Study- New/Update Digital copy of all materials Variance Requests Drainage Report Fire Dept. Letters Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Outside Agency Sanitation Dist: Outside Agency Water District: Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: Railroad: ___________________ School District: Poudre Other: 1 Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: 3 weeks Comments Due: Oct. 05. 2016 West Plum Housing Project Development Plan PDP160029