HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER - LINK-N-GREENS OVERALL DEVELOPMENT PLAN - ODP120002 - MINUTES/NOTES - CORRESPONDENCE-NEIGHBORHOOD MEETING- 1 -
Link-N-Greens Overall Development Plan
Neighborhood Meeting Comments
Meeting information: August 20, 2012 at the City of Fort Collins Streets Department,
Streets Training Room, 625 North Lemay Avenue, 5:30 p.m. to 8:00 p.m.
Part One: Development Review Overview Meeting
Question: Is this a done deal? Is this going to happen regardless?
Response: This is the beginning of the process; it is yet to be determined by
anyone who has authority if the project will go forward.
Q: Has the floodplain problem been addressed with regards to how close the
project will get to the river?
R: Deferred to the next meeting, where we’ll discuss the project. This meeting is
for the process.
Comment: Please contact staff if you would like to submit written comments.
Laurie Kadrich: lkadrich@fcgov.com
Jason Holland: jholland@fcgov.com
Q: The two stages that you talked about, do they correlate to the handout you
provided? I’m confused because the sign is up already.
R: The handout you have is more regarding the traditional process – typically we
have an application, post a sign and send out the notice. The Code doesn’t require
that level of staging; the developer has an opportunity to get tenants quickly, and
staff has posted the sign and we are holding the meeting ahead of getting the
application.
Q: So where are we in the process?
R: The conceptual review has already been done; we are in the middle of 2, 3, and
4.
Bruce Hendee – background and overview of the City’s Comprehensive Plan
Q: What’s the current zoning for the project? What is allowed?
R: The Site is Zoned CCR (Community Commercial River). The Land Uses range
from residential to light industrial.
Q: Any thoughts of a connector to the Mason corridor?
R: Yes, there are plans for an east-west circulator that would connect directly to
the mason corridor.
Planning, Development and
Transportation Services
Current Planning
281 North College Ave.
P.O. Box 580
Fort Collins, CO 80522-0580
970.221.6750
970.224.6134 - fax
fcgov.com/currentplanning
- 2 -
Q: Do you have a map of the floodplain? How much of Link-N-Greens is in the
floodplain?
R: I don’t have a map of that tonight.
Q: It’s fairly extensive isn’t it?
R: There is a large portion of the site that is floodway and flood fringe.
Q: Is there an island proposed between the two lanes of traffic?
R: It is planned to be boulevard with a median.
Q: Will there be right-of-ways to take a left?
R: That will be developed with the access plan.
Q: Are you proposing to put a lot more traffic on Lincoln? Will you need four lanes?
R: It is in the City’s Master Plan as a three-lane arterial. We haven’t gotten to the
access questions yet.
Q: Any thought for expanding the Natural Areas with the trail?
R: Part of the plan for this area is to protect the Poudre River corridor. There is a
river buffer in this zone district. Between these two regulations, those are the City
standards.
Q: Is this the RDR zone district? What is the buffer for this area?
R: This is the CCR zone district and the 300’ buffer standard applies.
Q: What do you mean by buffer? Is it San Antonio riverwalk or natural landscape?
R: Natural landscape.
Q: Is there a levy planned on this side of the Poudre River?
R: No
Applicant’s Presentation/Neighborhood Meeting
Q: What will happen to the current Woodward location?
R: Has not been determined at this point, but their business is growing and where
that growth occurs will determine what goes at this site. They expect to see
energy-related work, e.g., the engines that go in locomotives and products
associated with inverters and solar-powered generation, biofuels, etc.
Q: Will this add jobs or just move jobs?
R: They are planning to keep adding jobs to the company. It’s a phased plan over
many years that could be built over 10-20 years.
Q: Would locals be able to get work here?
R: There are a lot of local jobs already here, and that will continue.
Q: How much will taxes go up?
- 3 -
R: Assuming they mean property taxes; they don’t go up in reaction to a
development, they go up in reaction to the increase in property values (property
assessments). I cannot say the prices will go up either way.
Q: Who will own the Natural Area?
R: Very likely it will be Woodward; it could also be the City. The City will have a lot
to say about how that Natural Area integrates into the river. The current open
space on the plan is about six times the size of Buckingham Park.
Q: Secondary access – how much traffic will that generate?
R: Detailed traffic studies will be a part of the City’s approval process; that
information will be available to everyone as a part of the approval process. The
uses still need to be determined, as well as timing of the phases.
Q: What is the height limitation per the Code today?
R: Three stories; the applicants do not have plans for high-rise or mid-rise. They
may desire to go up to four stories, but that has not been decided. There are no
intentions for ten stories like you see in downtown.
Q: Will the farmstead be protected permanently?
R: Yes.
Q: How many local jobs will the project provide?
R: Over five years, several hundred, but it depends on the market.
Q: Where is the headquarters currently located?
R: It’s here in Fort Collins.
Q: Is there going to be an environmental impact review for the construction
process?
R: The applicants will follow all of the federal, state, and local requirements to a
tee.
R: (City) As a part of the process, they will be required to conduct an Ecological
Characterization Study (ECS) with the submittal of a Project Development Plan.
This proposal is only for an Overall Development Plan and an Ecological
Characterization Study is not required at this point.
Q: Will the open space be open for public use?
R: The bike trail will continue to be open for public use. His hope is that there will
also be an entry point into the open space from the retail area.
Q: What is the effect on the traffic to the north of Lemay and Lincoln?
R: South of the Magnolia/Lemay intersection is where the majority of the traffic will
go. A traffic evaluation has not been completed yet, but it will be a part of the
process to comply with the City’s Code.
Comment: Thank you for a wonderful plan.
Q: Are there any more grocery/retail grocery stores planned for this area?
- 4 -
R: I don’t believe you’re going to see any more groceries in the foreseeable future
probably exceed the current demand in this portion of town. Wal-mart is down the
street; King Soopers just opened a new store…
Q: If Woodward doesn’t select this location, what happens to the plan? Does it
then change to more retail/commercial?
R: This is Allen’s last hurrah for this project. His opinion is that this is the best use
for the property.
Q: What about the water that is attached to the land?
R: The water is owned privately; it will be up to them if they would like to sell that. If
they do, Woodward would likely be a buyer and the City would as well.
Q: If this project takes TIF (Tax Increment Financing) by the Downtown
Development Authority (DDA) or URA (Urban Renewal Authority), will the project
give property tax credit for investment given?
R: Really early in the process, cannot say exactly.
Q: Would the open land be added to the land trust?
R: Right now, still trying to figure out with the City regarding who is the best owner
of the land.
Q: Will retail/commercial develop in a way that incorporates into the neighborhood
rather than in competition with existing neighborhoods?
R: The amount of retail/commercial is about 1/3 of the amount that was originally
discussed for the site. The current retail purpose is for smaller retailers and will
likely be oriented toward food and some services. Tenants for these uses have yet
to be selected.
Q: As City residents, how can we help Woodward in Fort Collins?
R: Verbalize that support however you feel best; show up to meetings and express
your interest, write letters, etc.
R: (City) There will also likely be other neighborhood meetings in addition to this
meeting if the project proceeds forward.
Q: Taking a look at the FEMA map, there is only 30 some odd acres outside of the
100 year floodplain – what is necessary to make the 60 acres you are proposing
for development to happen?
R: There is a federal and a city process regarding floodplain regulations; this
project will follow both of these processes.
Comment: Save the Poudre – appreciated taking a walk along the property 1.5
years ago, thanks for listening, our initial response is positive and they are hopeful
they can continue a positive relationship in the future.
Comment: I live a block away from the current Woodward; they are a perfect
neighbor. I didn’t know the use was there when I moved in. If they can replicate
that use at the same site, then they will be a great neighbor.
- 5 -
Q: Saving the farm – does that include all of the historic structures that are
registered?
R: All of the historic structures will be preserved.
Q: What use?
R: The applicants do not know that right now.
Q: Woodward would own the structures?
R: Yes currently.
Q: What is the timeframe for making the decision?
R: As soon as possible; it depends on economic conditions and the process.
Q: Relating to your existing property, if the headquarters is already here, is the
current headquarters on Drake and Lemay?
R: Yes
Q: So, are you going to keep both?
R: They are going to build a brand new headquarters facility someplace.
Q: So you might just leave the other site?
R: They haven’t determined that yet.
Comment: Appreciates having the meeting with the neighborhood; really talking
with us (Buckingham neighborhood) and listening to our concerns; I think you
would be a great neighbor. I like hearing you are a quiet neighbor. The one aspect
that gives her a lot of pride is preserving the rich history and culture of the
Germans, Russians, and Hispanics.
Q: In the best case scenario, if all parties want to proceed, is it two years before
construction begins?
R: They need to get a little further into the plans.
Q: Does Woodward have any emphasis on being LEED certified?
R: We most likely won’t be pursuing LEED certification, but they will be pursuing
the performance and the energy savings associated with the certification.
Q: (Carol Tunner) worked to preserve the barn on the site; I like the idea of
Woodward Governor; I think they will be good stewards of the ground; I just want
to be sure that everyone understands the significance of the site. This is the cradle
of Fort Collins.
Q: You mentioned public access to the open space, is there any potential for a
sculpture garden and will the neighborhoods have access to that chunk of open
space?
R: Still in the midst of planning for that aspect of the project, but it will definitely be
accessible by the public. There will be access from Lemay for the public. He is
looking at ways to integrate historic preservation into the project, but it probably
won’t be in the open space because of the goals for the project’s open space.