Loading...
HomeMy WebLinkAboutTHE LYRIC CINEMA CAFE - FDP - FDP160036 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1089-001 Location: Fort Collins, CO Date: August 23, 2016 Total Acres: 1.64 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price Construction Fence w/Rock Sock L.L.F. F. 585 0 $$1.4.50 50 $877.$0.50 00 Wattle Dike Inlet Protection each each 8 0 $$100.75.00 00 $600.$0.00 00 Wattle Dike Swale Protection each each 0 0 $$100.75.00 00 $$0.0.00 00 each each 1 1 $$300.150.00 00 $$300.150.00 00 each each 1 4 $$200.75.00 00 $$200.300.00 00 per L.hour F. 400 10 $$60.1.00 00 $$400.600.00 00 1.5 x Sub-Sub-Total: Total: $$3,5,427.141.50 25 Amount of security: $5,141.25 Total Acres x $1325/Sub-Total: acre: $$2,2,173.173.00 00 Cost 1.5 x to Sub-Re-seed: Total: $$3,3,259.259.50 50 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $5,141.25 NOTE: 'Total Acres' represents total disturbed area. Lyric Cinema Erosion Control Cost Estimate Silt Fencing Inlet Protection Wattle Dike Curb Side Check Dam Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Sediment Concrete Washout Trap Area Rock Sawcutting Sock Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs