HomeMy WebLinkAboutTHE LYRIC CINEMA CAFE - FDP - FDP160036 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1089-001 Location: Fort Collins, CO
Date: August 23, 2016 Total Acres: 1.64
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
Construction Fence w/Rock Sock L.L.F. F. 585 0 $$1.4.50 50 $877.$0.50 00
Wattle Dike Inlet Protection each each 8 0 $$100.75.00 00 $600.$0.00 00
Wattle Dike Swale Protection each each 0 0 $$100.75.00 00 $$0.0.00 00
each each 1 1 $$300.150.00 00 $$300.150.00 00
each each 1 4 $$200.75.00 00 $$200.300.00 00
per L.hour F. 400 10 $$60.1.00 00 $$400.600.00 00
1.5 x Sub-Sub-Total: Total: $$3,5,427.141.50 25
Amount of security: $5,141.25
Total Acres x $1325/Sub-Total: acre: $$2,2,173.173.00 00
Cost 1.5 x to Sub-Re-seed: Total: $$3,3,259.259.50 50
Minimum escrow amount: $3,000.00
Erosion Control Escrow: $5,141.25
NOTE: 'Total Acres' represents total disturbed area.
Lyric Cinema
Erosion Control Cost Estimate
Silt Fencing
Inlet Protection
Wattle Dike Curb Side Check Dam
Vehicle Tracking Control Pads
Option 2 | Cost to Re-seed Disturbed acreage
Option 3 | Miniumum Escrow Amount
Final Escrow Amount
Sediment Concrete Washout Trap Area
Rock Sawcutting Sock Pollution Prevention
Street Sweeping and Cleaning
Option 1 | BMP Costs