HomeMy WebLinkAboutTHE LYRIC CINEMA CAFE - FDP - FDP160036 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSHORIZONTAL METAL LAPPED SIDING
IN A VARIATION OF THREE BLUE COLORS
PORTAL WINDOWS
ARCHITECTURAL METAL ELEMENT
LOW-SLOPED METAL ROOFING
BUILDING SIGN:
36" AND 18" HIGH
(see View 5)
TOWER CANOPY:
30' HIGH
MARQUEE : FINISH TO MATCH
THEATER STANDING SEAM METAL
CONE TOWER: "LYRIC" RED METAL FINISH
WITH VERTICAL ACCENTED WINDOWS
MAIN ENTRY & CANOPY
(Canopy may be completed at a subsequent phase)
14' - 1"
METAL ROOF TO MATCHING METAL
SIDING COLOR
16' - 2 1/2"
11' - 9"
1/2" / 1'-0"
ROOT TOP UNITS BEHIND SCREEN WALL - METAL
SIDING TO MATCH THEATER METAL SIDING
TWO SMALLER THEATERS
MAIN THEATER AND PERFORMANCE HALL
WITH STANDING SEAM METAL ROOFING
AND MATCHING METAL SIDING
33' - 1 1/4"
16' - 5 1/2"
11' - 9"
19' - 9"
10' - 3 1/4"
9' - 1 1/4"
15' - 1 1/4"
1" / 1'-0"
1/4" / 1'-0"
CORRUGATED METAL SIDING
22' - 11 1/4"
RTU SCREEN WALL W/
PIPE SECTIONS TO MIMIC SPACESHIP
ROCKET BOOSTER THEME
WEST ENTRY AND EXIT
(Canopy Vestibule may be done at subsequent phase)
SUNDECK
(May be built in subsequent phase)
THEATER EXIT DOORS
14' - 3" 5' - 8 3/4"
23' - 2 1/4"
10' - 3 1/4" 7' - 1 3/4"
GLASS GARAGE DOORS
MAIN ENTRY VESTIBULE
AND HALL
29' - 10"
1/2" / 1'-0"
1/2" / 1'-0"
1" / 1'-0"
19' - 8"
17' - 5 3/4"
MARQUEE SIGN
1" / 1'-0"
PERSON DOOR TO
SIDEWALK
9' - 1 1/2"
4" STEEL POSTS
W/ ANCHOR BOLTS
INTO CONCRETE SLAB
RUBBER BUMBER
TRASH AT 3' HIGH (TYP. OF 2)
(4 YD DUMPSTER)
CONCRETE PAD
STEEL BOLLARDS
GATES TO MATCH
WALL CLADDING
METAL PANEL TO MATCH
THEATER ON METAL FRAME
DRIVEWAY
SIDEWALK
RECYCLING
(4 YD DUMPSTER)
3' - 0"
16' - 0"
18' - 5"
AZ.E
7
6' - 0"
VERTICAL METAL
CORRUGATED SIDING
TO MATCH THEATER
SIDING ON METAL
FRAME
6"
E N G I N E E R I N G
N O R T H E RN
u|r
Scale
Project number
Date
Drawn by
Checked by
urban|rural design inc.
252 linden street
fort collins, colorado
970.846.0267
brian@urbanruralarch.com
merl@urbanruralarch.com
LANDSCAPE ARCHITECT:
ARCHITECT:
CIVIL ENGINEER:
301 North Howes Street
Suite 100
Fort Collins, Colorado
970.221.4158
contact: Randall Provencio
As indicated
8/23/2016 4:09:36 PM
AZ.E
BUILDING
ELEVATIONS
UR-12-14
THE LYRIC
Ben Mozer
JUNE 10, 2016
UR | DDS
bam
1/8" = 1'-0"
1
PDP - EAST ELEVATION
1/8" = 1'-0"
2
PDP - SOUTH ELEVATION
SUNSET DECK
1/8" = 1'-0"
3
PDP - WEST ELEVATION
1/8" = 1'-0"
4
PDP - NORTH ELEVATION
12" = 1'-0"
5
SIGN VIEW
NOTE: SEPARATE PERMIT REQUIRED
PRIOR TO INSTALLATION OF SIGN
AXONOMETRICS
PERSPECTIVE: RENDERING DOES NOT INCLUDE CURRENT EXTERIOR
COLORS. SEE ELEVATIONS ON THIS SHEET.
SOUTHWEST VIEW NORTHEAST VIEW
SOUTHEAST VIEW
PDP SUBMITTAL (HEARING) 6/10/16
1/4" = 1'-0"
6
TRASH ENCLOSURE PLAN
1/4" = 1'-0"
7
TRASH ENCLOSURE - NORTH
ELEVATION
TRASH ENCLOSURE
18" LETTERS
36" LETTERS
FINAL PLAN SUBMITTAL 8/23/16
No. Description Date
PDP FINAL PLAN SUBMITTAL