HomeMy WebLinkAboutWOODWARD TECHNOLOGY CENTER (FORMERLY LINK-N-GREENS) - PDP - PDP130001 - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSPROJECT: Link-n-Greens Project Development Plan, PDP #130001,
Modification of Standard to Section 4.20(D)(3)(a)(1) and
Modification of Standard to Section 4.20(D)(3)(a)(2)
APPLICANT: NewMark Merrill Mountain States
c/o Allen Ginsborg
2720 Council Tree Ave., Suite 230
Fort Collins, CO 80525
OWNERS: Link-n-Greens
C.A. Musgrave
777 E. Lincoln Ave.
James P. Hoffman Trust
Ruth N. Hoffman Trust
Dorothy A. Whisler
c/o Micheal P. Williams
Wood, Ris & Holmes, P.C.
1775 Sherman St. Ste. 1600
Denver CO, 80203
PROJECT DESCRIPTION:
This is a request for approval of a Project Development Plan (P.D.P.) for the Link-n-
Greens property. This area consists of 101.5 acres and is generally located at the
southwest corner of East Lincoln and South Lemay Avenue. The Cache la Poudre River
is the southern boundary and the majority of the western boundary of the P.D.P. The
Poudre River Trail is located on the property within an easement. The project is zoned
C-C-R Community Commercial – Poudre River District, and the proposed uses are
permitted in this zone district at this location.
The Link-n-Greens P.D.P. is being established to accommodate a new campus for
Woodward. As a large employer, Woodward intends to develop a campus of office,
Woodward Link-n-Greens P.D.P. February 15, 2012
1
manufacturing, and testing facilities. The campus will include a collection of buildings
with parking areas served by private drives. In conjunction with the campus, a retail and
commercial center is proposed to be located in the southeast corner of the site on Lot 3.
The combined building footprint is projected to be 944,400 square feet in buildings
ranging from one to three stories. A river restoration area of approximately 28.7 acres
is also proposed. Phasing for construction of all portions of the P.D.P. could occur over
a five to thirty year time frame depending on market activities for differing uses.
RECOMMENDATION: Approval of Link-n-Greens Project Development Plan, PDP
#130001, Modification of Standard to Section 4.20(D)(3)(a)(1) and Modification of
Standard to Section 4.20(D)(3)(a)(2), with Conditions.
EXECUTIVE SUMMARY:
The following summarizes key factors that are specific to the Woodward Link-n-Greens
P.D.P.:
• The project plan is divided into Phase One and Future Phases. Phase One
includes the core components of the Woodward operations, and is shown on
the plans with a higher level of detail than the future development areas. The
river restoration area shown on Lot 4 includes approximately 29 acres and is
also shown in greater detail.
• Future areas are shown with sufficient detail to establish a basic framework
that demonstrates compliance, with remaining required detail deferred to
subsequent submittals.
The level of detail shown in each area of the plan addresses several of Woodward’s
requirements that are critical to their evaluation and final selection of the site:
• the need for certainty that the desired components of the development
program will fit on the site;
• the need to ensure the initial Phase One grading operations encompass the
entire site, so that future development areas can be elevated out of the
floodplain, and areas adjacent to the river can be prepared for restoration
and;
• the need to expedite and simplify development approval of future areas to the
maximum extent feasible, by establishing a basic framework for future site
areas that includes parking, buffers, building envelopes and footprints. These
future areas include an appropriate level of detail to demonstrate the final
Woodward Link-n-Greens P.D.P. February 15, 2012
2
development intent, but without showing the final level of detail until
Woodward is ready to build such areas.
In order to address Woodward’s requirements and ensure that the P.D.P. plans for
Phase One and Future Areas are described as necessary to demonstrate compliance
with all applicable standards of Land Use Code, the following notes have been
recommended and are included on the plans:
• “Other than for Phase One for which final design and easements shall be
included as a part of the Final Development Plan documents, buildings,
parking, landscaping and other site elements are not indicated in final detail
with this Site Plan, Landscape Plan, Lighting Plan, and/or Building Elevations.
Final design shall be provided, approved, and accepted concurrent with and
prior to the approval of the minor amendment(s) for each additional phase(s),
building(s) and/or prior to the start of any construction work on these items,
provided that the Minor Amendment does not result in a change in character
of this development. Each Minor Amendment for future buildings shall
include a Traffic Impact Analysis if applicable.”
• “Building foundation, parking lot and perimeter landscaping are indicated in
detail for Phase One and river restoration areas. Future Phase building
foundation and parking lot landscaping within the campus will be similar in
character to Phase One. Specific areas of perimeter buffering are indicated
on the plans for future phase areas.”
• “Landscape buffer areas shown on the plan shall be used to screen service,
loading and parking areas, including drive isles, from abutting uses, streets
and natural areas. Screening shall consist primarily of plant material with a
minimum height of thirty (30) inches to provide solid visual screening but in an
informal arrangement reflecting the natural character of the adjacent river
landscape. Where appropriate and feasible, berming will also be used to
accomplish visual screening. Buffers areas shall be a minimum of twenty feet
in width exclusive of right-of-way.”
• “Tree removal should be timed to avoid the nesting season in accordance
with the Migratory Bird Treaty Act. A nest survey shall be conducted prior to
any tree removal if tree removal is proposed during the nesting season (April-
July).”
The Woodward Link-n-Greens Project Development plan as shown and noted, subject
to approval by the Planning and Zoning Board, complies with the applicable
requirements of the City of Fort Collins Land Use Code (LUC), more specifically:
Woodward Link-n-Greens P.D.P. February 15, 2012
3
• The P.D.P. complies with process located in Division 2.2 – Common
Development Review Procedures for Development Applications of Article 2 –
Administration.
• The P.D.P. is in conformance with the Link-n-Greens Overall Development
Plan approved by the Planning and Zoning Board, on September 13, 2012.
• The Modification of Standard to Section 4.20(D)(3)(a)(1) and Modification of
Standard to Section 4.20(D)(3)(a)(2) that are proposed with this P.D.P. meet
the applicable requirements of Section 2.8.2(H), and the granting of these
Modifications would not be detrimental to the public good.
• The P.D.P. complies with relevant standards located in Article 3 – General
Development Standards, with conditions.
• The P.D.P. complies with relevant standards located in Division 4.20,
Community Commercial – Poudre River District (C-C-R) of Article 4 –
Districts, provided that the Modification of Standard to Section
4.20(D)(3)(a)(1) and Modification of Standard to Section 4.20(D)(3)(a)(2) that
are proposed with this P.D.P. are approved.
COMMENTS:
1. Background:
The subject property was annexed from 1987 to 1997 through four separate ordinances:
• Link-n-Greens Annexation (October 1987, 37.3 acres)
• Link-n-Greens Second Annexation (April, 1988, 16.8 acres)
• Link-n-Greens Third Annexation (January, 1992, 44 acres)
• Link-n-Greens Fourth Annexation (July, 1997, 4.2 acres)
The property is currently used as the Link-n-Greens golf course which has been in
operation since 1986. The property contains a barn, silos and outbuildings known as
the Coy/Hoffman Barn, which were designated on the Colorado State Register of
Historic Properties in 1995. The barn is associated with the earliest development of
agriculture in the area, having been built during the 1860s as part of a homestead.
The surrounding zoning and land uses are as follows:
N: Community Commercial-
Poudre River (C-C-R): Commercial (Lambspun, Back Porch Cafe)
Industrial (I): Commercial; Light Industrial
Woodward Link-n-Greens P.D.P. February 15, 2012
4
S: River Conservation
District (RC): Mulberry Water Reclamation Facility
River Downtown
Redevelopment (RDR): Vacant Parcel
E: General
Commercial (CG): Large Retail; Commercial/Retail
W: Public Open
Lands (P-O-L): Udall Natural Area
Community Commercial-
Poudre River (C-C-R): Commercial
The Planning and Zoning Board, on September 13, 2012, approved the Link-n-Greens
Overall Development Plan. Two Modifications of Standard were also approved
regarding gated developments and orientation to build-to lines for street fronting
buildings.
2. Compliance with Article 4 of the Land Use Code – Community Commercial
– Poudre River District (C-C-R):
The project complies with all applicable Article 4 standards as follows:
A. Section 4.20(B) – Permitted Uses
• The proposed land uses are consistent with the permitted uses in the
C-C-R District. The development uses specifically proposed in the
P.D.P. are campus employment, office and commercial/retail. Campus
employment is an Addition of Permitted Use at this location.
B. Section 4.20(D) – Development Standards
1) 4.20(D)(3)(a) Buildings, Massing and Placement:
• Detailed building elevations are shown for all proposed building
footprints, including all buildings in the Lot 3 future Commercial/Retail
area. Three stories are proposed for the future office headquarters,
and all other buildings are one or two stories.
Request for Modification:
The applicant requested two modifications that are applicable to Section 4.20(D):
1) 4.20(D)(3)(a)(1) Height/Mass: A Modification of Standard is requested for
Buildings D and E. Buildings D and E, located on Lot 3, are proposed to be
Woodward Link-n-Greens P.D.P. February 15, 2012
5
two stories. These buildings are required to step down to one story directly
abutting the natural area protection buffer.
Land Use Code Modification Criteria:
“The decision maker may grant a modification of standards only if it finds that the
granting of the modification would not be detrimental to the public good, and that:
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan which
complies with the standard for which a modification is requested; or
(2) the granting of a modification from the strict application of any standard
would, without impairing the intent and purpose of this Land Use Code,
substantially alleviate an existing, defined and described problem of city-wide
concern or would result in a substantial benefit to the city by reason of the fact
that the proposed project would substantially address an important community
need specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of the City
Council, and the strict application of such a standard would render the project
practically infeasible; or
(3) by reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property, including, but not limited to,
physical conditions such as exceptional narrowness, shallowness or topography,
or physical conditions which hinder the owner's ability to install a solar energy
system, the strict application of the standard sought to be modified would result
in unusual and exceptional practical difficulties, or exceptional or undue hardship
upon the owner of such property, provided that such difficulties or hardship are
not caused by the act or omission of the applicant; or
(4) the plan as submitted will not diverge from the standards of the Land Use
Code that are authorized by this Division to be modified except in a nominal,
inconsequential way when considered from the perspective of the entire
development plan, and will continue to advance the purposes of the Land Use
Code as contained in Section 1.2.2.
Any finding made under subparagraph (1), (2), (3) or (4) above shall be
supported by specific findings showing how the plan, as submitted, meets the
requirements and criteria of said subparagraph (1), (2), (3) or (4).
Applicant’s Justification:
The following is the applicant’s written justification:
Woodward Link-n-Greens P.D.P. February 15, 2012
6
While a new allowed use called "Campus Employment" was added to the C-
C-R zone district with the Link-n-Greens ODP for this site, the definition of the
use does not contain specific standards for building massing and placement.
Accordingly, the Applicant requests that the building height limit of one (1)
story adjacent to the river buffer as set forth in 4.20(D)(3)(a)(1) of the Fort
Collins Land Use Code ("LUC") be modified to allow two (2) stories in order to
accommodate the current development plan for the property.
Following is an explanation of how the proposed PDP meets the requirements
for a modification of standards under LUC 2.8.
Current Standard
(A) Purpose. The Community Commercial - Poudre River District (C-C-R) is
for downtown fringe areas in the Cache la Poudre River corridor with both
public street frontage and River frontage. This District provides locations for
redevelopment or development of moderate intensity uses that are supportive
of Downtown, subject to floodplain restrictions. Such redevelopment or
development shall be compatible with the scenic, cultural, natural and
historical context of the River and Downtown.
A main purpose of the District is to foster a healthy and compatible
relationship between the River, the Downtown and surrounding urban uses.
Any significant redevelopment shall be designed as part of a master plan for
the applicable group of contiguous properties.
The Link-n-Greens PDP is being established to accommodate a new campus
for Woodward. As a large employer, Woodward is designing a master
planned campus of office, manufacturing, and testing facilities with nearby
services and offices that will complement the campus. The development
team has partnered with the City of Fort Collins to develop a comprehensive
approach to the restoration and enhancement of the Poudre River habitat
adjacent to the Link-N-Greens campus development areas. Multiple city
departments engaged in this discussion including Natural Resources,
Planning, Floodplain Administration, and Parks. Through these discussions
the Applicant has approached both the development of the property and the
river restoration in a holistic manner based on the river flow conditions,
existing landscape, historic river conditions, and the vision for the future
development of the Lincoln Triangle area.
Several site planning scenarios were explored for the narrow commercial
area designated at the southeast corner of the site. The site planning for the
commercial area has been designed to balance and achieve several goals
including:
Woodward Link-n-Greens P.D.P. February 15, 2012
7
- Woodward's desire that its headquarters become a catalyst for quality
private and public development and redevelopment in order to enhance the
area.
- Applying market and planning guidelines to achieve the highest and best
use for this parcel to allow the best opportunity to create vibrant, successful
mixed-use services for the adjacent Woodward campus and the nearby
neighborhoods.
- Protecting and enhancing views to the Poudre River from the Mulberry
corridor gateway into Fort Collins and the Mulberry Bridge.
- Applying the Performance Standards of 3.4.1(E)(1) and responding to the
comprehensive river restoration concepts.
The commercial area site plan positions commercial uses along Lemay
Avenue with two mixed-use office/ commercial buildings to the west adjacent
to the river buffer area. Use of vertically mixed use buildings is encouraged in
Plan Fort Collins. The use of two 2-story buildings creates a more compact
and varied development footprint along the river buffer than would a larger
footprint 1-story building of a similar size.
As a result, the applicant would like to request a modification of standard
4.20(D)(3)(a)(1) – Community Commercial – Poudre River District (C-C-R)
Building Height/Mass to allow two (2) stories rather than one (1) adjacent to
the river buffer area in order to allow for this more compact and varied
development pattern adjacent to the river buffer in the commercial area.
Pursuant to LUC 2.8.2(H), the modification must meet the first standard (not
detrimental to the public good), plus one of the four other listed standards. In
this case, the proposed modification meets all of the standards; accordingly,
the City's approval is requested.
The granting of the modification would not be detrimental to the public good.
Granting the proposed modification would not be detrimental to the public
good because the proposed development plan meets the other Performance
Standards of 3.4.1(E)(1), and brings an overall positive development to this
grossly underutilized land located in a key area of Fort Collins. The overall
purpose of the increased height is to allow for buildings with smaller
footprints, rather than buildings which occupy more of the site. Allowing
buildings to be up to two stories rather than one allows for better balancing of
the overall height and massing of the required structures on the site for a
more aesthetically pleasing overall appearance.
Woodward Link-n-Greens P.D.P. February 15, 2012
8
(Criteria 1): The granting of a modification from the strict application of any
standard would, without impairing the intent and purpose of this Land Use
Code, substantially alleviate an existing, defined and described problem of
city-wide concern or would result in a substantial benefit to the city by reason
of the fact that the proposed project would substantially address an important
community need specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of the
City Council, and the strict application of such a standard would render the
project practically infeasible.
- Overall, the Woodward campus project will bring significant economic
benefits to the City, in terms of retaining and creating quality jobs, prestige
and publicity for the City, and locating these jobs near downtown where they
will support existing Fort Collins businesses.
- In order to enhance the feasibility of the project and diversify the uses on
the site, the commercial portion of the development in the southeast corner of
the site is a key component.
- The increased density created with two stories will help provide positive
economic impact to stimulate further quality development in the area. Second
level space creates flexibility required to accommodate a broader variety of
uses and diversify the project, thus increasing its viability.
(Criteria 2): By reason of exceptional physical conditions or other
extraordinary and exceptional situations, unique to such property, including,
but not limited to, physical conditions such as exceptional narrowness,
shallowness or topography, or physical conditions which hinder the owner's
ability to install a solar energy system, the strict application of the standard
sought to be modified would result in unusual and exceptional practical
difficulties, or exceptional or undue hardship upon the owner of such property,
provided that such difficulties or hardship are not caused by the act or
omission of the applicant.
The area of the site within which the proposed two story buildings will be
located adjacent to the river buffer is narrow and one could argue that this
area is somewhat narrow to accommodate the proposed commercial
development, and is further narrowed by the river buffer. Additionally, an
existing PRPA power line, which may be relocated as part of the project, will
further narrow the area available for development. Woodward will be making
significant investments to enhance and stabilize the river embankments while
filling-in the floodplain; while this also enhances the development potential of
the property, it also increases project costs and creates a need to
accommodate increased development density. Because Woodward will be
dedicating approximately 1/3 of the site to open space, the remaining land is
Woodward Link-n-Greens P.D.P. February 15, 2012
9
burdened by the purchase price of this land, thereby increasing the land basis
by 33%. Adequate development coverage and density is needed to help
offset this investment.
- Although the relocation of the PRPA power line is technically caused by
the applicant as part of the project, the physical constraints on this portion of
the property are still somewhat limiting, even without this factor.
- Overall, the river buffer in its current state, or as proposed as part of the
project, is a further constraint on the property. Allowing the use of sensitively
designed two-story buildings to be located on certain parts of the property
adjacent to the river buffer balances the City's goals related to preservation
and enhancement of the river buffer with its goals for economic development.
- The use of two story buildings provides better protection to the habitat
area by containing noise, light and pollution from busy Lemay Avenue to the
east of the commercial space.
(Criteria 4): The plan as submitted will not diverge from the standards of the
Land Use Code that are authorized by this Division to be modified except in a
nominal, inconsequential way when considered from the perspective of the
entire development plan, and will continue to advance the purposes of the
Land Use Code as contained in Section 1.2.2.
The proposed modification is nominal and inconsequential in relationship to
the overall development plan, and will continue to advance the purposes of
the LUC. The master planned campus has been developed based on a
comprehensive approach considering the river flow conditions, historic river
patterns, and vision for the future development of the Lincoln Triangle area.
The plans include more than 30 acres of habitat restoration and open space
with wider areas where the river will be allowed to move outside its current
bank condition, and with a more narrowed area here where the river moves
back to its channel beneath the Mulberry bridge. The use of use of smaller
footprint 2-story buildings in this location supports this overall approach and
creates a more compact and varied development footprint along the river
buffer than would a larger footprint 1-story building of a similar size. When
considered from the perspective of the entire 100-acre development plan, the
use of these 2-story buildings will not diverge from the standard except in a
nominal and inconsequential way. In addition, the plan will continue to
advance the purposes of the Land Use Code as contained in Section 1.2.2
including:
- Encouraging innovations in land development and renewal.
- Fostering the safe, efficient and economic use of the land, the city’s
transportation infrastructure, and other public facilities and services.
Woodward Link-n-Greens P.D.P. February 15, 2012
10
- Ensuring that development proposals are sensitive to natural areas and
features.
Staff Finding
Staff finds that the request for a Modification of Standard to Section
4.20(D)(3)(a)(1) Height/Mass is justified by the applicable standards in 2.8.2(H)
for Buildings D and E located on Lot 3 of the Project Development Plan. This is
because:
A. The granting of the Modification would not be detrimental to the public
good. The plan provides substantial enhancements to the natural area
buffer adjacent to the proposed buildings. The proposed landscape
canopy adjacent to the buildings provides transition and helps reduce
the massing of the buildings. The plan as proposed for Lot 3 with two-
story buildings provides a more varied edge along the buffer than a
plan that would result from a strict interpretation of the standard that
would provide larger one-story building footprints along the River
buffer.
B. The request satisfies Criteria 4 (2.8.2(H)(4): The plan as submitted
does not diverge from the standards of the Land Use Code that are
authorized by this Division to be modified except in a nominal,
inconsequential way when considered from the perspective of the
entire development plan, and will continue to advance the purposes of
the Land Use Code as contained in Section 1.2.2. The majority of
development within the entire 100 acre plan provides for additional
buffer with deeper setbacks and screening, so that parking and
buildings that are not directly adjacent to the buffer, but rather set back
from the buffer.
Request for Modification:
2) 4.20(D)(3)(a)(2) Parking Lots: A Modification of Standard is requested to
address the requirement that buildings shall be sited so that any new parking
lots and vehicle use areas are located in either: 1) interior block locations
between buildings that face the street and buildings that face the River, or 2)
side yards.
Land Use Code Modification Criteria:
“The decision maker may grant a modification of standards only if it finds that the
granting of the modification would not be detrimental to the public good, and that:
Woodward Link-n-Greens P.D.P. February 15, 2012
11
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan which
complies with the standard for which a modification is requested; or
(2) the granting of a modification from the strict application of any standard
would, without impairing the intent and purpose of this Land Use Code,
substantially alleviate an existing, defined and described problem of city-wide
concern or would result in a substantial benefit to the city by reason of the fact
that the proposed project would substantially address an important community
need specifically and expressly defined and described in the city's
Comprehensive Plan or in an adopted policy, ordinance or resolution of the City
Council, and the strict application of such a standard would render the project
practically infeasible; or
(3) by reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property, including, but not limited to,
physical conditions such as exceptional narrowness, shallowness or topography,
or physical conditions which hinder the owner's ability to install a solar energy
system, the strict application of the standard sought to be modified would result
in unusual and exceptional practical difficulties, or exceptional or undue hardship
upon the owner of such property, provided that such difficulties or hardship are
not caused by the act or omission of the applicant; or
(4) the plan as submitted will not diverge from the standards of the Land Use
Code that are authorized by this Division to be modified except in a nominal,
inconsequential way when considered from the perspective of the entire
development plan, and will continue to advance the purposes of the Land Use
Code as contained in Section 1.2.2.
Any finding made under subparagraph (1), (2), (3) or (4) above shall be
supported by specific findings showing how the plan, as submitted, meets the
requirements and criteria of said subparagraph (1), (2), (3) or (4).
Applicant Justification:
The following is the applicant’s written justification:
While a new allowed use called "Campus Employment" was added to the
C-C-R zone district with the Link-n-Greens ODP for this site, the definition
of the use does not contain specific standards for parking lots.
Accordingly, the Applicant requests that standard set forth in
4.20(D)(3)(a)(2) – Community Commercial – Poudre River District (C-C-R)
Parking Lots be modified to allow parking between buildings and the
River.
Woodward Link-n-Greens P.D.P. February 15, 2012
12
Current Standard
(A) Purpose. The Community Commercial - Poudre River District (C-C-R)
is for downtown fringe areas in the Cache la Poudre River corridor with
both public street frontage and River frontage. This District provides
locations for redevelopment or development of moderate intensity uses
that are supportive of Downtown, subject to floodplain restrictions. Such
redevelopment or development shall be compatible with the scenic,
cultural, natural and historical context of the River and Downtown.
A main purpose of the District is to foster a healthy and compatible
relationship between the River, the Downtown and surrounding urban
uses. Any significant redevelopment shall be designed as part of a master
plan for the applicable group of contiguous properties.
Description of need for Modification of Standard
The Link-n-Greens PDP is being established to accommodate a new
campus for Woodward. As a large employer, Woodward is designing a
master planned campus of office, manufacturing, and testing facilities with
nearby services and small offices that will complement the campus.
These facilities have been designed as a collection of buildings with
deliberate adjacencies and both functional and operational connectivity.
The site master plan has been developed collaboratively with input from
city staff from various departments. The plan has been developed to best
meet the needs for Woodward’s continued operational success, but also
with awareness of the unique characteristics and opportunities of the site.
The site plan has been developed to both restore and highlight two key
features of the site, the Cache la Poudre River and the Coy-Hoffman barn
complex.
The site plan locates the office buildings and office areas of the industrial
buildings adjacent to these key features to make them an integral part of
the pedestrian-oriented outdoor spaces and walkways planned for the
campus.
With this type of large connected campus development, it is difficult to
define ‘front yards’ and ‘side yards’ as the standard references. The 100-
acre site is bounded by arterial streets on the north and east, and by the
Cache la Poudre River on the south and southwest leaving only the
northwest portion adjacent to other developed lots. With this large
connected development, the development plan still responds to the intent
of this standard by locating primary parking fields on the ‘side yards’ (east
and west of the main building collections).
Woodward Link-n-Greens P.D.P. February 15, 2012
13
However, small portions of the parking may be considered to depart from
this standard. In order to provide fire access and to serve the larger office
headquarters building, a small visitor parking circle is located to the south
of this building. While this parking circle is located south of this new
building, it is to the side of the historic barn structures and could potentially
be considered to be within a side yard. While not meeting the standard
fully, we believe it meets the intent of this section by minimizing the
appearance of parking fields from public rights of way and from the river
buffer area.
As a result, we would like to request a modification of standard
4.20(D)(3)(a)(2) – Community Commercial – Poudre River District (C-C-
R), Parking Lots, in order to allow for this campus-based parking
configuration.
Specific findings for the modification request:
Pursuant to LUC 2.8.2(H), the modification must meet the first standard
(not detrimental to the public good), plus one of the four other listed
standards. In this case, the proposed modification meets two additional
standards; accordingly, the City's approval is requested.
The granting of the modification would not be detrimental to the public
good.
The overall intent of the standard appears to be to minimize the
appearance of parking lots from public rights of way and from the river
buffer area. The site plan preserves this public good by locating the
parking lots in areas that are the closest thing to side yards, given the non-
traditional campus like configuration of the site plan. Only very limited
areas of parking are located in areas which may be considered to depart
from this standard. The public good is preserved notwithstanding the
modification. This is more fully explained below,
(Criteria 2) The granting of a modification from the strict application of any
standard would, without impairing the intent and purpose of this Land Use
Code, substantially alleviate an existing, defined and described problem of
city-wide concern or would result in a substantial benefit to the city by
reason of the fact that the proposed project would substantially address an
important community need specifically and expressly defined and
described in the city's Comprehensive Plan or in an adopted policy,
ordinance or resolution of the City Council, and the strict application of
such a standard would render the project practically infeasible.
Woodward Link-n-Greens P.D.P. February 15, 2012
14
Woodward is a primary employer for the community of Fort Collins and the
region. Accommodating a new campus for Woodward on the Link-N-
Greens site would substantially address the important community
Economic Health need by supporting this existing primary employer. The
ability for Woodward to develop a new campus on this site relies on the
ability to create a collection of internally connected buildings and uses that
support their successful operations. As a result, fire access and multiple
entries to the various buildings require the need for circulation and limited
parking in areas that may be considered a departure from the standard.
Strict application of the standard on such a large site would render the
project infeasible, and could result in a less aesthetic overall design than
that presented.
(Criteria 3) By reason of exceptional physical conditions or other
extraordinary and exceptional situations, unique to such property,
including, but not limited to, physical conditions such as exceptional
narrowness, shallowness or topography, or physical conditions which
hinder the owner's ability to install a solar energy system, the strict
application of the standard sought to be modified would result in unusual
and exceptional practical difficulties, or exceptional or undue hardship
upon the owner of such property, provided that such difficulties or
hardship are not caused by the act or omission of the applicant
The 100-acre site is bounded by arterial streets on the north and east, and
by the Cache la Poudre River on the south and southwest leaving only the
northwest portion adjacent to other developed lots. As such, it is difficult to
define ‘front yards’ and ‘side yards’ as the standard references. With this
large connected campus development, the site plan still responds to the
intent of this standard by locating primary parking fields on the ‘side yards’
(east and west of the main building collections). But fire access is
required in limited areas that may be considered to depart from the
standard. Thus strict application of the standard would result in
exceptional or undue hardship upon the owner.
Staff Finding:
Staff finds that the request for a Modification of Standard to Section
4.20(D)(3)(a)(2) Parking Lots to allow parking lots between buildings and the
River is justified. This is because:
A. The granting of the modification will not be detrimental to the public
good. Although it may be difficult or unwarranted to strictly apply front,
side and rear yard designations to this site, especially considering the
proposed use, it is important to point out that the general purpose of
this standard is to ensure that parking areas will be screened when
Woodward Link-n-Greens P.D.P. February 15, 2012
15
viewed from the Poudre River Trail. Due to the landscape buffers
provided, buildings are not needed to screen the parking. Because the
parking and vehicle service areas are screened, the location of the
parking lots in relation to the buildings is not detrimental.
B. In accordance with criteria 2.8.2(H)(1), the proposed plan will promote
the general purpose of the standard equally well or better than a plan
which complies with the standard. This is because the extensive
landscape buffers provided are intended to screen parking lots and
vehicle use areas when viewed from the River equally well or better
than buildings that would be used for the same purpose in compliance
with the standard.
3) 4.20(D)(3)(b)(2) Character and Image, Windows:
Glass curtain walls are utilized within portions of the building
elevations, and although this practice is discouraged in this zoning
district, the windows are divided by exposed mullions and decorative
bands that define the stories and establish human scale in accordance
with the standard.
4) 4.20(D)(4)(a) Site Design, Landscaping/Vegetation Protection:
The project meets this standard which requires that the natural
qualities of the river landscape be maintained and enhanced using
plants and landscape materials native to the river corridor in the design
of the landscape improvements. Extensive enhancements are
proposed with the restoration of the river buffer area and perimeter
landscape buffers are also provided with the project plan in
accordance with this standard.
3. Compliance with Article 3 of the Land Use Code – General
Development Standards
The project complies with all applicable General Development Standards; with the
following relevant comments provided:
A. Division 3.2 – Site Planning and Design Standards
1) 3.2.1 Landscaping and Tree Protection:
• The applicant is requesting Alternative Compliance to Section
3.2.1(D)(4) Tree species and Minimum Sizes. A detailed request from
the applicant is submitted with this report. This request applies to the
Woodward Link-n-Greens P.D.P. February 15, 2012
16
river restoration area. The request proposes a variation and reduction
in the minimum tree and shrub sizes to accomplish a more natural
condition rather than the uniform minimum sizing required by the
standard. The sizes and species proposed with the alternative
compliance plan are similar to those used in other City restoration
projects, and include a combination of B&B trees, container trees and
shrubs, flats and plugs. Staff has worked closely with the applicant to
develop the restoration plan, and recommends approval of the
alternative compliance in order to achieve a more natural condition that
will achieve the purpose of Section better than the minimum standard.
• A detailed tree mitigation plan is provided with this P.D.P. in
coordination and with the approval of the City Forester. An overall tree
mitigation tree replacement ratio of 1.2 was recommended by the City
Forester.
• “Full Tree Stocking” is planned along all high use and high visibility
areas of the development, with generous quantities of trees located
along building faces;
• Trees are planted in the parking lot interior and perimeter in excess of
the minimum requirements;
• Ground cover in parking lot and building foundation areas is also
planted in excess of the minimum requirements, with deciduous and
evergreen shrubs, perennials and ornamental grasses used
extensively.
• Landscape buffers are designated around future parking areas in order
to ensure that these areas will be adequately screened, and the plan
stipulates a minimum buffer depth of twenty feet.
2) 3.2.2 Access, Circulation and Parking:
• Sidewalk connections are planned for the campus between buildings
and through parking areas. Bicycle parking is planned in accordance
with the minimum quantity for industrial buildings and is placed
appropriately near building entrances. It is anticipated that additional
bicycle parking will be required to meet future program needs.
• A condition is recommended to provide a 15 feet wide public access
easement along the western property boundary to accommodate a
future trail connection from Lincoln Avenue to the Poudre River Trail
This condition is needed for the P.D.P. to provide compliance with
Woodward Link-n-Greens P.D.P. February 15, 2012
17
Section 3.2.2(A) and (B) Access, Circulation and Parking – Purpose
and General Standard and/or Section 3.2.2(C)(6) Direct On-Site
Access to Pedestrian and Bicycle Destinations. The circulation system
proposed is not sufficient without the condition. This is because the
P.D.P. does not accommodate direct connections either within the
development or adjacent to the development as required for the
movement of pedestrians and bicycles safely, efficiency and/or
conveniently to and from surrounding areas with directness and
continuity to the extent reasonably feasible or to the maximum extent
feasible.
The standards relevant to the recommended condition are as follows:
3.2.2 Access, Circulation and Parking
(A) Purpose. This Section is intended to ensure that the parking and
circulation aspects of all developments are well designed with regard
to safety, efficiency and convenience for vehicles, bicycles,
pedestrians and transit, both within the development and to and from
surrounding areas. Sidewalk or bikeway extensions off-site may be
required based on needs created by the proposed development. This
Section sets forth parking requirements in terms of numbers and
dimensions of parking stalls, landscaping and shared parking. It also
addresses the placement of drive-in facilities and loading zones.
(B) General Standard. The parking and circulation system within each
development shall accommodate the movement of vehicles, bicycles,
pedestrians and transit, throughout the proposed development and to
and from surrounding areas, safely and conveniently, and shall
contribute to the attractiveness of the development. The on-site
pedestrian system must provide adequate directness, continuity, street
crossings, visible interest and security as defined by the standards in
this Section. The on-site bicycle system must connect to the city’s on-
street bikeway network. Connections to the off-road trail system shall
be made, to the extent reasonably feasible.
3.2.2(C)(6) Development Standards – Direct On-Site Access to
Pedestrian and Bicycle Destinations. The on-site pedestrian and
bicycle circulation system must be designed to provide, or allow for,
direct connections to major pedestrian and bicycle destinations
including, but not limited to, parks, schools, Neighborhood Centers,
Neighborhood Commercial Districts and transit stops that are located
either within the development or adjacent to the development as
required, to the maximum extent feasible. The on-site pedestrian and
bicycle circulation system must also provide, or allow for, on-site
Woodward Link-n-Greens P.D.P. February 15, 2012
18
connections to existing or planned off-site pedestrian and bicycle
facilities at points necessary to provide direct pedestrian and bicycle
travel from the development to major pedestrian destinations located
within the neighborhood. In order to provide direct pedestrian
connections to these destinations, additional sidewalks or walkways
not associated with a street, or the extension of a sidewalk from the
end of a cul-de-sac to another street or walkway, may be required.
Request for Alternative Compliance:
The project proposes Alternative Compliance to exceed the maximum
parking ratio set forth in the table contained in Section 3.2.2(K)(2)(a)
for nonresidential land uses. To approve an alternative plan, the
decision maker must first find that the proposed alternative plan
accomplishes the purposes of this Section equally well or better than
would a plan which complies with the standards of this Section. In
reviewing the request for an alternative parking ratio plan in order to
determine whether it accomplishes the purposes of this Section, the
decision maker shall take into account the number of employees
occupying the building or land use, the number of expected customers
or clients, the availability of nearby on-street parking (if any), the
availability of shared parking with abutting, adjacent or surrounding
land uses (if any), the provision of purchased or leased parking spaces
in a municipal or private parking lot meeting the requirements of the
city, trip reduction programs (if any), or any other factors that may be
unique to the applicant's development request. The decision maker
shall not approve the alternative parking ratio plan unless it meets the
applicable criteria that it:
1. does not detract from continuity, connectivity and convenient
proximity for pedestrians between or among existing or future uses in
the vicinity,
2. minimizes the visual and aesthetic impact along the public street by
placing parking lots to the rear or along the side of buildings, to the
maximum extent feasible,
3. minimizes the visual and aesthetic impact on the surrounding
neighborhood,
4. creates no physical impact on any facilities serving alternative
modes of transportation,
5. creates no detrimental impact on natural areas or features,
Woodward Link-n-Greens P.D.P. February 15, 2012
19
6. maintains handicap parking ratios.
Staff finds that the applicable criteria are met. This is because:
A. The additional parking is not speculative and is intended solely
for use of the Woodward operations.
B. The plan designates areas rather than final quantities for future
Woodward parking and demonstrates that the future parking
areas can be adequately screened and buffered.
C. Future parking planned for Lot 3 shall not be a part of this
alternative compliance request.
D. Alternative modes of transportation are not physically impacted,
provided that the condition of approval is granted requesting a
15 feet wide public access easement along the western property
boundary to accommodate a future trail connection from Lincoln
Avenue to the Poudre River Trail.
E. Visual and aesthetic impact to public streets, natural areas, and
nearby neighborhoods is mitigated by the landscape buffer
areas designated on the plan.
F. Handicap ratios will be maintained.
3) 3.2.4 Site Lighting:
• A photometric plan was submitted for Phase One. As proposed, the
project complies with the lighting design standards. Parking lot and
drive lighting is provided by down-directional and sharp cut-off fixtures.
No lighting spills over into the Natural Habitat Buffer Zone; for future
phases, a note has been added that no light will may spill over into the
buffer zone.
• Additional lighting information will be required with Phase One Final
Plans and future Minor Amendments in order to demonstrate continued
compliance with this standard for all proposed outdoor lighting fixtures.
Woodward Link-n-Greens P.D.P. February 15, 2012
20
4) 3.2.5 Trash and Recycling Enclosures:
Trash and recycling enclosures will be located within the service areas
and within production buildings. Service areas are screened with a
combination of fencing and landscape material.
B. Section 3.3.5 – Engineering Design Standards
Three variances are requested for the project: 1) Length of
deceleration for auxiliary lanes; 2) Intersection spacing on Lincoln
Avenue; and 3) Increasing the maximum length of curb radii from 20
feet to 30 feet at intersection entrances. These variances were
reviewed by City Engineering and Transportation staff and found to be
warranted with no detriment to the public health, welfare and safety.
C. Division 3.4 – Environmental, Natural Area, Recreational and Cultural
Resource Protection Standards
1) 3.4.1 Natural Habitats and Features:
• The project’s Ecological Characterization Study reports that the Link-n-
Greens site contains several natural habitats and features,
predominately the Poudre River corridor, several wetlands that have
formed along the fringe of the golf course ponds (0.10 acres), and 464
significant trees. The site’s existing habitat value is largely contained
within the areas immediately adjacent to the Poudre River due to the
ornamental nature of the golf course and the lack of habitat diversity
associated with a bluegrass lawn. The site has also been evaluated for
Threatened and Endangered species and the only potentially suitable
habitat was for the Preble’s Meadow Jumping Mouse. However, no
populations of jumping mouse are known to exist in the Poudre River
downstream of Watson Lake (north of Bellvue).
• To meet the standards associated with Section 3.4.1, the project has
proposed to apply the performance standards contained in Section
3.4.1(E) of the Land Use Code. The project has proposed an overall
buffer area of 28.7 acres instead of the 23.4 acres that would be
required through the 300' standard. At no point is the proposed buffer
zone less than 210’ and the buffer zone is as large as 600’ along the
historical oxbow (a U-shaped area where the Poudre River was able to
meander out of its main channel when it was connected with its
floodplain).
Woodward Link-n-Greens P.D.P. February 15, 2012
21
Staff finds that the project meets, and in cases exceeds, the standards in
Section 3.4.1 by incorporating the following elements into the design. This
is because:
A. The project reconnects the Poudre River with its floodplain by
grading the site to allow the river to flow into the historical
oxbow on the site, in alignment with City Plan Policy ENV 4.2
(Enhance and Restore Streams), while also ensuring all
floodplain protection standards are met.
B. The applicants have worked extensively with the Natural Areas
and Planning Departments to ensure that the river restoration
area achieves the Poudre River Management Plan goals,
through extensive plantings of upland, cottonwood, willow
shrubland, wet meadow, and emergent wetland planting areas
in the 28.7 Natural Habitat Buffer Zone.
C. The project will also relocate the Poudre River Trail away from
the Poudre River corridor, which will allow for greater species
diversity in the corridor as less human-species interactions will
take place. However, access is being provided for trail users
down to the river so that the river landscape can still be enjoyed,
as allowed by Section 3.4.1(E)(2)(5) of the Land Use Code.
D. Where the buffer area proposed is less than 300’, the applicants
have incorporated native plantings and extensive screening to
ensure that the ecological value of the Poudre River corridor
and the trail user’s experience is protected to the maximum
extent feasible.
2) 3.4.4 Noise:
Production activities will be conducted within the proposed buildings
and the level of noise is not anticipated to exceed maximum allowable
Db(A) levels. Buildings and service areas are located interior to the
site to mitigate off site impacts.
3) 3.4.7 Historic and Cultural Resources:
The Coy/Hoffman barn, silos, and milk house are designated on the
Colorado State Register of Historic Properties. The barn and silos will
remain, and the milk house is proposed to be moved to a new location
approximately 30 feet north of the barn. The applicant has worked
Woodward Link-n-Greens P.D.P. February 15, 2012
22
closely with Historic Preservation staff to preserve and integrate the
historic buildings into the new development and has presented the
project to the Landmark Preservation Commission (L.P.C.). The plan
as proposed has received full support by the L.P.C.
4) 3.4.8 Parks and Trails:
The Link-n-Greens, P.D.P. is consistent with the City's adopted Parks
and Recreation Policy Plan. The plan proposes additional
pedestrian/bicycle connections between East Lincoln Avenue, South
Lemay Avenue and the Cache la Poudre River trail corridor.
D. Division 3.5 – Building Standards
• The architectural design for the Lot 3 commercial/retail buildings as
well as the Woodward production, support and office buildings
achieves a high standard of quality and compatibility within the context
of the surrounding area. The new buildings make a substantial
contribution to the character and image of the area.
• Variations in massing, juxtaposed materials and forms, and repeated
patterns of recesses and projections provide vertical and horizontal
interest, breaking down the overall scale of the buildings.
• The use of materials is balanced, with colors and textures helping to
emphasize and articulate overall building forms.
• Clerestories and other significant roof forms to add significant interest
to the building facades.
E. Division 3.6 – Transportation and Circulation
1) 3.6.3 Street Pattern and Connectivity Standards:
Project continues to comply with the framework established with the
Overall Development Plan. The project provides for access points to
East Lincoln Avenue, South Lemay Avenue, and the Cache la Poudre
River corridor that meet the purpose, general standard and spacing
requirements of Section 3.6.3 with regard to safety, efficiency, and
convenience for automobile, bicycle and pedestrian modes of travel,
provided that a condition is approved, which recommends that a 15
feet wide public access easement shall be provided along the western
Woodward Link-n-Greens P.D.P. February 15, 2012
23
property boundary to accommodate a future trail connection from
Lincoln Avenue to the Poudre River Trail.
The City Traffic Operations and Engineering Departments have
reviewed proposed intersection locations and found proposed
intersections to be in compliance with the standards in Section 3.6.3.
2) 3.6.4 Transportation Level of Service Requirements:
The Traffic Operations and Engineering Departments have reviewed
the Transportation Impact Study that was submitted to the City for
review and have determined that the vehicular, pedestrian and bicycle
facilities proposed with this P.D.P are consistent with the standards
contained in Part II of the City of Fort Collins Multi-modal
Transportation Level of Service Manual.
3. Neighborhood Meeting
Three neighborhood meetings were held for the project, and a detailed summary of
each meeting is attached.
• A meeting for the Overall Development Plan was held on August 20,
2012.
• A meeting for the Project Development Plan was held on November 7,
2012.
• A second meeting for the Project Development Plan was held on
January 30, 2012.
4. Findings of Fact/Conclusion
In evaluating the request for the Woodward Link-n-Greens Project Development Plan,
Staff makes the following findings of fact:
A. The Modification of Standard to Section 4.20(D)(3)(a)(1) regarding
Height/Mass that is proposed with this P.D.P. would not be detrimental to
the public good and the Modification meets the applicable requirements of
Section 2.8.2(H)(4). This is because the majority of development within
the entire 100 acre plan provides for additional buffer with deeper
setbacks and screening so that parking and buildings are not directly
adjacent to the buffer, but rather set back from the buffer, and therefore
the plan as submitted does not diverge from the standards of the Land
Woodward Link-n-Greens P.D.P. February 15, 2012
24
Use Code that are authorized by this Division to be modified except in a
nominal, inconsequential way when considered from the perspective of
the entire development plan.
B. The Modification of Standard to Section 4.20(D)(3)(a)(2) to allow parking
lots between buildings and the River that is proposed with this P.D.P.
would not be detrimental to the public good and the Modification meets the
applicable requirements of Section 2.8.2(H)(1). This is because the
proposed plan will promote the general purpose of the standard equally
well or better than a plan which complies with the standard due to the
extensive landscape buffers provided that are intended to screen parking
lots and vehicle use areas when viewed from the River equally well or
better than buildings that would be used for the same purpose in
compliance with the standard.
C. The P.D.P. complies with process located in Division 2.2 – Common
Development Review Procedures for Development Applications of Article
2 – Administration.
D. The P.D.P. is in conformance with the Link-n-Greens Overall Development
Plan approved by the Planning and Zoning Board, on September 13,
2012.
E. The P.D.P. is in conformance with the two Modifications of Standard
approved by the Planning and Zoning Board, on September 13, 2012.
F. The P.D.P. complies with relevant standards located in Article 3 – General
Development Standards, with conditions.
G. The P.D.P. complies with relevant standards located in Division 4.20,
Community Commercial – Poudre River District (C-C-R) of Article 4 –
Districts, provided that the Modification of Standard to Section
4.20(D)(3)(a)(1) and Modification of Standard to Section 4.20(D)(3)(a)(2)
that are proposed with this P.D.P. are approved.
RECOMMENDATION:
Staff recommends approval of:
A. Modification of Standard to Section 4.20(D)(3)(a)(2) to allow parking lots
between buildings and the river.
Woodward Link-n-Greens P.D.P. February 15, 2012
25
B. Modification of Standard to Section 4.20(D)(3)(a)(1) for Buildings D and E
located on Lot 3 to be two stories.
C. Link-n-Greens Project Development Plan #130001.
The following conditions are recommended with the approval:
1) A 15 feet wide public access easement shall be provided along the
western property boundary to accommodate a future trail connection from
Lincoln Avenue to the Poudre River Trail.
2) This project shall provide adequate access for emergency vehicles and for
those persons rendering fire protection and emergency services by
complying with Article 9, Fire Department Access and Water Supply, of
the Uniform Fire Code as adopted and amended pursuant to Chapter 9 of
the City Code.
3) A horizontal design for the double left turn lane for southbound Lemay
Avenue to eastbound Mulberry Street shall be provided (included as a part
of the final approved utility plan set) and the right-of-way needed to
accommodate this design shall be dedicated on the final plat. The double
left turn lane shall be built in conjunction with any phase of the project
which triggers the need for the double turn lane based upon the Traffic
Impact Study for that phase. If the double left turn lane construction
becomes the responsibility of the City the timing shall be at the City’s
discretion.
4) The final design of the utility infrastructure and any associated easements,
other than for Phase 1 for which final design and easements shall be
included as a part of the Final Development Plan documents, shall be
provided, approved, and accepted concurrent with and prior to the
approval of the minor amendment(s) for each additional phase(s),
building(s) and/ or prior to the start of any construction work on these
items.
5) As part of Phase One, this project is required to obtain FEMA approval of
a Conditional Letter of Map Revision (CLOMR) and a Letter of Map
Revision (LOMR) in order to update the floodplain maps.
6) A variance to allow hazardous material critical facilities in the 100-year
floodplain prior to approval of the LOMR was granted by the Water Board
on January 17, 2013. This project is required to comply with all conditions
set forth in the floodplain variance.
Woodward Link-n-Greens P.D.P. February 15, 2012
26
7) In the river restoration area, wetland plugs shall be required for landscape
installation at a standard interval of 18-24" on-center, depending on the
species, and never to exceed 36" on center. Broadcast seeding can be
used to supplement the installation of the plugs.
ATTACHMENTS:
1. Site Plan
2. Plat
3. Landscape Plans
4. River Restoration Planting Regimes
5. Building Elevations
6. Approved Overall Development Plan
7. Statement of Planning Objectives
8. Modification Request 4.20(D)(3)(a) Building Height
9. Modification Request 4.20(D)(3)(b) Parking Lots
10. River Buffer Narrative
11. Alternative Compliance Request, Plant Material Sizes
12. Engineering Variance Requests
13. Neighborhood Meetings, comments and responses
14. Ecological Characterization Study
15. Wetlands Letter
16. Transportation Impact Study - conclusions page
17. Transportation Impact Study - amendment
18. Hazardous Material Impact Analysis
Woodward Link-n-Greens P.D.P. February 15, 2012
27