Loading...
HomeMy WebLinkAboutTHE OVERLOOK - FDP - FDP160035 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL REPORT August 17, 2016 The Overlook Fort Collins, Colorado Prepared for: Stockover Investments, LLC 1806 Westview Road Fort Collins, CO 80524 970-556-8132 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1174-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Final Drainage and Erosion Control Report for The Overlook Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies Final Development Plan submittal for the proposed The Overlook development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer The Overlook Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 4 A. Regulations........................................................................................................................................ 4 B. Four Step Process .............................................................................................................................. 4 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 5 E. Hydraulic Criteria .............................................................................................................................. 5 F. Floodplain Regulations Compliance .................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 8 V. CONCLUSIONS ........................................................................................................ 8 A. Compliance with Standards .............................................................................................................. 8 B. Drainage Concept .............................................................................................................................. 9 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Detention Ponds B.2 – Water Quality Calculations B.3 – Storm Sewers B.4 – Inlets B.5 – Weir Calculations APPENDIX C – SWMM Modeling APPENDIX D – Erosion Control Report APPENDIX E – LID Exhibit APPENDIX F – References The Overlook Final Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 3 MAP POCKET: HDR1 – Historic Drainage Plan DR1 - Drainage Exhibit The Overlook Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. Located in the western half of Section 36, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is a part of Lots 3 and 4, Observatory Heights. 3. Bounded to the north by First National Bank 1st PUD, to the west by John F. Kennedy Parkway, to the south by Larimer County Canal, and to the east by a Private Drive and Wharf at the Landings PUD Phase 2 Replat. 4. No significant offsite flows are directed into the site. The majority of off-site flows are prevented from entering the site by curb and gutter. 5. The Overlook was originally included in the Revised Master Plan and Supplemental Drainage Report for Fort Collins National Bank PUD, prepared by Cornell Consulting Company, Revised April 4, 1980. The Overlook Final Drainage Report 2 B. Description of Property 1. The site is approximately 3.29 acres. Approximately 0.23 acres of the 3.29 acres is a parcel of land already developed by the First National Bank PUD; hence this area is included in the original drainage report and accounted for in the existing detention pond. Figure 1 – Aerial Photograph 2. The existing site is comprised of vacant land with natural grasses and vegetation. In the northeast corner of the site exists an existing parking lot. This existing parking lot will be demolished with this project and reconfigured in another location. 3. The majority of the site slopes to the north, while an eastern portion slopes to the east. 4. A report by Earth Engineering Consultants dated December 14, 2015 lists the soils for the area as consisting of lean clay with varying amounts of silt and sand, and sandstone/siltstone bedrock ranging from 2 to 7 feet below the ground surface. 5. A Web Soil Survey Created by the NRCS lists these soils as Hydrologic Soil Group D and have a low infiltration rate. 6. The proposed project site plan is composed of 2 buildings connected by a walkway. These buildings are classified as mixed-use with commercial on the first floor and residential above. This site will employ water quality features and runoff reduction facilities including rain gardens and extended detention basins. The Overlook Final Drainage Report 3 Figure 2– Proposed Site Plan 7. No existing irrigation facilities are known at this time. 8. The project site is within the First National Bank 1st PUD Master Plan. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Figure 3 – Existing Floodplains The Overlook Final Drainage Report 4 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Overlook project is located within the Foothills Drainage Basin, which is located between Prospect Road and Larimer #2 Canal from north to south and approximately between Shields Street and Zeigler Road from west to east. B. Sub-Basin Description 1. The western half of the property generally drains to the center of the property. From there, flows are conveyed north in a swale to the access road bordering the north side of the property. Flows within the access road are collected in an inlet at Horsetooth Road. From there, flows are detained and released to Warren Reservoir. 2. The eastern half of the site generally sheet flows to the eastern boundary. From there, flows sheet flow to backlot swales and drain pans routing flows around the existing residential buildings. These flows are also collected in downstream inlets and detained prior to be released to Warren Reservoir. 3. The proposed plan will generally detain developed flows and release to the detention ponds north of the site, on the First National Bank property. These ponds have been sized and included in the previous drainage report. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with The Overlook project. B. Four Step Process The overall stormwater management strategy employed with The Overlook project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Providing rain gardens throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Providing planter boxes with a rain garden filter section at downspout locations from the building to reduce runoff from the rooftops. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed water quality ponds. The Overlook Final Drainage Report 5 Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. This property discharges to existing detention ponds that have been designed to accommodate runoff from this project as a part of the First National Bank 1st PUD Master Plan. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Localized trash enclosures within the development will allow for the disposal of solid waste. Rain gardens and planter boxes for water treatment prior to flows entering the extended detention basins. Water Quality measures to protect and prolong the design life of the BMPs delineated in Step 1. C. Development Criteria Reference and Constraints 1. The proposed site is a part of the Revised Master Plan and Supplemental Drainage Report for Fort Collins National Bank PUD, prepared by Cornell Consulting Company, Revised April 4, 1980. This report states a release rate of 75% of the 2-year release. This is less than the typical 2-year release requirement. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. EPA SWMM modeling was utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the north and east. The north flows are collected in an existing inlet on the private access drive at Horsetooth Road then conveyed to an existing detention pond that releases to Warren The Overlook Final Drainage Report 6 Reservoir. 2. All drainage facilities proposed with The Overlook project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Overlook project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of The Overlook drainage design are to maintain the allowable storm runoffs as outlined within the Revised Master Plan and Supplemental Drainage Report for Fort Collins National Bank PUD. 2. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 3. Historic runoff from The Overlook project site was evaluated. This evaluation provided the historic 2-yr and 100-yr peak runoff rates for the existing site. Basin H1 Basin H1 has an area of 0.23 acres. This basin contains a portion of the existing private access road and an existing parking lot. The 2-yr and 100-yr peak runoff rates from Basin H1 are 0.56 cfs and 2.27 cfs, respectively. Basin H1 has been accounted for in previous subdivision drainage designs. Therefore, detention of this area is not proposed. Basin H2 Basin H2 has an area of 3.04 acres. This basin contains the majority of The Overlook site. This existing basin contains vacant land. The 2-yr and 100-yr peak runoff rates from Basin H2 are 1.05 cfs and 4.78 cfs, respectively. 4. The Overlook project divided the site into three (3) major drainage basins, designated as Basins A, B, and UD. The project further subdivided Basin A in to seven (7) sub- basins, Basin B into five (5) sub-basins, and Basin UD into five (5) sub-bains. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A is a total of 1.74 acres. Basin A consists of proposed building, parking lot, sidewalk, landscape areas and rain gardens. Runoff from Basins A1, A2, A3 and A4 The Overlook Final Drainage Report 7 flow via overland flow and gutter to proposed rain gardens. Runoff from Basin A5 is collected in trench drains and conveyed to Detention Pond A. Runoff from Basin A7 is collected in a curb inlet and conveyed to Detention Pond A. Basin A7 contains Detention Pond A. Total flow during a 100-yr storm from Basin A is calculated at a routed 11.67 cfs. Basin B Basin B is a total of 1.04 acres. Basin B consists of proposed building, parking lot, sidewalk, landscape areas and rain gardens. Runoff from Basins B1 and B2 are collected in a storm pipe and curb inlet and are conveyed to a rain garden. Runoff from Basins B3 and B4 are collected by curb inlets and are conveyed to Detention Pond B. Basin B5 contains Detention Pond B. Total flow during a 100-yr storm from Basin B is calculated at a routed 5.87 cfs. Basin UD Basin UD is a total of 0.50 acres. This basin is not detained and runoff will continue to flow to historic capture points. Basin UD1 and UD5 will continue, as historically, to overland flow to the adjacent The Wharf Subdivision. Basins UD1 and UD5 have a percent impervious of 0%. Runoff from these basins is considered negligible and similar to historic. Basins UD2, UD3, and UD4 combine for a developed 49% impervious and total combined area of 0.44 acres. These basins overland flow to either JFK Parkway or the Private Access Road. Flows are conveyed along gutters to an inlet located at the intersection of the Private Access Drive and Horsetooth Road. Total flows during a 100-yr storm from Basins UD2, UD3, and UD4 are a combined routed flow of 2.49 cfs. 5. Two (2) detention ponds are proposed with The Overlook development. Detention Pond A is located within Basin A and Detention Pond B is located within Basin B. Detention Pond B is routed through Detention Pond A. Release from Detention Pond A is then conveyed to the existing detention pond on the adjacent northern property. Detention Pond A Detention Pond A has a total of 0.49 ac-ft storage available. 0.44 ac-ft of storage is required with this project. Water quality control volume for Basin A and Basin B is included in the pond volume. Emergency Overflow from the pond is directed north to the existing access road. Release rate from Pond A is proposed at 0.55 cfs. Detention Pond B Detention Pond B has a total of 0.32 ac-ft storage available. 0.22 ac-ft of storage is required with this project. Water quality control volume for Basin B is included in Detention Pond A. Emergency Overflow from the pond is directed east through the Detention Pond B outlet structure. 0.88 ft of freeboard is provided in Detention Pond B above the 100-yr water surface elevation. Release rate from Pond B is proposed at 0.19 cfs. The Overlook Final Drainage Report 8 Total Stormwater Release from Site The total allowable 100-yr release from the site is a summation of the historic 100-yr runoff from Basin H1 (2.27 cfs), plus 75% of the historic 2-yr runoff from Basin H2 (1.05*0.75=0.79 cfs). This totals 3.06 cfs total release allowable from The Overlook site during a 100-yr event. Total developed 100-yr release from the site is a combination of the undetained 100- year flows from Basins UD2, UD3, and UD4 (2.49 cfs) plus the 0.55 cfs release from Pond A for a total proposed 3.04 cfs release. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. Storm sewers were sized for the 100-yr storm utilizing the program Hydraflow for AutoCAD Extension. 2. Weirs are provided from Rain Garden L1 and L4 to convey the 100-yr storm from the rain garden to their respective detention ponds. Weirs were analyzed by Hydraflow Express. 3. Curb cuts were modeled to verify the maximum flow to be conveyed. It was determined that the maximum flow will be sufficient to convey the 100-yr storm within each respective basin. Curb cuts were analyzed as weirs with Hydraflow Express. 4. Inlets were sized for the 100-yr event utilizing Urban Drainage spreadsheets and Area Inlet calculations spreadsheets. 5. Due to the existing development to the east of the proposed Detention Pond B, the pond outlet structure and downstream piping was upsized to convey the full 100-yr emergency overflow from Basin B. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with The Overlook project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with The Overlook project complies with the City of Fort Collins’ Master Drainage Plan for the Foothills Drainage Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 81% total impervious areas as being treated through an LID treatment. Please see LID Exhibit located in the Appendix. The Overlook Final Drainage Report 9 B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with previous studies and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration from rain gardens. This is currently unable to be calculated with available soils data. The Overlook Final Drainage Report 10 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Supplemental Drainage Report for Fort Collins National Bank PUD, April 4, 1980, Cornell Consulting Company. 3. Subsurface Exploration Report, JFK Luxury Apartments Fort Collins, Colorado, December 14, 2015, Earth Engineering Consultants, Inc.(EEC Project No. 1152119). 4. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 5. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS The Overlook CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: The Overlook Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: March 29, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 0.23 0.17 0.03 0.00 0.00 Clayey | Average 2% to 7% 0.029 0.86 0.86 1.00 86% The Overlook Overland Flow, Time of Concentration: The Overlook Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 H1 No 0.86 0.86 1.00 104 2.40% 3.4 3.4 1.4 267 1.69% 2.60 1.7 5.1 5.1 5.0 2 H2 Yes 0.25 0.25 0.31 526 2.47% 27.0 27.0 25.0 0 N/A N/A N/A 27.0 27.0 25.0 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. EXISTING TIME OF CONCENTRATION COMPUTATIONS S. Thomas The Overlook Rational Method Equation: Project: The Overlook Calculations By: Date: Rainfall Intensity: 1 H1 0.23 5 5 5 0.86 0.86 1.00 2.85 4.87 9.95 0.56 0.96 2.27 2 H2 3.04 27 27 25 0.25 0.25 0.31 1.39 2.37 5.04 1.05 1.80 4.78 EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 March 29, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) 3/29/2016 12:08 PM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Existing_Rational_Calcs.xlsx\Runoff The Overlook CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: The Overlook Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: August 15, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 0.55 0.00 0.01 0.00 0.54 Clayey | Average 2% to 7% 0.000 0.95 0.95 1.00 90% The Overlook Overland Flow, Time of Concentration: The Overlook Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 A1 No 0.95 0.95 1.00 91 12.42% 1.2 1.2 0.8 N/A N/A N/A 5.0 5.0 5.0 1 A2 No 0.30 0.30 0.38 97 0.82% 15.6 15.6 14.1 N/A N/A N/A 15.6 15.6 14.1 2 A3 No 0.92 0.92 1.00 157 5.57% 2.4 2.4 1.3 161 0.78% 1.76 1.5 5.0 5.0 5.0 3 A4 No 0.87 0.87 1.00 58 4.14% 2.1 2.1 0.9 170 0.35% 1.19 2.4 5.0 5.0 5.0 4 A5 No 0.88 0.88 1.00 33 0.91% 2.4 2.4 1.1 N/A N/A N/A 5.0 5.0 5.0 The Overlook Rational Method Equation: Project: The Overlook Calculations By: Date: Rainfall Intensity: 1 A1 0.55 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 1.49 2.54 5.46 2 A2 0.10 16 16 14 0.30 0.30 0.38 1.84 3.14 6.71 0.06 0.10 0.25 2 A3 0.43 5 5 5 0.92 0.92 1.00 2.85 4.87 9.95 1.14 1.95 4.32 3 A4 0.22 5 5 5 0.87 0.87 1.00 2.85 4.87 9.95 0.54 0.92 2.18 4 A5 0.10 5 5 5 0.88 0.88 1.00 2.85 4.87 9.95 0.26 0.45 1.03 5 A6 0.18 5 5 5 0.86 0.86 1.00 2.85 4.87 9.95 0.44 0.75 1.78 6 A7 0.16 5 5 5 0.25 0.25 0.31 2.85 4.87 9.95 0.11 0.19 0.48 TOTAL BASIN A TOTAL BASIN A 1.74 16 16 14 0.82 0.82 1.00 1.84 3.14 6.71 2.62 4.47 11.67 7 B1 0.32 7 7 5 0.61 0.61 0.77 2.52 4.31 9.95 0.50 0.85 2.46 8 B2 0.27 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.73 1.24 2.67 9 B3 0.11 5 5 5 0.86 0.86 1.00 2.85 4.87 9.95 0.27 0.46 1.09 10 B4 0.11 5 5 5 0.85 0.85 1.00 2.85 4.87 9.95 0.27 0.46 1.10 11 B5 0.24 16 16 15 0.28 0.28 0.35 1.81 3.08 6.62 0.12 0.21 0.56 TOTAL BASIN B TOTAL BASIN B 1.05 16 16 15 0.67 0.67 0.84 1.81 3.08 6.62 1.28 2.19 5.87 13 UD2 0.04 12 12 11 0.33 0.33 0.41 2.09 3.57 7.42 0.03 0.05 0.13 13 UD3 0.10 11 11 10 0.35 0.35 0.44 2.17 3.71 7.72 0.07 0.13 0.33 13 UD4 0.30 5 5 5 0.73 0.73 0.91 2.85 4.87 9.95 0.63 1.08 2.76 TOTAL BASIN UD2-UD4 TOTAL BASIN UD2-UD4 0.44 12 12 11 0.61 0.61 0.76 2.09 3.57 7.42 0.56 0.96 2.49 12 UD1 0.03 5 5 5 0.25 0.25 0.31 2.85 4.87 9.95 0.02 0.03 0.08 12 UD5 0.03 5 5 5 0.25 0.25 0.31 2.85 4.87 9.95 0.02 0.03 0.09 TOTAL SITE TOTAL SITE 3.29 16 16 15 0.74 0.74 0.92 1.81 3.08 6.62 4.38 7.45 20.00 August 15, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION PONDS B.2 WATER QUALITY CALCULATIONS B.3 STORM SEWER B.4 INLET B.5 WEIR CALCULATIONS APPENDIX B.1 DETENTION PONDS The Overlook 1174-001 Fort Collins, Colorado S. Thomas Date: 8/15/2016 Pond No.: Detention Pond A A 100-yr WQCV total 2740 ft3 (SEE WQ CALCS) 1.00 Approx. Rain Garden Vol. 1863 ft3 Area (A)= 1.74 acres WQCV Required 877 ft3 Max Release Rate = 0.55 cfs Quantity Detention 18111 ft3 (per SWMM) Total Volume 18988 ft3 Total Volume 0.44 ac-ft Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Developed "C" = Required Detention Volume 8/15/2016 8:50 AM D:\Projects\1174-001\Drainage\Detention\1174-001__Detention Pond A.xlsm\FAA_CoFC idf_Pond 1 1174-001 Fort Collins, CO S. Thomas Date: 8/15/2016 Pond No.: A A7 100-yr 0.44 acft 5019.90 ft. Design Storm WQCV Required Volume= 877 ft3 5014.17 ft. Contour Elevation (Y- values) Contour Area Depth Column Not Used Incremental Volume Total Volume Total Volume ft2 ft. ft3 ft3 ft3 acre-feet 5,013.20 7.7 0.00 0 0 0 0 5,013.40 244.02 0.20 20 20 0.00 5,013.60 803.75 0.20 99 119 0.00 5,013.80 1,336.01 0.20 212 330 0.01 5,014.00 1,513.83 0.20 285 615 0.01 5,014.20 1,623.22 0.20 313 928 0.02 5,014.40 1,728.93 0.20 335 1263 0.03 5,014.60 1,835.91 0.20 356 1619 0.04 5,014.80 1,945.17 0.20 378 1997 0.05 5,015.00 2,060.80 0.20 400 2397 0.06 5,015.20 2,152.25 0.20 421 2818 0.06 5,015.40 2,240.63 0.20 439 3257 0.07 5,015.60 2,345.81 0.20 458 3715 0.09 5,015.80 2,461.44 0.20 480 4195 0.10 5,016.00 2,582.65 0.20 504 4699 0.11 5,016.20 2,701.38 0.20 528 5227 0.12 5,016.40 2,825.00 0.20 552 5779 0.13 5,016.60 2,955.75 0.20 577 6356 0.15 5,016.80 3,088.04 0.20 604 6960 0.16 5,017.00 3,223.50 0.20 630 7590 0.17 5,017.20 3,343.00 0.20 656 8246 0.19 5,017.40 3,435.81 0.20 677 8924 0.20 5,017.60 3,525.14 0.20 695 9619 0.22 5,017.80 3,612.01 0.20 713 10332 0.24 5,018.00 3,696.70 0.20 730 11062 0.25 5,018.20 3,782.44 0.20 747 11809 0.27 5,018.40 3,869.28 0.20 764 12574 0.29 5,018.60 3,968.01 0.20 783 13356 0.31 5,018.80 4,074.34 0.20 803 14160 0.33 5,019.00 4,184.76 0.20 825 14985 0.34 5,019.20 4,297.83 0.20 847 15832 0.36 5,019.40 4,414.75 0.20 870 16703 0.38 5,019.60 4,539.08 0.20 894 17597 0.40 5,019.80 4,704.21 0.20 923 18521 0.43 5,020.00 4,897.09 0.20 959 19480 0.45 5,020.20 5,106.76 0.20 999 20479 0.47 5,020.40 5,254.04 0.20 1035 21514 0.49 Design Point Design Storm Require Volume= Stage - Storage Calculation The Overlook ORIFICE RATING CURVE Pond B Outlet 100-yr Orifice Project: The Overlook Date: 8/15/2016 By: S. Thomas 100-yr WSEL= 5021.12 Orifice Plate Outflow Q 0.19 cfs Orifice Coefficient Cd 0.65 Gravity Constant g 32.2 ft/s^2 100-year head H 4.55 ft Orifice Area Ao 0.02 ft^2 Orifice Area Ao 2.46 in^2 Radius r 0.9 in Diameter d 1.8 in Orifice Curve Stage (ft) H (ft) Q (cfs) SWMM Stage Note 5016.57 0.00 0.00 0.00 Pond Invert 5016.80 0.23 0.04 0.23 5017.10 0.53 0.06 0.53 5017.40 0.83 0.08 0.83 5017.70 1.13 0.09 1.13 5018.00 1.43 0.11 1.43 5018.30 1.73 0.12 1.73 5018.60 2.03 0.13 2.03 5018.90 2.33 0.14 2.33 5019.20 2.63 0.14 2.63 5019.50 2.93 0.15 2.93 5019.80 3.23 0.16 3.23 5020.10 3.53 0.17 3.53 5020.40 3.83 0.17 3.83 5020.70 4.13 0.18 4.13 5021.00 4.43 0.19 4.43 5021.12 4.55 0.19 4.55 100-yr WSEL 8/15/2016 8:50 AM D:\Projects\1174-001\Drainage\Detention\1174-001 Orifice B.xlsx\Orifice Size The Overlook 1174-001 Fort Collins, Colorado S. Thomas Date: 8/15/2016 Pond No.: Detention Pond B B 100-yr WQCV total 915 ft3 0.84 Approx. Rain Garden Vol. 457 ft3 Area (A)= 1.05 acres WQCV Required N/A ft3 (POND A) Max Release Rate = 0.19 cfs Quantity Detention 9673 ft3 (per SWMM) Total Volume 9673 ft3 Total Volume 0.22 ac-ft Detention Pond Calculation | SWMM Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Developed "C" = Required Detention Volume 8/15/2016 8:51 AM D:\Projects\1174-001\Drainage\Detention\1174-001__Detention Pond B.xlsm\SWMM_CoFC idf_Pond 1 1174-001 Fort Collins, CO S. Thomas Date: 8/15/2016 Pond No.: B B 100-yr 0.22 acft 5021.12 ft. Design Storm WQCV Required Volume= N/A ft 3 N/A ft. Contour Elevation (Y- values) Contour Area Depth Column Not Used Incremental Volume Total Volume Total Volume ft 2 ft. ft 3 ft 3 ft 3 acre-feet 5,016.60 0.47 0.00 0 0 0 0 5,016.80 38.37 0.20 3 3 0.00 5,017.00 138.99 0.20 17 20 0.00 5,017.20 283.65 0.20 41 61 0.00 5,017.40 438.86 0.20 72 133 0.00 5,017.60 604.53 0.20 104 236 0.01 5,017.80 781 0.20 138 374 0.01 5,018.00 968.53 0.20 174 549 0.01 5,018.20 1,167.28 0.20 213 762 0.02 5,018.40 1,377.14 0.20 254 1016 0.02 5,018.60 1,598.00 0.20 297 1313 0.03 5,018.80 1,829.44 0.20 342 1655 0.04 5,019.00 2,069.73 0.20 389 2044 0.05 5,019.20 2,318.44 0.20 438 2482 0.06 5,019.40 2,575.87 0.20 489 2971 0.07 5,019.60 2,843.14 0.20 541 3512 0.08 5,019.80 3,120.19 0.20 596 4108 0.09 5,020.00 3,406.96 0.20 652 4760 0.11 5,020.20 3,713.59 0.20 711 5471 0.13 5,020.40 4,074.84 0.20 778 6248 0.14 5,020.60 4,461.82 0.20 853 7101 0.16 5,020.80 4,853.28 0.20 930 8031 0.18 5,021.00 5,249.01 0.20 1009 9040 0.21 5,021.20 5,648.98 0.20 1088 10129 0.23 5,021.40 6,053.19 0.20 1169 11297 0.26 5,021.60 6,461.64 0.20 1250 12547 0.29 5,021.80 6,874.34 0.20 1332 13880 0.32 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: The Overlook ORIFICE RATING CURVE Pond B Outlet 100-yr Orifice Project: The Overlook Date: 8/15/2016 By: S. Thomas 100-yr WSEL= 5021.12 Orifice Plate Outflow Q 0.19 cfs Orifice Coefficient Cd 0.65 Gravity Constant g 32.2 ft/s^2 100-year head H 4.55 ft Orifice Area Ao 0.02 ft^2 Orifice Area Ao 2.46 in^2 Radius r 0.9 in Diameter d 1.8 in Orifice Curve Stage (ft) H (ft) Q (cfs) SWMM Stage Note 5016.57 0.00 0.00 0.00 Pond Invert 5016.80 0.23 0.04 0.23 5017.10 0.53 0.06 0.53 5017.40 0.83 0.08 0.83 5017.70 1.13 0.09 1.13 5018.00 1.43 0.11 1.43 5018.30 1.73 0.12 1.73 5018.60 2.03 0.13 2.03 5018.90 2.33 0.14 2.33 5019.20 2.63 0.14 2.63 5019.50 2.93 0.15 2.93 5019.80 3.23 0.16 3.23 5020.10 3.53 0.17 3.53 5020.40 3.83 0.17 3.83 5020.70 4.13 0.18 4.13 5021.00 4.43 0.19 4.43 5021.12 4.55 0.19 4.55 100-yr WSEL 8/15/2016 8:50 AM D:\Projects\1174-001\Drainage\Detention\1174-001 Orifice B.xlsx\Orifice Size APPENDIX B.2 WATER QUALITY CALCULATIONS POND A (Water Quality for Basins A and B) Project: The Overlook By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 2.790 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 69.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.6900 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.271 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.063 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 1863 <-- CALCULATED (minus Rain Garden Treatment Area) Adjusted WQCV (cu-ft) = 877 <-- CALCULATED WQ Depth (ft) = 1.020 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.086 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/3 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE August 12, 2016 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 84.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.840 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.28 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 14,044 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 332 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 14 in 12-INCH MAXIMUM B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 236 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 332 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 3/7 in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.05-Rain Garden L1.xlsm, RG 8/15/2016, 8:56 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.05-Rain Garden L1.xlsm, RG 8/15/2016, 8:56 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 77.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.770 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 28,237 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 584 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 435 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L2 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.05-Rain Garden L2.xlsm, RG 8/15/2016, 8:56 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L2 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.05-Rain Garden L2.xlsm, RG 8/15/2016, 8:56 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 78.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.780 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.25 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 23,241 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 490 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 14 in 12-INCH MAXIMUM B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 363 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L3 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.05-Rain Garden L3.xlsm, RG 8/15/2016, 8:57 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L3 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.05-Rain Garden L3.xlsm, RG 8/15/2016, 8:57 AM Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 68.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.680 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 25,730 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 457 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 350 sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L4 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.05-Rain Garden L4.xlsm, RG 8/15/2016, 8:58 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering August 15, 2016 The Overlook Rain Garden L4 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.05-Rain Garden L4.xlsm, RG 8/15/2016, 8:58 AM APPENDIX B.3 STORM SEWERS Project: 1174-001 Date: Calculation by: SJT Circular D or Da, Pipe Diameter (ft) H or Ha, Culvert Height (ft) W, Culvert Width (ft) Yt/D Q/D1.5 Q/D2.5 Yt/H Q/WH0.5 Storm A 10.22 1.50 0.60 0.40 5.56 3.71 N/A N/A 3.60 3.71 1.70 4.82 Type L 5.00 6.00 1.5 Storm B 2.19 0.66 0.26 0.40 4.08 6.19 N/A N/A 1.80 6.19 0.37 1.30 Type L 2.00 3.00 1.5 Storm C 1.03 0.66 0.26 0.40 1.92 2.91 N/A N/A 4.50 2.91 0.17 -0.04 Type L 2.00 3.00 1.5 Storm D 1.78 0.66 0.26 0.40 3.32 5.03 N/A N/A 2.40 5.03 0.30 1.11 Type L 2.00 3.00 1.5 Storm E 5.13 1.00 0.40 0.40 5.13 5.13 N/A N/A 2.30 5.13 0.86 2.62 Type L 3.00 4.00 1.5 Storm F 0.55 1.00 0.40 0.40 0.55 0.55 N/A N/A 6.70 0.55 0.09 -5.16 Type L 3.00 4.00 1.5 CALCULATE L= 1/(2tanq)* [At/Yt)-W] (ft) Expansion Factor 1/(2tanq) (From Figure MD-23 or MD-24) August 15, 2016 OUTPUT Storm Line/Culvert Label Culvert Parameters Yt, Tailwater Depth (ft) Urban Drainage pg MD-107 Box Culvert INPUT Design Discharge (cfs) At=Q/V (ft2) Spec Length of Riprap (ft) CALCULATIONS FOR RIPRAP PROTECTION AT PIPE OUTLETS Circular Pipe APPENDIX B.4 INLETS Area Inlet Performance Curve: Design Point 1 - Inlets A6.1-A6.5 and Inlets A8.1-A8.3 Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: 15" ADS Drop In Grate 1501DI Shape Circular Length of Grate (ft): 1.25 Width of Grate (ft): 1.25 Open Area of Grate (ft 2 ): 0.43 Flowline Elevation (ft): 5024.910 Allowable Capacity: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5024.91 0.00 0.00 0.00 0.05 5024.96 0.07 0.26 0.07 0.10 5025.01 0.19 0.37 0.19 0.15 5025.06 0.34 0.45 0.34 0.20 5025.11 0.53 0.52 0.52 0.25 5025.160 0.74 0.58 0.58 0.30 5025.21 0.97 0.63 0.63 0.35 5025.26 1.22 0.68 0.68 Q100 0.40 5025.31 1.49 0.73 0.73 0.45 5025.36 1.78 0.78 0.78 0.50 5025.410 2.08 0.82 0.82 Inlet at Design Point 1 is designed to intercept the full 100-yr flow of 0.68 cfs (per inlet) at the elevation 5025.31 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 Area Inlet Performance Curve: The Overlook - Design Point 2/Inlet A6 Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Neenah R-4370-27A Shape Circular Length of Grate (ft): 3.16 Width of Grate (ft): 3.16 Open Area of Grate (ft 2 ): 2.40 Flowline Elevation (ft): 5021.000 Allowable Capacity: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5021.00 0.00 0.00 0.00 0.05 5021.05 0.17 1.44 0.17 0.10 5021.10 0.47 2.04 0.47 0.15 5021.15 0.87 2.50 0.87 0.20 5021.20 1.33 2.88 1.33 Q2 0.25 5021.250 1.86 3.22 1.86 0.30 5021.30 2.45 3.53 2.45 0.35 5021.35 3.08 3.82 3.82 0.40 5021.40 3.77 4.08 4.08 0.45 5021.45 4.50 4.33 4.33 0.50 5021.500 5.26 4.56 4.56 Inlet at Design Point 2 is designed to intercept the full 100-yr flow of 4.57 cfs at the elevation 5021.50. 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 3.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.4 1.8 cfs INLET IN A SUMP OR SAG LOCATION The Overlook Design Pt 5, Inlet B2 CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths INLET - Design Pt 5.xlsm, Inlet In Sump 8/15/2016, 8:53 AM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 3.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.5 2.5 cfs INLET IN A SUMP OR SAG LOCATION The Overlook Design Pt 7, Inlet E2 CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths INLET - Design Pt 7.xlsm, Inlet In Sump 8/15/2016, 8:53 AM Project = Inlet ID = Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') alocal = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) = 3.00 3.00 feet Width of a Unit Grate Wo = 1.73 1.73 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) Aratio = 0.43 0.43 Clogging Factor for a Single Grate (typical value 0.50 - 0.70) Cf (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15 - 3.60) Cw (G) = 3.30 3.30 Grate Orifice Coefficient (typical value 0.60 - 0.80) Co (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) = 3.00 3.00 feet Height of Vertical Curb Opening in Inches Hvert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches Hthroat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) Wp = 2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.6) Cw (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70) Co (C) = 0.66 0.66 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa = 3.6 3.6 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = 0.3 1.1 cfs INLET IN A SUMP OR SAG LOCATION The Overlook Design Pt 9, Inlet D2 CDOT/Denver 13 Combination H-Vert H-Curb W Lo (C) Lo (G) Wo WP Override Depths INLET - Design Pt 9.xlsm, Inlet In Sump 8/15/2016, 8:53 AM Area Inlet Performance Curve: The Overlook - Design Point 10/Inlet B3 Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Neenah R-3409 Shape Rectangular Length of Grate (ft): 2.4 Width of Grate (ft): 1.4 Open Area of Grate (ft 2 ): 1.50 Flowline Elevation (ft): 5024.950 Allowable Capacity: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5024.95 0.00 0.00 0.00 0.03 5024.98 0.06 0.70 0.06 0.06 5025.01 0.17 0.99 0.17 0.09 5025.04 0.31 1.21 0.31 0.12 5025.07 0.47 1.40 0.47 0.15 5025.100 0.66 1.56 0.66 0.18 5025.13 0.87 1.71 0.87 0.21 5025.16 1.10 1.85 1.10 Q100 0.24 5025.19 1.34 1.97 1.34 0.27 5025.22 1.60 2.09 1.60 0.30 5025.250 1.87 2.21 1.87 Inlet at Design Point 10 is designed to intercept the full 100-yr flow of 1.1 cfs at the elevation 5025.16 0.00 0.50 1.00 1.50 2.00 2.50 0.00 0.05 0.10 0.15 0.20 0.25 0.30 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Area Inlet Performance Curve: The Overlook - Pond B Overflow through Outlet Structure Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: * where P = 2(L + W) * where H corresponds to the depth of water above the flowline At higher flow depths, the inlet will act like an orifice governed by the following equation: * where A equals the open area of the inlet grate * where H corresponds to the depth of water above the centroid of the cross-sectional area (A) The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation will cross at a certain flow depth. The two curves can be found below: If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: Pond B Outlet Structure Shape Rectangular Length of Grate (ft): 3 Width of Grate (ft): 3 Open Area of Grate (ft 2 ): 7.50 Top of Box Elevation (ft): 5021.120 Allowable Capacity: 50% Depth vs. Flow: Depth Above Inlet (ft) Elevation (ft) Shallow Weir Flow (cfs) Orifice Flow (cfs) Actual Flow (cfs) 0.00 5021.12 0.00 0.00 0.00 0.10 5021.22 0.57 6.37 0.57 0.20 5021.32 1.61 9.01 1.61 0.30 5021.42 2.96 11.04 2.96 0.40 5021.52 4.55 12.75 4.55 0.50 5021.620 6.36 14.25 6.36 100-yr 0.60 5021.72 8.37 15.61 8.37 0.70 5021.82 10.54 16.86 10.54 0.80 5021.92 12.88 18.03 12.88 0.90 5022.02 15.37 19.12 15.37 Overtopping 1.00 5022.120 18.00 20.15 18.00 Outlet Structure of Pond B is expected convey the full 100-yr flow from Basin B of 5.87 cfs at elevation 5021.59 0.00 5.00 10.00 15.00 20.00 25.00 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow APPENDIX B.5 WEIR CALCULATIONS Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 15 2016 Rain Garden L1 Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 0.25 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 2.18 Highlighted Depth (ft) = 0.13 Q (cfs) = 2.180 Area (sqft) = 2.02 Velocity (ft/s) = 1.08 Top Width (ft) = 16.04 0 2 4 6 8 10 12 14 16 18 20 22 Depth (ft) Rain Garden L1 Weir Depth (ft) -0.50 -0.50 0.50 0.50 1.00 1.00 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 15 2016 Rain Garden L4 Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 8.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 5.13 Highlighted Depth (ft) = 0.33 Q (cfs) = 5.130 Area (sqft) = 3.08 Velocity (ft/s) = 1.67 Top Width (ft) = 10.64 0 2 4 6 8 10 12 14 16 Depth (ft) Rain Garden L4 Weir Depth (ft) -0.50 -0.50 1.00 1.00 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 15 2016 2 ft Wide Curb Cut, Max Flow Rectangular Weir Crest = Sharp Bottom Length (ft) = 2.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 3.33 Compute by: Q vs Depth No. Increments = 5 Highlighted Depth (ft) = 0.50 Q (cfs) = 2.355 Area (sqft) = 1.00 Velocity (ft/s) = 2.35 Top Width (ft) = 2.00 0 .5 1 1.5 2 2.5 3 Depth (ft) 2 ft Wide Curb Cut, Max Flow Depth (ft) -0.50 -0.50 1.00 1.00 Weir W.S. Length (ft) APPENDIX C SWMM MODELING SUBB SUBA UD-2-4 OUTLETB OUTLETA OUT1 PONDB PONDA GAGE1 SWMM 5.1 Page 1 [TITLE] [OPTIONS] FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE START_DATE 02/26/2016 START_TIME 00:00:00 REPORT_START_DATE 02/26/2016 REPORT_START_TIME 00:00:00 END_DATE 02/27/2016 END_TIME 23:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:01:00 WET_STEP 00:01:00 DRY_STEP 01:00:00 ROUTING_STEP 0:00:15 ALLOW_PONDING NO INERTIAL_DAMPING PARTIAL VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.557 NORMAL_FLOW_LIMITED BOTH SKIP_STEADY_STATE NO FORCE_MAIN_EQUATION H-W LINK_OFFSETS DEPTH MIN_SLOPE 0 [EVAPORATION] ;;Type Parameters ;;---------- ---------- CONSTANT 0.0 [RAINGAGES] ;; Rain Time Snow Data ;;Name Type Intrvl Catch Source ;;-------------- --------- ------ ------ ---------- GAGE1 INTENSITY 0:05 1.0 TIMESERIES FC100-YR [SUBCATCHMENTS] ;; Total Pcnt. Pcnt. Curb Snow ;;Name Raingage Outlet Area Imperv Width Slope Length Pack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- -------- SUBB GAGE1 PONDB 1.05 57 914 4 0 SUBA GAGE1 PONDA 1.74 77 1515 2 0 UD-2-4 GAGE1 OUT1 .44 50 20 2 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- SUBB .016 .025 .1 .3 1 OUTLET SUBA .016 .025 .1 .3 1 OUTLET UD-2-4 .016 .025 .1 .3 1 OUTLET [INFILTRATION] ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- SUBB 3.0 0.5 4 7 0 SUBA 3.0 0.5 4 7 0 UD-2-4 3.0 0.5 4 7 0 [OUTFALLS] ;; Invert Outfall Stage/Table Tide ;;Name Elev. Type Time Series Gate ;;-------------- ---------- ---------- ---------------- ---- ;;Name Elev. Depth Depth Curve Params Area Frac. Infiltration ;;-------------- -------- -------- -------- ---------- -------- -------- -------- -------- -------- ------------- PONDB 5016.64 5 0 TABULAR PONDB 0 0 PONDA 5013.22 7 0 TABULAR PONDA 0 0 [OUTLETS] ;; Inlet Outlet Outflow Outlet Qcoeff/ Flap ;;Name Node Node Height Type QTable Qexpon Gate ;;-------------- ---------------- ---------------- ---------- --------------- ---------------- ---------- ---- OUTLETB PONDB PONDA 0 TABULAR/HEAD ORIFICEB NO OUTLETA PONDA OUT1 0 TABULAR/HEAD ORIFICEA NO [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- ORIFICEA Rating 0 0 ORIFICEA 7 .6 ORIFICEB Rating 0 0 ORIFICEB 5.5 .25 ORIFICEBCLOGGED Rating 0 0 ORIFICEBCLOGGED 5 0 ORIFICEBCLOGGED 10 0 ORIFICEAREDUCED Rating 0.00 0.00 ORIFICEAREDUCED 0.02 0.04 ORIFICEAREDUCED 0.52 0.22 ORIFICEAREDUCED 1.02 0.30 ORIFICEAREDUCED 1.52 0.37 ORIFICEAREDUCED 2.02 0.43 ORIFICEAREDUCED 2.52 0.48 ORIFICEAREDUCED 3.02 0.52 ORIFICEAREDUCED 3.52 0.57 ORIFICEAREDUCED 4.02 0.61 ORIFICEAREDUCED 4.52 0.64 ORIFICEAREDUCED 5.02 0.68 ORIFICEAREDUCED 5.52 0.71 ORIFICEAREDUCED 6.02 0.74 ORIFICEAREDUCED 6.52 0.77 ORIFICEAREDUCED 7.02 0.80 PONDA Storage 0 7.7 PONDA 0.2 244.02 PONDA 0.4 803.69 PONDA 0.6 1333.72 PONDA 0.8 1511.37 PONDA 1 1628.45 PONDA 1.2 1749.36 PONDA 1.4 1875.79 PONDA 1.6 2009.54 PONDA 1.8 2154.87 PONDA 2 2237.34 PONDA 2.2 2321.15 PONDA 2.4 2423.05 PONDA 2.6 2538.12 PONDA 2.8 2662.9 PONDA 3 2768.83 PONDA 3.2 2883.13 PONDA 3.4 3008.11 PONDA 3.6 3136.88 PONDA 3.8 3270.11 PONDA 4 3388 PONDA 4.2 3479.57 PONDA 4.4 3564.42 PONDA 4.6 3643.25 PONDA 5.8 4150.05 PONDA 6 4261.66 PONDA 6.2 4375.21 PONDA 6.4 4495.27 PONDA 6.6 4653.89 PONDA 6.8 4838.55 PONDA 7 5038.34 PONDA 7.2 5254.04 PONDB Storage 0 41.52 PONDB 0.2 149.92 PONDB 0.4 304.11 PONDB 0.6 469.78 PONDB 0.8 647.54 PONDB 1 837.28 PONDB 1.2 1039.65 PONDB 1.4 1255.23 PONDB 1.6 1483.68 PONDB 1.8 1726.73 PONDB 2 1982.69 PONDB 2.2 2249.92 PONDB 2.4 2531.35 PONDB 2.6 2830.4 PONDB 2.8 3115.85 PONDB 3 3393.85 PONDB 3.2 3668.01 PONDB 3.4 3958.49 PONDB 3.6 4328.6 PONDB 3.8 4729.31 PONDB 4 5118.92 PONDB 4.2 5472.22 PONDB 4.4 5791.41 PONDB 4.6 6080.43 PONDB 4.8 6351.35 PONDB 5 6595.94 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- FC100-YR 0:05 1 FC100-YR 0:10 1.14 FC100-YR 0:15 1.33 FC100-YR 0:20 2.23 FC100-YR 0:25 2.84 FC100-YR 0:30 5.49 FC100-YR 0:35 9.95 FC100-YR 0:40 4.12 FC100-YR 0:45 2.48 FC100-YR 0:50 1.46 FC100-YR 0:55 1.22 FC100-YR 1:00 1.06 FC100-YR 1:05 1 FC100-YR 1:10 .95 FC100-YR 1:15 .91 FC100-YR 1:20 .87 FC100-YR 1:25 .84 FC100-YR 1:30 .81 FC100-YR 1:35 .78 FC100-YR 1:40 .75 FC100-YR 1:45 .73 FC100-YR 1:50 .71 FC100-YR 1:55 .69 SWMM 5.1 Page 4 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.015) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ FEB-26-2016 00:00:00 Ending Date .............. FEB-27-2016 23:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:01:00 Wet Time Step ............ 00:01:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 15.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 0.988 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.168 0.624 Surface Runoff ........... 0.803 2.983 Final Surface Storage .... 0.018 0.066 Continuity Error (%) ..... -0.115 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 0.803 0.262 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.803 0.262 Internal Outflow ......... 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 15.00 sec Average Time Step : 15.00 sec Maximum Time Step : 15.00 sec SWMM 5.1 Page 1 Percent in Steady State : 0.00 Average Iterations per Step : 1.00 *************************** Subcatchment Runoff Summary *************************** ---------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS ---------------------------------------------------------------------------------------------- SUBB 3.669 0.000 0.000 0.802 2.816 0.080 10.110 0.767 SUBA 3.669 0.000 0.000 0.429 3.168 0.150 17.079 0.863 UD-2-4 3.669 0.000 0.000 0.968 2.653 0.032 3.328 0.723 -------------------------------------------------------------------------------------------- System 3.669 0.000 0.000 0.624 2.983 0.262 30.517 0.813 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- OUT1 OUTFALL 0.00 0.00 5013.00 0 00:00 PONDB STORAGE 1.40 4.19 5020.83 0 02:06 PONDA STORAGE 2.12 6.46 5019.68 0 02:06 ******************* Node InFlow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- OUT1 OUTFALL 3.33 3.70 0 00:40 0.032 0.262 PONDB STORAGE 10.11 10.11 0 00:40 0.080 0.080 PONDA STORAGE 17.08 17.22 0 00:40 0.150 0.230 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- PONDB STORAGE 47.00 4.192 0.808 PONDA STORAGE 47.00 6.464 0.536 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** SWMM 5.1 Page 2 Storage Volume Summary ********************** -------------------------------------------------------------------------------------- Average Avg Maximum Max Time of Max Maximum Volume Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------- PONDB 2.133 15 9.673 66 0 02:06 0.19 PONDA 4.520 22 18.110 88 0 02:06 0.55 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- OUT1 69.87 0.30 3.70 0.262 ----------------------------------------------------------- System 69.87 0.30 3.70 0.262 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence Velocity Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- OUTLETB DUMMY 0.19 0 02:06 OUTLETA DUMMY 0.55 0 02:07 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Aug 15 09:22:02 2016 Analysis ended on: Mon Aug 15 09:22:02 2016 Total elapsed time: < 1 sec SWMM 5.1 Page 3 APPENDIX D EROSION CONTROL REPORT The Overlook Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E LID EXHIBIT Project: The Overlook Calculations By: Date: L1 A4 9,533 86% 8,182 A5 4,511 81% 3,676 Total L1 14,044 84% 11,857 332 355 L2 A1 23,900 90% 21,510 Total L2 23,900 90% 21,510 584 584 L3 A3 18,904 94% 17,772 A2 4,337 7% 303 Total L3 23,241 78% 18,075 490 578 L4 B1 14,054 50% 7,070 B2 11,676 90% 10,508 Total L4 25,730 68% 17,578 457 555 Total Treated 86,915 79% 69,020 1,863 2,072 A6 7,798 86% 6,697 A7 6,773 0% 0 B3 4,763 83% 3,957 B4 4,834 84% 4,041 B5 10,551 4% 431 UD2 1,788 10% 183 UD3 4,216 13% 537 UD4 13,275 66% 8,753 UD1 1,133 0% 0 UD5 1,241 0% 0 Total Proposed Untreated 56,372 44% 24,599 H1 9,932 86% 8,542 Total Existing Untreated 9,932 86% 8,542 143,287 8,542 93,620 85,078 63,808 1,863 2,072 69,020 69,020 81% PROPOSED LID COMPUTATIONS S. Thomas August 15, 2016 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) UD Rain Garden WQCV Required (Cf) LID TREATMENT SUMMARY PROPOSED LID UNTREATED AREA Total Site Area (sf) PROPOSED LID TREATED AREA UD UD UD UD TF TF TF UD TF SHORES OFFICE OWNER: THE SHORES SHORES FOUR CONDO ASSOCIATION AT SHORES OFFICE PARK OWNER: SHORES FOUR LLC SHORES OFFICE PARK PUD OWNER: JOHNSON LEWIS MELVIN SHORES OFFICE PARK PUD OWNER: THE SHORES OFFICE PARK WHARF AT THE LANDINGS PUD PHASE 2 REPLAT OWNER: HDAH LLC WHARF AT THE LANDINGS PUD PHASE 2 REPLAT OWNER: HDAF LLC WHARF AT THE LANDINGS PUD PHASE 2 REPLAT OWNER: JAXF LLC WHARF AT THE LANDINGS PUD PHASE 2 REPLAT STRACHAN CONTINENTAL PUD OWNER: FORT COLLINS PLAZA LTD LIABILITY CO TOYS-R-US WESTERN AUTO PUD OWNER: IMAGO ENTERPRISES INC FIRST COMMUNITY BANK PLAZA OWNER: FOX POINTE PLAZA LLC JOHN F. KENNEDY PARKWAY 100' RIGHT OF WAY PRIVATE ACCESS ROAD PRIVATE ACCESS ROAD LARIMER COUNTY CANAL E X X G G G G G G APPENDIX F REFERENCES MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT HDR1 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 KEYMAP LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR THE OVERLOOK BY NORTHERN ENGINEERING, DATED MARCH 30, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr DR1 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R CityDate Engineer Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 301 N. HOWES STREET, UNIT 100 FORT COLLINS, CO 80521 N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 KEYMAP DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 0.55 0.95 1.00 5.0 5.0 1.49 5.46 2 A2 0.10 0.30 0.38 15.6 14.1 0.06 0.25 2 A3 0.43 0.92 1.00 5.0 5.0 1.14 4.32 3 A4 0.22 0.87 1.00 5.0 5.0 0.54 2.18 4 A5 0.10 0.88 1.00 5.0 5.0 0.26 1.03 5 A6 0.18 0.86 1.00 5.0 5.0 0.44 1.78 6 A7 0.16 0.25 0.31 5.0 5.0 0.11 0.48 7 B1 0.32 0.61 0.77 7.2 5.0 0.50 2.46 8 B2 0.27 0.95 1.00 5.0 5.0 0.73 2.67 9 B3 0.11 0.86 1.00 5.0 5.0 0.27 1.09 10 B4 0.11 0.85 1.00 5.0 5.0 0.27 1.10 11 B5 0.24 0.28 0.35 16.1 14.7 0.12 0.56 13 UD2 0.04 0.33 0.41 11.7 11.0 0.03 0.13 13 UD3 0.10 0.35 0.44 10.8 10.1 0.07 0.33 13 UD4 0.30 0.73 0.91 5.0 5.0 0.63 2.76 12 UD1 0.03 0.25 0.31 5.0 5.0 0.02 0.08 12 UD5 0.03 0.25 0.31 5.0 5.0 0.02 0.09 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE OVERLOOK BY NORTHERN ENGINEERING, DATED August 17, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) A 0.44 5019.90 877 5014.17 0.55 B 0.22 5021.12 N/A N/A 0.19 Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 H1 0.23 0.86 1.00 5.1 5.0 0.56 2.27 2 H2 3.04 0.25 0.31 27.0 25.0 1.05 4.78 G G G G G G E 6" W 6" W 6" W 6" W 6" W 6" W G G E E E E E E E E E E E T T T E E E E E E E 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W CTV CTV CTV CTV CTV CTV CTV CTV T T T T T T T T T CTV CTV CTV T T T X 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS S 8" W 8" W 8" W 8" W TT TC TC TC S S S W VAULT ELEC ELEC MM ELEC MM T VAULT H Y D H Y D 6" W 6" W 6" W 8" W 8" W 6" W H Y D H Y D LID BASIN L1 TOTAL AREA: 0.32 AC (14,044 SF) PERCENT IMPERVIOUS: 84% REQUIRED RAIN GARDEN VOLUME: 332 CF PROVIDED RAIN GARDEN VOLUME: 355 CF LID BASIN L3 TOTAL AREA: 0.53 AC (23,241 SF) PERCENT IMPERVIOUS: 78% REQUIRED RAIN GARDEN VOLUME: 490 CF PROVIDED RAIN GARDEN VOLUME: 578 CF LID BASIN L2 TOTAL AREA: 0.55 AC (23,900 SF) PERCENT IMPERVIOUS: 90% REQUIRED RAIN GARDEN VOLUME: 584 CF PROVIDED RAIN GARDEN VOLUME: 584 CF LID BASIN L4 TOTAL AREA: 0.59 AC (25,730 SF) PERCENT IMPERVIOUS: 79% REQUIRED RAIN GARDEN VOLUME: 457 CF PROVIDED RAIN GARDEN VOLUME: 555 CF RAIN GARDEN RAIN GARDEN PLANTER BOXES RAIN GARDEN RAIN GARDEN A7 A3 A4 A6 A2 A1 UD3 B4 B3 B5 B2 UD2 B1 UD4 UD5 UD1 A5 LID LOW IMPACT DEVELOPMENT EXHIBIT Sheet Of 11 Sheets THE OVERLOOK These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 N. HOWES STREET, UNIT 100 FORT COLLINS, CO 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 KEYMAP LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY DRAINAGE BASIN BUBBLE A LID BASIN BOUNDARY PROPOSED STORM SEWER RAIN GARDEN LID TREATMENT SUMMARY Total Site Area (sf) 143,287 Total Existing Impervious Area (sf) 8,542 Total Proposed Impervious Area (sf) 93,620 Total Net Proposed Impervious Area (sf) 85,078 75% Required Minimum Area to be Treated by LID measures (sf) 63,808 Rain Garden Treatment Total Volume Required (cf) 1,863 Total Volume Provided (cf) 2,072 Area treated by Rain Gardens (sf) 69,020 Total Treated Impervious Area (sf) 69,020 Percent Impervious Treated by LID measures 81% LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) Rain Garden WQCV Provided (cf) Total Existing Impervious Area (sf) Total Proposed Impervious Area (sf) Total Net Proposed Impervious Area (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures 75% Required Minimum Area to be Treated by LID measures (sf) Rain Garden Treatment Total Volume Required (cf) Total Volume Provided (cf) Area treated by Rain Gardens (sf) FC100-YR 2:00 .67 [REPORT] INPUT NO CONTROLS NO SUBCATCHMENTS ALL NODES ALL LINKS ALL SWMM 5.1 Page 3 PONDA 4.8 3719.24 PONDA 5 3801.9 PONDA 5.2 3885.54 PONDA 5.4 3970.3 PONDA 5.6 4059.01 SWMM 5.1 Page 2 OUT1 5013 FREE NO [STORAGE] ;; Invert Max. Init. Shape Shape Ponded Evap. SWMM 5.1 Page 1 Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 Discharge (cfs) Stage (ft) Stage - Discharge Curves Weir Flow Orifice Flow Q = 3 . 0 P H 1 . 5 Q = 0 . 67 A ( 2 gH ) 0 . 5 (Figure MD-21) Rectangular Pipe (Figure MD-22) Spec Width of Riprap (ft) 2*d50, Depth of Riprap (ft) for L/2 Froude Parameter Q/D2.5 Max 6.0 or Q/WH1.5 Max 8.0 Riprap Type (From Figure MD-21 or MD-22) Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Q = C f ( C )( i )( A ) 8/15/2016 8:49 AM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Proposed_Rational_Calcs.xlsx\Runoff 5 A6 No 0.86 0.86 1.00 95 4.21% 2.7 2.7 1.1 110 1.73% 2.63 0.7 5.0 5.0 5.0 6 A7 No 0.25 0.25 0.31 N/A N/A N/A N/A N/A N/A N/A 5.0 5.0 5.0 TOTAL BASIN A TOTAL BASIN A 15.6 15.6 14.1 7 B1 No 0.61 0.61 0.77 202 5.94% 7.2 7.2 4.9 N/A N/A N/A 7.2 7.2 5.0 8 B2 No 0.95 0.95 1.00 70 17.14% 0.9 0.9 0.6 N/A N/A N/A 5.0 5.0 5.0 9 B3 No 0.86 0.86 1.00 174 5.40% 3.3 3.3 1.4 16 3.13% 3.54 0.1 5.0 5.0 5.0 10 B4 No 0.85 0.85 1.00 138 5.22% 3.1 3.1 1.3 N/A N/A N/A 5.0 5.0 5.0 11 B5 No 0.28 0.28 0.35 179 2.07% 16.1 16.1 14.7 N/A N/A N/A 16.1 16.1 14.7 TOTAL BASIN B TOTAL BASIN B 16.1 16.1 14.7 13 UD2 No 0.33 0.33 0.41 47 4.26% 6.1 6.1 5.4 965 2.07% 2.88 5.6 11.7 11.7 11.0 13 UD3 No 0.35 0.35 0.44 47 4.26% 5.9 5.9 5.2 882 2.27% 3.01 4.9 10.8 10.8 10.1 13 UD4 No 0.73 0.73 0.91 17 4.71% 1.7 1.7 0.9 440 1.93% 2.78 2.6 5.0 5.0 5.0 TOTAL BASIN UD2-UD4 TOTAL BASIN UD2-UD4 11.7 11.7 11.0 12 UD1 No 0.25 0.25 0.31 21 7.62% 3.7 3.7 3.4 N/A N/A N/A 5.0 5.0 5.0 12 UD5 No 0.25 0.25 0.31 16 15.00% 2.6 2.6 2.4 N/A N/A N/A 5.0 5.0 5.0 TOTAL SITE TOTAL SITE 16.1 16.1 14.7 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas August 15, 2016 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 8/15/2016 8:48 AM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Proposed_Rational_Calcs.xlsx\Tc A2 0.10 0.00 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.092 0.30 0.30 0.38 7% A3 0.43 0.33 0.08 0.00 0.00 Clayey | Average 2% to 7% 0.018 0.92 0.92 1.00 94% A4 0.22 0.14 0.05 0.00 0.00 Clayey | Average 2% to 7% 0.026 0.87 0.87 1.00 86% A5 0.10 0.00 0.09 0.00 0.00 Clayey | Average 2% to 7% 0.010 0.88 0.88 1.00 81% A6 0.18 0.13 0.03 0.00 0.00 Clayey | Average 2% to 7% 0.023 0.86 0.86 1.00 86% A7 0.16 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.155 0.25 0.25 0.31 0% TOTAL BASIN A 1.74 0.61 0.27 0.00 0.54 Clayey | Average 2% to 7% 0.324 0.82 0.82 1.00 77% B1 0.32 0.12 0.05 0.00 0.00 Clayey | Average 2% to 7% 0.156 0.61 0.61 0.77 50% B2 0.27 0.00 0.00 0.00 0.27 Clayey | Average 2% to 7% 0.000 0.95 0.95 1.00 90% B3 0.11 0.04 0.05 0.00 0.00 Clayey | Average 2% to 7% 0.013 0.86 0.86 1.00 83% B4 0.11 0.07 0.03 0.00 0.00 Clayey | Average 2% to 7% 0.015 0.85 0.85 1.00 84% B5 0.24 0.00 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.231 0.28 0.28 0.35 4% TOTAL BASIN B 1.05 0.23 0.14 0.00 0.27 Clayey | Average 2% to 7% 0.415 0.67 0.67 0.84 57% UD2 0.04 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.036 0.33 0.33 0.41 10% UD3 0.10 0.00 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.083 0.35 0.35 0.44 13% UD4 0.30 0.14 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.097 0.73 0.73 0.91 66% TOTAL BASIN UD2-UD4 0.44 0.14 0.09 0.00 0.00 Clayey | Average 2% to 7% 0.216 0.61 0.61 0.76 49% UD1 0.03 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.026 0.25 0.25 0.31 0% UD5 0.03 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.028 0.25 0.25 0.31 0% TOTAL SITE 3.29 0.97 0.49 0.00 0.81 Clayey | Average 2% to 7% 1.010 0.74 0.74 0.92 65% Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 8/15/2016 8:48 AM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Proposed_Rational_Calcs.xlsx\Composite C March 29, 2016 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 3/29/2016 12:08 PM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Existing_Rational_Calcs.xlsx\Tc H2 3.04 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 3.038 0.25 0.25 0.31 0% TOTAL SITE 3.27 0.17 0.03 0.00 0.00 Clayey | Average 2% to 7% 3.067 0.29 0.29 0.37 6% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 3/29/2016 12:08 PM D:\Projects\1174-001\Drainage\Hydrology\1174-001_Existing_Rational_Calcs.xlsx\Composite C