Loading...
HomeMy WebLinkAboutVILLAGE ON HORSETOOTH (AFFORDABLE HOUSING) - PDP - PDP160025 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR VILLAGE ON HORSETOOTH AT 1506 W. HORSETOOTH ROAD FORT COLLINS, CO 80526 PREPARED FOR FORT COLLINS HOUSING AUTHORITY Fort Collins, CO 80521 AUGUST 17, 2016 Fort Collins Housing Authority - Village on Horsetooth Page 1 of 14 TABLE OF CONTENTS SITE LOCATION AND DESCRIPTION ......................................................................................... 4 DRAINAGE BASINS AND HISTORIC RUNOFF ............................................................................. 5 HISTORIC DRAINAGE ......................................................................................................... 5 DRAINAGE DESIGN CRITERIA ................................................................................................ 5 HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES ................................................... 5 HYDRAULIC CRITERIA ........................................................................................................ 5 VARIANCES FROM THE CRITERIA ............................................................................................ 6 DRAINAGE FACILITY DESIGN ................................................................................................. 6 GENERAL CONCEPT ......................................................................................................... 6 PROPOSED DEVELOPED SUBBASINS .................................................................................... 6 PROPOSED DETENTION POND ........................................................................................... 8 HISTORIC/DEVELOPED BASIN COMPARISON ....................................................................... 9 STORMWATER POLLUTION PREVENTION/EROSION CONTROL .................................................... 9 TEMPORARY EROSION CONTROL ....................................................................................... 9 PERMANENT EROSION CONTROL ....................................................................................... 9 STORMWATER MANAGEMENT CONTROLS ............................................................................ 10 SEQUENCE OF CONSTRUCTION ACTIVITIES ............................................................................ 12 CONCLUSIONS .................................................................................................................. 13 REFERENCES ...................................................................................................................... 14 LIST OF TABLES TABLE 1. HISTORIC SWMM BASIN PROPERTIES AND FLOWS ........................................................ 5 TABLE 2. DEVELOPED SWMM SUBBASIN PROPERTIES, FLOWS, AND RUNOFF COEFFICIENTS ............ 8 Fort Collins Housing Authority - Village on Horsetooth Page 2 of 14 APPENDICES Appendix A – Figures 1. Site Vicinity Map 2. Historic Drainage Map 3. Developed Drainage Map Appendix B – Hydraulic/Hydrologic Computations 1. Historic C, Tc, and Runoff Calculations 2. Developed C, Tc, and Runoff Calculations 3. WQCV Calculations 4. Pond Volume Calculations Appendix C – Referenced Documents 1. FEMA FIRM Map 2. Geotechnical Report – Summary of Conclusions by CTL Thompson INC 3. USDA NRCS Web Soil Survey Map and Soil Description 4. USDA National Wetlands Inventory Wetlands Map 5. City of Fort Collins Foothills Basin Master Plan WQ Conceptual Alternatives Map Fort Collins Housing Authority - Village on Horsetooth Page 3 of 14 ENGINEER’S STATEMENT: “I hereby certify that this report (plan) for the Preliminary Drainage Design for the Fort Collins Housing Authority Village on Horsetooth was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Standards for the Responsible Parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others.” ______________________________ Charles R. Hager, IV, P.E. Registered Professional Engineer State of Colorado No. 37146 Fort Collins Housing Authority - Village on Horsetooth Page 4 of 14 SITE LOCATION AND DESCRIPTION The Village on Horsetooth (site) is being developed by the Fort Collins Housing Authority and is located in Southeast Quarter of Section 27, Township 7 North, Range 69 West of the 6 th Principal Meridian, in Larimer County, Fort Collins, Colorado. Refer to Appendix A, Figure 1, for the site vicinity map. Horsetooth Road (Horsetooth) to the south, Pleasant Valley and Lake Canal (Canal) to the east, and residential subdivisions to the north and west border the property. There is open space and residential housing to the west. The site is located in the Foothills Stormwater Basin. The Foothill basin drains west to east through open channels and storm sewer that discharges into the Fossil Creek Reservoir Inlet Ditch. The Foothills Basin Master Plan Water Quality Conceptual Alternatives Map, provided by the City of Fort Collins, shows that the site is required to provide flood control and water quality; the map is attached in Appendix C. The current site is approximately 8.3 acres of partially developed land with an existing house and horse stable, arena and grazing open space area with a total percent impervious of 14.9%. The site historically generally drains to the east towards and into the Canal via overland flow with slopes ranging from 0.2% to 8.0%. The north half of Horsetooth bordering the site drains to the north onto the site and into the Canal. From the geotechnical report dated July 19, 2016, the soil is mainly sandy clay and clayey sand with no bedrock encountered in the borings. Ground water was located 19 to 22 feet below ground surface and did not drastically change several days after drilling. A soil map created using the USDA Natural Resources Conservation Service Web Soil Survey identifies the site’s soil as Altvan-Satanta Loams, which is in the hydrologic soil group B with infiltration rates ranging from 0.6 to 2 inches/hour. A summary of the conclusions of the geotechnical report and the web soil survey results are provided in Appendix C. According to the FEMA Flood Insurance Rate Map Panel Number 08069C0986G dated 05/02/2012, the site is located outside of the 100-year floodplain area. The map panel is attached in Appendix C. The proposed site construction includes the demolition of the existing home, horse stables and arena, gravel roadway and the construction of 9 new multi-unit residential buildings and clubhouse building with surrounding asphalt parking areas, playground and grass fields, sidewalks, water quality controls and detention pond. The site development will increase the overall percent impervious to 51.1%. The proposed developed cannot drain or discharge into the Canal and must tie into the City of Fort Collins (City) storm sewer system located in Horsetooth which eventually drains to Fossil Creek Reservoir Inlet Ditch. Storm valley gutters, area inlets, under drains, curb cuts, chases, channels and culverts are located throughout the site to capture and convey runoff to the detention pond. The main purpose of this study is to analyze the existing and developed drainage patterns in order to convey stormwater into the Horsetooth storm sewer system without causing adverse effects to the site and surrounding and downstream properties. The proposed scope of work will include new storm piping, valley gutters, curb cuts, and site grading to accommodate an infiltration basin, on-site water quality and detention pond, and piping to the existing Horsetooth storm system. An outlet structure and pipe with a restrictor plate will be installed in the pond to control the water quality release rate and the 100-year storm outflow rate to the calculated 2-year historical runoff Fort Collins Housing Authority - Village on Horsetooth Page 5 of 14 rate. A spillway is located along the southeast edge of the pond and will direct flow onto Horsetooth if the outlet structure is ever clogged or not performing correctly. DRAINAGE BASINS AND HISTORIC RUNOFF HISTORIC DRAINAGE The site historically drains to the east towards and into the Pleasant Valley and Lake Canal via overland flow with slopes ranging from 0.2% to 8.0%. Runoff from the north half of Horsetooth bordering the site drains north onto the site and into the Canal. The site consists of a gravel roadway, house, horse stables, arena, and grazing area which have an overall percent impervious of 14.9%. The peak 2-year and 100-year runoff rates are 2.24 cfs and 31.07 cfs, respectively. The historic drainage is outlined below. Design flow calculations and the historical drainage map are provided in Appendix A. Table 1. Historic SWMM Basin Properties and Flows Drainage Basin Design Point Area (acre) % Impervious Q-2 (cfs) Q-100 (cfs) Runoff Coefficient H1 1 8.68 14.9% 2.24 31.07 0.53 Total 8.68 14.9% 2.24 31.07 0.53 DRAINAGE DESIGN CRITERIA HYDROLOGIC METHOD AND DESIGN STORM FREQUENCIES The drainage for the site was designed to meet or exceed the City of Fort Collin’s Standards and Specifications, including the Stormwater Criterial Manual which incorporates most of the Urban Drainage and Flood Control District Criteria Manual (USDCM). The site’s basin percent impervious values were calculated using impervious values from Table 6-3 in the USDCM. The values for the 100-year event rainfall intensity duration for 0 to 60 minutes were taken from Table RA-7 in the City of Fort Collins’ Stormwater Criteria Manual. Equation 5.30 from the USDCM was used to calculate intensities for the 60 to 180 minute time steps. The runoff coefficients were calculated using USDCM’s Table 6-4 equations. HYDRAULIC CRITERIA The proposed drainage facility has been designed to comply with the City of Fort Collins Stormwater Criteria Manual, the Foothills Basin Master Plan design, and UDFCD’s Drainage Criteria Manual. The Foothills Basin Master Plan requires best management practices to have both flood control and water quality. Sizing for inlets and pipes has not been completed at this time, but UD-Inlet Version 3.14, Hydraflow, and Flowmaster will be used for calculations. Preliminary drainage plans are included in the construction documents. The pond volume was calculated using the modified FAA method and includes the 100-year runoff volume plus 100% Fort Collins Housing Authority - Village on Horsetooth Page 6 of 14 of the WQCV and an additional 20% of the 100-year volume as per the City’s stormwater criteria manual. Pond volume and runoff calculations are attached in Appendix B. VARIANCES FROM THE CRITERIA As per the City’s comments dated May 9, 2016, the site is required to discharge the 100-year event at the historical 2-year rate. There is no micropool in the detention basin and due to volume requirements there are no forebays in the pond, but there is an infiltration basin and riprap aprons for velocity dissipation as concentrated runoff enters the pond. DRAINAGE FACILITY DESIGN GENERAL CONCEPT As per the Foothills Basin Master Plan design, the site was graded in an attempt to capture all site runoff to be treated and detained in the extended detention basin located along the east side of the site. The pond has an outlet structure that ties into the City’s existing storm sewer system on the south side of Horsetooth. This connection restricted the design of the site’s detention. Only a portion of the site, 16.5%, was not able to be captured and treated onsite. Furthermore, 84.6% of the site’s modified and added impervious area is captured and treated on site. The offsite flow will drain onto Horsetooth Road and follow existing drainage pathways to the east. There is a small area on the east side of the crushed rock path that represents the west bank and berm of the Pleasant Valley and Lake Canal that will flow to the east, into the Canal, as it does in the historic flow pattern. The open space area in the center of the site will capture most of the runoff from the building roofs via two area inlets and a perforated underdrain pipe/bioswale, then discharge to the detention pond. Due to the site’s soil infiltration rate ranging from 0.6 to 2.0 inches/hour, infiltration is expected to occur within the center area and in the detention pond. Another infiltration basin is located downstream of the north emergency access road culvert. This infiltration basin will treat runoff before it enters the pond through a weir structure. Around the exterior of the buildings, drainage flows away from the buildings and into the parking lot. The parking lot has been designed with curb and gutter, concrete pans, channels, and chases to direct flow to the east and into the detention pond through two curb cuts. The parking lot also acts as part of the detention pond for larger storm events. Vertical curb and gutter will be installed along Horsetooth road to convey flows east along the road, similar to what is occurring to the west and east along Horsetooth. PROPOSED DEVELOPED SUBBASINS The site was delineated into seventeen subbasins, A1-A6, B and R1-R10. Basins A1-A6 and R1- R10 will be captured and treated in the detention basin. Basin B is the offsite basin and will not be treated. Basin A1 will flow through a culvert to the north infiltration pond in basin A6 and then to the detention pond in Basin A5. Basins A2 and A3 will convey flow through the parking lot and become treated in the detention pond through a curb cut and sidewalk chase. Drainage in basin A4 will be collected in inlets and piped to the detention pond. The roof drain basins R1-R6 are assumed to drain into basin A4. Roof drain R7 is assumed to be connected to the storm sewer from A4 to convey to the pond. The basins R8-R10 are to drain North into A3 and then to the detention pond. The developed drainage map is provided in Appendix A. Fort Collins Housing Authority - Village on Horsetooth Page 7 of 14 SUBBASIN DESCRIPTIONS: • Subbasin A1 contains the area to the north west contained mostly landscaped area and a small bike parking area. This area flows around to the east and through a culvert underneath the emergency access to Basin A6. • Subbasin A2 contains the north and east section of the parking lots and the sidewalks and landscape area along the north of the north buildings and east along the east buildings. It also contains the swale between roof basins R2 and R4 and the swale around roof basin R7. Runoff flows around the parking lot with the help of curb and gutter and concrete channel to a curb cut to the detention pond. • Subbasin A3 contains the south and most of the west portions of the parking lot and sidewalk and landscape along the buildings. It also contains the north portion of the access drive from Horsetooth. The basin drains through concrete pans and curb and gutter to the sidewalk chase that flows to the detention pond. • Subbasin A4 contains sidewalk, landscape, playground, and gravel grill areas at the inside of the site. The runoff is collected in two area drains and piped to the detention pond to the south east. • Subbasin A5 contains the landscaped detention pond and the crushed rock path on the east of the site. The runoff is directed to the middle concrete pan which directs flow to the outlet structure. The flow from the outlet structure connects to an existing storm system to the south of Horsetooth. • Subbasin A6 contains the north infiltration pond, a section of crushed rock path, and a section of the emergency access road from Birmingham Drive. The runoff is into the infiltration pond and can overflow to the east into the detention pond. • Subbasin B contains the north half of West Horsetooth Road, sidewalks, landscape areas, and areas to the east of the crushed rock path. The subbasins runoff flow is the only basin that is not captured on-site, and is directed to the east along Horsetooth to an existing inlet and to the east towards the Pleasant Valley and Lake Canal. • Roof Drain Subbasins R1, R2, R3, R4, R5 and R6 are assumed at this time that they will outfall into basin A4 and collected into the area inlets. • Roof Drain Subbasin R7 contains the south east building that is north of the parking lot. This flow is piped into the storm drain system that flows from Subbasin A4 to the detention pond. • Roof Subbasins R8, R9, and R10 contain the south buildings. This flow is assumed to outfall to the north into subbasin A3 and eventually to the detention pond. Fort Collins Housing Authority - Village on Horsetooth Page 8 of 14 Table 2. Developed SWMM Subbasin Properties, Flows, and Runoff Coefficients Drainage Basin Design Point Area (acre) % Impervious Q-2 (cfs) Q-100 (cfs) Runoff Coeff's C100 A1 1 0.35 6.4% 0.04 1.20 0.49 A2 2 1.48 74.1% 1.90 8.22 0.82 A3 3 1.48 70.6% 1.94 8.63 0.80 A4 4 1.10 17.8% 0.37 4.42 0.54 A5 5 1.29 9.2% 0.21 4.51 0.50 A6 6 0.10 17.1% 0.03 0.39 0.54 B 7 1.43 44.6% 1.12 6.61 0.67 R1 8 0.18 90.0% 0.40 1.56 0.90 R2 9 0.18 90.0% 0.40 1.56 0.90 R3 10 0.18 90.0% 0.40 1.56 0.90 R4 11 0.18 90.0% 0.40 1.56 0.90 R5 12 0.11 90.0% 0.24 0.96 0.90 R6 13 0.07 90.0% 0.15 0.60 0.90 R7 14 0.11 90.0% 0.26 1.02 0.90 R8 15 0.18 90.0% 0.40 1.56 0.90 R9 16 0.18 90.0% 0.40 1.56 0.90 R10 17 0.11 90.0% 0.24 0.96 0.90 Total 8.68 51.1% 8.92 46.89 0.70 Total to Pond (No Basin B) 7.25 52.4% 7.81 40.28 0.71 PROPOSED DETENTION POND The detention pond has been designed to capture the 100-year runoff volume, plus 100% of the WQCV and an additional 20% of the 100-year volume and discharge into City’s existing storm sewer system on the south side of Horsetooth Road. Due to the existing grade of the site, of the entire site only 16.5% of the sites area and runoff was not captured and conveyed through sites drainage system and detention pond. A total of 86.4% of the modified and added impervious surface is captured and treated on site. As per the City’s requirement, the 100-year outflow rate from the pond into the City’s system was restricted to the existing 2-year flow rate of 2.24 cfs by the use of a restrictor plate on the outlet pipe. The bottom of the pond is at an elevation of 5105.30 feet and is 3.95 feet deep with a total volume of 3.702 acre-ft. The pond’s overflow spillway is located on the southern edge of the pond and will discharge to Horsetooth if the outlet structure of the pond is ever clogged or malfunctioning. The spillway will be designed to be able to discharge the peak 100-year runoff rate of 40.28 cfs. Access to the pond and outlet can be achieved by entering the pond from the south from Horsetooth along the emergency spillway. The detention pond will act as both flood and water quality control. For the 100-year storm event, the pond will have a maximum water surface elevation of 5108.26 feet, which is a pond volume of approximately 1.80 acre-feet. This allows for 0.99 feet of freeboard to the emergency spillway at an elevation of 5109.25 feet. The maximum pond outflow rate is 2.24 cfs. The outlet pipe will Fort Collins Housing Authority - Village on Horsetooth Page 9 of 14 be a 15 inch reinforce concrete pipe with a restrictor plate placed 0.35 feet above the pipe invert. The WQCV will be treated in two locations within the pond. There is an infiltration basin located on the north portion of the pond and receive water from the drainage swale along the north and west side of the site that treats 752 cf of the WQCV. The infiltration basin will consist of existing soils having an infiltration rate ranging from 0.6-2 inches/hr. Once the infiltration basin fills above an elevation of 5108.0 feet, the water will spill over a concrete weir into the main area of the pond. The remaining required WQCV, 7129 cf, will be achieved in the detention pond. An orifice plate will be installed on the outlet structure to provide a 40hr drawdown time for the WQCV. The water surface elevation of the WQCV is 5106.51 feet and is also the outlet structure rim elevation. HISTORIC/DEVELOPED BASIN COMPARISON The site contains one historical basin that drains to the east into the Pleasant Valley and Lake Canal. The developed site still drains primarily to the east, but instead of draining into the Canal, the runoff is collected and discharged into the Horsetooth storm sewer system. A very small portion of the sites detention pond berm will drain into the Canal. There is also a portion of the site that will drain south onto Horsetooth and not be captured and treated on site. The total peak 100-year offsite runoff rate is 6.61 cfs with the majority draining onto Horsetooth. The existing site has a peak 100-year runoff rate of 31.07 cfs. As required by the City, the pond has a discharge rate of 2.24 cfs into the Horsetooth system, which is equivalent to the historical 2-year peak runoff rate. In the event that the detention ponds outlet pipe is clogged, the pond’s overflow spillway will safely convey flow onto Horsetooth at a peak rate of 40.28 cfs. STORMWATER POLLUTION PREVENTION/EROSION CONTROL TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection provided by the use of erosion control wattles/sediment control logs, inlet protection, vehicle tracking control at access points to the site. All temporary erosion control measures are to be removed after they are deemed unnecessary. Refer to the Erosion Control Plan and Details for the Village on Horsetooth for additional detailed information. PERMANENT EROSION CONTROL Chapter 2 of the Urban Drainage and Flood Control District’s Urban Storm Drainage Criteria Manual Volume 3 (USDCM) provides guidelines for the selection of appropriate permanent structural BMPs for a site that is to be developed or redeveloped. The Village on Horsetooth is best characterized as a “conventional redevelopment” with over 1 acre of impervious area on the project site. The BMP decision tree for such sites is provided in Figure 2-2 of the USDCM. As previously stated, the site and surrounding vicinity is comprised of hydrologic soil group Type B soils, per the NRCS soil survey, with a depth to bedrock of greater than 5 feet. Permanent erosion control measures include, but are not limited to, the constructed detention ponds, riprap pads placed for culvert and flared end section outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. A general erosion control plan has been provided in the construction documents. Fort Collins Housing Authority - Village on Horsetooth Page 10 of 14 STORMWATER MANAGEMENT CONTROLS The Stormwater Management Plan (SWMP) administrator is to be determined. According to the CDPHE Stormwater Fact Sheet – Construction, construction activities produce many different kinds of pollutants which may cause stormwater contamination problems. The main pollutant of concern at construction sites is sediment. Grading activities remove grass, rocks, pavement, and other protective ground covers, resulting in the exposure of underlying soil to the elements. The soil is then easily picked up by wind and/or washed away by rain or snowmelt. In addition, construction activities often require the use of toxic or hazardous materials such as fuel, fertilizers, pesticides, and herbicides, and building materials such as asphalt, sealants, and concrete, which may also pollute stormwater. These materials can be harmful to humans, plants, and aquatic life. There are no known potential pollution sources. However, this condition should be confirmed by the owner/operator or SWMP administrator. Other pollution sources that could be present include: runoff from vehicle washing, vehicle maintenance and/or fueling, There are no known existing non-stormwater components of discharge (i.e., springs, landscape irrigation return flow, etc.), or any anticipated during construction. 1. All Disturbed and Stored Soil: The total disturbed area will be approximately 8.3 acres. Soil stockpiles should be kept below the locally mandated maximum height of 10 feet and surrounded with sediment control devices. If the storage of these soils occurs over a period greater than 30 days, then consider temporarily seeding the soil to minimize soil loss to wind and water erosion. 2. Vehicle Tracking of Sediments: The majority of the existing site is unpaved. A temporary stabilized stone pad (Vehicle Tracking Control pad, VTC) will be provided at points of ingress and egress onto the unpaved area. The VTC is designed to reduce the amount of mud transported onto the public roads by construction traffic. If the site is extraordinarily muddy, then consider designating an area to wash construction vehicles before they leave the site and enter the public right-of-way. A BMP such as this is a good way to avoid the costs associated with street cleaning or accidentally discharging large amounts of sediment into other storm drain systems. When in doubt, choose methods that prevent pollution rather than ones that force clean-up at the downstream end just before the stormwater enters the receiving waters. In other words, the most efficient construction site BMPs are those that prevent erosion from happening. 3. Inlet Protection (IP): gravel inlet protection will be used on all inlets to prevent sediment and debris from entering the storm drain system. Fort Collins Housing Authority - Village on Horsetooth Page 11 of 14 4. Street sweeping will be conducted as necessary to remove sediment tracked on to pavement and adjacent streets. 5. Management of Contaminated Soils: There are no known contaminated soils on site. If contaminated soils are found, the contractor shall report to the SWMP administrator. 6. Loading and Unloading Operations: Loading/unloading activities will occur within the paved area of the site or a temporary gravel staging area will be provided. 7. Outdoor Storage Activities: Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. 8. Vehicle and Equipment Maintenance and Fueling: Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. Spill Management In general, spill prevention and response should include the following: a) Notification procedures to be used in the event of an accident. At the very least, the SWMP Administrator should be notified. Depending on the nature of the spill and the material involved, the Colorado Department of Health, downstream water users, or other agencies may also need to be notified. b) Instructions for clean-up procedures. c) Provisions for absorbents are to be made available for use in fuel areas, and for containers to be available for used absorbents. d) Procedures for properly washing out concrete trucks and other equipment in a manner and location so that the materials and wash water cannot discharge from the site, and never into a storm drain system or stream. 9. Significant Dust or Particulate Generating Processes: Disturbed areas not yet ready to be seeded, landscaped, paved, or otherwise stabilized shall be watered, or ripped as necessary to preclude visible dust emissions. Contractor shall make every effort to minimize particulate emissions from vehicles performing the work, including but not limited to regular maintenance of construction equipment. 10. Routine Maintenance Activates Involving Fertilizer, Pesticides, Detergents, Fuels, Solvents, Oils, Etc: Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. Fort Collins Housing Authority - Village on Horsetooth Page 12 of 14 11. On-site Waste Management Practices (Waste Piles, Liquid Wastes, Dumpsters, etc): Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. The area can be enclosed with temporary fencing and accessed through a gate with a lock. 12. Concrete Truck/Equipment Washing: A concrete washout facility will be provided onsite. Properly wash out concrete trucks and other equipment in a manner and location (a minimum of 50 feet away from any inlet structures) so that the materials and wash water cannot discharge from the site, and never into a storm drain system or stream. 13. Dedicated Asphalt and Concrete Batch Plants: There will be no dedicated batch plant on site. 14. Non-Industrial Waste Source Such as Workers Trash And Portable Toilets: Garbage cans shall be located at break areas and portable toilets shall be provided if onsite bathroom facilities cannot be used. Locate dumpsters and portable toilets away from drainage courses (minimum 50 feet from any inlet structures) and stake down toilets to prevent tipping. 15. Other Areas or Procedures where Potential Spills can Occur: Records of spills, leaks, or overflows that result in the discharge of pollutants must be documented and maintained. Record all spills that are responded to, even if they do not result in a discharge of pollutants. Information that should be recorded for all occurrences includes the time and date, weather conditions, reasons for the spill, etc. Some spills may need to be reported to immediately. Specifically, a release of any chemical, oil, petroleum product, sewage, etc., which may enter waters of the State of Colorado (which include surface water, ground water and dry gullies or storm sewers leading to surface water) must be reported. More guidance is available on the web at www.colorado.gov. The Division’s toll-free 24-hour number for environmental hazards and chemical spills and releases is 1-877-518-5608. SEQUENCE OF CONSTRUCTION ACTIVITIES Construction Start Date (This is the day you expect to begin disturbing soils, including grubbing, stockpiling, excavating, demolition, and grading activities): January 2017 Final Stabilization Date (this is when the site is finally stabilized. This means that all disturbed areas have been either built on, paved, or a uniform vegetative cover reaching over 70% of the initial vegetative density has been established.) Even if you are doing one part of the project, the estimated completion date must be for the overall project: June 2018 Construction Sequencing: (Detailed construction sequencing to be determined by the contractor) Fort Collins Housing Authority - Village on Horsetooth Page 13 of 14 1. Installation of temporary erosion and sediment control measures. This includes all sediment control logs, and inlet protection where land disturbing activities will occur. 2. Sequence of all land disturbing activity. Overlot grading in preparation for pouring of new sidewalks and building foundations will occur early in the construction schedule. Additional land disturbance will occur around the site for utility installation and the construction of the new driveway approach and sidewalk. 3. Drainage facility construction. Construction of the detention pond, storm inlets and piping will occur early in the schedule. 4. Sediment basins, temporary channel stabilization. Sediment control logs or erosion control blankets will be installed on the banks of the vegetated detention pond and swale on the east side of the site. 5. Seeding All disturbed areas will be seeded upon completing of finish grading. Refer to the landscape plans for detailed planting and seeding schedule. 6. Mulching. Spread straw mulch uniformly over seeded areas at a rate of 90 lbs per 1000 square feet of ground. No more than 25% of the ground should be visible. Crimp or pinch mulch into soil 2-4 inches by using either a mulch anchoring tool, a farm disk operating on the contour of the slope, or by cleating with bulldozer tracks operating up and down the slopes (to prevent tracks from forming gullies). 7. Required maintenance activities (e.g. after-storm checks of all BMPs, etc.). All temporary sediment control BMPs shall be inspected after each rain event to ensure proper protection and to determine if cleaning is necessary. Final cleaning of all storm facilities shall be provided upon final stabilization of site. CONCLUSIONS This Preliminary Drainage and Erosion Control Report for the Fort Collins Housing Authority Village on Horsetooth has been prepared to comply with the stormwater criteria set by the UDFCD and the City of Fort Collins. The proposed drainage system presented in this report is designed to convey the 100-year peak stormwater runoff through the site to the proposed detention pond. Through calculations and review of the proposed storm drain system, there appears to be adequate capacity to convey the proposed flows. This report also proposes best management practices for erosion control, permanent landscaping, riprap, and on-site construction facilities. It can therefore be concluded that development of the detention pond complies with all of the stormwater jurisdictional criteria and will not adversely affect the existing streets, storm drain system and/or detention/water quality facilities. Fort Collins Housing Authority - Village on Horsetooth Page 14 of 14 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, January 2016. 2. City of Fort Collins Stormwater Criteria Manual, City of Fort Collins, December 2013. 3. “Geotechnical Investigation FCHA Village At Horsetooth 1506 West Horsetooth Road Fort Collins, Colorado”, CTL Thompson Incorporated, Dated July 19, 2016. 4. City of Fort Collins Foothills Basin Master Plan, Retrieved from http://www.fcgov.com/ utilities/what-we-do/stormwater/drainage-basins/foothills-basin on August 8, 2016. APPENDIX A – FIGURES 1. Site Vicinity Map 2. Historic Drainage Map 3. Developed Drainage Map S. TAFT HILL RD S. SHIELDS STREET W. DRAKE RD W. HORSETOOTH RD HARMONY RD JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 Phone: 970.225.9099 Fax: 970.225.6963 E-mail: info@jvajva.com CONSULTING ENGINEERS VILLAGE ON HORSETOOTH PROJECT SHEET NUMBER C JVA, INC DATE: JOB NUMBER: CHECKED BY: DRAWN BY: DESIGNED BY: NO. DATE DRAWN DESIGNED REVISION / ISSUE DESCRIPTION JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 E-mail: info@jvajva.com Phone: 970.225.9099 Fax: 970.225.6963 CONSULTING ENGINEERS FCHA - VILLAGE ON HORSETOOTH 2595c 08/17/2016 HISTORIC DRAINAGE MAP EJK EJK CRH FIG 2 SHEET NUMBER C JVA, INC DATE: JOB NUMBER: CHECKED BY: DRAWN BY: DESIGNED BY: NO. DATE DRAWN DESIGNED REVISION / ISSUE DESCRIPTION JVA, Incorporated 25 Old Town Square Suite 200 Fort Collins, CO 80524 E-mail: info@jvajva.com Phone: 970.225.9099 Fax: 970.225.6963 CONSULTING ENGINEERS VILLAGE ON HORSETOOTH 2595c 08/17/2016 DEVELOPED DRAINAGE MAP EJK EJK CRH FIG 3 APPENDIX B – HYDRAULIC/HYDROLOGIC COMPUTATIONS 1. Historic C, Tc, and Runoff Calculations 2. Developed C, Tc, and Runoff Calculations 3. WQCV Calculations 4. Pond Volume Calculations JVA Incorporated JVA Office: 25 Old Town Square, S 200 Fort Collins Fort Collins, CO 80524 Ph: (970) 225 9099 Version 2016_XT: 6/30/2016 Project Information: Job Name: Village On Horsetooth Job Number: 2595c Date: 8/17/2016 Designed by: EJK/LAT Municipality : Fort_Collins Soil Type: B Runoff Calculations: Minor Design Storm: 2 year Major Design Storm: 100 year Detention Calculations: Minor Storm Detention: 2 year plus 100 % WQCV Major Storm Detention: 100 year plus 100 % WQCV Detention Volume by: ≤5ac FAA >5ac FAA+20% Enter WQCV : 7,881 cf (GB, PP, PLD, SFB, EDB,etc.) Allowable Release Rates (if applicable): Max release rate 1 cfs / acre? No Site Area: 8.68 acres Enter Offsite flows to bypass site (these will be added to the allowable release rates) Q2 = 0.00 cfs (bypass flows) Q2allow= 2.24 cfs Q100 = 0.00 cfs (bypass flows) Q100allow = 2.24 cfs Rainfall Data Information: Enter City, Town, or County: Fort_Collins Frequency of Design Event Do you need to Calc P1? No 2 yr 0.82 in 5 yr 1.14 in 10 yr 1.40 in 100 yr 2.86 in Runoff Coefficient Calculations: Use UDFCD Equations? Yes Intensity Duration Values: I-D-F FortCollinsIDF One Hour Point Rainfall P1 2595c - Rational Calculations.xlsx INTRO Page 1 of 1 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Historic Runoff Coefficient & Time of Concentration Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) tc Comp tc Final Basin Name Design Point Apaved streets (sf) Adrives/co nc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface K Velocity (fps) tt JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Composite Runoff Coefficient Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B C Value calculated from UDFCDCM Chapter 6 Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%) C2 C5 C10 C100 A1 1 766 14,465 15,231 0.35 6.4% 0.06 0.06 0.18 0.49 A2 2 32,708 16,154 633 14,973 64,468 1.48 74.1% 0.66 0.69 0.73 0.82 A3 3 28,329 18,726 17,446 64,501 1.48 70.6% 0.63 0.66 0.70 0.80 A4 4 7,835 1,804 38,340 47,979 1.10 17.8% 0.16 0.17 0.27 0.54 A5 5 3,281 3,082 49,937 56,300 1.29 9.2% 0.08 0.09 0.20 0.50 A6 6 496 557 3,237 4,290 0.10 17.1% 0.15 0.16 0.26 0.54 B 7 20,961 6,663 110 34,340 62,074 1.43 44.6% 0.40 0.41 0.49 0.67 R1 8 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R2 9 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R3 10 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R4 11 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R5 12 4,673 4,673 0.11 90.0% 0.80 0.84 0.85 0.90 R6 13 2,917 2,917 0.07 90.0% 0.80 0.84 0.85 0.90 R7 14 4,987 4,987 0.11 90.0% 0.80 0.84 0.85 0.90 R8 15 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R9 16 7,641 7,641 0.18 90.0% 0.80 0.84 0.85 0.90 R10 17 4,673 4,673 0.11 90.0% 0.80 0.84 0.85 0.90 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Time of Concentration Calculations Location: Fort_Collins Minor Design Storm: 2 Major Design Storm: 100 Soil Type: B Sub-Basin Data tc Comp tc Final Basin Name Design Point ATotal (ac) C5 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%) Type of Land Surface Cv Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc =(L/180)+ 10 (min) Min tc A1 1 0.35 0.06 160 1.3% 22.1 275 0.9% Grassed waterway 15 1.4 3.2 25.4 435 12.4 12.4 A2 2 1.48 0.69 59 3.0% 4.0 843 0.5% Paved areas & shallow paved swales 20 1.5 9.6 13.6 902 15.0 13.6 A3 3 1.48 0.66 40 4.6% 3.1 701 0.5% Paved areas & shallow paved swales 20 1.4 8.4 11.5 741 14.1 11.5 A4 4 1.10 0.17 89 1.9% 13.0 97 1.9% Grassed waterway 15 2.0 0.8 13.8 186 11.0 11.0 A5 5 1.29 0.09 60 1.2% 13.6 430 0.5% JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Developed Storm Runoff Calculations Design Storm : 100 Year Point Hour Rainfall (P1) : 2.86 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes A1 1 0.35 0.49 12.40 0.17 7.06 1.20 12.40 0.17 7.06 1.20 A2 2 1.48 0.82 13.60 1.21 6.79 8.22 13.60 1.21 6.79 8.22 A3 3 1.48 0.80 11.50 1.18 7.29 8.63 11.50 1.18 7.29 8.63 A4 4 1.10 0.54 11.00 0.60 7.42 4.42 11.00 0.60 7.42 4.42 A5 5 1.29 0.50 12.70 0.65 6.99 4.51 12.70 0.65 6.99 4.51 A6 6 0.10 0.54 11.00 0.05 7.42 0.39 11.00 0.05 7.42 0.39 B 7 1.43 0.67 13.10 0.96 6.90 6.61 13.10 0.96 6.90 6.61 R1 8 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R2 9 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R3 10 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R4 11 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R5 12 0.11 0.90 5.00 0.10 9.95 0.96 5.00 0.10 9.95 0.96 R6 13 0.07 0.90 5.00 0.06 9.95 0.60 5.00 0.06 9.95 0.60 R7 14 0.11 0.90 5.00 0.10 9.95 1.02 5.00 0.10 9.95 1.02 R8 15 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R9 16 0.18 0.90 5.00 0.16 9.95 1.56 5.00 0.16 9.95 1.56 R10 17 0.11 0.90 5.00 0.10 9.95 0.96 5.00 0.10 9.95 0.96 Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 2595c - Rational Calculations.xlsx Q100 Page 1 of 1 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Developed Storm Runoff Calculations Design Storm : 2 Year Point Hour Rainfall (P1) : 0.82 Basin Name Design Point Area (ac) Runoff Coeff tc (min) C*A (ac) I (in/hr) Q (cfs) Total tc (min) ΣC*A (ac) I (in/hr) Q (cfs) Inlet Type Q intercepted Q carryover Q bypass Pipe Size (in) or equivalent Pipe Material Slope (%) Pipe Flow (cfs) Max Pipe Capacity (cfs) Length (ft) Velocity (fps) tt (min) Total Time (min) Notes A1 1 0.35 0.06 12.40 0.02 2.02 0.04 12.40 0.02 2.02 0.04 A2 2 1.48 0.66 13.60 0.98 1.94 1.90 13.60 0.98 1.94 1.90 A3 3 1.48 0.63 11.50 0.93 2.09 1.94 11.50 0.93 2.09 1.94 A4 4 1.10 0.16 11.00 0.17 2.13 0.37 11.00 0.17 2.13 0.37 A5 5 1.29 0.08 12.70 0.11 2.00 0.21 12.70 0.11 2.00 0.21 A6 6 0.10 0.15 11.00 0.01 2.13 0.03 11.00 0.01 2.13 0.03 B 7 1.43 0.40 13.10 0.57 1.97 1.12 13.10 0.57 1.97 1.12 R1 8 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R2 9 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R3 10 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R4 11 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R5 12 0.11 0.80 5.00 0.09 2.85 0.24 5.00 0.09 2.85 0.24 R6 13 0.07 0.80 5.00 0.05 2.85 0.15 5.00 0.05 2.85 0.15 R7 14 0.11 0.80 5.00 0.09 2.85 0.26 5.00 0.09 2.85 0.26 R8 15 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R9 16 0.18 0.80 5.00 0.14 2.85 0.40 5.00 0.14 2.85 0.40 R10 17 0.11 0.80 5.00 0.09 2.85 0.24 5.00 0.09 2.85 0.24 Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 2595c - Rational Calculations.xlsx Q Minor Page 1 of 1 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 42599 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Water Quality Capture Volume (WQCV) Calculations (UDFCD Volume 3 Chapter 3) Infiltration Rate and Volume Location: Fort_Collins Major Design Storm: 100 Soil Type: B WQCV=a((0.91I3)-(1.19I2)+(0.78I)) Where: WQCV = Water Quality Capture Volume (watershed inches) a = Drain Time Coefficient (see table below ) I = Imperviousness (%/100) Drainage Time (hrs) Coefficient, a 12 0.8 24 0.9 40 1.00 WQCV North Basin: Max Rate: 2 in/hr a= 1.00 Min Rate: 0.6 in/hr I= 0.511 %/100 Depth in Pond: 1.21 ft WQCV= 0.209 watershed inches WQCV Area in Pond at Depth: 5,912 ft2 Drawdown time: 40 hr Vrequired=1.2*(WQCV/12)*A*43560 WQCV in EDB*: 7,129 ft3 MIN Infiltration in WQCV Area per hour: 296 ft3/hr WQCV= 0.209 watershed inches MIN Infiltration in WQCV Area during DD time: 11,823 ft3 A = 8.68 acre *752 ft3 in North Infiltration Basin Vrequired = 7881 cf Vrequired = 0.181 acre-ft Infiltration Rate from Websoil Survey Report Soil can infiltrate all of WQCV in 40 hour drawdown time JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Detention Pond Volume Calculations: FAA Procedure Based on FAA Procedure, per Federal Aviation Agency "Airport Drainage" Manual Drainage Basin A Design Storm 2 year Composite "C" Factor 0.47 Time of Concentration Tc 13.30 min Basin Size 7.25 acre Release Rate Calculations Allowable Release Rate for Site 2.24 cfs (Historic Flows for Basin H1) Less Undetained Offsite Flows - 0.00 cfs Allowable Release Rate for Pond 2.24 cfs Rainfall Intensity Calculations Point Hour Rainfall (P1) : 0.82 C1= 28.5 Rainfall Intensity: FortCollinsIDF C2= 10 I= C1*P1/(C2+T0)^C3 C3= 0.789 Volume Calculations Inflow Volume = C * I * A * time (sec) Outflow Volume = Alowable Release Rate * time (sec) Storage Volume = Inflow Volume - Outflow Volume Time t (min) Intensity I (in/hr) Inflow Vin (ft3) Outflow Adjustment Factor m Average Outflow (cfs) Outflow Vout (ft3) Storage Vstor (ft3) 5.0 2.85 2,892 1.00 2.24 672 2,220 10.0 2.21 4,485 1.00 2.24 1,344 3,141 15.0 1.87 5,693 0.94 2.11 1,902 3,791 20.0 1.61 6,535 0.83 1.87 2,238 4,297 25.0 1.43 7,256 0.77 1.72 2,574 4,681 30.0 1.30 7,915 0.72 1.62 2,910 5,005 35.0 1.17 8,325 0.69 1.55 3,246 5,079 40.0 1.07 8,703 0.67 1.49 3,582 5,120 45.0 0.99 9,060 0.65 1.45 3,919 5,141 50.0 0.92 9,356 0.63 1.42 4,255 5,101 55.0 0.87 9,722 0.62 1.39 4,591 5,132 60.0 0.82 9,985 0.61 1.37 4,927 5,059 65.0 0.77 10,222 0.60 1.35 5,263 4,959 Intensity Equation 70.0 0.74 10,462 0.60 1.33 5,599 4,863 75.0 0.70 10,686 0.59 1.32 5,935 4,751 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT Village On Horsetooth Detention Pond Volume Calculations: FAA Procedure Based on FAA Procedure, per Federal Aviation Agency "Airport Drainage" Manual Drainage Basin A Design Storm 100 year Composite "C" Factor 0.71 Time of Concentration Tc 13.30 min Basin Size 7.25 acre Release Rate Calculations Allowable Release Rate for Site 2.24 cfs (Historic Flows for Basin H1) Less Undetained Offsite Flows - 0.00 cfs Allowable Release Rate for Pond 2.24 cfs Rainfall Intensity Calculations Point Hour Rainfall (P1) : 2.86 C1= 28.5 Rainfall Intensity: FortCollinsIDF C2= 10 I= C1*P1/(C2+T0)^C3 C3= 0.789 Volume Calculations Inflow Volume = C * I * A * time (sec) Outflow Volume = Alowable Release Rate * time (sec) Storage Volume = Inflow Volume - Outflow Volume Time t (min) Intensity I (in/hr) Inflow Vin (ft3) Outflow Adjustment Factor m Average Outflow (cfs) Outflow Vout (ft3) Storage Vstor (ft3) 5.0 9.95 15,386 1.00 2.24 672 14,714 10.0 7.72 23,875 1.00 2.24 1,344 22,531 15.0 6.52 30,246 0.94 2.11 1,902 28,344 20.0 5.60 34,637 0.83 1.87 2,238 32,399 25.0 4.98 38,503 0.77 1.72 2,574 35,929 30.0 4.52 41,936 0.72 1.62 2,910 39,026 35.0 4.09 44,249 0.69 1.55 3,246 41,003 40.0 3.75 46,340 0.67 1.49 3,582 42,757 45.0 3.47 48,222 0.65 1.45 3,919 44,303 50.0 3.23 50,008 0.63 1.42 4,255 45,753 55.0 3.03 51,607 0.62 1.39 4,591 47,016 60.0 2.86 53,069 0.61 1.37 4,927 48,143 65.0 2.70 54,328 0.60 1.35 5,263 49,066 Intensity Equation 70.0 2.57 55,603 0.60 1.33 5,599 50,004 75.0 2.45 56,792 0.59 1.32 5,935 50,857 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT POND VOLUME CALCULATIONS - STAGE / STORAGE Pond Volume = Prismoidal Formula Volume Equation = (A1+A2+SQRT(A1*A2)*D/3 WEIGHTED INCREMENTAL CUMMULATIVE ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME ft ft ft 2 ft 2 ft 3 ft 3 5105.3 146 0 5105.5 0.2 587 367 68 68 5106.0 0.5 7,191 3,889 1,639 1,707 5106.5 0.5 14,358 10,775 5,285 6,992 5107.0 0.5 32,759 23,559 11,467 18,460 5107.5 0.5 41,632 37,196 18,553 37,013 5108.0 0.5 56,078 48,855 24,338 61,351 5108.5 0.5 74,177 65,128 32,458 93,810 5109.0 0.5 95,777 84,977 42,374 136,183 5109.25 0.3 104,838 100,308 25,068 161,252 Top of Pond 5109.25 3.95 161,252 cf 3.702 ac-ft Required Volume (ft 3 ) Required Volume (ac-ft) Water Surface Elevation Water Depth WQCV 7,129 cf 0.164 ac-ft 5106.51 ft 1.21 ft V2 + 100% WQCV 13,299 cf 0.305 ac-ft 5106.77 ft 1.47 ft V100 + 100% WQCV 78,246 cf 1.796 ac-ft 5108.26 ft 2.96 ft V2 + 100% WQCV V100 + 100% WQCV Vol Elev Vol Elev Vol Elev 6992.16 5106.50 6992.16 5106.50 61351.11 5108.00 7129.46 5106.51 13298.95 5106.77 78245.76 5108.26 18459.60 5107.00 18459.60 5107.00 93809.57 5108.50 North Infiltration Basin WEIGHTED INCREMENTAL CUMMULATIVE ELEVATION DEPTH (D) AREA (A1) AVG AREA (A2) VOLUME VOLUME ft ft ft 2 ft 2 ft 3 ft 3 5107.0 65 0 5107.25 0.25 337 201 46 46 5107.50 0.25 729 533 130 176 5107.75 0.25 1,151 940 233 409 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT 0 Top of Pond 161,252 cf 5109.25 WQCV 7,129 cf 5106.51 ft V2 + 100% WQCV 13,299 cf 5106.77 ft V100 + 100% WQCV 78,246 cf 5108.26 ft 5105.0 5105.5 5106.0 5106.5 5107.0 5107.5 5108.0 5108.5 5109.0 5109.5 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 WATER SURFACE ELEVATION (FEET ABOVE MSL) POND VOLUME (CF) STAGE VS. STORAGE Water Quality Detention Pond 2595c - Rational Calculations.xlsx Vol Pond Page 2 of 2 JVA Incorporated Job Name: Village On Horsetooth 25 Old Town Square, S 200 Job Number: 2595c Fort Collins, CO 80524 Date: 8/17/16 Ph: (970) 225 9099 By: EJK/LAT ORIFICE PLATE AT OUTLET PIPE WORKSHEET Orifice Plate using Headwater above opening and Q=cA(2gH)^.5 C= 0.65 QMAJOR allowable release rate: 2.24 cfs Summary of Available Pipe Releases 100-yr Water Surface Elev: 5108.26 ft Pipe Dia Area Head H Q Inv Elev at Outlet Struct: 5105.20 ft Outfall Pipe at centroid avail out Outlet Pipe at Structure: 15 in (in) (sf) (ft) (cfs) 12 0.79 2.56 6.55 15 1.23 2.44 9.98 18 1.77 2.31 14.00 24 3.14 2.06 23.51 30 4.91 1.81 34.43 36 7.07 1.56 46.03 Q=cA(2gH)^.5 C= 0.65 Iteration process Q 2.24 cfs c 0.65 Hhead 2.44 ft Needed Area 0.28 sf Using Area- determine Ao 0.28 sf Apipe 1.23 sf theta 4.056 rad Ao-calced 0.28 sf m -0.28 ft distance above(+) or below(-) center H 0.35 ft Height above pipe invert                    +          APPENDIX C – REFERENCED DOCUMENTS 1. FEMA FIRM Map 2. Geotechnical Report – Summary of Conclusions by CTL Thompson INC 3. USDA NRCS Web Soil Survey Map and Soil Description 4. USDA National Wetlands Inventory Wetlands Map 5. City of Fort Collins Foothills Basin Master Plan WQ Conceptual Alternatives Map 400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 GEOTECHNICAL INVESTIGATION FCHA VILLAGE AT HORSETOOTH 1506 WEST HORESTOOTH ROAD FORT COLLINS, COLORADO FORT COLLINS HOUSING AUTHORITY 1715 West Mountain Avenue Fort Collins, Colorado 80521 Attention: Kristin Fritz, AICP Project No. FC07464-120 July 19, 2016 FORT COLLINS HOUSING AUTHORITY VILLAGE AT HORSETOOTH CTL | T PROJECT NO. FC07464-120 1 SCOPE This report presents the results of our Geotechnical Investigation for the proposed FCHA Village at Horsetooth in Fort Collins, Colorado. The purpose of the investigation was to evaluate the subsurface conditions and provide founda- tion recommendations and geotechnical design criteria for the project. The report was prepared from data developed during field exploration, la- boratory testing, engineering analysis and experience with similar conditions. The report includes a description of subsurface conditions found in our explorato- ry borings and discussions of site development as influenced by geotechnical considerations. Our opinions and recommendations regarding design criteria and construction details for site development, foundations, floor systems, slabs- on-grade, lateral earth loads, pavements and drainage are provided. If the pro- posed construction changes, we should be requested to review our recommen- dations. Our conclusions are summarized in the following paragraphs. SUMMARY OF CONCLUSIONS 1. Soils encountered in our borings consisted of interlayered sandy clay and clayey sand to the depths explored. Based on laboratory testing, the soils are generally non-expansive to low-swelling. No bedrock was encountered in our borings. 2. Groundwater was encountered at depths of 19 to 23 feet during drilling and was measured several days after drilling at depths of 19 to 22 feet. Existing groundwater levels are not expected to signifi- cantly affect the proposed construction. 3. We believe the proposed structures can be constructed on a spread footing foundation placed on natural, undisturbed soil and/or properly compacted fill. Foundation design and construction rec- ommendations are presented in this report. FORT COLLINS HOUSING AUTHORITY VILLAGE AT HORSETOOTH CTL | T PROJECT NO. FC07464-120 2 4. We believe slab-on-grade floors are appropriate for this site. Some movement of slab-on-grade floors should be anticipated. We ex- pect movements will be minor, on the order of 1 inch or less. If movement cannot be tolerated, structural floors should be consid- ered. 5. Pavement subgrade at this site will generally consist of A-4 and A- 2-4 materials according to AASHTO criteria, with expected poor to good subgrade support. Recommended section thicknesses and pavement materials are provided in this report. SITE CONDITIONS AND PROPOSED CONSTRUCTION The area of proposed development is on the north side of Horsetooth Road east of Big Ben Drive in Fort Collins, Colorado. An existing residence with horse stalls and associated pasture areas were located on site at the time of our investigation. The ground surface is generally flat; vegetation consisted of natural grasses, weeds and trees. A ditch runs along the eastern boundary of the proper- ty. We understand that the proposed construction will consist of nine apart- ment buildings having 96 units, a club house, and associated paved parking are- as and access drives. No below grade areas are planned. INVESTIGATION Subsurface conditions were investigated by drilling thirteen exploratory borings to depths of approximately 20 to 30 feet. Our representative observed drilling operations, logged the soil found in the borings, and obtained samples. Groundwater measurements were taken during and several days after drilling. Summary logs of the borings, including results of field penetration resistance tests, are presented on Figures 2 and 3. Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 1 of 3 4487500 4487530 4487560 4487590 4487620 4487650 4487680 4487710 4487500 4487530 4487560 4487590 4487620 4487650 4487680 4487710 490980 491010 491040 491070 491100 491130 491160 491190 491220 491250 491280 491310 490980 491010 491040 491070 491100 491130 491160 491190 491220 491250 491280 491310 40° 32' 24'' N 105° 6' 23'' W 40° 32' 24'' N 105° 6' 8'' W 40° 32' 17'' N 105° 6' 23'' W 40° 32' 17'' N 105° 6' 8'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,610 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 3 Altvan-Satanta loams, 0 to 3 percent slopes 8.2 100.0% Totals for Area of Interest 8.2 100.0% Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 3 of 3 Larimer County Area, Colorado 3—Altvan-Satanta loams, 0 to 3 percent slopes Map Unit Setting National map unit symbol: jpw2 Elevation: 5,200 to 6,200 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Altvan and similar soils: 45 percent Satanta and similar soils: 30 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Altvan Setting Landform: Benches, terraces Landform position (three-dimensional): Side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 10 inches: loam H2 - 10 to 18 inches: clay loam, loam, sandy clay loam H2 - 10 to 18 inches: loam, fine sandy loam, silt loam H2 - 10 to 18 inches: gravelly sand, gravelly coarse sand, coarse sand H3 - 18 to 30 inches: H3 - 18 to 30 inches: H3 - 18 to 30 inches: H4 - 30 to 60 inches: H4 - 30 to 60 inches: H4 - 30 to 60 inches: Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 1 of 3 Available water storage in profile: Very high (about 13.2 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Description of Satanta Setting Landform: Structural benches, terraces Landform position (three-dimensional): Side slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium and/or eolian deposits Typical profile H1 - 0 to 9 inches: loam H2 - 9 to 18 inches: loam, clay loam, sandy clay loam H2 - 9 to 18 inches: loam, clay loam, fine sandy loam H2 - 9 to 18 inches: H3 - 18 to 60 inches: H3 - 18 to 60 inches: H3 - 18 to 60 inches: Properties and qualities Slope: 0 to 1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Very high (about 27.4 inches) Interpretive groups Land capability classification (irrigated): 1 Land capability classification (nonirrigated): 3c Hydrologic Soil Group: B Minor Components Nunn Percent of map unit: 10 percent Larim Percent of map unit: 10 percent Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 2 of 3 Stoneham Percent of map unit: 5 percent Data Source Information Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Map Unit Description: Altvan-Satanta loams, 0 to 3 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 3 of 3 Village On Horsetooth - Wetlands Map Source: DS,Airbus USDA, Esri, USGS, DigitalGlobe, AEX, Getmapping, GeoEye, Earthstar Aerogrid, Geographics, IGN, IGP, swisstopo, CNES/and Estuarine and Marine Deepwater Estuarine and Marine Wetland Freshwater Emergent Wetland Freshwater Forested/Shrub Wetland Freshwater Pond Lake Other Riverine August 11, 2016 0 0.130325 0.065 0.mi 0 0.05 0.1 0.2 km 1:4,058 This page National was produced Wetlands by the Inventory NWI mapper (NWI) This Service map is is not for responsible general reference for the accuracy only. The or US currentness Fish and Wildlife of the base be used data in shown accordance on this with map. the All layer wetlands metadata related found data on should the Wetlands Mapper web site. #* #* #* #* #* W PROSPECT RD W DRAKE RD W HARMONY RD W HORSETOOTH RD S TAFT HILL RD S SHIELDS ST S COLLEGE AVE S LEMAY AVE S TIMBERLINE RD ZIEGLER RD P l e a s a n t V a l l e y a n d L a k e Ca n a l N e w M er c er D i t ch Larime r Co u nty C anal N o . 2 S h e rw o od Later a l Spri n g C r e e k ShLerawkeood ParLkawkoeod WLaarkreen Cach e La P o udr e R i ver M c C lell a n d 's Ch a nn a l Larimer C ount y C a n a l N o. 2 Footh i l ls C han n el Dixon C a n y o n Lateral Foothills Mall Boltz MS TiCmhbuerrclihne Fort HCSollins EleBmeaetntiteary SEhleempaerndtsaoryn S TIMBERLINE RD E LEMAY AVE E PROSPECT RD UP RAILROAD Warren Troutman SCteawsaert Westfield FOOTHILLS Water Quality Master Concepetual Plan BASIN Alternatives Fort ● Retrofit Collins Existing High School Pond to Pond accommodate Volume Water Quality Collindale ●Pond Retrofit Existing PUD Pond to accommodate Volume Water Quality Warren ● Water Lake Quality Treatment provided Lake in Existing Warren Southmoor ● Retrofit Existing Village Pond Pond to accommodate Volume Water Quality Lake ● Water Sherwood Quality Treatment provided Sherwood in Existing Lake Parkwood ● Retrofit Existing East Pond Pond to accommodate Volume Water Quality Proposed Restoration Stream Improvement 0 500000 1,000 2,[ Feet NAIP Image - 2009 Proposed BMP Basin Type Foothills Basin Boundary Flood Control Only Water Quality Only Flood Control and Water Quality Proposed Improvements None Proposed Proposed WaterConceptual Quality Alternatives Undeveloped Area Water Stream - Canal Parks Proposed andRestoration Habitat Stream Improvements #* Proposed Water Quality Pond the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/11/2016 Page 2 of 3   − = 2 * cos 2 sin 2 2 θ θ π π θ A o A pipe r r       = 2 cos θ m r H = r + m 2595c - Rational Calculations.xlsx Major Orifice Page 1 of 1 5108.00 0.25 1,603 1,377 343 752 5108.0 1.0 TOTAL VOLUME 752 cf 0.017 ac-ft Top of Pond- North Infiltration Basin Stage / Storage Input Table TOTAL VOLUME Pond Volume Summary Table Volume Interpolation Calculations WQCV 2595c - Rational Calculations.xlsx Vol Pond Page 1 of 2 80.0 2.34 57,907 0.58 1.31 6,271 51,636 85.0 2.24 58,957 0.58 1.30 6,607 52,350 90.0 2.15 59,949 0.57 1.29 6,943 53,006 95.0 2.07 60,890 0.57 1.28 7,279 53,610 100.0 2.00 61,784 0.57 1.27 7,615 54,169 105.0 1.93 62,638 0.56 1.26 7,951 54,686 110.0 1.87 63,454 0.56 1.26 8,287 55,166 115.0 1.81 64,235 0.56 1.25 8,623 55,612 120.0 1.75 64,986 0.56 1.24 8,960 56,026 125.0 1.70 65,707 0.55 1.24 9,296 56,412 130.0 1.65 66,403 0.55 1.23 9,632 56,771 135.0 1.61 67,074 0.55 1.23 9,968 57,106 140.0 1.56 67,722 0.55 1.23 10,304 57,418 145.0 1.52 68,349 0.55 1.22 10,640 57,709 150.0 1.49 68,957 0.54 1.22 10,976 57,981 155.0 1.45 69,546 0.54 1.22 11,312 58,234 160.0 1.42 70,119 0.54 1.21 11,648 58,471 165.0 1.39 70,675 0.54 1.21 11,984 58,691 170.0 1.35 71,216 0.54 1.21 12,320 58,896 175.0 1.33 71,743 0.54 1.21 12,656 59,086 180.0 1.30 72,256 0.54 1.20 12,992 59,264 Max from FoCo CM Maximum Volume (ft3) 59,264 Max Volume + 20% of Max Volume 71,116 ft3 100% WQCV 7,881 ft3 Required 100Yr Volume 78,997 ft3 Detention Storage Calculations 2595c - Rational Calculations.xlsx Modified FAA-100-yr Page 1 of 1 80.0 0.67 10,895 0.58 1.31 6,271 4,624 85.0 0.64 11,093 0.58 1.30 6,607 4,486 90.0 0.62 11,280 0.57 1.29 6,943 4,336 95.0 0.59 11,457 0.57 1.28 7,279 4,177 100.0 0.57 11,625 0.57 1.27 7,615 4,010 105.0 0.55 11,786 0.56 1.26 7,951 3,834 110.0 0.53 11,939 0.56 1.26 8,287 3,652 115.0 0.52 12,086 0.56 1.25 8,623 3,463 120.0 0.50 12,227 0.56 1.24 8,960 3,268 125.0 0.49 12,363 0.55 1.24 9,296 3,068 130.0 0.47 12,494 0.55 1.23 9,632 2,862 135.0 0.46 12,620 0.55 1.23 9,968 2,652 140.0 0.45 12,742 0.55 1.23 10,304 2,438 145.0 0.44 12,860 0.55 1.22 10,640 2,220 150.0 0.43 12,975 0.54 1.22 10,976 1,999 155.0 0.42 13,085 0.54 1.22 11,312 1,773 160.0 0.41 13,193 0.54 1.21 11,648 1,545 165.0 0.40 13,298 0.54 1.21 11,984 1,314 170.0 0.39 13,400 0.54 1.21 12,320 1,079 175.0 0.38 13,499 0.54 1.21 12,656 842 180.0 0.37 13,595 0.54 1.20 12,992 603 Max from FoCo CM Maximum Volume (ft3) 5,141 Max Volume + 20% of Max Volume 6,169 ft3 100% WQCV 7,881 ft3 Required 2Yr Volume 14,051 ft3 Detention Storage Calculations 2595c - Rational Calculations.xlsx Modified FAA-2-yr Page 1 of 1 Paved areas & shallow paved swales 20 1.4 5.2 18.8 490 12.7 12.7 A6 6 0.10 0.16 56 3.8% 8.3 120 0.3% Grassed waterway 15 0.8 2.7 11.0 176 11.0 11.0 B 7 1.43 0.41 118 1.4% 12.3 445 0.4% Paved areas & shallow paved swales 20 1.3 5.6 17.9 563 13.1 13.1 R1 8 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R2 9 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R3 10 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R4 11 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R5 12 0.11 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R6 13 0.07 0.84 45 2.0% 2.6 Paved areas & shallow paved swales 20 0.0 0.0 2.6 45 10.3 5.0 R7 14 0.11 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R8 15 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R9 16 0.18 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 R10 17 0.11 0.84 60 2.0% 3.0 Paved areas & shallow paved swales 20 0.0 0.0 3.0 60 10.3 5.0 Initial Overland Time (ti ) Travel Time (tt ) tt =Length/(Velocity x 60) tc Urbanized Check ON 2595c - Rational Calculations.xlsx Developed Tc Page 1 of 1 TOTAL SITE 81,998 53,921 63,096 6,186 0 0 172,738 0 377,939 8.68 51.1% 0.46 0.48 0.54 0.70 61,037 47,258 63,096 6,076 0 0 138,398 0 315,865 7.25 52.4% 0.47 0.49 0.55 0.71 Runoff Coeff's Total To Pond (No Basin B) 2595c - Rational Calculations.xlsx Developed C Page 1 of 1 (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180)+ 10 (min.) Min tc H1 1 17,418 530 8,896 61,800 289,292 377,936 8.68 14.9% 0.13 0.14 0.25 0.53 500 1.3% 36.0 150 0.8% Paved areas & shallow paved swales 20 1.8 1.4 37.4 650 13.6 13.6 TOTAL SITE 17,418 530 8,896 61,800 0 0 289,292 0 377,936 8.68 14.9% 0.13 0.14 0.25 0.53 Basin Name Design Point Time of Conc (tc) C2 C5 C10 C100 2 5 10 100 ATotal (sf) ATotal (ac) Q2 Q5 Q10 Q100 H1 1 13.6 0.13 0.14 0.25 0.53 1.94 0.00 3.33 6.79 377,936 8.68 2.24 0.00 7.10 31.07 TOTAL SITE 377,936 8.68 2.24 0.00 7.10 31.07 Initial Overland Time (ti) Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON Runoff Coeff's Rainfall Intensities (in/hr) Area Flow Rates (cfs) Runoff Coeff's 2595c - Rational Calculations.xlsx Historic Page 1 of 1