PRELIMINARY
GEOTECHNICAL INVESTIGATION
OLD TOWN NORTH, BLOCK 6
FORT COLLINS, COLORADO
Prepared For:
GREELEY ASSOCIATES, LLC
2775 Iris Avenue
Boulder, Colorado 80304
Attention: Terry Palmos
Project No. FC07353-115
April 27, 2016
TABLE OF CONTENTS
SCOPE ....................................................................................................................... 1
SUMMARY OF CONCLUSIONS ............................................................................... 1
SITE DESCRIPTION AND PROPOSED DEVELOPMENT ...................................... 2
GEOLOGIC HAZARDS .......................................................................................... 3
SUBSURFACE CONDITIONS ................................................................................... 4
DEVELOPMENT RECOMMENDATIONS ................................................................. 4
Site Grading ............................................................................................................ 4
Utility Construction .................................................................................................. 5
Preliminary Pavement Thicknesses ....................................................................... 7
Foundations and Floor Systems ............................................................................ 6
Basements.............................................................................................................. 6
Surface Drainage ................................................................................................... 7
General Design Considerations ............................................................................. 8
RECOMMENDED FUTURE INVESTIGATIONS AND TESTING ............................. 9
LIMITATIONS ............................................................................................................. 9
FIGURE 1 – LOCATIONS OF EXPLORATORY BORINGS
FIGURE 2 – SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX A – LABORATORY TEST RESULTS
APPENDIX B – GUIDELINE SITE GRADING SPECIFICATIONS
1
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
SCOPE
This report presents the results of our Preliminary Geotechnical
Investigation for Block 6 of Old Town North Subdivision in Fort Collins, Colorado.
The purpose of our investigation was to identify geologic hazards that may exist
at the site and to evaluate the subsurface conditions to assist in planning and
budgeting for the proposed development. The report includes descriptions of the
subsoils, bedrock, and groundwater conditions found in our exploratory borings
and discussions of site development as influenced by geotechnical
considerations.
This report was prepared based upon our understanding of the
development plans. The recommendations are considered preliminary and can
be used as guidelines for further planning of development and design of grading.
We should review final development and grading plans to determine if additional
investigation is merited, or if we need to revise our recommendations. Additional
investigations will be required to design building foundations and pavements. A
summary of our findings and recommendations is presented below. More
detailed discussions of the data, analysis and recommendations are presented in
the report.
SUMMARY OF CONCLUSIONS
1. No geologic or geotechnical conditions were identified which would
preclude development of this site. The primary geologic hazard
concerning development at this property is the presence of shallow
groundwater. The risks associated with shallow groundwater can be
mitigated with proper design and construction practices.
2. Soils encountered in our borings consisted of 4½ to 7 feet of sandy
clay overlying sand and gravel. Claystone bedrock was encountered in
all six borings at depths of 20 to 22½ feet.
2
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
3. Groundwater was encountered in all six borings during drilling at
depths of 6 to 10 feet, and was measured several days later at depths
of 6 to 7 feet. We recommend a minimum 3-foot separation from
foundations and floor slabs to groundwater. Final grading plans
should consider groundwater levels for the proposed development.
4. Spread footing foundations are likely appropriate for all of the lots at
this site.
Slab-on-grade basement floors are likely appropriate for all of the lots.
We believe the risk of poor basement slab performance is generally
low at this site.
5. Preliminary data indicates sandy clay will likely be present at subgrade
levels for pavements. New fill is assumed to possess equal or better
qualities as the native soil. Estimated pavement sections are provided
in the report. Subgrade stabilization may be necessary to reduce
expansive potential of the subgrade soils. Mitigation may include
moisture conditioning or chemical treatment with lime or fly ash.
6. Overall surface drainage should be designed to provide rapid run-off of
surface water away from the proposed residences. Water should not
be allowed to pond near the crest of slopes, on or adjacent to
pavements, or adjacent to structures. All permanent slopes should be
re-vegetated to reduce erosion.
7. Further investigations are required to make design recommendations
for foundations, floors, and pavements.
SITE DESCRIPTION AND PROPOSED DEVELOPMENT
The project area is located north of Osiander Street, east of Blondel
Street in Fort Collins, Colorado (Figure 1). The area is planned for residential
development, including associated roadways and utilities. We have assumed a
mix of single-family and multi-family residences having one or two stories.
3
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
GEOLOGIC HAZARDS
Colorado is a challenging location to practice geotechnical engineering.
The climate is relatively dry and the near-surface soils are typically dry and
relatively stiff. These soils and related sedimentary bedrock formations tend to
react to changes in moisture conditions. Some of the soils swell as they increase
in moisture and are called expansive soils. Other soils can settle significantly
upon wetting and are referred to as collapsing soils. Most of the land available
for development east of the Front Range is underlain by expansive clay or
claystone bedrock near the surface. Laboratory tests on soil and bedrock
samples from this site show low to moderate swell potential. The soils that
exhibit collapse are more likely west of the Continental Divide; however, both
types of soils occur all over the state.
FIELD AND LABORATORY INVESTIGATIONS
Subsurface conditions were investigated by drilling six exploratory borings
at the approximate locations shown on Figure 1. The test holes were drilled to a
depth of 25 feet using a truck-mounted drill rig with 4-inch diameter, continuous-
flight augers. Our field representative observed drilling, logged the soils and
bedrock found in the borings and obtained samples. Summary logs of the
borings, including results of field penetration tests, are presented on Figure 2.
Samples recovered from the test holes were returned to our laboratory
and visually classified by the geotechnical engineer for this project. Laboratory
testing included moisture content, dry unit weight, swell-consolidation, particle-
size analysis, and water-soluble sulfates tests. Swell test samples from the site
were wetted at a pressure approximating the weight of the overburden soils.
Laboratory test results are presented in Appendix A and summarized in Table A-
I.
4
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
SUBSURFACE CONDITIONS
Soils encountered in our borings consisted of 4½ to 7 feet of sandy clay
overlying sand and gravel. Claystone bedrock was encountered in all six borings
at depths of 20 to 22½ feet. The overburden clay classified as medium stiff to
stiff based on field penetration test results. Swell testing was conducted on four
samples; results indicated 0.2 percent compression to 2.2 percent swell.
The sand and gravel classified as medium dense to very dense.
Gradation testing of two samples indicated fines contents (percent passing No.
200 sieve) of 14 and 25 percent. Based on laboratory testing and our
experience, we judge that the sand and gravel soils are non-expansive to low-
swelling.
Groundwater was encountered in all six borings during drilling at depths of
6 to 10 feet, and was measured several days later at depths of 6 to 7 feet. We
recommend a minimum 3-foot separation from foundations and floor slabs to
groundwater. Final grading plans should consider groundwater levels for the
proposed development.
DEVELOPMENT RECOMMENDATIONS
Site Grading
The properties of fill will affect the performance of foundations, slabs-on-
grade, utilities, and pavements. The ground surface in areas to be filled should
be stripped of vegetation, scarified, moisture-conditioned, and densely
compacted. The on-site soils can be used as site grading fill provided they are
substantially free of organics and other deleterious materials. Permanent cut
and fill slopes should be no steeper than 3:1 (horizontal to vertical) and be
5
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
seeded or mulched to reduce erosion. Use of flatter (4:1) slopes is preferable.
Our experience has shown clay fill moisture treated to optimum moisture
content or above will exhibit lower swell than drier material. Clay fill should be
moisture-conditioned to between optimum and 3 percent above optimum
moisture content and compacted to at least 95 percent of standard Proctor
maximum dry density (ASTM D 698). Sand fill should be moisture-conditioned to
within 2 percent of optimum moisture content. The placement and compaction
of site grading fill should be observed and density tested by our representative
during construction. Guideline grading specifications are presented in Appendix
B. Permanent slopes should be terraced and re-vegetated to reduce erosion.
Utility Construction
We believe excavations for utility installation can be performed with
heavy-duty trenchers, excavators, or large backhoes. Groundwater will likely be
encountered in utility trenches. Bracing and/or temporary dewatering may be
required during utility construction. Dewatering may be accomplished by sloping
excavations to occasional sumps where water can be removed by pumping. The
sumps should be several feet below the bottom of the excavations so that water
is pumped down through the soils rather than up through the bottom of the
excavations to reduce the potential that the support capacity of the subsoils will
be compromised.
Utility trenches should be sloped or shored to meet local, state, and
federal safety regulations. Excavation slopes specified by OSHA are dependent
upon soil types and groundwater conditions encountered. Seepage and
groundwater conditions in trenches may downgrade the soil type. Initial trench
excavations may be unstable and require flatter slopes than required by OSHA.
Contractors should identify the soils encountered in the excavations and refer to
6
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
OSHA standards to determine appropriate slopes. Excavations deeper than 20
feet should be designed by a professional engineer.
Water and sewer lines are usually constructed beneath paved roads.
Compaction of trench backfill can have a significant effect on the life and
serviceability of pavements. Our experience indicates compacted trench backfill
may settle 1 to 2 percent. More settlement may occur if wetting of the fill occurs.
Trench backfill should be placed in thin loose lifts, moisture-conditioned and
compacted as recommended in the Site Grading section of this report. The
placement and compaction of backfill should be observed and tested by our firm
during construction.
Foundations and Floor Systems
Low swelling clays were encountered in the upper 4½ to 7 feet of our
borings. Spread footing foundations and slab-on-grade basement floors are
likely appropriate for all of the lots at this site. If a design level investigation
encounters areas of higher swelling clay, shallow over-excavation may be
recommended.
Basements
Groundwater was encountered in all six of our borings at depths of 6 feet
and lower. We recommend a minimum 3-foot separation from foundations and
basement floors to groundwater. Meeting this separation will limit the depth of
basement excavations or require raising grades by several feet. Foundation
drains will be recommended around basement walls. Basement walls should be
designed to resist lateral earth pressures.
7
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
Preliminary Pavement Thicknesses
The subgrade will likely consist of sandy clay classifying as A-6 and A-7-6
according to AASHTO criteria. We have assumed any fill placed at the site will
have properties equal to or better than the native materials. We judge that the
risk of pavement distress due to swelling soils is considerable over the majority
of the site. Swell mitigation will likely be recommended. This may include
moisture conditioning and/or chemical stabilization, such as fly ash or lime of the
subgrade. Preliminary pavement thickness alternatives are presented in Table 1
below. These thicknesses should be used for planning purposes only. We
recommend a subgrade investigation and final pavement design after site
grading is complete.
TABLE 1
PRELIMINARY PAVEMENT THICKNESS ALTERNATIVES
Classification HMA* + ABC* PCC*
Local Standard
Residential (EDLA = 10)
4"-5.5” HMA +
6”-8” ABC
6”- 7” PCC
Residential Collector
(EDLA = 50)
5.5”- 6.5" HMA +
6"-10” ABC
6”- 7" PCC
*HMA = Hot Mix Asphalt; ABC = Aggregate Base Course; PCC = Portland Cement
Concrete
Surface Drainage
The performance of foundations will be influenced by surface drainage.
The ground surface around proposed residences should be shaped to provide
runoff of surface water away from the structure and off of pavements. We
generally recommend slopes of at least 12 inches in the first 10 feet where
8
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
practical in the landscaping areas surrounding residences. There are practical
limitations on achieving these slopes. Irrigation should be minimized to control
wetting. Roof downspouts should discharge beyond the limits of backfill. Water
should not be allowed to pond on or adjacent to pavements. Proper control of
surface runoff is also important to limit the erosion of surface soils. Sheet flow
should not be directed over unprotected slopes. Water should not be allowed to
pond at the crest of slopes. Permanent slopes should be re-vegetated to reduce
erosion.
Water can follow poorly compacted fill behind curbs and gutters and in
utility trenches. This water can soften fill and undermine the performance of the
roadways, flatwork, and foundations. We recommend compactive effort be used
in placement of all fill.
General Design Considerations
Exterior sidewalks and pavements supported above the on-site clays are
subject to post construction movement. Flat grades should be avoided to
prevent possible ponding, particularly next to buildings. Positive grades away
from the buildings should be used for sidewalks and flatwork around the
perimeter of the buildings in order to reduce the possibility of lifting of this
flatwork, resulting in ponding next to the structures.
Joints next to buildings should be thoroughly sealed to prevent the
infiltration of surface water. Where concrete pavement is used, joints should
also be sealed to reduce the infiltration of water. Since some post construction
movement of pavement and flatwork may occur, joints around the buildings
should be periodically observed and resealed where necessary.
9
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
RECOMMENDED FUTURE INVESTIGATIONS AND TESTING
Based on the results of this investigation and the proposed development,
we recommend the following investigations be performed by our firm:
1. Review of site grading plans once the plans are available;
2. Subgrade Investigation and Pavement Design after grading;
3. Design-level Soils and Foundation Investigation for each lot after grading;
4. Construction testing and observation during site development, and
building construction, including compaction testing of grading fill, utility
trench backfill and pavements, and foundation installation observations.
LIMITATIONS
Our exploratory borings were located to obtain preliminary subsoil data
indicative of conditions on this site. Although our borings were spaced to obtain
a reasonably accurate picture of subsurface conditions, variations in the subsoils
not indicated in our borings are always possible. We believe this investigation
was conducted in a manner consistent with that level of skill and care ordinarily
used by members of the profession currently practicing under similar conditions
in the locality of this project. No warranty, express or implied, is made.
This report was prepared from data developed during our field exploration,
laboratory testing, engineering analysis, and experience with similar conditions.
The recommendations contained in this report were based upon our
understanding of the planned construction. If plans change or differ from the
assumptions presented herein, we should be contacted to review our
recommendations.
10
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
If we can be of further service in discussing the contents of this report or
in the analysis of the building and pavement from the geotechnical point of view,
please call.
Very truly yours,
CTL | THOMPSON, INC.
Brendan P. Moran, EI Spencer Schram, PE
Staff Geotechnical Engineer Project Manager
BPM:SAS
(2 copies)
APPENDIX A
LABORATORY TEST RESULTS
APPENDIX B
GUIDELINE SITE GRADING SPECIFICATIONS
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
B-1
GUIDELINE SITE GRADING SPECIFICATIONS
1. DESCRIPTION
This item shall consist of the excavation, transportation, placement, and
compaction of materials from locations indicated on the plans, or staked by
the Engineer, as necessary to achieve preliminary street and overlot
elevations. These specifications shall also apply to compaction of excess
cut materials that may be placed outside of the development boundaries.
2. GENERAL
The Soils Engineer shall be the Owner's representative. The Soils
Engineer shall approve fill materials, method of placement, moisture
contents and percent compaction, and shall give written approval of the
completed fill.
3. CLEARING JOB SITE
The Contractor shall remove all vegetation and debris before excavation or
fill placement is begun. The Contractor shall dispose of the cleared
material to provide the Owner with a clean, neat appearing job site.
Cleared material shall not be placed in areas to receive fill or where the
material will support structures of any kind.
4. SCARIFYING AREA TO BE FILLED
All topsoil and vegetable matter shall be removed from the ground surface
upon which fill is to be placed. The surface shall then be plowed or
scarified until the surface is free from ruts, hummocks or other uneven
features, which would prevent uniform compaction.
5. COMPACTING AREA TO BE FILLED
After the foundation for the fill has been cleared and scarified, it shall be
disked or bladed until it is free from large clods, brought to the proper
moisture content (0 to 3 percent above optimum moisture content for clays
and within 2 percent of optimum moisture content for sands) and
compacted to not less than 95 percent of maximum dry density as
determined in accordance with ASTM D 698.
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
B-2
6. FILL MATERIALS
Fill soils shall be free from organics, debris or other deleterious
substances, and shall not contain rocks or lumps having a diameter greater
than six (6) inches. Fill materials shall be obtained from cut areas shown
on the plans or staked in the field by the Engineer.
On-site materials classifying as CL, CH, SC, SM, SW, SP, GP, GC, and
GM are acceptable. Concrete, asphalt, organic matter and other
deleterious materials or debris shall not be used as fill.
7. MOISTURE CONTENT AND DENSITY
Fill material shall be moisture conditioned and compacted to the criteria in
the table, below. Maximum density and optimum moisture content shall be
determined from the appropriate Proctor compaction tests. Sufficient
laboratory compaction tests shall be made to determine the optimum
moisture content for the various soils encountered in borrow areas.
FILL COMPACTION AND MOISTURE REQUIREMENTS
Soil
Type
Depth from
Final Grade
(feet)
Moisture Requirement
(% from optimum)
Density Requirement
Clay
0 to 15 feet
0 to +3 95% of ASTM D 698
Sand -2 to +2 95% of ASTM D 698
Clay Greater than
15 feet
-2 to +1 98% of ASTM D 698
Sand -2 to +1 95% of ASTM D 1557
The Contractor may be required to add moisture to the excavation
materials in the borrow area if, in the opinion of the Soils Engineer, it is not
possible to obtain uniform moisture content by adding water on the fill
surface. The Contractor may be required to rake or disk the fill soils to
provide uniform moisture content through the soils.
The application of water to embankment materials shall be made with any
type of watering equipment approved by the Soils Engineer, which will give
the desired results. Water jets from the spreader shall not be directed at
the embankment with such force that fill materials are washed out.
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
B-3
Should too much water be added to any part of the fill, such that the
material is too wet to permit the desired compaction from being obtained,
rolling and all work on that section of the fill shall be delayed until the
material has been allowed to dry to the required moisture content. The
Contractor will be permitted to rework wet material in an approved manner
to hasten its drying.
8. COMPACTION OF FILL AREAS
Selected fill material shall be placed and mixed in evenly spread layers.
After each fill layer has been placed, it shall be uniformly compacted to not
less than the specified percentage of maximum density. Fill shall be
compacted to the criteria above. At the option of the Soils Engineer, soils
classifying as SW, GP, GC, or GM may be compacted to 95 percent of
maximum density as determined in accordance with ASTM D 1557 or 70
percent relative density for cohesionless sand soils. Fill materials shall be
placed such that the thickness of loose materials does not exceed 12
inches and the compacted lift thickness does not exceed 6 inches.
Compaction as specified above shall be obtained by the use of sheepsfoot
rollers, multiple-wheel pneumatic-tired rollers, or other equipment approved
by the Engineer for soils classifying as CL, CH, or SC. Granular fill shall be
compacted using vibratory equipment or other equipment approved by the
Soils Engineer. Compaction shall be accomplished while the fill material is
at the specified moisture content. Compaction of each layer shall be
continuous over the entire area. Compaction equipment shall make
sufficient trips to ensure that the required density is obtained.
9. COMPACTION OF SLOPES
Fill slopes shall be compacted by means of sheepsfoot rollers or other
suitable equipment. Compaction operations shall be continued until slopes
are stable, but not too dense for planting, and there is not appreciable
amount of loose soils on the slopes. Compaction of slopes may be done
progressively in increments of three to five feet (3' to 5') in height or after
the fill is brought to its total height. Permanent fill slopes shall not exceed
3:1 (horizontal to vertical).
10. PLACEMENT OF FILL ON NATURAL SLOPES
Where natural slopes are steeper than 20 percent in grade and the
placement of fill is required, benches shall be cut at the rate of one bench
for each 5 feet in height (minimum of two benches). Benches shall be at
least 10 feet in width. Larger bench widths may be required by the
GREELEY ASSOCIATES, LLC
OLD TOWN NORTH BLOCK 6
CTL | T PROJECT NO. FC07353-115
B-4
Engineer. Fill shall be placed on completed benches as outlined within this
specification.
11. DENSITY TESTS
Field density tests shall be made by the Soils Engineer at locations and
depths of his choosing. Where sheepsfoot rollers are used, the soil may
be disturbed to a depth of several inches. Density tests shall be taken in
compacted material below the disturbed surface. When density tests
indicate that the density or moisture content of any layer of fill or portion
thereof is not within specification, the particular layer or portion shall be
reworked until the required density or moisture content has been achieved.
12. SEASONAL LIMITS
No fill material shall be placed, spread or rolled while it is frozen, thawing,
or during unfavorable weather conditions. When work is interrupted by
heavy precipitation, fill operations shall not be resumed until the Soils
Engineer indicates that the moisture content and density of previously
placed materials are as specified.
13. NOTICE REGARDING START OF GRADING
The Contractor shall submit notification to the Soils Engineer and Owner
advising them of the start of grading operations at least three (3) days in
advance of the starting date. Notification shall also be submitted at least 3
days in advance of any resumption dates when grading operations have
been stopped for any reason other than adverse weather conditions.
14. REPORTING OF FIELD DENSITY TESTS
Density tests made by the Soils Engineer, as specified under "Density
Tests" above, shall be submitted progressively to the Owner. Dry density,
moisture content, and percentage compaction shall be reported for each
test taken.
15. DECLARATION REGARDING COMPLETED FILL
The Soils Engineer shall provide a written declaration stating that the site
was filled with acceptable materials, and was placed in general accordance
with the specifications.