Loading...
HomeMy WebLinkAbout2601 CANTON CT. - PDP/FDP - FDP160033 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL STUDY 2601 CANTON COURT Prepared for: Dan Bernth Doberstein Lemburg Commerical, Inc 1401 Riverside Avenue Fort Collins, CO 80524 Prepared by: North Star Design, Inc. 700 Automation Drive, Unit I Windsor, Colorado 80550 (970) 686-6939 June 10, 2016 Job Number 347-09 ii June 10, 2016 Heather McDowell City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage and Erosion Control Study for 2601 Canton Court Dear Heather, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Study for 2601 Canton Court. I certify that this report for the drainage design was prepared in accordance with the Master Plan and the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Patricia Kroetch, P.E. 700 Automation Drive, Unit I Windsor, CO 80550 Phone: 970-686-6939 Fax: 970-686-1188 iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location ...................................................................................................................1 1.2 Description of Property ............................................................................................1 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description ..........................................................................................1 2.2 Sub-Basin Description .............................................................................................2 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations ..............................................................................................................2 3.2 Development Criteria Reference and Constraints ...................................................2 3.3 Hydrologic Criteria ..................................................................................................2 3.4 Hydraulic Criteria ....................................................................................................2 4. DRAINAGE FACILITY DESIGN 4.1 General Concept ......................................................................................................3 4.2 Specific Flow Routing .............................................................................................3 4.3 Drainage Summary ..................................................................................................4 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis .....................................................................................................5 5.2 SWMP Contact Information ...................................................................................6 5.3 Identification and location of all potential pollution sources ..................................7 5.4 Best Management Practices (BMP’s) for Stormwater Pollution Prevention ...........7 5.5 BMP Implementation ...............................................................................................9 6. CONCLUSIONS 6.1 Compliance with Standards ..................................................................................12 6.2 Drainage Concept ..................................................................................................12 7. REFERENCES ..................................................................................................................13 APPENDICES A Vicinity Map B Hydrologic Computations C Hydraulic Computations D Detention Pond Calculations E BMP Schedule & Cost Estimate 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The site is located on Lot 11, Prospect Industrial Park located in the Northeast Quarter of Section 20, Township 7 North, Range 68 West of the 9Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is located at the southwest end of Canton Court and is currently an undeveloped parcel. The site bounded on all sides by existing commercial or office developments. 1.2 Description of Property The entire site consists of approximately 1.02 acres of land. The land is currently undeveloped and is lower than the surrounding development. The site is currently drains to the southwest, onto the site at 2025 Sharp Point Drive and eventually into Midpoint Drive. Slopes on site range from approximately 0.5% to 12%. This project will include the development of one multi tenant building with man doors on the northwest and overhead doors on the southeast. There will be a private drive, a paved parking lot on the northwest side of the building, a recycled asphalt storage area on the southeast side of the building and landscaping on the remainder of the site. The majority of the site will drain to the south and east into a grassed swale with underdrain and then into detention storage on the adjacent lot. This detention pond will be contained in a drainage easement that will be dedicated with this development proposal. 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the Cache la Poudre Master Drainageway which requires that detention be provided to attenuate runoff to the 2 year historic runoff rate. It is also required that a minimum of fifty percent of the site runoff be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual and Low Impact Development (LID) treatment methods are required for seventy-five percent of the site runoff. 2 2.2 Sub-basin Description This site was most likely included in the original drainage report for Prospect Industrial Park but this report cannot be located. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints The majority of the runoff from this site has been routed to flow to the proposed grassed swale on the southeast side of the site and then routed to a proposed detention pond on the adjacent property. A small portion of the site will flow to the northeast and into Canton Court without entering the detention pond. The detention pond is restricted to a 2 year historic release rate with this design. The release rate for the detention pond has been calculated to be 0.04 cfs which is equivalent to the 2 year historic runoff rate for this site in an undeveloped condition. 3.3 Hydrologic Criteria Runoff coefficients calculations were prepared for the 2 and 10-year minor and 100-year major storm frequency utilizing the rational method. Detention is proposed on site with a release rate equal to the 2 year historic runoff rate. 3.4 Hydraulic Criteria The majority of the runoff from the site will flow to the southeast side of the lot and will enter the grassed swale. A perforated pipe will collect the runoff and convey it to the detention area and an overflow conveyance is also provided if the system fails or becomes overloaded. A small portion of the runoff from the site will flow to the northeast corner of the site and will be routed via concrete pan and metal sidewalk 3 culvert to Canton Court. Detention and water quality extended detention are required for this site and will be provided in the adjacent lot. The release from the detention pond will be restricted to the 2 year historic runoff which was calculated to be 0.40 cfs. The detention volume required for this site was calculated to be 0.13 acre feet and the extended detention volume was calculated to be 0.03 acre feet. The required volume will be accommodated in the proposed pond and will have a maximum water surface of 4896.00. The pond will discharge through a new drainage pipe to the curb in Midpoint Drive. This runoff will then be routed to the existing pond on the east side of Sharp Point Drive. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The runoff from this site will flow into the parking lot which will be constructed using conventional materials (asphalt or concrete) or into the storage area which will be recycled asphalt. The runoff from the site will then flow to the southeast and enter the grassed swale. The flow will percolated into the subsurface material and enter the perforated pipe. This pipe will convey runoff directly to the detention pond and, in an overflow situation, a second pipe is provided to convey the runoff to the detention pond. 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin 1 includes a small portion of the paved parking lot and sidewalk. Runoff from this basin will enter an opening in the curb and will flow to Canton Court via a concrete pan and metal sidewalk culvert. No water quality extended detention or attenuation will be provided for the runoff from this basin. Basin 2 includes the remainder of the lot including the proposed building, a majority of the paved parking lot and sidewalk, the recycled asphalt storage area and the grassed swale. The runoff from this basin will flow to the south and east and into the grassed swale. A perforated pipe will collect the flow and convey it to the offsite detention pond. 4 If the perforated pipe becomes clogged or is over capacity, the water will flow in the grassed swale to the secondary pipe and be conveyed to the detention pond. The offsite pond has been sized to accommodate runoff from Lot 11 but may be expanded in the future to also accommodate expansion at 2025 Sharp Point Drive. This pond also provides water quality extended detention and will release into a curb opening in Midpoint Drive to the southwest of this site. 4.3 Drainage Summary All runoff from this site will be safely conveyed via surface flow and piping to the detention pond. The site will generally conform to the Cache la Poudre Master Drainage plan which encompasses this site. The City of Fort Collins will be responsible for maintenance of the existing storm drainage facilities located within the right-of-way. The drainage facilities located outside of the right of way (including the detention pond) will be maintained by the owner of Lot 11 and any other properties that will contribute runoff to the pond. 5 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis The soils on this site are classified by the USGS Soil Survey as Caruso Clay Loam and are classified in the hydrologic group D. The soils are described as having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. The rainfall erodibility is deemed to be moderate and the wind erodibility is deemed to be moderate to high. The site is surrounded by developed sites including streets, buildings and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will be removed prior to placing new pavement. Rock socks will be utilized in the existing curb and proposed grassed swales to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as in the existing curb, at the concrete sidewalk chase and on the concrete pans. The site will also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed within the site or permanently disposed of offsite. A concrete washout will be used on site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP’s have not been located on the site map due to the fact that the site is very small and these BMP’s will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete pavement, recycled asphalt pavement and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of sod. 6 Refer to Appendix E for the timing of the construction phases and the sequential installation of all BMP phasing for this site. Refer to the Appendix E for the Erosion Control Surety calculations. 5.2 SWMP contact information Permit holder: Name: Address: Phone Number: Email Address: Appointed agent: Name: Address: Phone Number: Email Address: 7 5.3 Identification and location of all potential pollution sources Potential Pollutant Source Activity Potential Pollutant Generated Applicable to this project Disturbed Areas Sediment X Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Possible Loading and unloading chemicals Chemicals Unloading of building materials Trash, debris X Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals, trash, debris X Concrete washout Concrete, sediment, wash water X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5.4 Best Management Practices (BMP’s) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing curb line as shown on the Drainage & Erosion Control Plan. 8 All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP’s: Structural BMP Approximate location on site Applicable to this Project Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At existing sidewalk culverts, in existing gutters, refer to site map X Earthen diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection In the detention Pond X Culverts Refer to site map X Riprap Erosion control mats Inlet protection Vehicle Tracking Control Pad At site entrance, refer to site map X Concrete Washout To be located by Contractor X Non-Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. 9 No area shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMP’s: Non-Structural BMP Approximate location on site Applicable to this Project Surface roughening Entire site X Soil stockpile height limit (less than 10’) Perimeter vegetative buffer northwest and southwest boundaries of site X Minimization of site disturbance Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of existing vegetation & trees northwest and southwest boundaries of site X Good site housekeeping (routine cleanup of trash & constr debris) Entire Site X Sweeping & scraping of hardscape areas On and off site pavements X Heavy equip staged on site, properly maintained & inspected daily (no onsite maintenance) Staging area X 5.5 BMP Implementation 1) Phased BMP Implementation BMP’s are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP’s are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP’s shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP’s must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix E for the BMP schedule and estimated costs. 10 2) Materials Handling and Spill Prevention: Materials Handling & Spill Prevention BMP Approximate location on site Applicable to this Project Portable toilets, anchored & located away from drainages Contractor to determine X Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & fully attended Contractor to determine X Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal or smaller containers, kept in storage units Contractor to determine X Dumpsters containing used chemicals containers & liquid wastes kept covered Contractor to determine X Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or earthen berms will be immediately constructed to contain the spill & prevent runoff to adjacent surface waters Location of spill X MSDS sheets for onsite chemicals will be kept at the construction trailer to facilitate spill response & cleanup Contractor to determine X 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets and may be enforced by the City of Fort Collins, by the State of Colorado or by the EPA. 11 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be sufficiently deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden and be removed from site periodically as the washout reaches 50% of its capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection. 12 6. CONCLUSIONS 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual and the Cache la Poudre Master Drainage Plan. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for conveyance of runoff to the detention areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 13 7. REFERENCES 1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. A APPENDIX A VICINITY MAP B APPENDIX B HYDROLOGIC COMPUTATIONS North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Runoff % coefficient Impervious C 2 year 10 year 100 year Streets, parking lots (asphalt): 0.95 100 0 0.10 0.22 Sidewalks (concrete): 0.95 90 Roofs: 0.95 90 0 0.21 0.46 Recycled asphalt: 0.40 40 Lawns (flat <2%, heavy soil): 0.20 0 SUBBASIN TOTAL TOTAL ROOF PAVED SIDEWALK RECYCLED LANDSCAPE RUNOFF RUNOFF RUNOFF RUNOFF % DESIGNATION AREA AREA AREA AREA AREA ASPHALT AREA COEFF. COEFF. COEFF. COEFF. Impervious REMARKS (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C) 2 10 100 1 0.05 1,975 0 1,210 345 0 420 0.79 0.56 0.66 0.78 77 2 0.97 42,275 9,000 12,346 1,041 11,718 8,170 0.65 0.42 0.52 0.64 62 Total 1.02 44,250 9,000 13,556 1,386 11,718 8,590 0.66 0.43 0.52 0.64 62 Historic Lot 11 1.02 44,250 0 0 0 0 44,250 0.20 0.04 0.25 0.50 0 Equations - Calculated C coefficients & % Impervious are area weighted C =  (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's RUNOFF COEFFICIENTS & % IMPERVIOUS KCD Final Flow.xls Cval North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 2-yr storm SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) 1 1 0.05 0.56 46 1.0 6.6 35 1.7 0.016 2.6 0.2 6.8 81 10.5 6.8 2 2 0.97 0.42 46 1.0 8.3 380 0.5 0.016 1.4 4.5 12.8 426 12.4 12.4 Total 1.02 0.43 46 1.0 8.2 380 0.5 0.016 1.4 4.5 12.7 426 12.4 12.4 Historic Lot 11 1.02 0.04 172 1.6 21.4 131 0.7 0.030 0.9 2.5 23.9 303 11.7 11.7 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L 0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 YEAR Final Flow.xls TOC-2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 10-yr storm SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) 1 1 0.05 0.66 46 1.0 5.4 35 1.7 0.016 2.6 0.2 5.6 81 10.5 5.6 2 2 0.97 0.52 46 1.0 7.1 380 0.5 0.016 1.4 4.5 11.6 426 12.4 11.6 Total 1.02 0.52 46 1.0 7.0 380 0.5 0.016 1.4 4.5 11.5 426 12.4 11.5 Historic Lot 11 1.02 0.25 172 1.6 17.2 131 0.7 0.030 0.9 2.5 19.7 303 11.7 11.7 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves STANDARD FORM SF-2 TIME OF CONCENTRATION - 10 YEAR Final Flow.xls TOC-10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 100-yr storm SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C C100 Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 POINT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) 1 1 0.05 0.79 0.78 46 1.0 3.9 35 1.70 0.016 2.6 0.2 4.1 81 10.5 5.0 2 2 0.97 0.65 0.64 46 1.0 5.7 380 0.50 0.016 1.4 4.5 10.1 426 12.4 10.1 Total 1.02 0.66 0.64 46 1.0 5.6 380 0.50 0.016 1.4 4.5 10.1 426 12.4 10.1 0 Historic Lot 11 1.02 0.20 0.50 172 1.6 12.1 131 0.66 0.030 0.9 2.5 14.6 303 11.7 11.7 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves TIME OF CONCENTRATION - 100 YR STANDARD FORM SF-2 Final Flow.xls TOC-100 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (NEW IDF CURVE) (2-YEAR) LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 2-yr storm DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C2 tc i Q (2) from Q (2) Q(2)tot Sub-basin (new) Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) 1 1 0.05 0.56 6.8 2.55 0.1 0.1 2 2 0.97 0.42 12.4 2.02 0.8 0.8 Total 1.02 0.43 12.4 2.02 0.9 0.9 Historic Lot 11 1.02 0.20 11.7 2.07 0.4 0.4 Detention release rate Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Final Flow.xls Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (NEW IDF CURVE) (10-YEAR) LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 10-yr storm DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C10 tc i Q (10) from Q (10) Q(10)tot Sub-basin (new) Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) 1 1 0.05 0.66 5.6 4.68 0.1 0.1 2 2 0.97 0.52 11.6 3.56 1.8 1.8 Total 1.02 0.52 11.5 3.56 1.9 1.9 Historic Lot 11 1.02 0.25 11.7 3.54 0.9 0.9 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Final Flow.xls Q10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 RATIONAL METHOD PEAK RUNOFF (NEW IDF CURVE) (100-YEAR) LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK DATE: 6/21/2016 100-yr storm DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Area A C100 tc i Q (100) from Q (100) Q(100)tot (new) Design Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) 1 1 0.05 0.78 5.0 9.95 0.4 0.4 2 2 0.97 0.64 10.1 7.69 4.7 4.7 Total 1.02 0.64 10.1 7.69 5.0 5.0 Historic Lot 11 1.02 0.50 11.7 7.24 3.7 3.7 Q = C iA Q = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) NOTE: Intensity based on Figure 3-1, 1999 (Regional Analysis) Final Flow.xls Q100 C APPENDIX C HYDRAULIC CALCULATIONS Weir Check of Channel Sizing LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design DATE: 6/21/2016 Solve for h using Weir Equation Q = CLH3/2 where C = weir coefficient H = overflow height L = length of the weir Sidewalk Culvert in Basin 1 Q = 0.40 cfs C = 2.62 L = 2.00 ft Solve for H= 0.18 ft Project: Pipe ID: Design Information (Input) Pipe Invert Slope So = 0.0300 ft/ft Pipe Manning's n-value n = 0.0120 Pipe Diameter D = 12.00 inches Design discharge Q = 4.70 cfs Full-flow Capacity (Calculated) Full-flow area Af = 0.79 sq ft Full-flow wetted perimeter Pf = 3.14 ft Half Central Angle Theta = 3.14 radians Full-flow capacity Qf = 6.70 cfs Calculation of Normal Flow Condition Half Central Angle (0<Theta<3.14) Theta = 1.81 radians Flow area An = 0.51 sq ft Top width Tn = 0.97 ft Wetted perimeter Pn = 1.81 ft Flow depth Yn = 0.62 ft Flow velocity Vn = 9.24 fps Discharge Qn = 4.70 cfs Percent Full Flow Flow = 70.15% of full flow Normal Depth Froude Number Frn = 2.25 supercritical Calculation of Critical Flow Condition Half Central Angle (0<Theta-c<3.14) Theta-c = 2.50 radians Critical flow area Ac = 0.74 sq ft Critical top width Tc = 0.60 ft Critical flow depth Yc = 0.90 ft Critical flow velocity Vc = 6.31 fps Critical Depth Froude Number Frc = 1.00 CIRCULAR CONDUIT FLOW (Normal & Critical Depth Computation) 2601 Canton Court Pipe between grassed swale & detention pond Culvert.xls, Pipe 6/21/2016, 1:19 PM Project: Pipe ID: Design Information (Input) Pipe Invert Slope So = 0.0050 ft/ft Pipe Manning's n-value n = 0.0120 Pipe Diameter D = 12.00 inches Design discharge Q = 0.40 cfs Full-flow Capacity (Calculated) Full-flow area Af = 0.79 sq ft Full-flow wetted perimeter Pf = 3.14 ft Half Central Angle Theta = 3.14 radians Full-flow capacity Qf = 2.74 cfs Calculation of Normal Flow Condition Half Central Angle (0<Theta<3.14) Theta = 1.07 radians Flow area An = 0.16 sq ft Top width Tn = 0.88 ft Wetted perimeter Pn = 1.07 ft Flow depth Yn = 0.26 ft Flow velocity Vn = 2.49 fps Discharge Qn = 0.40 cfs Percent Full Flow Flow = 14.60% of full flow Normal Depth Froude Number Frn = 1.02 supercritical Calculation of Critical Flow Condition Half Central Angle (0<Theta-c<3.14) Theta-c = 1.07 radians Critical flow area Ac = 0.16 sq ft Critical top width Tc = 0.88 ft Critical flow depth Yc = 0.26 ft Critical flow velocity Vc = 2.45 fps Critical Depth Froude Number Frc = 1.00 CIRCULAR CONDUIT FLOW (Normal & Critical Depth Computation) 2601 Canton Court Detention pond outlet pipe Det Pond outlet.xls, Pipe 6/21/2016, 1:21 PM D APPENDIX D DETENTION POND CALCULATIONS 6/10/2016 Calculation for Required LID Treatment New Impervious Area 22556 sq. ft. Required Minimum Impervious Area to be Treated (75%) 16917 sq. ft. Impervious Area Treated by LID Treatment Method #1 (grassed swale) 21346 sq. ft. Impervious Area Treated by Porous pavement 0 sq. ft. Total Impervious Area Treated 21346 sq. ft. Calculation for Required Porous Pavement New Pavement Area 13556 sq. ft. Required Minimum Area of Porous Pavement (25%) 3389 sq. ft. Area of Paver Section 0 sq. ft. Run‐on area for Paver Section (up to 3:1 is permited) 0 sq. ft. Total Porous Pavement Area 0 sq. ft. 2601 Canton Court LID Summary Table Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 63.00 percent Catchment Drainage Imperviousness I a = 63.00 percent Catchment Drainage Area A = 0.970 acres Catchment Drainage Area A = 0.970 acres Predevelopment NRCS Soil Group Type = D A, B, C, or D Predevelopment NRCS Soil Group Type = D A, B, C, or D Return Period for Detention Control T = 10 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 12 minutes Time of Concentration of Watershed Tc = 12 minutes Allowable Unit Release Rate q = 0.40 cfs/acre Allowable Unit Release Rate q = 0.40 cfs/acre One-hour Precipitation P1 = 1.61 inches One-hour Precipitation P 1 = 2.61 inches Design Rainfall IDF Formula i = C1* P1 /(C2+Tc )^C3 Design Rainfall IDF Formula i = C1 * P1/(C2 +Tc)^C3 Coefficient One C1 = 28.50 Coefficient One C 1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C 2 =10 Coefficient Three C3 = 0.789 Coefficient Three C 3 = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.53 Runoff Coefficient C = 0.64 Inflow Peak Runoff Qp-in = 2.03 cfs Inflow Peak Runoff Qp-in = 3.97 cfs Allowable Peak Outflow Rate Qp-out = 0.39 cfs Allowable Peak Outflow Rate Qp-out = 0.39 cfs Mod. FAA Minor Storage Volume = 2,177 cubic feet Mod. FAA Major Storage Volume = 5,704 cubic feet Mod. FAA Minor Storage Volume = 0.050 acre-ft Mod. FAA Major Storage Volume = 0.131 acre-ft 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 5 5.42 0.019 1.00 0.39 0.003 0.017 5 8.78 0.038 1.00 0.39 0.003 0.035 10 4.32 0.031 1.00 0.39 0.005 0.025 10 7.00 0.060 1.00 0.39 0.005 0.054 15 3.62 0.038 0.91 0.35 0.007 0.031 15 5.87 0.075 0.91 0.35 0.007 0.068 20 3.13 0.044 0.81 0.31 0.009 0.036 20 5.08 0.087 0.81 0.31 0.009 0.078 25 2.78 0.049 0.75 0.29 0.010 0.039 25 4.50 0.096 0.75 0.29 0.010 0.086 30 2.50 0.053 0.71 0.27 0.011 0.042 30 4.05 0.104 0.71 0.27 0.011 0.093 35 2.28 0.056 0.68 0.26 0.013 0.044 35 3.69 0.110 0.68 0.26 0.013 0.098 40 2.09 0.059 0.66 0.25 0.014 0.045 40 3.40 0.116 0.66 0.25 0.014 0.102 45 1.94 0.062 0.64 0.25 0.015 0.047 45 3.15 0.121 0.64 0.25 0.015 0.106 50 1.81 0.064 0.62 0.24 0.017 0.048 50 2.94 0.126 0.62 0.24 0.017 0.109 55 1.70 0.066 0.61 0.24 0.018 0.048 55 2.76 0.130 0.61 0.24 0.018 0.112 60 1.61 0.068 0.60 0.23 0.019 0.049 60 2.60 0.134 0.60 0.23 0.019 0.114 65 1.52 0.070 0.60 0.23 0.021 0.049 65 2.47 0.137 0.60 0.23 0.021 0.116 70 1.45 0.072 0.59 0.23 0.022 0.050 70 2.34 0.140 0.59 0.23 0.022 0.118 75 1.38 0.073 0.58 0.23 0.023 0.050 75 2.23 0.143 0.58 0.23 0.023 0.120 80 1.32 0.075 0.58 0.22 0.025 0.050 80 2.14 0.146 0.58 0.22 0.025 0.121 85 1.26 0.076 0.57 0.22 0.026 0.050 85 2.05 0.149 0.57 0.22 0.026 0.123 90 1.21 0.077 0.57 0.22 0.027 0.050 90 1.97 0.151 0.57 0.22 0.027 0.124 95 1.17 0.078 0.57 0.22 0.029 0.050 95 1.89 0.154 0.57 0.22 0.029 0.125 100 1.12 0.080 0.56 0.22 0.030 0.050 100 1.82 0.156 0.56 0.22 0.030 0.126 105 1.09 0.081 0.56 0.22 0.031 0.049 105 1.76 0.158 0.56 0.22 0.031 0.127 110 1.05 0.082 0.56 0.22 0.033 0.049 110 1.70 0.160 0.56 0.22 0.033 0.127 115 1.02 0.083 0.55 0.21 0.034 0.049 115 1.65 0.162 0.55 0.21 0.034 0.128 120 0.99 0.084 0.55 0.21 0.035 0.048 120 1.60 0.164 0.55 0.21 0.035 0.129 125 0.96 0.085 0.55 0.21 0.037 0.048 125 1.55 0.166 0.55 0.21 0.037 0.129 130 0.93 0.086 0.55 0.21 0.038 0.048 130 1.51 0.168 0.55 0.21 0.038 0.129 Project: Basin ID: UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 DETENTION VOLUME BY THE MODIFIED FAA METHOD 2601 Canton Court Basin 2 0 0.05 0.1 0.15 0.2 0.25 0 50 100 150 200 250 300 350 Volume (acre-feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume UD-Detention_v2.34.xls, Modified FAA 6/21/2016, 12:56 PM STAGE - STORAGE TABLE (100-YEAR) LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 6/10/2016 100 yr Detention Volume Required = 0.130 Water Quality Volume Required = 0.030 Total Volume Required= 0.160 Surface Incremental Total Stage Area Storage Storage (ft) (ft2) (ac-ft) (ac-ft) 4893.75 0 4894.0 1,103 0.002 0.002 WQCV 4894.61 2,963 0.027 0.030 4895.0 4,153 0.057 0.059 100 yr WSEL 4896.0 5,591 0.111 0.170 <==SPILLWAY ELEV 4897.0 6,601 0.140 0.310 <==TOP OF BERM ELEV Detention Pond Outlet Sizing (100 yr event) LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 6/21/2016 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = CoAo sqrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s Ao = effective area of the orifice (ft2) Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qo = 0.40 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4893.75 ft Eo = 4893.88 ft h = 4896.0 ft - 100 yr WSEL Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.055 ft2 = 8.0 in2 orifice dia. = d = 3.18 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering ) d / D = 0.27 kinematic viscosity, u = 1.22E-05 ft2/s Reynolds no. = Red = 4Q/(pdu) = 1.57E+05 Co = (K in figure) = 0.62 check Use d = 3.20 in A o = 0.056 ft 2 = 8.04 in 2 Q max = 0.40 cfs Emergency Overflow Spillway Sizing LOCATION: 2601 Canton Court PROJECT NO: 347-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 5/24/2005 Equation for flow over a broad crested weir Q = CLH3/2 where C = weir coefficient = 2.8 H = overflow height L = length of the weir The pond has a spill elevation 0 ft above the maximum water surface elevation in the pond Spillways will be designed with 0.25 ft flow depth, thus H = 0.5 ft Size the spillway assuming that the pond outlet is completely clogged. Q (100) = 4.7 cfs Spill elev = 4896.00 ft 100 yr WSEL = 4896.0 ft Top of berm elev.= 4897.00 Weir length required: L = 5 ft Use L = 10 ft v = 0.67 ft/s Stormwater Facility Name: Facility Location & Jurisdiction: User (Input) Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope = 0.020 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length‐to‐Width Ratio = 1.00 L:W 0.00 0 0.00 0.00 Watershed Area =0.97acres 0.25 1,103 0.33 0.02 Watershed Imperviousness = 63.0% percent 0.86 2,963 0.66 0.06 Percentage Hydrologic Soil Group A =0.0%percent 1.25 4,153 1.00 0.26 Percentage Hydrologic Soil Group B = 0.0% percent 2.25 5,591 1.50 0.32 Percentage Hydrologic Soil Groups C/D = 100.0% percent 3.25 6,601 2.25 0.40 2.75 4.70 User Input 17 3.25 9.40 User Input: Detention Basin Characteristics WQCV Design Drain Time = 40.00 hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year One‐Hour Rainfall Depth = 0.53 0.98 1.36 1.71 2.31 2.91 3.67 in Calculated Runoff Volume = 0.020 0.048 0.077 0.104 0.153 0.200 0.263 acre‐ft OPTIONAL Override Runoff Volume = acre‐ft Inflow Hydrograph Volume = 0.019 0.048 0.076 0.103 0.152 0.200 0.263 acre‐ft Time to Drain 97% of Inflow Volume = 91111 11 11 12 12 hours Time to Drain 99% of Inflow Volume = 10 12 12 13 14 15 15 hours Maximum Ponding Depth = 0.58 0.92 1.18 1.41 1.81 2.17 2.40 ft Maximum Ponded Area = 0.048 0.072 0.090 0.101 0.114 0.125 0.132 acres Maximum Volume Stored = 0.015 0.035 0.057 0.079 0.122 0.164 0.194 acre‐ft Location for 1‐hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet 2601 Canton Court Fort Collins, CO Drain time check_FC_Rainfall.xlsm, Design Data 6/21/2016, 1:45 PM Doing_Clear_FoYes CountA= 1 0123 #N/A #N/A 0123 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 1 2 3 4 5 6 7 8 0.1 1 10 FLOW [cfs] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 0.5 1 1.5 2 2.5 3 0.1 1 10 100 PONDING DEPTH [ft] DRAIN TIME [hr] 100YR 50YR 25YR 10YR 5YR 2YR WQCV Drain time check_FC_Rainfall.xlsm, Design Data 6/21/2016, 1:45 PM E APPENDIX E BMP SCHEDULE & COST ESTIMATE Project: Disturbed Acres: 1.30 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F. 1150 $3.00 $3,450.00 each 7 $85.00 $595.00 each 1 $1,500.00 $1,500.00 each 1 $1,200.00 $1,200.00 each 0 $210.00 $0.00 Sub-Total: $6,745.00 1.5 x Sub-Total: $10,117.50 Amount of security: $10,117.50 Total Acres x Price/acre: $1,560.00 $1,200.00 Sub-Total: $1,560.00 1.5 x Sub-Total: $2,340.00 Amount to Re-seed: $2,340.00 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $10,117.50 Miniumum Escrow Amount 2601 Canton Court Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Rock Sock Vehicle Tracking Control Pad Final Escrow Amount Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence Concrete Washout Inlet Protection Reseeding Amount 6/21/2016 12:45 PM N:\347-09 Canton Court\drainage\ErosionEscrow.xls 135 0.90 0.086 0.55 0.21 0.039 0.047 135 1.47 0.169 0.55 0.21 0.039 0.130 140 0.88 0.087 0.54 0.21 0.041 0.047 140 1.43 0.171 0.54 0.21 0.041 0.130 145 0.86 0.088 0.54 0.21 0.042 0.046 145 1.39 0.172 0.54 0.21 0.042 0.130 150 0.84 0.089 0.54 0.21 0.043 0.045 150 1.36 0.174 0.54 0.21 0.043 0.131 155 0.82 0.090 0.54 0.21 0.045 0.045 155 1.32 0.175 0.54 0.21 0.045 0.131 160 0.80 0.090 0.54 0.21 0.046 0.044 160 1.29 0.177 0.54 0.21 0.046 0.131 165 0.78 0.091 0.54 0.21 0.047 0.044 165 1.26 0.178 0.54 0.21 0.047 0.131 170 0.76 0.092 0.54 0.21 0.049 0.043 170 1.24 0.180 0.54 0.21 0.049 0.131 175 0.75 0.092 0.54 0.21 0.050 0.042 175 1.21 0.181 0.54 0.21 0.050 0.131 180 0.73 0.093 0.53 0.21 0.051 0.042 180 1.18 0.182 0.53 0.21 0.051 0.131 185 0.72 0.094 0.53 0.21 0.053 0.041 185 1.16 0.184 0.53 0.21 0.053 0.131 190 0.70 0.094 0.53 0.21 0.054 0.040 190 1.14 0.185 0.53 0.21 0.054 0.131 195 0.69 0.095 0.53 0.21 0.055 0.040 195 1.12 0.186 0.53 0.21 0.055 0.131 200 0.68 0.096 0.53 0.21 0.057 0.039 200 1.09 0.187 0.53 0.21 0.057 0.130 205 0.66 0.096 0.53 0.21 0.058 0.038 205 1.07 0.188 0.53 0.21 0.058 0.130 210 0.65 0.097 0.53 0.21 0.059 0.037 210 1.06 0.189 0.53 0.21 0.059 0.130 215 0.64 0.097 0.53 0.21 0.061 0.037 215 1.04 0.191 0.53 0.21 0.061 0.130 220 0.63 0.098 0.53 0.20 0.062 0.036 220 1.02 0.192 0.53 0.20 0.062 0.130 225 0.62 0.098 0.53 0.20 0.063 0.035 225 1.00 0.193 0.53 0.20 0.063 0.129 230 0.61 0.099 0.53 0.20 0.065 0.034 230 0.99 0.194 0.53 0.20 0.065 0.129 235 0.60 0.099 0.53 0.20 0.066 0.033 235 0.97 0.195 0.53 0.20 0.066 0.129 240 0.59 0.100 0.53 0.20 0.067 0.033 240 0.95 0.196 0.53 0.20 0.067 0.128 245 0.58 0.101 0.53 0.20 0.069 0.032 245 0.94 0.197 0.53 0.20 0.069 0.128 250 0.57 0.101 0.52 0.20 0.070 0.031 250 0.92 0.198 0.52 0.20 0.070 0.128 255 0.56 0.101 0.52 0.20 0.071 0.030 255 0.91 0.199 0.52 0.20 0.071 0.127 260 0.55 0.102 0.52 0.20 0.073 0.029 260 0.90 0.200 0.52 0.20 0.073 0.127 265 0.55 0.102 0.52 0.20 0.074 0.028 265 0.88 0.200 0.52 0.20 0.074 0.126 270 0.54 0.103 0.52 0.20 0.075 0.027 270 0.87 0.201 0.52 0.20 0.075 0.126 275 0.53 0.103 0.52 0.20 0.077 0.027 275 0.86 0.202 0.52 0.20 0.077 0.125 280 0.52 0.104 0.52 0.20 0.078 0.026 280 0.85 0.203 0.52 0.20 0.078 0.125 285 0.52 0.104 0.52 0.20 0.079 0.025 285 0.84 0.204 0.52 0.20 0.079 0.125 290 0.51 0.105 0.52 0.20 0.081 0.024 290 0.83 0.205 0.52 0.20 0.081 0.124 295 0.50 0.105 0.52 0.20 0.082 0.023 295 0.82 0.206 0.52 0.20 0.082 0.124 300 0.50 0.105 0.52 0.20 0.083 0.022 300 0.81 0.207 0.52 0.20 0.083 0.123 305 0.49 0.106 0.52 0.20 0.085 0.021 305 0.79 0.207 0.52 0.20 0.085 0.123 Mod. FAA Minor Storage Volume (cubic ft.) = 2,177 Mod. FAA Major Storage Volume (cubic ft.) = 5,704 Mod. FAA Minor Storage Volume (acre-ft.) = 0.0500 Mod. FAA Major Storage Volume (acre-ft.) = 0.1310 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013 Determination of MINOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD 2601 Canton Court Basin 2 UD-Detention_v2.34.xls, Modified FAA 6/21/2016, 12:56 PM