Loading...
HomeMy WebLinkAboutBEEBE CHRISTIAN SCHOOL - PDP - PDP160022 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDrainage Report for BeBee Christian School 2103 Nancy Gray Avenue Fort Collins, CO 80525 Prepared by: Mike Beach, P.E. Project #:16‐026‐001 Date: July 13, 2016 Revised: ‐ 5255 Ronald Reagan Blvd, Suite 210 Johnstown, CO 80534 (303) 322-6480 EMAIL: mbeach@ridgetopeng.com 2 | Page Section Page 1. Project Engineer’s Certification ........................................................................................ 3 2. Project Location & Overview ............................................................................................ 4 3. Drainage Design Criteria ................................................................................................... 5 4. Hydraulic Calculations ....................................................................................................... 6 5. Facility Design .................................................................................................................... 7 6. Conclusion ......................................................................................................................... 8 7. References ......................................................................................................................... 8 Appendix A – Site Vicinity Map Appendix B – Flood Insurance Rate Map Appendix C – NRCS Soils Map Appendix D – Hydrologic Criteria Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO‐3 – Recommended Percentage Imperviousness Values Appendix E – Hydraulic Calculations Runoff Coefficients & Imperviousness Time of Concentration ‐ SF‐2 Rational Method Runoff Flows – SF‐3 (2‐Year Event) Rational Method Runoff Flows – SF‐3 (10‐Year Event) Rational Method Runoff Flows – SF‐3 (100‐Year Event) Detention Volume by Modified FAA Method Rain Garden Calculations (both Subbasins) LID Table Drain Times Appendix F – Maps Drainage Plan/Subbasin Map Appendix G – References Table of Contents 3 | Page Section 1: PROJECT ENGINEER’S CERTIFICATION I hereby attest that this Final Drainage Report for the design of stormwater management facilities for BeBee Christian School on 2103 Nancy Gray Ave. was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the responsible parties thereof. __________________________ Mike Beach, P.E. Registered Professional Engineer State of Colorado No. 45088 4 | Page Section 2: Project Location & Overview Location The sites address is 2103 Nancy Gray Avenue, Fort Collins, CO; which is described as a portion of Outlot A, Spring Creek Farms North, City of Fort Collins, County of Larimer, State of Colorado. For Recording purposes: Part of the Southeast Quarter of Section 19, TP 7 N, R 68 W of the 6th PM. Located along the north side of Nancy Gray Ave. and east of South Timberline Road, the site is described as above and contains 3.326 acres of undeveloped vacant land. (See Appendix A – Site Vicinity Map) Existing Condition The existing site is covered by native vegetation and slopes predominately towards South Timberline Road at approximately 0.5% slope. Stormwater runoff collected into an existing stormwater detention pond along the eastern side of the site. From there the detained water is released at no more than 2 cfs via outlet structure and conveyed via piping to “Storm 2” as delineated in previous storm reports. Storm 2 connects to Sidehill Filing 2 Storm system. Proposed Condition The intent of the development is to construct a new building of approximately 30,206 SF (in two phases), asphalt concrete parking, curb and gutter, playground area containing grass and gravel material, and landscaping. It has been determined by the survey that the existing pond has sufficient detention capacity for this project. Floodplain FEMA Floodplain mapping in this neighborhood is located on map‐panel 08069C1000F, Effective December 18, 2006, (Not Printed), however it appears the subject property is located in Zone X, which is outside the 100‐year floodplain. Flood Insurance Rate Map not available for printing. Existing Soils The Natural Resource Conservation Service mapped the historic soils on the site as part of the Nunn clay loam. The Hydrologic Class is Type ‘C’ Soils. (Appendix C – NRCS Soils Map) 5 | Page Section 3: Drainage Design Criteria Reference Manuals Storm drainage design criteria is defined in the City of Fort Collins “Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and Amendments, which references to the “Urban Drainage and Flood Control District” (UDFCD) and the “Urban Storm Drainage Criteria Manual” (USDCM), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual), are used and referenced in this report. Low Impact Development (LID) Requirements The proposed development is required to meet the City’s current Land Use Code, which includes: ‐ Treat no less than 50% of any newly added impervious area using one or a combination of LID techniques. ‐ Treat no less than 25% of any newly added pavement area using a permeable pavement. Four Step Process The City of Fort Collins has adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM for selecting BMP’s in urban redevelopment areas. The goal of this process is to minimize adverse impacts on receiving waters. The following describe how each step of the process are incorporated in the proposed development: Step 1 – Employ Runoff Reduction Practices By selecting a site that is undeveloped that currently does not have water quality treatment, the impacts of the proposed development will be less due to the addition of the water quality capture volume included. The project proposes to install a rain garden with underdrains to aid in conveyance and infiltration opportunities as well as impermeable pavers within vehicular traveled areas, which together will reduce the effects of the added impervious area from the development of the site. Step 2 – Water Quality Capture Volume (WQCV) In order to reduce the sediment load and other pollutants leaving the site, it is important to provide WQCV to minimize the downstream impacts. This project proposes to provide rain garden prior to the stormwater entering the detention pond, both located on the site. These facilities are sized to release at or below the historic runoff rates. Step 3 – Stabilize Drainageways Since this site is in close proximity to Poudre River it is important to take this Step into consideration. By providing stormwater detention and water quality and lowering the historic runoff and providing a metered outflow the project impacts to the drainageway are essentially reduced. The majority of the drainageway leaving the site is already stabilized. 6 | Page Step 4 – Implement Site Specific and Other Source Control BMP’s The proposed project will contain the following BMP’s: Rain Garden: All runoff from the site will be directed into and through the proposed BMP facilities prior to leaving the site. Rain gardens utilize native plants that act as sponges to reduce the amount of stromwater runoff and absorb contaminants. Pervious Pavers: Vehicular traveled areas will contain pervious pavers, which allow rainwater runoff to filter through the spaces between the blocks into the gravel layers underneath. This reduces the amount of stormwater runoff and absorbs contaminants that might otherwise enter the local waterways. Maintenance: In order for BMP’s to remain effective proper maintenance needs are required. Scheduled visual inspections and routine repair after larger storm events are critical in the maintenance and effectiveness of the installed BMP’s. The sites owner will be advised of these practices during installation in order to maximize the efficiency of the installed BMP’s. Section 4: Hydraulic Calculations Criteria Runoff criteria for the proposed sites was analyzed for the 2‐YR, 10‐YR, and 100‐YR storm events. The Rational Method is being used for the design of the proposed improvements. Rainfall Intensities used in the proposed design were determined as a function of the Time of Concertation for each subbasin. The values used were determined by the City of Fort Collins Rainfall Intensity/Duration/Frequency curve (Figure 3‐1 and Table 3‐1a (see Appendix D). Imperviousness Values from Table RO‐3 (USDCM) were used in determining the sites imperviousness. The overall proposed site improvements and landscaping equate to a total onsite proposed Imperviousness of 43%. Time of Concentration & Runoff Coefficient The onsite area was separated into two (2) subbasins with slopes varying between 0.5% to 1.5%. The calculated Time of Concentration (TC) for each subbasin are listed in Appendix E. See Basin Map in Appendix F for more information. WQCV The UD‐BMP_v3.03 (UDFCD) spreadsheet was used to calculated the required Rain Garden water quality capture volume. See Appendix E for design information. 7 | Page Detention The existing detention pond is already constructed and was designed by Stantec with and allowable release rate of 2 cfs. The Stantec report was not attainable, however the design was confirmed and discussed in the “Interim Timberline Road Widening – Drake to Prospect”. See existing report information in Appendix G. The detention facility Drain Time Spreadsheet has been calculated and is included within Appendix E of this report. The calculated drain time for 99% of the inflow volume of the pond with the proposed project and off‐site area included is approximately 6.3 hours for the 100‐ year event, which is below the maximum allowed drain time. Section 5: Facility Design The proposed improvements will increase the amount of impervious area; however, measures have been included in the design to minimize the amount of stormwater released from the site. Per previous design reports, the outlet structure is designed to release at 2 cfs. Per our report, the predeveloped 2‐year event at a release is 2.276 cfs per for the entire 3.32‐acre site (see Appendix E for historic calcs). The runoff will sheet flow until a concentrated point and then be conveyed via trickle channel or gutters and then deposited into the water quality device or detention pond. The site was broken into two developed subbasins for water quality purposes; Subbasin 1.0 (2.294 acres) and Subbasin 2.0 (1.030 acres). OS‐7 (as described below) was also modeled and included in the detention calculations. See Appendix E for breakdown of the different area types for each subbasin and Appendix F for the Subbasin Map. Subbasin 1.0 contains the proposed building, playground area, and minor areas adjacent to the building. The runoff will be conveyed to the east side of the building and outlet into proposed rain garden. The rain garden will outlet to the existing detention pond. Subbasin 2.0 is primarily the parking and paved areas which drains to the east to the existing detention pond. Since the existing detention pond was already sized for a release of 2 cfs, no modifications to the steel orifice plate will be required. Currently has one 3.5” diameter orifice. The existing pond was modeled with the proposed project and the 100‐year WSEL’s is indicated on the Drainage Plan in Appendix F. Water Quality for this subbasin will be provided via pervious pavers sized in accordance with the City of Fort Collins criteria. See the LID Table located in Appendix E and on the Drainage Plan. OS‐7 – This off‐site basin is included in our report based on previous reports indicating that is included within this detention pond. Full design calculations are included in order to determine the required detention volume is being provided within the existing pond. Since there is only one detention pond modeled with this report we have provided a summary of the design below. See supporting calculations within the Appendix of this report. 8 | Page Area (ac) Sub 1.0 2.29 2.22 3.79 9.63 0.009 0.409 0.238 ‐ ‐ Sub 2.0 1.03 1.38 2.38 6.50 Pavers 0.257 0.109 ‐ ‐ OS‐7 0.88 0.77 1.33 3.38 N/A 0.144 0.078 ‐ ‐ Total Site 3.32 3.63 6.19 16.88 ‐ 0.662 0.484 ‐ ‐ Total Basin 4.20 4.34 7.47 19.03 ‐ 0.812 0.630 0.849 2.0 Release Rate (cfs) 2‐Year Flow (cfs) 100‐Year Flow (cfs) WQCV (ac‐ft) 100‐Year Vol. (ac‐ft) Detention Req'd (ac‐ft) Tot. Volume Provided (ac‐ft) 10‐Year Flow (cfs) Section 6: Conclusions All computations that have been reviewed or completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volumes 1 &2. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention and water quality treatment of impervious areas by releasing the 100‐Year storm event at the required allowable release rate of 2.0 cfs, which is less than the Predeveloped 2‐Year runoff rates. The Water Quality design will benefit the site by reducing the initial discharge from the site and removal of any sediments or other pollutants generated by the developed site. Section 7: References  The Natural Resource Conservation Service Soil Survey for Larimer County and the WSS website.  FEMA FIRM map‐panel 08069C1000F Effective 12/18/2006. – Not Printed.  “City of Fort Collins Stormwater Criteria Manual” dated December 2011  Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual (UDFCD), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual). w Appendix A Site Vicinity Map Appendix B Flood Insurance Rate Map (Not available to Print) Appendix C NRCS Soils Map Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 1 of 4 4489690 4489710 4489730 4489750 4489770 4489790 4489810 4489690 4489710 4489730 4489750 4489770 4489790 4489810 496470 496490 496510 496530 496550 496570 496590 496610 496630 496650 496670 496470 496490 496510 496530 496550 496570 496590 496610 496630 496650 496670 40° 33' 32'' N 105° 2' 30'' W 40° 33' 32'' N 105° 2' 20'' W 40° 33' 28'' N 105° 2' 30'' W 40° 33' 28'' N 105° 2' 20'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 45 90 180 270 Feet 0 15 30 60 90 Meters Map Scale: 1:1,020 if printed on A landscape (11" x 8.5") sheet. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 4.3 97.1% 74 Nunn clay loam, 1 to 3 percent slopes C 0.1 2.9% Totals for Area of Interest 4.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 4 of 4 Appendix D Hydrologic Criteria RAINFALL INTENSITY-DURATION-FREQUENCY CURVE 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 STORM DURATION (minutes) RAINFALL INTENSITY (inches/hour) 2-Year Storm 10-Year Storm 100-Year Storm Figure RA-16 City of Fort Collins Rainfall Intensity-Duration-Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 7.0 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 7.3 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. (11) Section 4.0 is amended to read as follows: 4.0 Intensity-Duration-Frequency Curves for Rational Method: The one-hour rainfall Intensity-Duration-Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity-Duration-Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) 2-Year 10-Year 100-Year Duration (min) Intensity (in/hr) Intensity (in/hr) Intensity (in/hr) 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family * Multi-unit (detached) 60 Multi-unit (attached) 75 Half-acre lot or larger * Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off-site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 * See Figures RO-3 through RO-5 for percentage imperviousness. C A = K A + ( 1 . 31 i 3 − 1 . 44 i 2 + 1 . 135 i − 0 . 12 ) for CA ≥ 0, otherwise CA = 0 (RO-6) C CD = K CD + ( 0 . 858 i 3 − 0 . 786 i 2 + 0 . 774 i + 0 . 04 ) (RO-7) C B = (CA + C CD ) 2 2007-01 RO-9 Urban Drainage and Flood Control District Appendix E Hydraulic Calculations Historic Runoff Coefficients & Percent Impervious Calculated By: RSB Project - BeBee Christian School Checked By: MRB Job Number: 16-026-001 Date: 7/10/2016 IMP% Soil Types: Nunn Clay Loam Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: C Table RO-3 (UDSDCM Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.20 0 Landscaping (steep) 0.35 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.20 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv EX-7 0.880 38333 0 12197 0 0 26136 0.44 32 Off-Site EX-8 3.320 144619 0 0 0 2660 235224 0.34 2 Site Total Basin 4.20 182952 0 12197 0 2660 261360 0.36 8 Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year Historic TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 7/10/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME t c CHECK FINAL REMARKS DATA TIME (ti) (t t) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) EX-7 0.44 0.88 150 1.0 15.1 340 1 0.025 2.1 2.7 17.8 490 12.7 12.7 Off-Site EX-8 0.34 3.32 275 1.0 23.5 236 1 0.025 2.1 1.9 25.4 511 12.8 12.8 Site References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: RSB Event: 2-Year Date: 7/10/2016 Historic Flow Rate Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) EX-7 0.44 0.88 0.44 12.7 2.00 0.772 Off-Site EX-8 0.34 3.32 0.34 12.8 2.00 2.276 Site Total Basin 0.36 4.20 0.36 0.0 2.00 3.048 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Runoff Coefficients & Percent Impervious Calculated By: RSB Project - BeBee Christian School Checked By: MRB Job Number: 16-026-001 Date: 7/10/2016 IMP% Soil Types: Nunn Clay Loam Table RO-11 (COFC) Roof 0.95 90 Hydrologic Soil Group: C Table RO-3 (UDSDCM Asphalt 0.95 100 Concrete 0.95 96 Landscaping (flat) 0.20 0 Landscaping (steep) 0.35 0 Gravel & Pavers 0.50 40 Multi-family (attached) 0.65 70 Commercial 0.95 95 Undeveloped Historical 0.20 2 Basin Total Area Roof Paved Gravel Sidewalk Landscape Runoff % Comments Description (ac) Area (sf) Area (sf) Area (sf) Area (sf) Area (sf) Coeff C Imperv 1.0 2.294 99927 30206 0 11739 2529 54156 0.48 34 2.0 1.030 44867 0 25378 0 2421 18452 0.67 62 OS-7 0.880 38333 0 12197 0 0 26136 0.44 32 Directly to Pond Total Site 3.32 144793 30206 25378 11739 4950 72608 0.54 43 OS-7 Not Included Total Basin 4.20 183126 30206 37575 11739 4950 98744 0.52 41 OS-7 Included Equations: Calculated C coefficeints & Percent Impervious are Weighted C = Summation (Ci*Ai) / At Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci n - Number of different surfaces to be considered Runoff Coeff C Total Area (sq. ft.) STANDARD FORM SF-2 Event: 2-Year & 10-Year TIME OF CONCENTRATION Cf = 1.00 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 7/10/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti ) (tt) (URBANIZED BASINS) tc DESIG: C AREA LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. t t COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.48 2.29 175 1.0 15.4 283 0.5 0.016 1.3 3.6 19.0 458 12.5 12.5 2.0 0.67 1.03 95 0.5 9.9 387 0.5 0.015 1.4 4.6 14.5 482 12.7 12.7 OS-7 0.44 0.88 150 1.0 15.1 340 1 0.016 1.3 4.4 19.5 490 12.7 12.7 Total Site 0.54 3.32 100 2.0 8.3 325 0.5 0.016 1.3 4.2 12.5 425 12.4 12.4 Total Basin 0.52 4.20 150 2.0 10.6 340 0.5 0.016 1.3 4.4 15.0 490 12.7 12.7 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check STANDARD FORM SF-2 Event: 100-Year TIME OF CONCENTRATION Cf = 1.25 SUBDIVISION: BeBee CALCULATED BY: MRB DATE: 7/10/2016 REV: SUB-BASIN INITIAL/OVERLAND TRAVEL TIME tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASINS) tc DESIG: C AREA C*Cf LENGTH SLOPE ti LENGTH SLOPE Mannings VEL. tt COMP. TOT. LENGTH tc=(L/180)+10 Ac Ft % Min Ft % n FPS Min tc Ft Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1.0 0.48 2.29 0.60 175 1.0 12.4 283 0.5 0.016 1.3 3.6 16.0 458 12.5 12.5 2.0 0.67 1.03 0.84 95 0.5 6.0 387 0.5 0.015 1.4 4.6 10.6 482 12.7 10.6 OS-7 0.44 0.88 0.55 150 1.0 12.6 340 1 0.016 1.3 4.4 17.0 490 12.7 12.7 Total Site 0.54 3.32 0.67 100 2.0 6.3 325 0.5 0.016 1.3 4.2 10.5 425 12.4 10.5 Total Basin 0.52 4.20 0.65 150 2.0 8.2 340 0.5 0.016 1.3 4.4 12.6 490 12.7 12.6 References/Equations: Table RO-12 COFC tc = ti + tt ti = {1.87(1.1 - C*Cf)*L}/S^0.33 tt = L/Vel Velocity from Manning's Equation with R=0.1 (per COFC Figure 3-3) Final tc = Min of ti + tt and/or Urbanized Check Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 2-Year Date: 7/10/2016 Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.48 2.29 0.48 12.5 2.02 2.22 2.0 0.67 1.03 0.67 12.7 2.00 1.38 OS-7 0.44 0.88 0.44 12.7 2.00 0.77 Total Site 0.54 3.32 0.54 12.4 2.03 3.63 Total Basin 0.52 4.20 0.52 12.7 2.00 4.34 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 10-Year Date: 7/10/2016 Cf = 1.00 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.48 2.29 0.48 12.5 3.45 3.79 2.0 0.67 1.03 0.67 12.7 3.44 2.38 OS-7 0.44 0.88 0.44 12.7 3.44 1.33 Total Site 0.54 3.32 0.54 12.4 3.46 6.19 Total Basin 0.52 4.20 0.52 12.7 3.44 7.47 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 100-Year Date: 7/10/2016 Cf = 1.25 SUB-BASIN Direct Runoff Comments DATA DESIG: C AREA C*Cf tc i Q Ac min (in/hr) (cfs) 1.0 0.48 2.29 0.60 12.5 7.02 9.63 2.0 0.67 1.03 0.84 10.6 7.53 6.50 OS-7 0.44 0.88 0.55 12.7 7.00 3.38 Total Site 0.54 3.32 0.67 10.5 7.55 16.88 Total Basin 0.52 4.20 0.65 12.6 7.01 19.03 Q = Cf*C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 7/10/2016 BASIN: 1.0 Equations: A trib. To pond = 2.294 acre QD = CiA C100 = 0.60 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 1.38 acre Vo =m*QPO*(60*T) QPO = 2.000 cfs S = Vi - Vo tc = 12.5 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 13.7 4109 1.00 600 3509 0.081 10 7.72 10.6 6375 1.00 1200 5175 0.119 20 5.60 7.7 9249 0.81 1950 7299 0.168 30 4.52 6.2 11198 0.71 2550 8648 0.199 40 3.74 5.1 12355 0.66 3150 9205 0.211 50 3.23 4.4 13337 0.63 3750 9587 0.220 60 2.86 3.9 14171 0.60 4350 9821 0.225 70 2.62 3.6 15146 0.59 4950 10196 0.234 80 2.38 3.3 15724 0.58 5550 10174 0.234 90 2.22 3.1 16500 0.57 6150 10350 0.238 100 2.05 2.8 16930 0.56 6750 10180 0.234 110 1.93 2.7 17533 0.56 7350 10183 0.234 120 1.80 2.5 17838 0.55 7950 9888 0.227 130 1.60 2.2 17177 0.55 8550 8627 0.198 140 1.40 1.9 16186 0.54 9150 7036 0.162 150 1.20 1.7 14865 0.54 9750 5115 0.117 160 1.15 1.6 15195 0.54 10350 4845 0.111 170 1.10 1.5 15443 0.54 10950 4493 0.103 180 1.05 1.4 15608 0.53 11550 4058 0.093 Required Storage Volume: 10350 ft3 0.238 acre-ft DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 7/10/2016 BASIN: 2.0 Equations: A trib. To pond = 1.030 acre QD = CiA C100 = 0.84 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 0.87 acre Vo =m*QPO*(60*T) QPO = 2.000 cfs S = Vi - Vo tc = 10.6 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 8.6 2583 1.00 600 1983 0.046 10 7.72 6.7 4008 1.00 1200 2808 0.064 20 5.60 4.8 5814 0.77 1836 3978 0.091 30 4.52 3.9 7039 0.68 2436 4603 0.106 40 3.74 3.2 7766 0.63 3036 4730 0.109 50 3.23 2.8 8384 0.61 3636 4748 0.109 60 2.86 2.5 8908 0.59 4236 4672 0.107 70 2.62 2.3 9521 0.58 4836 4685 0.108 80 2.38 2.1 9884 0.57 5436 4448 0.102 90 2.22 1.9 10372 0.56 6036 4336 0.100 100 2.05 1.8 10642 0.55 6636 4006 0.092 110 1.93 1.7 11021 0.55 7236 3785 0.087 120 1.80 1.6 11213 0.54 7836 3377 0.078 130 1.60 1.4 10798 0.54 8436 2362 0.054 140 1.40 1.2 10175 0.54 9036 1139 0.026 150 1.20 1.0 9344 0.54 9636 -292 -0.007 160 1.15 1.0 9552 0.53 10236 -684 -0.016 170 1.10 1.0 9708 0.53 10836 -1128 -0.026 180 1.05 0.9 9811 0.53 11436 -1625 -0.037 Required Storage Volume: 4748 ft3 0.109 acre-ft DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 7/10/2016 BASIN: OS-7 Equations: A trib. To pond = 0.880 acre QD = CiA C100 = 0.55 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 0.48 acre Vo =m*QPO*(60*T) QPO = 0.780 cfs S = Vi - Vo tc = 12.7 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 4.8 1445 1.00 234 1211 0.028 10 7.72 3.7 2242 1.00 468 1774 0.041 20 5.60 2.7 3252 0.82 765 2487 0.057 30 4.52 2.2 3938 0.71 999 2939 0.067 40 3.74 1.8 4344 0.66 1233 3111 0.071 50 3.23 1.6 4690 0.63 1467 3223 0.074 60 2.86 1.4 4983 0.61 1701 3282 0.075 70 2.62 1.3 5326 0.59 1935 3391 0.078 80 2.38 1.2 5529 0.58 2169 3360 0.077 90 2.22 1.1 5802 0.57 2403 3399 0.078 100 2.05 1.0 5953 0.56 2637 3316 0.076 110 1.93 0.9 6165 0.56 2871 3294 0.076 120 1.80 0.9 6273 0.55 3105 3167 0.073 130 1.60 0.8 6040 0.55 3339 2701 0.062 140 1.40 0.7 5692 0.55 3573 2119 0.049 150 1.20 0.6 5227 0.54 3807 1420 0.033 160 1.15 0.6 5343 0.54 4041 1302 0.030 170 1.10 0.5 5430 0.54 4275 1155 0.027 180 1.05 0.5 5489 0.54 4509 979 0.022 Required Storage Volume: 3399 ft3 0.078 acre-ft DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 7/10/2016 BASIN: Total Site Equations: A trib. To pond = 3.320 acre QD = CiA C100 = 0.67 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 2.22 acre Vo =m*QPO*(60*T) QPO = 2.000 cfs S = Vi - Vo tc = 10.5 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 22.1 6640 1.00 600 6040 0.139 10 7.72 17.2 10303 1.00 1200 9103 0.209 20 5.60 12.5 14948 0.76 1830 13118 0.301 30 4.52 10.1 18098 0.68 2430 15668 0.360 40 3.74 8.3 19966 0.63 3030 16936 0.389 50 3.23 7.2 21554 0.61 3630 17924 0.411 60 2.86 6.4 22902 0.59 4230 18672 0.429 70 2.62 5.8 24477 0.58 4830 19647 0.451 80 2.38 5.3 25412 0.57 5430 19982 0.459 90 2.22 4.9 26666 0.56 6030 20636 0.474 100 2.05 4.6 27360 0.55 6630 20730 0.476 110 1.93 4.3 28334 0.55 7230 21104 0.484 120 1.80 4.0 28828 0.54 7830 20998 0.482 130 1.60 3.6 27761 0.54 8430 19331 0.444 140 1.40 3.1 26159 0.54 9030 17129 0.393 150 1.20 2.7 24024 0.54 9630 14394 0.330 160 1.15 2.6 24557 0.53 10230 14327 0.329 170 1.10 2.4 24958 0.53 10830 14128 0.324 180 1.05 2.3 25225 0.53 11430 13795 0.317 Required Storage Volume: 21104 ft3 0.484 acre-ft DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD LOCATION: BeBee Christian School CALCULATED BY: MRB PROJECT NUMBER: 16-026-001 DATE: 7/10/2016 BASIN: Total Basin Equations: A trib. To pond = 4.200 acre QD = CiA C100 = 0.65 (C*Cf) Vi = T*CiA = T*QD Developed C*A = 2.73 acre Vo =m*QPO*(60*T) QPO = 2.000 cfs S = Vi - Vo tc = 12.6 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 27.2 8149 1.00 600 7549 0.173 10 7.72 21.1 12645 1.00 1200 11445 0.263 20 5.60 15.3 18346 0.82 1956 16390 0.376 30 4.52 12.3 22211 0.71 2556 19655 0.451 40 3.74 10.2 24504 0.66 3156 21348 0.490 50 3.23 8.8 26454 0.63 3756 22698 0.521 60 2.86 7.8 28108 0.61 4356 23752 0.545 70 2.62 7.2 30041 0.59 4956 25085 0.576 80 2.38 6.5 31188 0.58 5556 25632 0.588 90 2.22 6.1 32727 0.57 6156 26571 0.610 100 2.05 5.6 33579 0.56 6756 26823 0.616 110 1.93 5.3 34775 0.56 7356 27419 0.629 120 1.80 4.9 35381 0.55 7956 27425 0.630 130 1.60 4.4 34070 0.55 8556 25514 0.586 140 1.40 3.8 32105 0.55 9156 22949 0.527 150 1.20 3.3 29484 0.54 9756 19728 0.453 160 1.15 3.1 30139 0.54 10356 19783 0.454 170 1.10 3.0 30631 0.54 10956 19675 0.452 180 1.05 2.9 30958 0.54 11556 19402 0.445 Required Storage Volume: 27425 ft3 0.630 acre-ft Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 43.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.430 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.15 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 32,450 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 406.1 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 271 sq ft D) Actual Flat Surface Area AActual = 308 sq ft E) Area at Design Depth (Top Surface Area) ATop = 650 sq ft F) Rain Garden Total Volume VT= 479 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 0.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 406 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1.38 in Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering July 13, 2016 BeBee Christian School Basin 1 Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_v3.03_Basin 1, RG 7/13/2016, 6:20 PM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) MRB Ridgetop Engineering July 13, 2016 BeBee Christian School Basin 1 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO UD-BMP_v3.03_Basin 1, RG 7/13/2016, 6:20 PM Stormwater Facility Name: Facility Location & Jurisdiction: User Input: Watershed Characteristics User Defined User Defined User Defined User Defined Watershed Slope = 0.005 ft/ft Stage [ft] Area [ft^2] Stage [ft] Discharge [cfs] Watershed Length = 475 ft 0.00 40 0.00 0.01 Watershed Area = 4.20 acres 1.00 1,566 1.00 2.00 Watershed Imperviousness = 43.0% percent 2.00 3,392 2.00 2.00 Percentage Hydrologic Soil Group A = percent 3.00 5,139 3.00 2.00 Percentage Hydrologic Soil Group B = percent 4.00 7,015 4.00 2.00 Percentage Hydrologic Soil Groups C/D = 100.0% percent 5.00 9,027 5.00 2.00 6.00 11,919 6.00 2.00 UDFCD Default 17 7.00 13,506 7.00 2.00 WQCV Treatment Method = hours After completing and printing this worksheet to a pdf, go to: https://maperture.digitaldataservices.com/gvh/?viewer=cswdif create a new stormwater facility, and attach the pdf of this worksheet to that record. Routed Hydrograph Results Design Storm Return Period = WQCV 2 Year 5 Year 10 Year 50 Year 100 Year One‐Hour Rainfall Depth = 0.53 0.98 1.36 1.71 2.91 3.67 in Calculated Runoff Volume = 0.137 0.252 0.361 0.757 1.023 acre‐ft OPTIONAL Override Runoff Volume = acre‐ft Inflow Hydrograph Volume = 0.136 0.252 0.360 0.756 1.022 acre‐ft Time to Drain 97% of Inflow Volume = 1.1 1.8 2.4 4.6 6.1 hours Time to Drain 99% of Inflow Volume = 1.2 1.8 2.5 4.7 6.3 hours Maximum Ponding Depth = 1.14 2.21 3.03 5.11 6.09 ft Maximum Ponded Area = 0.042 0.086 0.119 0.214 0.277 acres Maximum Volume Stored = 0.024 0.093 0.176 0.518 0.760 acre‐ft Location for 1‐hr Rainfall Depths (use dropdown): Workbook Protected Worksheet Protected Stormwater Detention and Infiltration Design Data Sheet Existing Detention Pond 2103 Nancy Gray Ave, Fort Collins, CO Drain Times New, Design Data 7/13/2016, 9:55 AM Doing_Clear_FoYes CountA= 1 0123 #N/A #N/A 0123 #N/A #N/A Check Data Set 1 Check Data Set 1 Area Discharge Stormwater Detention and Infiltration Design Data Sheet 0 5 10 15 20 25 0.1 1 10 FLOW [cfs] TIME [hr] 100YR IN 100YR OUT 50YR IN 50YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT WQCV IN WQCV OUT 0 1 2 3 4 5 6 7 0.1 1 10 100 PONDING DEPTH [ft] DRAIN TIME [hr] 100YR 50YR 10YR 5YR 2YR WQCV Drain Times New, Design Data 7/13/2016, 9:55 AM LID Table 50% On-Site Treatment by LID Requried New Impervious Area 60,534 sq. ft. Required Minimum Impervious Area to be Treated 30,267 sq. ft. Area Treated by Rain Garden (Phase I) 17,942 sq. ft. Area Treated by Rain Garden (Phase II) 14,508 sq. ft. Run-on Area 0 sq. ft. Impervious Area by LID Treatment 32,450 sq. ft. Actual % On-Site Treated by LID 54% 25% Porus Pavement Requried New Pavement Area 25,378 sq. ft. Required Minimum Area of Porus Pavement 6,345 sq. ft. Porus Pavement Area 2,825 sq. ft. Run-on Area (up to 3:1 allowed) 4,558 sq. ft. Total Porus Pavement Area 7,383 sq. ft. Actual % of Porus Pavement Provided 29% 14 | Page Appendix F Maps PROPOSED SCHOOL ±17,942 FFE = 4949 JOSEPH ALLEN DR. S. TIMBERLINE RD. NANCY GRAY AVE. DRAINAGE PLAN C-2.1 7 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION DATE SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEBEE CHRISTIAN SCOOL 361 71ST AVE. GREELEY, CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA 10 SUBMITTAL PROJECT DEVELOPMENT PLAN 7/14/2016 WATER QUALITY TREATMENT LEGEND Minimum 8" Thick Layer of CDOT No. 4 Aggregate Minimum 4" Perforated PVC Pipe (Optional Depending on Underlying Soil Conditions) 12" Ponding Depth Minimum 12" Thick Layer of Bioretention Sand Media (see Bioretention Sand Media Specification below) Minimum 6" Thick Layer of Pea Gravel Diaphragm Parking/Building Water Surface Minimum CDOT No. 4 Aggregate Above and Below PVC Pipe 15 | Page Appendix G References Undisturbed Soil CONNECT UNDERDRAIN TO OUTLET PIPE Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/7/2016 Page 2 of 4