HomeMy WebLinkAboutCAPSTONE COTTAGES - FDP - FDP150046 - PLANS - UTILITY PLANS (4)No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
5" (TYP)
3" (TYP)
3" (TYP)
CURB (MEDIAN)(SPECIAL)
12' 20'
(SEE DETAIL)
CURB (MEDIAN)(SPECIAL)
(SEE DETAIL)
CURB (MEDIAN)(SPECIAL)
6 INCH ABC (CLASS 6)
CONCRETE PAVEMENT (8.5 INCH) ON
CONCRETE COLOR DETAILS)
(SEE PAVEMENT DEFINITION SHEET FOR
6 INCH ABC (CLASS 6)
CONCRETE PAVEMENT (8 INCH)(COLORED) ON
TRUCK APRON
20' 12'
(SEE DETAIL)
CURB (MEDIAN)(SPECIAL)
(SEE DETAIL)
CURB (MEDIAN)(SPECIAL)
6 INCH ABC (CLASS 6)
S
D
TELE
D
S
WM
WV
D
D
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
D
D
D
T S
D
D
VAULT
ELEC
D
C.O.
S
C
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
42
+
00
P
O
E
4
3
+
9
8
.
6
7
P
T
42
+
49
.
73
P
I
41
+
05.61
43
+
00
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
S
D
TELE
D
S
WM
WV
D
D
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
3
1
+
00
32
+
00
3
3
+
00
34
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
P
O
E
4
3
+
9
8
.
6
7
P
T
42
+
49
.
73
P
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
3
1
+
00
32
+
00
3
3
+
00
34
+
00
35
+
00
PI 35+37.18
PC 34+64.08
HOUSE
CLUB
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
P
O
E
4
3
+
9
8
.
6
7
P
T
42
+
49
.
73
P
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
M
M
HOUSE
CLUB
D
U
FF
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
S
D
TELE
D
S
D
D
3
1
+
00
32
+
00
3
3
+
00
34
+
00
35
+
00
PI 35+37.18
PC 34+64.08
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
10
+
00
36
+
00
37
+
00
3
8
+
00
39
+
00
40
+
00
P
I
41
+
05
.
61
P
C
39
+
59
.
73
P
O
B
9
+
89
.
57
P
T
38
+
77
.
65
P
C
10
+
49
.
50
P
I
38
+
47
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
4
2
+
0
0
P
O
E
4
3
+
9
8
.
6
7
P
T
42
+
4
9
1
1
+
00
12
+
00
13
+
00
P
I
12
+
25
.
42
P
T
1
3
+
98
.
65
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
10
+
00
39
+
00
40
+
00
4
2
+
0
0
P
T
4
2
+
4
9
.
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
12
+
00
13
+
00
39
+
00
P
C
10
+
49
.
50
P
I
1
2
+
25
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
10
+
0
0
38
+
00
39
+
00
42
+
00
P
T
42
+
49
.
73
P
I
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
S
S
D
TELE
D
3
3
+
00
34
+
00
35
+
00
36
+
00
37
+
00
PT 36+10.05
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
38
+
00
P
C
10
+
49.50
P
I
12
+
25.42
P
I
3
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
S
S
D
D
37
+
00
PT 36+10.05
PI 35+37.18
PC 34+64.08
C
C
S
C
S
AC AC
AC
TELE
AC
AC
AC
HOUSE
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
10
+
00
3
9
+
00
4
0
+
00
P
C
39
+
59.73
P
O
B
9
+
89.5
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
43
+
00
D
I
RR
C
ON
T
R
O
L
I
RR
HOUSE
CLUB
D
U
F
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
00
39
+
00
40
+
00
P
C
10
+
49.50
P
I
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
S
S
D
TELE
D
3
3
+
00
34
+
0
0
PC 34+64.08
C.O.
S
C
S
TELE
HOUSE
CLUB
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
35
+
00
36
+
00
37
+
00
38
+
00
P
T
38
+
77.65
P
I
3
8
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
S
S
D
TELE
D
3
3
+
00
34
+
0
0
PC 34+64.08
C.O.
S
C
S
TELE
HOUSE
CLUB
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
36
+
00
37
+
00
38
+
00
P
T
38
+
77.65
P
I
3
8
+
4
7
.
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
10
+
00
39
+
0
0
P
C
3
9
+
59
.
73
P
O
B
9
+
89
.
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
1
0
+
00
39
+
0
0
P
C
39
+
59.73
P
O
B
9
+
89.5
7
P
T
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
TELE
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
C
AC AC
AC
TELE
AC
AC
AC
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
12
+
00
PI 12+25.42
P
I
41
+
0
5
.6
1
42
+
00
P
T
42
+
4
9
.
11
+
00
12
+
00
1
0
+
00
37
+
00
38
+
00
39
+
0
0
4
0
+
00
P
I
41
+
05
.
61
P
C
3
9
+
5
9
.
73
P
O
B
9
+
89.57
P
T
3
8
+
77.
65
P
C
1
0
+
49.5
0
D
D
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
31
+
00
32
+
00
33
+
00
3
4
+
0
0
35
+
00
10
+
00
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
00
P
I
12
+
25
.
42
P
T
13
+
98
.
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
3
1
+
00
32
+
00
3
3
+
00
34
+
00
35
+
00
C.O.
11
'
11
'
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
43
+
00
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
3
1
+
00
32
+
00
3
3
+
00
34
+
00
35
+
00
S
S
S
HOUSE
CLUB
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
43
+
00
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
3
1
+
00
32
+
00
3
3
+
00
34
+
00
35
+
00
HOUSE
CLUB
D
U
F
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
11
+
00
12
+
00
13
+
0
0
10
+
00
36
+
0
0
37
+
00
38
+
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
42
+
00
43
+
00
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
LINCOLN AVE. CROSS SECTIONS DZ
CEF BSH
1" = 20'
02/10/2016
4940.53
Lt. 41.06
NW EOP
4940.93
Lt. 34.59
NW EOP
4941.33
Lt. 28.13
NW EOP
4941.53
Lt. 24.00
NW EOP
4941.46
Lt. 24.00
NW EOP
4941.10
Lt. 24.00
NW EOP
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
LINCOLN AVE. CROSS SECTIONS DZ
CEF BSH
1" = 20'
02/10/2016
4939.41
Lt. 23.59
NW EOP
4939.85
Lt. 47.68
NW EOP
4938.99
Lt. 38.02
NE EOP
4938.10
Lt. 19.78
NE EOP
4937.57
Lt. 19.00
NE EOP
4937.15
Lt. 19.00
NE EOP
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
LINCOLN AVE. CROSS SECTIONS DZ
CEF BSH
1" = 20'
02/10/2016
4936.69
Lt. 19.00
NE EOP
4937.01
Lt. 6.00
ISLAND EAST LT EOP
4937.01
Rt. 6.00
ISLAND EAST RT EOP
4936.69
Rt. 32.30
SE EOP
RECYCLED ASPHALT SHOULDER
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 2:15:39 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Cross Sections_01.dgn
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
INTERNATIONAL BOULEVARD CROSS SECTIONS DZ
CEF BSH
1" = 20'
02/10/2016
4938.79
Lt. 12.50
ISLAND NORTH LT EOP
4938.10
Lt. 3.95
ISLAND NORTH LT EOP
4938.29
Lt. 7.00
ISLAND NORTH LT EOP
4937.97
Lt. 20.84
NW EOP
4937.88
Lt. 19.59
NW EOP
4938.87
Lt. 36.89
NW EOP
4938.55
Rt. 9.77
ISLAND NORTH RT EOP
4938.25
Rt. 7.00
ISLAND NORTH RT EOP
4938.28
Rt. 7.00
ISLAND NORTH RT EOP
4938.37
Rt. 29.33
NE EOP
4938.11
Rt. 22.45
NE EOP
4937.96
Rt. 24.00
NE EOP
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:41:15 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Cross Sections_01.dgn
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.11+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.11+50
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.12+00
4920
4930
4940
4950
0.33%
1.47%
-0.91%
-1.39%
-
2
.
95
%
-0.90%
-
4
.
1
:
1
-
2
.
3
1
%
0.13%
-
1
.
89
%
2
.
00
%
-
4
.
0
:
1
ROW
ROW
ROW
ROW
ROW
ROW
2.00
%
2
.
0
0
%
2
.
00
%
2
.
00
%
2
.0
0
%
C950
OF 122 SHEETS
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.42+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.42+50
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.43+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.43+50
4920
4930
4940
4950
2
.
00
%
2
.
00
%
-
2.45
%
-0.08%
-1.25%
-
1
.
98
%
-
1
.
97
%
-
1
.
97
%
-
1
.
9
7
%
-
1
.
97
%
EXIST ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
EXIST ROW
EXIST ROW
EXIST ROW
EXIST ROW
4
.
0
:
1
4
.
0
:
1
4
.
0
:
1
C949
OF 122 SHEETS
4939.71
Lt. 4.99
ISLAND WEST LT EOP
4938.96
Lt. 14.02
ISLAND EAST LT EOP
4938.26
Lt. 3.83
ISLAND EAST LT EOP
4937.85
Lt. 6.00
ISLAND EAST LT EOP
4937.43
Lt. 6.00
ISLAND EAST LT EOP
4939.65
Rt. 8.53
ISLAND WEST RT EOP
4938.70
Rt. 10.46
ISLAND EAST RT EOP
4938.26
Rt. 6.03
ISLAND EAST RT EOP
4937.85
Rt. 6.00
ISLAND EAST RT EOP
4937.43
Rt. 6.00
ISLAND EAST RT EOP
4939.60
Rt. 26.18
SW EOP
4939.35
Rt. 52.04
SW EOP
4938.71
Rt. 52.29
SE EOP
4938.44
Rt. 30.68
SE EOP
4937.94
Rt. 23.41
SE EOP
4937.48
Rt. 24.00
SE EOP
4937.04
Rt. 25.75
4938.84 SE EOP
Lt. 80.84
NE EOP
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 2:18:26 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Cross Sections_01.dgn
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.38+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.38+50
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.39+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.39+50
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.40+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.40+50
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.41+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.41+50
4920
4930
4940
4950
2
.
05
%
-1.64%
0.87%
-0.27%
1.58%
1.34%
1.16%
1.35%
-0.55%
-1.28%
-1.63%
-
2
.
91
%
-1.71%
-
1
.
7
9
%
-
2
.
15
%
-
2
.
38
%
-0.91%
-0.12%
-0.62%
-1.49%
-
2
.
30
%
-
2
.
15
%
-
3
.
1
3
%
-0.67%
-1.68%
-
1
.
94
%
-1.54%
-
2
.
9
9
%
-0.65%
-0.34%
-
6
.
3
:
1
1.43%
2
.
13
%
0.07%
1.42%
-1.32%
2.19
%
2
.
1
7
%
-1.01%
0.04%
-
1
.
88
%
1.99%
1.81%
2
.
00
%
-
2
.
1
0
%
-0.02%
-
2
.
04
%
2
.
0
0
%
1.83%
2
.
00
%
2
.00
%
-
2
.
16
%
-0.05%
-
1
.
98
%
1.91%
1.99%
-
9
.
6
:
1
-
5
.
77
%
8.22
%
-
9.
5
4
%
EXIST ROW
ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
EXIST ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
ROW
2
.
00
%
-
6
.
0
:
1
-
6
.
0
:
1
2.00
%
2
.
00
%
2
.
00
%
4.0
:
1
4.0
:
1
4.0
:
1
C948
OF 122 SHEETS
4940.67
Lt. 23.27
NW EOP
4940.34
Lt. 17.12
NW EOP
4939.85
Lt. 17.44
NW EOP
4941.49
Rt. 1.09
ISLAND WEST LT EOP
4941.68
Lt. 1.88
ISLAND WEST LT EOP
4941.87
Lt. 4.86
ISLAND WEST LT EOP
4941.95
Lt. 6.00
ISLAND WEST LT EOP
4941.83
Lt. 6.00
ISLAND WEST LT EOP
4941.49
Lt. 6.00
ISLAND WEST LT EOP
4941.06
Lt. 5.26
ISLAND WEST LT EOP
4940.66
Lt. 2.38
ISLAND WEST LT EOP
4940.23
Lt. 1.60
ISLAND WEST LT EOP
4941.27
Rt. 10.00
ISLAND WEST RT EOP
4941.56
Rt. 7.83
ISLAND WEST RT EOP
4941.84
Rt. 6.08
ISLAND WEST RT EOP
4941.95
Rt. 5.99
ISLAND WEST RT EOP
4941.83
Rt. 6.00
ISLAND WEST RT EOP
4941.49
Rt. 6.00
ISLAND WEST RT EOP
4941.04
Rt. 6.00
ISLAND WEST RT EOP
4940.59
Rt. 6.00
ISLAND WEST RT EOP
4940.14
Rt. 6.00
ISLAND WEST RT EOP
4940.70
Rt. 36.20
SW EOP
4941.04
Rt. 31.69
SW EOP
4941.38
Rt. 27.18
SW EOP
4941.52
Rt. 24.00
SW EOP
4941.42
Rt. 24.00
SW EOP
4941.07
Rt. 24.00
SW EOP
4940.62
Rt. 24.00
SW EOP
4940.22
Rt. 21.12
SW EOP
4939.88
Rt. 19.00
SW EOP
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:40:19 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Cross Sections_01.dgn
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.33+50
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.34+00
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.34+50
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.35+00
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.35+50
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.36+00
4930
4940
4950
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.36+50
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.37+00
4920
4930
4940
4950
4920
4930
4940
4950
-100 -80 -60 -40 -20 0 20 40 60 80 100
STA.37+50
4920
4930
4940
4950
1.89% 1.89%
-
2
.
28
%
-
7
.
64
%
-
2
.
17
%
-
1
.
97
%
0.52%
1.88%
1.88%
-
2
.
31
%
-
3
.
2
1
%
-
2.18
%
-
3
.
9
:
1
5
.
3
8
%
1.90% 1.90%
-
2
.
32
%
0.50%
-
2
.
2
2
%
-
5
.
4
:
1
7.27
%
2
.0
0
%
2
.
0
0
%
-
2
.3
3
%
-0.00%
-
2
.
3
9
%
-
6
.
1
:
1
7
.
4
7
%
2
.
00
%
2
.
00
%
-
2
.
10
%
-0.00%
-
2
.
3
1
%
-
6
.
5
:
1
7
.
6
1
%
2
.
0
0
%
2
.
00
%
-
2
.
16
%
-0.00%
-
2
.
35
%
-
6
.
8
:
1
8.4
:
1
1.88%
2
.
03
%
-
2
.
15
%
0.28%
-
2.33
%
-
8
.
4
:
1
2
.
07
%
-
2
.
2
2
%
-
3
.
0
4
%
-
2
.
48
%
2
.
08
%
1.88%
1.90%
-
2
.
41
%
-
2
.
03
%
2
.00
%
2
.
00
%
-
4
.
4
:
1
9
.
25
%
-
5
.
3
:
1
9
.
3
:
1
-
6
.
8
:
1
9
.
5
:
1
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST PERMANENT EASEMENT
EXIST ROW
EXIST ROW
ROW
EXIST ROW
EXIST ROW
ROW
EXIST ROW
ROW
2
.
0
0
%
4
.
0
:
1
1.72%
2
.
00
%
2
.
00
%
C947
OF 122 SHEETS
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
SOLID YELLOW LINE
SOLID WHITE LINE
SOLID YELLOW LINE
SOLID WHITE LINE
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:34:43 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P3_03
PHASING PLAN - PHASE 3
KEYMAP
CEF BSH
AS NOTED
02/10/2016
DMZ
L
I
N
C
O
L
N
AV
E
EXIST. ROW
EXIST. ROW
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
W1-6L (48X24)
R11-2 (48X30)
C946
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:31:35 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P3_02
L
I
N
C
O
L
N
AV
E
PHASING PLAN - PHASE 3
KEYMAP
CEF BSH
AS NOTED
02/10/2016
R
UN
A
P
T
S
.
B
U
FF
A
L
O
DMZ
TEMPORARY DRUMS
TEMPORARY DRUMS
(TEMPORARY)
CONCRETE BARRIER
TEMPORARY DRUMS
TEMPORARY DRUMS
TEMPORARY DRUMS
TEMPORARY DRUMS
TEMPORARY DRUMS
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
OU
LE
VA
R
D
FOR INFORMATION ONLY
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
LEGEND
TEMPORARY DRUMS
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
XXR11-2
C945
OF 122 SHEETS
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:29:13 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P3_01
PHASING PLAN - PHASE 3
KEYMAP
CEF BSH
AS NOTED
02/10/2016
~
DMZ
EXIST. ROW
LINCOLN AVE
BROKEN LINE
SOLID WHITE
SOLID WHITE LINE
SOLID WHITE LINE
(TEMPORARY)
CONCRETE BARRIER
IN PHASE 2
TEMPORARY PAVEMENT PLACED
COMPLETE FINAL MEDIAN AFTER PHASE 3
EXIST. ROW
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
STA 31+80.24 MATCH EXISTING STRIPING
BROKEN LINE
SOLID YELLOW
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
25
R2-1 (24X30)
W20-1 (36X36)
W4-2L (36X36)
WORK
ZONE
G20-5 (24X18)
WORK
ZONE
G20-5 (24X18)
FINES
DOUBLE
R2-6aP (24X18)
END
G20-2 (36X18)
ROAD WORK
W1-4L (36X36)
C944
OF 122 SHEETS
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
SOLID WHITE LINE
L
I
N
C
O
L
N
AV
E
PHASING PLAN - PHASE 2
KEYMAP
CEF BSH
AS NOTED
02/10/2016
DMZ
(TEMPORARY)
CONCRETE BARRIER
EXIST. ROW
SOLID YELLOW LINE
EXIST. ROW
(TEMPORARY)
CONCRETE BARRIER
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:26:39 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P2_03
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
W1-6L (48X24)
R11-2 (48X30)
C943
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:22:34 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P2_02
PHASING PLAN - PHASE 2
KEYMAP
CEF BSH
AS NOTED
02/10/2016
DMZ
DOUBLE YELLOW (FROM PRIOR PHASE)
(FROM PRIOR PHASE)
SOLID WHITE LINE
PLACE TEMPORARY DRUM
PLACE TEMPORARY DRUM
PLACE TEMPORARY DRUM
PLACE TEMPORARY DRUM
(TEMPORARY)
CONCRETE BARRIER
L
I
N
C
O
L
N
AV
E
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
OU
LE
VA
R
D
FOR INFORMATION ONLY
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
LEGEND
TEMPORARY DRUMS
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
C942
OF 122 SHEETS
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
LINCOLN AVE
PHASING PLAN - PHASE 2
SOLID WHITE LINE
KEYMAP
CEF BSH
AS NOTED
02/10/2016
IN PHASE 2 FOR PHASE 3 TRAFFIC
PLACE TEMPORARY PAVEMENT
~
S
H
L
D
R
DMZ
(TEMPORARY)
CONCRETE BARRIER
SOLID WHITE LINE
11
'
2
'
(TEMPORARY)
CONCRETE BARRIER
BROKEN LINE
SOLID WHITE
STA 31+82.11 MATCH EXISTING STRIPING
EXIST. ROW
EXIST. ROW
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:10:38 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P2_01
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
25
R2-1 (24X30)
FINES
DOUBLE
R2-6aP (24X18)
WORK
ZONE
G20-5 (24X18)
WORK
ZONE
G20-5 (24X18)
W4-2L (36X36)
W20-1 (36X36)
W1-4L (36X36)
END
ROAD WORK
G20-2 (36X18)
C941
OF 122 SHEETS
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
PHASING PLAN - PHASE 1
KEYMAP
DZ
CEF BSH
AS NOTED
02/10/2016
11
'
11
'
2
'
11
'
811
'
R
78
9
'
R
(TEMPORARY)
CONCRETE BARRIER
EXIST. ROW
DOUBLE YELLOW LINE
SOLID WHITE LINE
EXIST. ROW
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:06:22 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P1_03.dgn
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
W1-6L (48X24)
R11-2 (48X30)
C940
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 12:01:41 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P1_02.dgn
L
I
N
C
O
L
N
AV
E
PHASING PLAN - PHASE 1 DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
A
P
T
S
.
B
U
FF
A
L
O
R
UN
2
'
1
1
'
11
'
S
HD
L
R
SOLID WHITE LINE
(TEMPORARY)
CONCRETE BARRIER
DOUBLE YELLOW LINE
WHITE LINE
SOLID
NOTES:
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
OU
LE
VA
R
D
FOR INFORMATION ONLY
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
LEGEND
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
C939
OF 122 SHEETS
2
'
PRIOR TO START OF PHASE 1
PLACE TEMPORARY PAVEMENT
REMOVE EXISTING MEDIAN AND
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
PHASING PLAN - PHASE 1
NOTES:
CEF BSH
AS NOTED
02/10/2016
KEYMAP
DMZ
LINCOLN AVE
SOLID YELLOW LINE
BROKEN WHITE LINE
(TEMPORARY)
CONCRETE BARRIER
DOUBLE YELLOW LINE
EXIST. ROW
EXIST. ROW
STA 31+82.08 MATCH EXISTING STRIPING
ASPHALT SEAMS WITH PROPOSED STRIPING.
3. TOP LIFT OF ASPHALT SHALL BE PLACED TO COINCIDE
2. REMOVE ALL CONFLICTING PAVEMENT MARKINGS.
1. LANE ARROWS ARE FOR INFORMATION ONLY.
FOR INFORMATION ONLY
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:56:08 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Phasing Plan_P1_01.dgn
LEGEND
DETOUR PAVEMENT
IN PRIOR PHASE
DETOUR PAVEMENT CONSTRUCTED
CURRENT PHASE CONSTRUCTION
BUILT IN PRIOR PHASE
PROPOSED CONSTRUCTION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
25
R2-1 (24X30)
~
R
3
0
'
R
205.5
'
S
H
L
D
R
R4-7 (24X30)
W1-4L (36X36)
END
ROAD WORK
FINES
DOUBLE
R2-6aP (24X18)
W20-1 (36X36)
W4-2L (36X36)
WORK
ZONE
G20-5 (24X18)
WORK
ZONE
G20-5 (24X18)
G20-2 (36X18)
C938
OF 122 SHEETS
65
42
+
0
0
43
+
00
F
E
S
F
E
S
F
E
S
W
V
W
V
W
V
D
C
VAU
LT
ELE
C
D
D
G
C
ON
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
C
O
N
T
R
O
L
I
RR
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
TE
R
AV
E
N
U
E
I
N
T
E
R
NA
T
I
O
N
A
L
B
O
U
LE
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
OU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
5
4
7
5
6
2 5
6
4 5
4
7
4
2
SIGNING & STRIPING PLAN
6
6
2
2
2
LINCOLN AVE
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
STA 12+39.45 MATCH NORTHERN ENGINEERING DESIGN
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
L
VD
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:50:19 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Signing&Striping Sheet_02
TELESPAR SLEEVE BLANK TO EXTEND 36" MINIMUM BELOW SURFACE.
PVC SLEEVES TO BE CORED THROUGH PAVEMENT SOIL. CUT OFF 1" ABOVE MEDIAN CAP.
ALL SIGNS SHALL BE A MINIMUM OF 2.0' FROM CLOSEST POINT OF SIGN FACE TO BACK OF CURB.
LEADING EDGE OF CROSSWALK.
CHECK MUTCD TABLE 2C-4 FOR SIGN PLACEMENT. MEASURE ALONG OUTSIDE CURB FACE FROM
ALL PROPOSED STRIPING AND SIGNING MUST BE APPROVED BY LOCAL ENTITY ENGINEER.
GRINDING OF CONCRETE SURFACE (120 MILS).
PRE-FORMED THERMO PLASTIC STRIPING ON CONCRETE SHALL BE INLAID THROUGH APPROVED
ROUNDABOUT AREA INSIDE THE PEDESTRIAN CROSSINGS.
USE PRE-FORMED THERMO PLASTIC FOR ALL STRIPING AND MARKINGS WITHIN THE
ROLLED INTO THE FINAL SURFACE.
ALL THERMO PLASTIC STRIPING WORDS AND ARROWS PLACED ON ASPHALT SHALL BE HOT
USE ELONGATED ARROWS PER LCUASS.
USE PRE-FORMED THERMO PLASTIC FOR ALL WORD AND ARROW MARKINGS
9.
8.
7.
6.
5.
4.
3.
2.
1.
NOTES:
7 CENTER LINE: SOLID DOUBLE YELLOW, 4 IN. WIDE, 4 IN. APART
6 CROSSWALK LINE: SOLID WHITE, 18 IN. WIDE
5 EDGE LINE: SOLID WHITE, 6 IN. WIDE
4 DOTTED LINE: BROKEN WHITE, 6 IN. WIDE - 2 FT. SEGMENTS WITH 4 FT. GAPS
3 DOTTED LINE: BROKEN WHITE, 8 IN. WIDE - 2 FT. SEGMENTS WITH 4 FT. GAPS, BLACK CONTRAST
2 EDGE LINE: SOLID YELLOW, 4 IN. WIDE
1 CHANNELIZING LINE: SOLID WHITE, 8 IN. WHITE
LEGEND
30"x30"
W2-6
18"x18"
W13-P
30"x30"
W2-6
18"x18"
W13-P
30"x30"
W11-2
24"x12"
W16-7P
2.01
2.04
2.06
2.02
(30"x30")
OM 1-2
7
24"x30"
R4-7
2
2.03
2.05
(24"x30")
R3-16a
(24"x18")
SPECIAL
(24"x30")
R3-16a
(24"x18")
SPECIAL
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
M
A
T
C
H
L
I
N
E
S
T
A
10
+
94
0' 10' 20' 40'
20
M.P.H.
20
M.P.H.
(
P
R
I
VA
TE
D
R
I
V
E
)
C
O
TT
AG
E
D
R
I
V
E
MERGE
OR USE
PATH
MERGE
OR USE
PATH
C937
OF 122 SHEETS
3
6
+
0
0
37
+
00
38
+
00
39
+
00
40
+
0
0
C
C
C.O.
C
AC
AC
AC AC
AC AC
CABLE
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
O
N
A
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
LINCOLN
LINCOLN
1
1
1
1
4
4
5
5
5
2
6
2
3
2 2
2
3
6
2
5
2
6
2
6
3
2
2
6
4
4
5
6
3
(RED ON WHITE)
36"x36"x36"
R1-2
1.19
1.11
SIGNING & STRIPING PLAN
4
4
4
2
2
6
6
6
6
6
2
2
2
2
2
2
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
STA 33+10.63 MATCH EXISTING STRIPING
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:42:52 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Signing&Striping Sheet_01
.
dgn
TELESPAR SLEEVE BLANK TO EXTEND 36" MINIMUM BELOW SURFACE.
PVC SLEEVES TO BE CORED THROUGH PAVEMENT SOIL. CUT OFF 1" ABOVE MEDIAN CAP.
ALL SIGNS SHALL BE A MINIMUM OF 2.0' FROM CLOSEST POINT OF SIGN FACE TO BACK OF CURB.
LEADING EDGE OF CROSSWALK.
CHECK MUTCD TABLE 2C-4 FOR SIGN PLACEMENT. MEASURE ALONG OUTSIDE CURB FACE FROM
ALL PROPOSED STRIPING AND SIGNING MUST BE APPROVED BY LOCAL ENTITY ENGINEER.
GRINDING OF CONCRETE SURFACE (120 MILS).
PRE-FORMED THERMO PLASTIC STRIPING ON CONCRETE SHALL BE INLAID THROUGH APPROVED
ROUNDABOUT AREA INSIDE THE PEDESTRIAN CROSSINGS.
USE PRE-FORMED THERMO PLASTIC FOR ALL STRIPING AND MARKINGS WITHIN THE
ROLLED INTO THE FINAL SURFACE.
ALL THERMO PLASTIC STRIPING WORDS AND ARROWS PLACED ON ASPHALT SHALL BE HOT
USE ELONGATED ARROWS PER LCUASS.
USE PRE-FORMED THERMO PLASTIC FOR ALL WORD AND ARROW MARKINGS
9.
8.
7.
6.
5.
4.
3.
2.
1.
NOTES:
7 CENTER LINE: SOLID DOUBLE YELLOW, 4 IN. WIDE, 4 IN. APART
6 CROSSWALK LINE: SOLID WHITE, 18 IN. WIDE
5 EDGE LINE: SOLID WHITE, 6 IN. WIDE
4 DOTTED LINE: BROKEN WHITE, 6 IN. WIDE - 2 FT. SEGMENTS WITH 4 FT. GAPS
3 DOTTED LINE: BROKEN WHITE, 8 IN. WIDE - 2 FT. SEGMENTS WITH 4 FT. GAPS, BLACK CONTRAST
2 EDGE LINE: SOLID YELLOW, 4 IN. WIDE
1 CHANNELIZING LINE: SOLID WHITE, 8 IN. WHITE
LEGEND
18"x18"
W13-P
30"x30"
W2-6
AVE
AVE
60"x12"
D1-1
(BLACK ON WHITE)
60"x24" (min.)
R6-4b
30"x30"
W11-2
60"x12"
D1-1
1.01
1.02
1.03
1.04
1.06
1.07
1.08
1.09
1.10
1.12
1.13
1.15
1.16
1.17
1.18
1.05
STREET NAME TO BE DETERMINED
60"x12"
D1-1
24"x12"
W16-7P
24"x30"
R4-7
30"x30"
W11-2
24"x12"
W16-7P
(30"x30")
OM 1-2
(RED ON WHITE)
36"x36"x36"
R1-2
(RED ON WHITE)
36"x36"x36"
R1-2
(RED ON WHITE)
36"x36"x36"
R1-2
30"x30"
W11-2
24"x12"
W16-7P
L
I
N
C
O
L
N
AV
E
L
I
N
C
O
L
N
AV
E
(24"x30")
R3-16a
(24"x18")
SPECIAL
TS
U
.
D
.
R
UN
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
10
+
94
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
20
M.P.H.
MERGE
OR USE
PATH C936
OF 122 SHEETS
P
I
12
+
25
.
42
P
I
38
+
47
.
09
P
C
38
+
1
4.31
P
T
36
+
10
.0
5
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
C
ON
T
R
O
L
I
R
R
C
ON
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
W
V
E
A
C
C
.
O
.
A
C
A
C
G
A
C
A
C
A
C
C
C
E
C
.
O
.
A
C
A
C
A
C
A
C
A
C
A
C
A
C
A
C
G
A
C
A
C
A
C
A
C
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 11:19:02 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Sight Distance Plan_01
.
dgn
L
I
N
C
O
L
N
AV
E
L
I
N
C
O
L
N
AV
E
KEYMAP
SIGHT DISTANCE PLAN
LEGEND
REQUIRED SIGHT DISTANCE
CEF BSH
DZ AS NOTED
02/10/2016
B
U
FF
A
L
O
R
UN
A
P
T
S
.
STA 12+24.24, 21.97' LT
STA 40+79.15, 21.50' LT
STA 39+64.61, 80.99' LT
REQUIRED SIGHT DISTANCE TRIANGLE
STA 11+14.67, 63.23' LT
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
STA 37+47.63, 21.50' RT
REQUIRED SIGHT DISTANCE TRIANGLE
STA 39+79.47, 39.70' RT
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
T
E
R
NA
T
I
ONA
L
B
OU
LE
VA
R
D
STA 38+84.37, 33.7' LT
STA 39+46.37, 38.89' LT
STA 38+87.28, 16.98' RT
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
REQUIRED SIGHT DISTANCE TRIANGLE
0' 10' 20' 40'
C935
OF 122 SHEETS
7
3
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
6
.
1
%
4
.
9
%
5
.1
%
4
.
4
%
3
.
7
%
4.8
%
4.8
%
3.7
%
4
.
6
%
3
.
5
%
4.4
%
3.6
%
L
I
N
C
O
L
N
A
V
E
L
I
N
C
O
L
N
AV
E
L
I
N
C
O
L
N
AV
E
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
BIKE RAMP DETAILS
1
'
R
1
'
R
1
'
R
1
'
R
1
'
R
1'
R
TYPE III BARRICADE
LINCOLN AVE HCL
INTERNATIONAL BOULEVARD HCL
LINCOLN AVE HCL
LINCOLN AVE HCL
CITY COUNCIL BY RESOLUTION)
(FINAL NAME TO BE DETERMINED BY
INTERNATIONAL BOULEVARD
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 10:09:02 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Bike Ramp Detail Sheet_01
4940.98
Lt. 33.32
36+87.22
Front of Walk
4940.88
Lt. 28.87
36+93.31
Front of Walk
4940.76
Rt. 32.00
37+00.76
Front of Walk
4940.87
Rt. 36.00
36+93.39
Front of Walk
4940.36
Lt. 24.53
36+66.85
Flowline
4940.32
Lt. 23.87
36+72.75
Flowline
4940.25
Lt. 21.50
36+86.44
Flowline
4940.22
Rt. 25.78
36+78.99
Flowline
4940.15
Rt. 24.34
36+90.46
Flowline
4940.12
Rt. 23.59
36+96.41
Flowline
4940.86
Lt. 25.03
36+66.87
Curb Back
4940.32
Lt. 24.37
36+72.83
Curb Back
4940.75
Lt. 22.00
36+86.52
Curb Back
4940.72
Rt. 26.28
36+79.06
Curb Back
4940.15
Rt. 24.83
36+90.52
Curb Back
4940.62
Rt. 24.08
36+96.47
Curb Back
4938.51
Lt. 32.00
12+44.39
Front of Walk
4938.59
Rt. 36.00
12+02.60
Front of Walk
4938.59
Rt. 33.37
11+94.58
Front of Walk
4938.63
Lt. 36.00
12+52.13
Front of Walk
4938.01
Lt. 25.80
12+67.17
Flowline
4937.91
Lt. 24.46
12+55.18
Flowline
4937.87
Lt. 23.73
12+49.09
Flowline
4937.79
Rt. 26.00
12+21.67
Flowline
4937.82
Rt. 25.79
12+15.85
Flowline
4937.89
Rt. 24.91
12+01.46
Flowline
4938.39
Rt. 25.41
12+01.44
Curb Back
4937.82
Rt. 26.29
12+15.82
Curb Back
4938.29
Rt. 26.50
12+21.67
Curb Back
4938.51
Lt. 26.30
12+67.11
Curb Back
4937.91
Lt. 24.96
12+55.12
Curb Back
4938.37
Lt. 24.23
12+49.03
Curb Back
4938.44
Rt. 34.51
40+47.10
Front of Walk
4938.44
Rt. 37.70
40+54.36
Front of Walk
4937.70
Rt. 25.49
40+54.66
Flowline
4937.57
Rt. 25.89
40+69.73
Flowline
4937.51
Rt. 26.00
40+75.57
Flowline
4938.01
Rt. 26.50
40+75.57
Curb Back
4937.57
Rt. 26.39
40+69.71
Curb Back
4938.20
Rt. 25.99
40+54.65
Curb Back
4936.96
Lt. 32.00
42+24.96
Front of Walk
4936.92
Lt. 36.00
42+32.70
Front of Walk
4936.24
Lt. 23.73
42+29.66
Flowline
4936.17
Lt. 24.46
42+35.76
Flowline
4936.04
Lt. 25.80
42+47.74
Flowline
4936.74
Lt. 24.23
42+29.60
Curb Back
4936.17
Lt. 24.96
42+35.70
Curb Back
4936.54
Lt. 26.30
42+47.69
Curb Back
0' 5' 10' 20'
0' 5' 10' 20'
0' 5' 10' 20'
0' 5' 10' 20'
37
+
00
C934
OF 122 SHEETS
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
KEYMAP
4%
4%
7
.
18
%
7
.
28
%
4
%
7.28
%
4
%
7.18%
7.18
%
4
%
4
%
4
%
8
.
33
%
7.8
%
4
%
DZ
CEF BSH
AS NOTED
02/10/2016
PEDESTRIAN RAMP DETAILS
1
.
5
'
R
1
.
5
'
R
1
.
5
'
R
1.5
'
R
1
.
5
'
R
1.5
'
R
1
.
5
'
R
1.5
'
R
1.5
'
R
1.5
'
R
1
.
5
'
R
1
.
5
'
R
1.5
'
R
1
.
5
'
R
1.5
'
R
1
.
5
'
R
1.5
'
R
4940.02
Lt. 37.93
38+06.58
Front of Walk
4940.09
Lt. 39.22
38+13.46
Front of Walk
4939.49
Lt. 30.86
38+14.86
Breakline
4939.39
Lt. 28.72
38+16.38
Flowline
4939.39
Lt. 29.57
38+08.15
Breakline
4939.29
Lt. 26.85
38+07.12
Flowline
4938.27
Rt. 85.91
38+91.75
Flowline
4938.45
Rt. 77.21
38+86.69
Flowline
4938.52
Rt. 79.77
38+85.32
Breakline
4939.09
Rt. 83.10
38+79.29
Front of Walk
4938.82
Rt. 88.27
38+84.39
Front of Walk
4938.39
Rt. 85.81
38+88.83
Breakline
4938.09
Rt. 77.25
39+35.19
Flowline
4938.21
Rt. 76.45
39+38.19
Breakline 4938.84
Rt. 77.40
39+46.03
Front of Walk
4939.03
Rt. 70.91
39+50.72
Front of Walk
4938.33
Rt. 69.79
39+41.43
Breakline
4938.26
Rt. 67.48
39+39.89
Flowline
4939.44
Rt. 27.97
37+99.10
Flowline
4939.38
Rt. 32.66
38+08.24
Flowline
4939.49
Rt. 34.02
38+05.67
Breakline
4939.47
Rt. 30.85
37+99.50
Breakline
4940.14
Rt. 38.42
37+95.58
Front of Walk
4940.10
Rt. 41.61
38+01.81
Front of Walk
4938.81
Rt. 39.32
40+19.18
Front of Walk
4938.19
Rt. 31.00
40+17.50
Breakline
4938.08
Rt. 28.24
40+18.43
Flowline
4938.18
Rt. 30.43
40+08.90
Flowline
4938.27
Rt. 32.52
40+10.87
Breakline
4938.88
Rt. 40.83
40+12.59
Front of Walk
4939.25
Lt. 41.12
40+21.42
Front of Walk
4938.65
Lt. 33.28
40+18.00
Breakline
4938.58
Lt. 31.66
40+15.51
Flowline
4939.11
Lt. 38.36
40+28.10
Front of Walk
4938.51
Lt. 30.56
40+24.60
Breakline
4938.38
Lt. 27.69
40+25.12
Flowline
4938.12
Rt. 27.89
11+57.19
Flowline
4938.22
Rt. 30.64
11+56.24
Breakline
4938.84
Rt. 38.97
11+57.88
Front of Walk
4938.88
Rt. 40.45
11+51.29
Front of Walk
4938.27
Rt. 32.13
11+49.61
Breakline
4938.17
Rt. 30.03
11+47.65
Flowline
4938.38
Lt. 32.38
11+54.41
Flowline
4938.45
Lt. 33.97
11+56.92
Breakline
4938.30
Lt. 31.14
11+63.49
Breakline
4938.17
Lt. 28.27
11+63.96
Flowline
4938.90
Lt. 38.89
11+67.11
Front of Walk
4939.04
Lt. 41.75
11+60.47
Front of Walk
1
.
5
'
R
1.5
'
R
7.
2
8
%
R=1.5'
R=1.5'
R=1.5'
R=1.5'
4939.63
Rt. 9.92
38+08.78
Flowline
4939.73
Rt. 8.07
38+11.14
Breakline
4939.76
Rt. 2.26
38+14.11
Angle Point
4939.78
Lt. 3.05
38+13.12
Breakline
4939.68
Lt. 5.32
38+11.25
Flowline
4939.64
Rt. 13.35
38+18.62
Flowline
4939.74
Rt. 10.51
38+18.12
Breakline
4939.76
Rt. 3.06
38+21.67
Angle Point
4939.77
Lt. 4.16
38+19.84
Breakline
4939.67
Lt. 6.90
38+20.71
Flowline
4
%
4
%
0
.
41
%
R=1.5'
R=1.5'
R=1.5'
R=1.5'
4
%
1%
R=1.5'
R=1.5'
R=1.5'
4938.80
Rt. 73.75
39+10.58
Breakline
4
%
4%
1
.
33
%
R=1.5'
R=1.5'
4
%
4
%
1
.
2
3
%
4938.70
Rt. 8.80
40+04.15
Flowline
4938.61
Rt. 7.46
40+13.99
Flowline
4938.72
Rt. 5.17
40+12.11
Breakline
4938.82
Lt. 5.18
40+13.69
Breakline
4938.70
Lt. 7.13
40+15.95
Flowline
4938.89
Lt. 10.24
40+06.50
Flowline
4938.96
Lt. 7.39
40+06.99
Breakline
4938.86
Rt. 0.20
40+03.88
Angle Point
4938.78
Rt. 6.11
40+05.19
Breakline
1
.
03
%
1
.
0
0
%
0.14
%
0.14%
0.52
%
0
.60
%
1
.
7
1
%
1
.
7
6
%
2
.
00
%
1
.
86
%
2.00
%
1
.
60
%
1
.
46
%
2.00
%
2
.
00
%
1
.
87
%
0
.
84
%
0
.
50
%
0
.
51
%
2
.
00
%
2
.
00
%
1
.
8
9
%
0
.
92
%
1.00%
1.03%
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 10:14:34 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Ped Ramp Detail Sheet_01.dgn
4938.49
Lt. 120.52
39+21.32
Flowline
4938.58
Lt. 113.77
39+23.32
Flowline
4938.60
Lt. 119.57
39+18.99
Breakline
4938.60
Lt. 119.01
39+06.09
Flowline
4938.66
Lt. 112.82
39+20.99
Breakline
4938.62
Lt. 117.32
39+13.49
Angle Point
4938.65
Rt. 73.60
39+14.66
Flowline
4938.72
Lt. 118.47
39+08.55
Breakline
4938.78
Lt. 112.12
39+05.06
Flowline
4938.76
Rt. 0.84
40+11.18
Angle Point
4938.76
Lt. 110.00
39+14.08
Angle Point
4938.74
Rt. 74.98
39+08.34
Flowline
4938.77
Rt. 73.32
39+12.17
Breakline
4938.78
Rt. 73.24
39+11.49
Angle Point
4938.84
Rt. 66.79
39+16.30
Flowline
4938.85
Lt. 111.53
39+07.49
Breakline
4938.90
Rt. 66.47
39+13.80
4938.98 Breakline
Rt. 66.02
39+10.08
Angle Point
4938.95
Rt. 68.12
39+06.32
Flowline
4938.97
Rt. 66.87
39+08.55
Breakline
0' 5' 10' 20'
C933
OF 122 SHEETS
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
7.9%
4.0%
KEYMAP
4941.39
Lt. 26.00
34+97.72
Flowline
4941.13
Lt. 26.00
35+74.14
Flowline
4941.19
Lt. 29.00
35+49.90
Flowline
4941.28
Lt. 29.00
35+20.68
Flowline
4941.88
Lt. 36.00
35+62.78
Front of Walk
4.0%
4940.47
Lt. 45.34
33+51.96
Breakline
4940.44
Lt. 45.98
33+47.00
Breakline
2.0%
8.2% 1.4%
1.2%
DZ
CEF BSH
AS NOTED
02/10/2016
DRIVEW AY AND PEDESTRIAN DETAILS
1
'
R
1
'
R
1
'
R
1
'
R
7.9%
1
'
R
1
'
R
4940.83
Rt. 53.92
33+90.52
Front of Walk
4940.99
Rt. 52.65
33+60.55
Front of Walk
WIDENED WALK
7.9%
4940.72
Rt. 39.78
33+60.41
Breakline
4940.75
Rt. 39.33
33+65.39
Breakline
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:38:58 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Driveway+Ramp West Plan_01.dgn
4940.34
Lt. 43.50
33+46.68
Flowline
4940.37
Lt. 42.86
33+51.64
Flowline
4940.59
Rt. 37.29
33+60.18
Flowline
4940.63
Rt. 36.84
33+65.16
Flowline
4940.67
Rt. 45.77
33+90.83
Front of Pad
4940.80
Rt. 44.83
33+65.88
Front of Pad
4940.83
Rt. 44.64
33+60.85
Front of Pad
4941.03
Lt. 53.42
33+47.96
Front of Walk
4941.06
Lt. 52.78
33+52.92
Front of Walk
4941.42
Lt. 36.00
35+54.94
Flowline
4941.47
Lt. 36.00
35+57.46
Front of Walk
4941.54
Lt. 36.00
35+16.91
Flowline
4941.55
Lt. 42.00
35+51.79
Flowline
4941.57
Lt. 42.00
35+55.53
Back of Walk
4941.60
Lt. 36.00
35+14.40
Front of Walk
4941.61
Lt. 36.00
35+50.02
Front of Walk
4941.61
Lt. 42.00
35+57.45
Back of Walk
4941.66
Lt. 42.00
35+20.07
Flowline
4941.68
Lt. 42.00
35+16.33
Back of Walk
4941.70
Lt. 36.00
35+20.98
Front of Walk
4941.73
Lt. 42.00
35+50.13
Back of Walk
4941.72
Lt. 42.00
35+14.41
Back of Walk
4941.82
Lt. 42.00
35+21.24
Back of Walk
4942.02
Lt. 42.00
35+62.78
Back of Walk
4942.07
Lt. 36.00
35+08.94
Front of Walk
4942.19
Lt. 42.00
35+08.95
Back of Walk
0' 5' 10' 20'
34
+
00
35
+
00
P
C
34
+
64
.
08
P
I
35
+
37.18
C932
OF 122 SHEETS
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
CEF BSH
DZ AS NOTED
02/10/2016
CONCRETE
FAST TRACK
LEGEND
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT
CONTRACTION JOINT
LONGITUDINAL CONSTRUCTION
CONTRACTION JOINT
DOWELED TRANSVERSE
15
'
1
5
'
15
'
10
'
15
'
15'
12'
12'
12
'
1
5
'
1
5
'
1
0
'
1
5
'
15
'
15
'
15
'
15
15
'
15
'
1
5
'
10
'
1
5
'
15
'
15
'
15
'
1
2
'
12
'
12
'
12
'
15
'
15'
1
5
'
1
2
'
15
'
1
5
'
1
5
'
10
'
10
'
15
'
1
5
'
10
'
15
'
15
'
15
'
10
'
10
'
15
'
15
'
10
'
15
'
15
1
5
'
12
'
15
'
15
15
'
15
'
15
'
15
'
15'
15
'
15
'
15
'
FAST TRACK CONCRETE PAVEMENT
LONGITUDINAL CONTRACTION JOINT (TYP.)
LONGITUDINAL CONSTRUCTION OR
DOWELED TRANSVERSE CONTRACTION JOINT (TYP.)
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:31:40 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Jointing Plan Sheet_01.dgn
KEYMAP
0' 10' 20' 40'
JOINT DETAILS
C931
OF 122 SHEETS
38
+
77.65
P
C
10
+
4
9.50
P
I
38
+
47.0
9
WV
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:37:06 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - INNER ICD
GROUND
EXISTING
PLAN VIEW
EOP INNER ICD
EOP ICD
I
C
D
I
NN
E
R
I
C
D
GRADE AT EOP
PROPOSED
PAVEMENT OR CURB LIP
PROFILES ARE TO EDGE OF
4920
4930
4940
4950
4920
4930
4940
4950
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50
VPI=0+00.00
EL.=4940.00'
VPC=0+04.46
EL.=4940.06'
VPI=0+49.46
EL.=4940.63'
VPT=0+94.46
EL.=4940.02'
VPC=1+40.58
EL.=4939.39'
VPI=1+68.08
EL.=4939.02'
VPT=1+95.58
EL.=4939.38'
VPC=2+10.08
EL.=4939.57'
VPI=2+27.58
EL.=4939.80'
VPT=2+45.08
EL.=4939.56'
VPC=2+61.69
EL.=4939.34'
VPI=2+79.19
EL.=4939.10'
VPT=2+96.69
EL.=4939.34'
VPI=3+45.57
EL.=4940.00'
1.27%
-
1
.
36
%
1
.
32
%
-
1
.
36
%
1.36
%
V.C. = 90.00'
e = -0.30'
SSD = 454'
K = 34.14
V.C. = 55.00'
e = 0.18'
SSD = 293'
K = 20.49
V.C. = 35.00'
e = -0.12'
SSD = 419'
K = 13.04
V.C. = 35.00'
e = 0.12'
SSD = 253'
K = 12.83
4925
4935
4945
4925
4935
4945
0' 10' 20' 40'
1
+
00
3
+
00
4
+
00
PCC 2+35.62 PC 0+00.00
PT 4+71.24
1
+
00
2
+
00
3
+
00
PC 0+00.00
P
T
3
+
45.57
C930
OF 122 SHEETS
57
P
T
38
+
77.65
P
C
10
+
4
9.50
P
I
3
8
+
4
7
.
0
9
PC 38+14.31
WV
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:34:41 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ICD
GROUND
EXISTING
PLAN VIEW
EOP ICD
I
C
D
I
NN
E
R
I
C
D
GRADE AT ICD
PROPOSED
4920
4930
4940
4950
4920
4930
4940
4950
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
4925
4935
4945
4925
4935
4945
VPI=0+00.00
EL.=4939.60'
VPC=0+65.55
EL.=4938.95'
VPI=0+90.55
EL.=4938.70'
VPT=1+15.55
EL.=4938.95'
VPC=1+36.50
EL.=4939.16'
VPI=1+61.50
EL.=4939.41'
VPT=1+86.50
EL.=4939.16'
VPC=2+03.88
EL.=4938.98'
VPI=2+41.38
EL.=4938.61'
VPT=2+78.88
EL.=4938.98'
VPC=3+41.05
EL.=4939.61'
VPI=4+06.05
EL.=4940.26'
VPT=4+71.05
EL.=4939.61'
VPI=4+71.24
EL.=4939.60'
-
1
.
0
0
%
1
.
0
0
%
-
1
.
00
%
1
.
0
0
%
-1.00%
V.C. = 50.00'
e = 0.12'
SSD = 1000'
K = 25.00
V.C. = 50.00'
e = -0.12'
SSD = 565'
K = 25.00
V.C. = 75.00'
e = 0.19'
SSD = 1100'
K = 37.50
V.C. = 130.00'
e = -0.33'
SSD = 605'
K = 65.00
0' 10' 20' 40'
1
+
00
3
+
00
4
+
00
PCC 2+35.62 PC 0+00.00
PT 4+71.24
1
+
00
2
+
0
0
3
+
00
PC 0+00.00
P
T
3
+
45.
57
C929
OF 122 SHEETS
09
PC 38+14.31
PT 36+10.05
PI 35+37.18
C
C
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:30:42 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND WEST RIGHT (2 OF 2)
EXISTING GROUND
L
I
N
C
O
L
N
AV
E
.
PLAN VIEW
EOP ISLAND WEST (RIGHT)
GRADE AT EOP
PROPOSED
PAVEMENT/CURB LIP
PROFILES ARE TO EDGE OF
4925
4930
4935
4940
4945
4950
4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
VPI=4+25.77
EL.=4942.24'
VPT=5+00.77
EL.=4941.57'
VPC=6+70.39
EL.=4940.06'
VPI=6+85.39
EL.=4939.93'
VPT=7+00.39
EL.=4939.75'
VPC=7+05.17
EL.=4939.69'
VPI=7+25.71
EL.=4939.44'
VPT=7+46.25
EL.=4939.79'
VPI=7+46.97
-
0
.
89
%
-
1
.
20
%
2.75%
V.C. = 150.00'
e = -0.28'
SSD = 809'
K = 102.09
V.C. = 30.00'
e = -0.01'
SSD = 3468'
K = 96.00
V.C. = 41.09'
e = 0.15'
SSD = 225'
K = 14.16
Elev 4941.97
Off 0.00
STA 4+00.00
ISLAND W RT
Elev 4941.96
Off 0.00
STA 4+25.00
ISLAND W RT
Elev 4941.89
Off 0.00
STA 4+50.00
ISLAND W RT
Elev 4941.77
Off 0.00
STA 4+75.00
ISLAND W RT
Elev 4941.58
Off 0.00
STA 5+00.00
ISLAND W RT
Elev 4941.35
Off -0.00
STA 5+25.00
ISLAND W RT
Elev 4941.13
Off 0.00
STA 5+50.00
ISLAND W RT
Elev 4940.91
Off -0.00
STA 5+75.00
ISLAND W RT
Elev 4940.69
Off 0.00
STA 6+00.00
ISLAND W RT
Elev 4940.46
Off -0.00
STA 6+25.00
ISLAND W RT
Elev 4940.24
Off 0.00
STA 6+50.00
ISLAND W RT
Elev 4940.02
Off -0.00
STA 6+75.00
ISLAND W RT
Elev 4939.75
Off 0.00
STA 7+00.00
ISLAND W RT
Elev 4939.59
Off 0.00
STA 7+25.00
ISLAND W RT
Elev 4939.69
Off 0.00
STA 7+46.97
ISLAND W RT
EL.=4939.81'
4
+
00
5
+
00
6
+
00
7
+
00
P
T
5
+
18
.
64
P
C
6
+
86
.
30
P
R
C
7
+
42
.
76
P
I
4
+
2
0.
8
8
P
I
7
+
15.30
P
I
7
+
46
.
2
6
4
+
00
5
+
00
6
+
00
P
RC
6
+
00
.
76
P
RC
7
+
4
7
.
5
5
P
R
C
7
+
53
.
91
P
I
4
+
90
.
20
P
I
6
+
74
.
53
P
I
7
+
52
.
9
0
P
I
7
+
6
7
.
35
P
T
7
+
46
.
9
7
P
T
7
+
8
0
.
5
2
=
0' 10' 20' 40'
MATCH LINE STA 4+00 MATCH LINE STA 4+00
4
+
00
35
+
00
P
I
4
+
90.20
5
+
00
36
+
00
P
R
C
6
+
00
.
7
6
6
+
00
37
+
00
P
I
6
+
74.53
7
+
0
0
38
+
00
P
RC
7
+
47
.
55
P
I
7
+
15.30
7
+
0
0
P
C
6
+
86.30
6
+
00
P
T
5
+
18
.
64
5
+
00
P
I
4
+
2
0.
8
8
C928
OF 122 SHEETS
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
GRADE AT EOP
PROPOSED
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 2:01:29 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND WEST RIGHT (1 OF 2)
EXISTING GROUND
PLAN VIEW
PAVEMENT/CURB LIP
PROFILES ARE TO EDGE OF
EOP ISLAND WEST (RIGHT)
4930
4935
4940
4945
4950
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00
VPI=2+05.03
EL.=4941.04'
VPI=3+08.03
EL.=4941.55'
VPC=3+50.77
EL.=4941.80'
0.50%
0
.
5
8
%
V.C. = 150.00'
e = -0.28'
SSD = 809'
K = 102.09
Elev 4941.04
Off 0.00
STA 2+05.03
ISLAND W RT
Elev 4941.14
Off -0.00
STA 2+25.00
ISLAND W RT
Elev 4941.26
Off -0.00
STA 2+50.00
ISLAND W RT
Elev 4941.39
Off -0.00
STA 2+75.00
ISLAND W RT
Elev 4941.51
Off 0.00
STA 3+00.00
ISLAND W RT
Elev 4941.65
Off 0.00
STA 3+25.00
ISLAND W RT
Elev 4941.80
Off 0.00
STA 3+50.00
ISLAND W RT
Elev 4941.91
Off 0.00
STA 3+75.00
ISLAND W RT
3
+
00
P
T
2
+
80.46
P
C
3
+
22
.
57
3
+
00
P
I
2
+
2
9
.
92
0' 10' 20' 40'
MATCH LINE STA 4+00
M
A
T
C
H
L
I
N
E
S
T
A
4
+
00
P
O
B
2
+
05
.13
P
I
2
+
2
0
.05
P
I
2
+
2
9
.
92
3
+
0
0
P
C
3
+
78
.
8
4
P
C
2
+
21
.
16
P
I
2
+
50.82
P
T
2
+
80
.
46
3
+
00
P
C
3
+
22.57
3
4
+
0
0
33
+
0
0
P
O
B
2
+
05
.
03
C927
OF 122 SHEETS
4
7
.
09
PC 38+14.31
PT 36+10.05
PI 35+37.18
C
C
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:58:39 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND WEST LEFT (2 OF 2)
EXISTING GROUND
EOP ISLAND WEST (LEFT)
L
I
N
C
O
L
N
AV
E
.
PLAN VIEW
GRADE AT EOP
PROPOSED
PAVEMENT/CURB LIP
PROFILES ARE TO EDGE OF
4925
4930
4935
4940
4945
4950
4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
VPI=4+31.42
EL.=4942.12'
VPT=5+06.42
EL.=4941.51'
VPC=5+97.28
EL.=4940.76'
VPI=6+44.78
EL.=4940.38'
VPT=6+92.28
EL.=4939.90'
VPI=7+04.83
EL.=4939.78'
VPC=7+05.80
EL.=4939.76'
VPI=7+25.80
EL.=4939.54'
VPT=7+45.80
EL.=4939.68'
VPC=7+67.70
EL.=4939.84' VPI=7+70.59
VPT=7+73.48 EL.=4939.86'
EL.=4939.85'
-
0
.
82
%
-
1
.
00
%
-
1
.
11
%
0
.
70
%
-0.71%
V.C. = 150.00'
e = -0.22'
SSD = 986'
K = 126.66
V.C. = 95.00'
e = -0.02'
SSD = 6060'
K = 529.27
V.C. = 40.00'
e = 0.09'
SSD = 4390'
K = 22.18
V.C. = 5.78'
e = -0.01'
SSD = 1198'
K = 6.40
Elev 4941.93
Off 0.00
STA 4+00.00
ISLAND W LT
Elev 4941.91
Off 0.00
STA 4+25.00
ISLAND W LT
Elev 4941.84
Off 0.00
STA 4+50.00
ISLAND W LT
Elev 4941.73
Off 0.00
STA 4+75.00
ISLAND W LT
Elev 4941.56
Off 0.00
STA 5+00.00
ISLAND W LT
Elev 4941.36
Off 0.00
STA 5+25.00
ISLAND W LT
Elev 4941.15
Off 0.00
STA 5+50.00
ISLAND W LT
Elev 4940.95
Off 0.00
STA 5+75.00
ISLAND W LT
Elev 4940.74
Off 0.00
STA 6+00.00
ISLAND W LT
Elev 4940.53
Off -0.00
STA 6+25.00
ISLAND W LT
Elev 4940.31
Off -0.00
STA 6+50.00
ISLAND W LT
Elev 4940.07
Off -0.00
STA 6+75.00
ISLAND W LT
Elev 4939.82
Off -0.00
STA 7+00.00
ISLAND W LT
Elev 4939.64
Off -0.00
STA 7+25.00
ISLAND W LT
Elev 4939.71
Off 0.01
STA 7+50.00
ISLAND W LT
Elev 4939.85
Off -0.00
STA 7+75.00
ISLAND W LT
VPI=7+80.52
EL.=4939.81'
4
+
00
5
+
00
6
+
00
7
+
00
P
T
5
+
18
.
64
P
C
6
+
86
.
30
P
R
C
7
+
42
.
76
P
I
4
+
2
0.
8
8
P
I
7
+
15.30
P
I
7
+
46
.
2
6
4
+
00
5
+
00
6
+
00
P
RC
6
+
00
.
76
P
RC
7
+
4
7
.
5
5
P
R
C
7
+
53
.
91
P
I
4
+
90
.
20
P
I
6
+
74
.
53
P
I
7
+
52
.
9
0
P
I
7
+
6
7
.
35
P
T
7
+
46
.
9
7
P
T
7
+
8
0
.
5
2
=
0' 10' 20' 40'
MATCH LINE STA 4+00 MATCH LINE STA 4+00
P
I
4
+
2
0.
8
8
P
I
4
+
90.20
5
+
00
5
+
00
P
T
5
+
18
.
64
4
+
00
6
+
00
P
R
C
6
+
00
.
7
6
6
+
00
P
I
6
+
74.53
P
C
6
+
86.30
7
+
0
0
7
+
0
0
P
I
7
+
15.30
P
RC
7
+
47
.
55
35
+
00
36
+
00
37
+
00
38
+
00
C926
OF 122 SHEETS
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
GRADE AT EOP
PROPOSED
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:05:07 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND WEST LEFT (1 OF 2)
EXISTING GROUND
PLAN VIEW
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
EOP ISLAND WEST (LEFT)
4930
4935
4940
4945
4950
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00
VPI=2+05.13
EL.=4941.30'
VPC=3+56.42
EL.=4941.85'
0.37%
V.C. = 150.00'
e = -0.22'
SSD = 986'
K = 126.66
Elev 4941.30
Off 0.00
STA 2+05.13
ISLAND W LT
Elev 4941.37
Off 0.00
STA 2+25.00
ISLAND W LT
Elev 4941.46
Off -0.00
STA 2+50.00
ISLAND W LT
Elev 4941.55
Off 0.00
STA 2+75.00
ISLAND W LT
Elev 4941.64
Off 0.00
STA 3+00.00
ISLAND W LT
Elev 4941.73
Off 0.00
STA 3+25.00
ISLAND W LT
Elev 4941.82
Off 0.00
STA 3+50.00
ISLAND W LT
Elev 4941.90
Off 0.00
STA 3+75.00
ISLAND W LT
3
+
00
P
T
2
+
80.46
P
C
3
+
22
.
57
P
I
2
+
2
9
.
92
P
C
3
+
7
8
.
8
4
0' 10' 20' 40'
MATCH LINE STA 4+00
M
A
T
C
H
L
I
N
E
S
T
A
4
+
00
P
O
B
2
+
05
.13
P
I
2
+
2
0
.05
P
I
2
+
2
9
.
92
3
+
0
0
P
C
3
+
78
.
8
4
P
C
2
+
21
.
16
P
I
2
+
50.82
P
T
2
+
80
.
46
3
+
00
P
C
3
+
22.57
P
O
B
2
+
05
.
03
C925
OF 122 SHEETS
12
+
25.42
P
T
13
+
98.65
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:08:16 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND NORTH RIGHT
EXISTING GROUND
EXISTING GROUND
EOP ISLAND NORTH (RIGHT)
PROFILE - ISLAND NORTH LEFT
EOP ISLAND NORTH (LEFT)
OF PAVEMENT/ CURB LIP
PROFILES ARE TO EDGE
OF PAVEMENT/ CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
GRADE AT EOP
PROPOSED
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
L
VD
.
(
F
I
NA
L
4925
4930
4935
4940
4945
4925
4930
4935
4940
4945
0+00 0+50 1+00 1+50 2+00
VPI=0+00.00
EL.=4938.83'
VPC=0+24.72
EL.=4939.09' VPI=0+27.22
VPT=0+29.72 EL.=4939.11'
EL.=4939.06'
VPC=0+45.99
EL.=4938.73'
VPI=0+90.99
EL.=4937.82'
VPT=1+35.99
EL.=4938.24'
VPI=1+82.67
EL.=4938.68'
1
.
05
%
-
2
.
0
3
%
0.94
%
V.C. = 5.00'
e = -0.02'
SSD = 353'
K = 1.62
V.C. = 90.00'
e = 0.33'
SSD = 274'
K = 30.35
Elev 4938.83
Off -0.00
STA 0+00.00
Island N_LT
Elev 4938.99
Off -0.00
STA 0+25.00
Island N_LT
Elev 4938.65
Off 0.00
STA 0+50.00
Island N_LT
Elev 4938.28
Off -0.00
STA 0+75.00
Island N_LT
Elev 4938.12
Off -0.00
STA 1+00.00
Island N_LT
Elev 4938.16
Off -0.00
STA 1+25.00
Island N_LT
Elev 4938.37
Off -0.00
STA 1+50.00
Island N_LT
Elev 4938.61
Off -0.00
STA 1+75.00
Island N_LT
4925
4930
4935
4940
4945
4925
4930
4935
4940
4945
0+00 0+50 1+00 1+50 2+00
Elev 4938.65
Off 0.00
STA 0+00.00
ISLAND N RT
Elev 4938.51
Off -0.00
STA 0+25.00
ISLAND N RT
Elev 4938.36
Off 0.00
STA 0+50.00
ISLAND N RT
Elev 4938.23
Off -0.00
STA 0+75.00
ISLAND N RT
Elev 4938.19
Off -0.00
STA 1+00.00
ISLAND N RT
Elev 4938.29
Off -0.00
STA 1+25.00
ISLAND N RT
Elev 4938.50
Off -0.00
STA 1+50.00
ISLAND N RT
VPC=0+00.00
EL.=4938.83'
VPI=0+20.00
EL.=4938.51'
VPT=0+40.00
EL.=4938.41'
VPC=0+71.99
EL.=4938.25'
VPI=1+01.99
EL.=4938.10'
VPT=1+31.99
EL.=4938.35'
VPI=1+62.03
EL.=4938.60'
-
0
.
50
%
0
.
84
%
V.C. = 40.00'
e = 0.05'
SSD = 200'
K = 36.36 V.C. = 60.00'
e = 0.10'
SSD = 234'
K = 44.82
1
+
00
P
C
0
+
0
0.00
P
RC
0
+
06
.
14
P
RC
0
+
65.10
P
T
1
+
62
.
03
P
I
0
+
35
.
66
P
I
1
+
13
.
60
P
I
0
+
28
.
68
1
+
00
P
RC
0
+
25
.
21
P
RC
0
+
2
9
.
47
P
R
C
1
+
02
.
54
P
RC
1
+
31
.
93
P
T
1
+
82
.
67
P
I
0
+
12
.
73
P
I
0
+
28.82
P
I
0
+
67
.
76
P
I
1
+
17
.
25
P
I
1
+
5
7
.
3
0
0' 10' 20' 40'
P
I
0
+
04
.
93
P
RC
0
+
2
9.47
P
I
0
+
67.76
P
R
C
0
+
6
5.10
P
RC
0
+
06
.
14
P
I
0
+
35
.
66
P
RC
1
+
02
.
54
1
+
00
P
I
1
+
17
.
25
P
RC
1
+
31
.
93
1
+
00
P
I
1
+
13
.
60
P
I
12
+
25.42
P
T
1
+
62
.
03
P
I
1
+
5
7
.
3
0
P
T
1
+
82
.
67
C924
OF 122 SHEETS
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 12:45:14 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - ISLAND EAST LEFT
PROFILE - ISLAND EAST RIGHT
EXISTING GROUND
EXISTING GROUND
EOP ISLAND EAST (LEFT)
EOP ISLAND EAST (RIGHT)
GRADE AT EOP
PROPOSED
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
4925
4930
4935
4940
4945
4925
4930
4935
4940
4945
0+00 0+50 1+00 1+50 2+00 2+50 3+00
VPI=0+00.00
VPC=0+05.60 EL.=4938.96'
EL.=4939.02'
VPI=0+25.60
EL.=4939.24'
VPT=0+45.60
EL.=4938.84'
VPC=0+47.28
EL.=4938.80'
VPI=0+63.35
EL.=4938.48'
VPT=0+79.42
EL.=4938.35'
VPI=2+71.65
EL.=4936.73'
VPI=2+77.11
EL.=4936.84'
VPI=2+81.42
EL.=4936.74'
VPI=2+86.56
EL.=4936.76'
1
.
1
0
%
-2.00%
-
0
.
84
%
1
.
98
%
-
2
.
37
%
0.41%
V.C. = 40.00'
e = -0.16'
SSD = 368'
K = 12.90
V.C. = 32.14'
e = 0.05'
SSD = 164'
K = 27.73
Elev 4938.96
Off -0.00
STA 0+00.00
ISLAND E LT
Elev 4939.03
Off -0.00
STA 0+25.00
ISLAND E LT
Elev 4938.75
Off -0.00
STA 0+50.00
ISLAND E LT
Elev 4938.39
Off 0.00
STA 0+75.00
ISLAND E LT
Elev 4938.17
Off 0.00
STA 1+00.00
ISLAND E LT
Elev 4937.96
Off 0.00
STA 1+25.00
ISLAND E LT
Elev 4937.75
Off 0.00
STA 1+50.00
ISLAND E LT
Elev 4937.54
Off 0.00
STA 1+75.00
ISLAND E LT
Elev 4937.33
Off 0.00
STA 2+00.00
ISLAND E LT
Elev 4937.12
Off 0.00
STA 2+25.00
ISLAND E LT
Elev 4936.91
Off 0.00
STA 2+50.00
ISLAND E LT
Elev 4936.80
Off 0.00
STA 2+75.00
ISLAND E LT
4925
4930
4935
4940
4945
4925
4930
4935
4940
4945
0+00 0+50 1+00 1+50 2+00 2+50
VPI=0+00.00
EL.=4938.96'
VPI=0+06.19
EL.=4938.84'
VPC=0+11.10
EL.=4938.78'
VPI=0+20.70
EL.=4938.65'
VPT=0+30.31
EL.=4938.57'
VPI=2+48.33
-1.81%
-1.32%
-
0
.
83
%
V.C. = 19.21'
e = 0.01'
SSD = 212'
K = 39.28
Elev 4938.77
Off 0.00
STA 0+00.00
ISLAND E RT
Elev 4938.62
Off 0.00
STA 0+25.00
ISLAND E RT
Elev 4938.41
Off 0.00
STA 0+50.00
ISLAND E RT
Elev 4938.20
Off 0.00
STA 0+75.00
ISLAND E RT
Elev 4938.00
Off 0.00
STA 1+00.00
ISLAND E RT
Elev 4937.79
Off 0.00
STA 1+25.00
ISLAND E RT
Elev 4937.58
Off 0.00
STA 1+50.00
ISLAND E RT
Elev 4937.38
Off 0.00
STA 1+75.00
ISLAND E RT
Elev 4937.17
Off 0.00
STA 2+00.00
ISLAND E RT
Elev 4936.96
Off 0.00
STA 2+25.00
ISLAND E RT
=2+86.56(EOP LEFT)
EL.=4936.77'
1
+
00
2
+
00
P
C
0
+
00.00
P
RC
0
+
06
.
19
P
RC
0
+
72
.
59
P
T
2
+
4
8
.
33
P
I
0
+
0
5
.
0
1
P
I
0
+
39
.
44
P
I
1
+
60.66
1
+
00
2
+
00
P
RC
0
+
25.12
P
RC
0
+
29
.
3
5
P
RC
0
+
96
.
22
P
R
C
1
+
38
.
07
P
R
C
2
+
67
.
7
1
P
I
0
+
1
2
.
68
P
I
0
+
28
.
68
P
I
0
+
64
.
0
3
P
I
1
+
17.14
P
I
2
+
02
.
97
0' 10' 20' 40'
=
2
+
8
6
.
5
6
(
E
O
P
LE
F
T
)
C923
OF 122 SHEETS
7
P
T
38
+
77.65
P
C
10
+
4
9.50
P
I
3
8
+
47
.
09
PC 38+14.31
WV
G
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 12:40:59 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - EOP SW (2 OF 2)
GROUND
EXISTING
PLAN VIEW
EOP SW
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
4925
4930
4935
4940
4945
4950
134+50 135+00 135+50 136+00 136+50
VPI=134+02.82
EL.=4940.03'
VPT=134+77.82
EL.=4939.65'
VPC=135+21.19
EL.=4939.44'
VPI=135+37.53
EL.=4939.35'
VPT=135+53.87
EL.=4938.94'
VPC=135+64.52
EL.=4938.66'
VPI=135+84.52
EL.=4938.15'
VPT=136+04.52
EL.=4938.39'
VPI=136+08.45
EL.=4938.44'
-
0
.
50
%
-
2.56
%
1.20%
V.C. = 150.00'
e = 0.07'
SSD = 1418'
K = 375.00
V.C. = 32.68'
e = -0.08'
SSD = 541'
K = 15.90
V.C. = 40.00'
e = 0.19'
SSD = 137'
K = 10.65
Elev 4940.12
Off 0.00
STA 134+00.00
EOP_SW
Elev 4939.95
Off 0.00
STA 134+25.00
EOP_SW
Elev 4939.80
Off 0.00
STA 134+50.00
EOP_SW
Elev 4939.67
Off 0.00
STA 134+75.00
EOP_SW
Elev 4939.54
Off 0.00
STA 135+00.00
EOP_SW
Elev 4939.39
Off 0.00
STA 135+25.00
EOP_SW
Elev 4938.95
Off 0.00
STA 135+50.00
EOP_SW
Elev 4938.44
Off 0.00
STA 135+75.00
EOP_SW
Elev 4938.36
Off 0.00
STA 136+00.00
EOP_SW
Elev 4941.46
Off -0.00
STA 136+08.53
EOP_SW
13
4
+
00
135
+
00
136
+
00
P
C
134
+
50
.
12
P
CC
1
3
4
+
8
7
.
28
P
C
C
1
3
5
+
6
4
.
3
4
P
T
136
+
0
8
.
5
3
P
I
135
+
46.6
4
MATCH LINE 134+00
M
A
T
C
H
L
I
N
E
134
+
00
0' 10' 20' 40'
P
C
134
+
50.12
P
I
1
3
4
+
0
4
.
1
3
C922
OF 122 SHEETS
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 12:35:21 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - EOP SW (1 OF 2)
GROUND
EXISTING
PLAN VIEW
EOP SW
GRADE AT EOP
PROPOSED
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
4930
4935
4940
4945
4950
130+00 130+50 131+00 131+50 132+00 132+50 133+00 133+50
VPI=130+00.00
EL.=4940.43'
VPC=131+27.67
EL.=4941.30'
VPI=132+03.86
EL.=4941.82'
VPT=132+80.05
EL.=4941.13'
VPC=133+27.82
EL.=4940.70'
0
.
6
8
%
-
0.90
%
V.C. = 152.38'
e = -0.30'
SSD = 759'
K = 96.36
V.C. = 150.00'
e = 0.07'
SSD = 1418'
K = 375.00
Elev 4940.43
Off -0.00
STA 130+00.28
EOP_SW
Elev 4940.60
Off 0.00
STA 130+25.00
EOP_SW
Elev 4940.77
Off 0.00
STA 130+50.00
EOP_SW
Elev 4940.94
Off 0.00
STA 130+75.00
EOP_SW
Elev 4941.11
Off 0.00
STA 131+00.00
EOP_SW
Elev 4941.28
Off 0.00
STA 131+25.00
EOP_SW
Elev 4941.43
Off -0.00
STA 131+50.00
EOP_SW
Elev 4941.51
Off 0.00
STA 131+75.00
EOP_SW
Elev 4941.52
Off 0.00
STA 132+00.00
EOP_SW
Elev 4941.47
Off 0.00
STA 132+25.00
EOP_SW
Elev 4941.36
Off 0.00
STA 132+50.00
EOP_SW
Elev 4941.18
Off 0.00
STA 132+75.00
EOP_SW
Elev 4940.95
Off 0.00
STA 133+00.00
EOP_SW
Elev 4940.73
Off 0.00
STA 133+25.00
EOP_SW
Elev 4940.51
Off 0.00
STA 133+50.00
EOP_SW
Elev 4940.31
Off 0.00
STA 133+75.00
EOP_SW
131
+
00
133
+
00
13
4
+
0
0
P
T
130
+
10
.
16
P
C
131
+
62
.
12
P
CC
131
+
86
.
19
P
T
132
+
97
.
06
P
I
133
+
64
.
13
MATCH LINE 134+00
M
A
T
C
H
L
I
N
E
134
+
00
0' 10' 20' 40'
P
I
133
+
64.13
133
+
00
P
T
132
+
97.06
P
I
132
+
05
.
93
132
+
00
P
CC
131
+
86
.
1
9
P
C
130
+
00
.
28
130
+
00
P
I
130
+
05.22
P
T
130
+
10
.
16
131
+
00
P
C
131
+
62
.
12
C921
OF 122 SHEETS
8
+
47
.
09
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 12:30:03 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - EOP NW (2 OF 2)
GROUND
EXISTING
PLAN VIEW
EOP NW
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
V.C. = 40.00'
e = -0.06'
SSD = 961'
K = 34.88
S
W
W
S
4940
4925
4930
4935
4940
4945
145+50 146+00 146+50 147+00 147+50 148+00 148+50
VPC=145+01.63
EL.=4939.50'
VPI=145+16.64
EL.=4939.32'
VPT=145+31.65
EL.=4939.47'
VPC=145+54.84
EL.=4939.70'
VPI=145+89.84
EL.=4940.05'
VPT=146+24.84
EL.=4939.59'
VPC=146+25.35
EL.=4939.59'
VPI=146+45.35
EL.=4939.33'
VPT=146+65.35
EL.=4938.84'
VPI=146+75.64
EL.=4938.58'
VPC=146+92.40
EL.=4938.25'
VPI=147+22.40
EL.=4937.65'
VPT=147+52.40
EL.=4937.87'
VPI=147+89.97
EL.=4938.16'
VPI=148+05.32
EL.=4938.31'
-1.20%
1
.
0
0
%
-1.30%
-
2.45
%
-
2
.
00
%
0
.
75
%
1
.
00
%
V.C. = 30.02'
e = 0.08'
SSD = 518'
K = 13.65
V.C. = 70.00'
e = -0.20'
SSD = 504'
K = 30.39
V.C. = 60.00'
e = 0.21'
SSD = 283'
K = 21.82
Elev 4939.52
Off 0.00
STA 145+00.00
EOP_NW
Elev 4939.42
Off -0.00
STA 145+25.00
EOP_NW
Elev 4939.65
Off 0.00
STA 145+50.00
EOP_NW
Elev 4939.84
Off 0.00
STA 145+75.00
EOP_NW
Elev 4939.82
Off 0.00
STA 146+00.00
EOP_NW
Elev 4939.59
Off 0.00
STA 146+25.00
EOP_NW
Elev 4939.18
Off -0.00
STA 146+50.00
EOP_NW
Elev 4938.60
Off -0.00
STA 146+75.00
EOP_NW
Elev 4938.11
Off 0.00
STA 147+00.00
EOP_NW
Elev 4937.84
Off 0.00
STA 147+25.00
EOP_NW
Elev 4937.86
Off -0.00
STA 147+50.00
EOP_NW
Elev 4938.04
Off -0.00
STA 147+75.00
EOP_NW
Elev 4938.26
Off -0.00
STA 148+00.00
EOP_NW
145
+
00
146
+
00
1
47
+
00
1
4
8
+
00
P
T
146
+
13
.
10
P
C
146
+
43
.
31
P
CC
147
+
28
.
67
P
T
1
4
7
+
5
3.
12
P
C
147
+
93
.
12
P
T
148
+
0
5
.
3
0
P
I
145
+
2
3
.
0
6
P
I
14
6
+
90
.
5
2
P
I
14
7
+
9
9
.
2
1
MATCH LINE 145+00
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
145
+
00
C920
OF 122 SHEETS
PI 35+37.18
PC 34+64.08
C
C
S
C
S
TELE
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:47:39 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
CEF BSH
AS NOTED
02/10/2016
DMZ
PROFILE - EOP NW (1 OF 2)
GROUND
EXISTING
PLAN VIEW
EOP NW
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
4925
4930
4935
4940
4945
4950
140+00 140+50 141+00 141+50 142+00 142+50 143+00 143+50 144+00 144+50 145+00
VPC=140+02.80
EL.=4940.13'
VPI=140+50.30
EL.=4940.37'
VPT=140+97.80
EL.=4940.76'
VPC=141+55.57
EL.=4941.23'
VPI=142+33.35
EL.=4941.87'
VPT=143+11.13
EL.=4941.19'
VPC=143+69.17
EL.=4940.69'
VPI=143+91.67
EL.=4940.50'
VPT=144+14.17
VPC=144+16.24 EL.=4940.38'
EL.=4940.37'
VPI=144+38.74
EL.=4940.25'
VPT=144+61.24
EL.=4939.98'
0.50%
0.82
%
-
0
.
86
%
-0.52%
-
1
.
20
%
V.C. = 95.00'
e = 0.04'
SSD = 1154'
K = 300.06
V.C. = 155.56'
e = -0.33'
SSD = 720'
K = 92.53
V.C. = 45.00'
e = 0.02'
SSD = 552'
K = 130.61
V.C. = 45.00'
e = -0.04'
SSD = 1609'
K = 66.18
Elev 4940.12
Off 0.00
STA 140+00.00
EOP_NW
Elev 4940.25
Off 0.00
STA 140+25.00
EOP_NW
Elev 4940.41
Off 0.00
STA 140+50.00
EOP_NW
Elev 4940.58
Off -0.00
STA 140+75.00
EOP_NW
Elev 4940.78
Off 0.00
STA 141+00.00
EOP_NW
Elev 4940.98
Off -0.00
STA 141+25.00
EOP_NW
Elev 4941.19
Off 0.00
STA 141+50.00
EOP_NW
Elev 4941.37
Off 0.00
STA 141+75.00
EOP_NW
Elev 4941.49
Off 0.00
STA 142+00.00
EOP_NW
Elev 4941.54
Off 0.00
STA 142+25.00
EOP_NW
Elev 4941.52
Off -0.00
STA 142+50.00
EOP_NW
Elev 4941.44
Off -0.00
STA 142+75.00
EOP_NW
Elev 4941.28
Off 0.00
STA 143+00.00
EOP_NW
Elev 4941.07
Off 0.00
STA 143+25.00
EOP_NW
Elev 4940.86
Off 0.00
STA 143+50.00
EOP_NW
Elev 4940.64
Off 0.00
STA 143+75.00
EOP_NW
Elev 4940.46
Off 0.00
STA 144+00.00
EOP_NW
Elev 4940.32
Off 0.00
STA 144+25.00
EOP_NW
Elev 4940.11
Off -0.00
STA 144+50.00
EOP_NW
Elev 4939.82
Off 0.00
STA 144+75.00
EOP_NW
1
4
0
+
00
141
+
00
142
+
00
143
+
00
144
+
0
0
145
+
00
P
C
1
41
+
96
.
4
6
P
RC
142
+
07
.
11
P
T
143
+
91
.
62
P
C
144
+
3
1
.
6
2
P
I
142
+
01
.
79
P
I
142
+
99
.
58
MATCH LINE 145+00
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
145
+
00
P
C
14
4
+
3
1
.
6
2
144
+
0
0
P
T
143
+
91
.
62
143
+
00
P
I
142
+
99
.
58
P
RC
142
+
07
.
11
P
I
142
+
01
.
79
P
C
141
+
96
.
46
142
+
00
141
+
00
1
40
+
00
P
I
140
+
00
.
13
P
O
B
139
+
88
.
00
33
+
00
34
+
00
35
+
00
36
+
00
37
+
00
C919
OF 122 SHEETS
41
+
05
.
61
P
C
39
+
59.
7
3
P
O
B
9
+
89
.
57
P
T
38
+
77
.65
P
C
10
+
49
.
50
P
I
3
8
+
47
.
09
P
C
3
8
+
1
4
.
3
1
43
+
00
D
C
ON
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
C
O
N
T
R
O
L
I
RR
A
C
A
C
W
V
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
TE
R
A
V
E
NU
E
I
N
T
E
R
N
A
T
I
ON
A
L
B
OU
L
E
VA
R
D
C
O
T
T
AG
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
N
U
E
LE
M
A
Y
AV
E
NU
E
C
O
T
T
A
G
E
D
R
I
V
E
S
O
U
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 12:20:00 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
EOP ISLAND PROFILES
PROFILE - EOP SE
CEF BSH
AS NOTED
02/10/2016
DMZ
EXISTING GROUND
PLAN VIEW
EOP SE
KEYMAP
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
GRADE AT EOP
PROPOSED
4930
4935
4940
4945
4930
4935
4940
4945
120+00 120+50 121+00 121+50 122+00 122+50 123+00 123+50 124+00
Elev 4938.22
Off -0.00
STA 120+00.00
EOP_SE
Elev 4938.18
Off 0.00
STA 120+25.00
EOP_SE
Elev 4938.53
Off 0.00
STA 120+50.00
EOP_SE
Elev 4938.78
Off 0.00
STA 120+75.00
EOP_SE
Elev 4938.62
Off 0.00
STA 121+00.00
EOP_SE
Elev 4938.37
Off -0.00
STA 121+25.00
EOP_SE
Elev 4938.12
Off 0.00
STA 121+50.00
EOP_SE
Elev 4937.90
Off -0.00
STA 121+75.00
EOP_SE
Elev 4937.67
Off 0.00
STA 122+00.00
EOP_SE
Elev 4937.45
Off 0.00
STA 122+25.00
EOP_SE
Elev 4937.23
Off 0.00
STA 122+50.00
EOP_SE
Elev 4937.02
Off 0.00
STA 122+75.00
EOP_SE
Elev 4936.84
Off 0.00
STA 123+00.00
EOP_SE
Elev 4936.68
Off 0.00
STA 123+25.00
EOP_SE
Elev 4936.55
Off 0.00
STA 123+50.00
EOP_SE
Elev 4936.43
Off -0.00
STA 123+75.00
EOP_SE
VPC=120+00.00
EL.=4938.22'
VPI=120+20.00
EL.=4938.02'
VPT=120+40.00
EL.=4938.36'
VPC=120+51.74
EL.=4938.56'
VPI=120+71.74
EL.=4938.91'
VPT=120+91.74
EL.=4938.71'
VPI=121+53.58
EL.=4938.09'
VPC=122+45.16
EL.=4937.27'
VPI=122+95.16
EL.=4936.83'
VPT=123+45.16
EL.=4936.58'
VPI=123+76.72
EL.=4936.42'
1
.
7
2
%
-
1
.
00
%
-
0
.
89
%
-
0
.
50
%
V.C. = 40.00'
e = 0.14'
SSD = 263'
K = 14.72
V.C. = 40.00'
e = -0.14'
SSD = 417'
K = 14.72
V.C. = 100.00'
e = 0.05'
SSD = 996'
K = 255.22
L
I
N
C
O
L
N
AV
E
NU
E
121
+
00
122
+
00
123
+
00
P
C
120
+
00
.
00
P
C
C
120
+
30
.
45
P
C
C
120
+
83
.
63
P
T
12
1
+
5
4
.
2
5
P
C
121
+
94
.
25
P
T
12
2
+
5
4
.
5
7
P
C
123
+
57
.
45
P
T
12
3
+
76
.
72
P
I
12
0
+
6
2
.
4
6
P
I
122
+
24
.
41
P
I
1
23
+
67
.
12
0' 10' 20' 40'
C918
OF 122 SHEETS
.
4
2
HOUSE
CLUB
DU
FF
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
NU
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
VA
R
D
C
O
TT
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
N
U
E
LE
M
A
Y
AV
E
N
U
E
C
O
T
T
A
G
E
D
R
I
V
E
S
O
U
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 1:38:18 PM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
PROFILE - EOP NE
CEF BSH
AS NOTED
02/10/2016
DMZ
PLAN VIEW
COUNCIL BY RESOLUTION)
NAME TO BE DETERMINED BY CITY
INTERNATIONAL BLVD. (FINAL
EXISTING GROUND
EOP NE
GRADE AT EOP
PROPOSED
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
113
+
00
4925
4930
4935
4940
4945
113+00 113+50 114+00 114+50 115+00
VPC=113+07.10
EL.=4938.73'
VPI=113+27.10
EL.=4938.45'
VPT=113+47.10
EL.=4938.35'
VPC=114+23.38
EL.=4937.97'
VPI=114+43.38
EL.=4937.87'
VPT=114+63.38
EL.=4938.07'
VPI=114+87.41
EL.=4938.31'
-
1
.
39
%
-
0
.
50
%
1
.
0
0
%
V.C. = 40.00'
e = 0.04'
SSD = 234'
K = 44.86 V.C. = 40.00'
e = 0.07'
SSD = 160'
K = 26.67
Elev 4938.83
Off -0.00
STA 113+00.00
EOP_NE
Elev 4938.52
Off -0.00
STA 113+25.00
EOP_NE
Elev 4938.34
Off -0.00
STA 113+50.00
EOP_NE
Elev 4938.21
Off -0.00
STA 113+75.00
EOP_NE
Elev 4938.09
Off -0.00
STA 114+00.00
EOP_NE
Elev 4937.96
Off 0.00
STA 114+25.00
EOP_NE
Elev 4937.97
Off -0.00
STA 114+50.00
EOP_NE
Elev 4938.19
Off -0.00
STA 114+75.00
EOP_NE
114
+
00
P
T
113
+
83.40
P
C
114
+
2
3
.
4
0
P
T
114
+
87
.
41
P
I
114
+
55
.
42
MATCH LINE 113+00
-
1
.
40
%
P
C
10
+
4
9
.
50
P
I
12
+
2
5
.
42
C917
OF 122 SHEETS
7
3
P
I
41
+
05
.
61
P
C
39
+
59
.
73
P
O
B
9
+
89.57
P
T
38
+
77
.
65
P
C
10
+
49
.
50
P
I
38
+
47.09
43
+
00
W
V
HOUSE
CLUB
DU
FF
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
NU
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
VA
R
D
C
O
TT
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
N
U
E
LE
M
A
Y
AV
E
N
U
E
C
O
T
T
A
G
E
D
R
I
V
E
S
O
U
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 11:54:34 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\EOP Island Profiles
KEYMAP
EOP ISLAND PROFILES
PROFILE - EOP NE
CEF BSH
AS NOTED
02/10/2016
DMZ
EXISTING GROUND
PLAN VIEW
GRADE AT EOP
PROPOSED
EOP NE
OF PAVEMENT/CURB LIP
PROFILES ARE TO EDGE
4925
4930
4935
4940
4945
110+00 110+50 111+00 111+50 112+00 112+50
VPI=110+00.00
EL.=4936.19'
VPC=110+09.62
EL.=4936.29'
VPI=110+57.12
EL.=4936.79'
VPT=111+04.62
EL.=4937.20'
VPC=111+61.71
EL.=4937.70'
VPI=111+94.21
EL.=4937.98'
VPT=112+26.71
VPC=112+30.16 EL.=4938.63'
EL.=4938.70'
VPI=112+62.66
EL.=4939.35'
VPT=112+95.16
EL.=4938.90'
1
.
0
5
%
0
.
87
%
2.00%
-
1
.
39
%
V.C. = 95.00'
e = -0.02'
SSD = 5913'
K = 516.35
V.C. = 65.00'
e = 0.09'
SSD = 282'
K = 57.38
V.C. = 65.00'
e = -0.28'
SSD = 351'
K = 19.16
Elev 4936.45
Off -0.00
STA 110+25.00
EOP_NE
Elev 4936.70
Off -0.00
STA 110+50.00
EOP_NE
Elev 4936.94
Off -0.00
STA 110+75.00
EOP_NE
Elev 4937.16
Off -0.00
STA 111+00.00
EOP_NE
Elev 4937.38
Off -0.00
STA 111+25.00
EOP_NE
Elev 4937.60
Off -0.00
STA 111+50.00
EOP_NE
Elev 4937.83
Off -0.00
STA 111+75.00
EOP_NE
Elev 4938.16
Off -0.00
STA 112+00.00
EOP_NE
Elev 4938.60
Off -0.00
STA 112+25.00
EOP_NE
Elev 4938.99
Off 0.00
STA 112+50.00
EOP_NE
Elev 4939.07
Off -0.00
STA 112+75.00
EOP_NE
Elev 4938.83
Off -0.00
STA 113+00.00
EOP_NE
110
+
00
111
+
00
112
+
00
P
C
110
+
4
0.00
P
CC
1
1
1
+
83
.
2
9
P
CC
112
+
99
.
15
P
I
1
1
2
+
63
.
82
M
A
T
C
H
L
I
N
E
113
+
00
MATCH LINE 113+00
-
1
.
40
%
P
C
3
8
+
14
.
3
1
P
C
1
0
+
49
.
50
0' 10' 20' 40'
P
O
B
9
+
89
.
5
7
P
T
3
8
+
77
.
6
5
P
C
39
+
59
.
73
C916
OF 122 SHEETS
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
4935
4
93
5
4935
4935
4935
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:07:13 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Plan & Profile Sheet_04
PLAN VIEW
PROFILE VIEW
PLAN & PROFILE SHEET
ROADWAY
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
17
'
14
'
6' 11'
10' CONC. SIDEWALK (6 INCH)
CURB AND GUTTER TYPE 2
CONCRETE CURB RAMP
AT BACK OF WALK
PROPOSED ROW
PROPOSED BIKE RAMP
6' CONC. SIDEWALK (6 INCH)
10' CONC. SIDEWALK (6 INCH)
CONCRETE CURB RAMP
CURB AND GUTTER TYPE 2
PROPOSED BIKE RAMP AT BACK OF WALK
PROPOSED ROW
6' CONC. SIDEWALK (6 INCH)
CURB AND GUTTER TYPE 1
EXISTING GROUND
Rt. 24.00
11+76.83
ANGLE POINT
Lt. 19.00
11+86.48
ANGLE POINT
Lt. 24.00
12+26.98
ANGLE POINT
Rt. 21.97
11+37.72
ANGLE POINT
PROFILE SHEETS
C916-C922 EDGE OF PAVEMENT
FOR EDGE OF PAVEMENT PROFILES, SEE
LIP ELEV=4938.68
FL ELEV=4938.73
FL ELEV=4938.73
LIP ELEV=4938.68
MATCH LINE STA 12+39.45
ROUNDABOUT ICD
PROPOSED GRADE INTERNATIONAL BLVD
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
O
N
)
(
F
I
NA
L
N
A
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
O
U
LE
V
A
R
D
4920
4940
4960
10+00 11+00 12+00 13+00 14+00
Elev 4939.46
Off 0.00
STA 10+50.00
International
Elev 4938.64
Off -0.00
STA 11+00.00
International
Elev 4938.22
Off -0.00
STA 11+50.00
International
Elev 4938.45
Off 0.00
STA 12+00.00
International
VPI=10+07.83
EL.=4940.15'
VPC=10+95.15
EL.=4938.72'
VPI=11+45.15
EL.=4937.90'
VPT=11+95.15
EL.=4938.40'
-
1
.
64
%
1
.
0
0
%
V.C. = 100.00'
e = 0.33'
SSD = 373'
K = 37.89
VPI=12+81.61
EL.=4939.27'
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
1
2
+
3
9.45
M
A
T
C
H
L
I
N
E
S
T
A
10
+
9
4
.
54
4960
4940
4920
9+50
EL.=4939.27'
VPI=12+81.61
4935
4935
C915
OF 122 SHEETS
.
73
P
I
41
+
05
.
61
43
+
00
F
E
S
F
E
S
F
E
S
W
V
W
V
W
V
C
D
V
A
U
LT
ELE
C
D
D
G
C
O
N
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
C
ON
T
R
O
L
I
RR
4
9
30
4930
4930
4930
4930
4930
4
930
4930
4930
4930
4
93
0
4930
4930
4930
4
935
4935
4
9
35
49
3
5
4935
493
5
49
35
4935
4935
4935
4935
4935
4935
4935
493
5
4
9
3
5
4935
49
35
4
9
3
5
4935
4935
49
3
5
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 11:04:18 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Plan & Profile Sheet_03
13
'
18
'
L
I
N
C
O
L
N
AV
E
PLAN & PROFILE SHEET
ROADWAY
PLAN VIEW
PROFILE VIEW
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
10
'
10.5
'
12
'
12
'
6
'
R
R
492
'
100
'
R
1099
'
R
1081
'
R
1069
'
R
1
0
5
6
'
R
10
0
'
R
1033
'
R
CURB AND GUTTER TYPE 2
19.0' LT
STA 42+09.23,
ANGLE POINT
PROPOSED BIKE RAMP
EXISTING ROW
TYPE 3 BARRICADE
END SIDEWALK STA 42+49.73, 36.00' LT
6' CONC. SIDEWALK (6 INCH)
MATCH EXISTING SIDEWALK STA 41+61.90, 55.26' RT
CURB AND GUTTER TYPE 2
ANGLE POINT STA 41+32.03, 24.0' RT
CURB AND GUTTER TYPE 1
SAWCUT
MATCH EXISTING EOP STA 42+49.72, 36.00' RT
STA 43+56.86
MATCH EXISTING
EXISTING GROUND
PROFILE SHEETS
C916-C922 EDGE OF PAVEMENT
FOR EDGE OF PAVEMENT PROFILES, SEE
EDGE OF ASPHALT SHOULDER
EDGE OF PAVEMENT
528
'
PROPOSED GRADE LINCOLN AVE
(6 INCH)
SIDEWALK
10' CONC.
ANGLE POINT STA 42+49.73, 24.0' LT
4920
4940
4960
4920
4940
4960
41+00 42+00 43+00 44+00 45+00 46+00
VPI=42+49.62
EL.=4936.72'
-
0.85
%
Elev 4937.99
Off 0.00
STA 41+00.00
Lincoln
Elev 4937.56
Off 0.00
STA 41+50.00
Lincoln
Elev 4937.14
Off 0.00
STA 42+00.00
Lincoln
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
4930
4935
49
35
C914
OF 122 SHEETS
.
09
P
C
38
+
14.31
P
T
3
6
+
1
0.
0
5
No. Revisions: By: Date:
REVIEW ED BY:
DESIGNED BY:
DRAW N BY:
SCALE:
939-001
PROJECT:
Sheet
CAPSTONE COTTAGES
Company
the employ of W ilson &
Professional Engineer in
and sealed by a
construction unless signed
be used for any type of
Company and are not to
provided by W ilson &
instruments of service
DATE: These drawings are
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
W
V
C
C
493
5
4935
49
3
5
4935
4
9
3
5
4935
4
9
3
5
49
3
5
49
3
5
4935
4
9
35
4
935
4935
4935
4935
4935
4
935
4935
4
9
35
4935
4935
4935
4935
4935
4935
4935
4935
4
9
4
0
49
4
0
4940
4940
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
cefisher 10:58:17 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Plan & Profile Sheet_02
PLAN VIEW
PROFILE VIEW
PLAN & PROFILE SHEET
ROADWAY
ROUNDABOUT ICD
20
.
55
'
EXISTING WALK
E
X
I
S
T
I
NG
W
A
L
K
20
'
2
1
.
0
1
'
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
~
~
12
'
6
'
13
'
12
'
12
'
10
.
5
'
10
'
9
.
5
'
6
'
2
0
'
20
'
12
'
11.16'
10.91'
13
.
07
'
17
.
15
'
1
7
.
9
3
'
16.84
'
17.49
'
16
.
3
5
'
18
'
13
'
18
'
1
8
'
1
09
9
'
R
600
'
R
600
'
R
100
'
R
100
'
R
60
'
R
250
'
R
75
'
R
60
'
R
500
'
R
10
9
9
'
R
1081
'
R
5
0
0
'
R
1
00
'
R
500
'
R
5
5
'
R
75
'
R
50
0
'
R
75'
R
1
0
0
'
R
900.13
'
R
CURB AND GUTTER TYPE 1
24.0' RT
STA 36+77.13,
ANGLE POINT
PROPOSED BIKE RAMP
6' CONC. SIDEWALK (6 INCH)
PAVEMENT
BEGIN CONCRETE
ASPHALT PAVEMENT,
STA 36+10.05 END
22.38' LT
STA 36+69.65,
ANGLE POINT
PROPOSED BIKE RAMP
ANGLE POINT STA 37+09.06, 15.55' LT
CURB AND GUTTER TYPE 1
10' CONC. SIDEWALK (6 INCH)
EXISTING ROW
AT BACK OF WALK
PROPOSED ROW
CONCRETE CURB RAMP
CURB AND GUTTER TYPE 2
19.0' RT
STA 37+16.81,
ANGLE POINT
CURB AND GUTTER TYPE 2
CURB RAMP
CONCRETE
CONCRETE CURB RAMP
CURB MEDIAN (SPECIAL)
CONCRETE PAVEMENT (DAVIS COLOR XXXX)
TRUCK APRON
CURB AND GUTTER TYPE 2
CURB AND GUTTER TYPE 2
MATCH EXISTING SIDEWALK STA 38+99.74, 118.10' RT
MATCH EXISTING EOP STA 39+07.82, 115.44' RT
SAWCUT
MATCH EXISTING EOP STA 39+29.15, 108.76' RT
MATCH EXISTING SIDEWALK STA 39+37.49, 106.28' RT
CURB AND GUTTER TYPE 2
EXISTING ROW
10' CONC. SIDEWALK (6 INCH)
CONCRETE CURB RAMP
CURB RAMP
CONCRETE
MEDIAN DETAIL B
CURB AND GUTTER TYPE 1
23.30' RT
STA 40+33.89,
ANGLE POINT
PROPOSED BIKE RAMP
ANGLE POINT STA 40+73.03, 24.00' RT
INTERNATIONAL BLVD. POB STA 9+89.99
LINCOLN AVE STA 39+23.02 =
AT BACK OF WALK
PROPOSED ROW
CONCRETE CURB RAMP
10' CONC. SIDEWALK (6 INCH)
CURB AND GUTTER TYPE 1
L
I
N
C
O
L
N
AV
E
.
L
I
N
C
O
L
N
AV
E
.
EXISTING GROUND
1069
'
R
98
'
R
133
.
89
'
R
6
'
CURB AND GUTTER TYPE 1
SIDEWALK (6 INCH)
6' CONC.
PROFILE SHEETS
C916-C922 EDGE OF PAVEMENT
FOR EDGE OF PAVEMENT PROFILES, SEE
PROPOSED GRADE LINCOLN AVE
R
102
.
07
'
(6 INCH)
SIDEWALK
6' CONC.
(6 INCH)
SIDEWALK
10' CONC.
1081
.
27
'
R
RUN APTS
BUFFALO
4920
4940
4960
4920
4940
4960
35+80 36+00 37+00 38+00 39+00 40+00 41+00
VPT=35+98.69
EL.=4941.62'
VPC=38+04.01
EL.=4939.77'
VPI=38+24.01
EL.=4939.59'
VPT=38+44.01
EL.=4939.99'
VPI=38+59.56
EL.=4940.30'
VPI=39+64.24
EL.=4939.44'
VPC=39+77.24
EL.=4939.22'
VPI=40+02.24
EL.=4938.82'
VPT=40+27.24
EL.=4938.61'
-
0.90
%
1
.
98
%
-
0
.
83
%
-
1
.
62
%
-
0.85
%
V.C. = 155.56'
e = -0.27'
SSD = 849'
K = 111.11
V.C. = 40.00'
e = 0.14'
SSD = 228'
K = 13.88
V.C. = 50.00'
e = 0.05'
SSD = 311'
K = 65.06
Elev 4941.61
Off 0.00
STA 36+00.00
Lincoln
Elev 4941.16
Off 0.00
STA 36+50.00
Lincoln
Elev 4940.71
Off 0.00
STA 37+00.00
Lincoln
Elev 4940.26
Off 0.00
STA 37+50.00
Lincoln
Elev 4939.81
Off 0.00
STA 38+00.00
Lincoln
Elev 4940.11
Off 0.00
STA 38+50.00
Lincoln
Elev 4939.97
Off 0.00
STA 39+00.00
Lincoln
Elev 4939.55
Off -0.00
STA 39+50.00
Lincoln
Elev 4938.90
Off 0.00
STA 40+00.00
Lincoln
Elev 4938.41
Off 0.00
STA 40+50.00
Lincoln
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
MATCH LINE STA 10+94.54
4940
4940
494
0
4940
4940
4940
4940
4
9
40
4
9
4
0
4
9
40
4940
4940
4940
49
40
4940
4940
4940
4940
4940
4940
4940
4940
4940
C913
OF 122 SHEETS
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
D
D
D
T S
D
D
VAULT
ELEC
D
C.O.
S
C
S
AC AC
AC
TELE
AC
AC
AC
CABLE
VAULT
ELEC
VAULT
ELEC
494
0
4940
494
0
4
9
4
0
4
9
4
0
4940
49
4
0
4
9
4
0
494
0
494
0
4940
4940
4940
4940
4940
4940
4940
49
40
4940
49
40
4
94
0
4940
4940
49
4
0
4940
4940
4940
4
940
4
94
0
4940
4
940
4940
4940
4940
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
TE
R
N
A
T
I
ONA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
N
O
R
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
A
V
E
NU
E
L
E
M
AY
AV
E
N
U
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 10:19:53 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Plan & Profile Sheet_01.dgn
18
'
EXISTING EASEMENT
LINCOLN AVE
PLAN VIEW
PROFILE VIEW
PLAN & PROFILE SHEET
ROADWAY
1
8
'
EXISTING ROW
DZ
CEF BSH
AS NOTED
02/10/2016
KEYMAP
12
'
R
7
5
'
R
100
'
9
.
5
'
R
1
0
0
'
STA 32+83.10, 49.71' LT
BEGIN CURB AND GUTTER
CONCRETE CURB RAMP
6
'
C
O
N
CR
E
TE
S
I
D
E
W
A
L
K
CURB AND GUTTER TYPE 2
AT BACK OF WALL
PROPOSED ROW
EXISTING ROW
CURB AND GUTTER TYPE 1
CURB RAMP
CONCRETE
EXISTING EASEMENT
EXISTING ROW
STA 33+12.62, 51.62' RT
MATCH EXISTING SIDEWALK
STA 33+10.60, 39.62' RT
MATCH EXISTING EOP
EXISTING ROW
CONCRETE CURB RAMP
STA 32+95.65, 10.19' RT
MATCH EXISTING MEDIAN
STA 32+95.61, 4.06' RT
MATCH EXISTING MEDIAN
SAWCUT
SAWCUT
CURB AND GUTTER TYPE 2
CURB AND GUTTER TYPE 1
EXISTING GROUND
10
'
R
1042
'
R
108
1
'
R
1069
'
R
1051
'
R
6
'
SIDEWALK
CONCRETE
PROFILE SHEETS
C916-C922 EDGE OF PAVEMENT
FOR EDGE OF PAVEMENT PROFILES, SEE
STA 35+63.81, 77.54' RT
MATCH EXISTING SIDEWALK
SIDEWALK
CONCRETE
E
X
I
S
T
I
NG
W
A
L
K
R
98
'
PROPOSED GRADE LINCOLN AVE
R
10
9
9
'
CURB RAMP
CONCRETE
C
O
LLE
G
I
A
TE
D
R
DRIVEWAY
CONCRETE
IR
TS
36
"
RC
P
4920
4940
4960
4920
4940
4960
30+70 31+00 32+00 33+00 34+00 35+00 35+80
VPI=31+23.78
EL.=4940.71'
VPC=31+76.96
EL.=4940.82'
VPI=32+51.96
EL.=4940.98'
VPT=33+26.96
EL.=4941.35'
VPC=34+43.14
EL.=4941.93'
VPI=35+20.92
EL.=4942.32'
0.21%
0.50%
V.C. = 150.00'
e = 0.05'
SSD = 1922'
K = 518.35
V.C. = 155.56'
e = -0.27'
SSD = 849'
K = 111.11
Elev 4940.76
Off 0.00
STA 31+50.00
Lincoln
Elev 4940.87
Off 0.00
STA 32+00.00
Lincoln
Elev 4941.03
Off 0.00
STA 32+50.00
Lincoln
Elev 4941.22
Off 0.00
STA 33+00.00
Lincoln
Elev 4941.47
Off -0.00
STA 33+50.00
Lincoln
Elev 4941.72
Off 0.00
STA 34+00.00
Lincoln
Elev 4941.97
Off 0.00
STA 34+50.00
Lincoln
Elev 4942.07
Off 0.00
STA 35+00.00
Lincoln
Elev 4941.95
Off 0.00
STA 35+50.00
Lincoln
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
4
9
40
4940
49
40
4940
4940
4940
OF 122 SHEETS
C912
U
E
I
N
T
E
R
NA
T
I
O
N
A
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
OU
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
N
U
E
L
E
M
A
Y
AV
E
N
U
E
C
O
T
T
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HOU
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:41:20 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Pavement Details Sheet
(SEE PAVEMENT DETAIL)
CONCRETE PAVEMENT
PAVEMENT DETAIL)
ASPHALT PAVEMENT (SEE
PAVEMENT DETAILS SHEET
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT
(DAVIS TILE COLOR XXX)
CONCRETE PAVEMENT
CEF BSH
02/10/2016
AS NOTED
KEYMAP
LEGEND
DMZ
CONCRETE PAVEMENT (8.5 INCH) 370.78 SY
CONCRETE PAVEMENT (8.5 INCH) 338.44 SY
ASPHALT PAVEMENT 709.47 SY
CONCRETE PAVEMENT (8.5 INCH) 235.82 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 20.35 SY
(DAVIS COLOR XXX)
TRUCK APRON, CONCRETE PAVEMENT (8 INCH) 401.47 SY
CONCRETE PAVEMENT (8.5 INCH) 208.42 SY
CONCRETE PAVEMENT (8.5 INCH) 111.03 SY
(DAVIS COLOR XXX)
CONCRETE PAVEMENT (8 INCH) 3.71 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 20.80 SY
(DAVIS COLOR XXX)
CONCRETE PAVEMENT (8 INCH) 3.98 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 20.79 SY
(8.5 INCH) 231.47 SY
CONCRETE PAVEMENT
(8.5 INCH) 180.59 SY
CONCRETE PAVEMENT
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 20.76 SY
CONCRETE PAVEMENT 1534.44 SY
ASPHALT PAVEMENT 927.93 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 21.28 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 22.83 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 19.58 SY
(DAVIS COLOR TILE RED)
CONCRETE PAVEMENT (8.5 INCH) 19.92 SY
ASPHALT PAVEMENT 765.68 SY
L
I
N
C
O
L
N
AV
E
R
UN
A
P
T
S
B
U
FF
A
L
O
D
E
TE
R
M
I
N
E
D
B
Y
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
O
N
)
I
N
TE
R
NA
T
I
ONA
L
B
L
VD
(
F
I
N
A
L
N
A
M
E
T
O
B
E
W
E
B
S
TE
R
AV
E
C
O
LLE
G
I
A
TE
D
R
STA 41+32.03 END CONCRETE PAVEMENT
STA 36+10.05 BEGIN CONCRETE PAVEMENT
11
+
00
12
+
00
13
+
00
10
+
00
33
+
00
34
+
00
3
5
+
00
3
6
+
0
0
37
+
00
38
+
00
3
9
+
0
0
4
0
+
0
0
42
+
00
P
T
42
+
4
9
.
73
P
I
41
+
0
5
.
61
P
C
3
9
+
5
9.73
P
O
B
9
+
8
9
.
5
7
P
T
3
8
+
77
.
65
P
C
1
0
+
4
9.
5
0
P
I
12
+
25
.
42
P
T
13
+
98
.
65
P
I
38
+
47
.
09
P
C
38
+
14
.
3
1
P
T
36
+
10
.
05
P
I
35
+
3
7
.
1
8
P
C
3
4
+
6
4
.
0
8
43
+
00
0' 20' 40' 80'
C911
OF 122 SHEETS
I
41
+
05.61
43
+
00
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
GEOMETRIC DETAIL SHEET
KEYMAP
DZ
CEF BSH
AS NOTED
02/10/2016
DZ
CEF BSH
AS NOTED
02/10/2016
DZ
CEF BSH
AS NOTED
02/10/2016
SE EOP
E ISLAND RT
LINCOLN AVE
E ISLAND LT
NE EOP
L
I
N
C
O
L
N
AV
E
STA 42+49.70, 39.40' RT LINCOLN AVE.
STA 123+76.72 EOP SE=
STA 42+49.73, 24.00' LT LINCOLN AVE.
STA 110+00.00 EOP NE=
STA 42+29.25, 6.00' RT LINCOLN AVE.
STA 2+48.33 E ISLAND RT=
STA 42+29.26, 6.00' LT LINCOLN AVE.
STA 2+68.28 E ISLAND LT=
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 11:13:08 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Geometry Sheet_03.dgn
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
2. CONTOURS SHOWN ON THIS SHEET ARE 1' MAJOR, 0.2' MINOR CONTOURS
1. FOR EDGE OF PAVEMENT ELEVATIONS, SEE C916-C930 EDGE OF PAVEMENT PROFILE SHEETS
NOTES:
123
+
00
P
T
122
+
54
.
57
P
C
123
+
5
7
.
45
P
T
123
+
7
6
.
72
P
I
122
+
24
.
41
P
I
123
+
67
.
12
111
+
0
0
P
O
B
110
+
00
.
00
P
C
110
+
40
.
00
2
+
00
P
T
2
+
4
8
.
3
3
P
I
1
+
60.66
2
+
00
P
R
C
1
+
38
.
07
P
RC
2
+
67
.
71
P
I
2
+
02
.
97
4936
4937
4937
4
937
493
7
C910
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
P
I
41
+
0
5
.
6
1
P
C
3
9
+
5
9.73
P
O
B
9
+
8
9
.
5
7
P
T
38
+
77
.65
P
C
10
+
49
.
50
P
I
12
+
25
.
42
P
I
38
+
47
.
09
P
C
38
+
14
.
31
P
T
3
6
+
10
.
0
5
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 11:10:53 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Geometry Sheet_02.dgn
L
I
N
C
O
L
N
AV
E
GEOMETRIC DETAIL SHEET
KEYMAP
DZ
CEF BSH
AS NOTED
02/10/2016
R
UN
A
P
T
S
.
B
U
FF
A
L
O
L
I
N
C
O
L
N
A
V
E
INTERNATIONAL BOULEVARD
STA 12+39.45, 7.00' LT
STA 1+82.67 N ISLAND LT=
INTERNATIONAL BOULEVARD
STA 12+39.45, 24.00' LT
STA 148+05.30 EOP NW=
INTERNATIONAL BOULEVARD
STA 12+39.45, 7.00' RT
STA 1+62.03 N ISLAND RT=
INTERNATIONAL BOULEVARD
STA 12+39.45, 24.00' RT
STA 114+87.41 EOP NE=
N ISLAND LT
NE EOP
N ISLAND RT
NW EOP
SW EOP
ICD
INNER ICD
LINCOLN AVE
SE EOP
E ISLAND RT
E ISLAND LT
W ISLAND LT
LINCOLN AVE.
STA 38+34.01, 12.27' LT
STA 7+47.55 W ISLAND LT=
W ISLAND RT
LINCOLN AVE.
STA 39+91.92, 19.05' LT
STA 0+30.33 E ISLAND LT=
LINCOLN AVE.
STA 39+89.21, 12.42' RT
STA 0+06.19 E ISLAND RT=
LINCOLN AVE.
STA 39+29.15, 108.76' RT
STA 120+00.00 EOP SE=
LINCOLN AVE.
STA 39+07.82, 115.44' RT
STA 136+08.53 EOP SE=
LINCOLN AVE.
STA 38+35.45, 19.73' RT
STA 7+42.76 W ISLAND RT=
C
I
T
Y
C
O
UN
C
I
L
B
Y
R
E
S
O
L
U
T
I
O
N
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
O
NA
L
B
O
U
LE
V
A
R
D
DETERMINED BY CITY COUNCIL BY RESOLUTION)
INTERNATIONAL BOULEVARD (FINAL NAME TO BE
2
+
00
133
+
00
134
+
00
135
+
00
1
3
6
+
00
P
T
132
+
97.06
P
I
1
33
+
64.13
P
I
134
+
04.13
P
C
134
+
50.12
P
CC
134
+
87.28
P
CC
135
+
64
.
34
P
T
136
+
08
.
53
P
I
1
35
+
4
6
.
64
1
2
1
+
00
122
+
00
P
C
120
+
00
.
00
P
C
C
1
2
0
+
3
0
.
45
P
CC
120
+
8
3
.
63
P
T
121
+
54
.
25
P
C
12
1
+
94.25
P
I
120
+
62
.
46
P
I
122
+
2
4
.
4
1
143
+
00
144
+
00
145
+
00
146
+
00
147
+
00
148+00
P
T
1
4
3
+
91
.
62
P
C
144
+
31
.
62
P
T
146
+
13
.
10
P
C
146
+
43.31
P
C
C
14
7
+
28
.
6
7
P
T
14
7
+
5
3
.
12
P
C
147
+
93
.
12
PT 148+05.30
P
I
145
+
23
.
06
P
I
1
4
6
+
90
.
5
2
PI 147+99.21
112
+
00
113
+
00
114
+
00
P
CC
111
+
83.29
P
CC
112
+
9
9
.
15
P
T
113
+
83
.
40
P
C
114
+
23
.
40
PT 114+87.41
P
I
112
+
63
.
82
P
I
114
+
55.4
2
5
+
00
6
+
00
7
+
00
P
T
5
+
18.64
P
C
6
+
86.30
P
RC
7
+
42
.
76
P
I
7
+
15.30
P
I
7
+
46
.
2
6
1
+
00
P
C
0
+
0
0
.
00
P
RC
0
+
06
.
14
P
RC
0
+
65
.
10
PT 1+62.03
P
I
0
+
0
4
.
9
3
P
I
0
+
35
.
66
P
I
1
+
13
.
60
1
+
00
P
C
0
+
00
.
00
P
RC
0
+
06.19
P
RC
0
+
72
.
5
9
P
I
0
+
05
.
01
P
I
0
+
39
.
44
1
+
00
P
RC
0
+
25
.
12
P
RC
0
+
29.35
P
R
C
0
+
96
.
22
P
RC
1
+
3
8
.0
7
P
I
0
+
12
.
6
8
P
I
0
+
2
8
.
68
P
I
0
+
6
4
.
0
3
P
I
1
+
1
7
.
14
1
+
0
0
P
RC
0
+
25
.
21
P
RC
0
+
2
9
.
47
P
RC
1
+
02
.
54
P
RC
1
+
31
.
9
3
PT 1+82.67
P
I
0
+
12
.
73
P
I
0
+
2
8
.
82
P
I
0
+
6
7
.
7
6
PI 1+17.25
P
I
1
+
5
7
.
30
5
+
0
0
6
+
00
7
+
00
P
R
C
6
+
00
.
76
P
R
C
7
+
47
.
55
P
RC
7
+
53.91
P
I
6
+
74
.
53
P
I
7
+
52
.
90
P
I
7
+
67.35
P
T
7
+
4
6
.
9
7
P
T
7
+
80
.
52
=
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
1
+
00
3
+
00
4
+
0
0
P
C
0
+
0
0
.
00
P
CC
2
+
3
5
.
62
P
T
4
+
71
.
24
1
+
0
0
2
+
00
3
+
0
0
P
C
0
+
00
.
0
0
P
T
3
+
45
.
57
2. CONTOURS SHOWN ON THIS SHEET ARE 1' MAJOR, 0.2' MINOR CONTOURS
1. FOR EDGE OF PAVEMENT ELEVATIONS, SEE C916-C930 EDGE OF PAVEMENT PROFILE SHEETS
NOTES:
49
38
4938
4938
4938
4938
49
38
4
9
39
4
93
9
4939
4
9
39
49
39
4
94
0
4940
4940
4940
4940
494
0
4940
4940
4
940
4941
4
9
41
4
94
1
4941
C909
OF 122 SHEETS
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
LINCOLN AVE
GEOMETRIC DETAIL SHEET
KEYMAP
CEF BSH
DZ AS NOTED
02/10/2016
NW EOP
SW EOP
W ISLAND LT
W ISLAND RT
LINCOLN AVE
STA 33+10.67, 39.26' RT LINCOLN AVE.
STA 130+00.28 SW EOP=
LINCOLN AVE.
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 11:04:44 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Geometry Sheet_01.dgn
STA 32+95.65, 10.19' RT LINCOLN AVE.
STA 2+05.03 W ISLAND RT=
STA 39+95.61, 4.06' RT LINCOLN AVE.
STA 2+05.13 W ISLAND LT=
STA 32+70.96, 49.71' LT LINCOLN AVE.
STA 139+88.00 EOP NW=
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
2. CONTOURS SHOWN ON THIS SHEET ARE 1' MAJOR, 0.2' MINOR CONTOURS
1. FOR EDGE OF PAVEMENT ELEVATIONS, SEE C916-C930 EDGE OF PAVEMENT PROFILE SHEETS
NOTES:
130
+
00
131
+
00
132
+
00
P
C
130
+
00
.
28
P
T
130
+
10
.
16
P
C
131
+
62
.
12
P
CC
131
+
8
6
.
19
P
I
1
3
0
+
05.22
P
I
132
+
05
.
93
140
+
00
141
+
00
142
+
00
143
+
0
0
P
O
B
139
+
88
.
00
P
I
140
+
00
.
13
P
C
141
+
96.
46
P
RC
142
+
07
.
11
P
I
14
2
+
01.79
P
I
142
+
99.58
3
+
00
4
+
0
0
P
C
2
+
21
.
16
P
T
2
+
80.46
P
C
3
+
22.57
P
I
2
+
50.82
P
I
4
+
20
.
88
3
+
0
0
4
+
00
P
O
B
2
+
0
5
.13
P
I
2
+
20.
0
5
P
I
2
+
2
9
.
92
P
C
3
+
7
8
.
8
4
P
I
4
+
90
.
20
P
O
B
2
+
05
.
03
49
41
4
94
1
494
1
4
94
1
494
1
4941
C908
OF 122 SHEETS
I
41
+
05.61
43
+
00
F
E
S
F
E
S
F
E
S
W
V
W
V
W
V
C
D
VAU
LT
E
LE
C
D
D
G
C
ON
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
C
O
N
T
R
O
L
I
RR
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:20:17 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Removal Plan_03.dgn
REMOVE ASPHALT MAT
REMOVE CURB AND GUTTER
LEGEND
REMOVE SIDEWALK
REMOVE CONCRETE CURB RAMP
REMOVAL OF CONCRETE MEDIAN COVER MATERIAL
L
I
N
C
O
L
N
AV
E
REMOVAL PLAN
KEYMAP
CEF BSH
DZ
02/10/2016
AS NOTED
REMOVE 156.5 LF CURB AND GUTTER
EXISTING ROW
EXISTING ROW
EXISTING ROW
EXISTING ROW
REMOVE 992.1 SY ASPHALT MAT
EXISTING ROW
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
C907
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
P
I
41
+
0
5
.
6
1
P
C
3
9
+
5
9.73
P
O
B
9
+
8
9
.
5
7
P
T
38
+
77
.65
P
C
10
+
49
.
50
P
I
12
+
25
.
42
P
I
38
+
47
.
09
P
C
38
+
14
.
31
P
T
3
6
+
10
.
0
5
A
C
A
C
A
C
A
C
A
C
A
C
W
V
G
C
C
A
C
A
C
A
C
A
C
A
C
G
A
C
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:16:23 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Removal Plan_02.dgn
REMOVE ASPHALT MAT
REMOVE CURB AND GUTTER
LEGEND
REMOVE SIDEWALK
REMOVE CONCRETE CURB RAMP
REMOVAL OF CONCRETE MEDIAN COVER MATERIAL
L
I
N
C
O
L
N
AV
E
L
I
N
C
O
L
N
AV
E
REMOVAL PLAN
KEYMAP
CEF BSH
DZ
02/10/2016
AS NOTED
R
UN
A
PS
T
.
B
U
FF
A
L
O
REMOVE 257.2 LF CURB AND GUTTER
REMOVE 183.5 LF CURB AND GUTTER
REMOVE 3450.8 SY ASPHALT MAT
REMOVE 13.1 SY SIDEWALK
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ET
E
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
OU
L
E
VA
R
D
W
E
B
S
TE
R
AV
E
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
4
1
+
00
C906
OF 122 SHEETS
+
00
35
+
00
PI 35+37.18
PC 34+64.08
D
D
D
T S
D
D
VAULT
ELEC
D
C.O.
S
C
S
AC AC
AC
TELE
AC
AC
AC
CABLE
VAULT
ELEC
VAULT
ELEC
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:18:08 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Removal Plan_01.dgn
REMOVE ASPHALT MAT
REMOVE CURB AND GUTTER
LEGEND
REMOVE SIDEWALK
REMOVE CONCRETE CURB RAMP
REMOVAL OF CONCRETE MEDIAN COVER MATERIAL
LINCOLN AVE
REMOVAL PLAN
KEYMAP
CEF BSH
DZ
02/10/2016
AS NOTED
REMOVE 2076.6 SY ASPHALT MAT
EXISTING ROW
EXISTING EASEMENT
REMOVE 311.1 LF CURB AND GUTTER
EXISTING ROW
PROPOSED ROW
EXISTING ROW
EXISTING ROW
EXISTING EASEMENT
REMOVE CURB & GUTTER 235.8 LF
REMOVAL OF CONCRETE MEDIAN COVER MATERIAL 78.3 SY
C
O
LLE
G
I
A
TE
D
R
R
R
TS
W
3
6
"
RC
P
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
C905
OF 122 SHEETS
CHECKED BY:
CHECKED BY:
CHECKED BY:
Water Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
F
E
S
F
E
S
F
E
S
W
V
W
V
W
V
C
D
VAU
LT
E
LE
C
D
D
G
C
ON
T
R
O
L
I
RR
A
C
A
C
A
C
A
C
A
C
A
C
C
O
N
T
R
O
L
I
RR
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:07:49 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Utility Plan_03
L
I
N
C
O
L
N
AV
E
CEF BSH
DZ
02/10/2016
AS NOTED
KEYMAP
EXISTING UTILITY PLAN
EXISTING ROW
EXISTING ELECTRIC
EXISTING 8" WATER LINE
EXISTING 12" WATER LINE
EXISTING GAS
TELEVISION
EXISTING CABLE
STORM SEWER
EXISTING
EXISTING ROW
EXISTING 24" WATER LINE
EXISTING ROW
EXISTING 24" WATER LINE
EXISTING ELECTRIC LINE
EXISTING ROW
EXISTING 24" WATER LINE
EXISTING ROW
STORM SEWER
EXISTING
EXISTING STORM INLET
STORM MANHOLE
EXISTING
ELECTRICAL VAULT
EXISTING
STREET LIGHT
EXISTING
STORM MANHOLE
EXISTING
STORM MANHOLE
EXISTING
CONTROL VAULT
EXISTING IRRIGATION
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
41
+
00
C904
OF 122 SHEETS
00
3
9
+
0
0
4
0
+
0
0
P
I
41
+
0
5
.
6
1
P
C
3
9
+
5
9.73
P
O
B
9
+
8
9
.
5
7
P
T
38
+
77
.65
P
C
10
+
49
.
50
P
I
12
+
25
.
42
P
I
38
+
47
.
09
P
C
38
+
14
.
31
P
T
3
6
+
10
.
0
5
A
C
A
C
A
C
A
C
A
C
A
C
W
V
G
C
C
A
C
A
C
A
C
A
C
A
C
G
A
C
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 8:04:37 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Utility Plan_02
L
I
N
C
O
L
N
AV
E
L
I
N
C
O
L
N
AV
E
CEF BSH
DZ N/A
02/10/2016
KEYMAP
EXISTING UTILITY PLAN
R
UN
A
P
T
S
.
B
U
FF
A
L
O
WATER LINE (NWCWD)
EXISTING 24" RCCP
GAS
EXISTING
ELECTRIC
EXISTING
EXISTING ROW
(CITY OF FORT COLLINS)
EXISTING 8" PVC WATER LINE
EXISTING 12" AC WATER LINE
CABLE TELEVISION
EXISTING
(CITY OF FORT COLLINS)
EXISTING 8" PVC WATER LINE
EXISTING 12" WATER LINE
EXISTING ELECTRIC LINE
EXISTING EASEMENT
EXISTING STORM DRAIN
PROPOSED ROW
WATERLINE (NWCWD)
EXISTING 24" RCCP
EXISTING ELECTRIC LINE
C
I
T
Y
C
OUN
C
I
L
B
Y
R
E
S
O
L
U
T
I
ON
)
(
F
I
NA
L
NA
M
E
T
O
B
E
D
ETE
R
M
I
N
E
D
B
Y
I
N
TE
R
NA
T
I
ONA
L
B
OU
LE
VA
R
D
WEBSTER AVE
STREET LIGHT
EXISTING
0' 10' 20' 40'
M
A
T
C
H
L
I
N
E
S
T
A
3
5
+
8
0
M
A
T
C
H
L
I
N
E
S
T
A
4
1
+
00
P
T
38
+
77
.65
P
I
38
+
47
.
09
C903
OF 122 SHEETS
S
AC AC
AC
TELE
AC
AC
AC
CABLE
VAULT
ELEC
VAULT
ELEC
HOUSE
CLUB
D
U
F
F
D
R
I
V
E
W
E
B
S
T
E
R
AV
E
N
U
E
I
N
T
E
R
N
A
T
I
O
NA
L
B
O
U
L
E
V
A
R
D
C
O
T
T
A
G
E
D
R
I
V
E
NO
R
T
H
C
L
U
B
H
O
U
S
E
D
R
I
V
E
L
I
N
C
O
L
N
AV
E
NU
E
L
E
M
A
Y
AV
E
NU
E
C
O
TT
AG
E
D
R
I
V
E
S
OU
T
H
C
L
U
B
HO
U
S
E
D
R
I
V
E
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 7:58:31 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Utility Plan_01.dgn
LINCOLN AVE
DZ
CEF BSH
02/10/2016
KEYMAP
EXISTING UTILITY PLAN AS NOTED
EXISTING 24" WATER LINE
EXISTING STORM DRAIN
EXISTING EASEMENT
EXISTING ELECTRIC LINE
STORM MANHOLE
EXISTING
(NWCWD)
EXISTING 24" RICO WATER LINE
EXISTING STORM DRAIN
DISTRICT REQUIREMENTS
TO BE ABANDONED PER
12" AC WATERLINE(ELCO)
DISTRICT REQUIREMENTS
TO BE ABANDONED PER
12" AC WATERLINE (ELCO)
SANITARY MANHOLE
EXISTING
STORM MANHOLE
EXISTING
EXISTING 44" STORM DRAIN
TELEPHONE
EXISTING
EXISTING ROW ELECTRICAL
EXISTING
(CITY OF FORT COLLINS)
EXISTING 8" D.I.P. WATER LINE
10" SANITARY SEWER
(CITY OF FORT COLLINS) EXISTING
EXISTING 8" D.I.P. WATER LINE
EXISTING EASEMENT
EXISTING TELEPHONE
EXISTING GAS
CABLE TELEVISION
EXISTING
EXISTING GAS
EXISTING WATER
ROW
EXISTING
EXISTING EASEMENT
POWER LINE
OVERHEAD
EXISTING EASEMENT
EXISTING STORM DRAIN
EXISTING ROW
EXISTING EASEMENT
EXISTING 24" WATER LINE
EXISTING ELECTRIC LINE
STORM DRAIN
EXISTING
EXISTING GAS LINE
EXISTING GAS LINE
EXISTING GAS LINE
EXISTING EASEMENT
EXISTING 10" SANITARY LINE
EXISTING STORM DRAIN
EXISTING EASEMENT
EXISTING EASEMENT
EXISTING EASEMENT
EXISTING STORM DRAIN
EXISTING 24" WATER LINE
PROPOSED ROW
EXISTING ROW
C
O
LLE
G
I
A
TE
D
R
EXISTING STORM MANHOLE
EXISTING STORM MANHOLE
STORM MANHOLE
EXISTING
STORM MANHOLE
EXISTING
SANITARY MANHOLE
EXISTING
STREET LIGHT
EXISTING
ELECTRICAL VAULT
EXISTING
VAULT
ELECTRICAL
EXISTING
R
R
TS
W
3
6
"
RC
P
M
A
T
C
H
L
I
N
E
S
T
A
35
+
80
0' 10' 20' 40'
C902
OF 122 SHEETS
CONCRETE PAVEMENT (8.5 INCH) ON
CONCRETE COLOR DETAILS)
(SEE PAVEMENT DEFINITION SHEET FOR
6 INCH ABC (CLASS 6)
CONCRETE PAVEMENT (8 INCH)(COLORED) ON
TRUCK APRON
WALK PARK STRIP
4
:
1
4
:
1
PGL
PARK STRIP WALK
4
:
1
4
:
1
2.5'
2.5'
(6 INCH)
CONCRETE SIDEWALK
1' (TYP)
2% MAX 2% MAX
1.5'(TYP.)
6' 9.5' 9.5' 6'
CL LINCOLN AVE.
18' 12' MEDIAN
6' 12'
18'
12' 6'
BIKE LANE LANE LANE BIKE LANE
STA. 34+85.42 TO STA. 36+10.05
LINCOLN AVE.
WALK PARK STRIP
4
:
1
4
:
1
PGL
VARIES% VARIES%
PARK STRIP WALK
4
:
1
4
:
1
2.5'
2.5'
(6 INCH)
CONCRETE SIDEWALK
1' (TYP)
2% MAX 2% MAX
1.5'(TYP.)
6' 9.5' 6' 11' 11' 6' 9.5' 6'
BIKE LANE LANE LANE BIKE LANE
17' 14' MEDIAN 17'
WALK PARK STRIP
4
:
1
4
:
1
PGL
PARK STRIP WALK
4
:
1
4
:
1
2.5'
2.5'
(6 INCH)
CONCRETE SIDEWALK
1' (TYP)
2% MAX 2% MAX
1.5'(TYP.)
6' 9.5' 9.5' 6'
CL LINCOLN AVE.
12' MEDIAN
12'
18'
12' 6'
LANE LANE BIKE LANE
STA. 40+73.03 TO STA. 41+32.03
LINCOLN AVE.
WALK PARK STRIP
4
:
1
4
:
1
PGL
PARK STRIP WALK
4
:
1
4
:
1
2.5'
2.5'
(6 INCH)
CONCRETE SIDEWALK
1' (TYP)
2% MAX 2% MAX
9.5' 9.5' 6'
6'
CL LINCOLN AVE.
6' 12' 12' 12'
BIKE LANE LANE LANE BIKE LANE
12' PAINTED MEDIAN 6'
TURN LANE
60'
TYPICAL SECTIONS
2'
2.2% 2.2%
2'
CURB & GUTTER-TYPE 2
CURB & GUTTER-TYPE 2
ALIGNMENT & ELEVATION (TYP.)
EDGE OF PAVEMENT
SEE GEOMETRY SHEETS FOR
SEE PAVEMENT DETAILS
2.2% 2.2%
CURB & GUTTER-TYPE 2
CURB & GUTTER-TYPE 2
ALIGNMENT & ELEVATION (TYP.)
EDGE OF PAVEMENT
SEE GEOMETRY SHEETS FOR
CURB & GUTTER-TYPE 1 (TYP.)
CURB & GUTTER-TYPE 1 (TYP.)
SEE PAVEMENT DETAILS
STA. 42+49.72
LINCOLN AVE.
2.2% 2.2%
CURB & GUTTER-TYPE 2
CURB & GUTTER-TYPE 2
SEE PAVEMENT DETAILS
CURB & GUTTER-TYPE 2
CURB & GUTTER-TYPE 2
ALIGNMENT & ELEVATION (TYP.)
EDGE OF PAVEMENT
SEE GEOMETRY SHEETS FOR
CURB & GUTTER-TYPE 1 (TYP.)
SEE PAVEMENT DETAILS
2' 2'
2' 2'
2' 2'
3/4" FILTER ROCK
6 INCH ABC (CLASS 6)
2"
4" PERFORATED UNDERDRAIN
WRAPPED WITH FILTER FABRIC
MEDIAN SURFACE TREATMENT
SEE LANDSCAPE PLANS FOR
TOPSOIL (SPECIAL)
3' MIN.
4"
COMPACTED
SUBGRADE
SLOPE VARIES, SEE
DRAINAGE DETAILS
FOR UNDERGROUND
ELEVATIONS
6 INCH ABC (CLASS 6)
CONCRETE PAVEMENT (8 INCH)
(DAVIS COLOR OMAHA TAN 5084)
COMPACTED SUBGRADE
VARIES
DETAILS
SEE MEDIAN
DETAILS
SEE MEDIAN
CONTROL LINE
EOP-NE
DETAILS
SEE MEDIAN
TYPE 1
CURB & GUTTER
TYPE 1
CURB & GUTTER
MEDIAN SURFACE TREATMENT
SEE LANDSCAPE PLANS FOR
COMPACTED SUBGRADE
18" TOPSOIL (SPECIAL)
02/10/2016
N/A
BSH
DZ
CEF
(6 INCH)
CONCRETE SIDEWALK
(6 INCH)
CONCRETE SIDEWALK
(6 INCH)
CONCRETE SIDEWALK
(6 INCH)
CONCRETE SIDEWALK
18"
18"
4
:
1
4
:
1
PGL
1' (TYP)
CL LINCOLN AVE.
2.2%
4'
STA. 42+49.72 TO STA 43+56.86
LINCOLN AVE.
EXISTING ROADWAY
EOP-NW CONTROL LINE EOP-SW CONTROL LINE
EOP-SE CONTROL LINE
EOP-NW CONTROL LINE EOP-NE CONTROL LINE
EOP-NE CONTROL LINE EOP-SE CONTROL LINE
6' 12' 12'
LANE LANE
DETAILS
SEE PAVEMENT
SAWCUT
MEDIAN (VARIES) 12' VARIES
TURN LANE
LANE/RIGHT
SHARED BIKE
6'
SHOULDER
ASPHALT
RECYCLED
LANE
BIKE
CITY COUNCIL BY RESOLUTION)
CL INTERNATIONAL BOULEVARD (FINAL NAME TO BE DETERMINED BY
STA. 12+26.44 TO STA. 12+38.91
RESOLUTION)
BY CITY COUNCIL BY
(FINAL NAME TO BE DETERMINED
INTERNATIONAL BOULEVARD
FAX: 303-297-2693
PHONE: 303-297-2976
DENVER, CO 80202
1675 Broadway, Suite 200
DMZamarripa 7:50:39 AM pw:\\ABQPWINT01.wilsonco.com:Wilson_Projects\Documents\8100-TRN\CDOT\Lincoln Ave-International Blvd Fea Study\00000\Design\Drawings\Typical Sections
MEDIAN DETAIL A
MEDIAN DETAIL B
LANE
2%
CURB (MEDIAN)(SPECIAL) DETAIL
2%
ROUNDABOUT CIRCULATING ROADWAY
ICD CONTROL LINE
MATCH APPROACH ROADWAY
F
O
R
G
R
AD
I
NG
D
ET
A
I
L
S
)
L
AND
S
C
A
P
I
NG
S
H
EET
(
S
EE
C
E
N
T
E
R
I
S
L
AND
S
L
O
P
E
VA
R
I
E
S
LANE
2%
2%
ROUNDABOUT CIRCULATING ROADWAY
ICD CONTROL LINE
ROADWAY
MATCH APPROACH
C901
OF 122 SHEETS