HomeMy WebLinkAbout1127 W. PROSPECT RD., WIRELESS TELECOMMUNICATION FACILITY - PDP - PDP150033 - CORRESPONDENCE - REVISIONSJune 29, 2016
Attn: Ryan Mounce
Planning Department
Fort Collins Planning Services
281 North College Avenue
Fort Collins, CO 80524
RE: 1127 W. Prospect Rd. Wireless Telecommunications Facility Response Letter to
Round Two Comments
Department: Planning Services
Comment Number 1
Atlas Tower acknowledges and fully accepts this requirement.
Comment Number 7
These comments are incorporated on sheet C-3, “COLUMN DETAILS.”
Comment Number 9
These comments have been incorporated on sheet G-1.
Comment Number 10
These comments have been incorporated on sheet C-3, “TOWER ELEVATION.”
Department: Engineering Development Review
Comment Number 1
Atlas has separated the Erosion Control Plan from the rest of the submittal.
The drawings include graphic scale of 1” = 10’ – 0” has been used.
A legal description has been included.
Comment Number 6
This comment has been incorporated on sheet C-2.
Department: Environmental Planning
Comment Number 2
Atlas has incorporated this comment throughout the updated drawing set.
Comment Number 3
Atlas has incorporated this comment throughout the updated drawing set.
Comment Number 4
Atlas has incorporated this requested change into the updated drawing set and has
confirmed that the NHBZ calculations do not include these areas.
Comment Number 6
Atlas has incorporated this requested change into the updated drawing set. This
statement is on the Vicinity Map, Compound Detail, Natural Habitat Buffer Zone Area
Map, Proposed Impervious Areas detail, Grading Plan, Soil Erosion Control Plan,
Landscape Plan, and Utility Coordination detail.
Comment Number 7
Atlas has incorporated this requested change into the updated drawing set. This
statement is on the Vicinity Map, Compound Detail, Natural Habitat Buffer Zone Area
Map, Proposed Impervious Areas detail, Grading Plan, Soil Erosion Control Plan,
Landscape Plan, and Utility Coordination detail.
Comment Number 8
Atlas has incorporated this requested change into the updated drawing set on sheet L-1.
Comment Number 9
Atlas has checked/updated the scale dimensions on the site plan.
Comment Number 10
Atlas has incorporated this requested change into the updated drawing set.
Comment Number 11
Please see Exhibit 1 for images of the proposed fence material.
Comment Number 12
Atlas will use the suggested species when reseeding.
Comment Number 13
Atlas has worked to incorporate these comments into the updated drawings set. Please
let us know if anything should be modified.
Comment Number 14
Atlas has worked to incorporate these comments into the updated drawings set on sheet
C-4 in the Natural Habitat Buffer Zone Area Map and the Existing Impervious Areas and
Proposed Impervious Areas details.
Comment Number 15
Atlas has incorporated this requested change into the updated drawing set.
Forestry
Comment Number 1
Atlas met with the City Forster onsite on May 23.
Comment Number 4
Atlas will take this comment into account when landscaping.
Comment Number 5
Atlas has incorporated this comment into the drawing set on the Proposed Planting
Schedule on Sheet L-1.
Comment Number 6
To the greatest extent possible, Atlas has incorporated this comment into the drawing
set the Proposed Planting Schedule on Sheet L-1.
Comment Number 7
Atlas has incorporated this comment into the updated drawing set.
Comment Number 8
Atlas has incorporated this comment into the drawing set on sheet L-2.
Department: Light and Power
Comment Number 3
Atlas has included a one-line diagram with this submission.
Comment Number 5
Atlas acknowledges and consents to this comment.
Comment Number 6
A copy of a signed Utilities Easement has been submitted with this application. The
property owner is returning from Spain and will notarize an original copy within the next
few days and Atlas will then record the easement.
Comment Number 7
Atlas has incorporated this request into the updated drawing set on sheet E-1 in both the
Power Plan detail and the Utility Coordination detail.
Comment Number 8
Atlas has incorporated this request into the updated drawing set on sheet E-1 in both the
Power Plan detail and the Utility Coordination detail. Atlas will coordinate with Fort
Collins Light and Power to provide permit access to the site.
Storm Water Engineering
Comment Number 2
Atlas has incorporated this request throughout the updated drawing set.
Comment Number 3
Atlas has incorporated this request into the updated drawing set on sheet on sheet C-4.
Department: Technical Services
Comment Number 4
Atlas has incorporated this requested change throughout the drawing set.
Comment Number 5
Atlas has incorporated this requested change throughout the drawing set.
Comment Number 6
Atlas has incorporated this requested change throughout the drawing set.
Department: Wastewater Engineering
Comment Number 1
Water for a sprinkler system may be necessary for the landscaping. Atlas will either tap
into the water main or pay the neighbor to utilize an existing sprinkler line near the
property. Atlas will utilize an above ground drip system to establish the trees and shrubs
and a above ground sprinkler system to establish the native grass.
Department: Zoning
Comment Number 2
Atlas has incorporated this request into the updated drawing set on sheet on sheet C-4.
Best Regards,
Caleb Crossland
Atlas Tower Companies
4450 Arapahoe Ave., Suite 100
Boulder, CO 80303