HomeMy WebLinkAboutANGIE LEE PERIODONTICS - FDP - FDP160028 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSFIN. FLOOR
100' - 0"
BRICK, STACKED BOND
SMOOTH STUCCO
PREFINISHED METAL COPING
STUCCO REVEAL
ALUMINUM STOREFRONT
WINDOW FRAME
PREFINISHED METAL
COPING
10' - 8" 4' - 0 1/2"
HOLLOW METAL DOOR & FRAME
PHASE 2 PHASE 1
ADDRESS NUMBERS, MIN. 8"
PROPOSED SIGNAGE LOCATION
FIN. FLOOR (PHASE 2)
99' - 0"
116' - 8 1/2"
114' - 8 1/2"
116' - 8 1/2"
11' - 8" 6' - 0 1/2"
110' - 8"
FULL CUTOFF LIGHT
FIXTURE
PREFINISHED METAL
COPING
BRICK, STACKED BOND
SMOOTH STUCCO
BRICK, STACKED BOND
PREFINISHED
DOWNSPOUT
GAS METER
FIN. FLOOR
100' - 0"
118' - 10"
SMOOTH STUCCO
ALUMINUM STOREFRONT
WINDOW FRAME
WOOD SIDING
PREFINISHED METAL FASCIA
BRICK, STACKED
BOND
SMOOTH
STUCCO
STUCCO REVEAL
116' - 8 1/2"
PRECAST CAP
STONE VENEER, COURSED ASHLAR
PREFINISHED METAL COPING
ROD & CLEVIS
DOWNSPOUT BEYOND
ALUMINUM STOREFRONT WINDOW HOLLOW METAL DOOR
EXTERIOR FINISH SCHEDULE
WOOD SIDING
BRICK
STONE VENEER
STUCCO
PRECAST CAPS
STOREFRONT
GLAZING
EXTERIOR FINISH SCHEDULE
WOOD SIDING
BRICK
STONE VENEER
STUCCO
PRECAST CAPS
STOREFRONT
GLAZING
STEEL & FLASHINGS
PREFINISHED METAL
COPING
CMU
GENERAL NOTE:
ALL EXTERIOR WALL MOUNTED LIGHTS TO
BE FULL CUT-OFF.
BROWN
BROWN
COURSED ASHLAR- MIX
GREY & TAN
TAN
MED. GREY
SILVER
GREY TINTED
LIGHT GREY
GREY
GREY
FIN. FLOOR
100' - 0"
PREFINISHED METAL COPING
PRECAST CAP
STONE VENEER, COURSED ASHLAR
PREFINISHED METAL COPING
BIKE RACK
BRICK, STACKED BOND
HORIZONTAL STUCCO REVEAL
SMOOTH STUCCO
WOOD SIDING
ALUMINUM STOREFRONT
FRAME AND DOOR
118' - 4"
ALUMINUM STOREFRONT
FRAME AND DOOR
PHASE 1 PHASE 2
ALUMINUM STOREFRONT
FRAME AND DOOR
FIN. FLOOR (PHASE 2)
99' - 0"
110' - 8"
116' - 8 1/2"
118' - 4"
WOOD SIDING
BRICK, STACKED BOND
SMOOTH STUCCO
SMOOTH STUCCO
PRECAST CAP
STONE VENEER, COURSED ASHLAR
PREFINISHED METAL COPING
PREFINISHED METAL FASCIA
PROPOSED SIGNAGE
PREFINISHED METAL FASCIA
112' - 5 1/4"
116' - 8 1/2"
FULL CUTOFF
LIGHT FIXTURE
FIN. FLOOR
100' - 0"
PREFINISHED METAL
COPING
BRICK, STACKED BOND
BRICK, STACKED BOND
SMOOTH STUCCO
PREFINISHED METAL COPING
STUCCO ACCENT JOINT, TYP
114' - 8 5/8"
116' - 8 1/2"
110' - 8"
PREFINISHED METAL
COPING
BRICK, STACKED BOND
ALUMINUM STOREFRONT
WINDOW FRAME
BRICK, STACKED BOND
SMOOTH STUCCO
STUCCO ACCENT JOINT, TYP
FIN. FLOOR (PHASE 2)
99' - 0"
110' - 8"
116' - 8 1/2"
419 Canyon Avenue, Suite 200 Fort Collins, CO 80521
ph: 970.224.1191 www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARCHITECTS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
CHECKED BY:
DRAWN BY:
COPYRIGHT:
Issued
No. Description Date
1 03-30-16
Revisions
2
3
4
5
6
No. Description Date
VAUGHT FRYE LARSON architects
PDP ROUND 1
GD
GD, CA
FINAL PLAN SUBMITTAL
PDP ROUND 2 05-02-16
FINAL PLAN SUBMITTAL 06-22-16
4803 BOARDWALK DR.
FORT COLLINS, CO 80525
6/21/2016 3:30:43 PM
6/21/2016 3:30:43 PM
C:\Users\bolin\Documents\2016-02-10 Lee Periodontics Shell_bolin.rvt
A2
ARCHITECTURAL
ELEVATIONS
ANGIE LEE
PERIODONTICS
2015-71
1 3/16" = 1'-0"
WEST ELEVATION
2 3/16" = 1'-0"
SOUTH ELEVATION - PHASE 1
4
PLANNING - NORTHEAST CORNER
3 3/16" = 1'-0"
SOUTH ELEVATION - PHASE 2
NOTE:
FINAL BUILDING DESIGN IS SHOWN FOR PHASE
ONE AND TWO. AT THE TIME OF BUILDING
PERMIT, BUILDING PLANS AND ELEVATIONS
SHALL BE REVIEWED FOR COMPLIANCE WITH
THESE FINAL PLANS AND ELEVATIONS. THE
DIRECTOR SHALL DETERMINE WHETHER THE
APPROVAL OF VARIATIONS TO THESE PLANS
SHALL BE PERMITTED AS PART OF THE
BUILDING PERMIT OR WHETHER AN AMENDMENT
TO THESE PLANS IS REQUIRED.
STEEL & FLASHINGS
PREFINISHED METAL
COPING
CMU
GENERAL NOTE:
ALL EXTERIOR WALL MOUNTED LIGHTS TO
BE FULL CUT-OFF.
BROWN
BROWN
COURSED ASHLAR- MIX
GREY & TAN
TAN
MED. GREY
SILVER
GREY TINTED
LIGHT GREY
GREY
GREY
6" 6' - 0"
5" STL.
BOLLARD
POSTS
FILLED W/
CONC.
2X2 STL. TUBE
FRAME
CANE BOLTS
1/8" STL. PL. HASP
W/ HOLES TO
ACCEPT
PADLOCK BY
OWNER
STL. PIPE PIVOT HINGES
STL. PIPE SLEEVES
WELDED TO POSTS TO
SUPPORT HINGES
8" SMOOTH
CMU
2' - 8" 4' - 8" 4' - 8" 2' - 8"
PREFIN. MTL. COPING
10' - 0"
FRONT ELEV.
SIDE ELEV (NO GATE OPP. SIDE)
PREFIN. MTL.
COPING
8" SMOOTH
CMU
14' - 8"
PREFIN. MTL.
WALL PANEL
INFILLL TO MATCH
BLDG.
1/8" STL. PL
HANDLES
7' - 4"
6' - 8" 4' - 0" 4' - 0"
14' - 8"
SIDE ELEV (NO GATE OPP.
SIDE)
PREFIN. MTL.
COPING
8" SMOOTH
CMU
7' - 4"
7' - 4"
419 Canyon Avenue, Suite 200 Fort Collins, CO 80521
ph: 970.224.1191 www.VFLA.com
DRAWING NUMBER:
PROJECT NUMBER:
SEAL:
IN ASSOCIATION WITH:
Strength in design. Strength in partnership.
Strength in community.
VAUGHT FRYE LARSON ARCHITECTS, INC.
THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR
COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA.
CHECKED BY:
DRAWN BY:
COPYRIGHT:
Issued
No. Description Date
1 03-30-16
Revisions
2
3
4
5
6
No. Description Date
VAUGHT FRYE LARSON architects
PDP ROUND 1
GD
GD, CA
FINAL PLAN SUBMITTAL
PDP ROUND 2 05-02-16
FINAL PLAN SUBMITTAL 06-22-16
4803 BOARDWALK DR.
FORT COLLINS, CO 80525
6/21/2016 3:28:45 PM
6/21/2016 3:28:45 PM
C:\Users\bolin\Documents\2016-02-10 Lee Periodontics Shell_bolin.rvt
A1
ARCHITECTURAL
ELEVATIONS
ANGIE LEE
PERIODONTICS
2015-71
1 3/16" = 1'-0"
EAST ELEVATION
2 3/16" = 1'-0"
NORTH ELEVATION
4 1/4" = 1'-0"
TRASH ENCLOSURE ELEVATION - MASONRY
3
PLANNING - NORTHWEST CORNER
NOTE:
FINAL BUILDING DESIGN IS SHOWN FOR PHASE
ONE AND TWO. AT THE TIME OF BUILDING
PERMIT, BUILDING PLANS AND ELEVATIONS
SHALL BE REVIEWED FOR COMPLIANCE WITH
THESE FINAL PLANS AND ELEVATIONS. THE
DIRECTOR SHALL DETERMINE WHETHER THE
APPROVAL OF VARIATIONS TO THESE PLANS
SHALL BE PERMITTED AS PART OF THE
BUILDING PERMIT OR WHETHER AN AMENDMENT
TO THESE PLANS IS REQUIRED.