Loading...
HomeMy WebLinkAboutANGIE LEE PERIODONTICS - FDP - FDP160028 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONSFIN. FLOOR 100' - 0" BRICK, STACKED BOND SMOOTH STUCCO PREFINISHED METAL COPING STUCCO REVEAL ALUMINUM STOREFRONT WINDOW FRAME PREFINISHED METAL COPING 10' - 8" 4' - 0 1/2" HOLLOW METAL DOOR & FRAME PHASE 2 PHASE 1 ADDRESS NUMBERS, MIN. 8" PROPOSED SIGNAGE LOCATION FIN. FLOOR (PHASE 2) 99' - 0" 116' - 8 1/2" 114' - 8 1/2" 116' - 8 1/2" 11' - 8" 6' - 0 1/2" 110' - 8" FULL CUTOFF LIGHT FIXTURE PREFINISHED METAL COPING BRICK, STACKED BOND SMOOTH STUCCO BRICK, STACKED BOND PREFINISHED DOWNSPOUT GAS METER FIN. FLOOR 100' - 0" 118' - 10" SMOOTH STUCCO ALUMINUM STOREFRONT WINDOW FRAME WOOD SIDING PREFINISHED METAL FASCIA BRICK, STACKED BOND SMOOTH STUCCO STUCCO REVEAL 116' - 8 1/2" PRECAST CAP STONE VENEER, COURSED ASHLAR PREFINISHED METAL COPING ROD & CLEVIS DOWNSPOUT BEYOND ALUMINUM STOREFRONT WINDOW HOLLOW METAL DOOR EXTERIOR FINISH SCHEDULE WOOD SIDING BRICK STONE VENEER STUCCO PRECAST CAPS STOREFRONT GLAZING EXTERIOR FINISH SCHEDULE WOOD SIDING BRICK STONE VENEER STUCCO PRECAST CAPS STOREFRONT GLAZING STEEL & FLASHINGS PREFINISHED METAL COPING CMU GENERAL NOTE: ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF. BROWN BROWN COURSED ASHLAR- MIX GREY & TAN TAN MED. GREY SILVER GREY TINTED LIGHT GREY GREY GREY FIN. FLOOR 100' - 0" PREFINISHED METAL COPING PRECAST CAP STONE VENEER, COURSED ASHLAR PREFINISHED METAL COPING BIKE RACK BRICK, STACKED BOND HORIZONTAL STUCCO REVEAL SMOOTH STUCCO WOOD SIDING ALUMINUM STOREFRONT FRAME AND DOOR 118' - 4" ALUMINUM STOREFRONT FRAME AND DOOR PHASE 1 PHASE 2 ALUMINUM STOREFRONT FRAME AND DOOR FIN. FLOOR (PHASE 2) 99' - 0" 110' - 8" 116' - 8 1/2" 118' - 4" WOOD SIDING BRICK, STACKED BOND SMOOTH STUCCO SMOOTH STUCCO PRECAST CAP STONE VENEER, COURSED ASHLAR PREFINISHED METAL COPING PREFINISHED METAL FASCIA PROPOSED SIGNAGE PREFINISHED METAL FASCIA 112' - 5 1/4" 116' - 8 1/2" FULL CUTOFF LIGHT FIXTURE FIN. FLOOR 100' - 0" PREFINISHED METAL COPING BRICK, STACKED BOND BRICK, STACKED BOND SMOOTH STUCCO PREFINISHED METAL COPING STUCCO ACCENT JOINT, TYP 114' - 8 5/8" 116' - 8 1/2" 110' - 8" PREFINISHED METAL COPING BRICK, STACKED BOND ALUMINUM STOREFRONT WINDOW FRAME BRICK, STACKED BOND SMOOTH STUCCO STUCCO ACCENT JOINT, TYP FIN. FLOOR (PHASE 2) 99' - 0" 110' - 8" 116' - 8 1/2" 419 Canyon Avenue, Suite 200 Fort Collins, CO 80521 ph: 970.224.1191 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARCHITECTS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. CHECKED BY: DRAWN BY: COPYRIGHT: Issued No. Description Date 1 03-30-16 Revisions 2 3 4 5 6 No. Description Date VAUGHT FRYE LARSON architects PDP ROUND 1 GD GD, CA FINAL PLAN SUBMITTAL PDP ROUND 2 05-02-16 FINAL PLAN SUBMITTAL 06-22-16 4803 BOARDWALK DR. FORT COLLINS, CO 80525 6/21/2016 3:30:43 PM 6/21/2016 3:30:43 PM C:\Users\bolin\Documents\2016-02-10 Lee Periodontics Shell_bolin.rvt A2 ARCHITECTURAL ELEVATIONS ANGIE LEE PERIODONTICS 2015-71 1 3/16" = 1'-0" WEST ELEVATION 2 3/16" = 1'-0" SOUTH ELEVATION - PHASE 1 4 PLANNING - NORTHEAST CORNER 3 3/16" = 1'-0" SOUTH ELEVATION - PHASE 2 NOTE: FINAL BUILDING DESIGN IS SHOWN FOR PHASE ONE AND TWO. AT THE TIME OF BUILDING PERMIT, BUILDING PLANS AND ELEVATIONS SHALL BE REVIEWED FOR COMPLIANCE WITH THESE FINAL PLANS AND ELEVATIONS. THE DIRECTOR SHALL DETERMINE WHETHER THE APPROVAL OF VARIATIONS TO THESE PLANS SHALL BE PERMITTED AS PART OF THE BUILDING PERMIT OR WHETHER AN AMENDMENT TO THESE PLANS IS REQUIRED. STEEL & FLASHINGS PREFINISHED METAL COPING CMU GENERAL NOTE: ALL EXTERIOR WALL MOUNTED LIGHTS TO BE FULL CUT-OFF. BROWN BROWN COURSED ASHLAR- MIX GREY & TAN TAN MED. GREY SILVER GREY TINTED LIGHT GREY GREY GREY 6" 6' - 0" 5" STL. BOLLARD POSTS FILLED W/ CONC. 2X2 STL. TUBE FRAME CANE BOLTS 1/8" STL. PL. HASP W/ HOLES TO ACCEPT PADLOCK BY OWNER STL. PIPE PIVOT HINGES STL. PIPE SLEEVES WELDED TO POSTS TO SUPPORT HINGES 8" SMOOTH CMU 2' - 8" 4' - 8" 4' - 8" 2' - 8" PREFIN. MTL. COPING 10' - 0" FRONT ELEV. SIDE ELEV (NO GATE OPP. SIDE) PREFIN. MTL. COPING 8" SMOOTH CMU 14' - 8" PREFIN. MTL. WALL PANEL INFILLL TO MATCH BLDG. 1/8" STL. PL HANDLES 7' - 4" 6' - 8" 4' - 0" 4' - 0" 14' - 8" SIDE ELEV (NO GATE OPP. SIDE) PREFIN. MTL. COPING 8" SMOOTH CMU 7' - 4" 7' - 4" 419 Canyon Avenue, Suite 200 Fort Collins, CO 80521 ph: 970.224.1191 www.VFLA.com DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: Strength in design. Strength in partnership. Strength in community. VAUGHT FRYE LARSON ARCHITECTS, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF VFLA. CHECKED BY: DRAWN BY: COPYRIGHT: Issued No. Description Date 1 03-30-16 Revisions 2 3 4 5 6 No. Description Date VAUGHT FRYE LARSON architects PDP ROUND 1 GD GD, CA FINAL PLAN SUBMITTAL PDP ROUND 2 05-02-16 FINAL PLAN SUBMITTAL 06-22-16 4803 BOARDWALK DR. FORT COLLINS, CO 80525 6/21/2016 3:28:45 PM 6/21/2016 3:28:45 PM C:\Users\bolin\Documents\2016-02-10 Lee Periodontics Shell_bolin.rvt A1 ARCHITECTURAL ELEVATIONS ANGIE LEE PERIODONTICS 2015-71 1 3/16" = 1'-0" EAST ELEVATION 2 3/16" = 1'-0" NORTH ELEVATION 4 1/4" = 1'-0" TRASH ENCLOSURE ELEVATION - MASONRY 3 PLANNING - NORTHWEST CORNER NOTE: FINAL BUILDING DESIGN IS SHOWN FOR PHASE ONE AND TWO. AT THE TIME OF BUILDING PERMIT, BUILDING PLANS AND ELEVATIONS SHALL BE REVIEWED FOR COMPLIANCE WITH THESE FINAL PLANS AND ELEVATIONS. THE DIRECTOR SHALL DETERMINE WHETHER THE APPROVAL OF VARIATIONS TO THESE PLANS SHALL BE PERMITTED AS PART OF THE BUILDING PERMIT OR WHETHER AN AMENDMENT TO THESE PLANS IS REQUIRED.