HomeMy WebLinkAboutANGIE LEE PERIODONTICS - FDP - FDP160028 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORT (3)Project Number: U15013 Location: Fort Collins, CO
Date: June 22, 2016 Total Acres: 0.57
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
each 1 $100.00 $100.00
each 1 $100.00 $100.00
L.F. 390 $1.25 $487.50
L.F. 85 $1.20 $102.00
each 1 $750.00 $750.00
each 1 $200.00 $200.00
SY 5 $3.75 $18.75
SY 5 $1.30 $6.50
acre 0.20 $1,450.00 $290.00
TOTAL = $2,054.75
TOTAL = $3,082.13
TOTAL = $1,239.75
REQUIRED AMOUNT OF SECURITY = $3,082.13
NOTE: 'Total Acres' represents total disturbed area.
- OR -
COST TO VEGETATE: TOTAL ACRES x ($1450/acre) x 1.5
(WHICHEVER IS GREATER)
Angie Lee Periodontics
Erosion Control Cost Estimate
Vehicle Tracking Control Pads
AMOUNT OF SECURITY = 1.5 x $2,054.75
Rock Sock
Vegetate Landscaped Areas
Erosion Control Blanket
Inlet Protection
Turf Reinforcement Mat
Silt Fencing
Concrete Washout Area
Wattle Dikes
=
=
P:\U15013 - 4803 Boardwalk Office\Documents\U15013_Erosion-Escrow-Estimate.xls