Loading...
HomeMy WebLinkAboutANGIE LEE PERIODONTICS - FDP - FDP160028 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORT (3)Project Number: U15013 Location: Fort Collins, CO Date: June 22, 2016 Total Acres: 0.57 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price each 1 $100.00 $100.00 each 1 $100.00 $100.00 L.F. 390 $1.25 $487.50 L.F. 85 $1.20 $102.00 each 1 $750.00 $750.00 each 1 $200.00 $200.00 SY 5 $3.75 $18.75 SY 5 $1.30 $6.50 acre 0.20 $1,450.00 $290.00 TOTAL = $2,054.75 TOTAL = $3,082.13 TOTAL = $1,239.75 REQUIRED AMOUNT OF SECURITY = $3,082.13 NOTE: 'Total Acres' represents total disturbed area. - OR - COST TO VEGETATE: TOTAL ACRES x ($1450/acre) x 1.5 (WHICHEVER IS GREATER) Angie Lee Periodontics Erosion Control Cost Estimate Vehicle Tracking Control Pads AMOUNT OF SECURITY = 1.5 x $2,054.75 Rock Sock Vegetate Landscaped Areas Erosion Control Blanket Inlet Protection Turf Reinforcement Mat Silt Fencing Concrete Washout Area Wattle Dikes = = P:\U15013 - 4803 Boardwalk Office\Documents\U15013_Erosion-Escrow-Estimate.xls