Loading...
HomeMy WebLinkAboutWHITCOMB STREET & AGGIE VILLAGE NORTH UTILITY PLANS - FDP - FDP160026 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject Routing Sheet New: Revision: X Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): N/A Labels Received Y/N: N/A n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a RETURN ALL REDLINES 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 0 110 1100000 110000000000Revised: 1-29-2016 cd cd cd cd T.I.A. Utility Plans 6/29/2016 Submittal Narrative Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Holland Langenberger Wetland Delineation Ecological Study (ECS) Hazmat Review Soils Study- New/Update Digital copy of all materials L.U.C. Mod. Requests Drainage Report Building Materials Exhibit Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Outside Agency Sanitation Dist: N/A Outside Agency Water District: N/A Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: Railroad: ___________________ School District Other: 2 Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: 2 weeks Comments Due: 7/13/2016 Whitcomb Street & Aggie Village North Utility Plans Electronic Routing -- Final Plans FDP160026