January 17, 2014
Mark Melchi
MAV Development Company 2723 S. State St., Suite 250 Ann Arbor, MI 48104
RE: 221 East Mountain Ave. Preliminary Design Review, PDR130011, Round Number
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal
of the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com Topic: Building Elevations
Comment Number: 1 Comment Originated: 01/13/2014
01/13/2014:
Maximum height is 4 stories or 56 feet. Please confirm that the proposed 4 stories does not exceed 56 feet in
height.
In the Old City Center Sub-District the fourth story is required to be setback at a 35 degree angle measured at
the intersection of the floor plane of the fourth story and the property line along the public street frontage. The
intent of this standard is to reduce the perceived massing of the building to contribute to its sense of human
scale. The entire glass and metal module at the corner is out of context with the Old City Center and thus we are
challenged to find justification to permit a variance to the standards. Additionally, the request for a variance to this
standard cites the variance approved for the Mitchell Block across the street. The Mitchell Block is designed in a
contextually sensitive manner and the variance was justified due to the triangular shape of the lot causing
hardship in the design for stair towers and underground parking. The justifications for a variance (Sec. 2.10.2(H)
are that it is not detrimental to the public good and that:
(1) by reason of exceptional physical conditions or other extraordinary and exceptional situations unique to such
property, including, but not limited to, physical conditions such as exceptional narrowness, shallowness or
topography, or physical conditions which hinder the owner's ability to install a solar energy system, the strict
application of the standard sought to be varied would result in unusual and exceptional practical difficulties, or
exceptional or undue hardship upon the occupant of such property, or upon the applicant, provided that such
difficulties or hardship are not caused by the act or omission of the occupant or applicant;
(2) the proposal as submitted will promote the general purpose of the standard for which the variance is
requested equally well or better than would a proposal which complies with the standard for which the variance is
requested; or
(3) the proposal as submitted will not diverge from the standards of the Land Use Code that are authorized by
this Division to be varied except in a nominal, inconsequential way when considered in the context of the
Page 2 of 10
neighborhood, and will continue to advance the purposes of the Land Use Code as contained in Section 1.2.2.
Response: The average of the finished ground level at the center of all walls to the highest point of the roof
surface shall not be above 56’-0” The current average grade plane is @ elevation 4977’-7 1/16”. 56’ above this is
5033’-7 1/16”. The current High Roof of the project is at elevation 5033’-3”.
The 4th
story is currently shown as meeting the 35 degree angle bulk plane measurement.
Comment Number: 2 Comment Originated: 01/13/2014
01/13/2014:
Contextually this site needs more traditional architecture and high-quality materials. Use of local sandstone and
brick will contribute to the compatibility with the surrounding buildings. Clearly delineated base, middle, and top
with a three dimensional cornice feature and windows featuring architectural details such as lintels and sills, are
featured in all the surrounding buildings both historic and contemporary.
The glass curtain walls are specifically prohibited in section 4.16(D)(5)(c), and ground floor glazing shall not
exceed 75 percent of the façade and shall be framed by the walls.
See context examples.
Response: The building is currently shown with more traditional architecture using brick and stone/cultured stone
as the skin materials, the base middle and top are clearly delineated, & cornice details are shown on all masonry
parapets.
At the North elevation the ground level façade area is 2386.83sf and the glazing area is 1162.95sf, which is
48.72%.
At the East elevation the ground level façade area is 1992.17sf and the glazing area is 951.45sf, which is
47.75% of the ground floor area.
The glazing areas are shown framed by the walls.
Comment Number: 3 Comment Originated: 01/13/2014
01/13/2014:
The proposed building should be designed with ample variation in massing. The massing should be broken into
module sizes that emulate the existing pattern of the neighborhood. See Sec. 3.5.3(D).
Façade treatment, 4-sided architecture, and clearly defined base middle and top are required per Sec. 3.5.3(E).
Response: The building is currently showing a variation in massing and broken into several module sizes and
emulate the existing pattern of the neighborhood.
Comment Number: 4 Comment Originated: 01/13/2014
01/13/2014:
Section 3.5.1 requires that proposed development is compatible with the existing context of the area in terms of
building height, mass and scale, building materials, and operations.
See context examples.
Response: The above comments have been addressed and the building fits in with the context of the area.
Topic: General
Comment Number: 1 Comment Originated: 01/13/2014
01/13/2014:
Downtown (D) District – Old City Center Sub-district (4.16)
Office, restaurant, and retail uses are permitted via Basic Development Review (BDR). The proposal will work
with City Staff until it meets the standards of the Land Use Code and then will be administratively approved
without a public hearing.
Response: Acknowledged. This project is being submitted as a BDR.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/13/2014
01/13/2014:
Landscaping in the form of planter boxes or some variation thereof should be considered in order to meet the
Page 3 of 10
4.16(D) “Landscaping shall be designed as an integral part of the development plan.”
Please work with the City’s stormwater department regarding Low Impact Development (LID) standards for
improvements to the streetscape. Contact: Basil Hamdan BHAMDAN@fcgov.com 970-224-6035.
Response: Landscape planters are included in the project. The layout of the planters is directly related the
architecture. Overflow roof drains on the east side of the building are captured in chases and directed to rain
gardens.
Comment Number: 2 Comment Originated: 01/13/2014
01/13/2014:
Street trees shall be planted every 30 to 40 feet in the parkway of the detached sidewalk. See Sec.
3.2.1(D)(2).
The parkway strips should put the street trees into tree grates and carry the pattern of downtown through the site
frontage.
Response: One new street tree will be planted on along E. Mountain Ave. spaced to match the existing tree
pattern. Street trees are included along Mathews St. within tree grates.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: How does your development plan to accommodate your parking demand? Please evaluate your
expected parking demand for office uses and retail uses, and the capacity of the parking structure with a
discussion of where you anticipate your tenants and patrons to park. Also, we have had concerns with spill over
parking into adjacent neighborhoods (East side, south and east of your site), therefore you will want to consider
management practices that dissuade parking in that area: such as providing parking permits.
Response: Fifty six (56) spaces have been leased in the adjacent parking structure to provide employee parking
for the retail and office uses. Four (4) parking spaces are provided within the building footprint for this purpose as
well. Twelve (12) parking spaces are provided along E. Mountain and ten (10) parking spaces are provided along
Mathews Street to provide public access parking for patrons.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/14/2014 01/14/2014: Larimer County Road Impact Fees and
Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have
any questions.
Response: Acknowledged. Oversizing fee amounts will be coordinated.
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: The City's Transportation Development Review Fee (TDRF) is due at the time of submittal.
For additional information on these fees, please visit:
http://www.fcgov.com/engineering/dev-review.php
Response: Acknowledged.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or
restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed
improvements and/or prior to the issuance of the first Certificate of Occupancy.
Response: Acknowledged, Contractor will need to work with the City Inspector, a street cut note is also provided
on the plans.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting to
determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their
requirements as well.
Response: A TIS has been prepared for the project.
Page 4 of 10
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: Any public improvements must be designed and built in accordance with the Larimer County Urban
Area Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
Response: The LCUASS standards are being met to the extent possible. Standard details are provided on the
plans.
Comment Number: 6 Comment Originated: 01/14/2014 01/14/2014: This project is responsible for dedicating
any easements that are necessary for this project and vacating any existing easements that conflict with the
projects development plan. You can dedicate and vacate easements by platting the property or by separate
document. Please contact me or you can visit http://www.fcgov.com/engineering/devrev.php for additional
information.
Response: Acknowledged, no plat is necessary at this time.
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: The public right-of-way should be free of any encroachment of structures such as steps, doors,
patios, etc. Doors shall not swing out into public right-of-way and will either need to be recessed, or swing inward
(into private property).
Response: Public use doors have been recessed to avoid swinging over the R.O.W. Only the gates at the trash
enclosure swing over the R.O.W. at the alley. Patios are not shown but may be provided as tenant finish per
code within the R.O.W. but not reducing the walking path to less than 7 ft.
Comment Number: 8 Comment Originated: 01/14/2014
01/14/2014: Utility plans will be required and a Development Agreement will be required and recorded once the
project is finalized with recordation costs paid for by the applicant.
Response: Utility plans are provided for review.
Comment Number: 9 Comment Originated: 01/14/2014
01/14/2014: The (2) existing driveway cuts that will no longer be needed to serve this property will need to be
removed and replaced with full height curb and gutter to match the existing curb line.
Response: Driveway cuts are being removed on Mountain Ave and Mathews St and new curb and gutter will be
constructed to match existing condition. A new Alley approach will be constructed.
Comment Number: 10 Comment Originated: 01/14/2014
01/14/2014: This developments traffic numbers may warrant additional infrastructure improvements, such as
reconstruction or repairs to the alley south of the project. The existing alley has been paved but further evaluation
of the existing condition of the alley is needed while taking into account the additional traffic impacts generated by
the development.
Response: A new alley with trickle pan and outfall curb and gutter is proposed with the utility plans.
Comment Number: 11 Comment Originated: 01/14/2014
01/14/2014: The existing alley approach adjacent to the property is in poor condition and will need to be removed
and replaced to meet current LCUASS specifications.
Response: New alley will be constructed with these plans, See response to 10.
Comment Number: 12 Comment Originated: 01/14/2014
01/14/2014: Roof drainage will need to be designed in a way where water is not discharged across the public
sidewalk or alley.
Response: Roof drains will discharge to the north and east as historically occurs. Existing storm inlet will be
utilized for connection points except were rain gardens are implemented.
Comment Number: 13 Comment Originated: 01/14/2014
01/14/2014: It has been noted that you plan to implement several Low Impact Development features in the
sidewalk and public right-of-way. Additional information and conversations about the Low Impact Development
features will be needed to determine if it is acceptable to use the public right-of-way.
Response: Rain Gardens will be used for treatment of runoff from a portion of the roof drainage and building
frontage on the east side. Pervious pavers are proposed for the parking bays along the Mountain Avenue
frontage.
Page 5 of 10
Comment Number: 14 Comment Originated: 01/14/2014
01/14/2014: Consideration of the design and building construction process in relation to the property line must be
taken into account. No tie backs, footings, foundations or structures (permanent or temporary) are to extend or
encroach into public property or utility easements.
Response: See architectural drawings for details.
Comment Number: 15 Comment Originated: 01/14/2014
01/14/2014: Prior to construction start, please coordinate with Parking Services (221-6617) to block or utilize
existing parking spaces in the downtown area. Please contact Traffic Operations (221-6630) and Engineering
Inspection (221-6659) to coordinate sidewalk and street closures.
Response: Acknowledged, contact will be made closer to construction.
Comment Number: 16 Comment Originated: 01/14/2014
01/14/2014: A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the
site.
Response: Acknowledged, Owner to coordinate DCP agreement.
Department: Environmental Planning
Contact: Kate Rentschlar, 970-224-6086, krentschlar@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/13/2014
With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3), requires
that you use native plants and grasses in your landscaping or re landscaping and reduce bluegrass lawns as
much as possible.
Response: No new bluegrass lawn area is proposed with this project. A portion of existing turf will remain and be
repaired as needed adjacent to trees been protected. Removing the turf in these areas may be detrimental to the
existing trees.
Comment Number: 2 Comment Originated: 01/13/2014
The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "protects
significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH
(Diameter at Breast Height) of six inches or more. As several of the trees within this site may have a DBH of
greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221 6361) to
determine the status of the existing trees and any mitigation requirements that could result from the proposed
development.
Response: An on site tree inventory was conducted with Ralph Zentz. Only one significant tree is in direct conflict
the proposed building. See landscape sheet for mitigation requirements and statement of hardship.
Comment Number: 3 Comment Originated: 01/13/2014
Looking down the road, please include a note on the tree mitigation plan or landscape plan, as appropriate, that
requires a tree removal to occur outside of the migratory songbird nesting season (February 1-July 31), or that a
survey be conducted prior to removal to ensure no active nests in the area.
Response: Standard notes have been added to the site plan.
Department: Light And Power
Contact: Janet McTague, 970-224-6154, jmctague@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/13/2014
01/13/2014:
Light and Power has a 5 1/2' x 12 1/2' easement on the south side of the lot. The transformers in the easement
serve 221 E Mountain as well as other businesses along Mathews and will therefore need to remain. We will
need to find a transformer location for the new building.
Response: Civil plans call for the south transformer to remain. Final power needs will need to be coordinated
with the Owner and MEP.
Comment Number: 2 Comment Originated: 01/13/2014
01/13/2014:
Page 6 of 10
Primary power runs along both the south and east sides of the property and will need to be either relocated or
protected in place.
Response: Noted on the Demolition plan.
Comment Number: 3 Comment Originated: 01/13/2014
01/13/2014:
There is an existing 10' x 10' x 8' concrete electrical box on the NE corner of the lot that will need to be protected
in place.
Response: Noted on the Demolition plan.
Comment Number: 4 Comment Originated: 01/13/2014
01/13/2014:
Normal development charges will apply with credit given for the existing service capacity
Response: Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: 2012 IFC CODE ADOPTION
Be advised, the Poudre Fire Authority and the City of Fort Collins are currently in the process of reviewing the
2012 International Fire Code in preparation for its adoption in 2014. Building plan reviews shall be subject to the
adopted version of the fire code in place at the time of plan review submittal and permit application.
Response: Acknowledged.
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: AUTOMATIC FIRE SPRINKLER SYSTEM
This building will require an automatic fire sprinkler system under a separate permit. Fire Department
Connections shall be installed in accordance with NFPA standards. Fire department connections shall be located
on the street side of buildings, fully visible and recognizable from the street or nearest point of fire department
vehicle access. The location of the FDC shall be approved by the fire department.
Poudre Fire Authority requires at least one key box ("Knox Box") to be mounted in approved location(s) on every
new building equipped with a required fire sprinkler or fire alarm system. The top shall not be higher than 6 feet
above finished floor.
GROUP S-2 AUTOMATIC SPRINKLER SYSTEM REQUIREMENTS
06IFC 903.2.9 & 903.2.9.1: An automatic sprinkler system shall be provided throughout buildings classified as
enclosed parking garages (Group S-2 occupancy) in accordance with IBC 406.4 OR where located beneath other
groups.
Response: Acknowledged.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: FIRE STANDPIPE SYSTEM
06IFC Sections 905 and 913: Standpipe systems shall be provided in new buildings and structures in accordance
with Section 905 or the 2006 International Fire Code. Approved standpipe systems shall be installed throughout
buildings where the floor level of the highest story is located more than 30 feet above the lowest level of fire
department vehicle access, or where the floor level of the lowest story is located more than 30 feet below the
highest level of fire department vehicle access. The standpipe system shall be capable of supplying at minimum
of 100 psi to the top habitable floor. An approve fire pump may be required to achieve this minimum pressure.
Response: Acknowledged.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: ROOF ACCESS
06IFC 504.3: New buildings four or more stories in height shall be provided with a stairway to the roof. Stairway
Page 7 of 10
access to the roof shall be in accordance with IFC 1009.12. Such stairways shall be marked at street and floor
levels with a sign indicating that the stairway continues to the roof.
Response: Acknowledged.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM
New buildings greater than 50,000 square feet will require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be
used to define separate buildings. Where adequate radio coverage cannot be established within a building,
public-safety radio amplification systems shall be designed and installed in accordance with criteria established
by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01
Response: Acknowledged.
Department: Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: It appears the entire site is impervious now so that needs to be documented in the drainage study.
When a site is completely redeveloped (scraped) the standard requirement is to provide onsite detention with a 2
year historic release rate for water quantity. However in this case we probably can allow a variance if the site has
been paying fees for a higher imperviousness. Please contact Jean Pakech at 221- 6375 to determine the
present Stormwater fees and runoff coefficient category.
Response: The site is impervious and will remain impervious with the proposed development. Additional LID
measures will be implemented to improve on site and off site water quality.
Comment Number: 2 Comment Originated: 01/14/2014 01/14/2014: A drainage report, erosion control
report, and construction plans are required and they must be prepared by a Professional Engineer registered in
Colorado. The drainage report must address the four-step process for selecting structural BMPs. Standard
operating procedures (SOPs) for all onsite drainage facilities need to be prepared by the drainage engineer and
there is a final site inspection required when the project is complete and the maintenance is handed over to an
HOA or another maintenance organization. The erosion control report requirements are in the Fort Collins
Stormwater Manual, Section 1.3.3, Volume 3, Chapter 7 of the Fort Collins Amendments. If you need
clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or
jschlam@fcgov.com.
Response: A Drainage and Erosion Control is provided for review and discussed SOP and BMP’s.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: Water quality treatment for 50% of the site is provided for in the Udall Natural Area water treatment
facility. However additional onsite water quality treatment is encouraged as described in the Fort Collins
Stormwater Manual, Volume 3 - Best Management Practices (BMPs). Extended detention is the usual method
selected for water quality treatment; however the use of any of the BMPs is encouraged.
(http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regul
ations/stormwater-criteria)
Response: There is no available space for detention. BMPs will be used during construction and water quality
treatment with rain gardens and porous pavers.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: Low Impact Development (LID) requirements went into effect March 11, 2013. These require a
higher degree of water quality treatment for 50% of the new impervious area and 25% of new paved areas must
be pervious. Please contact Basil Hamdan at 224-6035 or bhamdan@fcgov.com for more information. There is
also more information on the EPA web site at:
http://water.epa.gov/polwaste/green/bbfs.cfm?goback=.gde_4605732_member_219392996.
LID design information can be found on the City's web site at: http://www.fcgov.com/utilities/business/builders-
and-developers/development-forms-guidelines-regulat ions/stormwater-criteria.
We suggest the small parking along the alley be in porous pavers and rain gardens in the ROW similar to what
was done across the street at Mitchel Block to meet this criteria. The rain gardens would have to be approved by
the Engeering Department. Another option is a green roof. Basil will work with you to meet this requirement to
Page 8 of 10
the maximum extent practicable.
Response: Rain gardens and porous pavers will be used. No parking is provided in the alley. Only several
covered spaces which would not benefit from the use of pavers.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: There is a storm drain in Mathews that would work to drain the porous pavers. It could tie into the
inlet at the corner of Mathews and Mountain or a manhole could be added to tie into the storm drain anywhere you
wanted to.
Response: Roof Drainage and the under drains from the rain garden and porous pavers will connect to existing
inlets in the streets.
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: The city wide Stormwater development fee (PIF) is $7,817/acre ($0.1795 sq.-ft.) for new impervious
area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.-ft.) review fee. No fee is charged for existing
impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be
found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-
development-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control
escrow required before the Development Construction permit is issued. The amount of the escrow is determined
by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in
accordance with the Fort Collins Stormwater Manual.
Response: The Erosion Escrow amount has been calculated and included in the Drainage and Erosion Control
Report.
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014: The design of this site must conform to the drainage basin design of the Old Town Master Drainage
Plan as well the Fort Collins Stormwater Manual.
Response: Acknowledged.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/13/2014
01/13/2014: No comments.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: General
Comment Number: 2 Comment Originated: 01/15/2014
01/15/2014: Project needs to look at exiting (northbound) sight distance issues at the alley and the sidewalk on
Mountain.
Response: Acknowledged, Sight distances and plantings will be reviewed.
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: A Traffic Impact Study will be required. Please have the project Traffic Engineer contact Ward
Stanford (970-221-6820) to schedule a scoping session.
Response: Acknowledged, TIS is provided.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/14/2014
01/14/2014: Existing water mains and sanitary sewers in this area include an 8-inch water main and a 12-inch
sewer in Mountain, a 4-inch water main and a 10-inch sewer in Mathews, a 6-inch sewer in an easement near the
west property line of this site and an 8-inch sewer in the alley to the south.
Response: Acknowledged, these are labeled on utility plans as applicable to connection points.
Page 9 of 10
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: The existing water service to the site is a 1-inch service connecting to the water main in Mountain.
Response: This service is to be determined if it will be used or abandoned.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: The water conservation standards for landscape and irrigation will apply. Information on these
requirements can be found at: http://www.fcgov.com/standards
Response: Acknowledged
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: Development fees and water rights will be due at building permit. Credit will be given for the existing
services for which accounts have been established.
Response: Acknowledged
Comment Number: 5 Comment Originated: 01/16/2014
01/16/2014: A grease interceptor will be required for all restaurant uses within the project.
Response: A grease interceptor is included in the utility plans.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom,@fcgov.com Topic: Building Elevations
Comment Number: 6 Comment Originated: 01/14/2014
01/14/2014: The maximum building height allowed is 56 feet. It appears as though there is an enclosed
mechanical structure on the roof which would be included in the overall height calculation if the area is more than
5% of the horizontal surface area of the roof (3.8.17(C)(2)
Response: Per 4.16(D)(2)(c) for the Downtown district the penthouse shall not exceed one-third of the floor area
of the floor below.
Topic: General
Comment Number: 7 Comment Originated: 01/14/2014
01/14/2014:
LUC 4.16(B) Restaurant, retail and office are all basic development reviews in the Old City Center sub district of
the D zone.
Response: The project is being submitted as a BDR.
Comment Number: 8 Comment Originated: 01/15/2014
01/15/2014: The signs shown on the elevations would not meet our sign code. Please see LUC 3.8.7 for more
information.
Response: The signage for this project as shown when this project was reviewed were not intended to shown
proposed design and only shown to demonstrate potential locations and an overall schematic design scheme.
LUC 3.8.7 will be followed when developing building signage. All other tenant signage will be designed and
reviewed to meet this section when tenants are acquired.
Topic: Site Plan
Comment Number: 2 Comment Originated: 01/14/2014
01/14/2014: 3.2.2(C)(4)(b) Minimum bicycle parking is 1 space/4000 sq.ft. 20% of those being enclosed and 80 %
fixed rakes.
Response: The required number of bike parking spots is provided on the site plan.
Comment Number: 3 Comment Originated: 01/14/2014
01/14/2014: If you are only proposing 6 parking spaces you are well under the maximum allowable for these
uses. See table in 3.2.2(K)(2)(a) for more information.
One of these parking spaces would need to be handicap van-accessible space. LUC 3.2.2(K)(5)
Response: The parking counts and distribution are indicated on the site plan.
Comment Number: 4 Comment Originated: 01/14/2014
01/14/2014: LUC 3.2.2(M) 6% interior parking lot landscaping will be required if there is 6 or more parking spaces
AND at least 1800 SQFT of parking including the loading zone.
Page 10 of 10
Response: The interior parking area does not meet the size requirement to require landscaping.
Comment Number: 5 Comment Originated: 01/14/2014
01/14/2014: LUC 3.2.5 All development, to the extent reasonably feasible, shall provide adequately sized
conveniently located, accessible trash and recycling enclosures.01/14/2014:
Response: Trash and recycling bins are located within the building footprint with access from the alley at the
south west corner of the building.
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com Topic: General
Comment Number: 1 Comment Originated: 01/08/2014
01/08/2014: Item 'K' in the applicant's narrative suggests that a setback variance might be requested for the
required 4th floor setback, and mentions a variance to that standard having been granted previously for the
Mitchell Block development across the street. A variance was approved in 2008 for the Mitchell Block building
and the minutes and staff report for that variance are attached.
Response: No variance is being requested.