HomeMy WebLinkAbout221 E. MOUNTAIN AVENUE - BASIC DEVELOPMENT REVIEW - BDR160011 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFinal Drainage and Erosion Control
Report for
221 East Mountain Avenue
Fort Collins, Colorado
May 3, 2016
May 3, 2016
Mr. Wes Lamarque
City of Fort Collins
Water Utilities--Storm water
700 Wood Street
Fort Collins, Colorado 80521
RE: Final Drainage and Erosion Control Report for the 221 East Mountain Avenue Project
Dear Wes:
We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion
Control Report for the 221 East Mountain Avenue Project. All computations within this report have
been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Respectfully,
Aspen Engineering
Prepared by: Reviewed by:
Tony Willkomm, P.E. John Gooch, P.E.
Senior Project Engineer Principal
TABLE OF CONTENTS
DESCRIPTION PAGE
I. GENERAL LOCATION AND DESCRIPTION 5
A. LOCATION 5
B. DESCRIPTION OF PROPERTY 5
II. DRAINAGE BASINS 6
A. MAJOR BASIN DESCRIPTION 6
B. EXISTING SUB-BASIN DESCRIPTION 6
III. DRAINAGE DESIGN CRITERIA 7
A. REGULATIONS 7
B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 7
C. HYDROLOGIC CRITERIA 7
D. HYDRAULIC CRITERIA 8
E. VARIANCE 8
IV. DRAINAGE FACILITY DESIGN 8
A. GENERAL CONCEPT 8
B. SPECIFIC DETAILS 9
C. DETENTION POND 11
D. STREET CAPACITIES 11
V. STORM WATER QUALITY 12
A. GENERAL CONCEPT 12
B. SPECIFIC DETAILS 12
VI. EROSION CONTROL 13
A. GENERAL CONCEPT 13
VII. CONCLUSIONS 13
A. COMPLIANCE WITH STANDARDS 13
B. DRAINAGE CONCEPT 14
C. STORM WATER QUALITY 14
D. EROSION CONTROL CONCEPT 14
E. EROSION CONTROL ESCROW ESTIMATE 14
REFERENCES 15
APPENDIX
PAGE
VICINITY MAP A
RATIONAL METHOD HYDROLOGY B
LID BASIN SIZING CALCULATIONS C
CURB CUT & STORM PIPE SIZING D
EROSION CONTROL ESCROW E
PROPOSED DRAINAGE BASIN MAP & EXISTING DRAINAGE BASIN MAP F
5
FINAL DRAINAGE
AND EROSION CONTROL REPORT
FOR 221 EAST MOUNTAIN AVENUE
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The 221 East Mountain Avenue Project (referred to as “221 Mountain” here-forward)
is bounded to the north by Mountain Avenue, to the east by Mathews Street, to the
south by a public alley and neighboring apartment building, and to the west by a
multi-story public parking structure.
The project site can also be described as situated in the northwest quarter of Section
12, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of
Larimer, Colorado. 221 Mountain site is currently occupied by a vacant building,
(formerly Mountain View Tire Center) with a paved parking lot. The proposed use
will be a four story office building surrounded by paved sidewalk, landscape features
and improvements to the public alley, south of the lot. Proposed improvements are
planned to occur over entire lot area of approximately 0.45 acres.
B. Description of Property
The 221 Mountain site is comprised of a four story building with enhanced sidewalks
and landscape improvements along the East Mountain Avenue frontage and Mathews
Street frontage. The public alley will be reconstructed with a center trickle pan and
outfall curb and gutter along the north and south sides of the alley.
Currently, the 221 Mountain site is occupied by an existing brick building with a
north driveway access on E. Mountain Ave and an east driveway access on Mathews
Street. The entire lot area around the building is paved with asphalt and concrete.
The space between the west side of the building and the public parking structure is
surfaced in gravel. The public alley south of the lot is asphalt paved.
The existing parking lot slopes north and east away from the building at slopes of
approximately 1% and 3%. A concrete curb is constructed along the south and east
sides of the lot. Drainage is released at an opening near the northeast corner of the
lot, at the east driveway access on Mathews Street and at the North driveway access
on Mountain Avenue. The off-site, gravel surfaced area west of the building drains
6
from the south to north and drains across the existing sidewalk to curb and gutter on
E. East Mountain Avenue.
II. DRAINAGE BASINS
A. Major Basin Description
The 221 Mountain site lies within the City of Fort Collins Old Town Basin. The
proposed development will be evaluated to determine the change in imperviousness
between existing and proposed conditions, while also providing LID and BMP’s for
the proposed development for any additional impervious areas, added by the
proposed development.
B. Existing Sub-Basin Description
The existing 221 Mountain site is comprised of two basins: EX-1 and EX-2. EX-1
comprises the existing building majority of the parking lot area to the east.
Existing basin EX-1 contains approximately 0.40 acres with a calculated 'c' value of
0.95. Existing runoff from the basin EX-1 is comprised of the concrete and asphalt
parking lot and the building roof area which is discharged to the paved surface via a
roof drain on the east face of the building. Runoff generally flows east through the
driveway access and northeast to a parking lot curb opening at the north end of the
lot. Flow drains over existing sidewalk and enters the curb and gutter in Mathews
Street. Drainage in Mathews Street flows north to enter an existing 12-ft
combination inlet.
Existing Basin EX-2 contains approximately 0.04 acres with a calculated ‘c’-value of
0.95. The basin is comprised of concrete and asphalt parking along the north face of
the existing building. Runoff drains north over existing sidewalk and through the
existing driveway access to the flowline in Mountain Avenue. Flow is conveyed east
in the curb and gutter to an existing 20-ft Type R inlet.
The existing Basin EX-3 is the off-site area comprised of the public alley and half the
right-of-way of Mathews Street. The alley drains east to the flowline of Mathews
Street, then north to the existing 12’ combination inlet. The basin is comprised of the
asphalt alley, asphalt street, concrete sidewalk and curb and gutter, and grass
landscaping between the curb and sidewalk. Basin EX-3 has an existing ‘c’ value of
0.88.
It should be noted that Basin EX-3 is existing public right-of-way and therefore
outside the limits of the site. The majority of the site runoff currently is discharged
7
through paved areas with no treatment for water quality. Minimal filtering may occur
in minor events were flow from the curb opening at the northeast corner of the lot
passes over grass area between the curb and sidewalk before entering the 12-ft
combination inlet.
Please see the Existing Drainage Exhibit attached for the existing basin limits and the
delineated pervious areas.
III. DRAINAGE DESIGN CRITERIA
A. Regulations
Under the existing fully developed conditions the site is 100% impervious and the
proposed developed condition will also be impervious within the property boundary.
The site is allowed to release un-detained, as occurs currently under the existing
condition. It was noted by the Stormwater Department the water quality treatment
for 50% of the site is treated by the Udall Natural Area water treatment facility.
However, additional LID improvements and BMP’s will be implemented to provide
for treatment of storm water runoff for the subject site. Please see the LID
calculations in Appendix C.
B. Development Criteria Reference and Constraints
The criteria and constraints from the City of Fort Collins will be met.
C. Hydrologic Criteria
The Rational Method for determining surface runoff was used for the project site.
The 2-year and 100-year storm event intensities were used in calculating runoff
values.
The City of Fort Collins intensity duration frequency curves were used to obtain
rainfall data for each storm specified. Detention pond sizing is not required as the
impervious area has been decreased with the proposed development. However,
additional water quality for the subject site is being provided through the utilization
of BMP and LID measures being incorporated into the proposed drainage
development plan. Please refer to Appendix C for specific details and calculation.
8
D. Hydraulic Criteria
All hydraulic calculations, including final calculations and sizing for curb cuts, and
erosion control have been provided in accordance with the City of Fort Collins
Drainage Criteria and can be found in the Appendix.
E. Variance
No variances are being requested for this project.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
Three drainage basins will provide conveyance of drainage for the 0.45 acre site. The
majority of the site will occupied by the proposed building which will drain runoff to
three roof drain locations, one to the north and two to the east. A relatively small area
of sidewalk between the building and the property boundary will sheet flow north and
east of the building. The runoff from the hardscape on site and within the right-of-
way will sheet flow to the respective street flowline in Mountain Avenue and
Mathews Street then drain to the existing inlets on each respective street.
The runoff from approximately 48% of the building will be treated using rain gardens
for LID treatment. The north roof drain will be piped underground and connect to the
existing Type R inlet in Mountain Avenue. The north roof drain along the east face of
the building will be piped to the existing combination inlet in Mathews Street. Roof
drain overflow will enter a chase and drain to a rain garden for water quality
treatment. The south roof drain, along the east side, will discharge all roof runoff to
a proposed concrete chase and discharge to a rain garden for water quality treatment.
Overflow scuppers at both east side roof drains will drain to chases which enter the
rain gardens. Excess overflow from the rain gardens will drain in the concrete chases
to the flowline of Mathews Street.
Site runoff and right-of-way runoff will be treated, prior to entering the storm sewer,
through the utilization of the proposed rain gardens and porous pavers with
underdrain system for LID measures. The existing parking spaces on Mountain
Avenue will be reconstructed with porous pavers to treat runoff from the north
frontage of the building and the east bound lanes of the existing Mountain Avenue
along the lot frontage.
The proposed storm sewer pipe, chases, and erosion control measures have been
sized and calculations are provided in the Appendices.
9
In comparing existing conditions to proposed conditions for the subject site, the c-
values are 0.95 and 0.95, respectively. The imperviousness for existing conditions is
96%, compared to the 91% for proposed conditions. Therefore, there is a net
decrease in impervious area for the development. Exhibits are provided in Appendix
F showing the existing and proposed basin areas, and drainage patterns.
The public alley south of the lot will be reconstructed with curb and gutter outfall
curbs and a 4-ft concrete drainage pan in the centerline of the alley. Alley runoff will
drain east to the flowline of Mathews Street then north to the existing combination
inlet. It should be noted that a long narrow paved section between the building and
the back of curb, approximately 200 SF, will sheet flow to the alley. This area will
not be able to be captured or redirected away from the alley due to grading restraints.
The alley impervious area will remain the same as the existing condition.
The rain garden LID measures, shown and called out in the plans, are anticipated to
provide for approximately 1 foot of ponding depth, prior to overflowing to concrete
chases and discharging to the Mathews Street. A 4-inch PVC underdrain will
connect the rain garden areas to a proposed 12” HDPE storm sewer that will
discharge to the existing storm sewer inlet. Runoff from hardscaping along the north
side of Basin 1 and Basin 3 will drain to porous pavers located in Mountain Avenue.
The hardscape areas along the east side of the building that are upstream of the rain
gardens, will sheet flow to the rain gardens. Please refer to sheets C-013 of the civil
utility plans for details on the porous paver areas. Rain garden details and the roof
drain chases will be provided on the Landscape plans.
B. Specific Details
Basins 1
Basin 1 conveys runoff from approximately 80% of the north half of the roof, to a
roof drain located near the northeast corner of the building. The building roof drain
will connect to a proposed 12” HDPE storm pipe and discharge to the existing 20’
Type R inlet in Mountain Avenue. The hardscape between the building and the north
property boundary was included with Basin 1 to simplify the basin delineation. This
will slightly increase the design flow calculated for the roof area. The hardscape area
north of the building will sheet flow to the flowline of Mountain Avenue then flow
east to the existing Type R inlet. It should be noted that the site flow will combine
with runoff in the right-of-way. Runoff will sheet over the proposed LID/porous
pavers before entering the storm sewer system.
Basin 2
Basins 2 will convey runoff from the south half of the building to a roof drain at the
east side of the building. Flow will discharge to a proposed 20” wide concrete
sidewalk chase then drain into a rain garden through a side opening in the chase.
When the garden is inundated, overflow from the rain garden will drain back to the
10
chase then drain to the flowline in Mathews Street, flow north in the curb and gutter,
and discharge to the existing 12-ft combination inlet as historically occurs.
The hardscape between the building and the north property boundary was included
with Basin 2 to simplify the basin delineation. This will slightly increase the design
flow calculated for the roof area. The hardscape area east of the building and west of
the rain garden, will sheet flow to the rain garden. The balance of the hardscape will
sheet flow to the flowline of Mathews Street then flow north to the existing 12-ft
combination inlet as historically occurs.
Basin 3
Basin 3 will convey runoff from the eastern most 20% of the north half the building.
The roof runoff will be conveyed to a roof drain at the east side of the building. The
roof drain will connect to a proposed 12” HDPE storm sewer and discharge to the
existing 12-ft combination inlet in Mathews Street. Overflow from the roof drain
will discharge from a scupper into a proposed 20” wide, concrete sidewalk chase.
Flow from the chase will drain into a rain garden through a side opening in the chase.
When the garden is inundated, overflow from the chase will drain back to the chase
and drain to the flowline in Mathews Street. Runoff will flow north in the curb and
gutter, then discharge to the existing 12-ft combination inlet as historically occurs.
The hardscape area between the building and the property boundary was included
with Basin 3 to simplify the basin delineation. This will slightly increase the design
flow calculated for the roof area. The hardscape area north of the building will sheet
flow to the flowline of Mountain Avenue and flow east to the existing Type R inlet.
The hardscape area east of the building and west of the rain garden, will sheet flow to
the rain garden. The balance of the hardscape area will sheet flow to the flowline of
Mathews Street then flow north to the existing 12-ft combination inlet as historically
occurs.
It’s important to note that because the proposed development is decreasing
imperviousness, and there is limited available space, the runoff LID measures are
placed within the right-of-way of Mountain Avenue and Mathews Street. The
proposed rain garden and porous paver LID measures will increase the treated
impervious area and provide additional water quality for runoff from site Basins 1, 2
and 3, which does not historically occur.
Basin OS-1
The off-site Basin OS-1 will convey runoff from the public alley in a proposed 4’
wide, concrete trickle pan and discharge to the flowline of Mathews Street. Flow
will drain north to the existing inlet on Mathews Street as historically occurs. The
existing paved alley will be removed and replaced with outfall curb and gutter on the
north and south sides of the alley and asphalt pavement to the trickle pan in the center
11
of the alley. The basin characteristic for ‘c’ value and imperviousness remain the
same as the existing condition.
Basin OS-2
The off-site Basin OS-2 will convey runoff from the opening between the proposed
building and the existing public parking structure to the west. This area is currently
gravel surfaced and will remain a gravel surface after construction. This basin drains
from south to north. Excess runoff from the basin will flow over the existing
sidewalk along Mountain Avenue, enter the existing curb and gutter and drain to the
existing Type R inlet in Mountain Avenue as historically occurs. The basin
characteristics for ‘c’ value and imperviousness remain the same as the existing
condition.
Overflow Conditions
Basins 1
Should the roof drain plug in Basin 1 an overflow drain will discharge to a scupper
and flow on the surface to the flowline of Mountain Avenue and enter the existing
Type R inlet. If the inlet clogs, water will pond up to the crest of the intersection and
flow east in Mountain Avenue.
Basins 2-3
Should the roof drains clog within basins 2 and 3 flow will drain to the concrete
chases and drain to the rain garden which will overflow to the flowline of Mathews
Street. If the inlet clogs, water will pond up to the crest of the intersection and flow
east in Mountain Avenue.
C. Detention Pond
The site imperviousness will be decreased with the proposed improvements and will
not require detention. The addition of LID and BMP measures will be implemented
to improve the water quality of runoff.
Proposed and existing impervious area will flow overland across porous pavers in the
north parking spaces on Mountain Avenue. Runoff from hardscape area north of the
proposed building will combine with off-site runoff and receive treatment by the
porous pavers. East of the proposed building, runoff will be directed to rain gardens.
These measures will be provided to enhance water quality of on-site and off-site
runoff which does not historically occur.
D. Street Capacities
The street capacity calculations are not required for the subject site, as no new public
street construction will be built with this project and the impervious area has been
12
reduced by this development. However, curb cut capacities have been analyzed and
calculations provided in the Appendices of this report.
V. STORM WATER QUALITY
A. General Concept
The water quality of stormwater runoff must be addressed on all final design utility
plans. Therefore, Best Management Practices for the treatment of stormwater runoff
for the subject site will include rain gardens and porous pavers. In addition to the site
BMP’s, water quality treatment for 50% of the site is treated by the Udall Natural
Area water treatment facility. These water quality features will provide a mechanism
for pollutants to settle out of the stormwater runoff before flows are directed off site
ultimately discharging to the Cache La Poudre River, as historically occurs.
B. Specific Details
Best Management Practices (BMP) for the treatment of storm water runoff has been
incorporated into the final design for this project.
LID measures are provided for through the conveyance of approximately 0.21 acres
(of the 0.45 acre total site area) through the rain garden which accounts for 47% of
the total site. This is considering only Basin 2, since Basin 3 roof drainage will treat
only the overflow runoff.
The hardscape north of the building, 1,254 square feet of area (6.4% of the total site)
is being conveyed to the porous paver LID in Mountain Avenue. A total of 53% of
the total site area is treated, thus exceeding the City’s LID treatment of 50% of new
impervious area. It’s important to note that because the area being routed over and
through the rain garden and porous pavers exceeds the 50% requirement for LID
treatment, and because imperviousness for the overall site has been reduced by the
proposed development, the project exceeds that normally required for water quality
and LID treatment. This treatment is beyond that already being provided for 50% of
the site by the Udall Natural Area water treatment facility.
Please refer to sheet C-013 of the civil utility plans, for details on the porous pavers.
13
VI. EROSION CONTROL
A. General Concept
The potential exists for erosion problems during construction, but should be minimal
after completion of proposed development. Silt fence will be installed along the
north and east sides of the site to prevent sediment from leaving the site. Where silt
fence is shown to cross hard surface areas, gravel inlet socks shall be utilized for
these areas, as may be applicable during construction. A tracking pad will also be
placed in the alley access at Mathews Street, gravel inlet filters will be placed at
existing storm inlets and at the proposed sidewalk chases to mitigate the build-up of
sediment and transport of debris into existing streets and downstream systems.
VII. CONCLUSIONS
A. Compliance with Standards
All computations within this report have been completed in compliance with the City
of Fort Collins Storm Drainage Design Criteria.
The City of Fort Collins Stormwater Utility will not maintain the on-site storm
drainage facilities within the subject site. The owners of the subject site will
maintain their on-site storm drainage facilities on a regular basis. The following shall
be implemented for the private stormwater improvements’ operations/ maintenance
procedures for the project on an annual or bi-annual basis:
1) Storm Sewer Inlets, pipes, curb cuts and concrete sidewalk culverts/chases,
structures, manholes, and the water quality/ outlet control structures (as
applicable) shall be cleaned through the removal of debris and sediment from
the associated items to allow for adequate drainage through the site to the
proposed detention facility (as may be applicable) or downstream systems
2) Sedimentation/ silting shall be removed to allow for adequate drainage along
the bottom of the swales and LID/ porous landscape detention basins. Grass
scrubbing along the bottom of the LID/ porous landscape detention basins
may be required to remove sediment and promote grass growth.
3) Re-vegetation through the use of Natural Seeding/ Sod shall be provided for
disturbed areas and other permanent erosion controls shall be provided for
areas where erosion has taken place and requires remediation back to the
proposed condition shown in the plans
14
The Stormwater Operating/ Maintenance Procedures listed above are guidelines to
the minimum procedures that shall be implemented for the site, with these and
additional measures being utilized on an as-needed basis.
B. Drainage Concept
The proposed drainage concepts presented in this study and shown on the utility
plans adequately provide for the transmission of developed on-site runoff to rain
garden LID’s and porous pavers and to adjacent streets and existing and proposed
storm sewer systems. The proposed roof drains will flow by surface and storm sewer
systems which will connect to the existing, storm inlets in Mountain Avenue and
Mathews Street. The proposed storm sewer will provide for the 100-year developed
flows to be conveyed to existing storm systems, while increasing water quality for the
overall site.
If groundwater is encountered at the time of construction, a Colorado Department of
Health Construction Dewatering Permit will be required.
C. Storm Water Quality
The final design has addressed the water quality aspect of stormwater runoff. The
rain garden LID and porous pavers with underdrain systems for the proposed
measures provide for additional water quality and treatment of runoff, prior to flows
being directed downstream.
D. Erosion Control Concept
Proposed erosion control concepts have been provided for and adequately provide for
the control of wind and rainfall erosion from the proposed development. Through the
construction of the proposed erosion control concepts, the City of Fort Collins
performance standards will be met. The proposed erosion control concepts presented
in this report and shown on the erosion control plan are in compliance with the City
of Fort Collins Erosion Control Criteria.
Erosion Control Escrow Estimate
The Erosion Control Escrow Estimate for the subject property is approximately
$5,141. Please refer to Appendix E for this calculation.
15
VIII. REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins,
Colorado, May 1984, Revised January 1997, & Associated UDFCD Updates and New City
of Fort Collins Stormwater Criteria manual, adopted January, 2012.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991, Revised January 1997, & Associated UDFCD Updates and New
City of Fort Collins Stormwater Criteria manual, adopted January, 2012.
3. Urban Storm Drainage Criteria Manual Volume 1; Urban Drainage and Flood Control
District, Denver, Colorado, March, 1969.
4. Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood Control
District, Denver, Colorado, March, 1969.
5. Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices; Urban
Drainage and Flood Control District, Denver, Colorado, September, 1999.
16
APPENDIX
17
APPENDIX A
VICINITY MAP
18
APPENDIX B
RATIONAL METHOD
HYDROLOGY
19
APPENDIX C
LID BASIN SIZING
CALCULATIONS
20
APPENDIX D
CURB CUT
& STORM PIPE SIZING
21
APPENDIX E
EROSION CONTROL
&
EROSION ESCROW
22
APPENDIX F
PROPOSED DRAINAGE BASIN MAP
&
EXISTING DRAINAGE BASIN MAP